Concrete dispensing device

CN224693093UActive Publication Date: 2026-08-28NORTHWEST ENGINEERING CORPORATION LIMITED
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522152768.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-10-11
Publication Date
2026-08-28
Estimated Expiration
2035-10-11

AI Technical Summary

Technical Problem

[0003]目前,在建筑施工场地通常需要在场地搭设外架,现有的混凝土下料装置主要通过螺旋输送结构或者天泵将混凝土送到浇筑地点,搭设外架后虽然可以对混凝土下料装置进行支撑,但是也会导致空间受限,尤其是现场二次结构构造柱及围梁浇筑时,需要的混凝土浇筑量比较少,一方面受搭设外架的影响天泵等混凝土浇筑机械往往不能直接将混凝土泵送到浇筑地点,即使能送至浇筑地点也非常繁琐,另一方面运输少量的混凝土采用天泵等浇筑机械成本较高

Benefits of technology

本装置设置的下料结构用于运输混凝土的管道采用首尾为较硬的钢管,起到主要承载物料的作用,首尾钢管之间采用柔性的第二管连接,即第二管可进行弯折利用第二管材质的特性,便于作业人员牵引第二管转动、弯折至需要的位置,实现无死角浇筑,可用于将料斗内的混凝土物料运送至需要现场二次结构构造柱或圈梁混凝土浇筑的地点,本装置可有效解决现场浇筑条件受限以及一次浇筑量少使用天泵等大型设备浇筑不经济问题,不仅可将混凝土安全送至浇筑位置,同时可保证作业人员人身安全,节约成本。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224693093U_ABST
    Figure CN224693093U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, concretely relates to a concrete blanking device, include: the hopper has the feed port and the discharge gate, the blanking structure includes the baffle and the first pipe, the second pipe and the third pipe connected in proper order from the head to the tail, the first pipe and the third pipe are steel pipes, the second pipe is the flexible pipe, the first pipe end away from the second pipe with the discharge gate intercommunication, the baffle is hinged with the third pipe end away from the second pipe, the baffle is used for covering the third pipe, the utility model's advantage lies in that the pipeline of transporting concrete still has a section of flexible second pipe connection, can be bent, be convenient for operating personnel to pull the second pipe rotation, bend to the required position, realize the no dead angle pouring, the device can effectively solve the site pouring condition limited and the once pouring volume little use the large -scale equipment such as sky pump and pour uneconomical problem, can send the concrete to the pouring position safely, saves the cost simultaneously.
Need to check novelty before this filing date? Find Prior Art