Disaster risk information provision system

The disaster information system addresses user misunderstanding by continuously providing and updating disaster information at predetermined levels, ensuring accurate and timely crisis awareness even as levels change, using real-time updates and area-specific crisis reporting.

JP2024134562AInactive Publication Date: 2024-10-04AISIN CORP +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023044810
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-21
Publication Date
2024-10-04
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing disaster information systems provide users with disaster or crisis information based on a fixed level threshold, leading to user misunderstanding when the crisis level changes over time, such as shifting from a major tsunami warning to a lower level, causing users to believe the risk has ended when it has not.

Method used

A disaster information providing system that continuously updates and provides information on disasters or crises at a predetermined level or higher, ensuring necessary information is delivered even if the crisis level drops below the threshold in areas where the crisis has already been reported, and updates information in real-time based on new disaster risk information.

Benefits of technology

Prevents user misunderstanding by ensuring continuous delivery of critical information and timely updates, maintaining accuracy in crisis awareness even as crisis levels fluctuate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024134562000001_ABST
    Figure 2024134562000001_ABST
Patent Text Reader

Abstract

To provide a disaster risk information provision system which prevents misunderstanding of a user from occurring with end of information provision while providing, as a target, information in which a level of disaster or risk is equal to or higher than a predetermined level to the user.SOLUTION: In a case where new disaster risk information is acquired and an area identified by the acquired disaster risk information is an area about which a user is not notified of occurrence of the same type of disaster or risk, on condition that a level of disaster or risk identified by the new disaster risk information is equal to or higher than a predetermined level, the user is notified of the information relating to the disaster or the risk which occurs in the area. On the other hand, in a case where the new disaster risk information is acquired and the area identified by the acquired disaster risk information is an area about which the user is already notified of occurrence of the same kind of disaster or risk, regardless of the level of disaster or risk identified by the new disaster risk information, the user is continuously notified of the information relating to the disaster or the risk which occurs in the area.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical Field]

[0001] The present invention relates to a disaster and crisis information providing system that provides users with information about disasters and crises. [Background technology]

[0002] In recent years, a disaster and crisis management notification service (hereinafter referred to as "disaster and crisis notification") has become known, which transmits various information (hereinafter referred to as "disaster and crisis information"), such as emergency notifications on earthquakes, tsunamis, floods, volcanic eruptions, and other large-scale disasters issued by government disaster prevention agencies, crisis management information on terrorism and other issues, and information on the issuance of evacuation advisories, via the quasi-zenith satellite "Michibiki."Information terminals compatible with "Michibiki," such as navigation devices and smartphones, can quickly and accurately provide users with information on disasters and crises that have occurred based on the disaster and crisis information received through the disaster and crisis notification.

[0003] Here, the disaster information generally includes information for identifying the area where the disaster or crisis has occurred as well as the level of the disaster or crisis. For example, information regarding tsunamis classifies the area where a tsunami is expected to occur and the level of the tsunami expected to occur in that area (highest level: major tsunami warning, tsunami warning, and warning cancellation). The information terminal does not provide all disaster information received via disaster risk reports to the user, but instead selects and provides information deemed necessary for the user based on information regarding the area and level. For example, Japanese Patent Application Laid-Open No. 2020-88741 discloses that when disaster risk information is received by an in-vehicle terminal, the disaster risk area where the disaster or crisis has occurred and the level of urgency are identified, and the information is provided by interrupt display when the distance from the vehicle's current location to the disaster risk area is less than a threshold and the level of urgency is greater than or equal to a threshold. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2020-88741 A (paragraph 0060, Figure 9) Summary of the Invention [Problem to be solved by the invention]

[0005] When a disaster or crisis occurs, the level of the disaster or crisis is not fixed from the time it occurs until it ends, but typically changes over time. Taking a tsunami as an example, even if the highest level, a major tsunami warning, is issued, there is a pattern in which the level transitions to a lower level tsunami warning after a while, and the warning is eventually lifted. In the above-mentioned Patent Document 1, only information on disasters or crises with a level above a threshold is provided. Therefore, if the information provided is limited to major tsunami warnings or higher, the provision of information will end when the major tsunami warning transitions to a tsunami warning, which may lead users to mistakenly believe that all tsunami-related warnings have been lifted (the risk of a tsunami has completely disappeared).

[0006] The present invention has been made to solve the above-mentioned problems in the past, and aims to provide a disaster and danger information provision system that provides users with information on disasters or crises at a predetermined level or above, while also preventing users from misunderstanding the situation when information provision ends. [Means for solving the problem]

[0007] In order to achieve the above-mentioned object, the disaster danger information provision system of the present invention comprises a disaster danger information acquisition means that acquires disaster danger information at predetermined intervals when a disaster or crisis occurs, the disaster danger information including information specifying the type of disaster or crisis that has occurred, the area where the disaster or crisis has occurred, and the level of the disaster or crisis that has occurred, and a disaster danger notification means that notifies the type of disaster or crisis that has occurred, the area where the disaster or crisis has occurred, and the level of the disaster or crisis that has occurred based on the disaster danger information acquired by the disaster danger information acquisition means, wherein when new disaster danger information is acquired and the area specified by the acquired disaster danger information is an area that has not yet been notified of the occurrence of the same type of disaster or crisis, the disaster danger notification means notifies the information about the disaster or crisis that has occurred in the area, provided that the level of the disaster or crisis specified by the new disaster danger information is equal to or higher than a predetermined level, and when new disaster danger information is acquired and the area specified by the acquired disaster danger information is an area that has already been notified of the occurrence of the same type of disaster or crisis, the disaster danger notification means continues to notify the information about the disaster or crisis that has occurred in the area, regardless of the level of the disaster or crisis specified by the new disaster danger information. The "type of disaster or crisis" may be, for example, an earthquake, tsunami, flood, eruption, terrorism, evacuation advisory, or the like. Furthermore, the "level of the disaster or crisis that has occurred" may indicate the scale of the disaster or crisis, its strength (degree), or its urgency. [Effects of the Invention]

[0008] According to the disaster / risk information provision system of the present invention having the above configuration, by providing users with information on disasters or crises where the level of the disaster or crisis is above a predetermined level, it is possible to selectively provide information that is deemed necessary for the user. On the other hand, for areas where a disaster or crisis has already been reported, the information will continue to be reported even if the level of the disaster or crisis subsequently falls below the predetermined level, thereby making it possible to prevent users from misunderstanding when the information provision ends. [Brief explanation of the drawings]

[0009] [Figure 1] 1 is a schematic configuration diagram showing a disaster information provision system according to an embodiment of the present invention. [Figure 2] FIG. 10 is a diagram showing an example of disaster danger information distributed by a disaster danger report. [Figure 3] FIG. 2 is a block diagram showing the configuration of a communication terminal according to the present embodiment. [Figure 4] 10 is a flowchart of an information provision processing program according to the present embodiment. [Figure 5] FIG. 10 is a diagram showing an example of a case where a notification based on disaster risk information is made for a new area. [Figure 6] FIG. 10 is a diagram showing an example of a case where a notification based on disaster risk information is made to an area where a notification has already been made. [Figure 7] 10 is a flowchart of a sub-processing program of the overlap determination process. [Figure 8] 3 is a diagram showing the results of performing a duplication determination process on the disaster risk information shown in FIG. 2. FIG. [Figure 9] 10 is a flowchart of a sub-processing program of the information update process. DETAILED DESCRIPTION OF THE INVENTION

[0010] A disaster / risk information providing system according to one embodiment of the present invention will be described in detail below with reference to the drawings. First, the schematic configuration of the disaster / risk information providing system 1 according to this embodiment will be described with reference to Fig. 1. Fig. 1 is a schematic configuration diagram showing the disaster / risk information providing system 1 according to this embodiment.

[0011] As shown in Fig. 1, the disaster information provision system 1 according to this embodiment basically includes a disaster management center 2, which is a disaster prevention organization under the jurisdiction of the government, a quasi-zenith satellite "Michibiki" 3, and a communication terminal 5 carried by a user 4. The communication terminal 5 may be, for example, a mobile phone, a smartphone, a tablet terminal, a personal computer, or an in-vehicle navigation device. In the following explanation, it is assumed that the user 4 is traveling by vehicle, but the user may also travel by a means of transportation other than a vehicle, or may travel on foot or stay in a location without traveling.

[0012] Here, the disaster and crisis management center 2 is a disaster prevention organization under the jurisdiction of the government that manages disaster prevention and crises, such as the Japan Meteorological Agency. In the event of an earthquake, tsunami, flood, eruption, other large-scale disaster, terrorism, or other crisis, the disaster and crisis management center 2 generates disaster and crisis information that includes information specifying the type of disaster or crisis, the area where the disaster or crisis occurred, and the level of the disaster or crisis that occurred. The generated disaster and crisis information is transmitted to the communication terminal 5 using a disaster and crisis management notification service (hereinafter referred to as disaster and crisis notification) transmitted from the control station (not shown) of "Michibiki" 3 via the quasi-zenith satellite "Michibiki" 3.

[0013] 2 is a diagram showing an example of disaster danger information distributed to the communication terminal 5 by a disaster danger report. In particular, FIG. 2 shows an example of disaster danger information that is generated when a tsunami occurs as a disaster. As shown in Figure 2, disaster risk information is divided by area and identifies the level of disaster or crisis that has occurred in each area. Areas can be divided by administrative divisions such as prefectures, cities, towns, and villages, or by latitude and longitude. For example, in the example shown in Figure 2, the disaster risk information distributed at 2:49 PM indicated that a major tsunami warning / announcement had been issued for Iwate Prefecture, Miyagi Prefecture, and Fukushima Prefecture; a major tsunami warning had been issued for the central Pacific coast of Hokkaido, the Pacific coast of Aomori Prefecture, Ibaraki Prefecture, the Kujukuri and Boso areas of Chiba Prefecture, and the Izu Islands; and a tsunami warning had been issued for the Pacific coast of Tohoku. Regarding tsunamis, a "major tsunami warning / announcement" is the highest level of warning, followed by a "major tsunami warning," a "tsunami warning," and a "warning canceled." However, a "major tsunami warning / announcement" and a "major tsunami warning" can be combined and treated as the same level.

[0014] The disaster and crisis management center 2 monitors the progress and status of disasters and crises that have occurred, and generates and distributes the latest disaster and crisis information at predetermined intervals using disaster and crisis reports. The predetermined intervals are not necessarily fixed; for example, in the example shown in Figure 2, disaster and crisis information is generated and distributed using disaster and crisis reports at 14:49, 15:14, 15:30, 16:08, 18:47, 21:35, and 22:53. The time when disaster and crisis information is distributed using disaster and crisis reports or the time when disaster and crisis information is generated at the disaster and crisis management center 2 is referred to as the announcement time. Even in the same area, the disaster and crisis levels change from time to time depending on the announcement time. The level may rise or fall, or there may be no change in the level from the previous announcement time. For example, a tsunami warning was issued for the "eastern Pacific coast of Hokkaido" at 3:14 PM, and the level of the warning was then raised to a major tsunami warning and announcement at 3:30 PM and 4:08 PM. The level was then lowered to a tsunami warning at 6:47 PM, and the warning was temporarily lifted at 9:35 PM, but was again raised to a major tsunami warning and announcement at 10:53 PM. Even if there is no change in the level, disaster information indicating the same level is generated again. For example, the disaster danger information at 3:30 PM and 4:08 PM contains the same information for the "eastern Pacific coast of Hokkaido," but at 4:08 PM, disaster danger information indicating that a major tsunami warning and announcement had been issued for the "eastern Pacific coast of Hokkaido" is also generated and distributed.

[0015] Meanwhile, "Michibiki" 3 is a quasi-zenith orbit satellite. Specifically, it includes a constellation of three satellites orbiting in a quasi-zenith orbit and one geostationary satellite placed in a geostationary orbit above the equator. In addition to sending the disaster alerts mentioned above, "Michibiki" 3 also has the function of complementing and reinforcing the current location detection by existing GPS satellites. For example, it improves accuracy by transmitting reinforcing radio waves to eliminate errors in current location detection caused by the influence of the ionosphere.

[0016] The communication terminal 5 is an information terminal carried by the user 4 and equipped with a navigation function for detecting the current location, displaying surrounding map information, and providing travel guidance to a set destination, and examples of such a terminal include a mobile phone, a smartphone, a tablet terminal, a personal computer, and an in-vehicle navigation device. In particular, if the communication terminal 5 is a terminal capable of executing applications such as a smartphone, an application program is installed as one of the applications that enables the user to receive disaster information delivered via "Michibiki" 3 in response to the disaster notification. The function of receiving such disaster information may be part of the navigation function that provides travel guidance to the destination, or may be executed by an application program separate from the navigation function.

[0017] The communication terminal 5 can also receive radio waves from "Michibiki" 3 and other GPS satellites, calculate the latitude and longitude of the location where the radio waves were received, and output the coordinates of the current location. However, the current location may also be detected using detection results from various sensors mounted on the communication terminal 5 or the vehicle, such as a vehicle speed sensor and acceleration sensor (described later), in addition to radio waves from satellites.

[0018] In addition to the disaster / disaster notification, the communication terminal 5 can also receive various information such as congestion information, regulation information, and traffic accident information transmitted from a traffic information center, for example, a VICS (Vehicle Information and Communication System) center, via the communication network. In addition, if the communication terminal 5 does not have map information, it can also receive map information from an external server.

[0019] The basic flow of information provision in the disaster information provision system 1 having the above configuration will now be explained. When a destination is set in the communication terminal 5 based on the operation of the user 4 and movement to the destination begins, the navigation function provides movement guidance to the destination, while in the event of a disaster or crisis, disaster information is distributed to the communication terminal 5 of the user 4 at predetermined intervals via "Michibiki" 3 using a disaster notification from the disaster management center 2. Then, as described below, the communication terminal 5 determines whether or not to output the distributed disaster information, taking into consideration the level of the disaster or crisis and the user's current location, and disaster information determined to be output is output by the communication terminal 5 and provided to the user 4. Note that disaster information is similarly provided when a disaster or crisis occurs even when the navigation function is not providing movement guidance. Details will be described later.

[0020] Next, the schematic configuration of the communication terminal 5 owned by the user 4 will be described with reference to Fig. 3. Fig. 3 is a block diagram that schematically shows a control system of the communication terminal 5 according to this embodiment. Note that the following description will be given taking as an example a case where the communication terminal 5 is a navigation device.

[0021] As shown in Figure 6, the navigation device (communication terminal 5) of this embodiment has a current position detection unit 11 that detects the current position of the vehicle in which the navigation device is installed and receives disaster information distributed from "Michibiki" 3 using disaster warnings, a data recording unit 12 that records various types of data, a navigation ECU 13 that performs various calculation processes based on the input information, an operation unit 14 that accepts operations from the user, a liquid crystal display 15 that displays a map of the area around the vehicle and disaster information to the user, a speaker 16 that outputs audio guidance regarding route guidance and disaster information, etc., a DVD drive 17 that reads a DVD, which is a storage medium, and a communication module 18 that communicates with an information center such as a VICS center.

[0022] Each of the components of the navigation device will be described below in order. The current position detection unit 11 includes a GNSS 21, a vehicle speed sensor 22, a steering sensor 23, a gyro sensor 24, and the like, and is capable of detecting the current vehicle position, direction, vehicle speed, current time, and the like. The GNSS 21 is a system that receives radio waves from "Michibiki" 3 and other GPS satellites to measure the current position on the ground. In particular, the GNSS 21 of this embodiment supports disaster alerts and is capable of receiving disaster alert information (L1S signals) distributed from "Michibiki" 3. The vehicle speed sensor 22 is a sensor for detecting the vehicle's travel distance and speed. It generates pulses in response to the rotation of the vehicle's drive wheels and outputs the pulse signals to the navigation ECU 13. The navigation ECU 13 then counts the generated pulses to calculate the rotation speed of the drive wheels and the travel distance. The navigation device does not need to include all four of the above-mentioned sensors; it may be configured to include only one or more of these sensors.

[0023] The data recording unit 12 also includes a hard disk (not shown) as an external storage device and recording medium, and a recording head (not shown) which is a driver for reading the map information DB 25, cache 26, predetermined programs, etc. recorded on the hard disk and for writing predetermined data to the hard disk. Note that the data recording unit 12 may include a flash memory, a memory card, or an optical disk such as a CD or DVD instead of a hard disk. The map information DB 25 may also be stored in an external server and acquired by the navigation device via communication.

[0024] Here, the map information DB25 is a storage means that stores, for example, link data related to roads (links), node data related to node points, search data used for processing related to route search and change, facility data related to facilities, map display data for displaying maps, intersection data related to each intersection, search data for searching for points, etc.

[0025] Meanwhile, the cache 26 is a storage means for storing disaster risk information ( FIG. 2 ) previously distributed from the MICHIBIKI 3 in response to disaster risk reports. The storage period for storing distributed information can be set as appropriate, for example, 24 hours from the time of distribution. Meanwhile, an expiration date is also set separately for the information stored in the cache 26, and only information that has not yet expired is provided to the user. The expiration date can be set as appropriate, for example, 6 minutes from the time the communication terminal 5 acquires the information. However, the storage period and expiration date may be the same (i.e., information that has expired and is no longer eligible for provision may be automatically deleted from the cache 26). The storage period and expiration date may vary depending on the level of the disaster or crisis. In this case, it is desirable to set longer storage periods and expiration dates for higher-level information. As described below, not all distributed disaster risk information is stored in the cache 26, and in some cases, the information may be discarded without being stored. The navigation ECU 13 then uses the disaster risk information stored in the cache 26 to provide the user with information about occurring disasters and crises. Details will be described later.

[0026] Meanwhile, the navigation ECU (electronic control unit) 13 is an electronic control unit that controls the entire navigation device. It includes internal storage devices such as a CPU 31, which functions as a calculation device and control device; a RAM 32, which is used as a working memory when the CPU 31 performs various calculation processes and stores route data and other information obtained when a route is searched; a ROM 33, which stores control programs as well as an information provision processing program (see FIG. 4) described below; and a flash memory 34, which stores programs read from the ROM 33. The navigation ECU 13 also includes various processing algorithms. For example, the disaster / risk information acquisition means acquires disaster / risk information at predetermined intervals in the event of a disaster or crisis, including information identifying the type of disaster or crisis, the area where the disaster or crisis occurred, and the level of the disaster or crisis. The disaster / risk notification means notifies the user of the type of disaster or crisis, the area where the disaster or crisis occurred, and the level of the disaster or crisis based on the disaster / risk information acquired by the disaster / risk information acquisition means.

[0027] The operation unit 14 is operated when inputting a departure point as a starting point of a trip and a destination point as a destination of a trip, and has a plurality of operation switches (not shown) such as various keys and buttons. The navigation ECU 13 controls the execution of various corresponding operations based on switch signals output by pressing each switch. The operation unit 14 may have a touch panel provided on the front surface of the liquid crystal display 15. It may also have a microphone and a voice recognition device.

[0028] The LCD display 15 also displays map images including roads, traffic information, operation guidance, operation menus, key guidance, guidance information along the guided route (planned travel route), news, weather forecasts, time, emails, television programs, etc. In this embodiment, when disaster information is received from "Michibiki" 3 via a disaster / risk notification, information about the disaster or crisis that has occurred is also displayed. Note that a HUD or HMD may be used instead of the LCD display 15.

[0029] The speaker 16 also outputs voice guidance for guiding the driver along the guide route (planned travel route) and traffic information guidance based on instructions from the navigation ECU 13. In this embodiment, when disaster information is received from "Michibiki" 3 via a disaster / danger notification, the speaker 16 also outputs voice information about the disaster or crisis that has occurred.

[0030] The DVD drive 17 is a drive that can read data recorded on a recording medium such as a DVD or CD. Based on the read data, music and video are played, and the map information DB 25 is updated. Instead of the DVD drive 17, a card slot for reading and writing data to a memory card may be provided.

[0031] The communication module 18 is a communication device for receiving traffic information transmitted from a traffic information center, such as a VICS center or other external center, and corresponds to, for example, a mobile phone or a DCM. It also includes a vehicle-to-vehicle communication device for communicating between vehicles and a road-to-vehicle communication device for communicating with roadside devices.

[0032] Next, an information provision processing program executed by the communication terminal 5 in the disaster / risk information provision system 1 having the above configuration will be described with reference to FIG. 4. FIG. 4 is a flowchart of the information provision processing program according to this embodiment. Here, the information provision processing program is executed after the vehicle's ACC power supply (accessory power supply) is turned on, and is a program that provides information on an occurring disaster or crisis when disaster / risk information is acquired via the MICHIBIKI 3 in response to a disaster / risk notification. However, if the communication terminal 5 is not a navigation device, the information provision processing program is executed after a predetermined application program (e.g., a navigation application or a dedicated application for providing information) for providing disaster / risk information to the user is started on the communication terminal 5. The programs shown in the flowcharts in FIGS. 4, 7, and 9 below are stored in the RAM 32 or ROM 33 provided in the communication terminal 5, and are executed by the CPU 31.

[0033] First, in step (hereinafter abbreviated as S) 1, the CPU 31 determines whether or not it has received information distributed from the MICHIBIKI 3 via a disaster notification. Specifically, information transmitted via a disaster notification is received by receiving an L1S signal transmitted from the MICHIBIKI 3 via the GNSS 21. In addition to the signal based on the disaster notification, the MICHIBIKI 3 also transmits signals (sub-meter level positioning augmentation information) for reducing errors in current position detection due to the influence of the ionosphere. However, in this embodiment, only the signal based on the disaster notification will be described below. The MICHIBIKI 3 transmits signals at intervals of one second at the shortest. When the amount of information is particularly large (when the area where the disaster or crisis occurred is large), the signal is transmitted in multiple parts. Therefore, the processing from S2 onward is performed at intervals of one second at the shortest.

[0034] If it is determined that the information distributed from "MICHIBIKI" 3 by the disaster / disaster notification has been received (S1: YES), the process proceeds to S2. On the other hand, if it is determined that the information distributed from "MICHIBIKI" 3 by the disaster / disaster notification has not been received (S1: NO), the process waits until the information is received.

[0035] In S2, the CPU 31 performs a reception determination process to determine whether or not the information received from "Michibiki" 3 via a disaster warning is disaster information that is to be provided to the communication terminal 5. Specifically, the CPU 31 determines whether the satellite number (identification information that identifies the satellite that is the source of the information) included in the received L1S signal is the specified satellite number, whether the signal level is above a threshold, and whether the disaster type code included in the received L1S signal is the appropriate code. If these conditions are not met, the received information is deemed not to be disaster information that is to be provided, and the received information is discarded without being stored in the cache 26. If the information is discarded, the processes of S3 and S4 below are not performed.

[0036] Here, the disaster type code is a code indicating the type of disaster or crisis that has occurred, and the CPU 31 can determine what type of disaster or crisis the disaster information relates to by referencing the disaster type code included in the L1S signal. Here, disaster risk reports may provide, for example, information on earthquakes, tsunamis, floods, volcanic eruptions, and other large-scale disasters, as well as crisis information on terrorism and the like. For example, the disaster type code for earthquakes is "1," and the disaster type code for tsunamis is "5." In the disaster risk information provision system 1 of this embodiment, disaster risk information relating to earthquakes and tsunamis is provided, for example.

[0037] Next, in S3, the CPU 31 performs a duplication determination process (FIG. 7) to be described later. The duplication determination process compares the disaster risk information that has been previously received and stored in the cache 26 and is currently being provided (more precisely, information that may be currently being provided; whether it will actually be provided is ultimately determined based on the user's current location and route, as described later) with the newly received disaster risk information, and further considers the level of the newly received disaster risk information to determine whether or not to discard the newly received disaster risk information without providing it. If the information is discarded, the process of S4 is not performed. Furthermore, if the disaster risk information to be compared does not exist in the cache 26 (i.e., if it is new information), it is basically not discarded but is instead stored in the cache 26.

[0038] Furthermore, in S4, the CPU 31 performs information update processing (FIG. 9), which will be described later. Note that, when it is determined in the duplication determination processing (S3) that the newly received disaster danger information should not be discarded, the information update processing is a processing that compares the announcement time of the disaster danger information that was previously received and stored in the cache 26 and is subject to provision (more precisely, information that may be subject to provision. Whether it will actually be provided is ultimately determined based on the user's current location and route, as will be described later) with the announcement time of the newly received disaster danger information, and updates the disaster danger information stored in the cache 26 to the newly received disaster danger information as necessary. Note that, when updating is not performed (when it is determined that updating is not necessary), the newly received disaster danger information is discarded without being stored in the cache 26.

[0039] Next, in S5, the CPU 31 determines whether or not a guided route to the destination (i.e., the user's planned future travel route) has been set in the communication terminal 5. For the guided route to the destination, for example, the user sets a desired destination in the communication terminal 5, and a recommended route to the destination is searched for using map information and traffic information, and the searched recommended route to the destination is set as the guided route. The recommended route may be searched for by the communication terminal 5 or an external server.

[0040] If it is determined that a guide route to the destination has been set in the communication terminal 5 (S5: YES), the process proceeds to S6. On the other hand, if it is determined that a guide route to the destination has not been set in the communication terminal 5 (S5: NO), the process proceeds to S7.

[0041] In S6, the CPU 31 identifies the area through which the guide route set in the communication terminal 5 (i.e., the user's planned future travel route, including the current location) passes, and determines whether disaster risk information for that area is stored in the cache 26. The area to be identified follows the area classification in the disaster risk information. As shown in FIG. 2, the area may be classified by administrative division such as prefectures or cities, wards, towns, and villages, or may be classified by latitude and longitude. The cache 26 stores, among the information received from "Michibiki" 3 in response to disaster risk reports, information that was not determined to be discarded in S2 to S4, i.e., information that was determined to be provided to the user.

[0042] If it is determined that disaster risk information for the area through which the guide route set in the communication terminal 5 passes is stored in the cache 26 (S6: YES), the process proceeds to S8. On the other hand, if it is determined that disaster risk information for the area through which the guide route set in the communication terminal 5 passes is not stored in the cache 26 (S6: NO), the process proceeds to S10 without providing new disaster risk information.

[0043] Meanwhile, in S6, the CPU 31 identifies an area including the current location detected by the current location detection unit 11 (i.e., the location where the user is currently located), and determines whether disaster risk information for that area is stored in the cache 26. In particular, it is desirable to complement and reinforce the detection of the current location by receiving signals from "MICHIBIKI" 3 in addition to existing GPS satellites. The area to be identified follows the area classification in the disaster risk information. As shown in FIG. 2, the area may be classified by administrative division such as prefectures or cities, wards, towns, and villages, or by latitude and longitude. The cache 26 stores, among the information received from "MICHIBIKI" 3 in response to disaster risk reports, information that was not determined to be discarded in S2 to S4, i.e., information determined to be provided to the user.

[0044] If it is determined that disaster risk information for the area including the current position detected by the current position detection unit 11 is stored in the cache 26 (S7: YES), the process proceeds to S8. On the other hand, if it is determined that disaster risk information for the area including the current position detected by the current position detection unit 11 is not stored in the cache 26 (S7: NO), the process proceeds to S10 without providing new disaster risk information.

[0045] Thereafter, in S8, the CPU 31 determines whether the area identified by the disaster danger information determined to be stored in the cache 26 in S6 or S7 is an area in which the occurrence of a disaster or crisis of the same type has not currently been reported to the communication terminal 5 (no information has been provided in S9, described below), and whether the level of the disaster or crisis identified by the disaster danger information is equal to or higher than a predetermined level. As shown in Fig. 2, the disaster danger information includes information identifying the area in which the disaster or crisis has occurred and the level of the disaster or crisis that has occurred. The type of disaster or crisis that has occurred can also be identified by a disaster type code included in the disaster danger information.

[0046] Furthermore, the predetermined level that serves as the judgment standard in S8 can be set as appropriate, but for example, if it is a tsunami, it is set to "Major Tsunami Warning." That is, if it is a "Major Tsunami Warning / Announcement" or a "Major Tsunami Warning," it is judged as YES. On the other hand, if it is an earthquake, it is set to "seismic intensity 3." That is, if the seismic intensity is "seismic intensity 3" or higher, it is judged as YES.

[0047] Then, if the area identified by the disaster danger information determined to be stored in the cache 26 in S6 or S7 is an area in which the communication terminal 5 has not currently notified that a disaster or crisis of the same type has occurred, and if it is determined that the level of the disaster or crisis identified by the disaster danger information is above a predetermined level (S8: YES), the process proceeds to S9.

[0048] In S9, the CPU 31 notifies the user of information relating to the disaster or crisis based on the disaster or crisis information determined to be stored in the cache 26 in S6 or S7, using the liquid crystal display 15 and the speaker 16. Here, Fig. 5 is a diagram showing an example of notifying the user of information relating to the disaster or crisis based on the disaster or crisis information in S9.

[0049] As shown in FIG. 5, when a driving guidance screen 40 is displayed on the LCD display 15 and information is to be notified in step S9, a new pop-up screen 41 is displayed superimposed on the driving guidance screen 40. The pop-up screen 41 displays information identifying the announcement time (the time when the relevant disaster / risk information was distributed using the disaster / risk notification or the time when it was generated by the disaster / risk management center 2), the type of disaster or crisis that occurred, the area where the disaster or crisis occurred, and the level of the disaster or crisis. In particular, regarding the level, it is desirable to include not only the type of alert, but also the expected arrival time and height of a tsunami, or the seismic intensity and magnitude of an earthquake. Additionally, a voice guidance is output from the speaker 16 in sync with the screen display. This allows the user to grasp information about disasters and crises that have occurred in the area where the user is currently located or in an area to which the user plans to travel.

[0050] Furthermore, an expiration date is set separately for the information stored in the cache 26, and only information whose expiration date has not yet passed is subject to notification. The expiration date can be set as appropriate, for example, to six minutes after the communication terminal 5 acquires the information. If the expiration date passes while the pop-up screen 41 is displayed, the pop-up screen 41 will close (the notification will end).

[0051] In S9, the disaster information to be notified is limited to the area where the user is currently located or the area to which the user is planning to move in the future, and only information about disasters or crises of a predetermined level or higher is notified to the user, so that it is possible to selectively provide information that is deemed necessary for the user. However, as will be described later, areas where a similar disaster or crisis has already been notified will be notified even if the level is below the predetermined level.

[0052] On the other hand, if the judgment process of S8 judges NO, and in particular if it is judged that the area identified by the disaster risk information judged to be stored in the cache 26 in S6 or S7 is an area where the occurrence of a similar disaster or crisis has already been notified to the communication terminal 5 (S10: YES), the process proceeds to S11.

[0053] In S11, the CPU 31 uses the LCD display 15 and the speaker 16 to notify the area of ​​disaster or crisis information based on the disaster or crisis information determined to be stored in the cache 26 in S6 or S7. In S11, disaster or crisis information based on previously received disaster or crisis information has already been notified for the area to be notified. Therefore, if the disaster or crisis information stored in the cache 26 has been updated in the information update process of S4 between the start of notification and the present time, the information to be notified will be updated to new information in accordance with the updated information stored in the cache 26, and the notification will continue. Note that the content of the information may remain the same, and only the announcement time may be updated. On the other hand, if the disaster or crisis information stored in the cache 26 has not been updated in the information update process of S4 between the start of notification and the present time, the notification will continue without updating the information to be notified. Here, FIG. 6 shows an example of updating and continuing the notification of disaster or crisis information based on disaster or crisis information in S11.

[0054] As shown in FIG. 6, when information is updated in S11 while the pop-up screen 41 is already displayed superimposed on the driving guidance screen 40 in S9, the contents of the pop-up screen 41 are updated. As described above, the pop-up screen 41 displays information identifying the announcement time (the time when the relevant disaster information was distributed using the disaster notification or the time when it was generated by the disaster management center 2), the type of disaster or crisis that occurred, the area where the disaster or crisis occurred, and the level of the disaster or crisis. The contents of the information to be updated are updated. For example, in the example shown in FIG. 6, the announcement time is updated to the latest time, the tsunami level is updated from "Major Tsunami Warning - Announced" to "Tsunami Warning" and then to "Warning Canceled," and the expected arrival time and tsunami height are also updated. The content of the guidance audio output from the speaker 16 is also changed in accordance with the screen display. This allows the user to grasp the latest information regarding disasters and crises that have occurred in the area where they are currently located or the area to which they plan to travel.

[0055] Furthermore, unlike S9, S11 also notifies users of information for which the disaster or crisis level is below a predetermined level. Therefore, for an area that was once the target of a notification, notifications will continue even if the disaster or crisis level drops to a level that is no longer the target of a notification in S9. For example, for an area that was once the target of a notification due to a tsunami and reached a "major tsunami warning" or higher, notifications will continue even if the level later drops to a "tsunami warning," and notifications of the lowest level, "alerts canceled," will be issued. As a result, users will be prevented from mistakenly believing that all issued alerts have been canceled (i.e., the risk of a tsunami has completely disappeared) even when alerts have been issued.

[0056] On the other hand, if the judgment process of S8 judges NO, and in particular if the area identified by the disaster danger information judged to be stored in the cache 26 in S6 or S7 is an area where the occurrence of a disaster or crisis of the same type has not currently been reported by the communication terminal 5, and it is judged that the level of the disaster or crisis identified by the disaster danger information is below a predetermined level (S10: NO), the process proceeds to S12 without reporting information regarding the disaster or crisis based on the disaster danger information judged to be stored in the cache 26 in S6 or S7.

[0057] In S12, the CPU 31 determines whether or not new information has been received from the MICHIBIKI 3 via a disaster / danger notification. The disaster / danger management center 2 checks the progress and status of the disaster or crisis that has occurred, and generates the latest information at predetermined intervals (not necessarily at regular intervals) and distributes it using the disaster / danger notification. Furthermore, if the amount of information is large (if the area where the disaster or crisis has occurred is large), the information may be divided into multiple parts and sent. Details are the same as in S1, so they will be omitted here.

[0058] If it is determined that the information distributed from "MICHIBIKI" 3 in response to the disaster / risk notification has been received (S12: YES), the process from S2 onwards will be executed again for the newly received information. On the other hand, if it is determined that the information distributed from "MICHIBIKI" 3 in response to the disaster / risk notification has not been received (S12: NO), the process will proceed to S13.

[0059] In S13, it is determined whether or not to terminate the provision of information associated with the disaster notification in the communication terminal 5. The provision of information associated with the disaster notification in the communication terminal 5 may be terminated, for example, when the power of the communication terminal 5 is turned off or when the user operates the communication terminal 5 to select to stop the provision of information.

[0060] If the communication terminal 5 determines that the provision of information associated with the disaster danger report should be terminated (S13: YES), the information provision processing program is terminated. On the other hand, if the communication terminal 5 determines that the provision of information associated with the disaster danger report should not be terminated (S13: NO), the process returns to S5, and the provision of information associated with the disaster danger report is continued.

[0061] Next, the sub-processing of the overlap determination process executed in S3 will be described with reference to Fig. 7. Fig. 7 is a flowchart of the sub-processing program of the overlap determination process.

[0062] First, in S21, the CPU 31 reads out disaster risk information stored in the cache 26. The cache 26 stores information that was previously received from the MICHIBIKI 3 in disaster risk reports, and that was not determined to be discarded in S2 to S4, i.e., information that was determined to be provided to the user. However, the disaster risk information stored in the cache 26 is deleted after a predetermined storage period has elapsed. The storage period is, for example, 24 hours from the time of distribution.

[0063] Next, in S22, the CPU 31 determines whether or not the disaster danger information stored in the cache 26 is related to the same disaster or crisis as the newly received disaster danger information. Specifically, the CPU 31 can determine what type of disaster or crisis the disaster danger information is related to by referencing the disaster type code included in the disaster danger information. For example, if the newly received disaster danger information is related to a tsunami, the CPU 31 determines whether or not the cache 26 stores disaster danger information related to a tsunami. Note that as long as the type is the same, the area or level does not matter.

[0064] Then, if it is determined that the disaster risk information stored in cache 26 does not relate to the same disaster or crisis as the newly received disaster risk information (S22: NO), i.e., if the information received this time is new, it is not discarded but is stored in cache 26 (S23). However, as explained in S8 above, in areas where the occurrence of the same type of disaster or crisis has not currently been reported, disaster risk information below a predetermined level is not subject to reporting, so disaster risk information below a predetermined level may be discarded. Thereafter, the process proceeds to S5 without performing the information update process (S4).

[0065] On the other hand, if it is determined that the disaster or danger information stored in the cache 26 is related to the same disaster or danger as the newly received disaster or danger information (S22: YES), the process proceeds to S24.

[0066] In S24, the CPU 31 determines whether the newly received disaster danger information is particularly disaster danger information related to a tsunami. The CPU 31 can determine what type of disaster or crisis the disaster danger information relates to by referring to the disaster type code included in the disaster danger information.

[0067] If it is determined that the newly received disaster information is disaster information related to a tsunami (S24: YES), the process proceeds to S26. On the other hand, if it is determined that the newly received disaster information is not disaster information related to a tsunami (S24: NO), the process proceeds to S25. In S25, a duplication determination process is performed on disaster information other than tsunami, and then the process proceeds to S4. Note that the following will explain the duplication determination process particularly for tsunami disaster information, and will omit an explanation of the duplication determination process for disaster information other than tsunami.

[0068] In S26, the CPU 31 compares the announcement times of the same type of disaster danger information that was previously received and stored in the cache 26 and is currently eligible for provision (more precisely, information that could potentially be eligible for provision. Whether it will actually be provided is ultimately determined based on the user's current location and route in S5 to S11 described above; the same applies below) with the newly received disaster danger information, and determines whether the announcement times are the same. The time at which the disaster danger information is distributed using the disaster danger report or the time at which the disaster danger information is generated in the disaster danger management center 2 is referred to as the announcement time. The announcement times do not need to be exactly the same, and it is desirable to consider a difference of a few seconds, for example, to be an error and to consider them to be equivalent.

[0069] If it is determined that the announcement times are the same (S26: YES), the process proceeds to S27. On the other hand, if it is determined that the announcement times are not the same (S26: NO), the process proceeds to S33.

[0070] In S27, the CPU 31 compares the disaster or crisis levels of the same type of disaster danger information that was previously received and stored in the cache 26 and is currently being provided with the newly received disaster danger information, and determines whether the levels are equivalent. Note that there are four levels for tsunamis, with "Major Tsunami Warning / Announcement" being the highest level of warning, followed by "Major Tsunami Warning," "Tsunami Warning," and "Warning Canceled."

[0071] If it is determined that the disaster or crisis levels are equivalent (S27: YES), the process proceeds to S28. On the other hand, if it is determined that the disaster or crisis levels are not equivalent (S27: NO), the process proceeds to S37.

[0072] In S28, the CPU 31 compares the area of ​​the disaster or crisis that occurred between the same type of disaster or crisis information previously received and stored in the cache 26 and currently being provided with the newly received disaster or crisis information, and determines whether the areas also completely match. Here, as shown in FIG. 2, in the case of a particularly widespread disaster or crisis, the disaster or crisis information may cover multiple areas. Therefore, if the newly received disaster or crisis information covers multiple areas, in S27 and S28, it is determined whether the level of each area covered by the newly received disaster or crisis information is equivalent to that of the disaster or crisis information stored in the cache 26. The area targeted by the information is identified by a code. For example, as shown in FIG. 2, code 1150 indicates that the information targets the "eastern Pacific coast of Hokkaido."

[0073] If it is determined that the area is also a perfect match (S28: YES), that is, if the same information is already stored in the cache 26 for all elements of announcement time, level, and area, the newly received disaster risk information does not need to be stored (information can be provided using the information already stored), so it is discarded (S29).Then, the process proceeds to S5.

[0074] On the other hand, if it is determined that the areas do not completely match (S28: NO), it is determined whether the level of the disaster or crisis specified by the newly received disaster risk information includes an area where the level is equal to or higher than a predetermined level (S30). Note that the predetermined level that serves as the determination criterion in S30 can be set as appropriate, but for example, in the case of a tsunami, it would be a "major tsunami warning." In other words, if it is a "major tsunami warning / announcement" or a "major tsunami warning," the result is determined to be YES.

[0075] If it is determined that the level of disaster or crisis identified by the newly received disaster risk information includes an area at or above a predetermined level (S30: YES), the newly received disaster risk information is expected to be subject to updating (as explained in S8 and S10, disaster risk information at or above a predetermined level is subject to notification regardless of whether or not a notification is currently being made that a similar disaster or crisis has occurred), so it is not subject to discarding and proceeds to the information update process of S4.

[0076] On the other hand, if it is determined that the level of the disaster or crisis specified by the newly received disaster risk information is below the predetermined level in all areas (S30: NO), the process proceeds to S31.

[0077] In S31, the CPU 31 compares the areas where disasters or crises have occurred for the same type of disaster risk information that was previously received, stored in the cache 26, and is being provided, with the newly received disaster risk information, and determines whether there are any matching areas.

[0078] If it is determined that there is a matching area (S31: YES), it is expected that the newly received disaster danger information will be subject to update for at least the matching area (as explained in S10, for areas that are currently being notified of the occurrence of a similar disaster or crisis, even disaster danger information below a predetermined level will be subject to notification), so the information is not discarded and the process moves to information update processing in S4. Note that, of the newly received disaster danger information, disaster danger information for areas that do not match the disaster danger information stored in cache 26 does not need to be stored (as explained in S8, for areas that are not currently being notified of the occurrence of a similar disaster or crisis, disaster danger information below a predetermined level will not be subject to notification), so it is desirable to discard it.

[0079] On the other hand, if it is determined that there is no matching area (S31: NO), the newly received disaster danger information does not need to be stored (as explained in S8, for areas that have not currently been notified of the occurrence of the same type of disaster or crisis, disaster danger information below a predetermined level is not subject to notification), so it is discarded (S32).Then, the process proceeds to S5.

[0080] Furthermore, in S33, which is executed when it is determined in S26 that the announcement times are not the same (S26: NO), the disaster or crisis levels of the same type of disaster danger information that was previously received, stored in cache 26, and is the subject of provision, and the newly received disaster danger information are compared to determine whether the levels are the same. Note that there are four levels for tsunamis, with "Major Tsunami Warning - Announced" being the highest level of warning, followed in order by "Major Tsunami Warning," "Tsunami Warning," and "Warning Cancelled."

[0081] If it is determined that the disaster or crisis levels are equivalent (S33: YES), the process proceeds to S34. On the other hand, if it is determined that the disaster or crisis levels are not equivalent (S33: NO), the process proceeds to S37.

[0082] In S34, the CPU 31 compares the areas where disasters or crises have occurred for the same type of disaster risk information that was previously received, stored in the cache 26, and is being provided, with the newly received disaster risk information, and determines whether there are any matching areas.

[0083] If it is determined that there is a matching area (S34: YES), it is expected that the newly received disaster risk information will be updated for at least the matching area (as explained in S10, areas that are currently being notified of the occurrence of a similar disaster or crisis will be notified regardless of the level (even if the level has not changed)), so the information is not discarded and the process moves to information update processing in S4.

[0084] On the other hand, if it is determined that there is no matching area (S34: NO), it is determined whether the level of the disaster or crisis specified by the newly received disaster risk information includes an area where the level is equal to or higher than a predetermined level (S35). Note that the predetermined level that serves as the determination criterion in S35 can be set as appropriate, but for example, in the case of a tsunami, it would be a "major tsunami warning." In other words, if it is a "major tsunami warning / announcement" or a "major tsunami warning," the result is determined to be YES.

[0085] If it is determined that the level of disaster or crisis identified by the newly received disaster risk information includes an area at or above a predetermined level (S35: YES), the newly received disaster risk information is expected to be subject to updating (as explained in S8 and S10, even in areas where the occurrence of the same type of disaster or crisis has not currently been reported, it will be subject to reporting if it is at or above the predetermined level), so it is not discarded and proceeds to the information update process of S4.

[0086] On the other hand, if it is determined that the level of the disaster or crisis specified by the newly received disaster risk information is below the predetermined level in all areas (S35: NO), the newly received disaster risk information does not need to be stored (as explained in S8, for areas that have not currently been notified of the occurrence of the same type of disaster or crisis, disaster risk information below the predetermined level is not subject to notification), so it is discarded (S36).Then, the process proceeds to S5.

[0087] Furthermore, in S37, which is executed when it is determined in S27 or S33 that the disaster or crisis levels are not equivalent (S27: NO or S33: NO), it is determined whether the level of the disaster or crisis identified by the newly received disaster risk information includes an area that is at or above a predetermined level. Note that the predetermined level that serves as the determination criterion in S37 can be set as appropriate, but for example, in the case of a tsunami, it would be a "major tsunami warning." In other words, if it is a "major tsunami warning / announcement" or a "major tsunami warning," the determination is YES.

[0088] If it is determined that the level of disaster or crisis identified by the newly received disaster risk information includes an area at or above a predetermined level (S37: YES), the newly received disaster risk information is expected to be subject to updating (as explained in S8 and S10, disaster risk information at or above a predetermined level is subject to notification regardless of whether or not a notification is currently being made that a similar disaster or crisis has occurred), so it is not subject to discarding and proceeds to the information update process of S4.

[0089] On the other hand, if it is determined that the level of the disaster or crisis specified by the newly received disaster risk information is below the predetermined level in all areas (S37: NO), the process proceeds to S38.

[0090] In S38, the CPU 31 compares the areas where disasters or crises have occurred for the same type of disaster risk information that was previously received, stored in the cache 26, and is being provided, with the newly received disaster risk information, and determines whether there are any matching areas.

[0091] If it is determined that there is a matching area (S38: YES), it is expected that the newly received disaster danger information will be subject to updating for at least the matching area (as explained in S10, for areas that are currently being notified of the occurrence of a similar disaster or crisis, even disaster danger information below a predetermined level will be subject to notification), so the information is not discarded and the process moves to information update processing in S4. Note that, of the newly received disaster danger information, disaster danger information for areas that do not match the disaster danger information stored in cache 26 does not need to be stored (as explained in S8, for areas that are not currently being notified of the occurrence of a similar disaster or crisis, disaster danger information below a predetermined level will not be subject to notification), so it is desirable to discard it.

[0092] On the other hand, if it is determined that there is no matching area (S38: NO), the newly received disaster danger information does not need to be stored (as explained in S8, for areas that have not currently been notified of the occurrence of a similar disaster or crisis, disaster danger information below a predetermined level is not subject to notification), so it is discarded (S36).Then, the process proceeds to S5.

[0093] In addition, when disaster danger information is received via disaster danger reports at 14:49, 15:14, 15:30, 16:08, 18:47, 21:35, and 22:53 as shown in Figure 2, if the above-mentioned duplication determination process (Figure 7) is performed, the disaster danger information that is not subject to discard but subject to update will be as shown in Figure 8. As shown in Figure 8, for areas where the same type of disaster or crisis is not stored in the cache 26, only disaster danger information of a predetermined level or above (large tsunami warning or above) will be newly stored, and the rest will be subject to discard. On the other hand, if the same type of disaster or crisis is stored in the cache 26, it will not be discarded but will be subject to update regardless of the disaster or crisis level. However, if the information completely matches past information, including the announcement time, it will be subject to discard even if it is above the predetermined level. In addition, information that was announced later than information already stored in the cache 26 (old information) will also be subject to discard in the information update process (Figure 9) described below.

[0094] Next, the sub-processing of the information update processing executed in S4 will be described with reference to Fig. 9. Fig. 9 is a flowchart of the sub-processing program of the information update processing.

[0095] First, in S41, the CPU 31 determines whether the information format of the disaster / risk information newly received this time is either "announcement" or "cancellation." Note that disaster / risk information can be in the form of "announcement," which announces the occurrence of a disaster or crisis, or "cancellation," which cancels information that was previously announced.

[0096] If the information type of the newly received disaster risk information is "announcement" (S41: YES), the process proceeds to S43. On the other hand, if the information type of the newly received disaster risk information is "cancellation" (S41: NO), processing such as deleting the relevant information from cache 26 is performed (S42). However, deletion is only performed if the announcement time of the cancellation information is newer than the announcement time of the disaster risk information to be deleted. Furthermore, if a notification (S9, S11) based on the disaster risk information deleted from cache 26 has been made, the notification is also canceled.

[0097] Next, in S43, the CPU 31 reads out disaster danger information stored in the cache 26 that is related to the same disaster or crisis and the same area as the newly received disaster danger information.

[0098] Thereafter, in S44, the CPU 31 determines whether or not the cache 26 stores disaster or danger information that is the same disaster or danger as the newly received disaster or danger information and that is targeted at the same area.

[0099] If it is determined that the cache 26 does not store disaster or danger information that is the same disaster or crisis as the newly received disaster or danger information and that targets the same area (S44: YES), that is, if the information received this time is new information, it is not discarded but is stored in the cache 26 (S45).Then, the process proceeds to S5.

[0100] On the other hand, if it is determined that the cache 26 stores disaster or crisis information that is the same as the disaster or crisis and that targets the same area as the newly received disaster or crisis information (S44: NO), the process proceeds to S46.

[0101] In S46, the CPU 31 compares the announcement times of disaster risk information of the same type and area that was previously received, stored in the cache 26, and is eligible for provision (more precisely, information that may be eligible for provision. Whether it is actually provided is finally determined based on the user's current location and route in the aforementioned S5 to S11; the same applies below) with the announcement times of the newly received disaster risk information, and determines whether the announcement time of the disaster risk information received this time is newer.

[0102] Then, if it is determined that the currently received disaster risk information has a newer announcement time (S46: YES), that is, if the currently received information is newer than the information already stored in the cache 26, it is not discarded but is stored in the cache 26 (S47). In this case, the previous information with the older announcement time is overwritten (information update). As a result, the information to be notified is updated to the new disaster risk information and notification is continued (S11). However, if the content of the information other than the announcement time is the same, there are cases where only the announcement time is updated. Thereafter, the process proceeds to S5.

[0103] On the other hand, if it is determined that the disaster risk information received this time is older or the same as the announcement time (S46: NO), the newly received disaster risk information does not need to be stored (information can be provided using information already stored), so it is discarded (S48). In this case, notifications based on the disaster risk information received in the past will continue to be made (S11). Then, the process proceeds to S5.

[0104] As explained in detail above, in the disaster danger information providing system 1, the communication terminal 5, and the computer program executed by the communication terminal 5 according to this embodiment, when a disaster or crisis occurs, disaster danger information including information specifying the type of disaster or crisis that has occurred, the area where the disaster or crisis has occurred, and the level of the disaster or crisis that has occurred is acquired at predetermined intervals (S1, S12), and the type of disaster or crisis that has occurred, the area where the disaster or crisis has occurred, and the level of the disaster or crisis that has occurred are notified based on the acquired disaster danger information (S9, S11). In this case, when new disaster danger information is acquired and the area specified by the acquired disaster danger information is an area where the occurrence of the same type of disaster or crisis has not been notified, In this case, information about the disaster or crisis that has occurred in the area is notified on the condition that the level of the disaster or crisis specified by the new disaster danger information is equal to or higher than a predetermined level (S8, S9).On the other hand, when new disaster danger information is acquired and the area specified by the acquired disaster danger information is an area for which a similar disaster or crisis has already been notified, information about the disaster or crisis that has occurred in the area is continued to be notified regardless of the level of the disaster or crisis specified by the new disaster danger information (S10, S11).By providing the user with information for which the disaster or crisis level is equal to or higher than a predetermined level, it is possible to selectively provide information that is deemed necessary for the user.On the other hand, for areas for which a disaster or crisis has already been notified, information is continued to be notified even if the disaster or crisis level subsequently falls below the predetermined level, which makes it possible to prevent user misunderstandings that may occur when information provision is terminated. Furthermore, when new disaster danger information is acquired and the area identified by the acquired disaster danger information is an area where a similar disaster or crisis has already been reported, and the level of the disaster or crisis identified by the new disaster danger information is different from the level that has already been reported, the information to be reported is updated to the new disaster danger information and the report continues (S11), allowing the user to grasp the latest information regarding the disaster or crisis that has occurred. In addition, the disaster danger information also includes information specifying the announcement time of the information, and when new disaster danger information is acquired and the area specified by the acquired disaster danger information is an area for which an announcement has already been made that the same type of disaster or crisis has occurred, and when the level of the disaster or crisis specified by the new disaster danger information is the same as the level that has already been announced, if the announcement time of the new disaster danger information is the same as or older than the announcement time of the disaster danger information that has already been announced, the new disaster danger information is discarded and announcements based on the previously acquired disaster danger information continue (S48).On the other hand, if the announcement time of the new disaster danger information is newer than the announcement time of the disaster danger information that has already been announced, the information to be announced is updated to the new disaster danger information and announcements continue (S47).Therefore, even if the crisis information has the same content, if the announcement time is updated, it is possible to make an announcement based on the crisis information based on the new announcement time. Furthermore, disaster risk information acquired up until a predetermined expiration date is set as the target for notification, so it is possible to prevent notifications from being made using old, incorrect information.

[0105] The present invention is not limited to the above-described embodiment, and it goes without saying that various improvements and modifications are possible within the scope of the present invention. For example, in this embodiment, disaster information for when a tsunami occurs has been described as an example, but similar processing is also possible for disaster information related to disasters or crises other than tsunamis. Types of disasters or crises include, for example, earthquakes, tsunamis, floods, volcanic eruptions, terrorism, and evacuation advisories.

[0106] In addition, in this embodiment, the level of the disaster or crisis that has occurred is the height of the tsunami (type of warning), but the level may also be, for example, the extent of the area affected by the tsunami or the length of time the impact lasts.

[0107] Furthermore, in this embodiment, it is assumed that the user is in a vehicle, but the user may also be in a means of transportation other than a vehicle (such as a train), traveling on foot, or staying at a specific location.

[0108] In addition, in the present embodiment, an example has been described in which the communication terminal 5 is applied to a navigation device, which is an in-vehicle device, but the communication terminal 5 can also be applied to other types of communication terminals as long as they have a navigation function and a function to output information. For example, the communication terminal 5 can be applied to a mobile phone, a smartphone, a tablet terminal, a personal computer, etc. Furthermore, when applied to a device other than a navigation device, the communication terminal 5 can also be implemented in situations other than when the user is traveling by car, for example, when the user is traveling on foot.

[0109] In addition, in this embodiment, the communication terminal 5 is configured to execute each process (S1 to S13) of the information provision processing program shown in Figure 4, but some or all of the processes may be executed by an external server connected to the communication terminal 5 so that they can communicate with each other. [Explanation of symbols]

[0110] 1...Disaster and danger information provision system, 2...Disaster and danger management center, 3...Michibiki (satellite), 4...User, 5...Communication terminal, 13...Navigation ECU, 21...GNSS, 26...Cache, 40...Driving guidance screen, 41...Pop-up screen

Claims

1. a disaster danger information acquiring means for acquiring disaster danger information at a predetermined interval, the disaster danger information including information for identifying a type of disaster or danger that has occurred, an area in which the disaster or danger has occurred, and a level of the disaster or danger that has occurred, when a disaster or danger has occurred; a disaster danger notification means for notifying a type of disaster or danger that has occurred, an area in which the disaster or danger has occurred, and a level of the disaster or danger that has occurred based on the disaster danger information acquired by the disaster danger information acquisition means, The disaster warning means includes: When new disaster danger information is acquired and the area specified by the acquired disaster danger information is an area that has not been notified of the occurrence of a disaster or crisis of the same type, information regarding the disaster or crisis that has occurred in the area is notified on the condition that the level of the disaster or crisis specified by the new disaster danger information is equal to or higher than a predetermined level; When new disaster danger information is acquired and the area identified by the acquired disaster danger information is an area that has already been reported as having the same type of disaster or crisis, the disaster danger information providing system continues to report information regarding the disaster or crisis that has occurred in that area, regardless of the level of the disaster or crisis identified by the new disaster danger information.

2. The disaster warning means includes: A disaster danger information providing system as described in claim 1, wherein when new disaster danger information is acquired and the area identified by the acquired disaster danger information is an area in which a report of the occurrence of a similar disaster or crisis has already been made, and when the level of the disaster or crisis identified by the new disaster danger information is different from the level that has already been reported, the information to be reported is updated to the new disaster danger information and the report is continued.

3. The disaster risk information also includes information specifying the time when the information was announced, The disaster warning means includes: When new disaster danger information is acquired, if the area specified by the acquired disaster danger information is an area that has already been notified that a disaster or crisis of the same type has occurred, and if the level of the disaster or crisis specified by the new disaster danger information is the same as the level that has already been notified, If the announcement time of the new disaster danger information is the same as or older than the announcement time of the disaster danger information already notified, the new disaster danger information is discarded and notification based on the previously obtained disaster danger information is continued, while A disaster danger information providing system as described in claim 2, wherein if the announcement time of the new disaster danger information is newer than the announcement time of disaster danger information that has already been reported, the information to be reported is updated to the new disaster danger information and the report is continued.

4. The disaster warning means includes:

4. The disaster danger information providing system according to claim 1, wherein the disaster danger information is subject to notification from when it is acquired by the disaster danger information acquiring means until a predetermined expiration date has elapsed.

Citation Information

Patent Citations

  • On-vehicle information terminal

    JP2020088741A