Automatic, environmentally friendly power management process for a crane

The automatic power management method for cranes uses a generator and battery system to adjust power supply modes, addressing inefficiencies and environmental impacts by maintaining optimal generator operation and reducing fuel consumption and pollution.

FR3141009B1Active Publication Date: 2024-10-18MANITOWOC CRANE GROUP FRANCE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
FR2022010468
Authority / Receiving Office
FR · FR
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-10-12
Publication Date
2024-10-18
Estimated Expiration
2042-10-12

AI Technical Summary

Technical Problem

Cranes often operate outside the optimal power range of generators, leading to increased fuel consumption, pollution, and risk of damage, due to their energy consumption patterns that alternate between low and high power demands, necessitating oversized generators to handle peak loads.

Method used

An automatic power management method using a generator and a rechargeable secondary power source, such as a battery, to maintain the generator within its optimal power range by adjusting power supply modes (main, mixed, hybrid, and charging) based on current power demands and battery charge levels, avoiding oversizing and ensuring efficient operation.

Benefits of technology

Reduces energy consumption, pollutant emissions, and extends generator lifespan by keeping the generator within its optimal power range, while allowing the use of smaller, less material-intensive generators, aligning with sustainable development goals.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000034_0000
    Figure 00000034_0000
  • Figure 00000034_0001
    Figure 00000034_0001
  • Figure 00000035_0000
    Figure 00000035_0000
Patent Text Reader

Abstract

The invention relates to an automatic power management method (100) for supplying power to a crane (3) comprising: - a primary power source (1) including a generator set with an optimal power range (P1opt) within which it delivers primary power (P1) while minimizing pollution, - a rechargeable secondary power source (2) which delivers secondary power (P2), has a charge level (C), and can be recharged from the primary power source if the latter is low. Depending on the power required for the crane's operation and the charge level, the automatic method implements one or more power management modes in which the crane receives power from the primary power source alone or from both power sources, and such that the generator set operates within its optimal power range for each mode.Figure from the summary: Figure 4.
Need to check novelty before this filing date? Find Prior Art

Description

Title of the invention: Automatic method for ecological power management for a crane Technical field

[0001] The invention relates to an automatic power management method for supplying power to a crane.

[0002] It relates more particularly to an automatic method allowing the use of a generator set and a rechargeable secondary power source for a power supply to the crane which is less energy-intensive and more ecological as possible.

[0003] The invention finds a preferred, and non-limiting, application for element-mounted cranes and automated assembly cranes. Prior art

[0004] Today, companies must positively comply with new regulations to initiate their ecological transition and put into practice behaviors in favor of sustainable development, with the aim of providing a global and lasting solution to the major environmental challenges of this century. The ecological transition aims to establish a model of economic, social, resilient and sustainable development that positively rethinks the way we consume, produce, work and live together, particularly in the areas of reducing energy consumption and polluting emissions.

[0005] As is known, cranes on construction sites can be powered either by the electricity network or by a generator.

[0006] However, in some cases, it is not possible to connect the crane to an available electrical network, and it is therefore essential to use autonomous energy sources, such as a generator set operating on gasoline or diesel fuel. In this case, it is therefore necessary to size the generator set according to the electrical energy requirements of the crane.

[0007] However, the endothermic engines with which generator sets are equipped are designed to operate optimally when they deliver power within an optimal power range, generally between 60% and 95% of the declared maximum power. When they operate outside this optimal power range, generator sets consume more fuel and pollute more by emitting more particles and harmful products. Eventually, the generator set engine can also be damaged by becoming dirty.

[0008] However, cranes have an energy operation that is not well suited to power supply by a generator set. In fact, cranes alternate between waiting phases for which they require little or no power to operate (therefore below the optimal power range), with phases during which they are working and which are characterized by peaks in power consumption (therefore beyond the optimal power range), the intensity of the power peaks being a function of all the actions carried out by the crane simultaneously (for example, lifting a load, or lifting a load combined with rotation of the boom, etc.).

[0009] Eventually, the generator set engine, when operating outside its optimal range, can also become damaged by fouling. In the worst case, the generator set may break down or no longer be usable. Again, such a situation does not fit well with a sustainable development approach because it involves manufacturing a new generator set.

[0010] In order to be able to absorb a maximum power peak corresponding to all the possible movements that the crane could perform simultaneously, the generator sets are conventionally oversized with a capacity to deliver a main power that can reach a maximum main value greater than 1.5 times, or even 3 times, the maximum power necessary for nominal operation of the crane, depending in particular on the power supply technologies of the actuators that the crane includes.

[0011] This oversizing has the effect that the generator set operates most of the time at no load or at low power outside its optimal power range, at best at 50% of its main maximum value. Consequently, the consumption of the generator sets is high and the risks of pollution or damage to the generator set are significant. Oversizing also results in a physical oversizing / an increase in the size of the generator set, requiring for example a greater quantity of materials to manufacture its engine, alternator, etc. Summary of the invention

[0012] The invention thus proposes to be part of an approach that is both ecological and economical, by providing a solution for supplying power to a crane that consumes less energy, emits less pollution and also uses fewer raw materials for its design.

[0013] In order to solve these problems of consumption and pollution caused by generator sets, and to prevent their possible damage, the proposed invention relates to an automatic power management method for supplying a crane requiring, in order to operate and move a load, an operating power which can reach a maximum operating value, which method automatic involves: - a main power source comprising a generator set equipped with an endothermic engine capable of supplying the crane with a main alternating current for a main power capable of reaching a main maximum value; the generator set being sized according to a power ratio such that the main maximum value is equal to the maximum operating value multiplied by said power ratio which is less than 1.2, and the generator set has an optimal power range bounded by a minimum optimal value and a maximum optimal value which is less than the main maximum value; - a secondary power source comprising at least one rechargeable electric battery, which has a charge level between zero and a maximum charge level, and which is capable of providing a secondary alternating current to deliver secondary power and capable of receiving charging power to be electrically recharged; the automatic process implementing a power management mode, called main mode, in which: - if the operating power has an operating value within the optimal power range of the generator set, and if the load level is above a first load threshold, then - the crane is electrically connected to the generator set only so that it receives from the generator set the main power which is equal to the operating value, said generator set then operating in its optimal power range.

[0014] In other words, the crane requires operating power to operate and perform a given action, such as lifting a load for example. The operating power is defined by a variable operating value which corresponds to the sum of power supplies to be supplied to a set of electrical equipment involved in performing the action that the crane must perform. The operating value can reach a maximum operating value, which corresponds, among all the actions that the crane can possibly perform, to the one requiring the most power supply (i.e. for which the sum of power supplies is the highest).

[0015] In order to power the crane, and therefore its electrical equipment, the proposed automatic power management method involves: - a generator set corresponding to the main power source of the crane, and capable of supplying main power to it which can reach a maximum main value, - but also a secondary power source consisting of at least one rechargeable battery with a charge level, and delivering secondary power to the crane.

[0016] In the remainder of the description, it is clear that the main power source corresponds to the generator set.

[0017] As indicated below, the role of the secondary power source is to deliver secondary power to the crane in the event that the operating value exceeds the maximum optimum value that can be supplied by the generator set, so that the generator set remains within its optimum power range.

[0018] According to different embodiments of the invention, in the event that such a situation arises, the generator set is configured to provide a main value (which may be equal to or less than the maximum optimum value) while the secondary power source must deliver to the crane a secondary power equal to the operating value less the main value.

[0019] The use of a secondary power source therefore has the advantage of significantly limiting the oversizing of the generator set, and therefore of encouraging the use of smaller generator sets.

[0020] Thus, in the context of the automatic method, the generator set is sized so that the power ratio between the main maximum value and the maximum operating value is less than or equal to 1.2.

[0021] Advantageously, in other embodiments of the invention, the generator set may not be oversized (the power ratio then being equal to 1), or may be undersized (with a power ratio less than 1).

[0022] Advantageously, one of the interests of the automatic power management process is therefore to encourage the use of smaller generator sets with a much smaller carbon footprint linked to their manufacture (since their manufacture requires fewer materials to be extracted, and / or processed, and / or transported, etc.), thus contributing to making the crane's power supply part of a positive approach in favor of sustainable development.

[0023] As previously indicated, a generator consumes less fuel, and therefore pollutes less, when the power it delivers, here the main power, is included in the optimal power range, which is bounded by: a minimum optimal value, and a maximum optimal value which is lower than the main maximum value.

[0024] The automatic method of the invention is defined as comprising the power management mode, called main mode, in which only the generator set is electrically connected to the crane, the crane receiving its main power from the generator set which takes as its value the operating value, and which is implemented if the following conditions are verified: - the operating value of the operating power for powering the crane is within the optimal power range of the generator set; - the charge level of the secondary power source is higher than the first charge threshold. The first charge threshold corresponds to a charge threshold below which it is estimated that the secondary power source must be recharged, in other words if its charge level is below this first charge threshold then the secondary power source is insufficiently charged. Conversely, when the charge level is above the first charge threshold, the secondary power source is considered to be sufficiently charged.

[0025] Thus, advantageously, the generator set delivers in the main mode a main power which is constantly within its optimal power range, eliminating any risk of overconsumption of fuel or excessive emission of pollutants.

[0026] This operation of the generator set in its optimal power range also offers other advantages such as: - optimized consumption and a reduction in its carbon footprint (a reduction in fuel consumption and significantly reduced emissions of carbon dioxide and polluting particles); and - longer lifespan and very low risk of damage.

[0027] Thus, the main mode of the automatic power management process fits positively into an economic and ecological logic in favor of sustainable development by being less energy-intensive, less polluting, etc.

[0028] Among the other advantages presented by the automatic power management method of the invention: - The generator set, as well as the secondary power source, if applicable, supply the crane with alternating current. Therefore, to implement the automatic power management process, commercially available generator sets and secondary power sources, which are moderately priced and sufficiently recent to meet current safety and environmental standards and requirements, can be used; - the generator set and the secondary power source are designed to be easily replaceable, making it possible for companies linked to buildings and public works to implement the power management process with older power sources, then to replace them subsequently with power sources more in line with today's environmental issues in the case of equipment renewal, to ultimately initiate or continue their ecological transition.

[0029] As will be explained later, another advantage of this automatic process is that it does not require communication or control between the crane and the generator set for its implementation. In other words, this process does not use a control logic or a control circuit in which the crane (or at least its control / command system) would manage the main power delivered by the generator set.

[0030] According to a characteristic of the invention, the automatic method implements another power management mode, called mixed mode, in which: - if the operating power has an operating value lower than the maximum optimum value and if the load level is lower than the first load threshold, then: - the crane is electrically connected to the single generator set to receive its operating power from the single generator set, said generator set delivering its main power which has a main value; and - the secondary power source is electrically connected to the generator set to receive from the generator set the charging power taking a given charging value, in order to recharge said secondary power source; and wherein the load value is adjusted so that the main value, which corresponds to a sum of the operating value and the load value, is within the optimum power range, said generator then operating within its optimum power range.

[0031] In other words, in the case where the charge level of the secondary power source is below the first charge threshold, meaning that the secondary power source is in the process of being discharged and needs to be recharged, and that the operating value of the operating power requested by the crane for its power supply does not exceed the maximum optimal value of the optimal power range of the generator set, then the automatic method implements this power management mode called mixed mode.

[0032] In this mixed mode, the generator set is electrically connected to the crane and also to the secondary power source to power both.

[0033] The load value of the charging power requested by the secondary power source is adjusted by the automatic method so that: - the sum of the primary value and the secondary value is equal to the operating value; - the main value remains constantly within the optimal power range.

[0034] Advantageously, the mixed mode is also designed so that the generator set supplies both the crane and the secondary power source while constantly operating in its optimal power range, for the same advantages as the main mode (optimized consumption, reduced carbon footprint, increased source lifespan, etc.).

[0035] In other words, the adjustment variable in this mixed mode is the load power, which can be controlled by the crane (or by its control system), in order to maintain the generator set in its optimal power range. It is therefore again clear that this method does not call upon a command from the crane's control system to manage the main power delivered by the generator set. The operation of this method requires adjusting the load value of the load power, so that the generator set delivers only what the crane and the secondary power source demand in terms of power, and that this demand remains within the optimal power range.

[0036] Thus, the mixed mode of the automatic power management process fits positively into an economic and ecological logic in favor of sustainable development.

[0037] According to a characteristic of the invention, the automatic method implements another power management mode, called hybrid mode, in which: - if the operating power has an operating value which is greater than the maximum optimum value, and if the load level is greater than a second load threshold, then: - the crane is electrically connected to both the generator set and the secondary power source so that the crane receives: - the secondary power from the secondary power source, said secondary power taking a given secondary value; and - the main power from the generator set, said main power taking a given main value; and wherein the secondary value is adjusted so that the primary value, which corresponds to the difference between the operating value and the secondary value, is within the optimum power range, said generator then operating within its optimum power range.

[0038] In other words, in the case where the operating value of the operating power requested by the crane exceeds the maximum optimal value of the optimal power range of the generator set, the automatic method implements this power management mode called hybrid mode in which the secondary power source is configured to deliver a secondary value of secondary power: - equal to the difference between the operating value and a main value delivered by the generator set, and - adjusted so that the main value delivered by the generator set is within the optimal power range;

[0039] provided that its charge level is greater than a second charge threshold. This second charge threshold is representative of a charge state of the secondary power source such that it is precisely capable of delivering said secondary value without the risk of presenting a state close to discharge or of being completely discharged. Depending on the characteristics of the secondary power source, in particular its capacity, and the secondary value that it must provide to compensate at least for the difference between the operating value and the maximum optimal value (in particular if these two values ​​are relatively close), the second charge threshold may be substantially equal to the first charge threshold.

[0040] Advantageously, just as in the two previous power management modes, the hybrid mode is also designed so that the generator set constantly provides the main power, the main value of which is always included in the optimal power range, the secondary power source constantly providing the difference in power supply to be provided to the crane as long as its state of charge / capacity allows it. Here again, the hybrid mode makes it possible to reduce / optimize the consumption of the generator set, to reduce its carbon footprint, and to preserve its condition and thus increase its lifespan.

[0041] In other words, the adjustment variable in this hybrid mode is the secondary power, which can be controlled by the crane (or by its control-command system), in order to maintain the generator set in its optimal power range. It is therefore once again clear that this method does not call upon a command from the crane's control / command system to manage the main power delivered by the generator set. The operation of this method requires adjusting the secondary value of the secondary power, so that the generator set delivers only the remaining power requested by the crane, and that this remaining power remains within the optimal power range.

[0042] Thus, the hybrid mode of the automatic power management process fits positively into an economic and ecological logic in favor of sustainable development.

[0043] According to a characteristic of the invention, the automatic method implements another power management mode, called charging mode, in which: - if the operating power has a zero operating value, and if the load level is below the maximum load threshold, then - the secondary power source is electrically connected to the generator set to receive from the generator set the charging power taking a given charging value, in order to recharge said secondary power source; and wherein the load value is adjusted so that the main value, which corresponds to the load value, is within the optimum power range, said generator then operating in its optimal power range.

[0044] In other words, the automatic method implements a power management mode called charging mode in order to charge the secondary power source if it is not fully charged when the crane is inactive, i.e. when it is not working. Generally, the crane is inactive at the beginning and end of the day, when the crane operator is no longer present on the site.

[0045] The charging mode is defined such that the charging value / main value of the charging power / main power delivered by the generator set remains constantly within the optimum power range. Once the secondary power source is charged, if the crane is still inactive, the generator set, to the extent that it no longer has to deliver main power, goes into standby or turns off.

[0046] The charging mode also advantageously makes it possible to reduce / optimize the fuel consumption of the generator, to prevent it from emitting too many polluting particles, and to keep it in good condition. It therefore fits positively into an economic and ecological logic in favor of sustainable development.

[0047] In summary, advantageously, the automatic power management method for supplying a crane fits positively into the economic and ecological challenges of sustainable development, by implementing in an alternative embodiment a set of modes (main mode, mixed mode, hybrid mode, charging mode) such that for each of the modes included in this set, the generator set constantly operates in its optimal power range, for optimized energy consumption and a lower carbon footprint.

[0048] According to a characteristic of the invention, the automatic method comprises at least - a comparison step during which the operating value of the operating power is compared to the maximum optimal value, - a comparison step during which the charge level is compared to the first charge threshold and / or the second charge threshold and / or the maximum charge level; - a step of selecting the power management mode from among the main mode, the mixed mode, the hybrid mode and the charging mode, based on the comparison results of the aforementioned comparison steps.

[0049] The automatic method implements one of the four power management modes (main mode, mixed mode, hybrid mode, charging mode) based on at least two comparisons: - a first comparison for which the operating power operating value is compared to the maximum optimum value, which value maximum optimal is predetermined; - a second comparison for which the charge level is compared with the first charge threshold and / or the second charge threshold and / or the maximum charge level, which are also predefined.

[0050] Thus, the selection of the power management mode is independent of the main power delivered by the generator set (to the crane, to the secondary power source, or to both) at a time t. Since the maximum optimal value and the load thresholds are predetermined parameters, the method to be implemented only requires knowledge of the operating power requested by the crane and the load level of the secondary power source.

[0051] Advantageously, this means that the generator set does not have to transmit information to the control system of the crane implementing the automatic process. It therefore does not need to communicate with it.

[0052] According to a characteristic of the invention, the automatic method also comprises a comparison step during which the operating value of the operating power is compared to the minimum optimal value.

[0053] According to a characteristic of the invention, in the hybrid mode, the secondary value is adjusted so that the main value is equivalent to the maximum optimal value.

[0054] In the case of the hybrid mode, as indicated above, the secondary power source is configured to deliver a secondary value: - equal to the difference between the operating value and a main value delivered by the generator set, and - adjusted so that the delivered main value is within the optimal power range.

[0055] In an alternative embodiment of the invention, the main value may be equal to the maximum optimal value. The secondary value is then equal to the operating value minus the maximum optimal value. In the other alternative embodiments, the main value is between the minimum optimal value inclusive, and the maximum optimal value not included.

[0056] According to a characteristic of the invention, the power ratio is between 0.6 and 1.2.

[0057] According to one embodiment of the invention, the power ratio is between 0.6 and 0.8.

[0058] Advantageously, and as explained previously, the automatic method is designed in such a way that a slightly oversized generator set can be selected for its implementation (i.e. for which the power ratio between the main power and the operating power is greater to 1) but also undersized (i.e. having a power ratio less than 1).

[0059] According to a characteristic of the invention, the maximum optimal value is equal to kmax times the main maximum value, kmax being between 0.8 and 0.95.

[0060] According to a characteristic of the invention, the minimum optimal value is equal to kmin times the main maximum value, kmin being non-zero and dependent on the intrinsic properties of the generator set.

[0061] According to one embodiment of the invention, kmin is between 0.4 and 0.8.

[0062] According to a characteristic of the invention, the first charge threshold is between 50 and 90% of the maximum charge level.

[0063] According to a characteristic of the invention, the second charge threshold is between 20% and 70% of the maximum charge level.

[0064] The first charge threshold and the second charge threshold depend on the battery technologies used. For example, for high-performance batteries such as lithium batteries, the first charge threshold is generally between 50% and 80% of the maximum charge level, while the second charge threshold may be between 20% and 50% of the maximum charge level. For lead-acid batteries, the first charge threshold is rather between 70% and 90% of the maximum charge level, while the second charge threshold is rather between 50% and 70% of the maximum charge level.

[0065] According to a characteristic of the invention, at least one of the first load threshold and the second load threshold is fixed (in other words non-variable).

[0066] According to one possibility, the first load threshold and the second load threshold are fixed.

[0067] According to a variant, at least one of the first load threshold and the second load threshold varies as a function of a measured temperature.

[0068] According to one possibility, the first load threshold and the second load threshold vary depending on the measured temperature.

[0069] Alternatively, the first load threshold decreases when the measured temperature increases and / or the second load threshold decreases when the measured temperature increases.

[0070] According to one embodiment of the invention, the measured temperature is a temperature of the secondary power source, or an external temperature.

[0071] As is known, the external temperature has an influence on the speed of the electrochemical reactions occurring at the electrode / electrolyte interfaces of the battery, i.e. on the capacity of the batteries and their performance / behavior in terms of charging and discharging. If the temperature drops, the efficiency of the reaction on the electrode also decreases. Assuming that the battery voltage remains constant, the discharge current decreases, and so does the battery's output power. Conversely, if the temperature increases, the battery's output power increases. However, if the temperature is too high, the batteries overheat, with a significant risk of damage.

[0072] The automatic method advantageously takes into account the influence of temperature on the efficiency and capacity of the battery, by adjusting the values ​​of the first charge threshold and the second charge threshold as a function, according to two embodiments of the invention, of the temperature of the secondary power source or of the external temperature, so that the at least one battery constituting the secondary power source sees its number of charge / discharge cycles reduced and is not damaged if it is subjected to high temperatures (above 45°) or low temperatures (below 5°). Thus, depending on the measured temperature, the automatic method leaves the first charge threshold and the second charge threshold at their current value (it does not modify them), or it increases or decreases them.

[0073] An advantage of measuring the outside temperature is that the values ​​of the first charging threshold and the second charging threshold can be modified in the event of high or too low outside temperatures without waiting for the battery to reach a critical state that could damage it. For example, in the case of an outside temperature above 45°, the values ​​of the first charging threshold and the second charging threshold are reduced in order to reduce the number of cycles of the at least one battery of the secondary power source and the power supplied before the at least one battery overheats.

[0074] The invention also relates to a load lifting assembly comprising: - a crane comprising at least several electrical equipments and a control-command system in communication with said several electrical equipments, said crane requiring, in order to operate and move a load, an operating power which can reach a maximum operating value, the operating power being equal to a sum of powers required by the electrical equipments; - a main power source comprising a generator set equipped with an endothermic engine capable of supplying the crane with a main alternating current for a main power capable of reaching a main maximum value; the generator set being sized according to a power ratio such that the main maximum value is equal to the maximum operating value multiplied by said power ratio which is less than 1.2, and the generator set has an optimal power range bounded by a minimum optimal value and a maximum optimal value which is less than the main maximum value; - a secondary power source comprising at least one electric battery rechargeable, which has a charge level between zero and a maximum charge level, and which is capable of providing a secondary alternating current to deliver secondary power and capable of receiving charging power to be electrically recharged; - an electrical coupling circuit between the crane, the generator set and the secondary power source; wherein the control system is in communication with: - the secondary power source to receive the load level and to adjust a secondary value of the secondary power and a load value of the load power; and - the electrical coupling circuit to control couplings between the crane, the generator set and the secondary power source; and in which said control-command system comprises a program for implementing the automatic power management method in accordance with the preceding description.

[0075] As indicated, the automatic power management method is contained in a program implemented in the control-command system of the crane. The role of the control-command system is to determine which power management mode (main mode, mixed mode, hybrid mode, load mode) must be implemented depending on the application context. This control-command system is connected to all the electrical equipment equipping the crane, such as for example the actuators capable of moving a load and / or moving an element of the crane, and the electrical accessories such as lights, alarms, sensors, temperature control devices, control station, etc.

[0076] Advantageously, according to the design of the automatic method, to determine which power management mode must be selected, the only power source with which the control-command system needs to communicate is the secondary power source. It is therefore not necessary to install a means of communication, for example a communication bus, between the generator set and the crane to carry out the exchange of information.

[0077] Also, the generator set does not exchange information with the secondary power source.

[0078] The generator set only delivers power to the crane and / or the secondary power source when it is electrically connected to it(them) via the electrical coupling circuit, and according to the power demand from it(them).

[0079] Consequently, the implementation of the automatic method is therefore more practical and less expensive, with fewer hardware, software or protocol resources to design and / or install.

[0080] Once the power management mode is selected, the control-command system communicates with the electrical coupling circuit so that the latter electrically implements the selected power management mode, as explained below.

[0081] According to a characteristic of the invention, the control-command system is configured to send a control order to the electrical coupling circuit, which is configured upon receipt of the control order to electrically connect or not the main power source to the secondary power source, the main power source to the crane, and the secondary power source to the crane.

[0082] As indicated above, the electrical implementation of a power management mode is ensured by the electrical coupling circuit such that: - in the main mode, the electrical coupling circuit connects the generator set to the crane and disconnects the secondary power source from the crane and the generator set; - in mixed mode, it connects the generator set to the crane and to the secondary power source, and the secondary power source is however not connected to the crane; - in hybrid mode, it connects the crane to the generator set and the secondary power source, and the generator set and the secondary power source are not connected to each other; - in the charging mode, the generator set and the power source are connected to each other and both disconnected from the crane.

[0083] The electrical coupling circuit electrically implements the different power management modes according to instructions contained in a control order that it receives from the control-command system.

[0084] According to a characteristic of the invention, the control-command system is configured to send the control order as a function of comparison results between at least the operating value of the operating power and the maximum optimal value, and also as a function of the load level.

[0085] In other words, the control order that the control system sends to the electrical coupling circuit so that it implements a power management mode among the available power management modes depends on the results from the aforementioned comparisons, and is generated following these.

[0086] Advantageously, according to the design of the automatic method, the control system does not need to know the main power delivered by the generator set to determine which power management mode must be implemented.

[0087] The characteristics of the generator set (i.e. the power range optimal and therefore the maximum optimal value) being information known by the operators when purchasing it, they can be, in one embodiment of the invention, entered by the latter in the program executing the automatic process.

[0088] Also, the operators enter the first charge threshold and the second charge threshold depending on the type of secondary power source used, or the charge level for which they estimate that the latter is discharged and needs to be charged.

[0089] The operating value of the operating power is known to the control system since it communicates with the electrical equipment of the crane; it therefore knows their power requirements.

[0090] This is why, in terms of external communication and information, the decision by the control-command system to select a power management mode only requires the charge level of the secondary power source to be increased.

[0091] According to a characteristic of the invention, depending on the measured temperature, the program implementing the automatic method: - receives a measured temperature from a temperature sensor connected to the control system; - varies at least one of the first load threshold and the second load threshold as a function of the measured temperature.

[0092] As already written, this measured temperature can correspond either to the temperature of the secondary power source or to the outside temperature.

[0093] In the case where the measured temperature corresponds to the temperature of the secondary power source, the temperature sensor can be integrated into the secondary power source, such as for example into its battery or one of its batteries.

[0094] In the case where the outside temperature corresponds to the measured temperature, the temperature sensor can for example be mounted on the crane.

[0095] According to a characteristic of the invention, in the mixed mode, the control-command system is configured to send a mixed mode adjustment order to the secondary power source so that it adjusts the load value of the load power requested from the main power source, so that: - the main power transmitted by the main power source to the crane is equal to the operating power value required to operate the electrical devices of the crane; and - that the sum of the operating value and the load value is within the optimum power range so that the main power source operates within its optimum power range.

[0096] According to a characteristic of the invention, in the hybrid mode, the control-command system is configured to send an adjustment order in hybrid mode to the secondary power source so that it adjusts the secondary value of the secondary power supplied to the crane so that: - the secondary value summed with the primary value of the main power delivered by the main power source to the crane corresponds to the operating value of the operating power requested by the crane; and - that the main value is included in the optimal power range so that the main power source operates in its optimal power range

[0097] According to a characteristic of the invention, in the charging mode, the control-command system is configured to send an adjustment order in charging mode to the secondary power source so that it adjusts the charging value of the charging power requested from the main power source, so that the charging value is included in the optimal power range so that the main power source operates in its optimal power range. Brief description of the drawings

[0098] Other characteristics and advantages of the present invention will appear on reading the detailed description below, of a non-limiting example of implementation, made with reference to the appended figures in which:

[0099] [Fig. 1] is an illustration of the principle of operation of the main mode;

[0100] [Fig.2] is an illustration of the operating principle of mixed mode;

[0101] [Fig.3] is an illustration of the operating principle of the charging mode;

[0102] [Fig.4] is an illustration of the operating principle of the hybrid mode;

[0103] [Fig.5] is an illustration of the operating principle of a secondary mode for which only the secondary power source is electrically connected to the crane to provide it with power, this mode being implemented when the charging capacity of at least one of the batteries constituting it is at its maximum charge level and the crane requires an operating power lower than the optimal minimum value;

[0104] [Fig.6] is a flowchart of the automatic power management method, showing in particular how the different power management modes are selected as a function of the operating value of the operating power required for the power supply and the load level of the secondary power source, as a function respectively of the optimal power range and the load thresholds.

[0105] [Detailed description of one or more embodiments of the invention]

[0106] As illustrated in Figures 1 to 4, the automatic power management method 100 is implemented within the framework of an application context of the assembly 101, for which a generator set equipped with an endothermic engine and constituting a main power source 1, and a secondary rechargeable power source 2 comprising at least one rechargeable electric battery are used; this is for the purpose of providing a crane 3 with operating power PF necessary for its operation and for example necessary for moving a load such as lifting a load, or rotating the boom.

[0107] More precisely, the operating power PF is used to power all the electrical / electronic equipment of the crane 3 involved in its operation. Among this equipment: the actuators capable of moving a load and / or moving an element of the crane (for example lifting winch, distribution winch, boom lifting winch, slewing motor); accessories such as lights; alarms; sensors; safety devices; temperature regulation devices; the control station, etc.

[0108] The required operating power PF is variable and depends on the nature of the operating tasks and the electrical / electronic systems involved. The value of the operating power PF, or operating value, can reach a maximum operating value PFmax, which corresponds, among all the actions that the crane 3 can possibly perform, to that requiring the most supply power (i.e. for which the sum of the supply powers of the electrical / electronic systems is the highest) which generally corresponds to a simultaneous combination of several “simple” tasks, for example the implementation of several movements such as lifting a load while the boom rotates.

[0109] The main power source 1 is used to deliver a main power PI which can reach a main maximum value Plmax. In the embodiment presented, the main power source 1 is a generator set with an endothermic engine. Also, in the remainder of the description, it is considered, for greater practicality, that the generator set refers to the main power source 1 and can therefore bear the same numerical reference “1”.

[0110] The generator set 1 is characterized by an optimal power range Plopt bounded by a non-zero minimum optimal value Plopt_min and a maximum optimal value Plopt_max less than Plmax, in which it delivers a main power value PI, called the main value, for lower fuel consumption and lower emissions of carbon dioxide and polluting particles.

[0111] The secondary power source 2 is configured to deliver a power se secondary P2 whose value, called secondary value, can reach a maximum secondary value P2max. It is also characterized by a charge level C (i.e. the battery capacity) which can be between 0 and a level of maximum load Cmax (typically 100%).

[0112] As a reminder, as previously explained, conventionally, in order to absorb a maximum peak of operating power PF, the generator sets are oversized with a capacity to deliver a main power PI which can reach a maximum main value Plmax greater than 1.5 times, or even 3 times the maximum operating value PFmax necessary for nominal operation of the crane 3. This oversizing generally implies that the generator sets rarely operate in their optimal power range Plopt.

[0113] The interest of the automatic power management method 100 of the invention is to avoid such oversizing and to allow the generator set 1 to be able, in the greatest number of situations possible, to operate in its optimal power range Plopt.

[0114] The secondary power source 2 is notably provided to both allow the sizing of the generator set 1 to be minimized but also, as already mentioned and re-indicated below, to deliver, if the operating value of the operating power PF were to be greater than the maximum optimal value Plopt_max of the generator set 1, a secondary value equal to the operating value less the maximum optimal value Plopt_max; the main power source 1 delivering to the crane 3 a main value equal to the maximum optimal value Plopt_max. In another alternative embodiment, the main power source 1 can deliver a main value slightly lower than the maximum optimal value Plopt_max, so as to guarantee that the generator set 1 remains within its optimal power range Plopt.

[0115] The invention provides several dimensions of the generator set 1 such that the power ratio of the main maximum value Plmax to the maximum operating value PFmax is between 0.6 and 1.2. Thus, in a first variant embodiment of the invention, the generator set 1 may be slightly oversized, for a power ratio greater than 1 and less than 1.2; whereas in a second embodiment, it may on the contrary be slightly or significantly undersized, for a power ratio greater than or equal to 0.6 and less than or equal to 1.

[0116] The sizing of the generator set 1 can, in part, be dictated by the performance of the references of the battery(ies) available and used as a secondary power source 2.

[0117] An advantage of the invention is that it provides that the generator set 1 and the secondary power source 2 deliver an alternating current to the crane 3. Thus, the invention can be implemented using “standard” generator sets and batteries, i.e. commercially available at moderate prices.

[0118] As previously indicated, the generator set 1 and the secondary power source 2 are intended to be easily replaceable. Older generator sets 1 and secondary power sources 2 that would have been used to previously implement the automatic power management method 100 can be replaced / changed with newer generator sets 1 and secondary power sources 2 that meet current safety and environmental requirements.

[0119] The optimal power range Plopt of the generator set 1 is defined such that: - the maximum optimal value Plopt_max is equal to kmax times the main maximum value Plmax, with kmax generally between 0.8 and 0.95.

[0120] - the minimum optimal value Plopt_min is equal to kmin times the maximum value main Plmax, the value of kmin depending on the characteristics / performance of the generator set 1 used and being able to be between 0.4 and 0.8, or even between 0.6 and 0.7.

[0121] According to the power management modes defining the automatic method 100, and which will be described later: - crane 3 is powered either by main power source 1 only, or by main power source 1 and secondary power source 2, or by secondary power source 2 only; - in the event of discharge, the secondary power source 2 is powered by the main power source 1 which provides it with a charging power Pload.

[0122] For this purpose, the assembly 101 comprises an electrical coupling circuit 4 used to electrically connect or not, depending on the power management mode implemented by the automatic method 100: the main power source 1 and the secondary power source 2 to the crane 3; and the main power source 1 to the secondary power source 2. These couplings are carried out according to control orders that the electrical coupling circuit 4 receives from the crane 3, more precisely from a control-command system 30 of the latter.

[0123] The automatic method 100 is contained and executed by a program implemented inside the control-command system 30 of the crane 3.In one embodiment, the automatic method 100 can be started at the beginning of the day, when the crane operator starts up the control-command system 30.

[0124] A flowchart of one embodiment among several possible ones of the automatic method 100 is illustrated [Fig.5].

[0125] The power management modes that can be implemented by the automatic method 100 are activated based on the results of several comparisons. Among these comparisons: - a comparison of the maximum operating value PFmax with the value maximum optimal value Plopt_max and possibly also with the minimum optimal value Plopt_min, in particular to determine whether the maximum operating value PFmax is included in the optimal power range Plopt; and - comparisons between the load level C of the secondary power source 2 with a first load threshold Cl, a second load threshold C2 and the maximum load level Cmax.

[0126] The first charge threshold C1 corresponds to a charge threshold below which it is estimated that the secondary power source 2 must be recharged, in other words if its charge level C is below this first charge threshold C1 then the secondary power source 2 is insufficiently charged. The first charge threshold C1 is between 50% and 90% of the maximum charge level Cmax.

[0127] The second charge threshold C2 is representative of a charge state of the secondary power source such that it is precisely capable of delivering a secondary value of secondary power P2 to the crane 3 without the risk of presenting a state close to discharge or of being completely discharged. According to different embodiments of the invention, depending on the characteristics and performances of the secondary power source 2, the second charge threshold C2 may be lower than the first charge threshold C1, or else be substantially equal to the latter. The second charge threshold C2 is between 20% and 70% of the maximum charge level Cmax.

[0128] Carrying out the various comparisons implemented by the automatic method 100 requires that the program / control system 30 knows the following information: - the operating value of the operating power PF requested by crane 3; - the minimum optimal value Plopt_min and the optimal value Pl_optmax of generator set 1; - the charge level C, the first charge threshold Cl, and the second charge threshold C2 of the secondary power source 2.

[0129] The characteristics of the generator set 1 being information known by the operators when it is purchased, they can be, in one embodiment of the invention, entered by the latter in the program executing the automatic method, for example during a parameterization step taking place before the execution step itself. The charge thresholds C1 and C2 can be defined by the user, in particular by taking into consideration the characteristics of the battery.

[0130] Finally, the operating power PF is known to the control-command system 30 given that it communicates with the electrical / electronic equipment of the crane 3; knowing in fact their power supply needs.

[0131] Knowing the operating power PF and the optimal power range Plopt of the generator set 1, the control-command system 30 does not need to know the main power PI, therefore to communicate with it for the activation of the power management modes and the control of the electrical coupling circuit 4.

[0132] On the other hand, the control-command system must have knowledge of the load level C of the secondary power source 2.

[0133] This is why it is only necessary for the secondary power source 2 of the two power sources to communicate with the control-command system 30 of the crane 3, for example by means of a communication bus or a wireless communication protocol, in order to transmit to it the charge level(s) C.

[0134] Optionally, and in order to take into account the impact of the temperature of the environment on the performance of the at least one battery included in the secondary power source 2, the program executing the automatic method can modify the values ​​of the first charge threshold C1 and of the second charge threshold C2 as a function of the temperature of the secondary power source 2 (in a first variant embodiment of the invention), or of the outside temperature (in a second variant embodiment of the invention), more precisely as a function of a measurement of said temperature of the secondary power source 2 or of said outside temperature which is transmitted to the control-command system 30.

[0135] Depending on the temperature of the secondary power source 2 or the outside temperature, the program: - leaves as is / does not modify the values ​​of the first load threshold Cl and the second load threshold C2, or - increases at least one of the two values, or - decreases at least one of the two values.

[0136] In one embodiment, when defining the first load threshold C1 and the second load threshold C2 during the parameterization step, the operator can enter different temperature ranges in which the first load threshold C1 and the second load threshold C2 take a given first load threshold value and a given second load threshold value. When executing the automatic method, when a temperature measurement of the secondary power source 2 or of the temperature is transmitted to the control system 30, the program determines which temperature range the measured temperature corresponds to, and adapts the first load threshold value C1 and the second load threshold value C2 accordingly.

[0137] In the embodiment where the temperature measured and transmitted to the control-command system 30 corresponds to the temperature of the secondary power source 2, the temperature of the secondary power source 2 is either: - if the technology of the at least one battery included in the secondary power source 2 allows it, transmitted by the secondary power source 2 itself (at the same time as the charge level), - measured then transmitted by an external temperature measuring device in communication with both the secondary power source 2 and the control system 30.

[0138] In the embodiment where the measured temperature corresponds to the outside temperature, the outside measurement is either: - measured then transmitted by an external temperature measuring device in communication with the control-command system 30 of crane 3, - either equipment integrated into the crane 3 in communication with the control-command system 30, for example a temperature measurement sensor.

[0139] In one embodiment, the automatic process 100 can be stopped at the end of the day, with the crane operator switching off the control-command system 30 (note that the “STOP” stop step of the automatic process is not shown in [Fig.5]). In a second embodiment, it is conceivable that the automatic process 100 can be stopped automatically if the crane 3 is put to rest (and therefore its operating power is zero), and if the charge level C of the secondary power source 2 is at its maximum charge level Cmax after an automated recharge of the battery.

[0140] Between its start and its stop, the automatic method 100 is executed continuously, and switches from one power management mode to another power management mode among the several power management modes that it comprises according to the comparison results of the comparison steps.

[0141] The order in which these comparison steps are carried out is not important since only their result counts. In the illustrated embodiment [Fig.5], the selection of the power management modes during ES selection steps is based firstly on power comparisons (in particular to determine whether the operating power PF is included in the optimal power range Plopt) and then on comparisons between the load level C and the load thresholds Cl, C2. In another embodiment, it is conceivable that the comparisons between the load level C and the load thresholds Cl, C2 could be carried out before the power comparisons.

[0142] In the remainder of the description, the power management modes implemented in the invention and their activation conditions are now presented.

[0143] With reference to [Fig.5], during a comparison step Q1, the automatic method 100 determines whether the operating value of the operating power PF is greater than the maximum optimal value Plopt_max. If not If not, it then compares the operating value in a comparison step Q3 with the minimum optimal value Plopt_min, in order to determine whether it is included in the optimal power range Plopt.

[0144] If the operating value is within the optimal power range Plopt, then the automatic method 100 compares the load level C of the secondary power source 2 to the first load threshold C1 during a comparison step Q5. If the load level C is greater than the first load threshold C1, then a first power management mode called main mode MM is selected. If not, a second power management mode called mixed mode XM is selected.

[0145] In the main mode MM, illustrated [Fig.l], the electrical coupling circuit 4 electrically connects only the generator set 1 to the crane 3, with the generator set 1 delivering a main power PI which is constantly included in the optimal power range Plopt (because the operating power PF is included in this optimal power range Plopt), eliminating any risk of overconsumption of fuel, excessive emission of pollutant, and damage to the generator set 1. In this main mode MM, the secondary power source 2 has its charge level C higher than the first charge threshold Cl, and it therefore does not need to be recharged, and therefore it is not connected to the generator set 1.

[0146] In the mixed mode XM, illustrated [Fig.2], the electrical coupling circuit 4 electrically connects the generator set 1 to both the secondary power source 2 and the crane 3. Being in communication with the secondary power source 2, the crane 3 is configured to control it by sending it an adjustment order. The adjustment order consists of the secondary power source 2 adjusting the charging power Pload that it requests and receives from the generator set 1, so that the main power PI that it delivers, and which is equal to the sum of the operating power PF and the charging power Pload, is included in the optimal power range Plopt. In this mixed mode XM, the secondary power source 2 has its charging level C lower than the first charging threshold Cl, and it therefore needs to be recharged, and therefore it is connected to the generator set 1 to receive the adjusted charging power Pload.

[0147] In the case, for example, where the operating power PF requested by the crane 3 remains within the optimal power range Plopt, and the load level C of the secondary power source 2 becomes higher than the first load threshold Cl, the automatic method 100 switches from mixed mode XM to main mode MM.

[0148] If at the end of the comparison step Q3, it is determined that the power of func If the operating power PF is less than the minimum optimal value Plopt_min, a new comparison step Q4 is implemented to determine whether the operating power PF is equal to zero or not.

[0149] If in step Q4 the operating power PF is non-zero (and therefore is between 0 and the minimum optimal value Plopt_min), the automatic method 100 then determines during a comparison step Q7 whether the charge level C of the secondary power source 2 is at its maximum charge level Cmax.

[0150] If the charge level C is lower than the maximum charge level Cmax, the automatic method 100 implements the mixed mode XM described above.

[0151] Otherwise, if the charge level C is equal to the maximum charge level Cmax (in other words if the secondary power source 2 is fully charged), the automatic method 100 implements a secondary mode SM during which only the secondary power source 2 is electrically connected to the crane 3, and provides it with a secondary power P2 corresponding to the requested operating power PF. In this secondary mode SM, the main power source 1 is not connected to either the crane 3 or the secondary power source 2, and can therefore be put on standby. According to one option, this secondary mode SM can be implemented as long as the charge level C is greater than the first charge threshold Cl, and of course also as long as the operating power PF is non-zero and less than the minimum optimal value Plopt_min.If in step Q4 the operating power PF is zero, meaning that the crane 3 is not requesting power, the automatic method 100 checks during a comparison step Q6 whether the secondary power source 2 is fully charged or not (therefore whether the charge level C is equal to the maximum charge level Cmax).

[0152] If in step Q6 the charge level C is lower than the maximum charge level Cmax (in other words the secondary power source 2 is not fully charged), the automatic method 100 implements a charge mode CM, illustrated [Fig. 3], in which the electrical coupling circuit 4 electrically connects the generator set 1 to the secondary power source 2 so that it provides a main power PI corresponding to a charging power Pload to recharge the secondary power source 2. The crane 3 receives no power from the two power sources 1, 2. In this charge mode CM, the control-command system 30 of the crane 3 is also configured to control the secondary power source 2 by sending it an adjustment order so that it adjusts the charging power Pload that it requests from the generator set 1, so that it is included in the optimal power range Plopt.In this way, the main power PI is included in the optimal power range Plopt. .

[0153] If at step Q6 the charge level C is equal to the maximum charge level Cmax (in other words the secondary power source 2 is fully charged), the generator set 1, to the extent that it does not have to deliver main power PI, goes into standby or turns off while waiting for the automatic method 100 to implement another power management mode. If the crane 3 remains inactive for a very long time, the charge level C of the at least one battery may possibly decrease. In this case, if it is active, the automatic method 100 then implements the charge mode CM.

[0154] Following the comparison step Q1, in the case where the operating power PF is greater than the maximum optimal value Plopt_max, the automatic method 100 proceeds to a comparison step Q2 during which it is verified whether the load level C of the secondary power source 2 is greater or not than the second load threshold C2. It should be noted that this scenario where the operating power PF requested by the crane 3 is greater than the maximum optimal value Plopt_max, corresponds to a case of power peak associated with a peak activity of the crane 3 with a large number of electrical equipment requiring a power supply and which can reach PFmax.

[0155] If at step Q2 the charge level C is greater than the second charge threshold C2, the automatic method 100 implements a power management mode called hybrid mode HM, illustrated [Fig.4], in which the electrical coupling circuit 4 electrically connects the generator set 1 and the secondary power source P2 to the crane 3 so that it delivers to it respectively a main power PI and a secondary power P2.In this hybrid mode HM, the control-command system 30 is configured to send to the secondary power source 2 an adjustment order so that the secondary power P2 that it sends to the crane 3 is at least equal to the difference between the function power PF and the maximum optimal value Plopt_max, and at most equal to the difference between the function power PF and the maximum optimal value Plopt_min; the generator set 1 then delivering a main power PI always included in the optimal power range Plopt.

[0156] If in step Q2 the load level C is lower than the second load threshold C2, the automatic method 100 implements a power management mode called critical mode OM, in which the electrical coupling circuit 4 electrically connects the generator set 1 to the crane 3 so that it delivers to it a main power PI, such that the main power PI is greater than the maximum optimal value Plopt_max; in other words the generator set 1 is outside its optimal range Popt. In this critical mode OM the main power PI can even be equal to the maximum main value Plmax.

[0157] In this critical mode OM, the electrical coupling circuit 4 can also electrically connect the secondary power source 2 to the crane 3 (depending on how it was fixed the second load threshold C2) so that the secondary power source 2 can provide for a given period of time (until it is completely discharged) a secondary power P2 making it possible to supplement, if necessary, the main power PI provided by the generator set 1 in order to jointly reach the operating power PF in the exceptional case where the operating power PF is greater than the main maximum value Plmax.

[0158] In another variant embodiment of the invention, during the critical mode OM, the control-command system 30 is configured to determine at what speed the secondary power source 2 discharges when it must supply the secondary power P2, an excessive discharge presenting a high risk of completely discharging the secondary power source 2. In the case where this eventuality occurs: - secondary power source 2 no longer provides secondary power P2 to crane 3, - certain actions of crane 3 that consume too much power are interrupted, such as lifting operations, - generator set 1 provides main power PI to crane 3 so that it can continue to perform less energy-intensive actions, as well as to secondary power source 2 to recharge it until it reaches at least the second charge threshold C2. This configuration is different from mixed mode XM because generator set 1 may or may not operate in its optimal power range Plopt (in other words, this configuration can be considered as a degraded mode of mixed mode XM).

[0159] Advantageously, the automatic method 100 implements several power management modes (main mode, mixed mode, hybrid mode, charging mode) such that for each of them, the generator set 1 constantly operates in its optimal power range Popt; except in the exceptional case of the critical mode OM. In the secondary mode SM, the generator set 1 is put on standby.

[0160] It should be noted that the probability of occurrence of the critical mode OM remains very low. Its occurrence assumes very frequent intense peaks of activity of the crane 3 over a long period without there being any possibility of recharging the secondary power source 2. Furthermore, the generator set 1 and the secondary power source 2 are chosen so as to be in line with the power requirements of the crane 3, thus having to prevent this critical mode OM from occurring.

[0161] Given that the control-command system 30 indirectly manages the main power PI that the generator set 1 delivers in the mixed mode XM, the hybrid mode HM, and the charging mode CM from a control of the secondary power source 2 so that it remains in its optimal power range Plopt (the generator set 1 being in this optimal power range Plopt in the main mode MM), the invention has the advantage of not requiring the design and / or installation of a means of communication between the generator set 1 and the crane 3 to carry out the exchange of information or commands.

[0162] Also, the generator set 1 does not exchange information with the secondary power source 2 since it is content to deliver a charging power Pload only when it is electrically connected to it, in the mixed mode XM and the charging mode CM, and according to the power demand from the latter.

[0163] Consequently, the implementation of the automatic method is therefore more practical and less expensive, with fewer hardware, software or protocol resources to design and / or install.

Claims

Claims

1. Automatic method (100) for power management for powering a crane (3) requiring, to operate and move a load, an operating power (PF) which can reach a maximum operating value (PFmax), which automatic method involves: - a main power source (1) comprising a generator set provided with an endothermic engine capable of supplying the crane with a main alternating current for a main power (PI) capable of reaching a main maximum value (Plmax); the generator set being sized according to a power ratio such that the main maximum value (Plmax) is equal to the maximum operating value (PFmax) multiplied by said power ratio which is less than 1.2, and the generator set has an optimal power range (Plopt) bounded by a minimum optimal value (Plopt_min) and a maximum optimal value (Plopt_max) which is less than the main maximum value (Plmax); - a secondary power source (2) comprising at least one rechargeable electric battery, which has a charge level (C) between zero and a maximum charge level (Cmax), and which is capable of providing a secondary alternating current to deliver a secondary power (P2) and capable of receiving a charging power (Pload) to be electrically recharged; the automatic process implementing a power management mode, called main mode (MM), in which: - if the operating power (PF) has an operating value within the optimal power range (Plopt) of the generator set, and if the load level (C) is greater than a first load threshold (Cl), then - the crane (3) is electrically connected to the generator set only so that it receives from the generator set the main power (PI) which is equal to the operating value (PF), said generator set then operating in its optimal power range (Plopt).

2. Automatic method (100) according to claim 1, wherein the automatic method implements another power management mode, called mixed mode (XM), in which: - if the operating power (PF) has a non-zero operating value and is lower than the maximum optimal value (Plopt_max) and if the load level (CL) is lower than the first load threshold (Cl), then: - the crane (3) is electrically connected to the single generator set to receive its operating power (PF) from the single generator set, said generator set delivering its main power (PI) which has a main value; and - the secondary power source (2) is electrically connected to the generator set to receive from the generator set the charging power (Pload) taking a given charging value, in order to recharge said secondary power source (2); and wherein the load value is adjusted so that the main value, which corresponds to a sum of the operating value and the load value, is within the optimum power range (Plopt), said generator set then operating within its optimum power range (Plopt).

3. Automatic method (100) according to any one of the preceding claims, in which the automatic method implements another power management mode, called hybrid mode (HM), in which: - if the operating power (PF) has an operating value which is greater than the maximum optimal value (Plopt_max), and if the charge level (C) is greater than a second charge threshold (C2), then: - the crane (3) is electrically connected to both the generator set and the secondary power source (2) so that the crane (3) receives: - the secondary power (P2) from the secondary power source (2), said secondary power (P2) taking a given secondary value; and - the main power (PI) from the generator set, said main power (PI) taking a given main value; and in which the secondary value is adjusted so that the main value, which corresponds to the difference between the operating value and the secondary value, is included in the optimal power range (Plopt), said generator set then operating in its optimal power range (Plopt).

4. An automatic method (100) according to any preceding claim, wherein the automatic method implements another power management mode, called charging mode (CM), in which: - if the operating power (PF) has a zero operating value, and if the charging level (C) is lower than the maximum charging threshold (Cmax), then: - the secondary power source (2) is electrically connected to the generator set to receive from the generator set the charging power (Pload) taking a given charging value, in order to recharge said secondary power source (2); and in which the charging value is adjusted so that the main value, which corresponds to the charging value, is included in the optimal power range (Plopt), said generator set then operating in its optimal power range (Plopt).

5. Automatic method (100) according to claims 1 to 4, wherein the automatic method (100) comprises at least: - a comparison step (Q1) during which the operating value of the operating power (PF) is compared to the maximum optimal value (Plopt_max), - a comparison step (Q2; Q5; Q6) during which the charge level (C) is compared to the first charge threshold (Cl) and / or to the second charge threshold (C2) and / or to the maximum charge level (Cmax); - a selection step (ES) of the power management mode from among the main mode (MM), the mixed mode (XM), the hybrid mode (HM) and the charging mode (CM), depending on the comparison results of the comparison steps (Q1; Q2; Q5; Q6).

6. An automatic method (100) according to claim 5, wherein the automatic method (100) also comprises a comparison step (Q3) during which the operating value of the operating power (PF) is compared with the minimum optimal value (Plopt_min).

7. An automatic method (100) according to claim 3, wherein, in the hybrid mode (HM), the secondary value is adjusted so that the primary value is equivalent to the maximum optimal value (Plopt_max).

8. An automatic method (100) according to any preceding claim, wherein the power ratio is between 0.6 and 1.9

9. An automatic method (100) according to claim 8, wherein the power ratio is between 0.6 and 0.

8.

10. An automatic method (100) according to any preceding claim, wherein the maximum optimal value (Plopt_max) is equal to kmax times the main maximum value (Plmax), kmax being between 0.8 and 0.

95.

11. Automatic method (100) according to any one of the preceding claims, in which the minimum optimal value (Plopt_min) is equal to kmin times the main maximum value (Plmax), kmin being non-zero and dependent on intrinsic properties of the generator set.

12. An automatic method (100) according to claim 11, wherein kmin is between 0.4 and 0.

8.

13. Automatic method (100) according to any one of the preceding claims, wherein the first charge threshold (Cl) is between 50 and 90% of the maximum charge level (Cmax).

14. Automatic method (100) according to any one of the preceding claims, wherein the second charge threshold (C2) is between 20% and 70% of the maximum charge level (Cmax).

15. An automatic method (100) according to any preceding claim, wherein at least one of the first load threshold (Cl) and the second load threshold (C2) is fixed.

16. An automatic method (100) according to any preceding claim, wherein at least one of the first charge threshold (Cl) and the second charge threshold (C2) varies as a function of a measured temperature.

17. An automatic method (100) according to claim 16, wherein the measured temperature is a temperature of the secondary power source (2), or an external temperature.

18. Load lifting assembly (101) comprising: - a crane (3) comprising at least several electrical equipments and a control-command system (30) in communication with said several electrical equipments, said crane (3) requiring to operate and move a load an operating power (PF) which can reach a maximum operating value (PFmax), the operating power (PF) being equal to a sum of powers requested by the electrical equipments; - a main power source (1) comprising a generator set provided with an endothermic engine capable of supplying the crane (3) with a main alternating current for a main power (PI) which can reach a main maximum value (Plmax); the group generator being sized according to a power ratio such that the main maximum value (Plmax) is equal to the maximum operating value (PFmax) multiplied by said power ratio which is less than 1.2, and the generator set has an optimal power range (Plopt) bounded by a minimum optimal value (Plopt_min) and a maximum optimal value (Plopt_max) which is less than the main maximum value (Plmax); - a secondary power source (2) comprising at least one rechargeable electric battery, which has a charge level (C) between zero and a maximum charge level (Cmax), and which is capable of providing a secondary alternating current to deliver a secondary power (P2) and capable of receiving a charging power (Pload) to be electrically recharged; - an electrical coupling circuit (4) between the crane (3), the generator set and the secondary power source (2);wherein the control-command system (30) is in communication with: - the secondary power source (2) to receive the load level (C) and to adjust a secondary value of the secondary power (P2) and a load value of the load power (Pload); and - the electrical coupling circuit (4) to control couplings between the crane (3), the generator set and the secondary power source (2); and wherein said control-command system (30) comprises a program for implementing the automatic power management method (100) according to any one of the preceding claims.;

19. Assembly (101) according to claim 18, in which the control-command system (30) is configured to send a control order to the electrical coupling circuit (4), which is configured upon receipt of the control order to electrically connect or not the main power source (1) to the secondary power source (2), the main power source (1) to the crane (3), and the secondary power source (2) to the crane (3).

20. Assembly (101) according to claim 19, in which the control-command system (30) is configured to send the control order according to comparison results between at least the operating power (PF) operating value and maximum optimum value (Plopt_max), and also depending on the load level (C).