Discrete event logistics simulation cloud platform base attributes and scenario attributes graphical user interface for electronic devices

CN309963099SActive Publication Date: 2026-05-05BEIJING XIANJUE ZHICHENG TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
BEIJING XIANJUE ZHICHENG TECHNOLOGY CO LTD
Filing Date
2024-11-20
Publication Date
2026-05-05

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. Name of the product in this design: Graphical User Interface for Basic Attributes and Scene Attributes of a Discrete Event Logistics Simulation Cloud Platform for Electronic Devices. 2. Intended use of this design: for use in electronic devices. 3. The key design features of this product are its graphical user interface content. 4. The picture or photo that best illustrates the key design points: Design 1 front view. 5. Other aspects of the product have no design features, and other views are omitted. 6. Design 1 is designated as the basic design. 7. Purpose of the graphical user interface: Used for creating, editing, and managing 3D simulation scenes. 8. Description of the changing states of the graphical user interface: Clicking "Initialize" on the right side of the main view of Design 1 enters the Design 1 interface changing state diagram 1; clicking "New+" in the Design 1 interface changing state diagram 1 enters the Design 1 interface changing state diagram 2; clicking "Save" in the middle of the Design 1 interface changing state diagram 2 enters the Design 1 interface changing state diagram 3; clicking "New+..." in the lower right corner of the Design 1 interface changing state diagram 3 enters the Design 1 interface changing state diagram 4; clicking "New+" in the lower right corner of the Design 1 interface changing state diagram 4 enters the Design 1 interface changing state diagram 5. Clicking "Simulation End" on the right side of the main view of Design 2 enters the Design 2 interface changing state diagram 1; clicking "New+" in the upper right corner of the Design 2 interface changing state diagram 1 enters the Design 2 interface changing state diagram 2; clicking the "Save" button in the middle of the Design 2 interface changing state diagram 2 enters the Design 2 interface changing state diagram 3; clicking the toggle button below "New+" in the Design 2 interface changing state diagram 3 enters the Design 2 interface changing state diagram 4; clicking the toggle button below "New+" in the Design 2 interface changing state diagram 4... Clicking the "..." button on the right of "end" leads to the Design 2 interface (Figure 5). Clicking the "Delete" button below "end" in Figure 5 leads to the Design 2 interface (Figure 6). Clicking "Custom Attributes" on the right side of the Design 3 main view leads to the Design 3 interface (Figure 1). Clicking "New +" in Figure 1 leads to the Design 3 interface (Figure 2). Clicking "Name" in Figure 2 leads to the Design 3 interface (Figure 3). Clicking the dropdown menu in the middle area of ​​Figure 3 leads to the Design 3 interface (Figure 4). Entering the corresponding text in the editing box in Figure 4 leads to the Design 3 interface (Figure 5). Clicking "Submit" in Figure 5 leads to the Design 3 interface (Figure 6). Clicking "Data Table" on the right side of the Design 4 main view leads to the Design 4 interface (Figure 1). Clicking the button on the right side of Figure 1 leads to the Design 4 interface (Figure 1). Click "New+" to enter the Design 4 interface (Figure 2). Click "Main" in Figure 2 to enter the Design 4 interface (Figure 3). Click "Add Header" in the middle of Figure 3 to enter the Design 4 interface (Figure 4). Enter text in the header name field in Figure 4 and click "OK" to enter the Design 4 interface (Figure 5). Click "Add Row" in Figure 5 to enter the Design 4 interface (Figure 6). Click "Clear" at the top center of Figure 6 to enter the Design 4 interface (Figure 7). Click "Method List" on the right side of the Design 5 main view to enter the Design 5 interface (Figure 1). Click "New+" in Figure 1 to enter the Design 5 interface (Figure 2). Click "Save" in Figure 2 to enter the Design 5 interface (Figure 3). Click the "New+" button at the bottom right of Figure 3..."To access the Design 5 interface (Figure 4), click the 'New + Delete' icon in the lower right corner of Figure 4 to access the Design 5 interface (Figure 5); click the 'Resource List' on the right side of the Design 6 main view to access the Design 6 interface (Figure 1); click the 'New +' icon on the right side of Figure 1 to access the Design 6 interface (Figure 2); click the 'Schedule' icon in Figure 2 to access the Design 6 interface (Figure 3); click the 'Add Row' icon in the middle of Figure 3 to access the Design 6 interface (Figure 4); click the 'Clear' icon in Figure 4 to access the Design 6 interface (Figure 5); click the 'Chart Panel' on the right side of the Design 7 main view to access the Design 7 interface (Figure 1); click the 'New +' icon on the right side of Figure 1 to access the Design 7 interface (Figure 2); click the 'Chart Panel 1' icon in Figure 2 to access the Design 7 interface (Figure 3)."
Need to check novelty before this filing date? Find Prior Art