Graphical User Interface for Developing Weekly Downtime Schedules for Electronic Devices
CN309603664SActive Publication Date: 2025-11-14AIR TRAFFIC ADMINISTRATION OF CIVIL AVIATION OF CHINA IN NORTH CHINA
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202530601712.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-14
- Publication Date
- 2025-11-14
- Estimated Expiration
- 2040-10-14
Smart Images

Figure 000001_ABST
Abstract
1. Name of the product in this design: Graphical User Interface for Weekly Off-Peak Planning of Electronic Equipment. 2. Intended use of this design: Applied to an electronic device. 3. The key design feature of this product is its graphical user interface. 4. The image or photograph that best illustrates the design's key features: the front view. 5. Purpose of the graphical user interface: This graphical user interface is used to demonstrate the process of formulating the weekly flight suspension plan for the DVNMS system of the air traffic control center. 6. Human-computer interaction method of graphical user interface: The interface shown in the main view is the main interface of the DVNMS system front end of the air traffic control center; the user clicks "New Work" under the workflow in the main navigation bar on the left side of the main view interface, and the interface jumps to interface change state diagram 1. In interface change state diagram 1, the user clicks "New NOTAM Original Data Notification Form", and the interface jumps to interface change state diagram 2. The user fills in the basic information according to the fields in the NOTAM Original Data Notification Form, saves and submits the NOTAM original data collection, and the interface jumps to interface change state diagram 3. After the user clicks the "Generate Weekly Summary Table" button in interface change state diagram 3, the interface jumps to interface change state diagram 4. In the work window of generating the summary table in interface change state diagram 4, the user checks the NOTAM, fills in the affected aircraft position, construction and maintenance module, construction project and suspension type, and clicks the "OK" button. The interface jumps to interface change state diagram 5. In interface change state diagram 5, the NOTAM is displayed in a list format. Clicking the "Agree" button completes the weekly suspension plan approval operation process. 7. Other situations requiring explanation: ** in the interface are replaceable text.
Need to check novelty before this filing date? Find Prior Art