Graphical user interface for dredging construction management of an offshore dredger

CN309703006SActive Publication Date: 2025-12-26NAT ENG RES CENT OF DREDGING TECH & EQUIP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202430777903.5
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2024-12-06
Publication Date
2025-12-26
Estimated Expiration
2039-12-06

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. The name of the design product: the graphical user interface of the marine dredger dredging construction management of the electronic device. 2. The use of the design product: an electronic device. 3. The design points of the design product: the graphical user interface. 4. The picture or photo that best shows the design points: design 1 front view. 5. The conventional design, omit the rear view, left view, right view, top view, bottom view of design 1-design 3. 6. Design 1 is designated as the basic design. 7. The use of the graphical user interface: for the management of large dredger marine construction site, for the whole process management of construction data file. 8. The human-computer interaction mode of the graphical user interface: design 1 front view is the main interface when opening the marine dredging construction system; click the icon in the upper left corner of design 1 front view, the interface jumps to design 1 interface change state diagram 1; click "file" in design 1 interface change state diagram 1, the interface jumps to design 1 interface change state diagram 2, and the function keywords such as "upload file", "manage file", "historical data query", "automatic save setting" appear; click "remove" below "operation" in design 1 interface change state diagram 3, jump to design 1 interface change state diagram 4. Design 2 front view is the main interface when opening the marine dredging construction system; click the icon in the upper left corner of design 2 front view, the interface jumps to design 2 interface change state diagram 1; click "file" in design 2 interface change state diagram 1, the interface jumps to design 2 interface change state diagram 2, and the function keywords such as "upload file", "manage file", "historical data query", "automatic save setting" appear; click "manage file" button in design 2 interface change state diagram 2, the interface jumps to design 2 interface change state diagram 3, and the "manage file" dialog box pops up; when clicking "load" below "operation" in design 2 interface change state diagram 3, jump to design 2 interface change state diagram 4. The design 3 main view is the main interface when the offshore dredging construction system is opened; clicking the icon in the upper left corner of the design 3 main view, the interface jumps to the design 3 interface change state diagram 1; clicking the "file" in the design 3 interface change state diagram 1, the interface jumps to the design 3 interface change state diagram 2, and the function keywords such as "upload file", "manage file", "historical data query" and "automatic save setting" appear; clicking the "manage file" button of the design 3 interface change state diagram 2, the interface jumps to the design 3 interface change state diagram 3, and the "manage file" dialog box pops up; when clicking "delete" below "operation" of the design 3 interface change state diagram 3, it jumps to the design 3 interface change state diagram 4. The "X" in the view represents a changeable or replaceable word, number or symbol.
Need to check novelty before this filing date? Find Prior Art