Computer with graphical user interface of city gas safety production information digital cloud system

CN309154676SActive Publication Date: 2025-03-07CHENGDU XIYU DIGITAL TECHNOLOGY DEVELOPMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202430297083.X
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2024-05-20
Publication Date
2025-03-07
Estimated Expiration
2039-05-20

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. The name of the product of this design: A computer with a graphical user interface for the urban gas safety production informatization digital cloud system. 2. Purpose of this design product: used to run programs. 3. The design highlights of this appearance design product lie in the interface content of the graphical user interface on the screen. 4. The picture or photo that best illustrates the key points of the design: main view. 5. If there is no design key point, the rear view will be omitted; if there is no design key point, the left view will be omitted; if there is no design key point, the right view will be omitted; if there is no design key point, the top view will be omitted; if there is no design key point, the bottom view will be omitted. 6. Purpose of the graphical user interface: Enter the account and password in the enlarged image of the interface and click Login to enter the interface change state diagram 1; click "System Settings" in the interface change state diagram 1 to enter the interface change state diagram 2; click "Data Backup" on the left side of the interface change state diagram 2 to enter the interface change state diagram 3; click "Permission Settings" on the left side of the interface change state diagram 3 to enter the interface change state diagram 4; click "Role Settings" in the interface change state diagram 4 to enter the interface change state diagram 5; click "Administrator Settings" in the interface change state diagram 5 to enter the interface change state diagram 6; click the interface change Click "One Pipeline Network Map" in status diagram 6 to enter interface change status diagram 7; click "Pipeline Network Management" on the left side of interface change status diagram 7 to enter interface change status diagram 8; click "Data View" on the left side of interface change status diagram 8 to enter interface change status diagram 9; click "Pipeline Network Analysis" on the left side of interface change status diagram 9 to enter interface change status diagram 10; click "Metering Management" on interface change status diagram 10 to enter interface change status diagram 11; click "Statistical Report" on the left side of interface change status diagram 11 to enter interface change status diagram 12; click "Smart Analysis" on the left side of interface change status diagram 12 to enter the interface Change state diagram 13; click on “Manual analysis” on the left side of interface change state diagram 13 to enter interface change state diagram 14; click on “Remote monitoring” on the left side of interface change state diagram 14 to enter interface change state diagram 15; click on “Equipment management” on the left side of interface change state diagram 15 to enter interface change state diagram 16; click on “Gas equipment management” on the left side of interface change state diagram 16 to enter interface change state diagram 17; click on “Metering area management” on the left side of interface change state diagram 17 to enter interface change state diagram 18; click on “Maintenance and scheduled inspection” on the left side of interface change state diagram 18 to enter interface change state diagram 19; State diagram 19; click on “Pressure Monitoring” on the interface change state diagram 19 to enter the interface change state diagram 20; click on “Pressure Regulating Equipment Management” on the left side of the interface change state diagram 20 to enter the interface change state diagram 21; click on “Pressure Monitoring Point Setting” on the left side of the interface change state diagram 21 to enter the interface change state diagram 22; click on “Manual Analysis” on the left side of the interface change state diagram 22 to enter the interface change state diagram 23; click on “Intelligent Judgment” on the left side of the interface change state diagram 23 to enter the interface change state diagram 24; click on “Alarm Ledger” on the left side of the interface change state diagram 24 to enter the interface change state diagram 25.
Need to check novelty before this filing date? Find Prior Art