A modular string converter booster integrated cabin
Through modular string design, each battery cluster is connected in series with the energy storage converter, AC in parallel and DC independently, which solves the bottleneck effect and inter-cluster circulating current problem of centralized energy storage compartments, improves system reliability and operation and maintenance efficiency, and reduces operation and maintenance costs.
Patent Information
- Application Number
- CN202522735048.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-24
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-24
AI Technical Summary
Existing centralized energy storage, converter, and booster modules suffer from the "weakest link" effect, inter-cluster circulation, and high operation and maintenance complexity, which affect system lifespan and operation and maintenance efficiency.
It adopts a modular string design, with each battery cluster connected in series with an energy storage converter. The AC side is connected in parallel, and the DC side is independent. It is equipped with inverter brackets, AC molded case switches and DC molded case switches, and is divided into transformer room, low voltage room and high voltage room, supporting single cluster management and fault isolation.
It avoids the barrel effect and inter-cluster circulation, improves system reliability and operation and maintenance efficiency, reduces the impact of single cluster failures on the system, supports single cluster operation and maintenance, and reduces operation and maintenance costs.
Smart Images

Figure CN224987330U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to an integrated converter and booster chamber, and more particularly to a modular string converter and booster chamber, belonging to the field of energy storage converter and booster chambers. Background Technology
[0002] An integrated energy storage converter and step-up transformer is a system used to achieve charge-to-voltage conversion and is a key integrated device in new power systems. It is an integrated device that combines the functions of an energy storage converter (PCS) and a voltage booster, typically designed in container form, for the efficient storage, conversion, and output of electrical energy. Its core function is to convert direct current (DC) to alternating current (AC) using converter technology, and simultaneously boost the voltage level to the required level for the grid or load using a transformer, meeting the power demands in different scenarios.
[0003] The core technology of the integrated energy storage, converter, and booster module lies in the coordinated control of converter and booster functions. The converter section employs bidirectional DC / AC conversion technology, enabling bidirectional flow of charging (energy storage) and discharging (power supply). The booster module uses transformers or power electronic devices to raise the voltage from low voltage (e.g., 400V DC) to medium or high voltage (e.g., 10kV / 35kV AC) to adapt to grid transmission or industrial load requirements. The equipment typically integrates monitoring units and protection devices to ensure safe and stable system operation.
[0004] In existing integrated booster module technologies, most are centralized booster modules. Centralized converter-booster modules integrate a centralized energy storage converter (PCS), a booster transformer, and an intelligent control cabinet into a single module. Centralized energy storage has long dominated the market due to its simple structure, low cost, and convenient operation and maintenance. However, as project scale expands, its limitations become apparent, mainly in the following aspects: 1) The barrel effect exists: all battery modules are connected in parallel, and the overall lifespan of the system depends on the weakest link, namely the battery module with the worst performance; 2) Inter-cluster circulating currents may occur. Different battery clusters have inconsistent discharge depths, leading to circulating currents and thus affecting charge and discharge efficiency. 3) High complexity of operation and maintenance: Once a failure occurs, professional personnel are usually required to go to the site for debugging and repair, which increases downtime and operation and maintenance costs. Utility Model Content
[0005] To address the shortcomings of the aforementioned technologies, this utility model provides a modular string converter booster integrated cabin.
[0006] To solve the above technical problems, the technical solution adopted by this utility model is: a modular string converter booster integrated cabin, including an energy storage cabin, an energy storage converter installed in the energy storage cabin, the energy storage converter is composed of multiple inverters, and each inverter is connected in series with each battery cluster. The energy storage compartment is equipped with multiple sets of inverter brackets along its length. Each set of inverter brackets is equipped with an inverter. The AC side and DC side of the inverter are respectively equipped with AC molded case switches and DC molded case switches. The energy storage compartment has a transformer room, a low-voltage room, and a high-voltage room arranged sequentially on one side.
[0007] Preferably, an AC / DC switch compartment is provided on the lower side of the inverter bracket, and both the AC molded case switch and the DC molded case switch are installed in the AC / DC switch compartment.
[0008] Preferably, the AC side of the energy storage converter is equipped with a main control switch, and multiple inverters are connected in parallel on the AC side and then connected to the main control switch.
[0009] Preferably, a cable tray is installed between the energy storage compartment and the transformer compartment, and the AC cable of the inverter is connected to the copper busbar of the transformer through the cable tray.
[0010] Preferably, the inverter is securely connected to the inverter bracket via a baffle.
[0011] Preferably, a step-up transformer is installed in the transformer room, and a cooling fan is installed on the top of the step-up transformer.
[0012] Preferably, the low-voltage room is equipped with a low-voltage cabinet for controlling the components in the low-voltage circuit, and an isolation transformer is installed above the low-voltage cabinet.
[0013] Preferably, the high-voltage room is equipped with a high-voltage cabinet for controlling the components in the high-voltage circuit.
[0014] Compared with the prior art, the present invention has the following beneficial effects:
[0015] 1) Each cluster is optimized independently to reduce the impact of component mismatch or shadow occlusion and avoid the weakest link effect;
[0016] 2) The system has high reliability, and the system capacity loss is minimal when a single module fails;
[0017] 3) Convenient operation and maintenance: When a serial PCS fails, the fault can be accurately located to a single cluster, making it convenient for maintenance personnel to replace the backup module in a timely manner, resulting in efficient and convenient operation and maintenance. Attached Figure Description
[0018] Figure 1 This is a schematic diagram of the overall structure of this utility model.
[0019] Figure 2 for Figure 1A schematic diagram of the front structure.
[0020] Figure 3 for Figure 1 The diagram shows the structure on the right.
[0021] Figure 4 for Figure 1 The diagram following is a schematic representation of the components.
[0022] Figure 5 for Figure 1 The left side is a schematic diagram.
[0023] Figure 6 This is the electrical schematic diagram of this utility model.
[0024] In the diagram: 10. Energy storage compartment; 2. Inverter bracket; 3. Inverter; 4. Step-up transformer; 5. Cooling fan; 6. Low-voltage switchgear; 7. High-voltage switchgear; 8. Isolation transformer; 9. AC / DC switchgear room; 11. Cable tray; 12. Baffle; 20. Transformer room; 30. Low-voltage room; 40. High-voltage room. Detailed Implementation
[0025] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments.
[0026] like Figures 1-5 The modular string converter booster integrated module shown includes an energy storage compartment 10, in which an energy storage converter is installed. The energy storage converter is composed of multiple inverters, and each inverter is connected in series with each battery cluster. By connecting each battery cluster in series with a separate energy storage converter, and connecting multiple energy storage converters in parallel on the AC bus side but not on the DC side, the circulating current problem between battery clusters can be solved, and each battery cluster can be managed or isolated from faults.
[0027] Multiple sets of inverter brackets 2 are installed along the length of the energy storage compartment 10. Each set of inverter brackets is equipped with an inverter 3. The AC side and DC side of the inverter 3 are respectively equipped with AC molded case switches and DC molded case switches. The inverter 3 is fastened to the inverter bracket through the baffle 12.
[0028] An AC / DC switch compartment 9 is located on the lower side of the inverter bracket 2, where both AC and DC molded case switches are installed. A main control switch is located on the AC side of the energy storage converter, and multiple inverters are connected in parallel on the AC side and then connected to the main control switch. A cable tray 11 is installed between the energy storage compartment 10 and the transformer compartment 20, and the AC cable of the inverter 3 is connected to the transformer copper busbar through the cable tray.
[0029] A transformer compartment 20, a low-voltage compartment 30, and a high-voltage compartment 40 are sequentially located on one side of the energy storage compartment 10. The transformer compartment 20 houses a step-up transformer 4, with a cooling fan 5 mounted on top of it. The low-voltage compartment 30 contains a low-voltage cabinet 6 for controlling components in the low-voltage circuit, with an isolation transformer 8 positioned above it. The high-voltage compartment contains a high-voltage cabinet 7 for controlling components in the high-voltage circuit.
[0030] Preferably, each compartment has 3 sets of inverter brackets on each side along its length, for a total of 6 sets of brackets. Each set of inverter brackets can install 2 inverters, for a total of 12 inverters. One side of the compartment has a transformer room, a low-voltage room, and a high-voltage room. The transformer room has a step-up transformer, a cooling fan, wall bushings, and cable trays. The AC cables at the inverters are connected to the transformer copper busbars via the cable trays. The low-voltage room has a low-voltage cabinet, and the high-voltage room has a high-voltage cabinet. The low-voltage cabinet is used to control the components in the low-voltage circuit, and the high-voltage cabinet is used to control the components in the high-voltage circuit. The low-voltage room also has an isolation transformer, which is used to transform the low-voltage circuit to the commonly used 400V circuit.
[0031] Each inverter is equipped with one AC molded case switch and one DC molded case switch, used for protection and connection of the AC and DC sides of the inverter, respectively. The AC and DC molded case switches are installed in the AC / DC switch compartment under the inverter bracket. The cables of the AC and DC molded case switches are connected to the inverter through the waterproof cable gland of the inverter bracket. The inverter is installed through the screw holes on the main body and the nuts reserved on the bracket, and is fixed with a baffle.
[0032] The cabin has 7 doors. The transformer room has 4 doors in total, which are used for the transfer and installation of transformers. The low-voltage room, high-voltage room and isolation transformer room each have 1 door. After opening the door, maintenance, repair and replacement of corresponding functional units can be carried out.
[0033] The inverter bracket consists of two layers: the upper layer houses the inverter, which is secured with screws and shielded by a baffle plate; the wiring between the inverter and the AC / DC molded case switches can be fixed using waterproof cable glands and cable clips; the lower layer is the AC / DC switch compartment, used to install the molded case switches on the AC and DC sides of the inverter, as well as the wiring for connecting AC cables to the step-up transformer. The inverter adopts an independent control strategy, meaning that there is no parallel connection on the DC side of the energy storage system, and each PCS is managed individually. This means that each battery cluster is connected to a separate PCS, eliminating issues such as cell inconsistency mismatch caused by circulating current. The system is free from the "weakest link" effect between clusters, and the capacity decay of a single cluster only affects the performance of that cluster, having a smaller impact on the system's charge and discharge. This results in a longer system cycle life, higher total charge and discharge capacity over the entire life cycle, and a higher rate of return.
[0034] DC side of the energy storage converter: The cable is connected to the DC molded case circuit breaker on the DC side of the PCS. Each DC molded case circuit breaker is equipped with a fuse FU3 and a surge protector SPD4 for lightning protection. The DC power on the AC side is converted to AC power by the PCS. Each PCS is equipped with an AC molded case circuit breaker for protection. The twelve AC molded case circuit breakers are connected to an AC frame circuit breaker as the main control on the AC side of the PCS.
[0035] The electrical principle of this utility model is as follows: High-voltage AC power enters the transformer via a high-voltage cabinet for voltage conversion (10kV / 0.8kV); the AC power (800V) after transformer conversion is divided into two paths; one path passes through the AC frame circuit breaker QF11 of the control circuit, which acts as the main switch for the control circuit. The AC power passing through QF11 then passes through an isolation transformer (0.8kV / 0.4kV) for voltage conversion, converting it to a usable 400V voltage for the control circuit, used to power various circuit breakers, sockets, double-switched ATS, and UPS; the other path of the double-switched ATS is connected to the backup power supply at the project site; the UPS is used to power important circuits such as fire protection to prevent power outages; the other 800V AC power passes through QF12 and then through various AC molded casings to reach the AC side of the PCS, where it undergoes AC-DC conversion to DC power and is connected to the battery pack, such as... Figure 6 As shown.
[0036] The string energy storage converter-boost module adopts a one-cluster-one-management, single-cluster overall operation and maintenance approach. When the string converter fails, only that single cluster stops working, without affecting the normal operation of the remaining battery clusters. The faulty cluster can be shut down for maintenance, repair, and module replacement. The BMS monitors individual cluster voltage / temperature anomalies in real time, triggering the converter to lock the charging and discharging of that cluster without affecting the operation of other clusters. Faulty clusters can be maintained offline independently without requiring a complete system shutdown; phased power replenishment is supported, and new battery clusters are plug-and-play.
[0037] The DC side of the energy storage converter uses an independent connection method, with each battery cluster directly connected to an independent converter module via a dedicated cable. This physical isolation on the DC side prevents inter-cluster circulating current. The AC side uses a parallel connection method, with the converter outputs connected to the same AC bus. After voltage boosting, the converter is connected to the grid, sharing the topology only on the AC side.
[0038] When a string energy storage converter malfunctions, open the AC molded case circuit breaker on the AC side of the converter to disconnect power to that single circuit; the entire unit does not need to be shut down. Then, remove the converter from the PCS rack for maintenance, repair, and module replacement. After maintenance is complete, reinstall the energy storage converter on the PCS rack, open the AC molded case circuit breaker (AC molded case switch), and re-energize for testing.
[0039] When a battery cluster malfunctions, the DC molded case circuit breaker on the DC side of the PCS needs to be disconnected to perform a single cluster power outage. There is no need to shut down the entire system. After shutting down the PCS, the battery cluster is then maintained. After maintenance, the battery cluster is reinstalled, the PCS is restarted, and the DC molded case circuit breaker (DC molded case switch) is powered on.
[0040] The purpose of this invention is to provide a modular string converter booster integrated module. By adopting a one-cluster-one-PCS architecture, each cluster of batteries is equipped with an independent converter unit (such as 12 215kW string PCS connected in parallel). Precise control is achieved through cluster-level SOC dynamic balancing technology, eliminating DC-side parallel circulating current, improving cycle efficiency, increasing usable capacity, and significantly improving the charge and discharge capacity throughout the entire life cycle. The modular design supports independent operation of a single cluster or parallel expansion, and allows for the mixing of new and old batteries, which greatly improves system availability, speeds up fault isolation, reduces operation and maintenance costs, and improves space utilization.
[0041] Definitions:
[0042] The "weakest link" effect: In centralized energy storage systems, all battery modules are connected in parallel. When one module reaches a fully charged or discharged state, the entire system must stop charging and discharging. This design limits the overall lifespan of the system to the weakest link, the battery module. Even if other modules have not reached the deep discharge (DOD) or charging threshold, the entire system cannot continue to operate.
[0043] Inter-cluster circulating current: In energy storage systems, inter-cluster circulating current refers to the current flowing between battery clusters instead of flowing entirely to the load or grid when multiple battery clusters are connected in parallel due to inconsistencies in voltage or internal resistance between the clusters. This circulating current phenomenon leads to energy loss between battery clusters, increases battery heat loss, accelerates battery aging, and may cause safety issues.
[0044] The above embodiments are not intended to limit the present utility model, nor is the present utility model limited to the examples given above. Any changes, modifications, additions or substitutions made by those skilled in the art within the scope of the technical solution of the present utility model are also within the protection scope of the present utility model.
Claims
1. A modular string converter booster integrated cabin, comprising an energy storage cabin (10), characterized in that: An energy storage converter is installed inside the energy storage compartment (10). The energy storage converter consists of multiple inverters, and each inverter is connected in series with each battery cluster. The energy storage compartment (10) is provided with multiple sets of inverter brackets (2) along the length direction. Each set of inverter brackets is equipped with an inverter (3). The AC side and DC side of the inverter (3) are respectively provided with an AC molded case switch and a DC molded case switch. The energy storage compartment (10) is provided with a transformer compartment (20), a low-voltage compartment (30), and a high-voltage compartment (40) on one side in sequence.
2. The modular string converter booster integrated cabin according to claim 1, characterized in that: An AC / DC switch chamber (9) is provided on the lower side of the inverter bracket (2), and both the AC molded case switch and the DC molded case switch are installed in the AC / DC switch chamber.
3. The modular string converter booster integrated cabin according to claim 1, characterized in that: The energy storage converter is equipped with a main control switch on its AC side, and multiple inverters are connected in parallel on the AC side and then connected to the main control switch.
4. The modular string converter booster integrated cabin according to claim 1, characterized in that: A cable tray (11) is installed between the energy storage compartment (10) and the transformer compartment (20), and the AC cable of the inverter (3) is connected to the transformer copper busbar through the cable tray.
5. The modular string converter booster integrated cabin according to claim 1, characterized in that: The inverter (3) is fastened to the inverter bracket via a baffle (12).
6. The modular string converter booster integrated cabin according to claim 1, characterized in that: The transformer room (20) is equipped with a step-up transformer (4), and a cooling fan (5) is installed on the top of the step-up transformer (4).
7. The modular string converter booster integrated cabin according to claim 1, characterized in that: The low-voltage chamber (30) is equipped with a low-voltage cabinet (6) for controlling the components in the low-voltage circuit, and an isolation transformer (8) is provided above the low-voltage cabinet (6).
8. The modular string converter booster integrated cabin according to claim 1, characterized in that: The high-voltage room is equipped with a high-voltage cabinet (7) for controlling the components in the high-voltage circuit.