A stealthy forklift robot

By setting up hangers of different heights in the lurking forklift robot, the problem of long hang-up time for the fork assembly was solved, enabling more efficient material handling and improving overall work efficiency.

CN224450217UActive Publication Date: 2026-07-03HANGZHOU HIKROBOT TECH CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
HANGZHOU HIKROBOT TECH CO LTD
Filing Date
2025-08-12
Publication Date
2026-07-03

AI Technical Summary

Technical Problem

The existing forklift robot has a long fork attachment time, which leads to a long preparation time for material handling and low overall work efficiency.

Method used

The design incorporates a lower first rack and a higher second rack, with fork-leg components hooked at different heights to reduce preparation time for cyclic material handling.

Benefits of technology

By setting up hangers at different heights, the preparation time for the fork-leg assembly to be hung from a low position to a high position and to be raised from a high position is shortened, thus improving overall work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224450217U_ABST
    Figure CN224450217U_ABST
Patent Text Reader

Abstract

This application provides a stealthy forklift robot, comprising: a mobile frame, a fork assembly, a first hanger, and a second hanger. The mobile frame has a fork receiving slot for accommodating the fork assembly. The first hanger is disposed within the fork receiving slot. The second hanger is disposed above the first hanger. When the fork assembly returns to the mobile frame empty, it is hooked onto the first hanger and located within the fork receiving slot. When the fork assembly returns to the mobile frame carrying material, it is hooked onto the second hanger. By setting the first and second hangers, the fork assembly can be hooked at two different heights during the picking and placing of goods, thereby reducing the preparation time for the entire material picking and placing cycle and improving overall work efficiency.
Need to check novelty before this filing date? Find Prior Art