A steel construction fabricated building assembly

Through innovative design of the support frame and connecting components, the horizontal steel and support columns can be quickly connected, solving the problem of cumbersome operation in existing technologies and improving construction efficiency and safety.

CN224412794UActive Publication Date: 2026-06-26CHANGSHU FENGFAN POWER EQUIP

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
CHANGSHU FENGFAN POWER EQUIP
Filing Date
2025-05-29
Publication Date
2026-06-26

AI Technical Summary

Technical Problem

The existing prefabricated building components are cumbersome to connect horizontal steel to support columns, which increases the labor intensity of construction workers and affects construction efficiency.

Method used

The design employs a support frame, connecting components, and fixing components. It achieves quick connection through structures such as connecting blocks, slots, connecting boxes, and clamps, and uses springs and bolts to fix the transverse steel, avoiding prolonged lifting.

Benefits of technology

This enables rapid connection between the horizontal steel and the supporting columns, reducing construction time, lowering the labor intensity of construction workers, and improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224412794U_ABST
    Figure CN224412794U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of steel structure prefabricated building components, relate to building component technical field, including support frame and connecting component;Support frame: four corresponding support components are installed on side surface, four corresponding fastening components are installed in the inside of support frame;Connecting component: including connecting block, clamping slot, connecting box and connecting slot, four corresponding openings are set up in the side surface of support frame, connecting block is provided in the inside of the opening, four corresponding clamping slots are set up in the side surface of connecting block, connecting box is fixed in the side surface of connecting block located support frame outside, two corresponding connecting slots are set up in the side surface of connecting box, transverse steel component is clamped in the inside of connecting box, fixed component is installed on the upside of connecting box, fixed component is connected with support component, transverse steel and support column can be connected quickly, avoid long time to lift.
Need to check novelty before this filing date? Find Prior Art