System for assisting in creating facility renewal plan, learning apparatus, inference device, method for assisting in creating facility renewal plan, and program for assisting in creating facility renewal plan
The equipment renewal plan creation support system addresses the challenge of insufficient data by using actual and predicted values to generate optimized renewal plans, enhancing energy efficiency and cost-effectiveness in building updates.
Patent Information
- Application Number
- JP2023046919
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-23
- Publication Date
- 2024-10-04
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing systems struggle to create appropriate equipment renewal plans for buildings, especially when sufficient data is not accumulated, making it difficult to optimize costs and energy efficiency in Zero Energy Buildings (ZEBs).
An equipment renewal plan creation support system that utilizes actual measured values of time-series data, including running costs and failure probabilities, combined with a trained model to generate predicted values, and complements the data to create an update plan, even with insufficient historical data.
Enables the creation of an appropriate renewal plan by supplementing data with predicted values, allowing for optimized equipment updates that minimize costs and enhance energy efficiency in buildings.
Smart Images

Figure 2024135980000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a facility renewal plan creation support system, a learning device, an inference device, a facility renewal plan creation support method, and a facility renewal plan creation support program that support the creation of a facility renewal plan for a building. [Background technology]
[0002] In recent years, efforts to realize a carbon-free society have been accelerating as a measure against global warming. There is a demand to reduce the energy consumed in buildings such as office buildings and commercial facilities, and reduction targets have been set in Japan. A building that aims to reduce the annual balance of primary energy consumed by the building to zero is called a ZEB (Zero Energy Building). In order to solve the energy problem, it is important to promote ZEB not only in new buildings but also in existing buildings. When converting an existing building to ZEB, it is common to do so over a period of several years, and a renewal plan is created taking into account the initial cost, which is the one-time cost incurred when updating the facilities in the building, and the running cost required to maintain the facilities, and then renewal work is carried out based on the renewal plan. However, it is difficult to create an appropriate renewal plan.
[0003] For example, Patent Document 1 discloses a system that supports the creation of equipment renewal plans for water treatment plants. In this system, actual measured values of data indicating the state of equipment owned by the user and actual measured values of data indicating the amount of power consumed by the equipment are stored in a database, and an optimization process is performed on the data stored in the database to derive an renewal plan that minimizes the life cycle cost. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2008-168185 A Summary of the Invention [Problem to be solved by the invention]
[0005] In the above-described conventional technology, future costs are expressed as a function based on actual measurement values accumulated in a database, and an equipment renewal plan is created based on the function. Therefore, when sufficient data is not accumulated, it is difficult to create an appropriate renewal plan.
[0006] The present disclosure has been made in consideration of the above, and aims to provide an equipment renewal plan creation support system that is capable of creating an appropriate renewal plan even when sufficient data regarding equipment has not been accumulated. [Means for solving the problem]
[0007] In order to solve the above-mentioned problems and achieve the object, the equipment update plan creation support system according to the present disclosure is characterized in comprising: a database that accumulates actual values of time series data of equipment data, including running costs and failure probabilities of equipment installed in a plurality of buildings, and equipment-related data including the type of equipment and operating status; an inference data acquisition unit that acquires equipment-related data of equipment to be inferred; an inference unit that outputs a predicted value of the equipment data from the equipment-related data acquired by the inference data acquisition unit using a trained model for inferring the time series data of the equipment data from the equipment-related data; a completion unit that complements the equipment data using the predicted value output by the inference unit, and generates complemented time series data including the actual values and the predicted values of the equipment data; and an update plan creation unit that generates an equipment update plan based on constraints on the update plan and the complemented time series data of the equipment data. Effect of the Invention
[0008] According to the present disclosure, it is possible to obtain an equipment replacement plan creation support system that is capable of creating an appropriate replacement plan even when sufficient data regarding equipment has not been accumulated. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is a diagram showing a configuration of a facility renewal plan creation support system according to a first embodiment. [Diagram 2] FIG. 1 is a diagram showing a functional configuration of a facility renewal plan creation support system according to a first embodiment. [Diagram 3] An explanatory diagram of model generation performed by the model generation unit shown in FIG. [Figure 4] An explanatory diagram of the processing of the cloud server shown in Figure 2. [Diagram 5] FIG. 13 is a diagram showing an example of facility equipment data used by the update plan creation unit. [Figure 6] Flowchart for explaining an example of operation in a cloud server [Figure 7] A flowchart for explaining an example of operation in a user terminal and an on-premise server [Figure 8] FIG. 13 is a diagram showing an example of a predicted value display screen displayed on a user terminal. [Figure 9] FIG. 13 is a diagram showing an example of an update plan display screen displayed on a user terminal. [Figure 10] FIG. 1 is a diagram showing a functional configuration of a facility renewal plan creation support system according to a second embodiment. [Figure 11] FIG. 13 is a diagram showing a functional configuration of a facility renewal plan creation support system according to a third embodiment. [Figure 12] FIG. 13 is a diagram showing a functional configuration of a facility renewal plan creation support system according to a fourth embodiment. [Figure 13] An explanatory diagram of the processing of the surplus equipment calculation unit [Figure 14] FIG. 13 is a diagram showing a functional configuration of a facility renewal plan creation support system according to a fifth embodiment. [Figure 15] A diagram showing an example of the configuration of a computer system that realizes a facility renewal plan creation support system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, a facility upgrade plan creation support system, a learning device, an inference device, a facility upgrade plan creation support method, and a facility upgrade plan creation support program according to embodiments of the present disclosure will be described in detail with reference to the drawings.
[0011] Embodiment 1 FIG. 1 is a diagram showing a configuration of an equipment update plan creation support system 1 according to a first embodiment. The equipment update plan creation support system 1 supports creation of an equipment update plan including information such as the timing of updating equipment installed in a building such as a building, the equipment to be updated, and the equipment to be introduced after the update. When creating an update plan, the equipment update plan creation support system 1 collects equipment data, which is information related to equipment installed in the building. At this time, the equipment update plan creation support system 1 collects the equipment data from a plurality of user companies. For example, the equipment data is collected on a cloud server 2. In addition, the equipment update plan creation support system 1 has a function of complementing the collected equipment data using AI (Artificial Intelligence), and creates an equipment update plan based on the complemented equipment data.
[0012] The facility renewal plan creation support system 1 can be configured using a cloud server 2, on-premise servers 3-1, 3-2, and 3-3 that are installed and operated in buildings managed by each user company, building monitoring and control systems 4-1, 4-2, and 4-3 introduced for each user company, and user terminals 5-1, 5-2, and 5-3 that are input / output terminals for each user company. Note that, here, components of the same type but belonging to different user companies are distinguished from each other by adding a hyphen and a different number after a common number. Components with the same number after the hyphen indicate components owned by the same user company. For example, the on-premise server 3-1, the building monitoring and control system 4-1, and the user terminal 5-1 are components owned by the same user company. Note that the building monitoring and control system 4-1 is an example of a monitoring and control system that monitors and controls equipment, and is a system that monitors and controls a building owned by a user company. Here, a building is given as an example of a building owned by a user company, but the building is not limited to a building, and may be a commercial facility such as a shopping centre.
[0013] In the following description, when there is no need to distinguish between the on-premise servers 3-1, 3-2, and 3-3, they will simply be referred to as the on-premise server 3. Similarly, when there is no need to distinguish between the building monitoring and control systems 4-1, 4-2, and 4-3, they will simply be referred to as the building monitoring and control system 4. Similarly, when there is no need to distinguish between the user terminals 5-1, 5-2, and 5-3, they will simply be referred to as the user terminal 5 when describing functions common to the user terminals 5-1, 5-2, and 5-3.
[0014] In addition, although the user of the equipment upgrade plan creation support system 1 is referred to as a "user company" here, the user of the equipment upgrade plan creation support system 1 may be an organization other than a company or an individual. In addition, in the following description, a person who operates the user terminal 5 may be referred to as a "user".
[0015] The user terminal 5 and the on-premise server 3 are connected via a LAN (Local Area Network), the building monitoring and control system 4 and the on-premise server 3 are connected via a LAN, and the on-premise server 3 and the cloud server 2 are connected via, for example, a VPN (Virtual Private Network). Here, the facility equipment data is extracted from the building monitoring and control system 4 and held on the cloud server 2.
[0016] Next, a specific functional configuration of the facility renewal plan creation support system 1 will be described. For simplicity, the following describes one of a plurality of user companies.
[0017] 2 is a diagram showing a functional configuration of the facility renewal plan creation support system 1 according to the first embodiment. The cloud server 2 includes a database 21 that stores facility equipment data 211 and facility-related data 212 of facilities installed in buildings owned by a user company, a database processing unit 22 that stores data in the database 21, retrieves the data stored in the database 21, and processes the data in the database 21, a machine learning device 23 that generates a trained model using the data stored in the database 21, a trained model storage unit 24 that stores the trained model generated by the machine learning device 23, and an inference device 25 that performs inference using the trained model.
[0018] The database 21 stores data on facilities collected from the building monitoring and control systems 4 of multiple user companies. Here, the facility refers to a facility installed in a building that consumes or produces energy in the building. For example, facilities that consume energy include air conditioning facilities, elevators, and lighting facilities. Facilities that produce energy include power generation facilities. Here, data on facilities that are used when creating a facility update plan is referred to as facility equipment data 211, and data other than the facility equipment data 211 is referred to as facility-related data 212. The facility equipment data 211 is data indicating an initial cost, which is a one-time cost required when introducing the facility, a running cost, which is a cost required to maintain the facility, a failure probability of the facility, and the like. Here, when the facility maintenance is performed, the facility is treated as having been updated. For this reason, the maintenance cost when the facility breaks down or when maintenance is required is included in the initial cost. The running cost is mainly an electricity charge, and the facility equipment data 211 may be the electricity charge itself or may be the amount of power. The running cost and the failure probability are time-series data. The equipment-related data 212 includes type data indicating the type of equipment, operation status data indicating the operation status of the equipment, etc. The operation status data includes at least data indicating the ON / OFF date and time of the equipment. The operation status data may also include time-series data of the operation mode, setting value, and actual measurement value of the equipment. For example, if the equipment is an air conditioning equipment, the operation status data may include data indicating the temperature set at what time, minute, and second, and the temperature reached.
[0019] The database processing unit 22 processes data related to the equipment stored in the database 21. For example, when the database processing unit 22 acquires data related to the equipment from the building monitoring control system 4, the database processing unit 22 can store the acquired data in the database 21 as the equipment data 211 or the equipment-related data 212. Alternatively, the database processing unit 22 may store the data acquired from the building monitoring control system 4 in the database 21 after processing it rather than as it is. The timing at which the database processing unit 22 acquires data from the building monitoring control system 4 can be a predetermined cycle, and can be once a day, for example. In addition, the database processing unit 22 has a function of providing the data stored in the database 21 to the machine learning device 23 and the inference device 25. In addition, the database processing unit 22 has a complementing unit 221 that complements the equipment data 211 stored in the database 21 using a predicted value of the equipment data 211 output by the inference device 25, and generates complemented time series data including the actual measurement value and the predicted value of the equipment data 211. The complementing unit 221 stores the complemented time-series data of the facility equipment data 211 in the database 21.
[0020] The machine learning device 23 generates a trained model for inferring the time-series data of the facility equipment data 211 from the facility-related data 212, based on the facility equipment data 211 and the facility-related data 212 stored in the database 21. The machine learning device 23 stores the generated trained model in the trained model storage unit 24. Specifically, the machine learning device 23 has a learning data acquisition unit 231 and a model generation unit 232.
[0021] The learning data acquisition unit 231 acquires data stored in the database 21 as learning data via the database processing unit 22. The learning data acquisition unit 231 acquires actual values of the facility equipment data 211 stored in the database 21, specifically, actual values of running costs and failure probability, and the facility-related data 212, specifically, data indicating the type of facility and operation status, as learning data. The model generation unit 232 uses the learning data to generate a trained model for inferring the time-series data of the facility equipment data 211 from the facility-related data 212 of the facility. The model generation unit 232 stores the generated trained model in the trained model storage unit 24.
[0022] The model generation unit 232 can use, for example, GAN (Generative Adversarial Networks) called generative adversarial networks as a learning algorithm. FIG. 3 is an explanatory diagram of model generation performed by the model generation unit 232 shown in FIG. 2. When using GAN, the model generation unit 232 has a generator 232-1 that generates pseudo data of the facility equipment data 211 from the facility-related data 212 that is learning data, and a discriminator 232-2 that distinguishes between the pseudo data and actual measurement data of the facility equipment data 211. The model generation unit 232 trains the generator 232-1 to output new facility equipment data 211 by using the facility-related data 212 as input and learning the features of the input data. The new facility equipment data 211 output by the generator 232-1 is also called pseudo data. Furthermore, the model generation unit 232 inputs the pseudo data of the facility equipment data 211 generated by the generator 232-1 and the actual measurement data of the facility equipment data 211 included in the learning data to the discriminator 232-2, and causes the discriminator 232-2 to learn to distinguish between the actual measurement data and the pseudo data. The model generation unit 232 improves the performance of the networks of both the generator 232-1 and the discriminator 232-2 by having the generator 232-1 and the discriminator 232-2 compete with each other, making it possible to generate pseudo data that is more similar to real data.
[0023] Here, an example in which the model generation unit 232 generates a trained model using GAN has been described, but the present invention is not limited to this. As for the learning algorithm, supervised learning, reinforcement learning, unsupervised learning, semi-supervised learning, or the like can also be applied. In addition, other deep learning can also be used as the learning algorithm used by the model generation unit 232. In addition, the model generation unit 232 may perform machine learning according to other known methods, such as genetic programming, functional logic programming, and support vector machines.
[0024] Returning to the description of FIG. 2, the inference device 25 includes an inference data acquisition unit 251 that acquires the facility-related data 212 of the facility to be inferred and sets it as inference data, and an inference unit 252 that outputs a predicted value of the facility equipment data 211 from the facility-related data 212 acquired by the inference data acquisition unit 251 using a trained model for inferring the time series data of the facility equipment data 211 from the facility-related data 212. The inference data acquisition unit 251 acquires the facility-related data 212 from the database 21 as inference data, and outputs the acquired inference data to the inference unit 252. The inference unit 252 inputs the inference data output by the inference data acquisition unit 251 to the trained model stored in the trained model storage unit 24, and outputs the time series data of the predicted value of the facility equipment data 211 output from the trained model to the complement unit 221 of the database processing unit 22.
[0025] The complementing unit 221 complements the equipment data 211 stored in the database 21 using time series data of the predicted values of the equipment data 211 output by the inference device 25, and generates complemented time series data including actual measured values and predicted values of the equipment data.
[0026] Fig. 4 is an explanatory diagram of the processing of the cloud server 2 shown in Fig. 2. At the time of learning, the machine learning device 23 acquires, as learning data, time-series data of actual measured values of the facility equipment data 211 and the facility-related data 212 from the database 21, and inputs them to the GAN, which is the model generation unit 232, to perform machine learning processing.
[0027] At the time of prediction, the inference device 25 acquires the facility-related data 212 from the database 21 as inference data, and inputs the acquired inference data to the GAN, which is the model generation unit 232. The GAN outputs time series data of the predicted value of the facility equipment data 211 as generated data. When the time series data of the predicted value of the facility equipment data 211, which is generated data, is output to the complementation unit 221, the complementation unit 221 generates complementation data using the time series data of the actual measurement value of the facility equipment data 211 stored in the database 21 and the time series data of the predicted value of the facility equipment data 211, which is generated data output by the inference device 25. At this time, the complementation unit 221 stores a timestamp so that the boundary between the actual measurement value and the predicted value can be seen. The star in the complementation data in FIG. 4 indicates a timestamp, and indicates that the time series data before the timestamp is the actual measurement value, and the time series data after the timestamp is the predicted value. The complementation unit 221 stores the complemented time series data in the database 21.
[0028] Returning to the explanation of Fig. 2, the on-premise server 3 has a data communication unit 31 that communicates with each of the building monitoring and control system 4, the user terminal 5, and the cloud server 2, an update plan creation unit 32 that creates an equipment update plan, and an update plan storage unit 33 that stores the created update plan.
[0029] When the data communication unit 31 receives data related to equipment from the building monitoring control system 4, it transmits the received data to the cloud server 2. Furthermore, when the data communication unit 31 receives data stored in the database 21 from the cloud server 2, it can output the received data to each functional unit of the on-premise server 3, such as the update plan creation unit 32. The data communication unit 31 can transmit screen display data for displaying a display screen generated by the on-premise server 3 to the user terminal 5, and output an operation signal indicating the content of an operation performed on the user terminal 5 to each functional unit of the on-premise server 3, such as the update plan creation unit 32.
[0030] The update plan creation unit 32 performs optimization processing based on the facility equipment data 211 stored in the database 21 and the constraint conditions input from the user terminal 5, and creates an equipment update plan that minimizes the cost and satisfies the constraint conditions.
[0031] FIG. 5 is a diagram showing an example of facility equipment data 211 used by the update plan creation unit 32. Here, the time series data of the running cost included in the facility equipment data 211 is shown. The "item number" is a number assigned to each facility, and the "timestamp" indicates the timing when the prediction process was last performed using the inference device 25, and the running cost corresponding to each date is stored in "yen" units. The values of the facility equipment data 211 are values after the complementation process, and include actual values and predicted values. Specifically, the value of the running cost is that data before the date indicated in the "timestamp" is the actual value, and data on the date after the "timestamp" is the predicted value. For example, in the item number "000001", since the timestamp is "2022 / 1 / 2", the data on "2022 / 1 / 1" is the actual value, and the data on "2022 / 1 / 2" and after is the predicted value. Similarly, for item number "000003", since the timestamp is "2022 / 1 / 5", the data from "2022 / 1 / 1" to "2022 / 1 / 4" are actual measured values, and the data from "2022 / 1 / 5" onwards are predicted values. As shown in Fig. 5, when the update plan creation unit 32 creates an update plan, the actual measured values are used for parts where actual measured values exist, and predicted values are used for parts where actual measured values do not exist.
[0032] Returning to the explanation of FIG. 2, the update plan creation unit 32 creates an equipment update plan using the numerical data of the initial cost included in the facility equipment data 211 and the time series data of the running cost and failure probability. The update plan creation unit 32 creates an equipment update plan so as to satisfy constraint conditions such as an energy saving target value, a budget, a construction period, and legal regulations. Here, the algorithm used by the update plan creation unit 32 is not particularly limited. For example, the update plan creation unit 32 can create an equipment update plan using linear programming. When linear programming is used, the update plan creation unit 32 formulates a problem using the "sum of the initial cost and the expected value of the running cost derived based on the failure probability" as an objective function, the "energy saving target value, the budget, the construction period, and legal regulations" as constraint conditions, and the "1 / 0 variable representing whether or not to update each piece of equipment in each year" as a variable, and can find a combination of variables that minimizes the objective function, thereby finding an equipment update plan. In this case, the output of the optimization process is a string of "1 / 0 variables representing whether or not to update each piece of equipment in each year." In addition, the update plan creation unit 32 can create an equipment update plan using algorithms such as the steepest descent method and dynamic programming in addition to linear programming. The variable is set for each year for all equipment stored in the database 21. For example, when the value of the variable is "1", it indicates that the target equipment is used in that year, and when the value of the variable is "0", it indicates that the target equipment is not used in that year. In this case, when the value of the variable changes from "1" to "0", it indicates that the target equipment in use is updated to the target year, and when the value of the variable changes from "0" to "1", it indicates that the target equipment is newly adopted by updating the equipment. As described above, since the maintenance of equipment is also treated as an equipment update here, when the value of the variable changes from "1" to "0", it indicates that the target equipment is updated to the target year and replaced with another equipment, or that maintenance work is performed and the equipment is treated as another equipment. The update plan creation unit 32 holds information indicating which equipment is replaced with which equipment for the equipment to be updated. The update plan creation unit 32 stores the created update plan in the update plan storage unit 33.
[0033] The user terminal 5 has a display unit 51 that outputs a display screen, and an input unit 52 that accepts input from a user of the user terminal 5. The display unit 51 can output a display screen based on screen display data received from the on-premise server 3. In addition, the input unit 52 can accept an operation input from the user of the user terminal 5, generate an operation signal indicating the operation content, and output the generated operation signal to the on-premise server 3.
[0034] In this embodiment, the user terminal 5 outputs a display screen based on the screen display data generated by the on-premise server 3, but the user terminal 5 may output a display screen based on screen display data generated by an application running on the user terminal 5. Alternatively, the user terminal 5 may be configured to output a display screen based on screen display data generated on the cloud server 2.
[0035] The display unit 51 can, for example, display a predicted value of the facility equipment data 211, or display an update plan created by the on-premise server 3. The display unit 51 can also display a screen for receiving input of constraint conditions used when creating an update plan.
[0036] Here, the operation of the facility renewal plan creation support system 1 will be described. Fig. 6 is a flowchart for explaining an example of the operation in the cloud server 2. The database processing unit 22 judges whether or not it is time to extract data once a day (step S101). For example, the database processing unit 22 may judge whether or not it is time to extract data once a day by judging whether or not the time elapsed since the start of the previous data extraction process has exceeded 24 hours, or may determine the time to perform the data extraction process in advance and judge whether or not the current time is the predetermined time to judge whether or not it is time to extract data once a day.
[0037] If it is time to extract data (step S101: Yes), the database processing unit 22 extracts data from the building monitoring control system 4 (step S102). The database processing unit 22 stores the data extracted from the building monitoring control system 4 in the database 21 (step S103). At this time, the database processing unit 22 may store the extracted data in the database 21 as is, or may process the extracted data before storing it in the database 21. If it is not time to extract data (step S101: No), the database processing unit 22 omits the processes of steps S102 and S103.
[0038] Next, the database processing unit 22 judges whether it is the timing to perform learning once a month (step S104). The database processing unit 22 can judge whether it is the timing to perform learning by predetermining the date for performing the learning process, such as the first day of each month, and judging whether the current date matches the predetermining date. Note that since it is once a month here, the date for performing the learning process is predetermining every month, but it is also possible to perform the learning process every 30 days, for example. In this case, it is possible to judge whether it is the timing to perform learning by counting the number of days that have passed since the previous learning process was performed.
[0039] If it is the learning timing (step S104: Yes), the database processing unit 22 instructs the machine learning device 23 to execute a learning process, and the learning data acquisition unit 231 of the machine learning device 23 acquires learning data from the database 21 (step S105). The learning data acquisition unit 231 outputs the acquired learning data to the model generation unit 232. The model generation unit 232 executes the learning process to generate a trained model (step S106). The model generation unit 232 stores the generated trained model in the trained model storage unit 24 (step S107). If it is not the learning timing (step S104: No), the processes from step S105 to step S107 are omitted.
[0040] The database processing unit 22 judges whether it is the once-a-day prediction timing (step S108). For example, the database processing unit 22 may judge whether it is the once-a-day prediction timing by judging whether the time elapsed since the start of the previous prediction process exceeds 24 hours, or may determine the time to perform the prediction process in advance and judge whether the current time is the predetermined time to judge whether it is the once-a-day prediction timing.
[0041] If it is not the prediction timing (step S108: No), the user terminal 5 ends the process shown in Fig. 6. If it is the prediction timing (step S108: Yes), the database processing unit 22 instructs the inference device 25 to execute a prediction process, and the inference data acquisition unit 251 of the inference device 25 acquires data for inference from the database 21 (step S109). The inference data acquisition unit 251 outputs the acquired data for inference to the inference unit 252.
[0042] The inference unit 252 performs data prediction by inputting the inference data into the trained model, and outputs the output from the trained model to the database processing unit 22 as prediction data (step S110).
[0043] The complementing unit 221 of the database processing unit 22 stores the predicted data output by the inference unit 252 in the database 21 (step S111). The complementing unit 221 further stores the time stamp in the database 21 (step S112).
[0044] The data extraction timing and prediction timing may be determined for each piece of equipment, or may be determined collectively for all pieces of equipment.
[0045] Fig. 7 is a flowchart for explaining an example of operation in the user terminal 5 and the on-premise server 3. The user terminal 5 judges whether or not there is an input from the user using the input unit 52 (step S201). If there is no input from the user (step S201: No), the user terminal 5 repeats the process of step S201. If there is an input from the user (step S201: Yes), the user terminal 5 judges whether or not the user has made an input for displaying a predicted value based on an operation signal (step S202). If it is a predicted value display (step S202: Yes), the user terminal 5 displays the predicted value using the display unit 51 (step S203), and ends the process shown in Fig. 7.
[0046] FIG. 8 is a diagram showing an example of a predicted value display screen displayed by the user terminal 5. The display screen displayed by the display unit 51 is illustrated. For example, the display unit 51 can display the predicted values and actual measured values of the facility equipment data 211 stored in the database 21 on the display screen. In the example shown in FIG. 8, for a period in which an actual measured value exists, the actual measured value and the predicted value are displayed in a superimposed manner, and for a period in which an actual measured value does not exist, only the predicted value is displayed. Note that here, the running cost of the facility equipment data 211 is shown in terms of the amount of electricity (kWh). By displaying the predicted value in a superimposed manner during a period in which an actual measured value exists, the user can check the accuracy of the predicted value.
[0047] Returning to the explanation of Fig. 7, if the predicted value is not displayed (step S202: No), the user terminal 5 judges whether or not the user has performed an operation for performing optimization processing based on the operation signal (step S204). If the optimization processing is not performed (step S204: No), the user terminal 5 ends the processing shown in Fig. 7. If the optimization processing is performed (step S204: Yes), the user terminal 5 reads the constraint conditions input by the user (step S205), and transmits the constraint conditions to the on-premise server 3 to instruct the execution of the optimization processing.
[0048] The on-premise server 3 executes the optimization process based on the instruction from the user terminal 5 and the constraint conditions received (step S206). Specifically, upon receiving an instruction to execute the optimization process from the user terminal 5, the update plan creation unit 32 of the on-premise server 3 acquires facility equipment data 211 to be used for the optimization process from the database 21, and performs the optimization process based on the acquired facility equipment data 211 and the constraint conditions received from the user terminal 5 to create an equipment update plan.
[0049] The update plan creation unit 32 stores the created update plan in the update plan storage unit 33 (step S207). The update plan creation unit 32 generates screen display data for displaying a display screen of the update plan based on the created update plan, and transmits the screen display data to the user terminal 5. The user terminal 5 displays the created update plan by using the screen display data received from the on-premise server 3 (step S208).
[0050] Fig. 9 is a diagram showing an example of an update plan display screen displayed by the user terminal 5. The update plan display screen includes, for each fiscal year, the equipment to be updated, the equipment after the update, and the cost of the update. Information such as that shown in Fig. 9 is extracted from the output of the optimization process and the data stored in the database 21, and screen display data is generated.
[0051] As described above, the equipment update plan creation support system 1 according to the first embodiment includes: a database 21 that accumulates actual measured values of time series data of equipment data 211 including running costs and failure probabilities of equipment installed in a plurality of buildings, and equipment-related data 212 including the type of equipment and operation status; an inference data acquisition unit 251 that acquires the equipment-related data 212 of equipment to be inferred; an inference unit 252 that outputs a predicted value of the equipment equipment data 211 from the equipment-related data 212 acquired by the inference data acquisition unit 251 using a learned model for inferring the time series data of the equipment equipment data 211 from the equipment-related data 212; a complementation unit 221 that complements the equipment equipment data 211 using the predicted value output by the inference unit 252, and generates complemented time series data including the actual measured values and the predicted value of the equipment equipment data 211; and an update plan creation unit 32 that generates an equipment update plan based on constraints on the update plan and the complemented time series data of the equipment equipment data 211. With this configuration, even if sufficient data regarding the facility is not accumulated, an update plan is created using the complemented time-series data, making it possible to create an appropriate update plan.
[0052] The complementing unit 221 also records a timestamp, which is inference date and time information indicating the date and time when the predicted value was generated. This makes it possible to distinguish between the actual measurement value and the predicted value of the facility equipment data 211. The display unit 51 is further provided to display the time series data after complementation on a display screen, and the display unit 51 can also display the actual measurement value and the predicted value included in the time series data in a distinguishable manner using different expressions based on the timestamp. The display unit 51 may, for example, display the actual measurement value and the predicted value in a distinguishable manner by changing the type, thickness, color, etc. of the characters, or may display the actual measurement value and the predicted value in a distinguishable manner by changing the background pattern or color of each data.
[0053] In addition, the equipment renewal plan creation support system 1 may further include a learning data acquisition unit 231 that acquires learning data including equipment-related data 212 of the equipment and actual measured values of the equipment data 211, and a model generation unit 232 that uses the learning data to generate a trained model for inferring time-series data of the equipment data 211 from the equipment-related data 212 of the equipment.
[0054] Also, according to the first embodiment, it is possible to provide an equipment update plan creation support method for supporting the creation of an update plan for equipment installed in a building. The equipment update plan creation support method includes the steps of: acquiring equipment-related data 212 of equipment to be inferred from a database 21 that accumulates actual measured values of time-series data of equipment equipment data 211 including running costs and failure probabilities of equipment installed in a plurality of buildings, and equipment-related data 212 including equipment types and operating statuses; outputting a predicted value of the equipment equipment data 211 from the equipment-related data 212 of the equipment to be inferred using a trained model for inferring the time-series data of the equipment equipment data 211 from the equipment-related data 212; complementing the equipment equipment data 211 using the predicted value to generate complemented time-series data including the actual measured values and predicted values of the equipment equipment data 211; and generating an update plan based on constraint conditions for the update plan and the complemented time-series data of the equipment equipment data 211.
[0055] According to the first embodiment, an equipment update plan creation support program for supporting the creation of an update plan for equipment installed in a building can also be provided. The equipment update plan creation support program causes a computer to execute the following steps: acquiring equipment-related data 212 of an equipment to be inferred from a database 21 that accumulates actual measured values of time-series data of equipment data 211 including running costs and failure probabilities of equipment installed in a plurality of buildings, and equipment-related data 212 including equipment types and operating statuses; outputting a predicted value of the equipment data 211 from the equipment-related data 212 of the equipment to be inferred using a trained model for inferring the time-series data of the equipment data 211 from the equipment-related data 212; complementing the equipment data 211 using the predicted value to generate complemented time-series data including the actual measured values and predicted values of the equipment data 211; and providing the generated complemented time-series data to a device that generates an update plan based on constraint conditions for the update plan and the complemented time-series data of the equipment data 211.
[0056] Embodiment 2 Fig. 10 is a diagram showing a functional configuration of an equipment update plan creation support system 1A according to the embodiment 2. Note that, in the equipment update plan creation support system 1A, similarly to the equipment update plan creation support system 1, a plurality of on-premise servers 3, a building monitoring control system 4, and a user terminal 5 of a plurality of user companies are actually connected to a common cloud server 2 as shown in Fig. 1, but for simplicity, Fig. 10 shows only one user company.
[0057] The equipment update plan creation support system 1A includes a cloud server 2, an on-premise server 3A, a building monitoring and control system 4, and a user terminal 5. Note that parts similar to those in the equipment update plan creation support system 1 are given the same reference numerals and explanations thereof are omitted, and hereinafter, the parts different from the equipment update plan creation support system 1 will be mainly explained.
[0058] The on-premise server 3A includes a data communication unit 31, an update plan creation unit 32A, an update plan storage unit 33, and a control unit .
[0059] The update plan creation unit 32A performs optimization processing based on the facility equipment data 211 stored in the database 21 and the constraint conditions input from the user terminal 5, and creates an equipment update plan that minimizes the cost and satisfies the constraint conditions.
[0060] The update plan creation unit 32A creates an equipment update plan using the numerical data of the initial cost included in the facility equipment data 211 and the time series data of the running cost and the failure probability. The update plan creation unit 32A creates an equipment update plan so as to satisfy constraint conditions such as the energy saving target value, the budget, the construction period, and the legal regulations. Here, the algorithm used by the update plan creation unit 32A is not particularly limited. For example, the update plan creation unit 32A can create an equipment update plan using linear programming. When using linear programming, the update plan creation unit 32A formulates a problem using the "sum of the initial cost and the expected value of the running cost derived based on the failure probability" as the objective function, the "energy saving target value, the budget, the construction period, and the legal regulations" as constraint conditions, and the "1 / 0 variable representing the ON / OFF of the control item of each equipment in each year" as a variable, and can find a combination of variables that minimizes the objective function, thereby finding an equipment update plan. In this case, the output of the optimization process is a string of "1 / 0 variables representing the ON / OFF of the control item of each equipment in each year". Here, the value of the "1 / 0 variable representing the ON / OFF of the control item of each equipment in each year" can also be said to be "1 / 0 variable representing whether or not each equipment in each year is used." In other words, when each equipment in each year is used, the control item is ON, and when each equipment in each year is not used, the control item is OFF. In addition, the update plan creation unit 32A can create an equipment update plan using algorithms such as the steepest descent method and dynamic programming in addition to linear programming. The update plan creation unit 32A stores the created update plan in the update plan storage unit 33. By outputting the "1 / 0 variable representing the ON / OFF of the control item of each equipment in each year," the output of the optimization process becomes an equipment operation plan including an equipment update plan.
[0061] The control unit 34 controls the building monitoring and control system 4 based on the equipment operation plan created by the update plan creation unit 32A. Specifically, it converts the "1 / 0 variable indicating the ON / OFF of the control item of each equipment for each year," which is the output of the optimization process, into a control instruction sequence for the building monitoring and control system 4, and transmits the converted control instruction sequence to the building monitoring and control system 4 via the data communication unit 31. This enables the building monitoring and control system 4 to add or remove each equipment to or from the monitoring targets in accordance with the equipment update plan.
[0062] As described above, the equipment update plan creation support system 1A according to the second embodiment can achieve the same effects as those of the first embodiment. The update plan creation unit 32A of the equipment update plan creation support system 1A according to the second embodiment generates an update plan by determining the value of a variable indicating whether or not the equipment provided in the target building is to be used in each period, and further includes a control unit 34 that converts the value of the variable into a control instruction sequence for the building monitoring and control system 4 and transmits the control instruction sequence to the building monitoring and control system 4. As a result, although the control items of the building monitoring and control system 4 change due to the update of the equipment, it becomes possible to automatically change ON / OFF of the control items without the user having to manually change the settings of each control item.
[0063] Embodiment 3 Fig. 11 is a diagram showing a functional configuration of a facility update plan creation support system 1B according to the third embodiment. As in the facility update plan creation support systems 1 and 1A, a plurality of on-premise servers 3, a building monitoring control system 4, and a user terminal 5 of a plurality of user companies are actually connected to a common cloud server 2 in the facility update plan creation support system 1B as shown in Fig. 1, but for simplicity, Fig. 11 shows only one user company.
[0064] The equipment update plan creation support system 1B includes a cloud server 2, an on-premise server 3B, a building monitoring and control system 4, and a user terminal 5. Note that parts similar to those in the equipment update plan creation support system 1 are given the same reference numerals and explanations thereof are omitted, and hereinafter, the parts different from the equipment update plan creation support system 1 will be mainly explained.
[0065] The on-premise server 3B includes a data communication unit 31, an update plan creation unit 32B, an update plan storage unit 33, a search processing unit 35, and an information registration unit .
[0066] The search processing unit 35 provides the user terminal 5 with a search screen for equipment, and searches for equipment stored in the database 21 based on a search query input to the search screen. The search query is, for example, initial cost, running cost, failure probability, manufacturer name, release year, product specifications, recommended usage environment, replacement time, etc. For this reason, in this embodiment, data on the manufacturer and release year of the equipment is stored in the database 21. The search processing unit 35 can provide the user terminal 5 with a display screen including information on equipment that matches the search query. In addition, the search processing unit 35 can convert the information of the search query into a data format of constraint conditions that can be recognized by the update plan creation unit 32B, and output it to the update plan creation unit 32B.
[0067] The information registration unit 36 provides the user terminal 5 with a registration screen for registering information such as the equipment manufacturer and release year in the database 21, and registers the equipment information in the database 21 by transmitting input information from the user terminal 5 to the database processing unit 22. The information registration unit 36 registers the equipment information based on the user's input, for example, when the system is operating and when the equipment is changed.
[0068] The update plan creation unit 32B can create an update plan based on the constraint conditions output by the search processing unit 35. The function of the update plan creation unit 32B is similar to that of the update plan creation unit 32, except that the constraint conditions output by the search processing unit 35 can be used.
[0069] The on-premise server 3B may reflect the search query in the update plan, that is, create an update plan using a constraint condition generated by converting the search query, only when a user operation using the user terminal 5 is accepted. For example, the search processing unit 35 generates screen display data for displaying on a display screen the search results and an operation object that accepts an operation for reflecting the search query corresponding to the search results in the update plan. When the display unit 51 displays the display screen based on this screen display data and accepts an operation on the displayed operation object, the search processing unit 35 may convert the search query into a constraint condition, and the update plan creation unit 32B may create an update plan based on this constraint condition.
[0070] As described above, the equipment update plan creation support system 1B according to the third embodiment further includes a search processing unit 35 that receives an input of a search query, which is a search condition, extracts equipment that matches the search query from the database 21, and converts the search query into constraint conditions, and the update plan creation unit 32B generates an update plan based on the constraint conditions converted from the search query by the search processing unit 35.
[0071] In addition, the equipment update plan creation support system 1B further includes a display unit 51 that displays on a display screen the search results by the search processing unit 35 and an operation object that accepts operations for reflecting the search conditions corresponding to the search results in the update plan, and when the search processing unit 35 accepts an operation on the operation object, it can also convert the search conditions into constraint conditions.
[0072] In addition, in the equipment renewal plan creation support system 1B, the database 21 further stores at least one of the equipment manufacturer and the equipment release year. Information such as the equipment manufacturer and release year can be registered by the information registration unit 36 in response to a user operation.
[0073] Embodiment 4 Fig. 12 is a diagram showing a functional configuration of an equipment update plan creation support system 1C according to the fourth embodiment. Note that, in the equipment update plan creation support system 1C, similarly to the equipment update plan creation support systems 1, 1A, and 1B, a plurality of on-premise servers 3, a building monitoring control system 4, and a user terminal 5 of a plurality of user companies are actually connected to a common cloud server 2 as shown in Fig. 1, but for simplicity, Fig. 12 shows only one user company.
[0074] The equipment update plan creation support system 1C includes a cloud server 2, an on-premise server 3C, a building monitoring and control system 4, and a user terminal 5. Note that parts similar to those in the equipment update plan creation support system 1 are given the same reference numerals and explanations thereof are omitted, and hereinafter, parts different from the equipment update plan creation support system 1 will be mainly explained.
[0075] It is assumed that operation data indicating the operation status of the equipment and the amount of power consumption are stored in the database 21. The on-premise server 3C has a data communication unit 31, an update plan creation unit 32, an update plan storage unit 33, and a surplus equipment calculation unit 37.
[0076] The surplus equipment calculation unit 37 evaluates the operation status of the equipment by a statistical method based on the equipment-related data 212 and the equipment data 211 stored in the database 21 and the update plan stored in the update plan storage unit 33, and outputs a judgment result such as "excessive use", "equipment surplus", or "normal use". Specifically, the surplus equipment calculation unit 37 can evaluate the operation status of the equipment based on the operation data, power consumption data, and the update plan. When outputting the judgment result, the surplus equipment calculation unit 37 can output a display screen showing the judgment result such as "excessive use", "equipment surplus", or "normal use" for each equipment to the user terminal 5 via the data communication unit 31.
[0077] The data used by the surplus equipment calculation unit 37 to evaluate the operation status is the user company's own data for the renewal plans, and for the operation data and power consumption, in addition to data on the equipment owned by the user company itself, data on equipment that is the same as the equipment owned by the user company but owned by other user companies can be used.
[0078] There are various methods that the surplus equipment calculation unit 37 can use to evaluate the operation status, and the following method can be used as an example. The surplus equipment calculation unit 37 first converts the operation data and power consumption of equipment owned by other user companies into a normal distribution as shown in FIG. 13. FIG. 13 is an explanatory diagram of the processing of the surplus equipment calculation unit 37. The horizontal axis of FIG. 13 indicates observed data such as operation data and power consumption, and the vertical axis indicates probability density. Next, the surplus equipment calculation unit 37 corrects the operation data and power consumption of equipment owned by the user company itself in accordance with the renewal plan. Next, the surplus equipment calculation unit 37 evaluates the operation status based on the data of the equipment owned by the user company itself and the standard deviation σ of the data converted into a normal distribution. Specifically, if the data of the equipment owned by the user company itself is greater than "average + 2σ", the equipment is determined to be "excessively used", if the data of the equipment owned by the user company itself is smaller than "average - 2σ", the equipment is determined to be "surplus equipment", and if it is within the range of "average ± 2σ", the equipment is determined to be "normally used". As shown in Fig. 13, approximately 95% of the data is included in the range of "average ±2σ". The display unit 51 can display a display screen showing the evaluation results by the surplus equipment calculation unit 37. For example, the display screen can display information showing classifications such as "excessive use", "surplus equipment", and "normal use".
[0079] As described above, the equipment update plan creation support system 1C according to the fourth embodiment further includes the surplus equipment calculation unit 37 that evaluates the operation status of the equipment based on the equipment-related data 212, the equipment data 211, and the update plan. In addition, the display unit 51 can display the evaluation result by the surplus equipment calculation unit 37 on the display screen using information indicating whether the equipment is within the range of normal usage, whether the equipment is in a state of over-usage compared to normal, or whether the equipment is in a state of surplus equipment.
[0080] Embodiment 5. Fig. 14 is a diagram showing a functional configuration of an equipment update plan creation support system 1D according to the fifth embodiment. Note that, in the equipment update plan creation support system 1D, similarly to the equipment update plan creation support systems 1, 1A, 1B, and 1C, a plurality of on-premise servers 3, building monitoring control systems 4, and user terminals 5 of a plurality of user companies are actually connected to a common cloud server 2 as shown in Fig. 1, but for simplicity, Fig. 14 shows only one user company.
[0081] The equipment update plan creation support system 1D includes a cloud server 2D, an on-premise server 3, a building monitoring and control system 4, and a user terminal 5. Note that parts similar to those in the equipment update plan creation support system 1 are given the same reference numerals and explanations thereof are omitted, and hereinafter, the parts different from the equipment update plan creation support system 1 will be mainly explained.
[0082] The cloud server 2D has a database 21D, a database processing unit 22D, a machine learning device 23D, a learned model storage unit 24, and an inference device 25D. The database 21D stores environmental data 213 in addition to facility equipment data 211 and facility-related data 212. The environmental data 213 is data indicating the environment in which the facility is installed, and includes, for example, data indicating temperature, humidity, sunshine hours, weather time series data, and the floor number on which the facility is installed. Here, the database processing unit 22D acquires the environmental data from the building monitoring and control system 4, but general data such as temperature may be acquired by the database processing unit 22D from a server that provides weather information based on the location where the facility is installed.
[0083] The complementation unit 221D instructs the machine learning device 23D to execute a learning process for the environmental data 213 in addition to the facility equipment data 211, generates a predicted value of the environmental data 213 using the inference device 25D, and performs a complementation process for the environmental data 213 using the generated predicted value.
[0084] The machine learning device 23D has a function of generating a trained model for inferring time series data included in the environmental data 213, for example, time series data of temperature, from the facility-related data 212, in addition to the function of the machine learning device 23. The training data acquisition unit 231D acquires the facility equipment data 211, the facility-related data 212, and the environmental data 213 as training data. The model generation unit 232D has a function of generating a trained model for inferring the environmental data 213 from the facility-related data 212, in addition to the function of the model generation unit 232. Note that, regarding the procedure for the model generation unit 232D to generate a trained model for inferring the environmental data 213 from the facility-related data 212, it is sufficient to replace "facility equipment data 211" with "environmental data 213" in the procedure for the model generation unit 232 to generate a trained model for inferring the facility equipment data 211 from the facility-related data 212, a detailed description will be omitted here.
[0085] The inference device 25D has a function of inferring and outputting a predicted value of the environmental data 213 from the facility-related data 212, in addition to the functions of the inference device 25. The complementing unit 221D complements the facility equipment data 211 and the environmental data 213 stored in the database 21 using the predicted value output by the inference device 25D. Therefore, when the user terminal 5 displays the predicted values, it is possible to display the predicted value of the environmental data 213 in addition to the predicted values of the facility equipment data 211 such as the running cost and the failure probability.
[0086] As described above, according to the equipment renewal plan creation support system 1D of the fifth embodiment, the database 21D further stores environmental data 213 indicating the environment in which the equipment is installed, and the environmental data 213 includes time series data of the temperature at the location where the equipment is installed, the trained model further infers the time series data of the temperature from the equipment-related data 212, and the inference unit 252D uses the trained model to output a predicted value of the temperature further into the future than the present time from the equipment-related data 212 acquired by the inference data acquisition unit 251D.
[0087] Here, the hardware configuration of the facility update plan creation support system 1, 1A, 1B, 1C, 1D described in the above-mentioned embodiments 1 to 5 will be described. The cloud servers 2, 2D, on-premise servers 3, 3A, 3B, 3C, building monitoring and control system 4, and user terminal 5 of the facility update plan creation support system 1, 1A, 1B, 1C, 1D are realized by, for example, a computer system. The cloud servers 2, 2D, on-premise servers 3, 3A, 3B, 3C, building monitoring and control system 4, and user terminal 5 may each be realized by one computer system or by multiple computer systems. In addition, the illustrated configuration is an example, and it is sufficient if the same function can be realized. For example, the cloud servers 2, 2D do not necessarily have to be realized by a cloud system, and may be a server accessible from multiple user companies. In addition, the devices equipped with each function in the facility update plan creation support system 1, 1A, 1B, 1C, 1D are only examples, and a plurality of components mounted on different devices in the facility update plan creation support system 1, 1A, 1B, 1C, 1D may be realized in one computer system, or a plurality of components mounted on the same device in the facility update plan creation support system 1, 1A, 1B, 1C, 1D may be realized in a plurality of different computer systems. For example, in FIG. 2, the update plan creation unit 32 and the update plan storage unit 33 are mounted on the same on-premise server 3, but the update plan creation unit 32 and the update plan storage unit 33 may be realized by different computer systems. For example, the function of the update plan creation unit 32 may be realized on the cloud server 2, 2D. In the cloud system, the hardware of the computer system and the devices such as servers for each function can be arbitrarily set. For example, one computer system may have the functions of a plurality of devices, or a plurality of computer systems may have the functions of one device.
[0088] An example of the configuration of a computer system that realizes the facility renewal plan creation support systems 1, 1A, 1B, 1C, and 1D will be described. Fig. 15 is a diagram showing an example of the configuration of a computer system that realizes the facility renewal plan creation support systems 1, 1A, 1B, 1C, and 1D. As shown in Fig. 15, this computer system includes a control unit 101, an input unit 102, a storage unit 103, a display unit 104, a communication unit 105, and an output unit 106, which are connected via a system bus 107.
[0089] In FIG. 15, the control unit 101 is, for example, a CPU (Central Processing Unit) or the like. The control unit 101 executes an equipment update plan creation support program in which each process performed by the equipment update plan creation support system 1, 1A, 1B, 1C, and 1D of the present embodiment is described. The input unit 102 is composed of, for example, a keyboard, a mouse, and the like, and is used by a user of the computer system to input various information. The storage unit 103 includes various memories such as a RAM (Random Access Memory) and a ROM (Read Only Memory) and a storage device such as a hard disk, and stores the program to be executed by the control unit 101, necessary data obtained in the process of the process, and the like. The storage unit 103 is also used as a temporary storage area for the program. The display unit 104 is composed of an LCD (Liquid Crystal Display: liquid crystal display panel) or the like, and displays various screens to the user of the computer system. The communication unit 105 is a communication circuit or the like that performs communication processing. The communication unit 105 may be composed of a plurality of communication circuits that respectively correspond to a plurality of communication methods. The output unit 106 is an output interface that outputs data to an external device such as a printer or an external storage device.
[0090] Note that Fig. 15 is an example, and the configuration of the computer system is not limited to the example of Fig. 15. For example, the computer system may not include the output unit 106. Also, all computer systems that realize the facility renewal plan creation support systems 1, 1A, 1B, 1C, and 1D may not be the computer systems shown in Fig. 15. For example, some computer systems may not include at least one of the display unit 104, the output unit 106, and the input unit 102 shown in Fig. 15.
[0091] Here, an example of the operation of the computer system until the equipment update plan creation support program in which the processing of the equipment update plan creation support system 1, 1A, 1B, 1C, 1D is described is executed will be described. In the computer system having the above-mentioned configuration, for example, the equipment update plan creation support program is installed in the storage unit 103 from a CD-ROM or DVD-ROM set in a CD (Compact Disc)-ROM drive or DVD (Digital Versatile Disc)-ROM drive (not shown). Then, when the equipment update plan creation support program is executed, the equipment update plan creation support program read from the storage unit 103 is stored in an area serving as the main storage device of the storage unit 103. In this state, the control unit 101 executes the processing as the equipment update plan creation support system 1, 1A, 1B, 1C, 1D of this embodiment according to the equipment update plan creation support program stored in the storage unit 103.
[0092] In the above explanation, the program describing the processing in the facility upgrade plan creation support systems 1, 1A, 1B, 1C, 1D is provided on a CD-ROM or DVD-ROM as a recording medium. However, the present invention is not limited to this, and depending on the configuration of the computer system, the capacity of the program to be provided, etc., it is also possible to use a program provided over a transmission medium such as the Internet via the communication unit 105.
[0093] The data communication unit 31 shown in Figure 2 is realized by the communication unit 105 shown in Figure 15, the database 21, the learned model memory unit 24, and the update plan memory unit 33 shown in Figure 2 are part of the memory unit 103 shown in Figure 15, the database processing unit 22 shown in Figure 2 is realized by the communication unit 105 and the control unit 101 shown in Figure 15, the machine learning device 23, the inference device 25, and the update plan creation unit 32 shown in Figure 2 are realized by the control unit 101 shown in Figure 15, the input unit 52 shown in Figure 2 is realized by the input unit 102 shown in Figure 15, and the display unit 51 shown in Figure 2 is realized by the display unit 104 shown in Figure 15.
[0094] In addition, the update plan creation unit 32A and the control unit 34 shown in Fig. 10, the update plan creation unit 32B, the search processing unit 35 and the information registration unit 36 shown in Fig. 11, the surplus equipment calculation unit 37 shown in Fig. 12, and the machine learning device 23D and the inference device 25D shown in Fig. 14 are also realized by the control unit 101 shown in Fig. 15. In addition, the database 21D shown in Fig. 14 is a part of the storage unit 103 shown in Fig. 15, and the database processing unit 22D shown in Fig. 14 is realized by the communication unit 105 and the control unit 101 shown in Fig. 15. In addition, among the functional units shown in Figs. 10 to 12 and 14, the functional units having the same reference numerals as those in Fig. 2 are the same as the functional units in Fig. 2.
[0095] The configurations shown in the above embodiments are examples of the contents of the present disclosure, and may be combined with other known technologies, and parts of the configurations may be omitted or modified without departing from the gist of the present disclosure.
[0096] For example, the on-premise servers 3, 3B, 3C shown in embodiments 3 to 5 may have a control unit 34 that controls the building monitoring control system 4 described in embodiment 2, and the on-premise server 3C shown in embodiment 4 or the on-premise server 3 shown in embodiment 5 may have the functions of the search processing unit 35 and the information registration unit 36 shown in embodiment 3.
[0097] Various aspects of the present disclosure are summarized below as appendices.
[0098] (Appendix 1) A database that accumulates actual measurement values of time-series data of facility equipment data including running costs and failure probabilities of facilities installed in a plurality of buildings, and facility-related data including the type and operation status of the facilities; an inference data acquisition unit that acquires the facility-related data of the facility to be inferred; an inference unit that outputs a predicted value of the facility equipment data from the facility-related data acquired by the inference data acquisition unit, using a trained model for inferring time-series data of the facility equipment data from the facility-related data; a complementing unit that complements the facility equipment data by using the predicted value output by the inference unit and generates complemented time-series data including the actual measurement value and the predicted value of the facility equipment data; an update plan creation unit that generates an update plan for the equipment based on constraints on the update plan and the complemented time-series data of the equipment data; A facility renewal plan creation support system comprising: (Appendix 2) The equipment renewal plan creation support system according to claim 1, wherein the complementing unit records inference date and time information indicating a date and time when the predicted value was generated. (Appendix 3) a learning data acquisition unit that acquires learning data including the facility-related data of the facility and actual measurement values of the facility device data; a model generation unit that generates a trained model for inferring time-series data of the facility equipment data from the facility-related data of the facility using the learning data; 3. The equipment renewal plan creation support system according to claim 1 or 2, further comprising: (Appendix 4) The renewal plan creation unit generates the renewal plan by determining a value of a variable indicating whether or not the equipment provided in the target building will be used in each period, a control unit that converts the value of the variable into a control instruction sequence for a monitoring and control system of the facility, and transmits the control instruction sequence to the monitoring and control system; 4. The equipment renewal plan creation support system according to claim 1, further comprising: (Appendix 5) a search processing unit that accepts input of search conditions, extracts the facilities that meet the search conditions from the database, and converts the search conditions into constraint conditions; Further equipped with The equipment renewal plan creation support system according to any one of appendix 1 to 4, characterized in that the renewal plan creation unit generates the renewal plan based on the constraint conditions converted from the search conditions by the search processing unit. (Appendix 6) a display unit that displays on a display screen a search result by the search processing unit and an operation object that accepts an operation for reflecting the search condition corresponding to the search result in the update plan; Further equipped with The facility renewal plan creation support system according to claim 5, wherein the search processing unit converts the search conditions into the constraint conditions when it receives an operation on the operation object. (Appendix 7) 7. The equipment renewal plan creation support system according to claim 5 or 6, wherein the database further stores at least one of a manufacturer of the equipment and a release year of the equipment. (Appendix 8) a surplus equipment calculation unit that evaluates an operating status of the equipment based on the equipment-related data, the equipment data, and the renewal plan; 8. The equipment renewal plan creation support system according to claim 1, further comprising: (Appendix 9) a display unit that displays the evaluation result by the surplus equipment calculation unit on a display screen using information indicating whether the equipment is within a range of normal usage conditions, whether the equipment is in a state of excessive usage compared to normal, or whether the equipment is in a state of surplus equipment; 9. The equipment renewal plan creation support system according to claim 8, further comprising: (Appendix 10) The database further stores environmental data indicating an environment in which the equipment is installed; The environmental data includes time series data of temperature at a location where the equipment is installed, The trained model further infers the temperature time series data from the facility-related data, The equipment renewal plan creation support system according to any one of appendices 1 to 9, wherein the inference unit uses the trained model to output a predicted value of the temperature from the equipment-related data acquired by the inference data acquisition unit. (Appendix 11) a learning data acquisition unit that acquires learning data including actual measurement values of time-series data of facility equipment data including running costs and failure probabilities of facilities installed in a plurality of buildings, and facility-related data including a type and an operating status of the facilities; a model generation unit that generates a trained model for inferring time-series data of the facility equipment data from the facility-related data of the facility using the learning data; A learning device comprising: (Appendix 12) an inference data acquisition unit that acquires equipment-related data of an equipment to be inferred from a database that accumulates actual measurement values of time-series data of equipment device data, including running costs and failure probabilities of equipment installed in a plurality of buildings, and equipment-related data, including a type and an operating status of the equipment; an inference unit that outputs a predicted value of the facility equipment data from the facility-related data acquired by the inference data acquisition unit, using a trained model for inferring time-series data of the facility equipment data from the facility-related data; An inference device comprising: (Appendix 13) A step of acquiring equipment-related data of the equipment to be inferred from a database that accumulates actual measurement values of time-series data of equipment device data, including running costs and failure probabilities of equipment installed in a plurality of buildings, and equipment-related data, including the type and operating status of the equipment; A step of outputting a predicted value of the facility equipment data from the facility-related data of the facility to be inferred, using a trained model for inferring time-series data of the facility equipment data from the facility-related data; A step of complementing the facility equipment data using the predicted value and generating complemented time series data including the actual measured value and the predicted value of the facility equipment data; generating the update plan based on constraints on the update plan and the complemented time-series data of the facility equipment data; A facility renewal plan creation support method comprising: (Appendix 14) A step of acquiring equipment-related data of the equipment to be inferred from a database that accumulates actual measurement values of time-series data of equipment device data, including running costs and failure probabilities of equipment installed in a plurality of buildings, and equipment-related data, including the type and operating status of the equipment; A step of outputting a predicted value of the facility equipment data from the facility-related data of the facility to be inferred, using a trained model for inferring time-series data of the facility equipment data from the facility-related data; A step of complementing the facility equipment data using the predicted value and generating complemented time series data including the actual measured value and the predicted value of the facility equipment data; providing the generated complemented time series data to a device that generates the update plan based on constraints on the update plan and the complemented time series data of the facility equipment data; A facility renewal plan creation support program that causes a computer to execute the above steps. [Explanation of symbols]
[0099] 1,1A,1B,1C,1D Equipment upgrade plan creation support system, 2,2D Cloud server, 3,3-1,3-2,3-3,3A,3B,3C On-premise server, 4,4-1,4-2,4-3 Building monitoring and control system, 5,5-1,5-2,5-3 User terminal, 21,21D Database, 22,22D Database processing unit, 23,23D Machine learning device, 24 Learned model storage unit, 25,25D Inference device, 31 Data communication unit, 32,32A,32B Upgrade plan creation unit, 33 Upgrade plan storage unit, 34,101 Control unit, 35 Search processing unit, 36 Information registration unit, 37 Surplus equipment calculation unit, 51,104 Display unit, 52,102 Input unit, 103 Storage unit, 105 Communication unit, 106 Output unit, 107 System bus, 211 equipment data, 212 equipment-related data, 213 environmental data, 221,221D completion section, 231,231D learning data acquisition section, 232,232D model generation section, 232-1 generator, 232-2 discriminator, 251,251D inference data acquisition section, 252,252D inference section.
Claims
1. A database that accumulates actual measurement values of time-series data of facility equipment data including running costs and failure probabilities of facilities installed in a plurality of buildings, and facility-related data including the type and operation status of the facilities; an inference data acquisition unit that acquires the facility-related data of the facility to be inferred; an inference unit that outputs a predicted value of the facility equipment data from the facility-related data acquired by the inference data acquisition unit, using a trained model for inferring time-series data of the facility equipment data from the facility-related data; a complementing unit that complements the facility equipment data by using the predicted value output by the inference unit and generates complemented time-series data including the actual measurement value and the predicted value of the facility equipment data; an update plan creation unit that generates an update plan for the equipment based on constraints on the update plan and the complemented time-series data of the equipment data; A facility renewal plan creation support system comprising:
2. 2. The facility renewal plan creation support system according to claim 1, wherein the complementing unit records inference date and time information indicating a date and time when the predicted value was generated.
3. a learning data acquisition unit that acquires learning data including the facility-related data of the facility and actual measurement values of the facility device data; a model generation unit that generates a trained model for inferring time-series data of the facility equipment data from the facility-related data of the facility using the learning data; The equipment replacement plan creation support system according to claim 1, further comprising:
4. The renewal plan creation unit generates the renewal plan by determining a value of a variable indicating whether or not the equipment provided in the target building will be used in each period, a control unit that converts the value of the variable into a control instruction sequence for a monitoring and control system of the facility, and transmits the control instruction sequence to the monitoring and control system; The equipment replacement plan creation support system according to claim 1, further comprising:
5. a search processing unit that accepts input of search conditions, extracts the facilities that meet the search conditions from the database, and converts the search conditions into constraint conditions; Further equipped with 2. The equipment renewal plan creation support system according to claim 1, wherein the renewal plan creation unit generates the renewal plan based on the constraint conditions converted from the search conditions by the search processing unit.
6. a display unit that displays on a display screen a search result by the search processing unit and an operation object that accepts an operation for reflecting the search condition corresponding to the search result in the update plan; Further equipped with 6. The facility renewal plan creation support system according to claim 5, wherein the search processing unit converts the search conditions into the constraint conditions when the search processing unit accepts an operation on the operation object.
7. 6. The equipment replacement plan creation support system according to claim 5, wherein the database further stores at least one of a manufacturer of the equipment and a release year of the equipment.
8. a surplus equipment calculation unit that evaluates an operating status of the equipment based on the equipment-related data, the equipment data, and the renewal plan; The equipment replacement plan creation support system according to claim 1, further comprising:
9. a display unit that displays the evaluation result by the surplus equipment calculation unit on a display screen using information indicating whether the equipment is within a range of normal usage conditions, whether the equipment is in a state of excessive usage compared to normal, or whether the equipment is in a state of surplus equipment; The equipment replacement plan creation support system according to claim 8, further comprising:
10. The database further stores environmental data indicating an environment in which the equipment is installed; The environmental data includes time series data of temperature at a location where the equipment is installed, The trained model further infers the temperature time series data from the facility-related data, The equipment renewal plan creation support system according to claim 1, characterized in that the inference unit uses the learned model to output the predicted value of the temperature from the equipment-related data acquired by the inference data acquisition unit.
11. a learning data acquisition unit that acquires learning data including actual measurement values of time-series data of facility equipment data including running costs and failure probabilities of facilities installed in a plurality of buildings, and facility-related data including a type and an operating status of the facilities; a model generation unit that generates a trained model for inferring time-series data of the facility equipment data from the facility-related data of the facility using the learning data; A learning device comprising:
12. an inference data acquisition unit that acquires equipment-related data of an equipment to be inferred from a database that accumulates actual measurement values of time-series data of equipment device data, including running costs and failure probabilities of equipment installed in a plurality of buildings, and equipment-related data, including a type and an operating status of the equipment; an inference unit that outputs a predicted value of the facility equipment data from the facility-related data acquired by the inference data acquisition unit, using a trained model for inferring time-series data of the facility equipment data from the facility-related data; An inference device comprising:
13. A step of acquiring equipment-related data of the equipment to be inferred from a database that accumulates actual measurement values of time-series data of equipment device data, including running costs and failure probabilities of equipment installed in a plurality of buildings, and equipment-related data, including the type and operating status of the equipment; A step of outputting a predicted value of the facility equipment data from the facility-related data of the facility to be inferred, using a trained model for inferring time-series data of the facility equipment data from the facility-related data; A step of complementing the facility equipment data using the predicted value and generating complemented time series data including the actual measured value and the predicted value of the facility equipment data; generating the update plan based on constraints on the update plan and the complemented time-series data of the facility equipment data; A facility renewal plan creation support method comprising:
14. A step of acquiring equipment-related data of the equipment to be inferred from a database that accumulates actual measurement values of time-series data of equipment device data, including running costs and failure probabilities of equipment installed in a plurality of buildings, and equipment-related data, including the type and operating status of the equipment; A step of outputting a predicted value of the facility equipment data from the facility-related data of the facility to be inferred, using a trained model for inferring time-series data of the facility equipment data from the facility-related data; A step of complementing the facility equipment data using the predicted value and generating complemented time series data including the actual measured value and the predicted value of the facility equipment data; providing the generated complemented time series data to a device that generates the update plan based on constraints on the update plan and the complemented time series data of the facility equipment data; A facility renewal plan creation support program that causes a computer to execute the above steps.
Citation Information
Patent Citations
Plant operation management support system
JP2005258816A
Building utilization state optimization support system
JP2008040865A
Plan creation device and program
JP2020042540A
Operation support device, operation support program, and operation support method
JP2022027192A
Information processing device, information processing method, and program
JP2022161337A
Cited By
Operational Support System
JP7731014B1
Operational Support System
JP7731015B1