Graphical user interface for band monitoring management of electronic devices
CN309667421SActive Publication Date: 2025-12-12ZHONGKE XINGTU JINNENG (NANJING) TECH CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202430566234.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2025-12-12
- Estimated Expiration
- 2039-09-05
Smart Images

Figure 000001_ABST
Abstract
1. The name of the design product: graphical user interface with monitoring management for electronic equipment. 2. The use of the design product: for electronic equipment. 3. The design points of the design product: the interface content of the graphical user interface in the display screen panel. 4. The picture or photo that best indicates the design points: design 1 front view. 5. Design 1 is designated as the basic design. 6. The use of the graphical user interface: the product interface is an interactive interface for displaying monitoring management; for Vdrag-SCADA configuration software to query, set, monitor, manage and maintain operation applications in CNG filling stations. 7. The man-machine interaction mode of the graphical user interface: the main view of design 1 is a login interface, enter the correct account and password and click login to jump to design 1 interface change state diagram 1, which is a station process interface; click the system architecture in the navigation bar above design 1 interface change state diagram 1 to enter design 1 interface change state diagram 2; the main view of design 2 is a login interface, enter the correct account and password and click login to jump to design 2 interface change state diagram 1, which is a station process interface; click the compressor process in the navigation bar above design 2 interface change state diagram 1 to enter design 2 interface change state diagram 2; the main view of design 3 is a login interface, enter the correct account and password and click login to jump to design 3 interface change state diagram 1, which is a station process interface; click the plane distribution in the navigation bar above design 3 interface change state diagram 1 to enter design 3 interface change state diagram 2; the main view of design 4 is a login interface, enter the correct account and password and click login to jump to design 4 interface change state diagram 1, which is a station process interface; click the data summary in the navigation bar above design 4 interface change state diagram 1 to enter design 4 interface change state diagram 2, which displays process data in the data summary; click the gas machine data in the upper left of design 4 interface change state diagram 2 to enter design 4 interface change state diagram 3; the main view of design 5 is a login interface, enter the correct account and password and click login to jump to design 5 interface change state diagram 1, which is a station process interface; click the data trend in the navigation bar above design 5 interface change state diagram 1 to enter design 5 interface change state diagram 2, which displays real-time trends in the data trend; click the historical trend in the upper left of design 5 interface change state diagram 2 to enter design 5 interface change state diagram 3; the main view of design 6 is a login interface, enter the correct account and password and click login to jump to design 6 interface change state diagram 1, which is a station process interface; click the alarm information in the navigation bar above design 6 interface change state diagram 1 to enter design 6 interface change state diagram 2, which displays real-time alarms in the alarm information; click the historical alarm in the upper left of design 6 interface change state diagram 2 to enter design 6 interface change state diagram 3; the main view of design 7 is a login interface, enter the correct account and password and click login to jump to design 7 interface change state diagram 1, which is a station process interface; click the report query in the navigation bar above design 7 interface change state diagram 1 to enter design 7 interface change state diagram 2.
Need to check novelty before this filing date? Find Prior Art