Combined unit stone material efficient hanging structure

By combining unit stone structures and pre-assembling main keel, steel adapters, waterproofing membranes, and aluminum adapters, the problem of high construction difficulty in stone installation is solved, achieving efficient, safe, and convenient construction results.

CN224565527UActive Publication Date: 2026-07-28SHANG HAI FU YI MU QIANG GONG CHENG YOU XIAN GONG SI
View PDF 1 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
SHANG HAI FU YI MU QIANG GONG CHENG YOU XIAN GONG SI
Filing Date
2025-07-04
Publication Date
2026-07-28

AI Technical Summary

Technical Problem

Existing stone installation methods are difficult to implement efficiently, safely, and conveniently, especially in the installation of stone curtain walls with combined patterns, where the construction is quite challenging.

Method used

The structure adopts a modular stone structure, including main keel, steel adapter, waterproof membrane, aluminum adapter and hanger. It is pre-assembled into a whole unit in the factory and quickly installed on site. It uses bolt assembly to form an efficient hanging system.

Benefits of technology

It achieves high efficiency, safety, and convenience in the construction of stone curtain walls, reducing construction difficulty and time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224565527U_ABST
    Figure CN224565527U_ABST
Patent Text Reader

Abstract

The utility model relates to a kind of combined unit stone high-efficiency hanging structure, for hanging combined unit stone (6), including main keel (1) fixed on main body structure, it is characterized in that, still include steel adapter (2), waterproof board (4), aluminium adapter (5), steel adapter (2) is fixed on main keel (1), and waterproof board (4), aluminium adapter (5) are sequentially connected by bolt assembly (3), and constitute hanging system;The combined unit stone (6) is connected hanging piece (8) by stone backplate keel (7), and hanging piece (8) is hung in aluminium adapter (5).The utility model realizes the efficient, safe, convenient performance of stone curtain wall construction, reduces construction difficulty.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the hanging technology of combined stone unit systems, and in particular to a high-efficiency hanging structure for combined stone units. Background Technology

[0002] Stone, as a natural decorative material, is frequently used in the exterior walls of many buildings. However, there are various installation methods for stone, including dry hanging and wet installation. A comprehensive comparison of these common methods reveals that achieving high efficiency and speed is difficult, especially for patterns using combinations of stone materials. Therefore, improving the safety, efficiency, and convenience of stone curtain wall installation has become a pressing issue for designers during the construction design process.

[0003] Invention patent CN202210393527.X relates to the field of building curtain wall technology, and provides a stone hanging component, system and stone curtain wall. The stone hanging component is a side-hanging type. The hanging parts for fixing the stone include a first hanging arm and a second hanging arm arranged opposite each other. The first hanging arm is fixed to the first side of the stone and the second hanging arm is fixed to the second side of the stone. Both the first hanging arm and the second hanging arm are fixedly connected to the profile. The first hanging arm is inserted into the slot on the profile and the second hanging arm is fixedly installed through the fixing slot on the profile. The stone is fixed from both sides by the two hanging arms. The installation process is visible and the installation structure is simple. It can realize the rapid hanging installation of narrow strip stone and is conducive to the construction of more complex curved stone curtain walls. Summary of the Invention

[0004] To address the aforementioned problems, the technical problem to be solved by this utility model is to provide a high-efficiency stone hanging structure for combined units, which, while ensuring architectural effect and meeting various performance requirements, achieves efficient, safe, and convenient construction of stone curtain walls, and reduces construction difficulty.

[0005] The technical problem of this utility model is solved by the following solution: a high-efficiency hanging structure for modular stone materials, used for hanging modular stone materials, including a main keel fixed to the main structure, a steel adapter, a waterproof board, and an aluminum adapter. The steel adapter is fixed to the main keel, and the waterproof board and the aluminum adapter are sequentially connected by bolt assemblies to form a hanging system. The modular stone materials are connected to the hanging brackets through the stone back panel keel, and the hanging brackets are hung on the aluminum adapters of the hanging system.

[0006] Furthermore, for ease of construction, the combined unit stone, stone back panel keel and hanging parts are an integral combined unit structure assembled in the factory.

[0007] Furthermore, the steel adapter is welded to the main keel according to the positioning dimensions, and after the bolt assembly is installed on the steel adapter, the waterproof plate is fixed to the steel keel, and the aluminum adapter is fixed with bolts.

[0008] Furthermore, the combined unit stones may have the same or different structures and dimensions.

[0009] The beneficial effects of this utility model are: it achieves high efficiency, safety and convenience in the construction of stone curtain walls, and reduces the difficulty of construction. Attached Figure Description

[0010] Figure 1 This is a front view schematic diagram of the present invention; Figure 2 This is a top view of the present invention; Figure 3 This is a side view of the present invention; Figure 4 This is a schematic diagram of the installation nodes of this utility model; Explanation of the labels in the diagram 1—Main keel; 2 – Steel adapter; 3 – Bolt assembly; 4 – Waterproof membrane; 5 – Aluminum adapter; 6 – Composite unit stone; 7 – Stone back panel keel; 8 - Pendant. Detailed Implementation

[0011] A high-efficiency hanging structure for modular stone cladding, such as Figures 1 to 4 As shown, the component used for mounting the modular stone 6 includes a main keel 1 fixed to the main structure, as well as a steel adapter 2, a waterproof board 4, and an aluminum adapter 5. The steel adapter 2 is fixed to the main keel 1, and the waterproof board 4 and the aluminum adapter 5 are sequentially connected by bolt assembly 3 to form a mounting system. The modular stone 6 is connected to the hanger 8 through the stone back plate keel 7, and the hanger 8 is hung on the aluminum adapter 5.

[0012] like Figures 1 to 3 As shown, first, the main keel 1 is fixed to the main structure according to its corresponding position. Then, the corresponding steel adapter 2 is welded to the steel keel 1 according to the positioning dimensions. Next, the bolt assembly 3 is installed on the steel adapter 2. Finally, the waterproof membrane 4 is fixed to the main keel 1. This ensures a good overall waterproof effect. The corresponding aluminum adapter 5 is then fixed using the installed bolt assembly 3. This completes the basic hanging system of the combined stone unit system. The factory-assembled combined stone units are then hung on the aluminum adapter 5 using the hangers 8. This improves the installation efficiency of the stone and makes it easier to guarantee the overall effect.

[0013] In this embodiment, the combined unit stone 6 is made of various sizes of stone, such as strip stones with sizes of 250mm*1500mm, 500mm*1500mm, 600mm*1500mm and 150mm*1500mm respectively; the stone back plate keel 7 is fixed into a whole frame by stainless steel screws, and the combined unit stone 6 of different sizes is fixed to the assembled stone back plate keel 7 by stone back bolts, so that it becomes a whole; the hanger 8 is fixed to both ends of the stone back plate keel 7 by bolts, thus completing the assembly of the entire stone unit.

[0014] In this embodiment, all profile processing and assembly are carried out in the factory, which can effectively ensure the processing dimensions and opening accuracy of the materials, and greatly improve the assembly effect after the stone is assembled.

[0015] In this embodiment, the combined unit stone 6 is composed of a variety of stones. Especially for some projects where the stone is small in size and has a wide variety of types, the stones can be assembled into units in the factory and then sent to the site for overall installation, which can greatly improve the installation progress, reduce the effective construction period, and improve work efficiency.

[0016] The construction method of this utility model is as follows: Figure 4 As shown: The steel main keel 1 is connected and positioned to the main building structure according to the theoretical dimensions. The steel adapter 2 is welded to the steel keel 1 according to the theoretical dimensions of the unit hanger 8. After the corresponding bolt assembly 3 is installed in place, the waterproof board 4 is fixed to the steel keel 1 to achieve the overall waterproof function. The aluminum adapter 5 is fixed according to the bolt positions on the bolt assembly 3. Thus, the adapter installation of the combined unit stone is completed. The combined unit stone 6, the stone back panel keel 7, and the hanger 8 are prefabricated units assembled in the factory. On-site, they are hoisted as a whole and hung on the aluminum adapter 5, thus completing the overall installation process.

Claims

1. A high-efficiency hanging structure for modular stone slabs (6), comprising a main keel (1) fixed to the main structure, characterized in that, It also includes a steel adapter (2), a waterproof board (4), and an aluminum adapter (5). The steel adapter (2) is fixed on the main keel (1), and the waterproof board (4) and the aluminum adapter (5) are connected in sequence by bolt assembly (3) to form a hanging system. The combined unit stone (6) is connected to the hanger (8) through the stone back plate keel (7), and the hanger (8) is hung on the aluminum adapter (5).

2. The high-efficiency stone hanging structure of the combined unit as described in claim 1, characterized in that, The combined unit stone (6) may have the same or different structures and sizes.

3. The high-efficiency stone hanging structure of the combined unit as described in claim 1 or 2, characterized in that, The combined unit stone (6), stone back panel keel (7) and hanging parts (8) are an integral combined unit structure.

4. The high-efficiency stone hanging structure of the combined unit as described in claim 3, characterized in that, The combined unit stone (6) consists of various sizes of stone; the stone back plate keel (7) is fixed into a whole frame by stainless steel screws, and the combined unit stone (6) of different sizes is fixed to the combined stone back plate keel (7) by stone back bolts, so that it becomes a whole; the hanging parts (8) are fixed to the two ends of the stone back plate keel (7) by bolts to form a whole stone unit.

5. The high-efficiency stone hanging structure of the combined unit as described in claim 1, characterized in that, The steel adapter (2) is welded to the main keel (1) according to the positioning dimensions. After the bolt assembly (3) is installed on the steel adapter (2), the waterproof plate (4) is fixed to the main keel (1), and the aluminum adapter (5) is fixed with the bolt assembly (3).