Railway engineering management system graphical user interface for electronic devices

CN309900578SActive Publication Date: 2026-04-07INST OF COMPUTING TECH CHINA ACAD OF RAILWAY SCI +2
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2025-07-22
Publication Date
2026-04-07

Smart Images

  • Figure 000002_ABST
    Figure 000002_ABST
Patent Text Reader

Abstract

1. The name of the design product: graphical user interface of railway engineering management system of electronic equipment. 2. The use of the design product: for an electronic device. 3. The design points of the design product: in the graphical user interface. 4. The picture or photo that best shows the design points: design 1 change state diagram 1. 5. Design 1 is designated as the basic design. 6. The use of the graphical user interface: to show the consistency of the user interface style of the railway engineering management platform. The system is a new generation of information management platform based on BIM for railway engineering construction. It provides planning consultation and overall solution for railway engineering construction informatization for each construction unit and participating unit. It covers workbench, department work, technical exchange, supervision items, daily office and other function modules, and realizes fine management from project approval, survey and design, construction acceptance. 7. The man-machine interaction mode of the graphical user interface: design 1 main view is the platform interface of system login, design 1 change state diagram 1 is displayed after user login, design 1 change state diagram 2 is displayed by dragging design 1 change state diagram 1 down, design 1 change state diagram 3 is displayed by dragging design 1 change state diagram 2 down, design 1 change state diagram 4 is displayed by dragging design 1 change state diagram 3 down. Design 2 main view is the platform interface of system login, design 2 change state diagram 1 is displayed after user login, design 2 change state diagram 2 is displayed by clicking "department work" at the top of design 2 change state diagram 1, design 2 change state diagram 3 is displayed by dragging design 2 change state diagram 2 down, design 2 change state diagram 4 is displayed by dragging design 2 change state diagram 3 down, design 2 change state diagram 5 is displayed by dragging design 2 change state diagram 4 down. Design 3 main view is the platform interface of system login, design 3 change state diagram 1 is displayed after user login, design 3 change state diagram 2 is displayed by clicking "department work" at the top of design 3 change state diagram 1, design 3 change state diagram 3 is displayed by clicking "plan contract and management" at the top of design 3 change state diagram 2, design 3 change state diagram 4 is displayed by dragging design 3 change state diagram 3 down, design 3 change state diagram 5 is displayed by dragging design 3 change state diagram 4 down, design 3 change state diagram 6 is displayed by dragging design 3 change state diagram 5 down. The main view of design 4 is the platform interface of system login, and design 4 change state diagram 1 is displayed after user login. Design 4 change state diagram 2 is displayed by clicking the "department work" at the top of design 4 change state diagram 1. Design 4 change state diagram 3 is displayed by clicking the "design management" at the top of design 4 change state diagram 2. Design 4 change state diagram 4 is displayed by dragging design 4 change state diagram 3 down. Design 4 change state diagram 5 is displayed by dragging design 4 change state diagram 4 down. The main view of design 5 is the platform interface of system login, and design 5 change state diagram 1 is displayed after user login. Design 5 change state diagram 2 is displayed by clicking the "department work" at the top of design 5 change state diagram 1. Design 5 change state diagram 3 is displayed by clicking the "station technology" at the top of design 5 change state diagram 2. Design 5 change state diagram 4 is displayed by dragging design 5 change state diagram 3 down. Design 5 change state diagram 5 is displayed by dragging design 5 change state diagram 4 down. Design 5 change state diagram 6 is displayed by dragging design 5 change state diagram 5 down. The main view of design 6 is the platform interface of system login, and design 6 change state diagram 1 is displayed after user login. Design 6 change state diagram 2 is displayed by clicking the "technology exchange" at the top of design 6 change state diagram 1. The main view of design 7 is the platform interface of system login, and design 7 change state diagram 1 is displayed after user login. Design 7 change state diagram 2 is displayed by clicking the "supervision items" at the top of design 7 change state diagram 1. Design 7 change state diagram 3 is displayed by clicking the specific supervision items at the bottom of design 7 change state diagram 2. Design 7 change state diagram 4 is displayed by clicking the "meeting summary card" in the middle of design 7 change state diagram 3. The main view of design 8 is the platform interface of system login, and design 8 change state diagram 1 is displayed after user login. Design 8 change state diagram 2 is displayed by clicking the "daily office work" at the top of design 8 change state diagram 1.
Need to check novelty before this filing date? Find Prior Art