A jacking device suitable for a concrete filled steel tube herringbone column frame

By using concrete pump trucks and one-way valve delivery pipes in the substation frame, combined with overflow/vent pipe connections, the complexity and high cost of constructing steel-concrete composite gable frame structures in substations were solved, achieving improvements in stability and economy.

CN224514760UActive Publication Date: 2026-07-17GANSU ELECTRIC POWER DESIGN INST +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
GANSU ELECTRIC POWER DESIGN INST
Filing Date
2025-08-05
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing technologies for concrete pouring methods used in bridge structures for steel-concrete composite gable columns are difficult to apply to substation frames, and suffer from problems such as complex construction, high cost, and insufficient stability.

Method used

A jacking device suitable for steel-concrete composite gable column structures was designed. It uses a concrete pump truck and a delivery pipe with a one-way valve, combined with an overflow/vent hole pipe. The construction is simplified by bolting, the welding process is reduced, and the one-way valve controls the concrete pumping process.

Benefits of technology

It improves the construction stability and economy of the substation A-frame structure, simplifies the construction process, reduces material waste and labor costs, and shortens the construction period.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224514760U_ABST
    Figure CN224514760U_ABST
Patent Text Reader

Abstract

A jacking device suitable for steel pipe concrete A-frame column frame, concrete delivery pipe with one-way inlet stop valve is installed perpendicularly to the A-frame column at the bottom of the A-frame column of the power transformation frame, and a plurality of overflow / vent hole connecting pipes are fixedly connected through the A-frame column, and the overflow / vent hole connecting pipes are communicated with the external overflow / vent hole pipes through bolt connectors; the one-way inlet stop valve comprises oppositely arranged A-frame column side connecting plates and grouting pipe side connecting plates, and has a cavity between the two and is integrally connected through bolts reserved on the respective bodies; a stop valve connecting plate is sealingly and slidingly installed in the cavity, a valve grouting hole is formed in the stop valve connecting plate, and the two ends of the stop valve connecting plate are fixedly connected with valve positioning plate I and valve positioning plate II respectively. The utility model optimizes the construction process, reduces the construction cost, and improves the stability and economy of the A-frame column frame construction of the power transformation station.
Need to check novelty before this filing date? Find Prior Art

Claims

1. A jacking device suitable for a concrete filled steel tube (CFST) X-braced frame, comprising a concrete pump truck, characterized in that, A concrete conveying pipe with a one-way stop valve is installed perpendicularly to the bottom of the A-frame column (4) of the substation frame. Several overflow / vent pipes (12) are fixedly connected to the lower side of the top of the A-frame column (4). The overflow / vent pipes (12) are connected to the overflow / vent pipe (13) of the outside through bolts (14). The one-way stop valve has the following structure: it includes a connecting plate (1) on the A-frame column side and a connecting plate (9) on the grouting pipe side, which are arranged opposite to each other. There is a cavity between the two and they are connected together by bolts through the bolt holes (2) reserved on their respective bodies. A stop valve is installed in the cavity in a sealed sliding manner. The connecting plate (10) has a valve grouting hole (7) on it. The two ends of the valve connecting plate (10) extending from the herringbone column side connecting plate (1) and the grouting pipe side connecting plate (9) are fixedly connected to the valve positioning plate I (5) and the valve positioning plate II (6) respectively. The two sides of the valve grouting hole (7) are respectively matched with the herringbone column side grouting pipe (3) and the pump truck side grouting pipe (8). The pump truck side grouting pipe (8) is connected to the concrete pump truck (15). The herringbone column side grouting pipe (3) and the pump truck side grouting pipe (8) are respectively fixedly connected to the herringbone column side connecting plate (1) and the grouting pipe side connecting plate (9).

2. The jacking device for a concrete-filled steel tube X-braced structure according to claim 1, wherein The length of the stop valve connecting plate (10) is twice that of the herringbone column side connecting plate (1) or the grouting pipe side connecting plate (9), and the center of the valve grouting hole (7) is located at the center of 1 / 4 of the total length of the stop valve connecting plate (10).

3. The jacking device for a concrete-filled steel tube X-braced structure according to claim 1, wherein The top of the A-frame column (4) of the substation structure is provided with several column head ventilation holes (11).