Installing a heavy lift crane system at a hoisting site
Patent Information
- Authority / Receiving Office
- EP · EP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2023-08-16
- Publication Date
- 2026-04-01
AI Technical Summary
The installation process of heavy lift crane systems is cumbersome due to their large size, requiring on-site assembly of components like the main boom and back mast, which are often modular and extensive, complicating the setup at locations such as refineries or wind turbine assembly sites.
A method involving the installation of a crane system with a circular slew track assembly, where the main boom and back mast are initially assembled in a horizontal orientation, followed by connecting a connector strut underneath the back mast, pivoting it into an inclined position, and suspending the counterweight, allowing for efficient assembly and setup.
This method facilitates a more efficient and dependable installation process by reducing the need for extensive on-site assembly, enabling quicker setup and readiness for operation.
Abstract
Citation Information
Patent Citations
A mobile heavy lift crane system
WO2021140011A1