Intelligent Construction Site Monitoring and Management Graphical User Interface for Electronic Devices
CN309405260SActive Publication Date: 2025-07-25BEIJING CRCC INT LOGISTICS CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202430586540.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2025-07-25
- Estimated Expiration
- 2039-09-13
Smart Images

Figure 000007_ABST
Abstract
1. The name of this design product: Graphical User Interface for Intelligent Construction Site Monitoring and Management of Electronic Devices. 2. The use of this design product: Graphical User Interface. 3. The design key points of this design product: lie in the graphical user interface design on the screen. 4. The picture or photo that best shows the design key points: Interface Change State Diagram 6. 5. The design key points are only in the graphical user interface, other views are omitted, omitted. 6. The use of the graphical user interface: Dynamically monitor the comprehensive display of personnel attendance, foundation pit status, environmental parameters, and video images at the project site. 7. The human-computer interaction method of the graphical user interface: The main view is the main interface for project comprehensive display. Click on the "Intelligent Labor" module in the main view to enter Interface Change State Diagram 1, which shows information such as personnel distribution and attendance; click on "Intelligent Progress" in Interface Change State Diagram 1 to enter Interface Change State Diagram 2, which shows information such as construction progress nodes; click on "Foundation Pit Monitoring" in Interface Change State Diagram 2 to enter Interface Change State Diagram 3, which shows foundation pit status information; click on "Intelligent Safety" in Interface Change State Diagram 3 to enter Interface Change State Diagram 4, which monitors and displays the safety risk problems and rectification situations at the project site; click on "Environmental Monitoring" in Interface Change State Diagram 4 to enter Interface Change State Diagram 5, which monitors the surrounding environment (temperature, humidity, PM, etc.) of the project site; click on "Video Monitoring" in Interface Change State Diagram 5 to enter Interface Change State Diagram 6, which conducts real-time video monitoring of the project site. 8. Other circumstances that need to be explained: Other explanations: The rectangular gray semi-transparent areas in the main view and Interface Change State Diagram 6 belong to the content screen.