METHOD AND DEVICE FOR LASER DRILLING

DE502021005196D1Active Publication Date: 2024-10-10ROMANOWSKI ARNO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
DE502021005196
Authority / Receiving Office
DE · DE
Patent Type
Patents
Current Assignee / Owner
Priority Date
2020-07-03
Filing Date
2021-07-02
Publication Date
2024-10-10
Estimated Expiration
2041-07-02

AI Technical Summary

Technical Problem

Existing laser drilling methods for rock formations face challenges in achieving rapid drilling progress in deep boreholes without overheating the laser drill head or drill pipe, due to high energy requirements and thermal issues associated with transmitting high-power laser beams through long fiber optic cables.

Method used

The method employs a laser guide tube through which a protective gas stream flows, supplying liquid nitrogen that transitions to a gaseous state at the laser drill head, where it is heated to create a cooling and heating gas stream, and uses a drill pipe design with concentric tubes for thermal insulation and efficient nitrogen distribution.

Benefits of technology

This approach allows for the transmission of high-power laser beams with minimal loss and effective cooling, preventing overheating and thermal short circuits, enabling efficient rock removal and maintaining drilling progress without damage.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The invention relates to a method and a device for drilling a borehole into a rock formation by applying a laser beam to the borehole bottom, which is generated by a laser beam generator located outside the borehole and is fed by means of suitable aids to a laser drilling head located at the borehole bottom and connected to a drill rod, wherein nitrogen is fed to the laser drilling head via the drill rod, which is divided in the area of ​​the laser drilling head into a partial flow serving as a protective gas flow, which protects the passing laser beam against obstructing suspended matter, and another partial flow serving as a production gas flow, which carries the rock material detached at the bottom of the borehole out of the borehole via an annular space remaining between the drill rod and the borehole wall.

[0002] Such a device is known, for example, from US 2010 / 0044102 A1. In known drilling methods of the type mentioned, a flexible tube is used as an aid for supplying the laser beam and for supplying nitrogen, which is required as a shielding gas and production gas. This can be a spiral tube, for example, in whose interior a fiber optic cable is arranged to conduct the laser beam, while still leaving sufficient space in the tube for the passage of a sufficient amount of nitrogen. The shielding gas flow and the laser beam exit together through an opening on the underside of the laser drill head facing the borehole bottom and together impinge on the borehole bottom. The energy of the laser beam impinging on the borehole bottom loosens the rock material present there, depending on the rock material, by melting, evaporation and / or spallation.The thermally detached rock material is then displaced by the protective gas flow impinging on the borehole bottom in the direction of the edge of the borehole bottom and there captured by the suction of the production gas flow directed in the discharge direction, which carries the material detached from the borehole bottom out of the borehole via the annular space between the drill rod and the borehole wall.

[0003] Such methods and devices have a number of conflicting requirements that lead to problems in practical implementation: The thermal detachment of rock from the borehole bottom used in these methods obviously requires a lot of energy, which is essentially supplied by the laser beam. Corresponding tests have shown that in normal rock formations, a power density of more than 400 W / cm² is required for the thermal detachment of rock material at the borehole bottom using a laser beam. To achieve this power density, with state-of-the-art devices, the laser beam must be appropriately focused in the impact area on the borehole bottom and successively guided over the borehole bottom. This requires complex mechanisms integrated into the laser drill head and / or supporting drilling tools if sufficient drilling progress is to be achieved.It would be better, however, if the entire borehole bottom could be exposed to sufficient intensity simultaneously, for example using an expander lens in the laser drilling head. However, for normal borehole diameters, this would require a laser beam with a power of more than 500 kW, preferably 600 kW to 700 kW.

[0004] However, a laser beam with such high power cannot be easily transmitted via a fiber optic cable, especially if the cable is 2,000 to 10,000 meters long due to the desired borehole depth. Fiber optic cables have a relatively high attenuation, meaning that the fed-in laser beam no longer reaches the laser drill head with sufficient intensity at such a length.

[0005] In addition, the required increase in laser beam power would lead to thermal problems, because the energy introduced by the laser beam and released as heat at the borehole bottom would cause excessive overheating of the laser drill head and drill rod. Given the high laser beam power, the quantities of gaseous nitrogen supplied by the shielding gas flow and the production gas flow are insufficient to adequately dissipate the excess heat. Furthermore, intensive exposure of the borehole bottom to a cold shielding gas flow would lead to a thermal short circuit in the borehole bottom area, which would impede the thermal detachment of the rock material from the borehole bottom.

[0006] It is therefore an object of the invention to further develop the method of the type mentioned at the outset in such a way that even in very deep boreholes, sufficiently rapid drilling progress is possible without harmful overheating of the laser drill head or the drill rod.

[0007] To achieve this object, the invention provides, starting from the method of the type mentioned at the outset, that the laser beam is fed to the laser drilling head via a laser guide tube extending over the length of the drill rod, the free cross section of which is flowed through by the protective gas flow, that the nitrogen is fed to the laser drilling head via the drill rod in a liquid state and is converted into a gaseous state in the region of the laser drilling head, and that a further partial flow serving as a heating gas flow is branched off from the supplied nitrogen, which is heated by means of an electrical heating device assigned to the laser drilling head and is directed towards the bottom of the borehole exposed to the laser beam.

[0008] The use of a laser guide tube through which the shielding gas flows, as provided for in the invention, instead of the conventional fiber optic cable, makes it possible to transmit an extremely high-power laser beam with virtually no loss along the entire length of the drill rod. Clean, gaseous nitrogen has an extremely low attenuation effect. To direct and, if necessary, correct the direction of the laser beam along the path of the laser guide tube, it is readily possible to arrange suitable lenses and / or mirror systems at suitable intervals within the guide tube. These, of course, must not interrupt the shielding gas flow.

[0009] Furthermore, because in the process according to the invention, the nitrogen is supplied to the laser drilling head in a liquid state and is only converted into a gaseous state in the area of ​​the laser head, sufficient coolant is available for cooling the laser drilling head, the shielding gas flow, the conveying gas flow, and the drill rod. This transition in the state of matter is extremely endothermic and significantly increases the supplied volume, so that sufficient amounts of cold nitrogen gas can be made available in the area of ​​the laser drilling head and distributed as needed to prevent overheating.

[0010] The electrically preheated heating gas stream directed toward the borehole bottom, which is also provided according to the invention, ultimately prevents the aforementioned thermal short circuit. As a result, it is readily possible to intensify this heating gas stream, which supports the removal work of the laser beam and simultaneously transports the rock material removed at the borehole bottom toward the production gas stream, as desired. This heating gas stream is preferably even heated to a temperature close to the melting point of the rock present.

[0011] A further problem with methods according to the invention is that the molten or vaporized rock material contained in the ascending production gas stream must, if possible, be cooled to below the solidification temperature of the rock before entering the annular space between the drill rod and the borehole wall, so that this rock material does not precipitate on the drill rod and / or the borehole wall. For this purpose, it is further provided that liquid nitrogen is additionally used as the production gas. This liquid nitrogen is injected in the region of the laser drill head into the production gas stream flowing back from the borehole bottom and laden with the rock material detached from the borehole bottom. There, it is converted into the gaseous state while cooling the production gas stream and the rock material contained therein.The liquid nitrogen used for this purpose is branched off within the laser drilling head from the liquid nitrogen stream supplied to the laser drilling head via the drill rod.

[0012] It is also advantageous to divert a further partial flow from the nitrogen supplied to the laser drilling head, serving as a cooling gas stream. This flow is led out of the borehole via the drill rod, thereby cooling the drill rod from the inside. This also ensures that unnecessary heat from the production gas stream is not introduced into the interior of the drill rod.

[0013] Finally, the process also provides for a further partial stream to be diverted from the nitrogen supplied to the laser drilling head, serving as a cleaning gas stream. This stream keeps the laser beam outlet of the laser drilling head, which faces the borehole bottom and is covered by an expander lens, clean. This prevents the transparently covered laser beam outlet from becoming contaminated by suspended matter from the excavated rock material rising from the borehole bottom, thus making it less permeable to the laser beam.

[0014] The invention further relates to a device for carrying out the method discussed above. This device is characterized by a special design of the drill rod. This drill rod comprises: A laser guide tube through which the protective gas flow flows for the passage of the laser beam, a double tube surrounding the laser guide tube concentrically and at a radial distance, the annular space of which is flowed through by liquid nitrogen, an insulation tube surrounding the double tube concentrically and at a radial distance, and an outer protective tube surrounding the insulation tube concentrically and at a radial distance, wherein the annular spaces surrounding the double tube are evacuated, the annular space between the outer protective tube and the insulation tube is connected to the cooling gas flow returned from the laser drilling head, and one or more of the tubes surrounded by the outer protective tube are provided with electrical conductors for conducting electrical energy and electrical signals to the laser drilling head.

[0015] Such a drill rod, with its compact design, enables the largely undamped passage of a high-power laser beam through the laser guide tube, a largely heat-insulated passage of liquid nitrogen through the annular space of the double tube, good thermal insulation of the entire drill rod against heat from the production gas flow, and the transmission of electrical energy and electrical signals to the laser drill head.

[0016] It is also practical to have the outer protective tube made of steel, and the tubes arranged inside the protective tube made of carbon fiber reinforced plastic (CFRP). The outer protective tube, made of steel, provides the entire drill rod assembly with the necessary stability and resistance to accidental overheating from the outside. The material used for the inner tubes is characterized by its low weight and extremely high strength, and is also good thermal and largely electrically insulating.

[0017] It is furthermore expedient for the laser drilling head to have a housing whose housing cover is attached to the outer protective tube of the drill rod, the housing further being provided with: a passage channel for the laser beam running through the housing and connecting to the laser guide tube of the drill rod, the exit opening of which is covered in the area of ​​the housing base by an expander lens, arranged in the interior of the housing and connected to the annular space of the double tube of the drill rod for the forwarding and / or evaporation of the incoming liquid nitrogen and for the storage and distribution of gaseous nitrogen to the various intended partial flows, production jet nozzles arranged in the housing shell and inclined in the flow direction of the production gas flow for the injection of liquid nitrogen into the production gas flow, heating jet nozzles arranged in the housing base and directed towards the borehole bottom for the heating gas flow,an electric heating device for the heating gas flow arranged in the interior of the housing as well as solenoid valves and volume flow controllers for the control and regulation of all nitrogen partial flows.

[0018] With such a laser drilling head, it is possible to deliver the laser beam arriving via the laser guide tube of the drill rod to the bottom of the borehole with as little dampening as possible and to evaporate the liquid nitrogen supplied via the double tube of the drill rod and divide it into the various partial flows in a volume flow-controlled manner.

[0019] It is also advantageous if the partial flow serving as the cooling gas flow runs through the interior of the casing, and the interior of the casing is connected to the annular space between the outer protective tube and the insulation tube of the drill rod. This simultaneously allows the cooling gas flow responsible for cooling the casing to keep the exterior of the drill rod sufficiently cool.

[0020] When using the device according to the invention, there is a risk that rock particles rising from the borehole floor will contaminate the expansion lens located in the laser beam exit area. To prevent this, cleaning nozzles for the partial flow serving as the cleaning gas stream are arranged in the housing base. These nozzles run parallel to the underside of the housing base and are aligned with the expansion lens covering the passage opening for the laser beam.

[0021] In order to supply the laser guide tube with a sufficient clean shielding gas flow starting at the housing of the laser drilling head and over its entire length, it is further provided that the passage channel for the laser beam within the housing of the laser drilling head is provided with inlet openings for the partial flow serving as the shielding gas flow.

[0022] Finally, it is provided that, within the passage channel for the laser beam and / or the laser guide tube, holding devices for holding the lenses and / or mirror systems that direct the laser beam are arranged at a distance from one another. These holding devices are designed to be gas-permeable to the shielding gas flow. Such devices make it possible to realign and / or focus the laser beam if necessary if the borehole and, accordingly, the drill rod deviate from a straight path.

[0023] An embodiment of the invention is explained below with reference to the drawings. They show: Figure 1: Schematic of a longitudinal section through the laser drilling head, attached to the drill rod, in its working position above the borehole bottom; Figure 2: Schematic of a cross-section through the drill rod.

[0024] In the drawing, the laser drill head is designated in its entirety by reference numeral 1, and the drill rod supporting the laser drill head 1 is designated in its entirety by reference numeral 2. The laser drill head 1 and the drill rod 2 are located in a borehole 4 inserted into a rock formation 3, having a borehole wall 4a and a borehole bottom 4b.

[0025] The laser drilling head 1, which is held in its working position at a short distance above the borehole bottom 4b, has a substantially cylindrical housing 5, the housing cover 5a of which is connected to the drill rod 2.

[0026] Furthermore, the housing 5 has a housing base 5b arranged at a distance from the borehole bottom 4b, which is centrally connected to a passage 6 for a laser beam 7 supplied via the drill rod 2 and forwarded through the housing 5. An expander lens 8 is located in the passage opening of this passage 6, which expands the incoming laser beam 7 to such an extent that the entire borehole bottom 4b is exposed to the laser beam 7.

[0027] Furthermore, the housing base 5b contains heating jet nozzles 9 which generate heating gas flows 10 directed towards the borehole bottom 4b and are supplied with heating gas by electrical heating devices 11 arranged in the interior of the housing 5.

[0028] In addition, cleaning nozzles 12 are located in the housing base 5b, which are aligned parallel to the underside of the housing base 5b in the direction of the centrally arranged expander lens 8 and are supplied with clean, gaseous nitrogen as a cleaning gas stream 14 for keeping the expander lens 8 clean from a nitrogen collecting container 13 located inside the housing 5.

[0029] Furthermore, the housing 5 of the laser drilling head 1 has a housing shell 5c, which leaves an annular space around the borehole wall 4a for the passage of a production gas stream 15 loaded with the detached rock material, rising from the borehole bottom 4b. This production gas stream 15 originates in the edge region of the borehole bottom 4b, which is acted upon by the heating gas stream 10, and carries the rock material detached from the borehole bottom out of the borehole 4.

[0030] To support this ascending conveying gas flow 15, conveying jet nozzles 16 and 17 are arranged in the housing shell 5c of the housing 5 of the laser drilling head 1. These nozzles are inclined in the direction of the conveying gas flow 15 and can be supplied with liquid and / or gaseous nitrogen from the interior of the housing 5. If liquid nitrogen is introduced via the conveying jet nozzles 16, this contributes particularly intensively to the cooling of the rock material contained in the conveying gas flow 15.

[0031] In order to be able to supply the laser beam 7 to the laser drilling head 1 with as little dampening as possible and also to be able to supply the laser drilling head 1 with a sufficient amount of nitrogen, the above-mentioned drill rod 2 is specially designed, as will be explained in detail below.

[0032] This drill rod 2 consists of several concentrically arranged tubes, namely: an inner laser guide tube 19, through which a protective gas stream 18 flows, for the passage of the laser beam 7; a double tube 21 surrounding the laser guide tube 19 concentrically and at a radial distance, the annular space 21a of which is flowed through by liquid nitrogen; an insulation tube 22 surrounding the double tube 21 concentrically and at a radial distance; and an outer protective tube 23 surrounding the insulation tube 22 concentrically and at a radial distance.

[0033] The protective gas flow 18 consisting of clean nitrogen is fed to the laser guide tube 19 of the drill rod 2 via inlet openings 20 located inside the housing 5 of the laser drill head 1 and opening into the passage channel 6, specifically above its passage opening.

[0034] Furthermore, the annular spaces surrounding the double tube 21 are evacuated towards the laser guide tube 19 and the insulation tube 22 in order to keep the liquid nitrogen flowing through the annular space of the double tube 21 sufficiently thermally insulated.

[0035] The annular space between the outer protective tube 23 and the insulation tube 22 is connected to a cooling gas flow 24 which is returned from the housing 5 of the laser drilling head 1 and which sufficiently cools the outside of the drill rod 2.

[0036] The outer protective tube 23 is made of steel and ensures good stability and load-bearing capacity of the entire drill rod 1. All tubes located inside the protective tube 23, namely the laser guide tube 19, the double tube 21 and the insulation tube 22, are made of carbon fiber reinforced plastic (CFRP).

[0037] Furthermore, one or more of the tubes surrounded by the outer protective tube 23 are provided with electrical conductors, not shown in detail in the drawing, for conducting electrical energy and electrical signals in the direction of the laser drilling head 1.

[0038] To simplify handling, the drill rod 1 is divided into lengths that can be connected to one another at their ends by screwable socket-and-tenon joints 25, 26. In the area of ​​these socket-and-tenon joints 25, 26, the adjacent sections of the laser guide tube 19, the annular space of the double pipe 21, and the annular space between the outer protective pipe 23 and the insulation pipe 22 are connected to one another in an aligned and pressure-tight manner. Furthermore, the adjacent sections of the electrical conductors are electrically connected to one another there. In contrast, the annular spaces present in the individual sections of the drill rod 2, which are evacuated for the purpose of insulating the double pipe 21, are each individually sealed in a pressure-tight manner and are not connected to one another.

[0039] Finally, in the interior of the passage channel 6 for the laser beam 7 and / or the laser guide tube 19, holding devices 27 for holding lenses or mirror systems directing the laser beam 7 are arranged at a distance from one another, said holding devices being designed to be permeable to the protective gas flow 18, ie being provided with corresponding passage holes at the edge.

[0040] In the housing 5 of the laser drilling head 1 there are several solenoid valves and volume flow controllers (not provided with reference symbols in the drawing), which can be controlled via the signal conductors contained in the drill rod 2 and distribute the liquid nitrogen supplied to the housing 5 via the double pipe 21 to the conveyor jet nozzles 15, the collecting container 13 for gaseous nitrogen, the heating devices 11 for the heating gas flow 10 and the housing interior as required. The control and regulation is carried out in such a way that the system remains in thermodynamic equilibrium despite the energy supplied with the laser beam.

[0041] The system shown in the drawing works in principle as follows: A laser beam 7 with a power of 500 kW to 700 kW is fed into the laser guide tube 19 from a high-performance laser generator located outside the borehole 2 and directed to the laser drilling head 1. At the same time, the laser guide tube 19 is exposed from below to the shielding gas stream 18 consisting of clean nitrogen gas, so that the laser beam is barely attenuated on its way to the laser drilling head 1. In the laser drilling head 1, the laser beam 7 is then expanded by the expander lens 8 to such an extent that it covers the entire borehole bottom 5b.

[0042] Simultaneously with the expanded laser beam 7, the borehole bottom 4b is exposed to the heating gas stream 10, which has previously been heated by the heating device 11 to a temperature close to or even higher than the melting temperature of the rock present at the borehole bottom 4b. Under the influence of the laser beam 7 and the heating gas stream 10, rock material is removed from the surface of the borehole bottom 4b by melting, evaporation, or spallation and displaced by the heating gas stream 10 to the outer edge of the borehole bottom 4b.

[0043] In this edge area, an upwardly directed production gas flow 15 loaded with the removed rock material is formed, which pushes upwards through the annular space between the casing shell 5c and the borehole wall 4a.

[0044] Liquid nitrogen and / or gaseous nitrogen is then injected into this ascending production gas stream using the production jet nozzles 16 and 17, thereby cooling and simultaneously intensifying the production gas stream 15. This production gas stream 15, laden with rock material, is then discharged from the borehole 2 via the annular space between the drill rod 2 and the borehole wall 4a. List of reference symbols:

[0045] 1 - Laser drill head 2 - Drill rod 3 - Rock formation 4 - Borehole, 4a - Borehole wall, 4b - Borehole bottom 5 - Casing, 5a - Casing cover, 5b - Casing bottom, 5c - Casing jacket 6 - Passage channel 7 - Laser beam 8 - Expander lens 9 - Heating jet nozzles 10 - Heating gas flow 11 - Heating device 12 - Cleaning nozzle 13 - Collecting container for nitrogen gas 14 - Cleaning gas flow 15 - Production gas flow 16 - Production jet nozzles 17 - Production jet nozzles 18 - Shielding gas flow 19 - Laser guide tube 20 - Inlet openings 21 - Double pipe 22 - Insulation tube 23 - Protection tube 24 - Cooling gas flow 25 / 26 - Socket-pin connection 27 - Holding devices

Claims

1. Method for introducing a borehole (4) into a rock formation (3) by applying a laser beam (7) to the borehole bottom (4b), which laser beam is generated by a laser beam generator located outside the borehole and is supplied by means of suitable aids to a laser drilling head (1) located on the borehole bottom (4b) and connected to a drill rod (2), wherein supplied to the laser drilling head (1) via the drill rod (2) is nitrogen, which is divided into - a partial flow serving as a shield gas flow (18), which protects the laser beam (7) passing through against obstructive suspended matter, - and a further partial flow serving as a carrier gas flow (15), which discharges the rock material detached on the borehole bottom (4b) out of the borehole (4) via an annular space remaining between the drill rod (2) and borehole wall (4a), characterised in that the laser beam (7) is supplied to the laser drilling head (1) via a laser guide tube (19), which extends over the length of the drill rod and through the free cross section of which the shield gas flow (18) flows, the nitrogen is supplied to the laser drilling head (1) via the drill rod (2) in a liquid state and is transferred to the gaseous state in the region of the laser drilling head (1) and additionally branched off from the nitrogen supplied is a further partial flow serving as a heating gas flow (10), which is heated by means of an electric heating device (11) associated with the laser drilling head (1) and is directed against the borehole bottom (4b) to which the laser beam (7) is applied.

2. Method according to claim 1, characterised in that additionally used as a carrier gas is liquid nitrogen, which is injected in the region of the laser drilling head (1) into the carrier gas flow (15) flowing back from the borehole bottom (4b) and laden with the rock material detached from the borehole bottom (4b), and is transferred there to the gaseous state with cooling of the carrier gas flow (15) and the rock material located therein.

3. Method according to claims 1 and 2, characterised in that branched off from the nitrogen supplied to the laser drilling head (1) is a further partial flow serving as a cooling gas flow (24), which is led out of the borehole (4) via the drill rod (2) and thereby cools the drill rod (2) from inside.

4. Method according to any one of the preceding claims, characterised in that branched off from the nitrogen supplied to the laser drilling head (1) is a further partial flow serving as a cleaning gas flow (14), which keeps the laser beam exit opening of the laser drilling head (1) facing the borehole bottom (4b) clean.

5. Device for carrying out the method according to claim 1, characterised in that the drill rod (2) has: - a laser guide tube (19) for the passage of the laser beam (7), through which tube the shield gas flow (18) flows, - a double tube (21) surrounding the laser guide tube (19) concentrically and at a radial distance, through the annular space of which liquid nitrogen flows, - an insulation tube (22) surrounding the double tube (21) concentrically and at a radial distance, - and an outer protective tube (23) surrounding the insulation tube (22) concentrically and at a radial distance, wherein - the annular spaces surrounding the double tube (21) are evacuated, - the annular space between the outer protective tube (23) and the insulation tube (22) is connected to a cooling gas flow (24) led back from the laser drilling head (1) - and one or more of the tubes surrounded by the outer protective tube (23) are provided with electrical conductors for conducting electrical energy and electrical signals to the laser drilling head (1).

6. Device according to claim 5, characterised in that the outer protective tube (23) consists of steel and the tubes arranged in the interior of the protective tube (23) consist of carbon-fibre-reinforced plastic (CFRP).

7. Device according to claims 5 or 6, characterised in that the drill rod (2) is divided into length sections, which are each connected to one another at their ends by a screwable sleeve-stud connection (25, 26), wherein in the region of these sleeve-stud connections (25, 26) - the adjacent sections of the laser guide tube (19) and of the annular space of the double tube (21) and of the annular space between the outer protective tube (23) and the insulation tube (22) are connected flush and pressure-tight to one another, - the adjacent sections of the electrical conductors are connected electrically conductively to one another, - and the consecutive sections of the evacuated annular spaces surrounding the double tube (21) are closed pressure-tight without connection to one another.

8. Device according to any one of claims 5-7, characterised in that the laser drilling head (1) has a casing (5), the casing cover (5a) of which is attached to the outer protective tube (23) of the drill rod (2), wherein the casing (5) is further provided with: - a duct (6) running through the casing (5) and connecting to the laser guide tube (19) of the drill rod (2) for the laser beam, the exit opening of which duct is covered in the region of the casing base (5b) by an expander lens (8) in a light-permeable manner, - devices arranged in the casing interior and connected to the annular space of the double tube (21) of the drill rod (2) for routing and / or vaporisation of the arriving liquid nitrogen and for the storage and distribution of gaseous nitrogen to the various partial flows provided, - delivery jet nozzles (16, 17) arranged in the casing shell (5c) and running inclined in the flow direction of the carrier gas flow for injecting liquid and / or gaseous nitrogen into the carrier gas flow (15), - heating jet nozzles (9) arranged in the casing base (5b) and directed in the direction of the borehole bottom (4b) for the heating gas flow (10) - an electric heating device (11) arranged in the casing interior for the heating gas flow (10) - and solenoid valves and volume flow controllers for the control and regulation of all nitrogen partial flows.

9. Device according to claim 8, characterised in that the partial flow serving as a cooling gas flow (24) runs through the casing interior, wherein the casing interior is connected to the annular space between the outer protective tube (23) and the insulation tube (22) of the drill rod (2).

10. Device according to claim 8, characterised in that arranged in the casing base (5b) are cleaning nozzles (12) for a partial flow serving as a cleaning gas flow (14), which runs parallel to the underside of the casing base (5b) and is oriented to the expansion lens (8) covering the outlet opening for the laser beam.

11. Device according to claim 8, characterised in that inside the casing (5) of the laser drilling head, the duct (6) for the laser beam (7) is provided with inlet openings (20) for the partial flow serving as a shield gas flow (18).

12. Device according to any one of claims 5-7, characterised in that in the interior of a duct (6) for the laser beam (7) running through the casing (5) and connecting to the laser guide tube (19) of the drill rod (2), the exit opening of which duct is covered in the region of the casing base (5b) by an expander lens (8) in a light-permeable manner, and / or of the laser guide tube (19), holding devices (27) spaced from one another are arranged for holding lenses and / or mirror systems deflecting the laser beam (7), wherein these holding devices (27) are formed gas-permeable for the shield gas flow (18).

13. Device according to any one of claims 8-11, characterised in that arranged in the interior of the duct (6) for the laser beam (7) and / or of the laser guide tube (19) are holding devices (27) spaced from one another for holding lenses and / or mirror systems deflecting the laser beam (7), wherein these holding devices (27) are formed gas-permeable for the shield gas flow (18).