Concrete pouring formwork for shear wall

CN224396047UActive Publication Date: 2026-06-23CHINA 19TH METALLURGICAL CORP

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
CHINA 19TH METALLURGICAL CORP
Filing Date
2025-07-28
Publication Date
2026-06-23

AI Technical Summary

Technical Problem

In the current process of pouring concrete for shear walls, excessive pouring height makes it difficult to guarantee the quality of the bottom concrete, which can easily lead to segregation, affecting compressive strength and construction quality.

Method used

A pouring notch is set on the concrete pouring formwork of the shear wall, and a rotatable baffle and baffle plate are provided. The pouring height is reduced by pouring in sections, and the notch is sealed by the weight of the baffle, so as to ensure that the concrete is evenly distributed.

Benefits of technology

Effective control of concrete segregation improves the quality of shear wall bottom pouring, ensures overall compressive strength, reduces formwork modifications, and improves construction quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224396047U_ABST
    Figure CN224396047U_ABST
Patent Text Reader

Abstract

The utility model relates to shear wall construction equipment field especially relates to a kind of shear wall concrete pouring formwork of effectively reducing the risk of segregation in shear wall concrete pouring process, including first template and second template, first template and second template are mutually parallel along vertical direction and are set, first template, second template and ground are enclosed to form pouring cavity, first template includes pouring gap, and pouring gap is communicated with pouring cavity and outside;Including baffle, the shape of the baffle is matched with the shape of pouring gap, and the baffle is rotatably arranged on the first template, and the baffle is rotated to realize the sealing or opening of pouring gap.The utility model is especially suitable for shear wall concrete pouring process.
Need to check novelty before this filing date? Find Prior Art