Control method for user equipment, and user equipment

IN606903BActive Publication Date: 2026-10-23SHARP KK +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
IN202147005242
Authority / Receiving Office
IN · IN
Patent Type
Patents
Current Assignee / Owner
Priority Date
2018-07-10
Filing Date
2021-02-08
Publication Date
2026-10-23
Estimated Expiration
2039-07-09

AI Technical Summary

Technical Problem

In the dual connection or multi-connection mode of the user equipment, when a problem occurs in the primary cell group (MCG) transmission, the existing technology is difficult to effectively handle the current bearer and restore the logical link transmission, and if the secondary cell group (SCG) link also fails The problem, how to deal with the user equipment becomes a difficult problem.

Method used

The user equipment detects MCG transmission failure and performs MCG failure processing operations, such as suspending transmission, sending failure information, and starting the recovery timer; if SCG fails, triggers the RRC connection re-establishment process; after receiving the RRC reconfiguration message, the user equipment resumes suspension. transmission; if the timer times out, RRC connection re-establishment is triggered.

Benefits of technology

It effectively reduces the impact of MCG link interruption on business transmission, ensures the continuity and reliability of communication, reduces delays, and promptly handles SCG link problems when they occur to avoid transmission interruptions.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

A control method (100) for user equipment (UE), and user equipment, the control method (100) for the UE comprising: the UE performing communication on the basis of a master cell group (MCG) and a secondary cell group (SCG) (S101); the UE detecting whether a failure has occurred in the MCG transmission (S102); if it is detected that a failure has occurred in the MCG transmission, executing an MCG failure processing operation (S103); and the UE sending to a base station a message that carries or indicates information related to an MCG failure (S104).
Need to check novelty before this filing date? Find Prior Art

Description

User equipment control methods and user equipment Technical Field

[0001] This invention relates to the field of wireless communication technology, and more specifically, to a control method for user equipment and user equipment. Background Technology

[0002] With the rapid growth of mobile communications and the tremendous advancements in technology, the world will move towards a fully interconnected network society, where anyone or anything can access information and share data anytime, anywhere. To enhance the communication needs of mobile broadband services and massive IoT terminals, next-generation communication technology (5G) will research technological enhancements for users under dual connectivity and even multi-connectivity (RP-181469 New WID on DC and CA enhancements).

[0003] Dual connectivity or multiple connectivity refers to a UE operating in connected mode establishing physical pathways with more than one network node and enabling data transmission. This includes a Master Node (MN) and a Secondary Node (SN). The MN is executed by a Gnb / Enb / ng-eNB, and the serving cell group controlled by the MN is called the Master Cell Group (MCG). Correspondingly, the SN is executed by one or more Gnb / Enb / ng-eNBs, and the serving cell group controlled by the SN is called the Secondary Cell Group (SCG).

[0004] UEs configured with dual or multiple connections can communicate via MCG or SCG. In the existing mechanism, when a link transmission problem occurs in the MCG, even if the UE can transmit normally via the SCG, the UE still needs to trigger the RRC connection re-establishment process. This involves using the cell reselection mechanism to select a suitable cell to restore the link connection, while simultaneously releasing the previously configured SCG. The reconstruction process takes time and may fail, requiring an interruption of the UE's transmission and increasing service transmission latency.

[0005] To address this issue, the existing mechanism proposes that when the MCG experiences a link failure, if the SCG is functioning normally, the UE can report the MCG failure to the network side via the SCG. Then, the network side sends an RRC reconfiguration message to the UE via the SCG, enabling the UE to continue operating through reconfiguration, thereby minimizing the impact of the link interruption.

[0006] In this scheme, how the UE should handle the current bearer when MCG transmission encounters a problem is a problem that needs to be solved; correspondingly, how to restore logical link transmission after the UE receives the RRC reconfiguration message is also a problem that needs to be solved. Furthermore, if the SCG link also encounters a problem between the occurrence of an MCG transmission problem and the UE receiving the reconfiguration message, how the UE should handle this situation is also a problem that needs to be solved.

[0007] Summary of the Invention

[0008] This invention proposes solutions to the following problems: how the UE should handle the current bearer when MCG transmission encounters a problem; how to restore logical link transmission after the UE receives an RRC reconfiguration message; and how the UE should handle the situation if the SCG link also encounters a problem between the occurrence of an MCG transmission problem and the UE receiving the reconfiguration message. Specifically, this invention provides a user equipment control method and a user equipment.

[0009] According to a first aspect of the present invention, a control method for a user equipment (UE) is provided, comprising: the UE communicating based on a primary cell group (MCG) and a secondary cell group (SCG); the UE detecting whether a failure has occurred during MCG transmission; performing an MCG failure handling operation if a failure is detected during MCG transmission; and the UE sending a message carrying or indicating information related to the MCG failure to a base station.

[0010] In the above control method, when a failure is detected in the MCG transmission, the UE initiates or triggers an MCG failure notification process to send a message carrying or indicating relevant information about the MCG failure to the base station. During the initialization or start operation of the MCG failure notification process, the MCG failure handling operation is performed.

[0011] In the above control method, the MCG failure handling operation includes at least one of the following operations: suspending the transmission of all SRBs on the MCG; suspending the transmission of all DRBs on the MCG; suspending the transmission of all SRBs except SRB0 on ​​the MCG; suspending the transmission of split SRBs on the MCG; suspending MCG SRBs except SRB0; and suspending all MCG DRBs.

[0012] In the above control method, when the UE detects a failure in the MCG transmission or sends a message carrying or indicating information related to the MCG failure to the base station, it starts a recovery timer. During the operation of the recovery timer, if the UE detects a failure in the SCG, it triggers an RRC connection re-establishment process. If the UE receives an RRC reconfiguration message, it stops the timer. After the recovery timer times out, the UE triggers an RRC connection re-establishment process.

[0013] In the above control method, failures occurring during MCG transmission include at least one of the following: MCG radio link failure; lower-layer indication integrity protection check failure of the MCG; the RLC indication of the MCG reaching the maximum allowed number of transmissions or retransmissions; and the MCG MAC reporting a random access problem. Failures occurring during SCG transmission include at least one of the following: SCG radio link failure; lower-layer indication integrity protection check failure of the SCG; the RLC indication of the SCG reaching the maximum allowed number of transmissions or retransmissions; and the SCG MAC indicating a random access problem.

[0014] In the above control method, if the UE detects a failure in the MCG transmission and the UE is configured with a recovery timer or a recovery timer duration, the UE performs the MCG failure handling operation, sends a message carrying or indicating information related to the MCG failure to the base station, and starts the recovery timer; if the UE is not configured with a recovery timer or the recovery timer duration is not configured, the UE triggers the RRC connection re-establishment process.

[0015] In the above control method, after the UE sends a message carrying or indicating MCG failure information to the base station, when the UE receives the RRC reconfiguration message, if the UE MCG transmission is suspended, the UE performs operations to resume SRB transmission, resume DRB transmission, and resume split SRB transmission for the suspended SRB, DRB, and split SRB transmission on the MCG, respectively; if the UE MCG transmission is not suspended, the UE performs corresponding configuration based on the information indicated in the RRC reconfiguration message.

[0016] In the above control method, after the UE sends a message carrying or indicating MCG failure information to the base station, when the UE receives an RRC reconfiguration message, if the RRC reconfiguration message is the first RRC reconfiguration message received by the UE after sending the message carrying or indicating MCG failure information, then the UE performs RRC reconfiguration operations for the SRBs, DRBs, and split SRBs whose transmissions on the MCG are suspended; if the RRC reconfiguration message is not the first RRC reconfiguration message, then the UE performs corresponding configuration based on the information indicated in the RRC reconfiguration message.

[0017] In the above control method, after the UE detects that the MCG has failed, and before receiving the RRC reconfiguration message, if the UE detects that the SCG transmission has failed, and if the MCG transmission is suspended or the recovery timer is running, the UE triggers or starts the RRC connection re-establishment process; if the MCG transmission is not suspended, or the recovery timer is stopped or not running, the UE triggers the process of sending SCG failure information to report the SCG failure.

[0018] According to a second aspect of the present invention, a user equipment (UE) is provided, comprising: a processor; and a memory storing instructions; wherein the instructions, when executed by the processor, perform a control method according to a context. Attached Figure Description

[0019] Figure 1 is a flowchart illustrating a control method 100 for a user equipment (UE) based on an embodiment of the present invention.

[0020] Figure 2 is a flowchart illustrating a control method 200 for a user equipment (UE) based on an embodiment of the present invention.

[0021] Figure 3 is a block diagram showing the structure of user equipment (UE) communicating based on MCG and SCG.

[0022] Figure 4 is a block diagram illustrating a user equipment 40 according to an embodiment of the present invention. Detailed Implementation

[0023] The present invention will now be described in detail with reference to the accompanying drawings and specific embodiments. It should be noted that the present invention should not be limited to the specific embodiments described below. Furthermore, for the sake of simplicity, detailed descriptions of well-known technologies not directly related to the present invention have been omitted to prevent confusion in understanding the present invention.

[0024] Before proceeding with the detailed description, the following explanation is provided for several terms mentioned in this invention. Unless otherwise specified, the terms used in this invention shall have the meanings described below.

[0025] UE User Equipment

[0026] NR New Radio - Next-Generation Wireless Technology

[0027] eLTE Enhanced Long Term Evolution

[0028] E-UTRA (Evolved Universal Terrestrial Radio Access)

[0029] DC Dual Connectivity

[0030] MC Multi Connectivity

[0031] Gnb provides the NR user plane and control plane protocol stack to the UE and connects to the base station node of the 5G core network.

[0032] Enb provides the UE with the E-UTRAN user plane and control plane protocol stack and connects to the base station node of the EPC core network.

[0033] Ng-enb provides the UE with the E-UTRAN user plane and control plane protocol stack and connects to the base station node of the 5G core network.

[0034] SRB signaling radio bearer

[0035] DRB Data Radio Bearer

[0036] Split SRB signaling bearer

[0037] RLC Radio Link Control

[0038] PDCP (Packet Data Convergence Protocol 1) is a packet data convergence protocol layer.

[0039] MAC Media Access Control Layer

[0040] The following describes the control method for user equipment (UE) in this invention, specifically, the access control method for UE. As an example, Figure 1 shows a flowchart of a control method 100 for a user equipment (UE) based on an embodiment of this invention.

[0041] In step S101, the user equipment (UE) communicates with the base station based on the master cell group (MCG) and the secondary cell group (SCG).

[0042] In step S102, the user equipment (UE) detects whether a failure has occurred during the MCG-based transmission.

[0043] Among them, failures occurring in MCG-based transmissions include at least one of the following: MCG radio link failure; MCG lower-layer indication integrity protection check failure; MCG RLC indication reaching the maximum allowed number of transmissions or retransmissions; and MCG MAC reporting random access problems.

[0044] In step S102, if the user equipment UE detects a failure in the MCG transmission, the process proceeds to step S103, where the user equipment UE performs a processing operation for the MCG failure. This processing operation can be referred to as the "MCG failure processing operation".

[0045] The “MCG failure handling operation” includes at least one of the following operations: suspending all SRB transmissions on the MCG; suspending all DRB transmissions on the MCG; suspending all SRB transmissions on the MCG except for SRB0; suspending split SRB transmissions on the MCG; suspending all MCG SRBs except for SRB0; and suspending all MCG DRBs.

[0046] Then, in step S104, the user equipment (UE) sends a message to the base station carrying or indicating information related to MCG failure. Specifically, this information is transmitted via the split SRB. For example, if SRB1 is configured as a split SRB, the message is transmitted via SRB1.

[0047] In addition, in step S102, if the user equipment UE does not detect a failure in the MCG transmission, that is, if no failure occurs in the MCG-based transmission, the process returns to step S101 and continues to communicate based on MCG and SCG.

[0048] Furthermore, Figure 2 shows a flowchart of a user equipment (UE) control method 200 based on an embodiment of the present invention.

[0049] The difference between the user equipment (UE) control method 200 and the control method 100 described above is that step S103 is replaced by step S203; the other steps are the same as those in control method 100. Below, only the different parts will be described in detail; the identical parts will be omitted.

[0050] In step S102, if the user equipment (UE) detects a failure in the MCG transmission, the process proceeds to step S203. In step S203, the UE initiates or triggers the MCG failure notification process, and performs the aforementioned MCG failure handling operation during the initialization or start of the MCG failure notification process.

[0051] Furthermore, the control method for when the user equipment (UE) detects a failure in the MCG transmission and a failure also occurs in the SCG transmission is explained.

[0052] In the event of a failure in MCG-based transmission, the User Equipment (UE) starts a recovery timer. The recovery timer can be started either when the UE detects any of the aforementioned MCG failure scenarios, or when the UE sends a message carrying / indicating information related to the MCG failure.

[0053] During the recovery timer operation, if the user equipment (UE) detects a failure in the SCG, it triggers the RRC connection re-establishment process. If the UE receives an RRC reconfiguration message, it stops the timer operation.

[0054] After the recovery timer times out, the user equipment (UE) triggers the RRC connection re-establishment process.

[0055] Among them, the failures that occur in the SCG include at least one of the following: SCG radio link failure; SCG underlying indication integrity protection check failure; SCG RLC indication reaching the maximum allowed number of transmissions or retransmissions; and SCG MAC indication random access problem.

[0056] The specific embodiments of the present invention will be described in detail below. Furthermore, as mentioned above, the embodiments in this invention are illustrative examples provided for ease of understanding and are not intended to limit the scope of the invention.

[0057]

Example 1

[0058] Step 1: The UE detects that the MCG has experienced at least one of the following failure conditions:

[0059] -MCG wireless link failure

[0060] - The layer below MCG, such as the PDCP layer, indicates that the integrity protection check failed.

[0061] -MCG's RLC indicator has reached the maximum allowed number of transmissions or retransmissions.

[0062] -MCG MAC reports random access issues

[0063] Step 2: The UE performs at least one of the following operations:

[0064] -Suspend all SRB transmissions on the MCG

[0065] -Suspend all DRB transfers on the MCG

[0066] -Suspend the transmission of all SRBs on the MCG except for SRB0.

[0067] -Suspend the transmission of SRB on the MCG

[0068] -Suspend all MCG SRBs except SRB0

[0069] -Suspend all MCG DRBs.

[0070] Among them, MCG SRB refers to the signaling bearer under dual connectivity or multiple connectivity, whose RLC and MAC logical channel configuration is only configured / operates in the primary cell group (MCG).

[0071] MCG DRB refers to the data bearer under dual connectivity or multiple connectivity, whose RLC and MAC logical channel configuration is only configured / operates in the Master Cell Group (MCG).

[0072] Split SRB refers to the signaling bearer between the Master Node (MN) and the UE, whose RLC and MAC logical channel configurations are configured in the primary cell group (MCG) and secondary cell group (SCG).

[0073] As shown in Figure 3, MCG SRB, MCG DRB, and split SRB can be either SRB or DRB.

[0074] Furthermore, suspending SRB / DRB transmission on the MCG means pausing / stopping the reception and transmission of SRB / DRB data via the MCG. If the RLC and MAC logical channel configurations of these SRB / DRBs are configured in both the primary cell group (MCG) and the secondary cell group (SCG), then the data of such SRB / DRBs can still be received and transmitted via the SCG; if the RLC and MAC logical channel configurations of these SRB / DRBs are configured only in the primary cell group (MCG), then the transmission of such SRB / DRB data is paused / stopped.

[0075] Suspending the transmission of a split SRB on the MCG means pausing / stopping the reception and transmission of data from the split SRB through the MCG. Since the RLC and MAC logical channel configuration of the split SRB is configured in the primary cell group (MCG) and secondary cell group (SCG), it can still be received and transmitted through the SCG even though its transmission on the MCG is paused / stopped.

[0076] Suspending an SRB / DRB is different from its transmission on the MCG. Suspending an SRB / DRB means that the SRB / DRB is paused / stopped. The PDCP and RLC entities of the SRB / DRB will no longer generate or process data packets, and all corresponding timers will be stopped. The information of the suspended SRB / DRB will be saved in the UE context for later resumption.

[0077] Step 3: The UE sends a message to the base station carrying / indicating information related to MCG failure. Optionally, in this message, the UE may report that at least one of the aforementioned failure conditions of the MCG has occurred. This information is transmitted via the split SRB in Step 2. For example, if SRB1 is configured as a split SRB, then this message is transmitted via SRB1.

[0078]

Example 2

[0079] Example 2 is another implementation of Example 1, and the specific details are as follows.

[0080] Step 1: The UE detects that the MCG has failed in at least one of the following ways:

[0081] -MCG wireless link failure

[0082] -MCG's lower-level indication integrity protection check failed.

[0083] -MCG's RLC indicator has reached the maximum allowed number of transmissions or retransmissions.

[0084] -MCG MAC reports a random access issue.

[0085] Step 2: The UE initiates / triggers the process of sending a message to the base station carrying / indicating information related to MCG failure.

[0086] During the initialization / start operation of this process, the UE performs at least one of the following operations:

[0087] -Suspend all SRB transmissions on the MCG

[0088] -Suspend all DRB transfers on the MCG

[0089] -Suspend the transmission of all SRBs on the MCG except for SRB0.

[0090] -Suspend the transmission of SRB on the MCG

[0091] -Suspend all MCG SRBs except SRB0

[0092] -Suspend all MCG DRBs.

[0093] Step 3: The UE sends a message to the base station carrying / indicating information related to MCG failure. Optionally, in this message, the UE may report that at least one of the aforementioned failure conditions of the MCG has occurred. This information is transmitted via the split SRB in Step 2. For example, if SRB1 is configured as a split SRB, then this message is transmitted via SRB1.

[0094]

Example 3

[0095] The difference between Example 3 and Example 1 is that when the UE detects that at least one of the following failure conditions of the MCG has occurred, a timer is started, which is referred to here as the recovery timer.

[0096] -MCG wireless link failure

[0097] -MCG integrity protection verification failed.

[0098] -MCG's RLC indicator has reached the maximum allowed number of transmissions or retransmissions.

[0099] -MCG MAC reports a random access issue.

[0100] During the recovery timer operation, if the UE detects that at least one of the following failures has occurred in the SCG, it triggers the RRC connection re-establishment process.

[0101] -SCG wireless link failure

[0102] -SCG's underlying indication integrity protection check failed.

[0103] -SCG's RLC indicator has reached the maximum allowed number of transmissions or retransmissions.

[0104] -SCG MAC indicates a random access problem.

[0105] When the recovery timer times out, the UE triggers the RRC connection re-establishment process.

[0106] If the UE receives an RRC reconfiguration message during the recovery timer operation, then the timer operation is stopped.

[0107]

Example 4

[0108] The difference between Example 4 and Example 3 is that when the UE sends a message carrying / indicating information related to MCG failure, it starts a recovery timer.

[0109] Specifically, the recovery timer can be started when the UE generates and sends a message carrying / indicating MCG failure information; or when the UE delivers the message carrying / indicating MCG failure information to the lower layer transmission; or after the UE triggers the process of sending a message carrying / indicating MCG failure information to the base station, the recovery timer can be started during the initialization / start phase of this process.

[0110] During the recovery timer operation, if the UE detects that at least one of the following failures has occurred in the SCG, it triggers the RRC connection re-establishment process.

[0111] -SCG wireless link failure

[0112] -SCG's underlying indication integrity protection check failed.

[0113] -SCG's RLC indicator has reached the maximum allowed number of transmissions or retransmissions.

[0114] -SCG MAC indicates a random access problem.

[0115] When the recovery timer expires, the UE triggers the RRC connection re-establishment process.

[0116] If the UE receives an RRC reconfiguration message during the recovery timer operation, then the timer operation is stopped.

[0117]

Example 5

[0118] Example 5 combines Examples 1 and 3, or Examples 1 and 4. After performing step one in Example 1, the UE does not always execute steps two and three. Specifically, it can be the following steps.

[0119] Step 1: The UE detects that the MCG has failed in at least one of the following ways:

[0120] -MCG wireless link failure

[0121] -MCG's lower-level indication integrity protection check failed.

[0122] -MCG's RLC indicator has reached the maximum allowed number of transmissions or retransmissions.

[0123] -MCG MAC reports a random access issue.

[0124] If the UE is configured with a recovery timer, or with a specified duration for the recovery timer, then the UE continues to execute steps two and three as described in Example 1, and starts the recovery timer as described in Example 3 or 4, and performs the corresponding operations.

[0125] If the UE is not configured with a recovery timer, or if the recovery timer duration is not configured, then the UE will trigger the RRC connection re-establishment process.

[0126]

Example 6

[0127] Example 6 combines Examples 2 and 3, or Examples 2 and 4. After performing step one in Example 2, the UE does not always execute steps two and three. Specifically, it can be the following steps.

[0128] Step 1: The UE detects that the MCG has failed in at least one of the following ways:

[0129] -MCG wireless link failure

[0130] -MCG's lower-level indication integrity protection check failed.

[0131] -MCG's RLC indicator has reached the maximum allowed number of transmissions or retransmissions.

[0132] -MCG MAC reports a random access issue.

[0133] If the UE is configured with a recovery timer, or with a specified duration, then the UE continues to execute step two, as described in Example 2, the process of the UE initiating / triggering the sending of a message carrying / indicating MCG failure information to the base station, and step three; and as described in Example 3 or 4, the recovery timer is initiated and corresponding operations are performed.

[0134] If the UE is not configured with a recovery timer, or if the recovery timer duration is not configured, then the UE will trigger the RRC connection re-establishment process.

[0135]

Example 7

[0136] After the UE sends the aforementioned message carrying / indicating MCG failure information to the base station, it may receive an RRC reconfiguration message.

[0137] When the UE receives the RRC reconfiguration message,

[0138] If the UE MCG transmission is suspended, then the UE performs at least one of the following operations:

[0139] For an SRB whose transmission is suspended on the MCG, the UE performs one or more of the following operations:

[0140] - Perform PDCP data recovery for this SRB.

[0141] - Reconstruct the PDCP entity of the SRB.

[0142] - Rebuild the RLC entity of the SRB.

[0143] - Resume the suspended SRB transmission on the MCG.

[0144] For a DRB where transmission on the MCG is suspended, the UE performs one or more of the following operations:

[0145] - Perform PDCP data recovery for this DRB.

[0146] - Reconstruct the PDCP entity of the DRB.

[0147] - Reconstruct the RLC entity of the DRB.

[0148] - and / or resume suspended DRB transfers on the MCG.

[0149] For a split SRB where transmission on the MCG is suspended, the UE performs one or more of the following operations:

[0150] - Perform PDCP data recovery

[0151] - Reconstruct the PDCP entity of the split SRB.

[0152] - Reconstruct the RLC entity of the split SRB.

[0153] - Resume the suspended split SRB transfer on the MCG.

[0154] Preferably, if the split SRB is SRB1, then for SRB1 whose transmission on the MCG is suspended, the UE performs one or more of the following operations:

[0155] - Perform PDCP data recovery for SRB1

[0156] - Reconstruct the PDCP entity of SRB1,

[0157] - Reconstruct the RLC entity of SRB1,

[0158] - Resume SRB1 transmission on MCG

[0159] For suspended DRBs, restore their PDCP state and rebuild the PDCP entity, and resume the suspended DRBs.

[0160] For suspended SRBs, restore their PDCP state and rebuild the PDCP entity, and resume the suspended SRBs.

[0161] In this process, the transmission of UE MCG is suspended. The specific suspension process is as described in Example 1. That is, before receiving the RRC reconfiguration message, the transmission of UE MCG is suspended as described in Example 1.

[0162] If the transmission of the UE MCG is not suspended, the UE will perform the corresponding configuration based on the information indicated in the RRC reconfiguration message.

[0163] [Modified Example of Example 7]

[0164] As a variation of Embodiment 7 above, when the UE receives an RRC reconfiguration message, if this is the first RRC reconfiguration message received by the UE after sending a message carrying / indicating information related to MCG failure as shown in Embodiment 1, then the UE performs at least one of the following operations after receiving the RRC reconfiguration message:

[0165] For an SRB whose transmission is suspended on the MCG, the UE performs one or more of the following operations:

[0166] -Execute the PDCP data recovery procedure for this SRB.

[0167] - Reconstruct the PDCP entity of the SRB.

[0168] - Rebuild the RLC entity of the SRB.

[0169] - Resume the suspended SRB transmission on the MCG.

[0170] For a DRB where transmission on the MCG is suspended, the UE performs one or more of the following operations:

[0171] - Perform PDCP data recovery for this DRB

[0172] - Reconstruct the PDCP entity of the DRB.

[0173] - Reconstruct the RLC entity of the DRB.

[0174] - Resume the suspended DRB transfer on the MCG.

[0175] For a split SRB where transmission on the MCG is suspended, the UE performs one or more of the following operations:

[0176] - Perform PDCP data recovery for the split SRB

[0177] - Reconstruct the PDCP entity of the split SRB.

[0178] - Reconstruct the RLC entity of the split SRB.

[0179] - Resume the suspended split SRB transfer on the MCG.

[0180] Preferably, if the split SRB is SRB1, then for SRB1 whose transmission on the MCG is suspended, the UE performs one or more of the following operations:

[0181] - Perform PDCP data recovery for SRB1

[0182] - Reconstruct the PDCP entity of SRB1,

[0183] - Reconstruct the RLC entity of SRB1,

[0184] - Resume the transmission of SRB1 on the MCG.

[0185] For suspended DRBs, restore their PDCP state and rebuild the PDCP entity, and resume the suspended DRBs.

[0186] For suspended SRBs, restore their PDCP state and rebuild the PDCP entity, and resume the suspended SRBs.

[0187] If this is not the first RRC reconfiguration message received by the UE after sending a message carrying / indicating information related to MCG failure as shown in Example 1, then the UE performs the corresponding configuration based on the information indicated in the RRC reconfiguration message.

[0188] In this implementation, since the UE performs a corresponding suspension operation before or at the same time as sending a message carrying / indicating MCG failure information, as shown in Examples 1 and 2, the judgment condition "whether the RRC reconfiguration message is received after the UE sends a message carrying / indicating MCG failure information" is equivalent to "whether the transmission of UE MCG is suspended".

[0189] The PDCP data recovery process described above can be found in Chapter 5.5 of 3GPP Technical Specification 38.323.

[0190]

Example 8

[0191] The UE may detect an SCG failure between the time it detects an MCG failure and the time it receives an RRC reconfiguration message.

[0192] When the UE detects an SCG failure, it determines whether to initiate an RRC connection re-establishment or trigger the transmission of SCG failure information based on whether the MCG transmission is suspended. Details are as follows.

[0193] When the UE detects that the SCG has failed in at least one of the following ways,

[0194] -SCG wireless link failed.

[0195] -SCG's underlying indication integrity protection verification failed.

[0196] -SCG's RLC indicator has reached the maximum allowed number of transmissions or retransmissions.

[0197] -SCG MAC indicates a random access problem.

[0198] If the MCG transmission is suspended, the UE triggers / initiates the RRC connection re-establishment process;

[0199] If the MCG transmission is not suspended, the UE triggers / initiates the process of sending / transmitting SCG failure information to report SCG failure.

[0200] The suspension operation of the MCG transmission mentioned above is described in Example 1.

[0201] [Modified Example of Example 8]

[0202] As a variation of Embodiment 8 above, when the UE detects an SCG failure, it determines whether to re-establish the RRC connection or trigger the transmission of SCG failure information based on whether the recovery timer is running. The specific details are as follows.

[0203] When the UE detects that the SCG has failed in at least one of the following ways,

[0204] -SCG wireless link failed.

[0205] -SCG's underlying indication integrity protection verification failed.

[0206] -SCG's RLC indicator has reached the maximum allowed number of transmissions or retransmissions.

[0207] -SCG MAC indicates a random access problem.

[0208] If the recovery timer is running, then the UE triggers / initiates the RRC connection re-establishment process;

[0209] If the recovery timer stops or is not running, the UE triggers / initiates the process of sending / transmitting SCG failure information to report SCG failure.

[0210] The suspension operation of the MCG transmission mentioned above is described in Example 1.

[0211] In this implementation, since the UE performs a corresponding suspension operation and starts a recovery timer before or at the same time as sending a message carrying / indicating information related to MCG failure, as shown in embodiments 3 and 4, the judgment condition of "whether the transmission of MCG is suspended" is equivalent to "whether the recovery timer is running".

[0212] Furthermore, FIG4 shows a block diagram of a user equipment 40 according to an embodiment of the present disclosure. As shown in FIG4, the user equipment 40 includes a processor 401 and a memory 402. The processor 401 may include, for example, a microprocessor, a microcontroller, an embedded processor, etc. The memory 402 may include, for example, volatile memory (such as random access memory RAM), a hard disk drive (HDD), non-volatile memory (such as flash memory), or other memory systems. Program instructions are stored on the memory 402. When executed by the processor 401, these instructions can perform the control methods described in detail in the user equipment of the present disclosure.

[0213] The program running on the device according to the invention can be a program that enables the computer to perform the functions of embodiments of the invention by controlling the central processing unit (CPU). The program or the information processed by the program can be temporarily stored in volatile memory (such as random access memory RAM), hard disk drive (HDD), non-volatile memory (such as flash memory), or other memory systems.

[0214] Programs used to implement the functions of the various embodiments of the present invention can be recorded on a computer-readable recording medium. The corresponding functions can be implemented by causing a computer system to read and execute the programs recorded on the recording medium. The term "computer system" here can refer to a computer system embedded in the device, and may include an operating system or hardware (such as peripheral devices). "Computer-readable recording medium" can be a semiconductor recording medium, an optical recording medium, a magnetic recording medium, a short-time dynamic storage program recording medium, or any other computer-readable recording medium.

[0215] Various features or functional modules of the devices used in the above embodiments can be implemented or executed by circuits (e.g., monolithic or multi-chip integrated circuits). Circuits designed to perform the functions described in this specification may include general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic, discrete hardware components, or any combination of the above devices. A general-purpose processor may be a microprocessor, or any existing processor, controller, microcontroller, or state machine. The above circuits may be digital circuits or analog circuits. In cases where advancements in semiconductor technology have led to new integrated circuit technologies that replace existing integrated circuits, one or more embodiments of the present invention may also be implemented using these new integrated circuit technologies.

[0216] Furthermore, the present invention is not limited to the embodiments described above. Although various examples of the embodiments have been described, the present invention is not limited thereto. Fixed or non-mobile electronic devices installed indoors or outdoors can be used as terminal devices or communication devices, such as AV equipment, kitchen equipment, cleaning equipment, air conditioners, office equipment, vending machines, and other household appliances.

[0217] As described above, embodiments of the present invention have been described in detail with reference to the accompanying drawings. However, the specific structure is not limited to the above embodiments, and the present invention also includes any design modifications that do not depart from the spirit of the invention. Furthermore, various modifications can be made to the present invention within the scope of the claims, and embodiments obtained by appropriately combining the technical means disclosed in different embodiments are also included within the technical scope of the present invention. In addition, components with the same effects described in the above embodiments can be substituted for each other.

Claims

1. A control method for a user equipment (UE), comprising: The UE communicates based on the primary cell group (MCG) and the secondary cell group (SCG). The UE detects whether a failure has occurred during the MCG transmission; If a failure is detected in the MCG transmission, an MCG failure handling operation is performed; and The UE sends a message to the base station carrying or indicating information related to the failure of the MCG.

2. The control method according to claim 1, wherein, If a failure is detected in the MCG transmission, the UE initiates or triggers an MCG failure notification process to send a message carrying or indicating relevant information about the MCG failure to the base station. The MCG failure handling operation is performed during the initialization or start of the MCG failure notification process.

3. The control method according to claim 1 or 2, wherein, The MCG failure handling operation includes at least one of the following operations: Suspend all SRB transmissions on the MCG; Suspend all DRB transmissions on the MCG; Suspend all SRB transmissions on the MCG except for SRB0; Suspend the transmission of the split SRB on the MCG; Suspend all MCG SRBs except SRB0; and Suspend all MCG DRBs.

4. The control method according to claim 1, wherein, When the UE detects a failure in the MCG transmission, or sends a message carrying or indicating information related to the MCG failure to the base station, it starts a recovery timer. During the recovery timer's operation, if the UE detects a failure in the SCG, it triggers an RRC connection re-establishment process; if the UE receives an RRC reconfiguration message, it stops the timer's operation. After the recovery timer times out, the UE triggers the RRC connection re-establishment process.

5. The control method according to claim 4, wherein, The failures that occur during the MCG transmission include at least one of the following: The MCG wireless link failed. The lower-level indication of the MCG failed the integrity protection verification. The RLC indication of the MCG has reached the maximum allowed number of transmissions or retransmissions; and The MCG MAC report indicates a random access problem. The failures that occur in the SCG include at least one of the following: The SCG wireless link failed; The underlying indication of the SCG failed the integrity protection verification. The SCG's RLC indication has reached the maximum allowed number of transmissions or retransmissions; and The SCG MAC indicates a random access problem.

6. The control method according to claim 1, wherein, If the UE detects a failure in the MCG transmission, If the UE is configured with a recovery timer, or with a configured recovery timer duration, the UE performs the MCG failure handling operation, sends a message carrying or indicating information related to the MCG failure to the base station, and starts the recovery timer. If the UE is not configured with a recovery timer, or if the recovery timer duration is not configured, the UE triggers the RRC connection re-establishment process.

7. The control method according to claim 1, wherein, After the UE sends a message carrying or indicating MCG failure information to the base station, when the UE receives the RRC reconfiguration message, If the transmission of the UE MCG is suspended, the UE performs the operations of resuming the SRB transmission, resuming the DRB transmission, and resuming the split SRB transmission respectively for the SRB whose transmission on the MCG is suspended, the DRB whose transmission on the MCG is suspended, and the split SRB whose transmission on the MCG is suspended. If the transmission of the UE MCG is not suspended, the UE performs the corresponding configuration based on the information indicated in the RRC reconfiguration message.

8. The control method according to claim 1, wherein, After the UE sends a message carrying or indicating MCG failure information to the base station, when the UE receives the RRC reconfiguration message, If the RRC reconfiguration message is the first RRC reconfiguration message received by the UE after sending a message carrying or indicating information related to MCG failure, then the UE performs RRC reconfiguration operations for the SRBs whose transmissions on the MCG are suspended, the DRBs whose transmissions on the MCG are suspended, and the split SRBs whose transmissions on the MCG are suspended. If the RRC reconfiguration message is not the first RRC reconfiguration message, then the UE performs the corresponding configuration based on the information indicated in the RRC reconfiguration message.

9. The control method according to claim 1, wherein, When the UE detects a failure in the SCG transmission after detecting a failure in the MCG and before receiving the RRC reconfiguration message, If the transmission of the MCG is suspended or the recovery timer is running, the UE triggers or initiates the RRC connection re-establishment process; If the MCG transmission is not suspended, or the recovery timer is stopped or not running, the UE triggers the process of sending SCG failure information to report SCG failure.

10. A user equipment (UE), comprising: processor; as well as Memory, which stores instructions; The instructions are executed by the processor to perform the control method according to any one of claims 1 to 9.