Survey data processing device, survey data processing method and program for survey data processing

The method uses aircraft positioning data from multiple surveying devices to determine the location of a surveying device with unknown orientation, overcoming visibility and accuracy limitations, enabling easier and more accurate installation.

JP2023041316A5Active Publication Date: 2024-10-01TOPCON CORPORATION
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2021148616
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2021-09-13
Publication Date
2024-10-01
Estimated Expiration
2041-09-13

AI Technical Summary

Technical Problem

Existing methods for determining the installation location of surveying equipment, such as total stations, are limited by visibility requirements, necessitate specialized GNSS equipment, and struggle with accuracy in mountainous areas, and require pre-prepared three-dimensional models.

Method used

A method using a first surveying device with known external orientation elements and a second with unknown elements, involving positioning data acquisition and calculation based on the closest time relationship of aircraft positioning data from both devices to determine the position and orientation of the second device, even when direct visibility is obstructed.

Benefits of technology

Enables easier and more accurate determination of surveying device locations, reducing the need for direct measurement and specialized equipment, and improving positioning accuracy in obstructed environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

To obtain more easily information on a machine point of a surveying instrument.SOLUTION: A survey data processing device accepts positioning data obtained by positioning a flying UAV 300 at a plurality of positions using a surveying device 100 with known external orientation elements and a surveying device 200 with unknown external orientation elements, obtains positioning data having a corresponding relationship between the positioning data of the UAV 300 by the surveying instrument 100 and the positioning data of the UAV 300 by the surveying instrument 200, and determines a position of the surveying device 200 by the backward intersection method based on the positioning data having the corresponding relationship.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a technique used when installing a surveying instrument. [Background technology]

[0002] It is necessary to determine the installation position of surveying equipment such as a total station (TS). Specifically, it is necessary to obtain data on the position of the surveying equipment in the coordinate system to be used. This is a basic matter in surveying work. The position of this surveying equipment is also called the instrument position or instrument point. The work is also called obtaining the instrument point, setting the instrument point, etc.

[0003] A classic method is to use a surveying device whose position is known to survey an instrument point whose position is unknown. In addition, a method of measuring the position of an instrument point by relative positioning using GNSS is also used. For example, Patent Document 1 describes a technology for calculating the position of an instrument point by using a three-dimensional model. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2017-203742 A Summary of the Invention [Problem to be solved by the invention]

[0005] The method of measuring the position of a machine point using a surveying device can only be applied if the machine point is in a position visible from the surveying device. In addition, the method of relative positioning using GNSS requires dedicated equipment and is limited in its use because it is necessary to obtain information from reference stations. In addition, the method using GNSS has limitations in that the navigation satellites that can be used are limited in mountainous areas, and positioning accuracy may not be ensured. In addition, the method using a three-dimensional model requires the three-dimensional model to be prepared in advance.

[0006] In this context, an object of the present invention is to provide a technique for more easily obtaining information on the instrument points of a surveying instrument. [Means for solving the problem]

[0007] The present invention is a surveying data processing device comprising a positioning data receiving unit that receives positioning data obtained by performing positioning at multiple positions of a flying aircraft using a first surveying device whose exterior orientation parameters are known and a second surveying device whose exterior orientation parameters are unknown, a positioning data acquisition unit that acquires positioning data that is closest to the positioning data of the aircraft by the first surveying device and the positioning data of the aircraft by the second surveying device, and a surveying device position calculation unit that calculates at least one of the position and attitude of the second surveying device based on the positioning data that is closest to the positioning data.

[0008] In the present invention, the positioning data related to the positioning at the closest time may be data on the position of the aircraft measured by one of the first surveying instrument and the second surveying instrument at time Tn, and data on the position of the aircraft measured by the other of the first surveying instrument and the second surveying instrument at the closest time before and / or after the time Tn.

[0009] In the present invention, an embodiment can be given in which Pn is the data of the position of the aircraft measured by one of the first surveying instrument and the second surveying instrument at the time Tn, Tn1 and Tn2 are the closest times before or after the time Tn at which the other of the first surveying instrument and the second surveying instrument measured the position of the aircraft, Pn1 is the position of the aircraft measured by the other of the first surveying instrument and the second surveying instrument at the time Tn1, and Pn2 is the position of the aircraft measured by the other of the first surveying instrument and the second surveying instrument at the time Tn2, and Pn is calculated based on Pn1 and Pn2.

[0010] In the present invention, an embodiment is provided in which the Pn is determined from a path from the Pn1 to the Pn2. In the present invention, an embodiment is provided in which the Pn is determined based on a path that fits the Pn1 and the Pn2.

[0011] In the present invention, the distance between Pn1 and Pn2 is D1, the distance between Pn1 and Pn is D, and Pn is calculated as a position that is a distance D away from Pn1 in the direction of Pn2, and D is calculated by D=D1×(Tn-Tn1) / (Tn2-Tn1).

[0012] In the present invention, the Tn is obtained from a period during which the aircraft is flying in a straight line, the aircraft is repeatedly positioned by the first surveying instrument, and the period during which the aircraft is flying in a straight line is detected based on the repeated positioning of the aircraft by the first surveying instrument. In the present invention, a synchronization signal is output from the aircraft to the first surveying instrument and the second surveying instrument.

[0013] The present invention can also be understood as a surveying data processing method that accepts positioning data obtained by positioning a flying aircraft at multiple positions using a first surveying instrument whose exterior orientation parameters are known and a second surveying instrument whose exterior orientation parameters are unknown, obtains positioning data that is closest to the positioning data of the aircraft measured at the first surveying instrument and the positioning data of the aircraft measured at the second surveying instrument, and calculates at least one of the position and attitude of the second surveying instrument based on the positioning data that is closest to the positioning data measured at the time.

[0014] The present invention can also be understood as a surveying data processing program that is read and executed by a computer, and causes the computer to accept positioning data obtained by positioning a flying aircraft at multiple positions using a first surveying instrument whose exterior orientation parameters are known and a second surveying instrument whose exterior orientation parameters are unknown, obtain positioning data that is closest to the positioning data of the aircraft measured at the time by the first surveying instrument and the positioning data of the aircraft measured at the time by the second surveying instrument, and calculate at least one of the position and attitude of the second surveying instrument based on the positioning data that is closest to the positioning data measured at the time by the second surveying instrument.

[0015] The present invention can also be understood as a survey data processing device including a positioning data receiving unit that receives positioning data obtained by performing positioning at multiple positions of a flying aircraft using a first surveying device whose exterior orientation parameters are known and a second surveying device whose exterior orientation parameters are unknown, a positioning data acquiring unit that acquires positioning data measured at a time equal to or less than a predetermined difference or positional difference between the positioning data of the aircraft measured by the first surveying device and the positioning data of the aircraft measured by the second surveying device, and a position calculating unit of the surveying device that calculates at least one of the position and attitude of the second surveying device based on the positioning data measured at a time equal to or less than the predetermined difference or positional difference between the positioning data of the aircraft measured by the second surveying device. The present invention can also be understood as a method and a program invention.

[0016] The present invention can also be understood as a survey data processing device that includes a positioning data receiving unit that receives positioning data obtained by performing positioning at multiple positions of a flying aircraft using a first surveying instrument whose exterior orientation parameters are known and a second surveying instrument whose exterior orientation parameters are unknown, a positioning data acquiring unit that acquires positioning data that has a specific relationship between the positioning data of the aircraft by the first surveying instrument and the positioning data of the aircraft by the second surveying instrument, and a position calculating unit of the surveying instrument that calculates at least one of the position and attitude of the second surveying instrument based on the positioning data that has the specific relationship, and the positioning data that has the specific relationship is data on the position of the aircraft measured by one of the first surveying instrument and the second surveying instrument at time Tn, and data on the position of the aircraft measured by the other of the first surveying instrument and the second surveying instrument at times before and after the time Tn. This invention can also be understood as an invention of a method and a program. Effect of the Invention

[0017] According to the present invention, information on the instrument points of a surveying instrument can be obtained more easily. [Brief description of the drawings]

[0018] [Figure 1] FIG. 1 is a schematic diagram of an embodiment. [Diagram 2] (A) and (B) are schematic diagrams of the surveying equipment. [Diagram 3] FIG. 2 is a block diagram of the surveying instrument. [Figure 4] FIG. 2 is a block diagram of a data processing device. [Diagram 5] 11 is a flowchart illustrating an example of a processing procedure. [Figure 6] 11 is a flowchart illustrating an example of a processing procedure. [Figure 7] FIG. 4 is a diagram illustrating an example of positioning data. [Figure 8] This is a diagram showing the principle of rear intersection. [Figure 9]FIG. 2 is a conceptual diagram showing the relationship between positioning time and positioning data in a three-dimensional space. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] 1. First embodiment (overview) 1 shows a surveying instrument 100, a surveying instrument 200, a UAV (unmanned aerial vehicle) 300, and a data processing instrument 400. Each instrument will be described in detail later.

[0020] In this example, the exterior orientation parameters (position and attitude) of the surveying device 100 are known, and the exterior orientation parameters of the surveying device 200 are unknown. The surveying device 100 and the surveying device 200 perform positioning of a flying UAV 300.

[0021] Using the measured positions of the UAV 300 as reference points (orientation points), the position (instrument point) of the surveying device 200 is obtained by the resection method. This process is performed by the data processing device 400.

[0022] With this technology, even if there are mountains, trees, buildings, or other obstructions between the surveying device 100 and the surveying device 200 and it is not possible to directly locate the position of the surveying device 200 using the surveying device 100, it is possible to obtain the instrument point of the surveying device 200, i.e., to identify the installation position of the surveying device 200.

[0023] The surveying instrument 200 only needs to measure the position of the flying UAV 300, and does not need to directly measure the position of the surveying instrument 200. Therefore, the information on the instrument point of the surveying instrument 200 can be obtained more easily.

[0024] The number of surveying devices whose positions are known and whose positions are unknown is not limited to one, but may be multiple. The number of UAVs 300 used is not limited to one, but may be two or more.

[0025] (Surveying equipment) The surveying instruments 100 and 200 are total stations, and have the functions of measuring distance and position using laser light, and capturing and tracking the target of surveying. Total stations sold by surveying equipment manufacturers can be used as the surveying instruments 100 and 200.

[0026] Here, the same surveying instrument is used as the surveying instrument 100 and the surveying instrument 200. The surveying instrument 100 and the surveying instrument 200 may be different models or types as long as they have the functions described below. Also, a combination in which one is a total station and the other is a laser scanner is possible.

[0027] In this example, the surveying instrument 100 and the surveying instrument 200 are the same, so the following description will be given taking the surveying instrument 100 as an example. Figure 2 shows perspective views (A) and (B) of the surveying instrument 100. (A) is a perspective view seen from the front side, and (B) is a perspective view seen from the back side.

[0028] The surveying instrument 100 comprises a base unit 122 fixed on a tripod 121, a horizontal rotation unit 123 capable of horizontal rotation on the base unit 122, and a vertical rotation unit 124 held on the horizontal rotation unit 123 in a state allowing vertical rotation (elevation angle control and depression angle control).

[0029] Horizontal and vertical rotations are performed by motors. The horizontal angle of the horizontal rotation unit 123 (the horizontal direction of the optical axis of the telescope 125) and the vertical angle of the vertical rotation unit 124 (the elevation or depression angle of the optical axis of the telescope 125) are precisely measured by encoders.

[0030] In front of the vertical rotating part 124, a telescope 125, capture The optical unit 129 for tracking laser light and the wide-angle camera 101 are arranged, and the telescope 125 is connected to the back. eye 3. The display unit 126 and the touch panel display 128 are arranged on the rear panel 124. The telescope 125 also serves as the optical system of the telephoto camera 102 shown in FIG.

[0031] A laser beam for measuring distance (distance measurement beam) is emitted to the outside through the objective lens of the telescope 125, and the reflected beam is received. That is, the optical axis of the telescope 125 (the optical axis of the telephoto camera 102) and the optical axis of the distance measurement beam are set on the same axis line. Also, the optical axis of the wide-angle camera 101 and capture The optical axis of the tracking laser light optical unit 129 is also set in the same direction as the optical axis of the telescope 125 .

[0032] The touch panel display 128 is an operation panel and display for the surveying instrument 100. On the touch panel display 128, various information related to the operation of the surveying instrument 100 and information related to the surveying results are displayed.

[0033] (Block diagram of surveying equipment) 3 is a functional block diagram of the surveying instrument 100. The surveying instrument 100 includes a wide-angle camera 101, a telephoto camera 102, a drive control unit 103, a target capture It comprises a tracking unit 104, a positioning unit 105, an absolute time acquisition unit 106, a data storage unit 107, a communication device 108, a GNSS receiving device 109, and a touch panel display 128.

[0034] The wide-angle camera 101 captures wide-angle images. The telephoto camera 102 captures telephoto images. The drive control unit 103 controls the direction of the optical axis of the surveying instrument 100 (the optical axis of the telescope 125). Specifically, the drive control unit 103 controls the horizontal rotation of the horizontal rotation unit 123 and the vertical rotation of the vertical rotation unit 124.

[0035] target capture The tracking unit 104 capture Target identification using a tracking laser beam capture The target is a reflector such as a reflector prism. In this example, the target is a reflector prism 301 mounted on the UAV 300.

[0036] captureThe tracking laser light has a beam shape that spreads out like a fan, and the direction of the target is searched for by detecting the reflected light. At this time, the direction of the optical axis of the surveying instrument 100 is finely adjusted under the control of the drive control unit 103. Specifically, the optical axis is finely adjusted as if the instrument were shaking its head up and down and left and right to search for the target. This technology is described in, for example, JP 2009-229192 A.

[0037] By the above search, the target is captured on the optical axis of the surveying instrument 100 (the optical axis of the telescope 125). capture Once the target capture When the target is moved, the optical axis of the surveying instrument 100 is controlled in real time to maintain that state. This is the target tracking. Even if the target moves, the direction of the optical axis is controlled to follow the target. capture The state is maintained.

[0038] In addition, the target capture If the target is lost while in the targeting state, a search for the target will be started. capture Control is performed so that the state is as follows.

[0039] The positioning unit 105 performs positioning using laser light. Positioning is performed based on the distance to an object (in this case, a reflecting prism that is the target) measured by distance measurement light (laser light for distance measurement) and the direction of the optical axis of the distance measurement light. The distance is calculated using the principle of optical distance measurement. There are two methods for calculating the distance: a method that uses the phase difference of the received distance measurement light, and a method that uses the propagation time. In this example, distance measurement is performed using the method that uses the phase difference.

[0040] In the method using phase difference, a reference optical path is provided within the surveying instrument, and the distance to the object is calculated from the difference (phase difference) between the reception timing of the distance measuring light that has propagated through this reference optical path and the reception timing of the distance measuring light that has reflected from the object. In the method using propagation time, the distance to the object is calculated from the time it takes for the distance measuring light to hit the object, be reflected, and return.

[0041] The direction of the distance measurement point as viewed from the surveying instrument 100 (the direction of the optical axis of the distance measurement light) is obtained by measuring the rotation angles of the horizontal rotation unit 123 and the vertical rotation unit 124. The rotation angles of the horizontal rotation unit 123 and the vertical rotation unit 124 are precisely measured by encoders.

[0042] The absolute time acquisition unit 106 is a highly accurate electronic clock that acquires absolute time based on a navigation signal received by the GNSS receiver 109 from a navigation satellite. For example, Coordinated Universal Time (UTC) is used as the absolute time. It is also possible to use other types of clocks as long as they have the function of keeping accurate time.

[0043] The data storage unit 107 stores data and programs necessary for the operation of the surveying instrument 100, and data on surveying results. The communication unit 108 communicates with other devices. The communication is performed using a telephone line, a wireless LAN line, or a wired line.

[0044] The GNSS receiver 109 receives navigation signals from navigation satellites used in the GNSS. The absolute time acquisition unit 106 acquires absolute time based on the time information contained in the navigation signals.

[0045] (Block diagram of data processing device) In this example, the data processing device 400 is configured using a PC (personal computer). Application software for implementing the functional units shown in Fig. 4 is installed in the PC, thereby obtaining the data processing device 400. Some or all of the functional units shown in Fig. 4 can also be implemented by dedicated hardware. The functions of the data processing device 400 can also be implemented in a server connected to an Internet line.

[0046] The data processing device 400 includes a positioning data acquisition unit 401, a specific relationship positioning data acquisition unit 402, an estimated positioning data calculation unit 403, a machine point position calculation unit 404, data It includes a memory unit 405 and a communication device 406 .

[0047] The positioning data acquisition unit 401 performs the process of step S111 described later. In this process, the positioning data is acquired by the surveying device 100 and the surveying device 200 performing positioning of the UAV 300. The surveying device 100 and the surveying device 200 transmit the positioning data to the data processing device 400 using a wireless LAN line, and the positioning data acquisition unit 401 accepts the data.

[0048] The acquisition unit 402 of the positioning data in a specific relationship performs the process of steps S113 and S114 described later. In this process, the positioning data in the specific relationship that is related to the positioning data of the UAV 300 and that is measured at the closest time in the positioning data of the surveying device 100 and the surveying device 200 is acquired. Details of the process performed by the acquisition unit 402 of the positioning data in a specific relationship will be described in detail in the explanation of steps S113 and S114.

[0049] The estimated positioning data calculation unit 403 performs the process of step S115 described later. In this process, estimated positioning data of one surveying instrument corresponding to the positioning data of the UAV 300 obtained by the other surveying instrument is calculated.

[0050] The positioning of the UAV 300 by the surveying instrument 100 and the surveying instrument 200 may not be performed at the same time. In this case, the positioning times of the two instruments are different, so it is necessary to obtain positioning data that is estimated to be obtained if the positioning was performed at the same time.

[0051] The positioning data estimated to be obtained when positioning is performed at the same time is the estimated positioning data. The process related to this calculation is performed in the estimated positioning data calculation unit 403. There are two possible types of estimated positioning data: estimated positioning data estimated to be obtained on the surveying device 100 side with the surveying device 200 as the reference, and estimated positioning data estimated to be obtained on the surveying device 200 side with the surveying device 100 as the reference. Details of the process will be described later. Steps This will be explained in detail in relation to the explanation of S115.

[0052] The instrument point position calculation unit 404 performs the process of step S117. In this process, the position and attitude of the surveying instrument 200, whose position is unknown at the initial stage, is calculated using the backward intersection method. Details of the process will be described later in relation to the description of S117.

[0053] data The storage unit 405 stores data and operation programs necessary for the operation of the data processing device 400, data processed by the data processing device 400, etc. The communication device 406 communicates with external devices. The communication device 406 is used to communicate with, for example, the surveying device 100 and the surveying device 200. The communication is performed via a wireless LAN line, a telephone line, or a wired line.

[0054] (UAVs) The UAV 300 is equipped with a reflecting prism 301 that serves as a target for positioning. The reflecting prism 301 reflects the incident ranging light (positioning light) by inverting the direction by 180°. Various reflectors such as retroreflective targets can be used instead of the reflecting prism.

[0055] The positioning of the UAV 200 by the surveying instrument 100 and the surveying instrument 200 is performed using the reflecting prism 301 as a target. Therefore, the position of the UAV 300 is grasped as the position of the reflecting prism 301.

[0056] The UAV 300 may be of an autonomous type or of a type that is operated by an operator. In this example, the accuracy of the flight path of the UAV is not required, and since the equipment to be carried is a reflecting prism, a large payload is not required. For example, a toy drone that is inexpensively available may be used as the UAV 300.

[0057] (An example of advance work) An example of the processing procedure is shown in Figures 5 and 6. Figure 6 shows the processing related to the calculation of the position (instrument point) of the surveying instrument 200, and Figure 5 shows the procedure of the work carried out in the previous stage.

[0058] First, Fig. 5 will be described. First, the surveying instrument 100, which is a first surveying instrument, is installed at the first instrument point (step S101). Here, the exterior orientation elements (position and attitude) of the surveying instrument 100 at the first instrument point are acquired in advance and are known. In other words, the position (coordinates) of the first instrument point is known.

[0059] The coordinate system used is the absolute coordinate system (global coordinate system). The absolute coordinate system is the coordinate system used in maps and GNSS. In the absolute coordinate system, a position is described by longitude, latitude, and altitude.

[0060] Also, a second surveying instrument, the surveying instrument 200, is installed at the second instrument point (step S102). Here, the exterior orientation elements (position and attitude) of the surveying instrument 200 at the second instrument point are unknown. In other words, the position (coordinates) of the second instrument point is unknown.

[0061] After the surveying device 100 and the surveying device 200 are installed, the UAV 300 is flown in an airspace visible from both devices, and continuous positioning of the flying UAV 300 is performed by the surveying device 100 and the surveying device 200 (step S103).

[0062] The flight of the UAV 300 is performed by the operator or along a predetermined flight path. The flight path is selected in an airspace visible from both the surveying devices 100 and 200.

[0063] The positioning of the UAV 300 by the surveying devices 100 and 200 is continuously and repeatedly performed. measurement The measurement is performed at a repetition frequency of about 1 Hz to 20 Hz.

[0064] The positioning data is acquired as data on the distance from the surveying instrument to the UAV 300 measured using distance measuring light, and the direction of the optical axis of the distance measuring light (the direction of the UAV 300 as seen from the surveying instrument). This is the same for the surveying instruments 100 and 200.

[0065] The direction of the optical axis of the distance measuring light is the horizontal rotation part. 123 Horizontal rotation angle and vertical rotation 124 The vertical angle (elevation or depression) data is obtained.

[0066] The above positioning data is obtained in association with the absolute time measured by each surveying instrument. The positioning data of the flying UAV 300 obtained by the surveying instruments 100 and 200 is processed by the data processing device 400. In this example, after a set of positioning data is acquired, the positioning data is sent to the data processing device 400 and processed. Data processing can also be performed in parallel with positioning.

[0067] (An example of a processing procedure) Fig. 6 is a flowchart showing the procedure of processing performed in data processing device 400. A program for executing the processing in Fig. 6 is stored in an appropriate storage medium and executed by the CPU of a computer constituting data processing device 400. It is also possible to store the program for executing the processing in Fig. 6 in a server and download it for use.

[0068] When the process starts, first, positioning data of the UAV 300 obtained by the surveying instrument 100 and positioning data of the UAV 300 obtained by the surveying instrument 200 are acquired (step S111).

[0069] An example of positioning data is shown in Figure 7. The positioning time in Figure 7 is the time when the reflected light of the distance measurement light from the UAV 300 is received. Note that data on the direction of the optical axis of the surveying instrument (horizontal angle and vertical angle) is acquired at the timing when this distance measurement light is received.

[0070] 7 shows an example of the positioning data of the UAV 300 obtained by the surveying instrument 100 and an example of the positioning data of the UAV 300 obtained by the surveying instrument 200. In the example of FIG. 7, the times when the two positions were measured do not match, and are not at equal intervals. This is for the following reasons.

[0071] The surveying instrument 100 (the same applies to the surveying instrument 200) performs positioning using the reflecting prism 301 of the UAV 300 as a target. capture The direction of the optical axis of the surveying instrument 100 is controlled in real time to maintain this state, that is, the attitude of the surveying instrument 100 is controlled.

[0072] However, there are problems such as the shaking and vertical movement of the UAV 300 due to wind and air currents, and interruption of tracking and blocking of the distance measurement light due to birds, leaves, dust, etc. flying on the optical axis of the distance measurement light, so positioning (distance measurement) is not necessarily performed at the intended time. In addition, this phenomenon occurs separately in the surveying devices 100 and 200. Therefore, as shown in Figure 7, the times at which the positioning is performed by both devices do not match, and are not evenly spaced. Of course, there may be cases where the times at which the positioning is performed by both devices match and are evenly spaced, but there is no guarantee.

[0073] Fig. 7 shows a case where positioning processing is basically performed every 50 ms (20 Hz). However, if for some reason positioning processing cannot be completed in time, processing may be skipped and the interval may become 100 ms or 150 ms. Also, if the tracking of the reflecting prism 301 is lost or becomes unstable, the next positioning may not be a multiple of 50 ms. For these reasons, Fig. 7 shows a case where the times when the two positionings are performed do not match and are not equally spaced.

[0074] After acquiring the positioning data in step S111, the two positioning data (see, for example, FIG. 7) are compared to determine whether the positioning data of UAV300 acquired by the surveying device 100 and the positioning data of UAV300 acquired by the surveying device 200 are synchronized (step S112).

[0075] If the two positioning data are synchronized, the process proceeds to step S117, and if they are not synchronized, the process proceeds to step S113. Whether or not the data are synchronized is determined using a predetermined threshold value. The threshold value is determined taking into consideration the calculation error and the flight speed of the UAV. For example, a value of 0.1 ms to 10 ms is adopted as the threshold value.

[0076] When the two pieces of positioning data are synchronized (or can be considered to be synchronized), the surveying instrument 100 and the surveying instrument 200 measure a common absolute time, so that the positioning data of the UAV 300 measured by the surveying instrument 100 and the positioning data of the UAV 300 measured by the surveying instrument 200 can be obtained without any special ingenuity, which is the positioning data that is closest to the time measured. In an ideal case, it is possible to obtain positioning data measured at the same time.

[0077] When the process proceeds from step S112 to step S117, the exterior orientation parameters (position and attitude) of the surveying instrument 200 are calculated using the resection, the principle of which is shown in Fig. 8. By this process, a second instrument point, which is the position of the surveying instrument 200, is calculated.

[0078] In this process, at least two points are used as the acquired position of the UAV 300. Fig. 8 shows a case where three points P1, P2, and P3 are used as the position of the UAV 300.

[0079] In this case, since the timing of positioning of the surveying instrument 100 and the surveying instrument 200 is synchronized, P1 to P3 in FIG. 8 are positioned simultaneously (or at a timing considered to be so) by the surveying instrument 100 and the surveying instrument 200. 。The point P0 is the position of the surveying device 200 (the second mechanical point). Here, the vectors connecting P0 and P1, P0 and P2, and P0 and P3 are obtained from the distance measurement values by the surveying device 200 and the direction of the optical axis of the distance measurement light.

[0080] In this case, the positions (coordinate values) of P1 to P3 in the absolute coordinate system are measured by the surveying device 100. Therefore, the position of the point P0, which is the intersection of these three vectors, in the absolute coordinate system is obtained. Also, the orientation of the surveying device 200 is obtained.

[0081] Hereinafter, the case of proceeding from step S112 to step S113 will be described. In step S113, a certain time Tn at which the UAV 300 was positioned is acquired from the positioning data of the surveying device 200. Here, there is no positioning data of the UAV 300 by the surveying device 100 at the time Tn. This is because the determination in step S112 is NO.

[0082] Next, the positioning points Pn1 and Pn2 of the UAV 300 obtained by the surveying device 100 before and after the time Tn are acquired (step S114). Here, Pn1 is the positioning position by the surveying device 100 that is closest to Pn in the past on the time axis, and Pn2 is the positioning position by the surveying device 100 that is closest to Pn in the future on the time axis.

[0083] The absolute time is shared between the surveying device 100 and the surveying device 200. Therefore, the positioning times Tn1 and Tn2 of the UAV 300 by the surveying device 100 adjacent before and after the time Tn can be known.

[0084] Here, Tn1 < Tn < Tn2. In this case, the positioning position of the UAV 300 by the surveying device 100 at the time Tn1 is Pn1, and the positioning position of the UAV 300 by the surveying device 100 at the time Tn2 is Pn2.

[0085] After acquiring Pn1 and Pn2, the estimated positioning data of the UAV 300 by the surveying instrument 100 at time Tn is calculated by linear interpolation (step S115). That is, although the positioning of the UAV 300 is not actually performed by the surveying instrument 100 at time Tn, the estimated value is described using the positioning data obtained by the surveying instrument 100.

[0086] The process of step S115 will be described in detail below. Here, the time of the positioning point Pn1 is Tn1, the time of the positioning point Pn2 is Tn2, and the position of the UAV 300 at the time Tn is Pn.

[0087] 9 shows the positional relationship between Pn1, Pn2, and Pn. Here, the UAV 300 moves from position Pn1 to Pn2, is located at position Pn1 at time Tn1, is located at position Pn at time Tn, and is located at position Pn2 at time Tn2.

[0088] What we want to know here is the positioning data of the UAV300 measured by the surveying instrument 100 at time Tn. Therefore, we assume that the UAV300 flew in a straight line at a constant speed between time Tn1 and time Tn2, and estimate the position of the UAV300 at time Tn based on the measured positions Pn1 and Pn2 measured by the surveying instrument 100. In other words, we consider describing the position of the UAV300 at time Tn using Pn1 and Pn2.

[0089] Specifically, the calculation is performed as follows. First, it is assumed that the UAV 300 moves in a straight line from position Pn1 to Pn2 at a constant speed. The time when the UAV 300 is at position Pn is Tn. If the above flight is performed from position Pn1 to position Pn, the flight time is ( Tn-Tn1 ) It is.

[0090] Here, if the distance between Pn1 and Pn2 is D1 and the distance between Pn1 and Pn is D, then Pn is a position that is a distance D away from Pn1 in the direction of Pn2. Since the flight is at a constant speed, the relationship (distance = speed x time) means that the distance and flight time are directly proportional, and the proportional relationship D:D1=(Tn-Tn1):(Tn2-Tn1) holds.

[0091] Expanding the above proportional relationship, D(Tn2-Tn1)=D1(Tn-Tn1), we obtain D=D1(Tn-Tn1) / (Tn2-Tn1). In other words, the position of Pn is calculated as a position that is a distance of D from the position of Pn1 in the direction from Pn1 to Pn2.

[0092] In this way, the estimated position of Pn is calculated using the positioning data and absolute time value of the surveying instrument 100. This calculation of the estimated position is performed in step S115. This process can also be said to be a process of finding a straight line that fits Pn1 and Pn2, dividing this straight line with Pn1 as the starting point at a ratio of (Tn-Tn1) / (Tn2-Tn1), and setting the division point as the estimated position of Pn based on the positioning data of the surveying instrument 100.

[0093] The processing of steps S113 to S115 obtains positioning data that corresponds to the positioning data of the UAV 300 obtained by the surveying instrument 100 and the positioning data of the UAV 300 obtained by the surveying instrument 200. In this case, as the positioning data by the surveying instrument 100 that corresponds to the positioning data Pn of the UAV 300 obtained by the surveying instrument 200, a position that is the distance D away in the direction from Pn1 to Pn2 is obtained.

[0094] Next, it is determined whether or not the position data of the UAV 300 required for calculating the installation position (machine point) of the surveying instrument 200 by the resection has been acquired (step S116).

[0095] At least two points of UAV300 position data are required to calculate the installation position (machine point) of the surveying instrument 200. Normally, it is desirable to secure three points or more. If the surveying instrument 200 is installed horizontally above the unknown point, the resection method can be used even if there are only two points of UAV300 position data. In this case, the error is minimized when the opening angle between the two points is 90° and the distance to the two points is the same. The closer the opening angle is to 0° or 180°, the larger the error becomes.

[0096] This also applies when selecting three or more points. By selecting the position of the UAV 300 so that the angle between two points is as close to 90° as possible and is equidistant from the perspective of the surveying instrument 200, the accuracy of calculation of the instrument point of the surveying instrument 200 can be improved. The position of the UAV 300 can be freely selected, which is an advantage in this respect.

[0097] Specifically, it is preferable that the position data of the UAV 300 to be determined in step S116 includes a position at an elevation angle of about 45° from the surveying instruments 100 and 200, and further at a left-right viewing angle of about 90°. By satisfying this requirement, it is possible to improve the accuracy of calculation of the installation position (machine point) of the surveying instrument 200 by the resection method.

[0098] In step S116, if the positioning data required for the process of step S117 has not been obtained, the process from step S113 onwards is repeated. Note that in the second and subsequent processes of step S113, a value of Tn different from those up to that point is selected. In this way, the estimated positioning data calculated in step S115 is obtained for a location different from that of the previous time.

[0099] In step S116, if the positioning data required for the processing of step S117 has been obtained, the process proceeds to step S117, where the installation position (instrument point) of the surveying instrument 200 is calculated by the resection.

[0100] Hereinafter, a description will be given of the process of step S117 in the case where the process proceeds from step S116 to step S117. In this case, P1 to P3 in Fig. 8 are the positions of the UAV 300 measured by the surveying instrument 200. P0 is the position of the surveying instrument 200.

[0101] Here, the vector connecting P0 and P1, the vector connecting P0 and P2, and the vector connecting P0 and P3 are obtained from the distance measurement value by the surveying instrument 200 and the direction of the optical axis of the distance measurement light.

[0102] On the other hand, P1 to P3 are not directly positioned by the surveying instrument 100, but are calculated as estimated positioning data based on the position data of the UAV 300 positioned by the surveying instrument 100 in step S115.

[0103] That is, P1 to P3 are obtained as estimated positioning data described using the positioning data obtained by the surveying instrument 100. Here, the positioning data obtained by the surveying instrument 100 is a positioning value in an absolute coordinate system.

[0104] Therefore, the position in the absolute coordinate system of point P0, which is the intersection of the above three vectors, can be obtained. In addition, since the directions of P1 to P3 as seen from the surveying instrument 200 are known, the attitude of the surveying instrument 200 can be obtained. In this way, the position and attitude of the surveying instrument 200 are calculated based on the corresponding positioning data obtained by the surveying instrument 100 and the positioning data obtained by the surveying instrument 200. The above processing is performed in step S117 when the process proceeds from step S116 to step S117.

[0105] (Advantages) Even if the surveying device 100, whose exterior orientation elements are known, and the surveying device 200, whose exterior orientation elements are unknown, are between the surveying device 100 and the surveying device 200, and the surveying device 200 is not visible from the surveying device 100, the exterior orientation elements of the surveying device 200 can be obtained. The UAV 300 is not required to have a high level of autonomous flight performance. Therefore, a toy drone that is available at low cost can be used. Furthermore, the flight control of the UAV 300 is not required to be high level.

[0106] For example, the present invention can be implemented by flying the UAV 300 so as to circle a large area of ​​the airspace visible from the surveying instruments 100 and 200, and having the surveying instruments 100 and 200 continuously and continuously track and position the UAV 300 during this operation, and then analyzing the data. This is a simple task and can greatly reduce the burden on workers.

[0107] 2. Second embodiment 6, the first surveying instrument 100 acquires the time Tn at which it positioned the UAV 300. In addition, in step S114, the positioning data of the UAV 300 acquired by the surveying instrument 200 before and after the time Tn is acquired.

[0108] This allows for positioning data that corresponds to the positioning data of the UAV 300 measured by the surveying instrument 100 and the positioning data of the UAV 300 measured by the surveying instrument 200 to be obtained.

[0109] In step S115, estimated positioning data of the UAV 300 by the second surveying instrument 200 at time Tn is obtained by linear interpolation. In this way, the position of the surveying instrument 200 is calculated based on the corresponding positioning data. The rest is the same as the processing in FIG.

[0110] 3. Third embodiment The present invention can also be applied when there are three or more surveying instruments. In this case, the instrument point of the first surveying instrument is known, the instrument point of the second surveying instrument is unknown, the instrument point of the third surveying instrument is unknown, ... the instrument point of the Nth surveying instrument is unknown. N is a natural number equal to or greater than 3.

[0111] The procedure is to apply the process of Fig. 6 to the first surveying instrument and the second surveying instrument to obtain the instrument point of the second surveying instrument. Also, apply the process of Fig. 6 to the first surveying instrument and the third surveying instrument to obtain the instrument point of the third surveying instrument. Then, by using a similar method, obtain the instrument point of the Nth surveying instrument.

[0112] In this case, the flight control of the UAV involves flying the UAV in an airspace visible from the first surveying instrument and the second surveying instrument, flying the UAV in an airspace visible from the first surveying instrument and the third surveying instrument, ... flying the UAV in an airspace visible from the first surveying instrument and the Nth surveying instrument.

[0113] As another method, first, the process of Fig. 6 is applied to the first surveying instrument and the second surveying instrument to obtain the instrument point of the second surveying instrument. Next, the process of Fig. 6 is applied to the second surveying instrument whose instrument point is known and the third surveying instrument whose instrument point is unknown to obtain the instrument point of the third surveying instrument. Then, using a similar method, the N-1th surveying instrument is treated as a surveying instrument whose instrument point position is known, and the Nth surveying instrument is treated as a surveying instrument whose instrument point position is unknown, and the instrument point of the Nth surveying instrument is obtained by the process of Fig. 6.

[0114] In this case, the flight control of the UAV involves flying the UAV in the airspace visible from the first surveying instrument and the second surveying instrument, flying the UAV in the airspace visible from the second surveying instrument and the third surveying instrument, ... flying the UAV in the airspace visible from the N-1 surveying instrument and the Nth surveying instrument.

[0115] Even if there are two or more surveying instruments that require the acquisition of instrument points (acquisition of exterior orientation elements), the workload does not increase significantly. In this case, after each surveying instrument is installed, a UAV is sent into the sky and each instrument measures its position, thereby obtaining the necessary positioning data. Then, by processing the positioning data obtained by each instrument with post-processing based on the processing in Figure 6, the instrument points of multiple surveying instruments whose instrument points are unknown can be obtained.

[0116] 4. Fourth embodiment In step S115, it is assumed that the UAV 300 is flying in a straight line, and the estimated positioning data is calculated by linear interpolation. However, the UAV 300 does not necessarily fly in a straight line. In addition, there may be cases where the UAV 300 moves irregularly due to the influence of air currents.

[0117] In this embodiment, the period during which the UAV 300 flies in a straight line is identified, and Tn is obtained in step S113 during that period. The procedure will be described below. In this process, in the stage before step S113, the period during which the UAV 300 flies in a straight line is found based on the positioning data of the UAV 300 by the surveying instrument 100.

[0118] The surveying device 100 continuously measures the position of the UAV 300, and the positioning data is a value in an absolute coordinate system and is linked to absolute time. Therefore, the positioning data of the surveying device 100 can tell the period during which the flight path of the UAV 300 is a straight line. From this period, Tn is obtained in step S113. In this way, the error occurring in the processing of step S115 can be reduced.

[0119] The flight path may be approximated by a circular arc or the like, and the estimated positioning data may be obtained by interpolation. The function used for approximation is not limited to a circular arc, but may be a part of an ellipse, equations of various curves, or other curves that fit the flight path.

[0120] 5. Fifth embodiment Other methods for synchronizing the surveying instrument 100 and the surveying instrument 200 will be described. The first method is a method in which a timing signal instructing the timing of positioning is transmitted from the UAV 300 as a synchronization signal. In this case, a positioning instruction signal, which is a synchronization signal instructing positioning, is transmitted from the UAV 300. The transmission of the positioning instruction signal is performed, for example, using the wireless LAN standard.

[0121] The surveying device 100 and the surveying device 200 continuously capture the flying UAV 300. When the surveying device 100 and the surveying device 200 receive the positioning instruction signal while capturing the UAV 300, the surveying device 100 and the surveying device 200 use this as a trigger to perform positioning of the UAV 300.

[0122] The UAV 300 transmits the positioning signal multiple times while flying. 0 If the surveying instrument 200 and the surveying instrument 200 are of the same model number, the speed of operation upon receiving a positioning command signal will be the same, and the positioning process between the two can be synchronized.

[0123] In this case, it may be possible that at least one of the surveying devices is unable to measure the position of the UAV due to the influence of birds flying in the sky, etc. In such a case, in post-processing, positioning data performed at the same time is selected.

[0124] The synchronization signal may be sent from the UAV 300 as an optical signal. For example, the UAV 300 is equipped with a light-emitting element that periodically emits synchronization light. The surveying device 100 and the surveying device 200 photograph the UAV 300 with their own cameras and detect the synchronization light from the image. Upon detecting the synchronization light, the surveying device 100 and the surveying device 200 perform positioning of the UAV 300.

[0125] 6. Sixth embodiment As a means for obtaining absolute time, a reference clock signal transmitted from the UAV 300 can also be used. What is important about the absolute time here is not the absolute value of the time, but that it can be used in common by the surveying instruments 100 and 200 and that the timing can be grasped at the same time. In other words, it is important that the surveying instruments 100 and 200 can use clocks that keep the same time.

[0126] Therefore, a reference signal may be transmitted from UAV 300 and received by surveying instruments 100 and 200, and the same time may be measured by both surveying instruments.

[0127] This example can be realized by mounting a transmitter that outputs a radio-controlled clock signal that indicates time on the UAV 300. Since the positioning of the UAV 300 by the surveying instruments 100 and 200 is performed within the visible range, the transmitter may be of low output.

[0128] Also, instead of outputting a clock signal by radio waves, an optical clock signal may be output from the UAV 300. In this case, the surveying instruments 100 and 200 detect this optical clock signal with their on-board cameras and obtain the time information recorded there.

[0129] 7. Seventh embodiment 9, in addition to Tn1 and Tn2, the time Tn0 at which the surveying instrument 100 measured the position of the UAV 300 before Tn1 may be selected as the time at which the surveying instrument 100 measured the position of the UAV 300. Here, the positioning data of the UAV 300 measured by the surveying instrument 100 at Tn0 is set to Pn0.

[0130] In this case, a flight path that fits the three points Pn0, Pn1, and Pn2 is set, and the coordinates of the point on this flight path that corresponds to Tn are obtained.

[0131] For example, the distance between Pn1 and Pn2 on the above flight path is divided at a ratio of (Tn-Tn1) / (Tn2-Tn1), and the division point is set as the point corresponding to Pn. In this way, Pn can be described using the positioning data of the surveying instrument 100.

[0132] In the above case, it is also possible to select the time when the surveying device 100 positions the UAV 300 after Tn2 and obtain the positioning data Pn3. In this case, the flight path of the UAV 300 is set as the path fitted to the four points Pn0, Pn1, Pn2, and Pn.

[0133] According to this embodiment, when the UAV 300 is performing a turning flight, the influence can be incorporated into the calculation of the estimated positioning data in step S115.

[0134] 8. Eighth Embodiment In the case of FIG. 9, it is preferable that Pn1 and Pn2 are as close to Pn as possible. This is because the shorter the interval between Pn1 and Pn2, the higher the accuracy of the linear interpolation performed in step S115.

[0135] Therefore, in this embodiment, first, Pn1 and Pn2 that are adjacent on the spatial axis and have the shortest interval are selected from the positioning data series in which the surveying device 100 positions the UAV 300. Then, Tn1 corresponding to Pn1 and Tn2 corresponding to Pn2 are obtained.

[0136] Next, it is determined whether there is a Tn that satisfies Tn1 < Tn < Tn2. If there is a Tn that satisfies the above determination condition, that is, if the surveying device 200 positions the UAV 300 between Tn1 and Tn2, the Tn is selected, and the processes from step S113 in FIG. 6 are executed.

[0137] If there is no Tn that satisfies Tn1 < Tn < Tn2, then Pn1 and Pn2 with a short interval are selected next, and the determination as to whether there is a Tn that satisfies Tn1 < Tn < Tn2 is repeated.

[0138] According to this embodiment, Pn1 and Pn2 that are as close to Pn as possible are selected, and the accuracy of the estimated positioning data calculated in step S115 can be improved.

[0139] 9. Ninth Embodiment Below, we will explain an example in which one positioning data of an aircraft obtained by a first surveying instrument and one positioning data of an aircraft obtained by a second surveying instrument are selected as positioning data that have a specific relationship between each other, and one positioning data of the first surveying instrument is obtained.

[0140] In this example, only Tn1 is selected as the time corresponding to Tn in FIG. , measurement As the positioning time of the UAV 300 of the measurement device 100, a time Tn1 that is before Tn and close to Tn is acquired.

[0141] In this case, the following calculation is performed to improve the accuracy of the estimated positioning data calculated in step S115. First, a velocity vector of the UAV 300 at time Tn1 is obtained based on the positioning data of the UAV 300 of the surveying device 100. Next, assuming that the flight continues from Tn1 to Tn in the state of that velocity vector, the position at Tn is calculated as estimated positioning data.

[0142] In this example, it is also possible to acquire Tn2 without acquiring Tn1. In this case, the position of UAV300 at Tn is calculated as estimated positioning data by calculating backward from Tn2. That is, the velocity vector of UAV300 at Tn2 is obtained, and it is assumed that the velocity vector continues from Tn to Tn2, and the position of UAV300 at Tn is calculated by tracing back the flight path from Pn2.

[0143] 10. Tenth embodiment Let Tn1 and Tn2 be the times when the surveying instrument 100 measures the position of the UAV 300, and Tn be the time when the surveying instrument 200 measures the position of the UAV 300. In this case, it is also possible to set Tn-Tn1=ΔT1, Tn2-Tn=ΔT2, and select Tn1 and Tn2 under the conditions of threshold ≧ΔT1 and threshold ≧ΔT2.

[0144] In this case, the positioning time Tn of the surveying instrument 200 and the positioning time Tn1 of the surveying instrument 100 do not have to be adjacent on the time axis. In other words, the positioning of the UAV 300 may be performed by the surveying instrument 100 between Tn1 and Tn.

[0145] Furthermore, the positioning time Tn of the surveying instrument 200 and the positioning time Tn2 of the surveying instrument 100 do not have to be adjacent to each other on the time axis. In other words, the positioning of the UAV 300 may be performed by the surveying instrument 100 between Tn and Tn2.

[0146] The threshold value used to determine ΔT1 and ΔT2 is, for example, a value of 100 ms or less.

[0147] Also, when Pn-Pn1=ΔP1 and Pn2-Pn=ΔP2, a mode is possible in which Tn1 (Pn1) and Tn2 (Pn2) are selected under the conditions of threshold value ≧ΔP1 and threshold value ≧ΔP2.

[0148] In this case, the position Pn measured by the surveying instrument 200 and the position Pn1 measured by the surveying instrument 100 do not have to be adjacent to each other. That is, there may be a positioning point measured by the positioning instrument 100 between Pn and Pn1. Also, the position Pn measured by the surveying instrument 200 and the position Pn2 measured by the surveying instrument 100 do not have to be adjacent to each other. That is, there may be a positioning point measured by the positioning instrument 100 between Pn and Pn2. The threshold value is selected to be, for example, 100 cm or less, preferably 50 cm or less, and more preferably 25 cm or less.

[0149] 11. Eleventh embodiment Let Tn1 and Tn2 be the times when the surveying instrument 100 performs positioning of the UAV 300, and Tn be the time when the surveying instrument 200 performs positioning of the UAV 300. In this case, it is also possible to adopt a mode in which at least one of Tn1 and Tn2 is not selected from the time closest to Tn.

[0150] For example, when the UAV is flying in a straight line at a constant speed, even if Tn1 and Tn2 are far apart on the time axis, the error in the estimated positioning data calculated in step S115 is small. In such a case, it is not necessary to select at least one of Tn1 and Tn2 from the time closest to Tn.

[0151] 12. Twelfth embodiment When the position and attitude of a first surveying instrument at a first instrument point are known, and the position of a second surveying instrument at a second instrument point is known but its attitude is unknown, the attitude of the second surveying instrument at the second instrument point can be obtained by using the present invention. This method is called the backsight method. A specific example is shown below.

[0152] For example, the location of the second instrument point may already have been surveyed and staked or marked, in which case placing a second instrument there will determine the position of the second instrument, but its orientation is unknown.

[0153] In this case, the UAV is flown in the air in a common area visible to the first and second surveying instruments, and its positioning is performed by the first and second surveying instruments. The method of acquiring data is the method disclosed in this specification.

[0154] In this case, the UAV needs to be positioned at one point (of course, two or more points are also acceptable). If the position P of the UAV and the direction of the UAV's position P as seen from the second surveying instrument are known, a vector pointing from the second surveying instrument to point P can be set. Since the position of the second surveying instrument is known, the attitude of the second surveying instrument can be determined by setting the above vector. In this way, the attitude of the second surveying instrument, which was previously unknown, is determined.

[0155] In addition, when the position and attitude of the first surveying instrument at the first instrument point are known, and the position of the second surveying instrument at the second instrument point is unknown but its attitude is known, the position of the second surveying instrument at the second instrument point can also be determined by a similar method.

[0156] (others) The present invention can also be used to identify the instrument point of a surveying instrument whose instrument point is unknown, using multiple surveying instruments whose instrument points are known. That is, a UAV can be tracked and positioned by a first surveying instrument and a second surveying instrument whose instrument points are known, and a third surveying instrument whose instrument point is unknown, and the positioning data from these can be used to identify the instrument point of the third surveying instrument.

[0157] A laser scanner or a total station with a laser scanner can also be used as a surveying device. [Explanation of symbols]

[0158] 100...surveying equipment, 101...wide-angle camera, 102...telephoto camera, 121...tripod, 122...base unit, 123...horizontal rotation unit, 124...vertical rotation unit, 125...telescope, 126...telescope docking unit, 128...touch panel display, 200...surveying equipment, 300...UAV, 301...reflecting prism, 400...data processing device (PC).

Claims

1. A positioning data receiving unit that receives positioning data obtained by positioning an aircraft in flight at multiple locations using a first surveying device with known external orientation elements and a second surveying device with unknown external orientation elements, A positioning data acquisition unit acquires positioning data that is related to the positioning of the aircraft at the closest time between the positioning data of the aircraft obtained by the first surveying device and the positioning data of the aircraft obtained by the second surveying device. A position calculation unit for a surveying device calculates at least one of the position and orientation of the second surveying device based on the positioning data that was measured at the closest time. A surveying data processing device equipped with [a specific feature].

2. The positioning data that was measured at the closest time mentioned above is: The survey data processing device according to claim 1, wherein the data includes the position of the aircraft determined by one of the first surveying device and the second surveying device at time Tn, and the position of the aircraft determined by the other of the first surveying device and the second surveying device at the closest time before and / or after time Tn.

3. Pn is the data of the aircraft's position measured at time Tn by either the first surveying device or the second surveying device. The closest times before and after the aforementioned time Tn, when the other of the first and second surveying devices performed positioning of the aircraft, are designated as Tn1, Tn2, The position of the aircraft at time Tn1, as determined by the other of the first and second surveying devices, is given as Pn1. Let Pn2 be the position of the aircraft at time Tn2, as determined by the other of the first and second surveying devices. The survey data processing device according to claim 2, wherein the Pn is determined based on the Pn1 and Pn2.

4. The survey data processing device according to claim 3, wherein the Pn is obtained from the path from the Pn1 to the Pn2.

5. The survey data processing device according to claim 3 or 4, wherein the Pn is determined based on a path that fits the Pn1 and the Pn2.

6. Let D1 be the distance between Pn1 and Pn2. Let D be the distance between Pn1 and Pn. The aforementioned Pn is calculated as a position at a distance D away from Pn2 in the direction of Pn1, starting from Pn1. The aforementioned D is, A survey data processing device according to any one of claims 3 to 5, which is obtained by D = D1 × (Tn - Tn1) / (Tn2 - Tn1).

7. The aforementioned Tn is obtained from the period during which the aircraft is flying in a straight line. The aircraft is repeatedly positioned by the first surveying device, A survey data processing device according to any one of claims 2 to 6, wherein the period of straight-line flight is detected based on positioning repeatedly performed on the aircraft by the first surveying device.

8. The survey data processing device according to any one of claims 1 to 7, wherein a synchronization signal is output from the aircraft to the first surveying device and the second surveying device.

9. The system receives positioning data obtained by determining the position of a flying aircraft at multiple locations using a first surveying device with known external orientation elements and a second surveying device with unknown external orientation elements. The positioning data obtained from the aircraft positioning data obtained from the first surveying device and the aircraft positioning data obtained from the second surveying device is the positioning data that is closest in time. A survey data processing method for calculating at least one of the position and orientation of the second surveying device based on the positioning data that was measured at the closest time.

10. It is a program that is read and executed by a computer. to the computer The system receives positioning data obtained by determining the position of a flying aircraft at multiple locations using a first surveying device with known external orientation elements and a second surveying device with unknown external orientation elements. Acquisition of positioning data that is related to the positioning of the aircraft at the closest time between the positioning data of the aircraft measured by the first surveying device and the positioning data of the aircraft measured by the second surveying device, A process to calculate at least one of the position and orientation of the second surveying device based on the positioning data that was measured at the closest time. A program for processing survey data that executes the following.

11. A positioning data receiving unit that receives positioning data obtained by positioning an aircraft in flight at multiple locations using a first surveying device with known external orientation elements and a second surveying device with unknown external orientation elements, A positioning data acquisition unit that acquires positioning data measured at a time less than or equal to a predetermined difference, or positioning data in which the positional difference is less than or equal to a predetermined difference, between the positioning data of the aircraft measured by the first surveying device and the positioning data of the aircraft measured by the second surveying device, A position calculation unit for a surveying device calculates at least one of the position and orientation of the second surveying device based on positioning data measured at a time less than or equal to the predetermined difference, or positioning data in which the position difference is less than or equal to the predetermined difference. A surveying data processing device equipped with [a specific feature].

12. A positioning data receiving unit that receives positioning data obtained by positioning an aircraft in flight at multiple locations using a first surveying device with known external orientation elements and a second surveying device with unknown external orientation elements, A positioning data acquisition unit that acquires positioning data that has a specific relationship between the positioning data of the aircraft obtained by the first surveying device and the positioning data of the aircraft obtained by the second surveying device, A position calculation unit for a surveying device calculates at least one of the position and orientation of the second surveying device based on the positioning data in the aforementioned specific relationship. Equipped with, The positioning data in the aforementioned specific relationship is A survey data processing device comprising data of the aircraft's position measured at time Tn by one of the first surveying device and the second surveying device, and data of the aircraft's position measured at times before and after time Tn by the other of the first surveying device and the second surveying device.

Citation Information

Patent Citations

  • Position specification device, position specification method, and program for position specification

    JP2017203742A