Procedures for operating a mobile construction site robot

By using markers to adapt operating parameters, the construction site robot addresses inefficiencies in existing systems, enabling efficient and flexible operation with reduced operator intervention and software adjustments, enhancing safety and precision.

DE102024212136A1Pending Publication Date: 2026-06-18ROBERT BOSCH GMBH
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
DE102024212136
Authority / Receiving Office
DE · DE
Patent Type
Applications
Current Assignee / Owner
Filing Date
2024-12-18
Publication Date
2026-06-18

AI Technical Summary

Technical Problem

Autonomous construction site robots operate inefficiently due to the need for time-consuming adjustments to their operating plans when deviations occur between the expected and actual work environments, requiring operator intervention and software modifications.

Method used

The construction site robot determines the position and reads coded information from markers to adapt operating parameters, such as processing and navigation parameters, based on this information, allowing for efficient and flexible operation without the need for real-time software adjustments.

Benefits of technology

This approach reduces operational interruptions, enables fast and adaptable operation, enhances ease of use, and increases safety and precision by allowing autonomous adjustments to the robot's operation based on the current work environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000016_0000
    Figure 00000016_0000
  • Figure 00000017_0000
    Figure 00000017_0000
  • Figure 00000018_0000
    Figure 00000018_0000
Patent Text Reader

Abstract

A method for operating a mobile construction site robot (12) is proposed, wherein the construction site robot (12) determines the position of at least one marker (32, 34, 36, 38, 40) arranged in a working environment (30) of the construction site robot (12) and reads coded information from the marker (32, 34, 36, 38, 40), wherein at least one operating parameter of the construction site robot (12), in particular at least one processing parameter for controlling a processing operation and / or at least one navigation parameter for controlling a navigation operation, is adapted for an operating project in an environment (42, 44, 46, 48, 50) of the marker (32, 34, 36, 38, 40) based on the coded information.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Method for setting up a machine tool and manufacturing system

    DE102019210752A1

  • Method and robot system for machining a workpiece as well as coordinate system markers for a robot system

    DE102022200461A1

  • Autonomous or manual work tool, system and method for at least partially automatic processing of an object

    DE102022212338A1

  • Autonomous or manual work tool, system and method for at least partially automatic processing of an object

    DE102022212353A1

  • Autonomous or manual work tool, system and method for at least partially automatic processing of an object

    DE102022212354A1