Construction management method, construction management system, and program

JP2023074193A5Active Publication Date: 2024-10-08NICHIAS CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
JP2021187013
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2021-11-17
Publication Date
2024-10-08
Estimated Expiration
2041-11-17

AI Technical Summary

Technical Problem

Workers face difficulties in attaching the appropriate type of sealing material to pipe joints due to the need to visually confirm the type from a design ledger, which can be challenging with materials that are difficult to distinguish by appearance or have slight differences in dimensions.

Method used

A construction management method and system that utilizes construction target information to identify pipe connections, reads sticker information using a device, and determines if the type information matches the required sealing material, ensuring correct attachment through a determination process.

Benefits of technology

Reduces the burden on operators by accurately identifying and attaching the correct sealing material to pipe joints, minimizing errors and improving traceability through automated verification.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

To reduce a burden on a worker in attaching a seal material to a connection place of piping.SOLUTION: A construction management method includes the steps of: inputting construction object information, given to a connection part of piping to be a construction object, for identifying the connection part of the piping; acquiring type information associated with the inputted construction object information from storage means for associating the construction object information with the type information to store them; reading seal information including type information of a seal material from the seal material; determining whether the acquired type information is the same as the type information included in the read seal information; outputting a determination result; and attaching the seal material to the connection part of the piping on the basis of the outputted determination result.SELECTED DRAWING: Figure 5
Need to check novelty before this filing date? Find Prior Art

Description

[Technical Field]

[0001] The present invention relates to a construction management method, a construction management system, and a program. [Background technology]

[0002] Sealing materials such as gaskets are attached to the points where pipes are connected. Which sealing materials are used at which connections are managed in a design ledger, and construction is carried out based on that design ledger.

[0003] Patent Document 1 discloses that a flange tag indicating flange information in a bar code is provided on the flange, and a gasket tag indicating the same in a bar code is provided on the gasket; the flange information includes a flange number that identifies the flange and flange dimensions; the flange information is obtained from the flange tag using a bar code reader, and the gasket information indicated in the bar code on the gasket is obtained, and the suitability is displayed based on a determination of whether or not this matches the tightening information.

[0004] Patent Document 2 discloses that after acquiring tightening condition information associated with a flange, flange information including gasket information is acquired from the flange tag, the gasket information is acquired from the gasket tag, and it is determined whether the gasket information included in the flange information matches the gasket information acquired from the gasket.

[0005] Patent Document 3 discloses that flange information including gasket information is obtained from a flange tag, gasket information is obtained from the gasket tag, and it is determined whether the gasket information included in the flange information matches the gasket information obtained from the gasket.

[0006] Patent Document 4 discloses that a sealant installation system issues instructions to installers to attend sealant installation training, and acquires information on the sealant required for sealant installation in response to the installer's attendance at the sealant installation training. The sealant information / installation information table of the training server stores information identifying the installation equipment to be used for sealant installation.

[0007] Patent document 5 discloses that in an item management system, storage material is attached to an item, and the storage material stores identification data, expiration date, and time of entry, and a reading device reads this information from the storage material to enable searching.

[0008] Patent Document 6 discloses a system that supports cable installation. In this system, an RFID tag is attached to the end of a cable, and a PDA reads the RFID tag to obtain a cable ID, and based on this, work information for that cable is displayed.

[0009] Patent Document 7 describes a method of creating a barcode ledger by printing barcodes that indicate areas that need repair and attaching them to a board. [Prior art documents] [Patent documents]

[0010] [Patent Document 1] International Publication No. 2018 / 180055 [Patent Document 2] Patent No. 6630437 [Patent Document 3] Patent No. 6654244 [Patent Document 4] Patent No. 6616513 [Patent Document 5] Japanese Patent Application Laid-Open No. 2005-60085 [Patent Document 6] Japanese Patent Application Laid-Open No. 2008-171186 [Patent Document 7] Japanese Patent Application Publication No. 2-244258 Summary of the Invention [Problem to be solved by the invention]

[0011] It is not easy for workers to install the appropriate type of sealant at pipe connections. For example, they had to find the connection point in the design ledger, check the type of sealant to be used at that connection point, and visually confirm that the sealant they planned to install was appropriate. For example, there are sealants that are difficult to distinguish from their appearance, such as sealants with different heat resistance or sealants with slightly different diameters, so workers had to pay close attention to whether the sealant was appropriate.

[0012] The present invention has been made in view of the above-mentioned problems, and its object is to provide a technique for reducing the burden when attaching a sealing material to a pipe connection point. [Means for solving the problem]

[0013] In order to solve the above problems, the construction management method of the present invention includes the steps of: inputting construction target information that is assigned to a connection part of a pipe that is the subject of construction work and that identifies the connection part of the pipe; acquiring type information associated with the input construction target information from a storage means that stores construction target information and type information in association with each other; reading seal information from a sealing material that includes type information of the sealing material; determining whether the acquired type information is identical to the type information included in the read seal information; outputting the result of the determination; and attaching a sealing material selected based on the output result of the determination to the connection part of the pipe.

[0014] The construction management system of the present invention includes a target acquisition means for acquiring construction target information attached to a pipe connection that is the target of construction work, for identifying the pipe connection; an association acquisition means for acquiring type information of a sealing material that can be attached to the pipe connection indicated by the acquired construction target information from a storage means that stores the construction target information and type information in association with each other; a seal information acquisition means for acquiring seal information read from the sealing material, the seal information including the type information of the sealing material; a judgment means for judging whether the type information acquired from the storage means is the same as the type information included in the read seal information; and a result output means for outputting the result of the judgment by the judgment means.

[0015] The program of the present invention causes a computer to function as: a target acquisition means for acquiring construction target information attached to a pipe connection that is the target of construction work, for identifying the pipe connection; an association acquisition means for acquiring, from a storage means that stores construction target information and type information in association with each other, type information of a sealing material that can be attached to the pipe connection indicated by the acquired construction target information; a seal information acquisition means for acquiring seal information read from the sealing material, the seal information including the type information of the sealing material; a judgment means for judging whether the type information acquired from the storage means is the same as the type information included in the read seal information; and a result output means for outputting the result of the judgment by the judgment means.

[0016] In one form of the present invention, the construction management method further includes a step of displaying type information associated with the acquired construction object information, and in the step of reading the seal information, seal information including type information of the seal material may be read from a seal material selected based on the displayed type information.

[0017] In one form of the present invention, in the step of inputting the construction target information, the construction target information may be input by reading, with a reading device, a readable part attached to the connection part of the piping that is the target of the construction, in which the construction target information is written.

[0018] In one form of the present invention, the readable portion includes a portion on which the encoded construction target information is printed or an IC tag on which the construction target information is written, and in the step of inputting the construction target information, the construction target information may be input by reading the construction target information from the printed portion or the IC tag using a reading device.

[0019] In one form of the present invention, in the step of reading the sticker information, the sticker information may be read from an IC tag attached to the sealing material on which the sticker information is written or from a portion on which the encoded sticker information is printed.

[0020] In one embodiment of the present invention, the seal information further includes a lot number of the seal material, The method may further include a step of storing information indicating the result of the judgment and the lot number in a storage means in association with the construction object information.

[0021] In one form of the present invention, the method may further include a step of searching for construction object information associated with the lot number input as a query based on the lot number and the construction object information stored in association with each other in the memory means.

[0022] In one aspect of the present invention, the result output means may store information indicating the result of the determination in a storage means in association with the construction object information.

[0023] In one form of the present invention, the associated acquisition means displays type information associated with the acquired construction object information, and the seal information acquisition means may read seal information including type information of the seal material from a seal material selected based on the displayed type information.

[0024] In one embodiment of the present invention, the seal information further includes a lot number of the seal material, The result output means may store information indicating the result of the judgment and the lot number in a storage means in association with the work object information.

[0025] In one embodiment of the present invention, the system may further include a search means for outputting construction object information associated with a lot number input as a query based on the lot number stored in association with the construction object information. [Effects of the Invention]

[0026] According to the present invention, the burden on the worker when attaching a sealing material to a pipe connection can be reduced. [Brief explanation of the drawings]

[0027] [Figure 1] 1 is a diagram illustrating a construction management system and a construction target according to an embodiment of the present invention. [Figure 2] FIG. 2 is a diagram illustrating a hardware configuration of a construction management system. [Figure 3] FIG. 2 is a diagram showing an outline of the construction process. [Figure 4] FIG. 2 is a diagram illustrating an example of construction management data. [Figure 5] 10A and 10B are diagrams illustrating an example of a work procedure at a connection section. [Figure 6] FIG. 10 is a diagram showing an example of a gasket. [Figure 7] FIG. 10 is a diagram illustrating an example of a screen displayed by a client device. [Figure 8] FIG. 2 is a block diagram showing functions realized by the construction management system. [Figure 9] FIG. 10 is a flowchart illustrating an example of processing performed by a client device. [Figure 10] FIG. 10 is a flowchart illustrating an example of processing by an analysis unit. [Figure 11] FIG. 10 is a diagram showing another example of a gasket. DETAILED DESCRIPTION OF THE INVENTION

[0028] The following describes an embodiment of the present invention with reference to the drawings. Components having the same functions are designated by the same reference numerals, and their description will be omitted. The following describes a construction management system for managing the installation of a sealing material, such as a gasket, on a flange portion of a pipe.

[0029] FIG. 1 is a diagram illustrating a construction management system and a construction target according to an embodiment of the present invention. The construction management system includes a management server 1, a client device 2, and a reading device 3. The management server 1 is a server computer that manages information related to construction. The client device 2 is, for example, a mobile personal computer, and executes a process to confirm the correspondence between the construction target area and the sealing material at the construction site. The reading device 3 is, for example, a two-dimensional barcode reader or RFID reader, and reads information from a recording medium attached to the construction target area and a gasket 43 serving as the sealing material.

[0030] The object of construction is the connection that connects two pipes 33, and the connection includes flanges 34a and 34b at the ends of the pipes 33. The connection may include the portion of the pipes 33 surrounding the flanges 34a and 34b. A gasket 43 is attached between the flanges 34a and 34b. A tag 41 is attached to the connection, on which construction target information is written to identify the connection. Note that the tag 41 attached to the connection may be hung on the connection itself, or may be placed around the connection so that it is clear that it is the connection.

[0031] 2 is a diagram showing the hardware configuration of the construction management system. The management server 1 includes a processor 11, a storage 12, a communication unit 13, and an input / output unit 14. The client device 2 includes a processor 21, a storage 22, a communication unit 23, an input / output unit 24, and a display unit 25.

[0032] Processor 11 operates according to a program stored in storage 12, and controls communication unit 13 and input / output unit 14. Processor 21 operates according to a program stored in storage 22, and controls communication unit 23, input / output unit 24, and display unit 25. The above programs may be provided by being stored in a computer-readable storage medium such as a flash memory, or may be provided via a network such as the Internet.

[0033] The storages 12 and 22 are configured with memory elements such as DRAM and flash memory, and external storage devices such as hard disk drives. The storage 12 stores the above programs. The storages 12 and 22 also store information and calculation results input from the processors 11 and 21, the communication units 13 and 23, etc.

[0034] The communication units 13 and 23 are network interface controllers that communicate with other devices and include integrated circuits for wired LAN, wireless LAN, or mobile communication, and communication terminals or antennas. The communication units 13 and 23 have the function of communicating with other devices via a network. Based on the control of the processors 11 and 21, the communication units 13 and 23 input information received from other devices to the processors 11 and 21 or the storages 12 and 22, and transmit information to other devices.

[0035] The input / output units 14 and 24 are mainly composed of input / output controllers that exchange data with external devices. Examples of external devices include input devices such as a keyboard, a mouse, a touch panel, and a reading device 3. Under the control of the processors 11 and 21, the input / output units 14 and 24 acquire data input by the user operating the input device.

[0036] The display unit 25 includes a so-called GPU (Graphics Processing Unit), a frame buffer memory, and a display control circuit. The display unit 25 may further include a display output device. The display unit 25 generates image data and displays the generated image on the display output device.

[0037] FIG. 3 is a diagram showing an outline of the construction process. First, the administrator prepares construction management data including construction target information that identifies the connection of the pipe 33 to be constructed, and gasket information (step S101). The gasket information includes a product number that indicates the type of gasket 43 to be attached to the connection. The product number is a type of type information that indicates the type of sealing material such as the gasket 43. As type information, part of the serial number assigned to the gasket 43 may be used instead of the product number. At this point, the construction management data is stored in the management server 1.

[0038] The administrator then attaches the tag 41 (the readable portion) on which the construction target information is written to the connection portion (step S102). The administrator may write the construction target information by printing the encoded construction target information on the tag 41, or by attaching an IC chip (e.g., an RFID chip) on which the construction target information is written or a sticker on which the encoded construction target information is printed to the tag 41. The encoded construction target information may be a two-dimensional barcode. Hereinafter, the portion of the tag 41 on which the construction target information is printed and the IC chip will be collectively referred to as the record-storing portion. The printed portion and the IC chip are a type of recording medium. Attaching the tag 41 to the connection portion may involve hanging the tag 41 on the connection portion, and the record-storing portion may be a sticker attached to the connection portion or its vicinity, or an area on the connection portion or its vicinity on which the encoded construction target information is printed.

[0039] Next, the administrator prepares the gasket 43 to be attached to the connection portion (step S103). The seal information is attached to the gasket 43. The seal information of the gasket 43 will be described in detail later.

[0040] Then, the administrator copies the construction management data to the client device 2 (step S104). A client device 2 is prepared for each construction worker, and only the construction management data for the connection part that the worker is in charge of may be copied to the client device 2. Up to this point, the preparation work before actually starting the construction work is completed.

[0041] After the preparation work is completed, the worker attaches the gaskets 43 to each of the connections, and the client device 2 updates the installation management data (step S105). This process is performed for each connection. Details of this process will be described later.

[0042] When the worker finishes the construction of the connection part, the client device 2 transfers the updated construction management data to the server (step S107). The management server 1 updates the construction management data in the management server 1 based on the transferred construction management data.

[0043] Then, the management server 1 tally or search for information regarding the construction status of the connections (step S108). The management server 1 may tally the number of connections that have been constructed from the construction management data, or may search for connections based on a query including the work date or the lot number of the gasket 43.

[0044] Fig. 4 is a diagram showing an example of construction management data. The construction management data includes a record for each connection, and each record includes construction target information, the part number of the gasket 43 to be installed, and the dimensions of the gasket 43. Each record also includes, as information stored during installation, the confirmation date, the confirmation result, the shipping date of the installed gasket 43, and the lot number of the gasket 43. Note that some or all of the items other than the part number shown in Fig. 4 do not need to be included in the construction management data.

[0045] The process of step S105 will be further explained below. Figure 5 is a diagram showing an example of the work procedure at the connection section. The procedure shown in Figure 5 is performed for each connection section.

[0046] First, the worker uses the reading device 3 to read the construction target information from the tag 41 at the connection of the pipe 33 that is the target of the construction work (step S201). More specifically, the worker may hold the reading device 3 over the record storage unit, and the reading device 3 may read and decode the encoded construction target information from the recording area 42 of the tag 41, or alternatively, the reading device 3 may wirelessly read the construction target information from the IC chip.

[0047] The client device 2 acquires the construction object information read by the reading device 3, acquires the product number of the gasket 43 stored in association with the read construction object information from the construction management data, and outputs the acquired product number (step S202).

[0048] The worker picks out the gasket 43 with the product number output from the client device 2 from one or more gaskets 43 prepared in advance, and reads the gasket information from the gasket 43 using the reading device 3 (step S203).

[0049] FIG. 6 is a diagram showing an example of a gasket 43. The gasket 43 is placed in a package 47 before installation. In the example of FIG. 6, the gasket 43 has an annular main portion and an extension portion 44 extending radially from a portion of the main portion. An IC tag with gasket information written thereon or something printed with encoded gasket information (e.g., a sticker or package 47) is attached to the gasket 43. Hereinafter, this IC tag or printed thing will be referred to as a recording medium. In the example of FIG. 6, a printed sticker 45 is attached to the extension portion 44 as a recording medium. FIG. 11 is a diagram showing another example of the gasket 43. In the example of FIG. 11, a package 47 with a printed sticker 45 attached thereto is attached to the gasket 43 as a recording medium.

[0050] More specifically, in step S203, the worker holds the reading device 3 over the recording medium attached to the gasket 43, and the reading device 3 reads the gasket information from the recording medium. The reading device 3 may read and decode the encoded construction target information, or the reading device 3 may read the construction target information from the IC chip via wireless communication.

[0051] Then, the client device 2 determines whether the product number of the gasket 43 linked to the construction object information is the same as the product number included in the read gasket information (step S204). If the product number of the linked gasket 43 is different from the product number included in the gasket information (N in step S204), the client device 2 outputs an error message (step S205), and the worker returns the current gasket 43 to the place where it was originally stored, and repeats the process from step S203.

[0052] On the other hand, if the part number of the linked gasket 43 is the same as the part number included in the gasket information (Y in step S204), the client device 2 outputs a message indicating that the gasket 43 is correct (normal), and stores the current date and time, part of the gasket information (e.g., the shipping date and lot number of the gasket 43), and the collation result (confirmation result) in association with the work object information in the storage 22 (step S206). Note that the information stored in association with the work object information may be only part of the above. Then, the worker attaches the gasket 43 to the connection part (step S207).

[0053] Fig. 7 is a diagram showing an example of a screen displayed by the client device 2. Following "Construction target," construction target information is displayed, the "Management ledger" column of the table displays the product number of the gasket 43 in the construction management data, and the "Reading result" column displays the product number read by the reading device 3. In Fig. 7, the collation result is displayed below the table, and a confirmation button is displayed below that.

[0054] By writing gasket information including the product number to the gasket 43 in advance, reading the gasket information with the reading device 3, and comparing it with construction management data prepared in advance by the client device 2, it is possible to significantly reduce the possibility of attaching the wrong gasket 43 to a connection. In addition, the location of the connection to be constructed is also read by the reading device 3 from the tag 41 attached to the connection, reducing input errors and further reducing the possibility of attaching the wrong gasket 43 to the connection. In addition to the product number, the gasket information also includes the shipping date and lot number, and by storing this information in association with the construction target information, it is possible to improve so-called traceability.

[0055] 6 and 7, if the verified part numbers are the same, the verification result is stored in storage 22 as a substantial work record in step S206, but after the worker performs the installation work in step S207, the verification result and the installation result may be stored in storage 22. In this case, when the worker inputs an indication that the work is complete, the verification result and the installation result may be stored in storage 22. For example, when the confirmation button is pressed in FIG. 7, a work completion button may be displayed on the screen, and when the worker presses the work completion button, information indicating the verification result, etc. may be stored in storage 22.

[0056] Next, the functions and processes realized by the construction management system will be described. FIG. 8 is a block diagram showing the functions realized by the construction management system. Functionally, the construction management system includes a construction target acquisition unit 51, a type presentation unit 52, a gasket information acquisition unit 53, a comparison unit 54, a comparison result output unit 55, an analysis unit 58, a client database 61, and a server database 63. The construction target acquisition unit 51, the type presentation unit 52, the gasket information acquisition unit 53, the comparison unit 54, and the comparison result output unit 55 are realized by the processor 21 of the client device 2 executing program commands corresponding to each unit stored in the storage 22 and controlling the communication unit 23, the input / output unit 24, and the display unit 25. The analysis unit 58 is realized by the processor 11 of the management server 1 executing program commands corresponding to each unit stored in the storage 12 and controlling the communication unit 13 and the input / output unit 14.

[0057] The client database 61 and the server database 63 are mainly realized by the storages 12 and 22, respectively. The client database 61 and the server database 63 store construction management data. The client database 61 and the server database 63 may be realized by the processors 21 and 11 executing database management system programs executed in the client device 2 and the management server 1, and exchanging data with the storages 22 and 12.

[0058] The construction target acquisition unit 51 acquires construction target information that is assigned to a connection of the pipe 33 that is the target of construction work and that is used to identify the connection.

[0059] The type presenting unit 52 obtains the product number of the gasket 43 stored in association with the obtained construction object information from the construction management data, and outputs information indicating the obtained product number to a display output device or the like.

[0060] The gasket information acquisition unit 53 acquires gasket information including a product number that indicates the type of the gasket 43, read from the gasket 43.

[0061] The collation unit 54 acquires the product number associated with the construction object information acquired by the construction object acquisition unit 51 from the storage 22, which stores construction object information in association with product numbers, and determines whether the acquired product number is the same as the product number included in the acquired gasket information.

[0062] The matching result output unit 55 outputs the result of the determination made by the matching unit 54. The matching result output unit 55 may output the result of the determination via a display output device or as a sound. The matching result output unit 55 associates the current date (e.g., the confirmation date in FIG. 4), information indicating the result of the determination (e.g., the confirmation result in FIG. 4), and part of the gasket information with the construction object information and stores them in the storage 22. The part of the gasket information may include one or more of the lot number and the shipping date. When the part number associated with the construction object information differs from the part number included in the acquired gasket information, the matching result output unit 55 may acquire the construction object information associated with the part number included in the gasket information from the storage 22, which stores construction object information and part numbers in association with each other, and display information indicating the construction location corresponding to the construction object information.

[0063] The analysis unit 58 analyzes the contents of the server database 63, which stores the construction management data. The server database 63 stores the construction management data prepared in step S101 and updated in step S107 with the current date, information indicating the judgment result, and some gasket information. The analysis unit 58 may count the number of construction object information items included in the construction management data and associated with confirmation results indicating that the judgment result is OK as the number of constructed connections. The analysis unit 58 also outputs construction object information associated with the lot number or shipping date input as a query based on the lot number or shipping date stored in association with the construction object information in the construction management data. This makes it easy to determine the areas that need to be checked, for example, if a manufacturing problem with the gasket 43 is later discovered. The analysis unit 58 may also output construction object information included in the construction management data and whose confirmation date is before the reference date that serves as the query. This makes it easy to determine the elapsed time since the installation of the gasket 43.

[0064] FIG. 9 is a flow diagram showing an example of the processing of the client device 2, and shows the processing executed by the client device 2 in the steps shown in FIG.

[0065] First, the construction object acquisition unit 51 acquires the construction object information read by the reading device 3 (step S401). The type presentation unit 52 acquires the product number of the gasket 43 stored in association with the acquired construction object information from the construction management data (step S402). Then, the type presentation unit 52 outputs the acquired product number to a display output device or the like (step S403).

[0066] 5, when the worker performs an operation to read the gasket information, gasket information acquisition unit 53 acquires the gasket information read from reader 3 (step S404). Collation unit 54 determines whether the product number output by type presentation unit 52 in step S403 (the product number associated with the construction object information acquired by construction object acquisition unit 51 in the construction management data) is the same as the product number included in the gasket information (step S405). If they are different (N in step S405), collation result output unit 55 outputs a message of NG as the judgment result via a display output device or the like (step S406).

[0067] In step S406, the matching result output unit 55 may further search the construction management data to obtain construction target information associated with the product number included in the gasket information, and display information indicating the construction location corresponding to the construction target information. This makes it easy to determine, for example, where a gasket 43 with an incorrect product number should be returned. It also makes it easy to detect cases where another worker has mistakenly carried a gasket 43 that should have been used.

[0068] On the other hand, if the part number output by the type presenting unit 52 is the same as the part number included in the gasket information (Y in step S405), the matching result output unit 55 outputs an OK message as the determination result via a display output device or the like (step S407). Then, the matching result output unit 55 associates the current date (confirmation date), information indicating the determination result, and part of the gasket information with the construction object information and stores them in the client database 61 (step S408). The matching result output unit 55 may store part of the above information in the client database 61, and part of the gasket information may include the lot number and shipping date.

[0069] Through the above process, the client device 2 compares the read part number with the part number associated with the read construction object information based on the construction management data. The construction management system including the client device 2 reduces the burden of checking the type of gasket 43 during construction, and significantly reduces the possibility of errors occurring during installation.

[0070] The output of the OK or NG message may be a display of a message indicating OK or NG, a sound indicating OK or NG, or a light indicating OK or NG that is lit or flashing.

[0071] The processing of step S408 may be performed after the worker presses the work completion button. In this case, after the processing of step S407, the matching result output unit 55 waits until the worker inputs an input indicating that the work is complete. Then, when the input indicating that the work is complete is input, the matching result output unit 55 performs the processing of step S408.

[0072] 10 is a flow diagram showing an example of processing by the analysis unit 58, in which the analysis unit 58 searches for construction management data based on a query such as a lot number. It is assumed that the confirmation date, information indicating the judgment result, and part of the gasket information stored in the client database 61 of the client device 2 are reflected in the server database 63 in advance.

[0073] First, the analysis unit 58 acquires a query that serves as a search condition (step S501). The query may be a lot number, a confirmation date range, or a shipping date. The query may be input from an input device connected to the management server 1, or may be input from another computer that is connected to the management server 1 via the communication unit 13.

[0074] The analysis unit 58 searches for data that satisfies the query from the construction management data stored in the server database 63 (step S502). The analysis unit 58 then acquires construction target information associated with the data that satisfies the query. The analysis unit 58 outputs the data acquired by the search to, for example, a display output device or the computer that input the query (step S503).

[0075] The process shown here makes it easy to know what needs to be checked when a problem is discovered in a product, for example. [Explanation of symbols]

[0076] 1 Management server, 2 Client device, 3 Reading device, 11, 21 Processor, 12, 22 Storage, 13, 23 Communication unit, 14, 24 Input / output unit, 25 Display unit, 33 Pipe, 34a, 34b Flange, 41 Tag, 42 Recording area, 43 Gasket, 44 Extension unit, 45 Printed seal, 47 Packaging, 51 Construction object acquisition unit, 52 Type presentation unit, 53 Gasket information acquisition unit, 54 Matching unit, 55 Matching result output unit, 58 Analysis unit, 61 Client database, 63 Server database.

Claims

1. A step of inputting construction target information that is assigned to a connection part of a pipe to be subjected to construction, the construction target information being for identifying the connection part of the pipe; A step of acquiring type information associated with the input construction object information from a storage means that stores construction object information and type information in association with each other; reading seal information including type information of the seal material from the seal material; a step of determining whether the acquired type information is the same as type information included in the read sticker information; outputting a result of the determination; a step of attaching a sealant selected based on the output result of the determination to a connection portion of the pipe; Construction management methods including:

2. In the construction management method according to claim 1, In the step of outputting the result of the judgment, when it is judged that the acquired type information is not the same as the type information included in the read sticker information, construction target information associated with the type information included in the read sticker information is acquired from the storage means, and information indicating the construction location corresponding to the construction target information is displayed. Construction management method.

3. The construction management method according to claim 1 or 2, The method further includes a step of displaying type information associated with the input construction object information, In the step of reading the seal information, seal information including type information of the sealing material is read from the sealing material selected based on the displayed type information. Construction management method.

4. The construction management method according to any one of claims 1 to 3, In the step of inputting the construction target information, a readable portion is attached to the connection portion of the piping that is the target of the construction, and the construction target information is written in the readable portion, and the construction target information is input by reading the readable portion with a reading device. Construction management method.

5. The construction management method according to claim 4, The read portion includes a portion on which the encoded construction object information is printed or an IC tag on which the construction object information is written, In the step of inputting the construction target information, the construction target information is input by reading the construction target information from the printed portion or the IC tag with a reading device. Construction management method.

6. The construction management method according to any one of claims 1 to 5, In the step of reading the sticker information, the sticker information is read from an IC tag on which the sticker information is written, or from a portion on which the encoded sticker information is printed, which is attached to the sealing material. Construction management method.

7. The construction management method according to any one of claims 1 to 6, The seal information further includes a lot number of the seal material, The method further includes a step of storing information indicating the result of the determination and the lot number in a storage means in association with the construction object information. Construction management method.

8. The construction management method according to claim 7, The method further includes a step of searching for construction object information associated with the lot number input as a query, based on the lot number and the construction object information stored in association with each other in the storage means. Construction management method.

9. An object acquiring means for acquiring construction object information for identifying a connection part of a pipe, the construction object information being assigned to the connection part of a pipe that is the object of construction; an association acquisition means for acquiring information on the type of a sealant that can be attached to the connection portion of the pipe indicated by the acquired construction object information from a storage means that stores the construction object information and the type information in association with each other; a seal information acquiring means for acquiring seal information including type information of the seal material read from the seal material; a determining means for determining whether the type information acquired from the storage means is the same as the type information included in the read sticker information; a result output means for outputting a result of the determination by the determination means; Construction management system including.

10. In the construction management system according to claim 9, The association acquisition means displays type information associated with the acquired construction object information, the seal information acquisition means reads seal information including type information of the sealing material from the sealing material selected based on the displayed type information; Construction management system.

11. In the construction management system according to claim 10, The result output means stores information indicating the result of the judgment in association with the construction object information in a storage means. Construction management system.

12. The construction management system according to claim 11, The seal information further includes a lot number of the seal material, The result output means stores information indicating the result of the judgment and the lot number in a storage means in association with the construction object information. Construction management system.

13. The construction management system according to claim 12, and a search means for outputting construction object information associated with a lot number input as a query based on the lot number stored in association with the construction object information. Construction management system.

14. an object acquiring means for acquiring construction object information for identifying a connection part of a pipe, the construction object information being assigned to the connection part of a pipe that is the object of construction; an association acquisition means for acquiring information on the type of a sealant that can be attached to the connection portion of the pipe indicated by the acquired construction object information from a storage means that stores the construction object information and the type information in association with each other; a seal information acquiring means for acquiring seal information including type information of the seal material read from the seal material; a determining means for determining whether the type information acquired from the storage means is the same as the type information included in the read sticker information; and a result output means for outputting a result of the determination made by the determination means; A program that makes a computer function as a