System and method for the purification, collection and preparation of isotope samples and their application
The system addresses purity and accuracy issues in isotope detection by using a series of traps and valves to purify and enrich isotope samples, achieving precise detection of binary methane isotopes and supporting diverse applications.
Patent Information
- Application Number
- DE112020000037
- Authority / Receiving Office
- DE · DE
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2019-09-24
- Filing Date
- 2020-01-21
- Publication Date
- 2024-12-05
- Estimated Expiration
- 2040-01-21
AI Technical Summary
Existing systems for isotope sample purification and detection face challenges in achieving high purity and accuracy, particularly for low-abundance binary methane isotopes, due to interference from other substances, and fail to accommodate both large and small sample quantities effectively.
A system and method involving a series of traps and valves for sample purification, enrichment, and collection, including VOC, adsorption, chemical, and liquid nitrogen traps, coupled with a chromatography column and vacuum system, to remove impurities and enrich isotope samples for precise detection.
The system achieves high accuracy in isotope detection with internal precision of Δ18 at 0.3‰ and external precision of Δ13CH3D at 2.5‰, supporting applications in isotope detection, petroleum exploration, and environmental studies, while accommodating both large and small sample sizes.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical area
[0001] The present invention relates to the technical field of isotope detection, in particular to a system and a method for cleaning, collecting and processing isotope samples and their application. State of the art
[0002] The development of isotope theory and mass spectrometry from one-dimensional to multidimensional isotope determination has become a milestone in the method of stable single-element isotope systems and is used to study many disciplines such as astrochemistry and geochemistry, geology, and biology. At the beginning of this century, a new perspective in isotope research, cluster isotope geochemistry, was introduced. It investigates the geochemical behavior of isotopic bodies from the perspective of isotopic binding and can obtain information that conventional isotopes cannot provide for the study of the overall composition. It is a revolutionary technology with great potential after conventional stable isotopes.In particular, with the introduction of the MAT 253-Ultra (Thermo Fisher) and Panoroma (Nu Instruments) analyzers, isotope analysis technology has evolved from the determination of simple molecules to the analysis of molecular isotopes, such as the determination of molecular cluster isotope ratios and molecular special sites.
[0003] However, advanced mass spectrometers also need to use various methods to prepare or convert the original samples (substances in inorganic form or complex organic substances) into pure gases such as N2, O2, H2, CO2, SO2, N2O, CH4, etc., before entering mass spectrometry for the corresponding isotope detection. Therefore, the sample pretreatment technology and the supporting pretreatment device become the key to successful mass spectrometry. Obtaining pure gas requires not only complex processes for removing impurities but also the enrichment and separation of trace gases, as well as the collection and conversion of target gases.
[0004] The collection of samples from different sources and different target gases corresponds to different pretreatment methods. The international analysis technology of methane cluster isotopes ( 13 CH3D and 12CH2D2) has become an important detection method for natural gas research after carbonate. Binary methane isotope detection technology mainly targets two isotopic bodies ( 13 CH3D and 12 CH2D2) with a mass-to-charge ratio of 18 in methane isotopic bodies. Since these two isotopic bodies of methane have two heavy isotopic substitutions (also called cluster isotopes), their relative abundance is very low (6.92*10-6 and 1.44*10-7, respectively). Therefore, to accurately determine its abundance, the mass spectrometer must first have extremely high sensitivity and accuracy. At the same time, the sample must be extremely pure to avoid interference from other substances and achieve a good mass spectrometric separation effect.
[0005] Currently, large-scale high-resolution stable isotope dual-focus mass spectrometry has high resolution, such as MAT253 Ultra (Thermo Scientific) and Panorama (NU), the former having a resolution of 27000, which can measure the total concentration (denoted as Δ18) of 13 CH3D and 12 CH2D2 can be tested in methane cluster isotopes, the latter having a resolution of 40,000, allowing the concentrations of 13 CH3D and 12 CH2D2 can be tested in binary methane isotopes. Since the integer molecular weights of 13 CH3D and 12CH2D2 with very low natural abundance in methane at 18 amu, after the methane sample enters the mass spectrometer and is ionized, the atoms in the ion source are combined with a certain probability to form corresponding ions. If the sample contains components with a mass number of about 18 amu, such as water molecules, oxygen atoms (derived from oxygen and oxygen-containing compounds), nitrogen atoms (derived from nitrogen and nitrogen-containing compounds), hydrogen atoms other than methane (which combine with carbon, nitrogen, and oxygen atoms to form interfering ions), carbon atoms other than methane, and argon atoms (dual-charged ions in the isotope 36 Ar), the exact test gas purity of 13 CH3D and 12 CH2D2 in binary methane isotopes seriously perturbed.
[0006] Because the relative abundance of methane cluster isotope molecules is very low and there is a lot of interference from other substances, accurate determination is challenging. Currently, Imperial College and Protium have developed an automated purification system (Imperial Batch Extraction, IBEX). Its main function is as follows: It uses an ultra-low-temperature helium cooling pump. Impurity gases such as H2, He, CO2, O2, N2, and the like are removed from methane in a liquid helium environment at a temperature range of 10K to 320K. The frozen methane is then heated and released. The methane is transferred with liquid nitrogen into a sample tube containing a 5A molecular sieve to seal the combustion. Afterward, it is heated and released again, and the measurement is completed by mass spectrometry.In addition, since the liquid helium cooling pump used in this system is expensive to maintain and the system has not been commercially produced, this system only gives an index after methane purification, which has an internal accuracy of 0.4 ‰ of Δ18.
[0007] Furthermore, injection and collection processes have different requirements for different sample volumes. For large sample volumes (e.g., oil and gas) and small sample volumes (e.g., rare samples from cold regions (Antarctica or the Arctic)), a distinction must be made between injection methods and collection methods. Existing systems for cleaning, collection, and processing cannot meet the needs of both simultaneously.
[0008] Therefore, it is necessary to establish a system for purification, collection, and preparation of samples for binary isotope detection to ensure that all possible interfering ions are removed and rare samples are enriched before the sample gas enters the mass spectrometry analysis. Therefore, accurate detection of isotopic compounds is achieved and can be extended to the detection of binary methane isotopes. 13 CH3D and 12 CH2D2 can be used. Contents of the present invention
[0009] An object of the present invention is to provide a system for purifying, collecting, and processing isotope samples to address the problem that isotope samples available in the prior art require higher purity for mass spectrometry. The corresponding isotope purification and enrichment device is combined with an isotope mass spectrometer online. For a small sample quantity, the sample can be injected through the injector injection unit and then enriched after passing through the GC, enriched in a sample bottle, and then introduced into a mass spectrometer for analysis, and then tested in batches. As needed, the sample bottle is introduced into the mass spectrometer. For a large sample quantity, the sample can be injected through a natural gas sample bottle and then, after passing through the GC, introduced directly into the mass spectrometer for analysis.
[0010] Another object of the present invention is to provide an application of the system for purification, collection, and processing of isotope samples in isotope detection. It can not only detect methane, 13 CD ( 13 CH3D, 13 CH2D2, 13 CHD3, 13 CD4), but also provide technical support for petroleum exploration, deep mineral exploration, global climate change, and water resource evaluation, and can also be applied to the purification and collection of other types of isotopes. This technology is also being used to expand the monitoring of cluster isotopes of multiple greenhouse gases in the tripolar region (Antarctica, the Arctic, and the Qinghai-Tibet Plateau).
[0011] Another object of the present invention is to provide a method for purification, collection and preparation of isotope samples, by which methane purification can achieve the main technical indicators of the internal accuracy of methane: the internal accuracy of Δ18 is 0.3 ‰, the internal accuracy of Δ13CH3D is 0.4 ‰ and the external accuracy of methane Δ18 is 2 ‰ and Δ13CH3D is 2.5 ‰.
[0012] The technical solutions to achieve the purpose of the present invention are: A system for cleaning, collecting, and processing isotope samples, characterized in that it comprises a two-stage four-way valve A, a two-stage six-way valve B, a two-stage six-way valve C, a two-stage four-way valve D, a VOC trap T1, an adsorption trap T2, an adsorption trap T3, a chemical trap T4, a liquid nitrogen cold trap T5, a liquid nitrogen enrichment trap T6, a verification and enrichment trap T7, a cleaning and re-enrichment trap T8, and a sample collection trap T9, wherein the two-stage four-way valve A has four hole positions a1, a2, a3, a4, wherein a2 is connected to a natural gas sample bottle via a connecting line, wherein a4 is connected to the injection injector via a pipeline, wherein the injection injector is provided with a GC sample inlet, wherein the injection injector is provided with a supply line of the carrier gas He0, wherein a1 is connected to an exhaust line; wherein the two-stage six-way valve B has six hole positions b1, b2, b3, b4, b5, b6, wherein b2 is connected to a3 via a pipeline, wherein b3 is connected to the inlet of the VOC trap T1 via a pipeline, wherein the outlet of the VOC trap T1 is connected to b6 via a pipeline, wherein b1 is connected to the inlet of the liquid nitrogen cold trap T5 via a contaminant removal pipeline, wherein the contaminant removal pipeline is sequentially connected to the adsorption trap T2, the adsorption trap T3 and the chemical trap T4, wherein b4 is connected to an inlet line of the first load gas, wherein b5 is connected to a drain line; wherein the two-stage six-way valve C has six hole positions c1, c2, c3, c4, c5, c6, wherein the outlet of the liquid nitrogen cold trap T5 is connected to c2 via a pipe, wherein c3 is connected to the inlet of the liquid nitrogen enrichment trap T6 via a pipe, wherein the outlet of the liquid nitrogen enrichment trap T6 is connected to the inlet of the verification and enrichment trap T7 via a pipe, wherein the outlet of the verification and enrichment trap T7 is connected to c6 via a pipe, wherein c1 is connected to a pipe for discharging impurity gas, wherein c4 is connected to an inlet line of the second load gas, wherein c5 is connected to the inlet of the chromatography column GC8 via a pipe; wherein the two-stage four-way valve D has four hole positions d1, d2, d3, d4, wherein d1 is connected via a pipeline to the outlet of the chromatography column GC, wherein d2 is connected via an enrichment pipeline to the inlet of the cleaning and re-enrichment trap T8, wherein d3 is connected to an inlet line of the third load gas, wherein d4 is connected to a heavy gas outlet line, wherein the enrichment line is provided with a switching valve V1, wherein the outlet of the cleaning and re-enrichment trap T8 is connected via a pipeline to the inlet of the sample collection trap T9, wherein the sample collection trap T9 is connected via a communication line to each of the sample outlet line and the collection line, wherein the communication line is provided with a switching valve V2, wherein the sample outlet line is provided with a switching valve V3, wherein the collection line is provided with a switching valve V4,wherein the collecting pipeline is connected to a vacuum branch line and a collecting branch line, the vacuum branch line being connected to a vacuum source, the collecting branch line being provided with a switching valve V5 and a switching valve V10, the end of the collecting branch line being connected to a sample collecting line, the sample collecting line being arranged in the sample collecting trap.
[0013] In the above technical solution, it is provided that the low vacuum gauge P1 is connected to the vacuum branch line via a first connecting line, wherein the first connecting line is provided with a switching valve V8, wherein the dry pump is connected to the vacuum branch line via a second connecting line, wherein the second connecting line is provided with a switching valve V6, wherein the high vacuum gauge P2 is connected to the vacuum branch line via a third connecting line, wherein the third connecting line is provided with a switching valve V9, wherein the molecular pump is connected to the vacuum branch line via a fourth connecting line, wherein the fourth connecting line is provided with a switching valve V7.
[0014] The above technical solution provides for the connecting line to be equipped with a cylinder decompression gauge.
[0015] In another aspect of the present invention, a system for cleaning, collecting and processing isotope samples in the detection of methane isotopes 13 CD ( 13 CH3D, 13 CH2D2, 13 CHD3, 13 CD4) is used.
[0016] The present invention has the following advantageous effects over the prior art: 1. According to the invention, the purification, collection, and preparation of samples for binary methane isotope detection are completed by the impurity removal, enrichment, purification, transfer, carrier gas release, and collection functions implemented on the collected gas sample. Each component in the system has a reasonable design and convenient operation and is integrated to realize the purification and collection of sample gas. 2. The invention simultaneously supports two sample injection modes: injection and bottle injection. These two methods can be freely converted through the valve body, which is convenient and has strong applicability. 3. The collected methane gas can be injected either manually or automatically online, which is connected to the two-way injection system of the isotope mass spectrometer, enabling the analysis and detection of the binary methane isotopes 13 CH3D and 12 CH2D2 is realized by Δ18 and Δ13CH3D. 4. The invention has a simple principle and integrates the functions of sampling, adsorption, separation, enrichment, purification, transfer, collection, and the like into its structural design. This makes the sample testing process simple and convenient, and the operation is convenient, which can effectively improve the accuracy of the test value. This is a series of sample preparation systems with scientific research significance and high relevance, and has good application and promotional value. Short description of the drawing Fig. 1 is a block diagram of a system according to Embodiment 1 of the present invention. Fig. 2 is a connection diagram of a piping according to Embodiment 1 of the present invention. Fig. 3 is a diagram of a sampling and enrichment state of a methane sample according to Embodiment 2 of the present invention. Fig. 4 is a diagram showing a purification, transfer, and collection state of a methane sample according to Embodiment 2 of the present invention. Detailed embodiments
[0017] The present invention will be described in more detail below in conjunction with specific embodiments. It should be understood that the specific embodiments described herein are used only to interpret the invention and are not used to define the invention. Example 1
[0018] System for the purification, collection and preparation of isotope samples, characterized in that it comprises an injection unit, a VOC trap T1, an adsorption trap T2, an adsorption trap T3, a chemical trap T4, a liquid nitrogen cold trap T5, a liquid nitrogen enrichment trap T6, a verification and enrichment trap T7, a chromatography column GC, a purification and re-enrichment trap T8, a sample collection trap T9, which are sequentially connected via a pipeline, wherein the inlet of the injection unit is connected to a GC sample inlet 1 and a supply line of the carrier gas He0, wherein the GC sample inlet is provided with a switching valve V24, wherein the supply line of the carrier gas He0 is provided with a switching valve V23; wherein an outlet of the injection unit is connected via a first pipeline to an inlet of the VOC trap T1, wherein the first pipeline is provided with a switching valve V11, wherein the outlet of the injection unit is connected via a second pipeline to an inlet of the adsorption trap T2, wherein the second pipeline is provided with a switching valve V12; wherein a supply line of the carrier gas He1 is connected to the inlet of the VOC trap and a drain line is connected to the outlet to drain the cooled water and the VOC components in the VOC trap, wherein the supply line of the carrier gas He1 is provided with a switching valve V13, wherein the drain line is provided with a switching valve V14; wherein the pipeline connecting the adsorption trap T2, the adsorption trap T3, the chemical trap T4 and the liquid nitrogen cold trap T5 is provided with a carrier gas purge line, the carrier gas purge line comprising a supply line of the carrier gas He0 to the inlet of the adsorption trap group and a drain line for impurity gas to the outlet of the liquid nitrogen cold trap T5, the drain line for impurity gas being provided with a switching valve V15; wherein the pipeline between the liquid nitrogen cold trap T5 and the liquid nitrogen enrichment trap T6 is provided with a switching valve V16, wherein the inlet of the liquid nitrogen enrichment trap T6 is connected to a supply line of the carrier gas He2, wherein the supply line of the carrier gas He2 is provided with a switching valve V17, wherein the supply line of the carrier gas He2 is connected via a third pipeline to the inlet of the chromatography column GC, wherein the third pipeline is provided with a switching valve V18; wherein the outlet of the verification and enrichment trap T7 is connected to a permanent gas discharge line for discharging permanent gases (such as nitrogen, oxygen, hydrogen, argon and other gas components) that cannot be condensed in the liquid nitrogen cold trap and liquid nitrogen enrichment trap, wherein the permanent gas discharge line is provided with a switching valve V19; wherein the inlet of the cleaning and re-enrichment trap T8 is connected to a supply line of the carrier gas He3, wherein the supply line of the carrier gas He3 is provided with a switching valve V20, wherein the pipeline between the chromatography column GC and the cleaning and re-enrichment trap T8 is provided with a valve V1, wherein the outlet of the cleaning and re-enrichment trap is connected to a heavy gas drain line, a sample collection line, and a sample drain line, wherein the heavy gas drain line is provided with a switching valve V22, wherein the sample collection line is arranged in the sample collection trap, wherein the outlet of the sample collection line is connected to a vacuum line for removing impurity gas and carrier gas,The carrier gas passing through the He2 carrier gas supply line introduces the enriched sample in the liquid nitrogen enrichment trap into the inlet of the chromatography column during sampling. The outlet of the chromatography column is connected to a heavy gas outlet line and a purification and re-enrichment trap, respectively. The heavy gas outlet line is used to discharge impurity gas with a retention time after the target gas. For example, ethane, which can be spiked into the sample after methane purification, has the retention time after methane purification. Ethane is discharged via the heavy gas outlet line after methane extraction.
[0019] Preferably, the injection unit is an injector injection unit and / or a bottle injection unit, wherein the injector injection unit comprises an injection injector connected to a VOC trap via a pipeline, wherein the bottle injection unit comprises a natural gas sample bottle connected to the VOC trap via a connecting line, wherein the connecting line is provided with a bottle decompression measuring device. The piping between the liquid nitrogen enrichment trap and the chromatography column is equipped with a verification and enrichment trap to verify whether the sample is fully enriched in the liquid nitrogen enrichment trap. Especially for unknown samples to be tested, the verification and enrichment trap can verify whether the length of the cooling line connected by the previous liquid nitrogen cold trap and the liquid nitrogen enrichment trap and whether the cooling temperature are appropriate, and adjust them in a timely manner until it is verified that there is no target methane gas release in the enrichment trap, indicating that the parameters of the liquid nitrogen cold trap and the liquid nitrogen enrichment trap are reasonable.
[0020] Preferably, the vacuum line comprises a primary vacuum line connected to the dry pump and a secondary vacuum line connected to the molecular pump. In particular, the low vacuum gauge P1 is connected to the vacuum branch line via a first connecting line, the first connecting line being provided with a switching valve V8, the dry pump 6 is connected to the vacuum branch line via a second connecting line, the second connecting line being provided with a switching valve V6, the high vacuum gauge P2 is connected to the vacuum branch line via a third connecting line, the third connecting line being provided with a switching valve V9, and the molecular pump 7 is connected to the vacuum branch line via a fourth connecting line, the fourth connecting line being provided with a switching valve V7. Example 2
[0021] According to embodiment 1, a method for cleaning, collecting and processing isotope samples comprises the following steps: I. Enrichment process: Step 1: After the sample is introduced through the injection unit, the switching valves V24, V11, V16, V18, and V19 are opened and the other switching valves are closed. The gas sample is sequentially introduced into the VOC trap T1 to remove water and VOC components (the temperature control range of the VOC trap T1 is -24°C to -0°C). HayeSep D or PoraPLOT Q resin or molecular sieve fillers are incorporated to remove a large amount of VOC components from the sample). Then, it is introduced into the adsorption trap T2 (filled with diiodine pentoxide to oxidize CO to carbon dioxide), the adsorption trap T3 (filled with alkali lime or sodium hydroxide to remove the acidic gas carbon dioxide, etc.).to remove), the chemical trap T4 (the backup trap can specifically remove other contaminants), the liquid nitrogen cold trap T5 (liquid nitrogen cold trap without filler for removing sulfur dioxide and volatile gases), the liquid nitrogen enrichment trap T6, and the verification and enrichment trap T7 are introduced. The final sample is enriched in the liquid nitrogen enrichment trap T6, and other contaminant gases are discharged through the permanent gas discharge line. Step 2: Switching valves V24, V11, V16, V18, and V19 are opened, and the other switching valves are closed. The carrier gas passing through the He2 carrier gas supply line introduces the sample in the liquid nitrogen enrichment trap T6 into the GC chromatography column. Separation is performed in the GC chromatography column according to the different retention times of the various gas components. When the target gas flows out, V1 is opened, and the target gas is enriched in the purification reenrichment trap T8. When the heavy gas (gas with a retention time later than the target gas) flows out, V1 is closed, and V22 is opened, and the heavy gas is discharged through the heavy gas discharge line. II. Transfer, replenishment and collection process: Step 1: Switching valves V20, V1, V2, and V3 are opened, and the other switching valves are closed. The carrier gas passing into the He3 carrier gas supply line is discharged from the sample outlet line after passing through the purification and re-enrichment trap T8. Step 2: Close vacuum valves V1, V2, and V5, and open vacuum valves V2, V4, V6, and V8 to evacuate the impurity gas in the passage by operating the dry pump 6. When the vacuum gauge P1 indicates a value of 0.1 mbar, close vacuum valve V6 and open vacuum valves V7 and V9 to further evacuate the carrier gas contained therein by operating the molecular pump unit 7. When the vacuum gauge P2 indicates that the requirements are met, close V7 and open V10. This releases the methane sample in the purification and replenishment trap T8 and diffuses into the pre-pumped sample collection line 5, and places the sample collection line 5 into the sample collection trap T9.
[0022] In particular, it is provided that the front tubing of the chromatography column can be cleaned during or after transfer, reconcentration and collection, comprising: (1) Functional restoration of VOC trap T1: Switching valves V13 and V14 are opened, and the other switching valves are closed. When the temperature of VOC trap T1 is increased (to 100 °C), the carrier gas passing into the He1 carrier gas supply line and the water and VOC components remaining in VOC trap T1 are discharged through the drain line. (2) Purging the adsorption trap group, the chemical trap, and the liquid nitrogen cold trap: The switching valves V23, V12, V16, and V19 are opened, and the other switching valves are closed. Carrier gas flowing into the He0 carrier gas supply line will discharge the impurities remaining in the adsorption trap T2, the adsorption trap T3, the chemical trap T4, and the liquid nitrogen cold trap T5 from the impurity gas discharge line. Example 3
[0023] A system for cleaning, collecting, and processing isotope samples, characterized in that it comprises a two-stage four-way valve A, a two-stage six-way valve B, a two-stage six-way valve C, a two-stage four-way valve D, a VOC trap T1, an adsorption trap T2, an adsorption trap T3, a chemical trap T4, a liquid nitrogen cold trap T5, a liquid nitrogen enrichment trap T6, a verification and enrichment trap T7, a cleaning and re-enrichment trap T8, and a sample collection trap T9, wherein the two-stage four-way valve A has four hole positions a1, a2, a3, a4, wherein a2 is connected via a connecting line to a natural gas sample cylinder 3, wherein the connecting line is provided with a cylinder decompression gauge 4, wherein a4 is connected via a pipeline to the injection injector 2, wherein the injection injector 2 is provided with a GC sample inlet 1, wherein the injection injector 2 is provided with a supply line of the carrier gas He0; wherein the two-stage six-way valve B has six hole positions b1, b2, b3, b4, b5, b6, wherein b2 is connected to a3 via a pipeline, wherein b3 is connected to the inlet of the VOC trap T1 via a pipeline, wherein the outlet of the VOC trap T1 is connected to b6 via a pipeline, wherein b1 is connected to the inlet of the liquid nitrogen cold trap T5 via a contaminant removal pipeline, wherein the contaminant removal pipeline is sequentially connected to the adsorption trap T2, the adsorption trap T3 and the chemical trap T4, wherein b4 is connected to an inlet line of the first load gas, wherein b5 is connected to a drain line; wherein the two-stage six-way valve C has six hole positions c1, c2, c3, c4, c5, c6, wherein the outlet of the liquid nitrogen cold trap T5 is connected to c2 via a pipe, wherein c3 is connected to the inlet of the liquid nitrogen enrichment trap T6 via a pipe, wherein the outlet of the liquid nitrogen enrichment trap T6 is connected to the inlet of the verification and enrichment trap T7 via a pipe, wherein the outlet of the verification and enrichment trap T7 is connected to c6 via a pipe, wherein c1 is connected to a pipe for discharging impurity gas, wherein c4 is connected to an inlet line of the second load gas, wherein c5 is connected to the inlet of the chromatography column GC8 via a pipe; wherein the two-stage four-way valve D has four hole positions d1, d2, d3, d4, wherein d1 is connected via a pipeline to the outlet of the chromatography column GC8, wherein d2 is connected via an enrichment pipeline to the inlet of the cleaning and re-enrichment trap T8, wherein d3 is connected to an inlet line of the third load gas, wherein d4 is connected to a heavy gas outlet line, wherein the enrichment line is provided with a switching valve V1, wherein the outlet of the cleaning and re-enrichment trap T8 is connected via a pipeline to the inlet of the sample collection trap T9, wherein the sample collection trap T9 is connected via a communication line to each of the sample outlet line and the collection line, wherein the communication line is provided with a switching valve V2, wherein the sample outlet line is provided with a switching valve V3, wherein the collection line is provided with a switching valve V4,wherein the collecting pipeline is connected to a vacuum branch line and a collecting branch line, wherein the vacuum branch line is connected to a vacuum source, wherein the collecting branch line is provided with a switching valve V5 and a switching valve V10, wherein the end of the collecting branch line is connected to a sample collecting line 5, wherein the sample collecting line 5 is arranged in the sample collecting trap T9, wherein the low vacuum gauge P1 is connected to the vacuum branch line via a first connecting line, wherein the first connecting line is provided with a switching valve V8, wherein the dry pump 6 is connected to the vacuum branch line via a second connecting line, wherein the second connecting line is provided with a switching valve V6, wherein the high vacuum gauge P2 is connected to the vacuum branch line via a third connecting line,wherein the third connecting line is provided with a switching valve V9, wherein the molecular pump 7 is connected to the vacuum branch line via a fourth connecting line, wherein the fourth connecting line is provided with a switching valve V7.,
[0024] In order to reduce the gas diffusion volume, avoid the possible degassing effect of the low vacuum gauge P1 and the safety protection of the high vacuum gauge P2 and the effects of ionization of the high vacuum gauge P2, in the vacuum control unit, the low vacuum gauge P1 and the high vacuum gauge P2 in the system are connected to the vacuum system via the vacuum valves V8 and V9, respectively.
[0025] In the present embodiment, the temperature control range of VOC trap T1 is between -24°C and -0°C. HayeSep D or PoraPLOT Q resin or molecular sieve fillers are incorporated to remove a large amount of VOC components from the sample. Then, it is introduced into adsorption trap T2 (filled with diiodine pentoxide to oxidize CO to carbon dioxide), adsorption trap T3 (filled with alkali lime or sodium hydroxide to remove acidic gases such as carbon dioxide), chemical trap T4 (a backup trap that can selectively remove other contaminants), liquid nitrogen cold trap T5 (a liquid nitrogen cold trap without filler to remove sulfur dioxide and volatile gases), liquid nitrogen enrichment trap T6, and verification and enrichment trap T7.The Verification and Enrichment Trap T6 and the Verification and Enrichment Trap T7 are two fully consistent, in-line liquid nitrogen cold traps with built-in molecular sieve or resin fillers, connected in series. Switching valves V1, V2, V3, V4, V5, V6, V7, V8, V9, and V10 are manual vacuum valves distributed throughout each pipeline to complete the collection of the target gas.
[0026] The two positions of the four rotary valves are respectively the injection state when rotated clockwise and the sampling state when rotated counterclockwise. The functions of impurity removal, enrichment, purification, separation, and transfer of sample gas are realized by switching and combining hole positions between the two-stage four-way valve (A), the two-stage six-way valve (B), the two-stage six-way valve (C), and the two-stage four-way valve (D). The combination of the vacuum switching valves V1, V2, V3, V4, V5, V6, V7, V8, V9, and V10 enables the re-enrichment, transfer, collection, and online injection analysis of the target gas. It is applied to the combination of the above valve bodies. I) Sample injection: 1) For gas samples with relatively high concentration, the sampling holes a4, a3 of the two-stage four-way valve A and the sampling holes b2, b3 of the two-stage six-way valve B are connected to the injection injector 2, so that the carrier gas He0 is introduced from the GC sample inlet 1, thereby introducing the sample in the injection injector 2 into the system; 2) For cylinder gas with relatively low concentration, the sampling holes a2, a3 of the two-stage four-way valve A and the sampling holes b2, b3 of the two-stage six-way valve B are connected to the gas sample with relatively low concentration in the natural gas sample cylinder 3, so that the carrier gas He0 is introduced from the GC sample inlet 1 into the system. II) Impurity gas removal: After the sample gas is introduced into the system, the carrier gas He0 passes through the VOC trap T1 sequentially to remove water and VOC components; the hole positions b6 and b1 of the two-stage six-way valve B are connected to the adsorption trap T2, the adsorption trap T3, the chemical trap T4, the liquid nitrogen cold trap T5, the hole positions c2 and c3 of the two-stage six-way valve C, and the liquid nitrogen enrichment trap T6, thereby combining the arranged chemical traps to remove impurity gas components;The sample is purified and enriched for storage in the liquid nitrogen enrichment trap T6, and then the enrichment effect of the enriched target gas is verified in the verification and enrichment trap T7 (to adjust the length and carrier gas flow of the connecting line between the liquid nitrogen cold trap T5 and the liquid nitrogen enrichment trap T6 so that the sample is fully enriched in the liquid nitrogen enrichment trap T6); other impurity gases in the sample gas are separated from the permanent gas through the hole positions c6, c1 of the two-stage six-way valve C and the impurity gas discharge line. III) Chromatographic separation and re-enrichment of methane gas: The carrier gas is removed and methane is collected to complete the transfer and collection of methane gas. Hole positions c4 and c3 of the two-stage six-way valve C, the liquid nitrogen enrichment trap T6, the verification and enrichment trap T7, the hole positions c6 and c5 of the two-stage six-way valve C, the chromatography column 8, the hole positions d1 and d2 of the two-stage four-way valve D, the vacuum valve V1, and the purification and re-enrichment trap T8 are connected to introduce the carrier gas He2 from hole position c4 of the two-stage six-way valve C. The purified methane gas stored in the liquid nitrogen enrichment trap T6 is introduced into the chromatography column 8. The separation of methane is carried out using a separation chromatography column or a capillary column.The separated methane gas is switched and adjusted by the valve body to complete the maintenance of methane enrichment in the cleaning and re-enrichment trap T8, thereby waiting for the next transfer and collection;. IV) Carrier gas removal and methane collection: The vacuum valves V1, V3, V5 are closed and the vacuum valves V2, V4, V6, V8 are opened, and the impurity gas in the passage is evacuated by the operation of the dry pump 6. When the vacuum gauge P1 indicates a value of 0.1 mbar, the vacuum valve V6 is closed and the vacuum valves V5, V7, V9 are opened to further evacuate the carrier gas contained therein by the operation of the molecular pump unit 7. When the vacuum gauge P2 indicates that the requirements are met (the indicated value is not worse than 1*10 -6mbar), V7 is closed and V5 and V10 are opened. This releases the methane sample in the purification and re-enrichment trap T8 and diffuses into the pre-pumped sample collection line 5, and the sample collection line 5 is placed in the sample collection trap T9; V) Isotope mass spectrometry test for gas stabilization: The sample collection line 5 is directly connected to the two-way injection system of the isotope mass spectrometer (MAT253 Ultra Thermo Scientific) for gas stabilization, or V5 is opened to directly and evenly diffuse into the two-way injection storage tank of the isotope mass spectrometer (MAT253 Ultra Thermo Scientific) to complete the analysis and detection of the binary isotopes 13CH3D and 12CH2D2 in methane samples, and to complete the analysis and detection of Δ18 and Δ13CH3D of the binary isotopes 13CH3D and 12CH2D2 in methane samples.
[0027] In addition, the system has the following functions: I) Functional restoration of VOC trap T1: The temperature of VOC trap T1 is set to 100°C. The hole positions b4, b3 of the two-stage six-way valve B, VOC trap T1, and the hole positions b6, b5 of the two-stage six-way valve B are connected, so that the carrier gas He1 is introduced from the hole position b4 of the two-stage six-way valve B, and the frozen water and other VOC components in the system are discharged for reuse. II) Chemical trap purge mode: The hole positions a4, a3 of the two-stage four-way valve A, the hole positions b2, b1 of the two-stage six-way valve B, the adsorption trap T2, the adsorption trap T3, the chemical trap T4, the liquid nitrogen cold trap T5 and the hole positions c2, c1 of the two-stage six-way valve C are connected, so that the carrier gas He0 is introduced from the GC sample inlet 1 and vented after passing through the piping to keep the gas path system clean; III) Permanent gas purge mode: The liquid nitrogen cold trap T5, the hole positions c2, c3 of the two-stage six-way valve C, and the liquid nitrogen enrichment trap T6, the verification and enrichment trap T7, and the hole positions c6 and c1 of the two-stage six-way valve C are connected, so that the carrier gas He0 is sequentially introduced from the two-stage four-way valve A and the two-stage six-way valve B to vent the permanent gas remaining in the connecting line and keep the system clean; IV) Purification and re-enrichment mode: The hole positions d3, d2 of the two-stage four-way valve D, the vacuum valve V1 and the purification and re-enrichment trap T8, the vacuum valve V2, the vacuum valve V3 are connected, so that the carrier gas He3 is introduced from the hole positions d3, d2 of the two-stage four-way valve D and discharged through the vacuum valve V3 to complete the purification and enrichment of the methane sample.
Claims
[1] System for cleaning, collection and preparation of isotope samples, characterized by that it comprises a two-stage four-way valve A, a two-stage six-way valve B, a two-stage six-way valve C, a two-stage four-way valve D, a VOC trap T1, an adsorption trap T2, an adsorption trap T3, a chemical trap T4, a liquid nitrogen cold trap T5, a liquid nitrogen enrichment trap T6, a verification and enrichment trap T7, a cleaning and re-enrichment trap T8, a sample collection trap T9, wherein the two-stage four-way valve A has four hole positions a1, a2, a3, a4, wherein a2 is connected to a natural gas sample bottle via a connecting line, wherein a4 is connected to the injection injector 2 via a pipeline, wherein the injection injector is provided with a GC sample inlet 1, wherein the injection injector is provided with a supply line of the carrier gas He0, wherein a1 is connected to an exhaust gas line; wherein the two-stage six-way valve B has six hole positions b1, b2, b3, b4, b5, b6, wherein b2 is connected to a3 via a pipeline, wherein b3 is connected to the inlet of the VOC trap T1 via a pipeline, wherein the outlet of the VOC trap T1 is connected to b6 via a pipeline, wherein b1 is connected to the inlet of the liquid nitrogen cold trap T5 via a contaminant removal pipeline, wherein the contaminant removal pipeline is sequentially connected to the adsorption trap T2, the adsorption trap T3 and the chemical trap T4, wherein b4 is connected to an inlet line of the first load gas, wherein b5 is connected to a drain line; wherein the two-stage six-way valve C has six hole positions c1, c2, c3, c4, c5, c6, wherein the outlet of the liquid nitrogen cold trap T5 is connected to c2 via a pipe, wherein c3 is connected to the inlet of the liquid nitrogen enrichment trap T6 via a pipe, wherein the outlet of the liquid nitrogen enrichment trap T6 is connected to the inlet of the verification and enrichment trap T7 via a pipe, wherein the outlet of the verification and enrichment trap T7 is connected to c6 via a pipe, wherein c1 is connected to a pipe for discharging impurity gas, wherein c4 is connected to an inlet line of the second load gas, wherein c5 is connected to the inlet of the chromatography column GC8 via a pipe; wherein the two-stage four-way valve D has four hole positions d1, d2, d3, d4, wherein d1 is connected via a pipeline to the outlet of the chromatography column GC, wherein d2 is connected via an enrichment pipeline to the inlet of the cleaning and re-enrichment trap T8, wherein d3 is connected to an inlet line of the third load gas, wherein d4 is connected to a heavy gas outlet line, wherein the enrichment line is provided with a switching valve V1, wherein the outlet of the cleaning and re-enrichment trap T8 is connected via a pipeline to the inlet of the sample collection trap T9, wherein the sample collection trap T9 is connected via a communication line to each of the sample outlet line and the collection line, wherein the communication line is provided with a switching valve V2, wherein the sample outlet line is provided with a switching valve V3, wherein the collection line is provided with a switching valve V4,wherein the collecting pipeline is connected to a vacuum branch line and a collecting branch line, the vacuum branch line being connected to a vacuum source, the collecting branch line being provided with a switching valve V5 and a switching valve V10, the end of the collecting branch line being connected to a sample collecting line 5, the sample collecting line being arranged in the sample collecting trap. [2] System for cleaning, collecting and processing isotope samples according to claim 1, characterized bythat the low vacuum gauge P1 is connected to the vacuum branch line via a first connecting line, wherein the first connecting line is provided with a switching valve V8, wherein the dry pump 6 is connected to the vacuum branch line via a second connecting line, wherein the second connecting line is provided with a switching valve V6, wherein the high vacuum gauge P2 is connected to the vacuum branch line via a third connecting line, wherein the third connecting line is provided with a switching valve V9, wherein the molecular pump 7 is connected to the vacuum branch line via a fourth connecting line, wherein the fourth connecting line is provided with a switching valve V7. [3] A method for cleaning, collecting and processing isotope samples for a system for cleaning, collecting and processing isotope samples according to any one of claims 1 to 2, comprising the following steps: I) Sample injection: 1) For gas samples with relatively high concentration, the sampling holes a4, a3 of the two-stage four-way valve A and the sampling holes b2, b3 of the two-stage six-way valve B are connected to the injection injector, so that the carrier gas He0 is introduced from the GC sample inlet, thereby introducing the sample in the injection injector into the system; 2) For cylinder gas with relatively low concentration, the sampling holes a2, a3 of the two-stage four-way valve A and the sampling holes b2, b3 of the two-stage six-way valve B are connected to the gas sample with relatively low concentration in the natural gas cylinder, so that the carrier gas He0 is introduced into the system from the GC sample inlet 1; II) Impurity gas removal: After the sample gas is introduced into the system, the carrier gas He0 passes through the VOC trap T1 sequentially to remove water and VOC components; the hole positions b6 and b1 of the two-stage six-way valve B are connected to the adsorption trap T2, the adsorption trap T3, the chemical trap T4, the liquid nitrogen cold trap T5, the hole positions c2 and c3 of the two-stage six-way valve C, and the liquid nitrogen enrichment trap T6, thereby combining the arranged chemical traps to remove impurity gas components; the sample is purified and enriched in the liquid nitrogen enrichment trap T6 for storage, and then the enrichment effect of the enriched target gas is verified in the verification and enrichment trap T7;Other impurity gases in the sample gas are separated from the permanent gas through the hole positions c6, c1 of the two-stage six-way valve C and the impurity gas discharge line; III) Chromatographic separation and re-enrichment of methane gas: The carrier gas is removed and methane is collected to complete the transfer and collection of methane gas. Hole positions c4 and c3 of the two-stage six-way valve C, the liquid nitrogen enrichment trap T6, the verification and enrichment trap T7, the hole positions c6 and c5 of the two-stage six-way valve C, the chromatography column 8, the hole positions d1 and d2 of the two-stage four-way valve D, the vacuum valve V1, and the purification and re-enrichment trap T8 are connected to introduce the carrier gas He2 from hole position c4 of the two-stage six-way valve C. The purified methane gas stored in the liquid nitrogen enrichment trap T6 is introduced into the chromatography column 8. The separation of methane is carried out using a separation chromatography column or a capillary column.The separated methane gas is switched and adjusted by the valve body to complete the maintenance of methane enrichment in the cleaning and re-enrichment trap T8, thereby waiting for the next transfer and collection;. IV) Carrier gas removal and methane collection: The vacuum valves V1, V3, and V5 are closed, and the vacuum valves V2, V4, V6, and V8 are opened, and the impurity gas in the passage is evacuated by the operation of the dry pump. When the vacuum gauge P1 indicates a value of 0.1 mbar, the vacuum valve V6 is closed and the vacuum valves V5, V7, and V9 are opened to further evacuate the carrier gas contained therein by the operation of the molecular pump unit. When the vacuum gauge P2 indicates that the requirements are met, V7 is closed and V5 and V10 are opened. This releases the methane sample in the purification and replenishment trap T8 and diffuses into the pre-pumped sample collection line, and the sample collection line is placed in the sample collection trap T9; V) Isotope mass spectrometry test for gas stabilization: The sample collection line is directly connected to the two-way injection system of the isotope mass spectrometer for gas stabilization, or V5 is opened to directly and evenly diffuse into the two-way injection storage tank of the isotope mass spectrometer to complete the isotope analysis and detection together with the gas isotope mass spectrometer. [4] Use of the system for cleaning, collecting and processing isotope samples according to one of claims 1 to 2 for the detection of methane-13CD isotopes.
Citation Information
Patent Citations
CN000103743846A
