A line burying device for civil engineering construction

CN224384919UActive Publication Date: 2026-06-19GUIZHOU CONSTR ENG SOUTHWEST CONSTR CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
GUIZHOU CONSTR ENG SOUTHWEST CONSTR CO LTD
Filing Date
2025-07-10
Publication Date
2026-06-19

AI Technical Summary

Technical Problem

Existing buried cable installation devices for civil engineering construction require manual placement of cables during cable laying, which is inconvenient and lacks a flattening function, resulting in cables being easily exposed and affecting their service life.

Method used

The cable routing mechanism includes a servo motor-driven take-up frame, pressing rollers, and casters. With the help of spring thrust, the cable is automatically and neatly arranged in the cable tray. The neat arrangement of the cable and the movement of the device are achieved through the servo motor and adjusting screw.

Benefits of technology

This technology enables cables to be automatically and neatly arranged in the cable trays without manual placement during the cable laying process, thereby improving the service life of the cables and construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224384919U_ABST
    Figure CN224384919U_ABST
Patent Text Reader

Abstract

This utility model relates to the field of construction cable laying technology and provides a cable laying device for civil construction, including a frame (1) and a wiring mechanism (3) on the frame (1); the wiring mechanism (3) includes a mounting frame (31) fixed to the frame (1), a fixing plate (32) fixed to the side wall of the mounting frame (31), a connecting frame (33) passing through and sliding on the fixing plate (32), a moving plate (34) fixed to the lower end of the connecting frame (33), and two pressing rollers (35) rotatably connected to the lower end face of the moving plate (34). This utility model can neatly arrange the cable in the cable trough during the cable laying process without the need for manual placement of the cable.