Natural-fission-based multi-disaster fusion early warning method and system for coal mine

By establishing a multi-hazard fusion early warning object relationship network in coal mines and natural fission rules using the LSTM model, the relationship weights between sensor monitoring objects are analyzed, which solves the problem of difficulty in serially connecting monitoring data in the existing technology and realizes multi-hazards in coal mines. The spatial and temporal correlation analysis and prediction and early warning have improved the early warning capabilities of coal mine safety management.

WO2024222460A1PCT designated stage expired Publication Date: 2024-10-31CHINA COAL TECH & ENG GRP CHONGQING RES INST CO LTD

Patent Information

Application Number
PCT/CN2024/087107
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-24
Filing Date
2024-04-11
Publication Date
2024-10-31

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively connect various types of monitoring data, and cannot achieve spatio-temporal correlation analysis and prediction and early warning of multiple disasters in coal mines.

Method used

By establishing a multi-hazard fusion early warning object relationship network in coal mines, using natural fission rules and depth-first traversal algorithms based on the LSTM model, the relationship weights between sensor monitoring objects are analyzed to achieve multi-hazard prediction and early warning.

Benefits of technology

It realizes multi-dimensional timely analysis and advanced trend prediction of coal mine disaster monitoring information, and can detect other potential disaster warning indicators in advance when a single disaster warning indicator is abnormal, improving the early warning capability of coal mine safety management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024087107_31102024_PF_FP_ABST
    Figure CN2024087107_31102024_PF_FP_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of coal mine safety and disaster analysis. Disclosed are a natural-fission-based multi-disaster fusion early warning method and system for a coal mine. The method comprises: first, establishing a relationship model between object entities of a multi-disaster fusion early warning for a coal mine, constructing a relationship network for the object entities of the multi-disaster fusion early warning for the coal mine, and updating the network according to a rule; then establishing a sensor monitoring object trend prediction model based on a long short-term memory (LSTM) artificial neural network model, and constructing a natural fission analysis rule; then establishing a method for identifying early abnormalities of a single-disaster type in the coal mine, said method being based on a disaster indicator prediction method and a disaster early warning system; and finally, when a given disaster prediction and early warning indicator of the coal mine has an early abnormality, traversing other disaster prediction and early warning indicators on the basis of a depth-first traversal algorithm and a natural fission rule, and giving a prompt of performing targeted prediction and forecasting. The present invention establishes a potential relationship chain between prediction and early warning indicators by means of association analysis, achieving the advantages of multi-dimensional comprehensive analysis and advanced trend analysis.
Need to check novelty before this filing date? Find Prior Art

Description

A coal mine multi-hazard integrated natural fission early warning method and system Technical Field

[0001] The present invention belongs to the technical field of coal mine safety disaster analysis, and relates to a coal mine disaster fusion early warning method and system, and in particular to a coal mine multi-hazard fusion natural fission early warning method and system. Background Art

[0002] Currently, existing technologies have established a comprehensive system for disaster monitoring and management across various types of hazards, and numerous methods have been proposed for single-disaster prediction and early warning. These methods provide effective technical means for pre-disaster warning, evacuation, and post-disaster analysis. However, these prediction methods can only identify a single causal factor and are unable to effectively connect various monitoring data and fully utilize their value.

[0003] The occurrence of a coal mine disaster is often accompanied by the incubation and development of secondary disasters, and the occurrence of various disasters exhibits temporal and spatial correlations. Today, time series analysis has developed into a systematic discipline, and various deep recurrent neural networks are gaining popularity. By combining statistical theory with machine learning, sensor monitoring objects related to various coal mine disasters can be integrated and analyzed, allowing objects to naturally split based on correlations, making correlation analysis and data prediction possible.

[0004] Summary of the Invention

[0005] In view of this, the technical problem to be solved by the present invention is to provide a natural fission warning method for coal mine multi-hazard integration. When the coal mine disaster prediction and warning indicators are abnormal, the coal mine warning object relationship network can be traversed through the natural fission rules to find the prediction and warning indicators of other disasters with potential impact in a timely and complete manner, and targeted prediction and forecasting can be taken to realize multi-hazard integrated warning.

[0006] The object of the present invention is achieved like this:

[0007] A coal mine multi-hazard integrated natural fission early warning method, the method comprising the following steps:

[0008] S1: Establish a relationship model between the entities of coal mine multi-hazard fusion warning objects, construct a relationship network of coal mine multi-hazard fusion warning objects, and update the network according to the rules;

[0009] S2: Establish a sensor monitoring object trend prediction model based on the long short-term memory artificial neural network (LSTM) model and construct natural fission analysis rules;

[0010] S3: Establish an early identification method for single-type coal mine disasters based on disaster indicator prediction methods and disaster early warning systems;

[0011] S4: When a disaster prediction and warning indicator of a coal mine is abnormal, it traverses to other disaster prediction and warning indicators based on the depth-first traversal algorithm and natural fission rule, prompting targeted prediction and forecasting to achieve multi-disaster integrated warning.

[0012] Optionally, in S1, the coal mine multi-hazard fusion warning object entity includes prediction and warning indicators and sensor monitoring objects of a single disaster type;

[0013] For the sequence of object X {x t} and the sequence of objects Y {y t}, if there is a relationship set R between the two, define the relationship between them as

[0014] According to the different ways of obtaining relationships, the relationships are divided into relationship R1 based on causal mechanism and production process, position relationship R2 based on spatial topology, and numerical relationship R3 based on correlation coefficient; relationship R1 is obtained by querying coal mine disaster prediction and warning data and production process regulations; relationship R2 is obtained by the spatial topology algorithm of the coal mine geographic information system; relationship R3 is solved by the correlation coefficient indicator of the pooled value sequence in a specific time window;

[0015] The relationship weight w between objects X and Y R It is the accumulation of multiple relationship weights between the two. The specific formula is as follows:

[0016] Where, is the weight corresponding to the i-th relationship type between objects X and Y; the corresponding relationship between the relationship type and weight of multi-hazard fusion natural fission objects is:

[0017] The relationship type is mechanism-process relationship R1, the evaluation index is mechanism-process, the relationship weight of physical mechanics relationship is 1, and the relationship weight of upstream and downstream process is 0.5;

[0018] The relationship type is positional relationship R2, the evaluation index is spatial topology, the weight of the relationship of inclusion or intersection is 0.5, and the weight of the relationship of adjacent relationship within 20m is 0.2;

[0019] The relationship type is numerical relationship R3, and the evaluation index is the correlation coefficient index P. The relationship weight of P∈(0.8,1] is 0.8, the relationship weight of P∈(0.6,0.8] is 0.5, and the relationship weight of P∈(0.4,0.6] is 0.2.

[0020] Optionally, the numerical relationship R3 is solved by the correlation coefficient of the pooled value sequence in a specific time window, specifically:

[0021] For the prediction and warning indicator A and sensor monitoring object B corresponding to coal mine disasters, the time step of A is set to Δt. Based on the data of the most recent period, the maximum, minimum and average values ​​of the pooling indicator of B in the time window Δt are used to generate the pooling sequence B. k , k=1,2,3, and then calculate A and B k Correlation coefficient r of sequence pairs k , the time window of the prediction and warning indicator A is Δt, and the correlation coefficient between the prediction and warning indicator A and the sensor monitoring object B is calculated as follows: P AB =max k=1,2,3 (|r k |) (2)

[0022] For sensor monitoring object B p and sensor monitoring object B q Based on the data of the most recent period, the average value within the pooling indicator time window is used to obtain two mean series and Then calculate the absolute value of the correlation coefficient of the sequence pair |r pq |, then the sensor monitors object B p and B q The calculation formula of the correlation coefficient indicator is as follows:

[0023] Optionally, in S1, a coal mine multi-hazard integrated warning object relationship network is constructed and updated according to the rules as follows:

[0024] For the disaster prediction and early warning indicator set {A i} and sensor monitoring object set {B j}, i, j∈R + , analyze A in turn i and B j Look up the relationship table R1, R2 and R3 and calculate the relationship weight w R , when w R Establish a relationship when ≥1 For the sensor monitoring object set {B j}, j∈R + , analyze object B in turn p and B q Look up the relationship between R1, R2 and R3 and calculate the relationship weight w R , when w R Establish a relationship when ≥1 Completed the establishment of a coal mine multi-hazard integrated early warning object relationship network;

[0025] The inter-object relationship R1 established based on the causal mechanism is a fixed relationship. The inter-object relationship R1 established based on the production process is updated synchronously after the process flow changes. The inter-object relationship R2 established based on the spatial topology is updated synchronously with the change of the object position. The inter-object relationship R3 established based on numerical related indicators is updated every week.

[0026] Optionally, in S2, the selection of hyperparameters of the LSTM model needs to refer to the stationarity and periodicity of the time series of the coal mine sensor monitoring object; before model training, the data is standardized using a normalization method; the model training uses cross entropy as the loss function, the gradient clipping method is used to constrain the gradient, the stochastic gradient descent method is used to optimize the model, and the prediction accuracy of the model on the test set is calculated successively.

[0027] Optionally, the stationarity and periodicity analysis of the time series of the sensor monitoring object is performed by using the window mean sequence of the sensor monitoring object in the most recent period; the stationarity analysis of the sequence is performed by using the unit root test method. If the sequence is non-stationary, the sequence is further differentiated and then subjected to stationarity analysis until the obtained sequence is stationary, thereby obtaining the differential order N. d ; If the sequence is stationary, set the difference order N d =0; perform periodic analysis on the sequence, use fast Fourier transform, draw the sequence spectrum with frequency as the horizontal axis and amplitude as the vertical axis, and obtain the specific frequency F of the signal by identifying the peak value s , and then obtain the sequence period T = 1 / F s ; If there is no obvious peak in the spectrum, the sequence does not have periodicity, and T=0 is set.

[0028] Optionally, the parameters of the LSTM model are:

[0029] For a sensor monitoring object, the LSTM model has the following data input number d, batch size n, and hidden unit number h. The input data is X t ∈R n×d ,y t ∈R n×1 , the design initialization hyperparameter selection formula is as follows: h= <d*ln(N d +2)> (4)

[0030] Where T is the period of the sequence, Δt is the pooling time window of the mean sequence, and N d is the order of stationary difference of the sequence; <> is the rounding operation.

[0031] Optionally, after the LSTM model is trained, the data is normalized with the same parameters before prediction, and the prediction results need to be reverse normalized for use; based on the latest set of data input at the current time, the input average value E and the predicted value are obtained Will Push data input to get predicted values The formula for predicting trend indicators of sensor monitoring objects is as follows: (5)

[0032] Where ε is the scaling factor, which is set for different types of sensor monitoring objects;

[0033] The first training dataset of the LSTM model should be no less than T m , when the data growth reaches T m And the total length of the training data set is less than 10T m When , the model is retrained and the two models are compared to make a trade-off in the next K prediction accuracies. During this period, the model prediction still uses the original model to take into account data feature extraction and overfitting.

[0034] Optionally, in S4, when a certain prediction and warning indicator of a coal mine has early abnormal characteristics, a depth-first algorithm is used to traverse the coal mine multi-hazard fusion warning object relationship network, and for each specific sensor monitoring object traversed, an LSTM model is used to calculate the prediction trend index S; if the indicator S value is normal, the current node is no longer deeply traversed; if the indicator S value exceeds the threshold, it is considered that the current sensor monitoring object meets the natural fission rule, and the deep traversal continues until the entire warning object relationship network is traversed, thereby obtaining the associated prediction and warning indicators of the natural fission anomaly inference located at the network endpoint; and then prompting the management party to take targeted predictions and forecasts to achieve multi-hazard fusion warning.

[0035] A coal mine multi-hazard integrated natural fission early warning system, the system comprising:

[0036] The monitoring and early warning data collection and storage module is used to collect sensor monitoring data and prediction and early warning indicator data of the coal mine safety monitoring system and various disaster prediction and early warning systems at a specified frequency and store them in the fusion early warning database;

[0037] The relationship network construction and update module is used to collect basic information of each sensor monitoring object and prediction and warning indicator object in the coal mine to generate a list of relationship entities. By regularly editing the mechanism and process relationship and calculating the geometric topology and correlation coefficient, the relationship weights between each pair of sensor monitoring objects and between sensor monitoring objects and prediction and warning indicator objects are calculated to establish or update the coal mine multi-hazard fusion warning object relationship network;

[0038] The fission model training and update module is used to regularly train the LSTM parameters in the trend prediction model of each sensor monitoring data, and select appropriate parameters by comparing the prediction accuracy of the previous and next prediction models;

[0039] The natural fission analysis and push module is used to collect abnormal information of a disaster prediction and warning indicator, and then traverse to other disaster prediction and warning indicators based on the depth-first traversal algorithm and natural fission rules, and then highlight the results on the user interface and push them back to various prediction and warning systems.

[0040] The monitoring and early warning data acquisition and storage module is responsible for external data access to form an object data set; the relationship network construction and update module generates relationship entity object list data and object relationship weight data based on the object data set, and finally generates an object relationship network; at the same time, the fission model training and update module trains the LSTM model based on the object data set; when the monitoring and early warning data acquisition and storage module identifies that a certain prediction and early warning indicator has early abnormal characteristics, the natural fission analysis and push module uses a depth-first algorithm to traverse the object relationship network, finds abnormally associated prediction and early warning indicators based on natural fission rules, and pushes the result data.

[0041] The advantages of the present invention are: coal mine multi-hazard fusion natural fission warning, by integrating the existing coal mine disaster prediction and warning indicator objects and the full amount of sensor monitoring objects, the whole-body detection of the coal mine is realized, and the relationship weight analysis between the disaster prediction and warning indicators and the sensor monitoring objects, and between the sensor monitoring objects and the sensor monitoring objects is used to construct a coal mine multi-hazard fusion warning object relationship network. Combined with the judgment rules of the trend prediction indicators based on the artificial neural network algorithm, the natural fission between coal mine objects is realized, and other disaster prediction and warning indicators are traced back, thereby achieving multi-dimensional and timely analysis of coal mine disaster monitoring information, advanced trend prediction and multi-hazard fusion warning.

[0042] Other advantages, objects, and features of the present invention will be described in part in the following description and, in part, will be apparent to those skilled in the art upon examination of the following description or may be learned from practice of the present invention. The objects and other advantages of the present invention may be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below with reference to the accompanying drawings, in which:

[0044] Figure 1 is a flow chart of the coal mine multi-hazard fusion natural fission early warning method;

[0045] Figure 2 is a flow chart of the time series analysis and processing of coal mine sensor monitoring objects;

[0046] Figure 3 is a flow chart of the LSTM model training process for coal mine sensor monitoring objects;

[0047] Figure 4 is a flow chart of the LSTM model calculation unit for coal mine sensor monitoring objects;

[0048] Figure 5 is a module diagram of the coal mine multi-hazard integrated natural fission early warning system. DETAILED DESCRIPTION

[0049] The following describes the embodiments of the present invention by means of specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the illustrations provided in the following embodiments are only schematic illustrations of the basic concept of the present invention, and the following embodiments and features in the embodiments can be combined with each other without conflict.

[0050] Referring to Figures 1 to 5 , the present invention provides a coal mine multi-hazard integrated natural fission early warning method, comprising the following steps:

[0051] S1: Establish a relationship model between the entities of coal mine multi-hazard fusion warning objects, construct a relationship network of coal mine multi-hazard fusion warning objects, and update the network according to the rules;

[0052] S2: Establish a sensor monitoring object trend prediction model based on the long short-term memory artificial neural network (LSTM) model and construct natural fission rules;

[0053] S3: Establish an early identification method for single-type coal mine disasters based on disaster indicator prediction methods and disaster early warning systems;

[0054] S4: When a disaster prediction and warning indicator of a coal mine is abnormal, it traverses to other disaster prediction and warning indicators based on the depth-first traversal algorithm and natural fission rule, prompting targeted prediction and forecasting to achieve multi-disaster integrated warning.

[0055] Furthermore, the coal mine multi-hazard fusion warning object entity referred to in step S1 includes the prediction warning indicators and sensor monitoring objects of a single disaster type. t} and the sequence of objects Y {y t}, if there is a relationship set R between the two, we can define the relationship between them as Based on the different ways of acquiring relationships, we categorize relationships into R1, which is based on causal mechanisms and production processes; R2, which is based on spatial topology; and R3, which is based on numerical correlation coefficients. R1 is obtained by querying coal mine disaster prediction and warning data and production process regulations. R2 is obtained using the spatial topology algorithm of the coal mine geographic information system. R3 is solved using the correlation coefficient indicator of the pooled value series within a specific time window.

[0056] The relationship weight w between objects X and Y R It is the accumulation of multiple relationship weights between the two. The specific formula is as follows:

[0057] Where, is the weight corresponding to the i-th relationship type between objects X and Y; the corresponding table of relationship types and weights of multi-hazard fusion natural fission objects is shown in the following table.

[0058] Table 1. Corresponding relationship types and weights of multi-hazard fusion natural fission objects

[0059] Furthermore, the numerical relationship R3 is solved by the correlation coefficient of the pooled value sequence in a specific time window, specifically:

[0060] For the prediction and warning indicator A and sensor monitoring object B corresponding to coal mine disasters, the time step of A is set to Δt. Based on the data of the most recent period, the maximum, minimum and average values ​​of the pooling indicator of B in the time window Δt are used to generate the pooling sequence B. k , k=1,2,3, and then calculate A and B k Correlation coefficient r of sequence pairs k , the time window of the prediction and warning indicator A is Δt, and the correlation coefficient between the prediction and warning indicator A and the sensor monitoring object B is calculated as follows: P AB =max k=1,2,3 (|r k |) (2)

[0061] For sensor monitoring object B p and sensor monitoring object B q Based on the data of the most recent period, the average value within the pooling indicator time window is used to obtain two mean series and Then calculate the absolute value of the correlation coefficient of the sequence pair |r pq |, then the sensor monitors object B p and B q The calculation formula of the correlation coefficient indicator is as follows:

[0062] Furthermore, the coal mine multi-hazard fusion warning object relationship network proposed in step S1 is constructed and updated according to the rules. i} and sensor monitoring object set {B j}, i, j∈R + , analyze A in turn i and B j Look up the relationship table R1, R2 and R3 and calculate the relationship weight w R , when w R Establish a relationship when ≥1 For sensor monitoring object set {B j}, j∈R + , analyze object B in turn p and B q Look up the relationship between R1, R2 and R3 and calculate the relationship weight w R , when w R Establish a relationship when ≥1 Based on this, a coal mine multi-hazard integrated warning object relationship network was constructed.

[0063] The inter-object relationship R1 established based on the causal mechanism is a fixed relationship. The inter-object relationship R1 established based on the production process is updated synchronously after the process flow changes. The inter-object relationship R2 established based on the spatial topology is updated synchronously with the change of the object position. The inter-object relationship R3 established based on numerical related indicators is updated every week.

[0064] Furthermore, the hyperparameter selection for the LSTM model proposed in step S2 requires consideration of the stationarity and periodicity of the time series of the coal mine sensor monitoring objects. Before model training, the data must be normalized using a normalization method. Model training uses cross entropy as the loss function, gradient clipping to constrain the gradient, and stochastic gradient descent to optimize the model. The model's prediction accuracy on the test set is then calculated repeatedly.

[0065] Furthermore, the stationarity and periodicity analysis of the time series of the sensor monitoring object is carried out by using the window mean sequence of the sensor monitoring object in the recent period. The stationarity analysis of the sequence is carried out by using the unit root test method. If the sequence is non-stationary, the sequence is further differentiated and then subjected to stationarity analysis until the obtained sequence is stationary, and the difference order N is obtained. d ; If the sequence is stationary, set the difference order N d = 0. Perform periodic analysis on the sequence and use fast Fourier transform to draw the sequence spectrum with frequency as the horizontal axis and amplitude as the vertical axis. The specific frequency F of the signal is obtained by identifying the peak value. s , and then obtain the sequence period T = 1 / F s ; If there is no obvious peak in the spectrum, the sequence does not have periodicity, and T=0 is set.

[0066] Furthermore, the LSTM model parameters are selected. For a sensor monitoring object, the LSTM training model has the following data input number d, batch size n, and hidden unit number h. The input data is X t ∈R n×d ,y t ∈R n×1 , the design initialization hyperparameter selection formula is as follows: h= <d*ln(N d +2)> (4)

[0067] Where T is the period of the sequence, Δt is the pooling time window of the mean sequence, and N d is the order of stationary difference of the sequence. <> is the rounding operation.

[0068] Furthermore, the gated memory element used in the LSTM model includes the forget gate F t ∈R n×h , input gate I t ∈R n×h , candidate memory Output gate O t ∈R n×h Memory C t ∈R n×h and hidden state H t ∈R n×h The LSTM model iteration formula is as follows:

[0069] Where, is the predicted value, and the initialization values ​​C0 and H0 of the memory and hidden state are matrices with all elements zero.

[0070] Furthermore, after the LSTM model is trained, the data is normalized with the same parameters before prediction, and the prediction results need to be denormalized for use. Based on the latest set of data input at the current time, the input average value E and the predicted value are obtained. Will Push data input to get predicted values Then, the formula for predicting trend indicators of sensor monitoring objects is as follows:

[0071] Where ε is the scaling factor, which is determined by different types of sensor monitoring objects.

[0072] The first training dataset of the LSTM model should be no less than T m , when the data growth reaches T m And the total length of the training data set is less than 10T mWhen , the model is retrained and the two models are compared to make a trade-off in the next K prediction accuracies. During this period, the model prediction still uses the original model to take into account data feature extraction and overfitting.

[0073] The threshold values ​​of trend indicators of sensor monitoring objects are determined based on the required values ​​of various sensor monitoring objects in the "Coal Mine Safety Regulations" and other coal mine management documents.

[0074] Furthermore, the method for identifying early-stage anomalies in coal mines for a single type of disaster, proposed in step S3, uses disaster prediction indicators outlined in documents such as the "Coal Mine Safety Regulations," the "Regulations on the Prevention and Control of Coal and Gas Outbursts," the "Regulations on the Prevention and Control of Water in Coal Mines," the "Detailed Rules for Coal Mine Fire Prevention and Suppression," and the "Detailed Rules for the Prevention and Control of Rockburst in Coal Mines." When the measured value of an indicator reaches 80% of the specified threshold, it is considered to be an early-stage anomaly characteristic of the corresponding disaster. For the mine's own disaster early warning system, which is based on geophysical exploration, process technology, and monitoring mechanism analysis, an early-stage anomaly characteristic of the corresponding disaster is identified when the indicator value reaches the minimum warning level.

[0075] Furthermore, step S4 proposes that when a coal mine prediction and warning indicator exhibits early abnormal characteristics, a depth-first algorithm is used to traverse the coal mine's multi-hazard integrated warning object relationship network. For each specific sensor monitoring object traversed, an LSTM prediction model is used to calculate the prediction trend indicator S. If the indicator S value is normal, the current node is not further traversed. If the indicator S value exceeds the threshold, the current sensor monitoring object is considered to meet the natural fission rule, and the deep traversal continues until the entire warning object relationship network is traversed, thereby obtaining the associated prediction and warning indicators inferred from the natural fission anomaly at the network endpoint. This prompts management to implement targeted predictions and forecasts, achieving multi-hazard integrated warning.

[0076] Furthermore, a coal mine multi-hazard integrated natural fission early warning system includes four major modules:

[0077] The monitoring and early warning data acquisition and storage module is used to collect sensor monitoring data and prediction and early warning indicator data of the coal mine safety monitoring system and various disaster prediction and early warning systems at a specified frequency, and store them in the fusion early warning database.

[0078] The relationship network construction and update module is used to collect the basic information of each sensor monitoring object and prediction and early warning indicator object in the coal mine to generate a list of relationship entities. By regularly editing the mechanism and process relationship and calculating the geometric topology and correlation coefficient, the relationship weights between each sensor monitoring object and between the sensor monitoring object and the prediction and early warning indicator object are solved, and the relationship network of multi-hazard integrated early warning objects in the coal mine is established or updated.

[0079] The fission model training and update module is used to regularly train the LSTM parameters in the trend prediction model of each sensor monitoring data, and select appropriate parameters by comparing the prediction accuracy of the previous and next prediction models.

[0080] The natural fission analysis and push module is used to collect abnormal information of a disaster prediction and warning indicator, and then traverse to other disaster prediction and warning indicators based on the depth-first traversal algorithm and natural fission rules, and then highlight the results on the user interface and push them back to various prediction and warning systems.

[0081] Furthermore, the module relationship of a coal mine multi-hazard integrated natural fission early warning system is as follows:

[0082] First, the monitoring and early warning data acquisition and storage module is responsible for accessing external data and forming an object data set. Then, on the one hand, the relationship network construction and update module generates a list of relationship entity objects and inter-object relationship weights based on the object data set, ultimately forming an object-relationship network. On the other hand, the fission model training and update module trains an LSTM model based on the object data set. Finally, when the monitoring and early warning data acquisition and storage module identifies early abnormality characteristics for a predictive warning indicator, the natural fission analysis and push module uses a depth-first algorithm to traverse the object-relationship network, finds the predictive warning indicator associated with the abnormality based on natural fission rules, and pushes the resulting data.

[0083] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not limiting. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solutions, which should all be included in the scope of the claims of the present invention.

Claims

1. A coal mine multi-hazard integrated natural fission early warning method, characterized by: The method comprises the following steps: S1: Establish a relationship model between the entities of coal mine multi-hazard fusion warning objects, construct a relationship network of coal mine multi-hazard fusion warning objects, and update the network according to the rules; S2: Establish a sensor monitoring object trend prediction model based on the long short-term memory artificial neural network (LSTM) model and construct natural fission analysis rules; S3: Establish an early identification method for single-type coal mine disasters based on disaster indicator prediction methods and disaster early warning systems; S4: When a disaster prediction and warning indicator of a coal mine is abnormal, it traverses to other disaster prediction and warning indicators based on the depth-first traversal algorithm and natural fission rule, prompting targeted prediction and forecasting to achieve multi-disaster integrated warning.

2. A coal mine multi-hazard integrated natural fission early warning method according to claim 1, characterized in that: In S1, the coal mine multi-hazard fusion warning object entity includes the prediction and warning indicators and sensor monitoring objects of a single disaster type; For the sequence of object X {x t } and the sequence of objects Y {y t }, if there is a relationship set R between the two, define the relationship between them as According to the different ways of obtaining relationships, the relationships are divided into relationship R1 based on causal mechanism and production process, position relationship R2 based on spatial topology, and numerical relationship R3 based on correlation coefficient; relationship R1 is obtained by querying coal mine disaster prediction and warning data and production process regulations; relationship R2 is obtained by the spatial topology algorithm of the coal mine geographic information system; relationship R3 is solved by the correlation coefficient indicator of the pooled value sequence in a specific time window; The relationship weight w between objects X and Y R It is the accumulation of multiple relationship weights between the two. The specific formula is as follows: Where, is the weight corresponding to the i-th relationship type between objects X and Y; the corresponding relationship between the relationship type and weight of multi-hazard fusion natural fission objects is: The relationship type is mechanism-process relationship R1, the evaluation index is mechanism-process, the relationship weight of physical mechanics relationship is 1, and the relationship weight of upstream and downstream process is 0.5; The relationship type is positional relationship R2, the evaluation index is spatial topology, the weight of the relationship of inclusion or intersection is 0.5, and the weight of the relationship of adjacent relationship within 20m is 0.2; The relationship type is numerical relationship R3, and the evaluation index is the correlation coefficient index P. The relationship weight of P∈(0.8,1] is 0.8, the relationship weight of P∈(0.6,0.8] is 0.5, and the relationship weight of P∈(0.4,0.6] is 0.

2.

3. A coal mine multi-hazard integrated natural fission early warning method according to claim 2, characterized in that: The numerical relationship R3 is solved by the correlation coefficient of the pooled value sequence in a specific time window, specifically: For the prediction and warning indicators A and sensor monitoring objects B corresponding to coal mine disasters, the time step of A is set to Δt, and the basic Based on the data of the most recent period, the maximum, minimum and average values ​​of the pooling index of B in the time window Δt are used to generate the pooling sequence B k , k=1,2,3, and then calculate A and B k Correlation coefficient r of sequence pairs k , the time window of the prediction and warning indicator A is Δt, and the correlation coefficient between the prediction and warning indicator A and the sensor monitoring object B is calculated as follows: P AB =max k=1,2,3 (|r k |) (2) For sensor monitoring object B p and sensor monitoring object B q Based on the data of the most recent period, the average value within the pooling indicator time window is used to obtain two mean series and Then calculate the absolute value of the correlation coefficient of the sequence pair |r pq |, then the sensor monitors object B p and B q The calculation formula of the correlation coefficient indicator is as follows:

4. The coal mine multi-hazard integrated natural fission early warning method according to claim 1 is characterized by: In S1, a coal mine multi-hazard integrated warning object relationship network is constructed and updated according to the rules: For the disaster prediction and early warning indicator set {A i } and sensor monitoring object set {B j }, i, j∈R + , analyze A in turn i and B j Look up the relationship table R1, R2 and R3 and calculate the relationship weight w R , when w R Establish a relationship when ≥1 For sensor monitoring object set {B j }, j∈R + , analyze object B in turn p and B q Look up the relationship between R1, R2 and R3 and calculate the relationship weight w R , when w R Establish a relationship when ≥1 Completed the establishment of a coal mine multi-hazard integrated early warning object relationship network; The inter-object relationship R1 established based on the causal mechanism is a fixed relationship. The inter-object relationship R1 established based on the production process is updated synchronously after the process flow changes. The inter-object relationship R2 established based on the spatial topology is updated synchronously with the change of the object position. The inter-object relationship R3 established based on numerical related indicators is updated every week.

5. The coal mine multi-hazard integrated natural fission early warning method according to claim 1 is characterized by: In S2, the selection of hyperparameters of the LSTM model needs to refer to the stationarity and periodicity of the time series of the coal mine sensor monitoring object; before model training, the data is standardized using the normalization method; The model training uses cross entropy as the loss function, the gradient clipping method is used to constrain the gradient, the stochastic gradient descent method is used to optimize the model, and the prediction accuracy of the model on the test set is calculated one by one.

6. The coal mine multi-hazard integrated natural fission early warning method according to claim 1 is characterized by: The stationarity and periodicity analysis of the time series of the sensor monitoring object is performed by using the window mean sequence of the sensor monitoring object in the most recent period; the stationarity analysis of the sequence is performed by using the unit root test method. If the sequence is non-stationary, the sequence is further differentiated and then subjected to stationarity analysis until the obtained sequence is stable, thereby obtaining the differential order N. d ; If the sequence is stationary, set the difference order N d =0; perform periodic analysis on the sequence, use fast Fourier transform, draw the sequence spectrum with frequency as the horizontal axis and amplitude as the vertical axis, and obtain the specific frequency F of the signal by identifying the peak value s , and then obtain the sequence period T = 1 / F s ; If there is no obvious peak in the spectrum, the sequence does not have periodicity, and T=0 is set.

7. The coal mine multi-hazard integrated natural fission early warning method according to claim 5, characterized in that: The parameters of the LSTM model are selected as follows: For a sensor monitoring object, the LSTM model has the following data input number d, batch size n, and hidden unit number h. The input data is X t ∈R n×d ,y t ∈R n×1 , the design initialization hyperparameter selection formula is as follows: Where T is the period of the sequence, Δt is the pooling time window of the mean sequence, and N d is the order of stationary difference of the sequence; <> is the rounding operation.

8. The coal mine multi-hazard integrated natural fission early warning method according to claim 5 is characterized by: After the LSTM model is trained, the data is normalized with the same parameters and then predicted. The prediction results need to be reverse normalized for use. Based on the latest set of data input at the current time, the input average value E and the predicted value are obtained. Will Push data input to get predicted values The formula for predicting trend indicators of sensor monitoring objects is as follows: Where ε is the scaling factor, which is set for different types of sensor monitoring objects; The first training dataset of the LSTM model should be no less than T m , when the data growth reaches T m And the total length of the training data set is less than 10T m When , the model is retrained and the two models are compared to make a trade-off in the next K prediction accuracies. During this period, the model prediction still uses the original model to take into account data feature extraction and overfitting.

9. The coal mine multi-hazard integrated natural fission early warning method according to claim 1 is characterized by: In S4, when a coal mine prediction and warning indicator has early abnormal characteristics, a depth-first algorithm is used to traverse the coal mine multi-hazard fusion warning object relationship network, and for each specific sensor monitoring object traversed, an LSTM model is used to calculate the prediction trend indicator S; If the indicator S value is normal, the current node will no longer be deeply traversed; if the indicator S value exceeds the threshold, it is considered that the current sensor monitoring object meets the natural fission rules, and the deep traversal will continue until the entire warning object relationship network is traversed, thereby obtaining the associated prediction warning indicators of the natural fission anomaly inference at the network endpoint; and then prompting the management party to take targeted predictions and forecasts to achieve multi-disaster integrated warning.

10. A coal mine multi-hazard integrated natural fission early warning system, characterized by: The system comprises: Monitoring and early warning data collection and storage module is used to collect data from coal mine safety monitoring system and various disaster prediction and early warning systems at a specified frequency. The sensor monitoring data and prediction and warning indicator data of the warning system are stored in the fusion warning database; The relationship network construction and update module is used to collect basic information of each sensor monitoring object and prediction and warning indicator object in the coal mine to generate a list of relationship entities. By regularly editing the mechanism and process relationship and calculating the geometric topology and correlation coefficient, the relationship weights between each pair of sensor monitoring objects and between sensor monitoring objects and prediction and warning indicator objects are calculated to establish or update the coal mine multi-hazard fusion warning object relationship network; The fission model training and update module is used to regularly train the LSTM parameters in the trend prediction model of each sensor monitoring data, and select appropriate parameters by comparing the prediction accuracy of the previous and next prediction models; The natural fission analysis and push module is used to collect abnormal information of a disaster prediction and warning indicator, traverse to other disaster prediction and warning indicators based on the depth-first traversal algorithm and natural fission rules, and then highlight the results on the user interface and push them back to various prediction and warning systems; The monitoring and early warning data acquisition and storage module is responsible for external data access to form an object data set; the relationship network construction and update module generates relationship entity object list data and object relationship weight data based on the object data set, and finally generates an object relationship network; at the same time, the fission model training and update module trains the LSTM model based on the object data set; when the monitoring and early warning data acquisition and storage module identifies that a certain prediction and early warning indicator has early abnormal characteristics, the natural fission analysis and push module uses a depth-first algorithm to traverse the object relationship network, finds abnormally associated prediction and early warning indicators based on natural fission rules, and pushes the result data.

Citation Information

Patent Citations

  • Multi-disaster scene fusion visual emergency linkage command system

    CN113763547A

  • Sugarcane multi-disaster meteorological disaster early warning method based on multi-source heterogeneous data fusion

    CN114821338A

  • Fusion processing method, device and equipment of multi-disaster early warning information and storage medium

    CN115798174A

  • Coal mine multi-disaster fusion natural fission early warning method and system

    CN116738817A

  • Project disaster warning method and system based on collaborative fusion of multi-physics monitoring data

    US20230410012A1

Cited By

  • Supporting action monitoring method and device of hydraulic support and electronic equipment

    CN119150209A

  • Hydrogen long-distance pipeline sensor optimization method based on artificial intelligence algorithm

    CN119249281A

  • Miner behavior monitoring method and device

    CN119337189A

  • Coal mine emergency situation identification and processing method and system based on intelligent service

    CN119364330A

  • Mine multi-dimensional fusion intelligent monitoring and early warning system method

    CN119393187A