Information output device, learned model generation device, program, learned model, and operation indication information generation method

The information output device uses a learned model to integrate vessel and machinery vibrations, enabling accurate operation instruction information for autonomous heavy equipment operation on work vessels, addressing the challenge of complex oscillations in offshore construction.

JP2024136159APending Publication Date: 2024-10-04PENTA OCEAN CONSTRUCTION CO LTD +4
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2023047164
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-23
Publication Date
2024-10-04

AI Technical Summary

Technical Problem

Existing technologies struggle to generate operation instruction information for heavy machinery on work vessels that accurately account for both vibrations caused by external forces like waves and wind, as well as vibrations induced by the machinery's operations, especially in offshore construction where oscillations are complex and unpredictable.

Method used

An information output device that utilizes a learned model generated through machine learning to combine data on vessel oscillations and machinery operations, incorporating specifications and external force data to generate operation instruction information that considers both types of vibrations, allowing for autonomous operation of heavy equipment.

Benefits of technology

The solution enables precise operation instruction information that accounts for both external and machinery-induced vibrations, facilitating the autonomous operation of heavy equipment on work vessels, improving efficiency and reducing operator dependency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024136159000001_ABST
    Figure 2024136159000001_ABST
Patent Text Reader

Abstract

To consider influence of oscillation applied on a work ship by operation of a heavy machine and oscillation generated on the work ship due to external force such as wave and wind in generation of an operation indication information to the heavy machine for marine civil engineering work on the work ship.SOLUTION: An information processor (10) has a generation part (113) to generate an operation indication information for operating a heavy machine on a first work ship by inputting oscillation property of the first work ship in a state of not executing marine civil engineering work and information showing a specification of the first work ship to a learned model generated by machine learning using information showing a specification of a second work ship on which the heavy machine is placed and an oscillation property of the second work ship in a state of not executing marine civil engineering work and time series data showing operation of the heavy machine on the second work ship.SELECTED DRAWING: Figure 9
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a technique for carrying out marine civil engineering work using heavy machinery on a work vessel. [Background technology]

[0002] In recent years, the automation and autonomy of construction machinery (hereinafter also referred to as heavy machinery) has been progressing in order to improve the efficiency and labor saving of civil engineering work, and the automation and autonomy of heavy machinery on work boats is also required for offshore construction, but the automation of heavy machinery on work boats in offshore construction is more difficult than the automation of heavy machinery used on land. The main reason is that the target heavy machinery is fixed on the work boat, and when operating the heavy machinery on the work boat, the work boat is subjected to rocking due to waves and wind. Even if the heavy machinery on the work boat is stopped, the rocking of the work boat causes the dredging bucket and weight suspended via wires at the end of the boom of the crane, etc. to rock, so when operating heavy machinery such as a crane on the work boat, it is necessary to operate it while taking into account the rocking of the work boat.

[0003] For this reason, it has been proposed to perform control that takes into account the motion of the work ship when heavy machinery on the work ship is in operation during offshore construction. For example, Patent Document 1 describes a device that predicts the motion of the work ship from the current point in time and controls the rotation speed of the winch that raises and lowers the load based on the prediction result, thereby suppressing the motion of the load and improving work efficiency even if the work ship is swayed by waves. In addition, Patent Document 2 describes a device that detects the motion of the work ship, corrects the acceleration pattern applied to the trolley based on the detected motion, and automatically operates the trolley according to the corrected acceleration pattern in order to perform anti-sway control that takes into account the motion of the hull due to wind, waves, etc. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent Publication No. 2021-91529 [Patent Document 2] Japanese Patent Application Publication No. 10-329787 Summary of the Invention [Problem to be solved by the invention]

[0005] Incidentally, the motions that occur on a work ship include not only motions caused by external forces such as waves and wind, but also motions caused by work performed by heavy machinery installed on the work ship, such as the turning of a crane. It is necessary to operate the heavy machinery on the work ship while taking into consideration the motions that combine both of these, but such operation is difficult, and it is particularly difficult for inexperienced people to operate it appropriately. In addition, the technology described in Patent Document 1 predicts the motion waveform from the present time to the future using measurement data of past motion waveforms, but since the mode of motion caused by work differs depending on the work situation of marine construction using heavy machinery, it is not possible to properly predict the motions that occur on a work ship when performing different work from past measurement data. In addition, the technology described in Patent Document 2 does not consider motions caused by work, so it is not possible to perform corrections that take into account the influence of motions caused by work.

[0006] One aspect of the present invention has been made in consideration of the above problems, and aims to provide a technology that can generate operation instruction information for heavy machinery on a work ship for marine civil engineering work, taking into consideration the effects of motion caused by the operation of the heavy machinery on the work ship and motion caused by external forces such as waves and wind on the work ship. [Means for solving the problem]

[0007] In order to solve the above problem, an information output device according to one embodiment of the present invention includes an acquisition unit that acquires time series data representing the motion of a first work vessel carrying heavy machinery for performing offshore civil engineering work when the first work vessel is not performing the offshore civil engineering work, the time series data being measured by a measuring device attached to a predetermined position of the first work vessel for measuring the motion of the first work vessel, and a calculation unit that analyzes the time series data and calculates the motion characteristics of the first work vessel, and (i) information representing the specifications of a second work vessel carrying heavy machinery and time series data representing the motion of the second work vessel when not performing offshore civil engineering work, the time series data being measured by a measuring device attached to the second work vessel when not performing the offshore civil engineering work, and (ii) information representing the motion characteristics of the second work vessel when not performing the offshore civil engineering work, the time series data being measured by a measuring device attached to the second work vessel. The system comprises: a trained model generated by machine learning a correlation between a total oscillation, which is a combination of oscillations caused by external forces in the oscillations occurring on the second work vessel during marine civil engineering work by the heavy equipment on the second work vessel and oscillations caused by the heavy equipment due to the operation of the operator, and the operation content performed on the heavy equipment on the second work vessel, using time series data of an operator's operation of the heavy equipment on a second work vessel that represents the operation of the heavy equipment on the second work vessel when the heavy equipment on the second work vessel is performing marine civil engineering work; and a generation unit that generates operation instruction information for operating the heavy equipment on the first work vessel by inputting into the trained model information representing the oscillation characteristics of the first work vessel when not performing marine civil engineering work calculated by the calculation unit and the specifications of the first work vessel.

[0008] According to the above configuration, operation instruction information for heavy machinery on a work boat for offshore civil engineering work can be generated taking into account the effects of the motion caused on the work boat by the operation of the heavy machinery and the motion caused on the work boat by external forces such as waves and wind.

[0009] In the above information output device, the information representing the operation content may include a parameter included in a function that formulates the relationship between the operation instruction information given to the second work boat and time.

[0010] According to the above configuration, it is possible to generate operation instruction information that takes into account the influence of motions occurring on the work vessel, using a function identified by using a trained model that has been machine-learned to determine the correlation between motions caused by external forces on the work vessel and the parameters contained in the function.

[0011] In the above-mentioned information output device, the motion characteristics may include at least one of the motion amplitude, the motion period, and the phase difference of the work vessel. According to the above-mentioned configuration, it is possible to generate operation instruction information taking into consideration the effect of motion on the work vessel caused by the operation of the heavy machinery and the effect of motion on the work vessel caused by an external force.

[0012] In the above information output device, the trained model is a trained model that receives information regarding the specifications of the work boat and the motion characteristics of the work boat as input, and outputs parameters included in a function that represents the relationship between operation instruction information for heavy equipment on the work boat and time, and the generation unit may generate the operation instruction information using parameters obtained by inputting the motion characteristics calculated by the calculation unit and information regarding the specifications of the first work boat into the trained model.

[0013] According to the above configuration, operation instruction information can be generated using parameters output from the trained model.

[0014] In the above information output device, the learned model may further include time series data representing the motion of the second work vessel and operations of heavy equipment on the second work vessel as input data, and the generation unit may generate the operation instruction information using a learned model generated by machine learning using teacher data in which operation instruction information for the heavy equipment on the second work vessel by an experienced operator in response to the numerical value of the motion is output as input data.

[0015] According to the above configuration, operation instruction information suitable for the content of offshore civil engineering work performed by heavy equipment on a work vessel can be generated by generating operation instruction information using a learned model trained through machine learning using training data including data showing actual operations of heavy equipment on a work vessel performed by a skilled operator who is an experienced and highly skilled operator.

[0016] In the above information output device, the generation unit may compare operation instruction information generated by the generation unit for heavy equipment on a new work ship using the learned model with operation instruction information of an experienced operator for the heavy equipment on the new work ship, and use only information where the difference between the operation instruction information for the heavy equipment on the new work ship by the experienced operator and the operation instruction information generated by the generation unit for the heavy equipment on the new work ship is within a threshold value as training data for re-learning, and generate the operation instruction information using a re-learned model that has been re-learned on the learned model.

[0017] According to the above configuration, by re-learning the trained model using operation instruction information that removes abnormal values ​​due to operation errors in the operation instruction information of an experienced operator, it is possible to generate operation instruction information that is more suitable for operating heavy machinery that performs marine civil engineering work. In particular, it is possible to update the trained model to an optimal one that is tailored to each work vessel or each work site, for example.

[0018] In the above-mentioned information output device, the operation instruction information may include at least one of information for controlling the operations of heavy machinery, such as raising and lowering a suspended bucket or weight, opening and closing of the bucket, and information for controlling the speed, timing, and angle of rotation of a crane, which is heavy machinery suspending the weight or bucket, and the boom raising and lowering angle.

[0019] According to the above configuration, it is possible to generate operation instruction information for controlling a bucket, a weight, and / or a crane of heavy machinery used in offshore civil engineering work.

[0020] The information output device may further include a work control unit that causes the heavy equipment on the first work ship to perform marine civil engineering work using the operation instruction information generated by the generation unit instead of an operator. According to the above configuration, the heavy equipment on the work ship can be caused to perform marine civil engineering work without an operator operating the heavy equipment on the work ship.

[0021] In addition, the trained model generation device of the present invention includes an acquisition unit that acquires time series data representing the motion of a work vessel carrying heavy equipment performing offshore civil engineering work when the work vessel is not performing the offshore civil engineering work, the data being measured by a measuring device attached to a predetermined position on the work vessel that measures the motion of the work vessel, a calculation unit that analyzes the time series data and calculates the motion characteristics of the work vessel, and a generation unit that generates a trained model by machine learning the correlation between (i) information representing the specifications of the work vessel and the motion characteristics calculated by the calculation unit, and (ii) information representing the operation content performed on the heavy equipment on the work vessel.

[0022] By using the trained model generated by the above configuration, it is possible to generate operation instruction information for heavy machinery on a work boat for offshore civil engineering work that takes into account the effects of the motions caused to the work boat by the operation of the heavy machinery and the motions caused to the work boat by external forces such as waves and wind.

[0023] Further, a program according to the present invention is a program for causing a computer to function as the information output device, and is a program for causing a computer to function as the acquisition unit, the calculation unit, and the generation unit.

[0024] According to the above configuration, operation instruction information for heavy machinery on a work boat for offshore civil engineering work can be generated taking into account the effects of the motion caused on the work boat by the operation of the heavy machinery and the motion caused on the work boat by external forces such as waves and wind.

[0025] Furthermore, a program according to the present invention is a program for causing a computer to function as the trained model generation device, and is a program for causing a computer to function as the acquisition unit, the calculation unit, and the generation unit.

[0026] By using the trained model generated by the above configuration, it is possible to generate operation instruction information for heavy machinery on a work boat for offshore civil engineering work that takes into account the effects of the motions caused to the work boat by the operation of the heavy machinery and the motions caused to the work boat by external forces such as waves and wind.

[0027] In addition, the trained model of the present invention is a trained model generated by machine learning the correlation between (i) the motion characteristics of a work vessel obtained by analyzing time series data representing the motion of the work vessel when the work vessel is not performing offshore civil engineering work, measured by a measuring device attached to a predetermined position on the work vessel that measures the motion of the work vessel carrying heavy equipment performing offshore civil engineering work, and (ii) information representing the content of operations performed on the heavy equipment on the work vessel.

[0028] By using the trained model with the above configuration, it is possible to generate operation instruction information for heavy machinery on a work boat for offshore civil engineering work that takes into account the effects of the motions caused to the work boat by the operation of the heavy machinery and the motions caused to the work boat by external forces such as waves and wind.

[0029] The method for generating operation instruction information according to the present invention includes a first step of acquiring time series data representing the motion of a first work vessel carrying heavy machinery for performing offshore civil engineering work when the first work vessel is not performing the offshore civil engineering work, the time series data being measured by a measuring device attached to a predetermined position of the first work vessel for measuring the motion of the first work vessel; a second step of analyzing the time series data and calculating the motion characteristics of the first work vessel; (i) the motion characteristics of the second work vessel when not performing work, analyzed based on information representing the specifications of a second work vessel carrying heavy machinery and the time series data representing the motion of the second work vessel measured by a measuring device attached to the second work vessel when not performing the offshore civil engineering work; and (ii) a step of calculating the motion characteristics of the second work vessel when not performing the offshore civil engineering work, the second ... The information output device executes a third step of generating operation instruction information for operating the heavy equipment on the first work vessel by inputting information representing the motion characteristics of the first work vessel when not performing marine civil engineering work and the specifications of the first work vessel calculated in the second step into a learned model generated by machine learning the correlation between a total motion, which is a combination of motions caused by external forces in the motions occurring on the second work vessel during marine civil engineering work by the heavy equipment on the second work vessel and motions caused by the heavy equipment due to the operation of the operator, and the operation content performed on the heavy equipment on the second work vessel, using time series data of operator operations representing the motion of the heavy equipment when it is performing marine civil engineering work, and information representing the motion characteristics of the first work vessel when not performing marine civil engineering work and the specifications of the first work vessel calculated in the second step.

[0030] According to the above configuration, operation instruction information for heavy machinery on a work boat for offshore civil engineering work can be generated taking into account the effects of the motion caused on the work boat by the operation of the heavy machinery and the motion caused on the work boat by external forces such as waves and wind.

[0031] The information output device according to each aspect of the present invention may be realized by a computer. In this case, the control program for the information output device, which causes the computer to operate as each part (software element) of the information output device, thereby realizing the information output device on the computer, and the computer-readable recording medium on which the control program is recorded, also fall within the scope of the present invention.

[0032] In addition, the trained model generation device according to each aspect of the present invention may be realized by a computer. In this case, a control program for the trained model generation device that causes a computer to operate as each part (software element) of the trained model generation device to realize the trained model generation device on a computer, and a computer-readable recording medium on which the control program is recorded, also fall within the scope of the present invention. Effect of the Invention

[0033] According to one aspect of the present invention, operation instruction information for heavy machinery on a work boat for offshore civil engineering work can be generated that takes into account the effects of the motion caused to the work boat by the operation of the heavy machinery and the motion caused to the work boat by external forces such as waves and wind. [Brief description of the drawings]

[0034] [Figure 1] FIG. 1 is a diagram showing an example of a heavy machine for performing dredging work according to a first embodiment. [Diagram 2] FIG. 2 is a diagram showing an example of a heavy machine performing weight compaction work on a rubble mound according to the first embodiment. [Diagram 3] FIG. 13 is a diagram showing an example of the results of decomposing the motion of a work vessel. [Figure 4] FIG. 13 is a diagram showing an example of the results of decomposing the motion of a work vessel. [Diagram 5] FIG. 11 is a diagram showing an example of time-series data indicating the operation content of an operator. [Figure 6] FIG. 11 is a diagram showing an example of time-series data indicating the operation content of an operator. [Figure 7] FIG. 13 is a diagram showing a specific example of a function that approximates the operation content of an operator. [Figure 8] 2 is a diagram for explaining an outline of a process performed by the information output device 10. FIG. [Figure 9] 1 is a block diagram showing a functional configuration of an information output device according to a first embodiment. [Figure 10]FIG. 2 is a diagram showing an example of a flow of a dredging operation according to the first embodiment. [Figure 11] FIG. 2 is a diagram showing an example of a flow of weight compaction work for a rubble mound in the first embodiment. [Figure 12] FIG. 13 is a diagram showing an example of a change in bucket height over time during dredging work. [Figure 13] FIG. 11 is a diagram showing an example of a change over time in the rotation angle of a crane during dredging operation. [Figure 14] FIG. 11 is a diagram showing an example of a change in bucket opening degree over time during dredging work. [Figure 15] FIG. 13 is a diagram showing an example of a change over time in the hoisting angle of a crane during dredging operations. [Figure 16] FIG. 13 is a diagram showing an example of the change in the height of a weight over time during weight compaction work on a rubble mound. [Figure 17] 4 is a flowchart showing an example of the flow of an operation instruction information generating method according to the first embodiment. [Figure 18] FIG. 1 is a flow diagram showing an example of the flow of a trained model generation method according to the first embodiment. [Figure 19] FIG. 11 is a block diagram showing a functional configuration of an information output device according to a second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0035] [Embodiment 1] <1. Overview of the Present Embodiment> (1-1. Overview of offshore civil engineering works) The information output device according to this embodiment generates operation instruction information for autonomously operating heavy machinery on a work ship that performs marine civil engineering work. One example of the heavy machinery on the work ship is heavy machinery that performs civil engineering work such as leveling, riprap, and dredging. The operation instruction information is information for operating work tools such as weights, buckets, and clamshells in civil engineering work. One example of the work ship is a crane ship, which is equipped with a crane on the deck of a barge, and is equipped with any one of the following devices (1) to (3) suspended from a pair of lifting wires that are let out from the tip of the crane's jib. (1) A device for shaping the top and slope of an underwater mound using a weighted body (2) A device that uses a bucket or clamshell to dredge sediment from the bottom of a body of water. (3) A device that dumps crushed stone from a ship's hold onto the bottom of the water using a bucket or clamshell.

[0036] Here, a specific example of heavy equipment on a work ship will be described with reference to Figs. 1 and 2. Fig. 1 is a diagram showing an example of heavy equipment for dredging work. In Fig. 1, a crane ship W1 moored on the water surface S is a work ship equipped with heavy equipment for grab dredging, and a crane C12, which is a heavy equipment on the crane ship W1, is a crane equipped with a bucket B11 for dredging and a winch for raising and lowering the bucket B11. The crane C12 is equipped with a rotating part rotatably installed on a barge and a jib rotatably supported on the rotating part, and the bucket B11 is suspended from the tip of a hoisting wire that is reeled out from the tip of the jib. The operator of the crane C12 performs dredging work while adjusting the height of the bucket (the position in the Z-axis direction in the figure), the rotating angle of the crane, the opening degree of the bucket, and the like.

[0037] FIG. 2 is a diagram showing an example of a heavy machine performing weight compaction work on a rubble mound. In FIG. 2, the heavy machine on the crane ship W2 anchored on the water surface S is equipped with a weight B21 and a crane C22 that raises and lowers the weight B21. The crane C22 is equipped with a swivel unit rotatably installed on a barge and a jib rotatably supported on the swivel unit, and the weight B21 is suspended from the tip of a hoisting wire that is let out from the tip of the jib. In the weight compaction work on the rubble mound, the lower surface of the weight B21 supported by a pair of hoisting wires that are let out from the tip of the jib of the crane ship W2 is lowered toward the top surface of the water bottom mound by letting out the hoisting wire, thereby leveling the top surface of the mound. The operator of the crane C22 performs the weight compaction work on the rubble mound while adjusting the height of the weight B21 (the position in the Z-axis direction in the figure), the swivel angle of the crane C22, and the like.

[0038] (1-2. Explanation of work boat motion) The information output device according to this embodiment generates operation instruction information for operating the heavy equipment autonomously without an operator operating the heavy equipment. At this time, the information output device creates operation instruction information that takes into account the influence of the motion of the work boat. Here, the motion of the work boat will be explained with reference to the drawings. The motion of the work boat is broadly divided into motion caused by external forces such as waves, wind, and currents, and motion caused by work such as the rotation of the bucket. Hereinafter, motion caused by external forces will also be referred to as "motion caused by external forces". Moreover, motion caused by work will also be referred to as "motion caused by work".

[0039] While external force-induced motion has a peak near the natural period that is the ship's motion characteristics, work-induced motion depends on the raising and lowering of the bucket or weight, the opening and closing of the bucket, the rotation speed, timing of rotation, rotation angle, boom hoisting angle, etc. of the crane, which is the heavy equipment that suspends the weight or bucket, and generates a motion period that differs from the natural period that is the ship's motion characteristics. In other words, by acquiring ship motion data and performing a frequency spectrum analysis, it is possible to separate work-induced motion from external force-induced motion.

[0040] Figures 3 and 4 are diagrams showing an example of the results of decomposing the motion of a work boat into motion caused by external forces and motion caused by work using spectrum analysis. Motion of a work boat can be swaying, fore-aft motion, or up-down motion, and in the example of Figures 3 and 4, only swaying or fore-aft motion is measured. In Figures 3 and 4, the horizontal axis indicates elapsed time (seconds) and the vertical axis indicates motion angle (°). Figure 3 shows a motion waveform when motion caused by external forces is large, and Figure 4 shows a motion waveform when motion caused by external forces is small.

[0041] In Fig. 3, waveform w11 is a waveform representing the vibration caused by an external force, and waveform w12 is a waveform representing the vibration caused by the work. Waveform w13 is a waveform representing the vibration before disassembly, that is, a waveform obtained by combining waveforms w11 and w12. In other words, waveform w13 is a waveform representing a combination of vibration caused by an external force and vibration caused by the work.

[0042] 4, waveform w21 is a waveform representing the vibration caused by an external force, and waveform w22 is a waveform representing the vibration caused by the work. Waveform w23 is a waveform representing the vibration before disassembly, that is, a waveform obtained by combining waveforms w21 and w22. In other words, waveform w23 is a waveform representing a combination of vibration caused by an external force and vibration caused by the work.

[0043] In the example of FIG. 3, the waveform w11, which is an external force-induced motion, occurs periodically, while the waveform w12, which is a work-induced motion, occurs once between t=60 and 90. That is, during the period when periodic motions occur due to external forces such as waves and wind, the heavy equipment on the work vessel performs work such as turning the crane, causing the work-induced motion. On the other hand, in the example of FIG. 4, the waveform w21, which is an external force-induced motion, hardly occurs, while the waveform w22, which is a work-induced motion, occurs once between t=60 and 90. That is, during the period when periodic motions occur due to external forces such as waves and wind, the heavy equipment on the work vessel performs work such as turning the crane, causing the work-induced motion.

[0044] Fig. 5 is a diagram showing an example of time-series data representing the operation content of the operator when the rocking of the work boat has the waveform shown in Fig. 4, i.e., when the rocking caused by external forces is small. In Fig. 5, the broken line w24 represents the time-series data of the operation content of the operator. The broken line w24 represents the operation content when the operator performs a right turn operation and then a left turn operation. The function approximating the broken line w24 is also referred to as the "reference operating function" below.

[0045] On the other hand, Fig. 6 is a diagram showing an example of time-series data representing the operation contents of the operator when the rocking of the work boat has the waveform shown in Fig. 3, that is, when the rocking caused by an external force is large. In Fig. 6, the broken line w14 represents the time-series data of the operation contents of the operator. In the example of Fig. 6, similar to the example of Fig. 5, the operator performs a right turn operation and then a left turn operation. However, in the example of Fig. 6, taking into account the influence of the external force generated at times 60 to 80, the operator makes the turning angle (upward in the figure) in the right turn operation smaller than in the example of Fig. 5.

[0046] As shown in Figures 5 and 6, the operator operates the heavy machinery while taking into account the motion of the work vessel. In other words, the operator performs operations while taking into account both the motion caused by external forces and the motion caused by the work itself. The difference between the above-mentioned reference motion function and the broken line w14 in Figure 6 is the corrective motion of an experienced operator (an operator with long experience in operating heavy machinery and high proficiency) who takes into account the motion caused by external forces. Here, the civil engineering work in which the operation instruction information of the broken line w24 was measured and the civil engineering work in which the operation instruction information of the graph w14 was measured do not necessarily have to be performed at the same location, as long as they are similar works. Since the grab dredger repeats almost the same tasks, similar actions are measured even if the locations are different.

[0047] In this embodiment, the function approximation of the time change of the rotation angle of the crane is, for example, θ=a / [1+b*exp(t-t0)] Here, θ is the turning angle, t is the elapsed time, a is the maximum turning angle, b is a parameter related to the turning speed, and t0 is a parameter related to the start time of the turning operation (phase shift with respect to the motion behavior). FIG. 7 is a diagram showing a specific example of a function approximating the operation content of the operator. In FIG. 7, function 211 is an approximation function when the motion caused by the external force is small. On the other hand, function 212 is an approximation function when the motion caused by the external force is large. The parameters of function 211 in FIG. 7 are, for example, a=120, b=0.8, and t0=50 (s). In the case of function 211, quick operation is possible. On the other hand, the parameters of function 212 are, for example, a=120, b=0.5, and t0=55 (s). In the case of function 212, slow operation is performed. In addition, when the motion caused by the waves acting on the work boat is large, the turning start time is adjusted taking into account the wave period.

[0048] The external force-induced rocking that occurs on a work vessel varies depending on the situation at the time, and the work-induced rocking varies depending on the work content. The information output device according to this embodiment generates operation instruction information that takes into account both the external force-induced rocking and the work-induced rocking. The configuration and operation of the information output device are described below.

[0049] <2. Information output device> (2-1. Overview of information output device) FIG. 8 is a diagram for explaining an outline of the process performed by the information output device 10 according to the present embodiment. The information output device 10 includes a control unit 11 and a storage unit 12, and the control unit 11 includes an estimation phase execution unit 110 and a learning phase execution unit 150. The estimation phase execution unit 110 generates operation instruction information for autonomously operating heavy machinery performing offshore civil engineering work. The learning phase execution unit 150 constructs the learned model LM1 used to generate the operation instruction information by machine learning using training data including operation instruction information of an operator in offshore civil engineering work actually performed in the past. Note that the training data is preferably operation instruction information of an experienced operator. In the following, for convenience of explanation, one or more work ships equipped with heavy machinery to be autonomously operated (i.e., to be controlled) in the estimation phase are referred to as "first work ships". Also, one or more work ships equipped with the same type of heavy machinery used to measure various data included in the training data are referred to as "second work ships". The first work ship and the second work ship may be the same work ship or may be different work ships. That is, the work ship equipped with the same type of heavy equipment used to measure the various data included in the training data may be a work ship equipped with heavy equipment to be operated autonomously (subject to control). Also, each of the first work ship and the second work ship may be a single work ship or may include multiple work ships. That is, training data including various data measured for each of the heavy equipment mounted on the multiple work ships may be used to train the trained model LM1.

[0050] As described above, the motions of a work ship are broadly divided into motions caused by work and motions caused by external forces. Motions caused by external forces vary depending on the work environment (waves, wind, tides) of marine civil engineering work. On the other hand, motions caused by work are considered to be almost the same for the same work. Therefore, in this embodiment, attention is paid to motions caused by external forces among the motions of a work ship equipped with heavy machinery performing marine civil engineering work, and operation instruction information for autonomously operating the heavy machinery on the work ship is generated using a trained model LM1 that has been pre-trained on (a) motions caused by external forces and (b) the operation content of the operator.

[0051] The information output device 10 according to the present embodiment mainly executes the data collection process T1, the advance learning process T2, the parameter determination process T3, and the operation instruction information generation process T4 (not shown) shown in FIG. 8. In the data collection process T1, the information output device 10 collects operation data indicating the operation contents performed by the operator on the heavy equipment on the second work ship that performed the marine civil engineering work, and the vibration data indicating the vibration at that time. In the advance learning process T2, the information output device 10 performs machine learning to obtain the correlation between the vibration caused by the external force and the parameters of the function representing the operation contents of the operator, thereby generating the learned model LM1. In the parameter determination process T3, the information output device 10 inputs the vibration caused by the external force occurring on the first work ship, which is the control target, into the learned model LM1, thereby determining the parameters of the function used to generate the operation instruction information. In the operation information generation process T4, the information output device 10 generates the operation instruction information for operating the heavy equipment on the first work ship using the function determined by the determined parameters.

[0052] (2-2. Configuration of information output device) FIG. 9 is a block diagram showing a functional configuration of an information output device 10 according to this embodiment. The information output device 10 is an example of an information output device and an example of a trained model generation device according to the present specification. The information output device 10 includes a control unit 11, a storage unit 12, a communication IF 13, and an input / output IF 14. The control unit 11 includes an estimation phase execution unit 110 and a learning phase execution unit 150. The estimation phase execution unit 110 includes a first acquisition unit 111, a first calculation unit 112, a generation unit 113, and an output unit 114. The learning phase execution unit 150 includes a second acquisition unit 151, a training data calculation unit 153, a second calculation unit 152, and a model generation unit 154.

[0053] (2-2-1. Configuration related to the estimation phase) The estimation phase execution unit 110 generates operation instruction information for autonomously operating the heavy equipment on the first work ship. The first acquisition unit 111 acquires time series data representing the motion of the first work ship measured by the measurement device 20 when the heavy equipment on the first work ship is not performing offshore civil engineering work. Here, the state in which the heavy equipment on the first work ship is not performing offshore civil engineering work is, for example, a state immediately before the heavy equipment starts offshore civil engineering work or a state during a lunch break.

[0054] The measuring device 20 is attached to a predetermined position of the first work boat, and is a device that measures the motion of the first work boat. The position where the measuring device 20 is attached may be, for example, the stern, bow, or center of the hull of the first work boat. As an example, the measuring device 20 has an inclinometer that can measure at least two axes, roll and pitch. The measuring device 20 is connected to the communication IF 13 wirelessly or by wire, and the first acquisition unit 111 acquires time series data from the measuring device 20 via the communication IF 13. However, the first acquisition unit 111 may acquire time series data from a measuring device connected to the input / output IF 14.

[0055] The first calculation unit 112 analyzes the time-series data acquired by the first acquisition unit 111, and calculates the motion characteristics of the first work vessel. Here, the motion characteristics include, for example, at least one of the motion amplitude, motion period, and phase difference of the first work vessel.

[0056] The generation unit 113 generates operation instruction information for operating the heavy equipment on the first work boat based on information obtained by inputting the motion characteristics calculated by the first calculation unit 112 and information representing the specifications of the first work boat into the learned model LM1. In other words, the generation unit 113 generates operation instruction information for operating the heavy equipment on the first work boat by inputting the motion characteristics of the first work boat in a state in which marine civil engineering work is not being performed and information representing the specifications of the first work boat calculated by the first calculation unit 112 into the learned model LM1. The generation process of the operation instruction information performed by the generation unit 113 and the learned model LM1 will be described later.

[0057] The operation instruction information includes, for example, at least one of information that controls the operation of the heavy machinery, such as raising and lowering a suspended bucket or weight, opening and closing the bucket, the speed, timing, and angle of the rotation of a crane, which is a heavy machinery that suspends the weight or bucket, and the boom raising and lowering angle. Also, the information that indicates the specifications of the work boat is, for example, information that indicates the size, weight, shape, type, etc. of the work boat.

[0058] The output unit 114 outputs the operation instruction information generated by the generation unit 113. As an example, the output unit 114 outputs the operation instruction information to an output device connected to the input / output IF 14, such as a display (not shown) or a portable terminal. The output unit 114 may also output the operation instruction information to another device connected to the communication IF 13, or may output the operation instruction information by writing it in a predetermined storage area of ​​the storage unit 12.

[0059] Furthermore, the output unit 114 may control the rotation of the crane and the raising / lowering, opening / closing, etc. of the bucket by outputting the operation instruction information generated by the generation unit 113 to a crane control device that controls the operation of the crane and bucket. In other words, as an example, the output unit 114 causes the heavy machinery on the first work vessel to perform marine civil engineering work using the operation instruction information generated by the generation unit 113, instead of an operator. The output unit 114 is an example of a work control unit according to this specification.

[0060] (2-2-2. Structure related to the learning phase) Next, a description will be given of the configuration of the learning phase execution unit 150 related to the learning phase. The learning phase execution unit 150 generates training data TD from data collected during civil engineering work actually performed in the past, and generates a trained model LM1 by machine learning using the training data TD.

[0061] The second acquisition unit 151 acquires time series data representing the motion of the second work vessel measured in the past by a measuring device (hereinafter referred to as "second measuring device 20-2") attached to a predetermined position on the second work vessel when the second work vessel is not performing offshore civil engineering work. Here, the state when the second work vessel is not performing offshore civil engineering work is, for example, a state immediately before heavy equipment on the second work vessel starts offshore civil engineering work or a state during a lunch break.

[0062] The second acquisition unit 151 also acquires time series data representing the operation contents of the operator when the heavy equipment of the second work ship actually performed marine civil engineering work in the past. The time series data representing the motion of the second work ship measured by the second measuring device 20-2 in the past and the time series data representing the operation contents of the operator are recorded in the storage unit 12 as a work log WL. The second acquisition unit 151 acquires these time series data by reading the work log WL ​​from the storage unit 12. The second acquisition unit 151 may acquire data input by an input device connected to the input / output IF 14, or may receive data transmitted by another device connected via the communication IF 13. An input device and / or an output device that are computer-readable recording media may be connected to the input / output IF 14, and examples of the input / output device include an optical disk such as a USB or a CD-ROM (Compact Disc ROM) or a magnetic disk. The input device is a device operated by an operator, and includes, for example, a touch panel, a keyboard, a mouse, a scanner, and / or a microphone.

[0063] Furthermore, the second acquisition unit 151 acquires information representing the specifications of the second work boat. The information representing the specifications of the second work boat is recorded in the memory unit 12 as a work log WL, and the second acquisition unit 151 acquires the information representing the specifications of the second work boat from the memory unit 12. Note that the second acquisition unit 151 may acquire information input by an input device connected to the input / output IF 14 or information recorded in an input / output device connected to the input / output IF 14, and may also receive information transmitted by another device connected via the communication IF 13.

[0064] The training data calculation unit 153 generates training data including one or more sets of information indicating the specifications of the second work boat and the motion characteristics of the second work boat calculated by the second calculation unit 152, and the parameters Pt determined by the training data calculation unit 153. The parameters Pt are parameters included in a function that approximates time-series data representing the operator's past operations. As an example, the function including the parameters Pt includes at least one of a sigmoid function, a tanh function, and an exponential function. However, the function including the parameters Pt is not limited to these and may be another function. The parameters Pt are included in the training data TD of the learned model LM1.

[0065] The second calculation unit 152 analyzes the time series data representing the motion of the second work vessel acquired by the second acquisition unit 151, and calculates the motion characteristics of the second work vessel. The motion characteristics include, for example, at least one of the motion amplitude, motion period, and phase difference of the second work vessel. The motion characteristics of the second work vessel calculated by the second calculation unit 152 are included in the training data TD.

[0066] The model generation unit 154 generates a learned model LM1 by machine learning using the training data TD. Here, the training data TD includes information representing the specifications of the second work vessel, the motion characteristics calculated by the second calculation unit 152, and the parameters Pt determined by the training data calculation unit 153. The parameters Pt are an example of information representing the operation content performed on the second work vessel. In other words, the model generation unit 154 generates a learned model LM1 by machine learning the correlation between the information representing the specifications of the second work vessel and the motion characteristics calculated by the second calculation unit 152, and the information representing the operation content performed on the second work vessel.

[0067] (Pre-trained model) The trained model LM1 is a trained model generated by machine learning the correlation between the total vibration, which is a combination of vibrations caused by external forces in the vibrations caused by the heavy equipment on the second work vessel during the marine civil engineering work by the heavy equipment on the second work vessel and vibrations caused by the heavy equipment due to the operation of the operator, and the operation content performed on the heavy equipment on the second work vessel, using (i) the vibration characteristics of the second work vessel when the vessel is not working, analyzed based on the information representing the specifications of the second work vessel and the time series data representing the vibrations of the second work vessel measured by the second measuring device 20-2 when the vessel is not working, and (ii) the time series data representing the operation of the heavy equipment on the second work vessel when the heavy equipment on the second work vessel is working on the marine civil engineering work, and the operation content performed on the heavy equipment on the second work vessel. As a machine learning method for the trained model LM1, for example, any of linear regression, nonlinear regression, decision tree method, support vector machine, and neural network is used. As the neural network, for example, a convolutional neural network or a recurrent neural network method may be used. However, the machine learning method of the trained model LM1 is not limited to the above example, and other methods may be used.

[0068] (Input data) The input data of the trained model LM1 in the estimation phase includes, as an example, the motion characteristics of the first work vessel calculated by the first calculation unit 112 and information representing the specifications of the first work vessel. However, the input data is not limited to these and may include other data. For example, the input data may include other information representing the work environment of the marine civil engineering work. More specifically, the input data may include information indicating at least one of the water depth, tide level, ground conditions, excavation depth, rubble mound height, external force conditions, bucket capacity, and weight of a weight in the work environment. The external force conditions include wave height, period, wave direction, wind speed, wind direction, etc. Furthermore, as an example, the input data may include information indicating the type of marine civil engineering work performed by the heavy equipment on the first work vessel.

[0069] (Output data) The output data of the trained model LM1 in the estimation phase includes, as an example, information representing the operation content of the first work boat. The information representing the operation content includes, as an example, a parameter P that defines a function used to generate operation instruction information. In this case, the trained model LM1 can be said to be a trained model LM1 that receives information regarding the specifications of the first work boat and the rolling characteristics of the first work boat as input, and outputs a parameter P included in a function that represents the relationship between operation instruction information for the heavy equipment on the first work boat and time. However, the output data is not limited to the above example, and may include other data.

[0070] (Parameter) The parameter P is, for example, a parameter that defines an S-shaped or inverse S-shaped function. Here, the S-shaped or inverse S-shaped function is, for example, a function that includes at least one of a sigmoid function, a tanh function, and an exponential function. The above function may be, for example, a function expressed by superimposing a polynomial function, a Sin function, a Cos function, or the like. The function used to generate the operation instruction information is, for example, a function that represents the relationship between information indicating at least one of the height of the bucket or weight, the opening degree of the bucket, and the swing angle of the crane, and time. However, the function is not limited to the above example, and may be another function that represents a temporal change in the operating amount of the work tool that performs civil engineering work. The parameter P is a parameter included in a function that formulates the relationship between the operation instruction information given to the second work vessel and time. The parameter P is an example of information that represents the operation content performed on the second work vessel.

[0071] Examples of parameters P of the function used in dredging work include parameters indicating the start time of each process included in the dredging work (start timing of each process), parameters related to the bucket movement speed, etc. Also, examples of parameters P of the function used in the weight compaction work of the riprap mound include parameters indicating the start time of each process included in the work (start timing of each process), parameters related to the weight movement speed, etc. However, the parameters included in parameters P are not limited to the above examples.

[0072] (Training data) The training data TD in the learning phase of the learned model LM1 includes one or more sets of (a) information representing the specifications of the second work boat, (b) the motion characteristics of the second work boat measured when the heavy equipment on the second work boat is not performing marine civil engineering work, and (c) information representing the operation content performed on the second work boat. Here, (a) the information representing the specifications of the second work boat and (b) the motion characteristics of the second work boat are information included in the work log WL. In addition, (b) the motion characteristics of the second work boat are motion characteristics calculated by the second calculation unit 152 using time series data representing the motion of the second work boat measured by the second measuring device 20-2.

[0073] Moreover, (c) the information representing the operation content performed on the second work boat includes, as an example, a parameter Pt that defines an S-shaped or inverse S-shaped function that represents the relationship between the operation content performed on the heavy equipment on the second work boat that performed the marine civil engineering work and time. In other words, the parameter Pt is a parameter obtained by functionally approximating the temporal change in the operation content of the heavy equipment when the civil engineering work was actually performed in the past. However, the information representing the operation content performed on the second work boat is not limited to the above example, and may be other information. The information representing the operation content may be, for example, identification information indicating one of a plurality of functions prepared in advance as functions to be used in generating operation instruction information.

[0074] The training data TD is not limited to the above-mentioned example, and the training data may include other data. For example, the training data may include other information that represents the work environment of the marine civil engineering work, and may include information that represents the type of marine civil engineering work performed by the heavy equipment on the second work vessel.

[0075] In addition, the training data may include, as an example, operational instruction information for the heavy equipment on the second work vessel and the operation of the heavy equipment when the heavy equipment is performing offshore civil engineering work, and time series data representing the motion of the second work vessel measured by a second measuring device 20-2 attached to the second work vessel.

[0076] (2-3. Memory section, communication interface, input / output interface) The storage unit 12 stores various data necessary for the processing executed by the information output device 10. In particular, the storage unit 12 stores the work log WL, the parameters P, the training data TD, and the learned model LM1.

[0077] The work log WL ​​is data showing the history of past civil engineering work, and includes time-series data showing the operation contents performed in the past on heavy machinery on a work ship. The parameter P is a parameter included in an S-shaped or inverse S-shaped function used when the information output device 10 generates operation instruction information. The function including the parameter P includes at least one of a sigmoid function, a tanh function, and an exponential function. The training data TD is training data used for machine learning of the trained model LM1. Note that the trained model LM1 being stored in the storage unit 12 means that parameters defining the trained model LM1 are stored in the storage unit 12. In addition, the trained model LM1 may be stored in a storage device other than the storage unit 12 (e.g., an external server, etc.).

[0078] The communication IF13 is an interface for communicating with other computers. The communication IF13 may include an interface for communicating with other computers without a network, such as a Bluetooth (registered trademark) interface. The communication IF13 may also include an interface for communicating with other computers via a LAN (Local Area Network), such as a Wi-Fi (registered trademark) interface. An input device and / or an output device are connected to the input / output IF14. An example of the input / output IF14 is a USB.

[0079] <3. Dredging work flow> Before describing the process of generating operation instruction information performed by the information output device 10, a specific example of civil engineering work performed by heavy machinery on a work ship and a specific example of a function used to generate the operation instruction information will be described. Here, dredging work and weight compaction work for a riprap mound will be described as specific examples of civil engineering work performed by heavy machinery on a work ship. In dredging work, the lifting and lowering, horizontal movement, opening and closing, etc. of a bucket are controlled by the operator.

[0080] Fig. 10 is a diagram showing an example of the flow of dredging work. In dredging work, a series of actions is repeated: the bucket of a heavy machine is lowered from the water surface S toward the bottom of the water, excavation is performed, the bucket is turned, and the soil is discharged. In the example of Fig. 10, the dredging work includes a bucket lowering step S1, an excavation step S2, a bucket raising step S3, a bucket turning step S4, a soil discharge step S5 onto a soil transport barge, and a bucket turning step S6.

[0081] In the bucket lowering step S1, the bucket is lowered toward the seabed in an open state. In the excavation step S2, the bucket opening degree is controlled to excavate the seabed surface. In the bucket raising step S3, the bucket is raised above the water surface S in a closed state. In the bucket rotating step S4, the bucket is rotated in a closed state. In the soil discharging step S5 onto the soil ship, the bucket is lowered, opened to discharge soil, and raised in an open state. In the bucket rotating step S6, the bucket B11 is rotated in an open state. In this way, in the grab dredging operation, the bucket is lowered (open state), closed, raised (closed state), rotated (closed state), lowered (closed state), opened, raised (open state), and rotated (open state) in this order. The dredging operation is performed by repeatedly executing these steps.

[0082] The lifting, swinging, and opening / closing operations of the bucket may be performed in parallel. For example, the bucket lifting step S3 and the bucket swinging step S4 may be performed in parallel, or the bucket swinging step S6 and the bucket lowering step S1 may be performed in parallel.

[0083] <4. Flow of work for compacting rubble mounds with weights> Fig. 11 is a diagram showing an example of the flow of weight compaction work on a riprap mound. In weight compaction work on a riprap mound, the lifting and lowering, horizontal movement, falling (compaction), etc. of the weight are controlled by the operation of an operator. In the example of Fig. 11, the weight compaction work on a riprap mound includes a rotation process S21, a lowering process S22, a lifting process S23, a compaction process S24, and a lifting and moving process S25.

[0084] In the rotation process S21, the crane is rotated and the weight is set at the target position in the horizontal direction and at a specified height from the water surface. In the lowering process S22, the weight is lowered and allowed to hit the bottom to check the depth. In the ascent process S23, the weight is raised and raised again to the target height. In the compaction process S24, the weight is dropped from a specified height to strike the top surface, and the impact energy is used to compact the top surface of the riprap mound. After the compaction process S24 and the ascent process S23 have been performed a specified number of times, in the raising and moving process S25, the weight is raised and the crane is rotated to set it at the next compaction position.

[0085] <5. Specific function expressions> Next, a specific example of a functional expression expressing the operation contents for each of the dredging operation and the riprap mound weight compaction operation will be described. As an example, the operation instruction information is expressed by the following sigmoid function.

number

[0086] (5-1. In case of dredging work) As described above, dredging work is performed in a cycle of excavating the seabed, lifting the bucket, rotating the bucket, discharging soil onto the soil barge, rotating the bucket, lowering the bucket, excavating the seabed, etc. In this case, (i) the bucket height, (ii) the crane's rotation angle, (iii) the bucket opening and closing degree, and (iv) the crane's elevation are each expressed by a sigmoid function.

[0087] (5-1-1. Bucket height) FIG. 12 is a diagram showing an example of a change in bucket height over time during dredging work. In the example of FIG. 12, the horizontal axis indicates elapsed time (seconds), and the vertical axis indicates bucket height (m). In the example of FIG. 12, the dredging work is divided into five steps, namely (a) an excavation step S2, (b) a bucket raising step S3, (c) a soil releasing step S5_1, (d) a soil releasing step S5_2, and (e) a bucket lowering step S1, for the bucket height, and a sigmoid function is determined for each operation. In the example of FIG. 6, the soil releasing step S5 (see FIG. 4) is divided into a soil releasing step S5_1 and a soil releasing step S5_2. A specific example of the sigmoid function for each operation (a) to (e) will be described.

[0088] (a) Excavation process S2 First, the height H (m) of the bucket in the excavation process S2 is expressed by the following function, for example.

number

[0089] (b) Bucket rising process S3 Moreover, the height H(m) of the bucket in the bucket raising step S3 is expressed by the following function, for example.

number

[0090] (c) Soil release process onto a soil transport ship S5_1 Moreover, the height H(m) of the bucket in the soil releasing process S5_1 onto the soil barge is expressed by the following function, for example.

number

[0091] (d) Soil release process S5_2 Moreover, the height H (m) of the bucket from the altitude reference plane in the soil releasing process S5_2 is expressed by the following function, for example.

number

[0092] (e) Bucket lowering process S1 Moreover, the height H (m) of the bucket from the altitude reference plane in the bucket lowering process S1 is expressed by the following function, for example.

number

[0093] Although a specific example of the function representing the bucket height has been described, the function representing the bucket height is not limited to the above example and may be another function. For example, in the bucket lowering process S1, considering the difference in resistance value between air and water, the parameters may be different between the air portion and the underwater portion, and the bucket height may be expressed by different functions. The same is true for the bucket ascent process S3, where the parameters may be different between the air portion and the underwater portion, and the bucket height may be expressed by different functions.

[0094] (5-1-2. Crane rotation angle) Next, a specific example of a function representing the crane's swing angle will be described. Fig. 13 is a diagram showing an example of the change over time in the swing angle of the crane during dredging work. In the example of Fig. 13, the horizontal axis indicates elapsed time (seconds) and the vertical axis indicates the swing angle (°). In the example of Fig. 13, functions are determined for the swing angle of the crane at each of (f) swing process S4 (when releasing soil onto the soil transport barge) and (g) swing process S6 (when lowering the bucket).

[0095] (f) Turning process S4 First, the rotation angle θ (°) of the crane in the rotation process S4 is expressed by the following function, for example.

number

[0096] (g) Turning process S6 Moreover, the rotation angle θ (°) of the crane in the rotation process S6 is expressed by the following function, for example.

number

[0097] (5-1-3. Bucket opening) Next, a specific example of a function representing the bucket opening degree will be described. FIG. 14 is a diagram showing an example of a change in the bucket opening degree over time in dredging work. In the example of FIG. 14, the horizontal axis indicates elapsed time (seconds), and the vertical axis indicates the opening degree (%). The dredging bucket is closed (closing step S31) in the excavation step S2 to the bucket lifting step S3 shown in FIG. 10 described above, and then opens to release soil in the soil releasing step S5 (opening step S32), opens again (opening step S33) in the bucket lowering step S1, and closes again (closing step S31) in the excavation step S2. In the example of FIG. 14, a function is determined for the bucket opening degree for each of (h) the closing step S31 (excavation step S2 to the bucket lifting step S3), (i) the opening step S32 (soil releasing step S5), and (j) the opening step S33 (bucket lowering step S1).

[0098] (h) Closing process S31 First, the opening degree R (%) of the bucket in the closing step S31 is expressed by the following function, for example.

number

[0099] (i) Opening process S32 Moreover, the bucket opening rate R (%) in the opening step S32 (the step S5 of releasing soil onto the soil barge) is expressed by the following function, for example.

number

[0100] Here, R1 is the opening degree (%) at the end of the closing process S31, M2 is the maximum opening degree (%) at the time of releasing soil to the soil ship, c2 is a parameter related to the opening speed (m / s), and t c2 is a parameter related to the start time (s) of the shedding process S32. The above parameters are, for example, R1=0.0, M2=15, C2=3.0, t c2 Each of these parameters is obtained by functional approximation of the actual operation contents by a skilled operator. The parameters M2, c2, and t c2 are parameters that are set separately, and if each parameter can be set appropriately, the change in mouth opening degree R over time can be appropriately expressed.

[0101] (j) Opening process S33 Moreover, the bucket opening rate R (%) in the opening step S33 is expressed by the following function, for example.

number

[0102] (5-1-2. Crane hoisting angle) Next, a specific example of a function that represents the hoisting angle of a crane, which is a heavy machine that suspends a weight or bucket, will be described. Fig. 15 is a diagram showing an example of the change over time in the hoisting angle of a crane during dredging work. In the example of Fig. 15, the horizontal axis represents elapsed time (seconds) and the vertical axis represents the hoisting angle (°). In the example of Fig. 15, functions are determined for the hoisting angle of the crane at each of (k) the lowering process S4' (when releasing soil onto the soil transport barge) and (l) the raising process S6' (when lowering the bucket).

[0103] (k) Laying down process S4' First, the hoisting angle θ′ (°) of the crane in the lowering step S4′ is expressed by the following function, for example.

number

[0104] (l) Raising process S6' Moreover, the hoisting angle θ′ (°) of the crane in the raising step S6′ is expressed, for example, by the following function.

number

[0105] (5-1-4. Parameters to be determined) In the above function representation, D 1a , D 1b , ~D5, t1~t5, a1~a5, K1~K2, K1'~K2', t b1 ~t b2 , t b1 '~t b2 ', b1~b2, b1'~b2', M1~M3, t c1 ~t c3 By setting each of the parameters c1 to c3, it is possible to generate operation instruction information for autonomously operating the work boat according to the rules defined by the functions. Each parameter can be obtained, for example, by performing function approximation on time-series data that represents the operation content of an operator skilled in operating heavy machinery.

[0106] (5-1-5. When performing multiple actions in parallel) As described above, the crane hoisting operation, the bucket height operation, the crane slewing operation, and / or the bucket opening and closing operation may be performed in parallel. For example, in the example of Figs. 12 to 14, the bucket lifting and lowering operation, the crane slewing operation, and the bucket opening operation are performed in parallel between 65 and 80 seconds in order to release soil to the soil transport barge. At each time, each operation is operated so as to match the operation value shown in the graph (or so as to reduce the difference). As a result of adding up each operation, multiple operations performed in parallel, such as the crane slewing while lowering the bucket, can be expressed by a function. Note that the crane hoisting operation mainly occurs at the start of work for the day, but is not an operation that occurs all the time, so this function is used as necessary.

[0107] (5-2. Compaction of rubble mounds using weights) Next, we will explain the functions that represent the operation contents in the weight compaction work of the rubble mound. The operation of raising and lowering the weight and the operation of the crane turning in the weight compaction work of the rubble mound can be expressed by functions in the same way as the operation in the dredging work described above. In addition, the release of the weight, that is, the controlled drop, can also be expressed by a function.

[0108] (5-2-1. Height of weight) Fig. 16 is a diagram showing an example of the change in the height of the weight over time in weight compaction work on a rubble mound. In the example of Fig. 16, the horizontal axis indicates the elapsed time (seconds) and the vertical axis indicates the height of the weight. In the example of Fig. 16, the height H (m) of the weight in the compaction process S24 in which the weight is dropped in a controlled manner is expressed by a sigmoid function. The height H (m) of the weight in the descent process S22 is expressed by the following function, for example.

number

[0109] <6. Flow of operation instruction information generation method> 17 is a flow diagram showing an example of the flow of an operation instruction information generating method executed by the information output device 10. In step M11, the information output device 10 determines whether to start civil engineering work using heavy machinery on the first work boat. For example, the information output device 10 determines that work should be started when an operator inputs operation instruction information to start work. If civil engineering work should be started (step M11; YES), the information output device 10 proceeds to the process of step M12. On the other hand, if civil engineering work should not be started (step M11; NO), the information output device 10 waits until work starts.

[0110] In step M12, the first acquisition unit 111 acquires time series data representing the motion of the first work vessel measured by the measuring device 20 in a state in which the heavy equipment on the first work vessel has not yet started marine civil engineering work. In other words, the first acquisition unit 111 acquires time series data representing the motion of the first work vessel in a state in which the first work vessel is not performing marine civil engineering work. Step M12 is an example of the first step according to this specification.

[0111] In step M13, the first calculation unit 112 analyzes the time series data acquired by the first acquisition unit 111 and calculates the motion characteristics of the first work vessel. Step M13 is an example of the second step related to this specification. In step M14, the generation unit 113 determines a parameter P obtained by inputting the motion characteristics of the first work vessel calculated by the first calculation unit 112 and information representing the specifications of the first work vessel into the trained model LM1.

[0112] For example, in the case of dredging work, the generation unit 113 determines the following parameters (a) to (k) for each process shown in FIG. (a) Parameters of the function representing the bucket height in the excavation process S2 (b) Parameter of the function representing the bucket height in the rising process S3 (c) Parameter of the function representing the bucket height in the soil discharge process S5_1 (d) Parameter of the function representing the bucket height in the soil discharge process S5_2 (e) Parameter of the function representing the height of the bucket in the descending process S1 (f) Parameter of the function representing the rotation angle of the crane in the rotation process S4 (g) Parameter of the function representing the rotation angle of the crane in the rotation process S6 (h) Parameter of a function representing the opening degree of the bucket in the closing process S31 (j) A parameter of a function representing the opening degree of the bucket in the opening step S32 (k) A parameter of a function representing the opening degree of the bucket in the opening step S33

[0113] Furthermore, for example, in the case of weight compaction work on a rubble mound, the generating unit 113 determines the parameter of a function that represents the height of the weight. However, the parameter P determined by the generating unit 113 is not limited to the above-mentioned example, and the generating unit 113 may determine the parameter of another function that represents the operating amount of a work tool used in civil engineering work.

[0114] In step M15, the generation unit 113 generates operation instruction information for autonomously operating the heavy machinery on the work boat using a function determined by the parameter P determined in step M14. In other words, the generation unit 113 generates operation instruction information using parameters obtained by inputting the motion characteristics calculated by the first calculation unit 112 and information related to the specifications of the first work boat into the trained model LM1.

[0115] At this time, the generating unit 113 generates operation instruction information for each operation using a function corresponding to each of a plurality of operations of the heavy equipment in civil engineering work. For example, in step M13, the generating unit 113 calculates three pieces of operation instruction information, (i) the height H of the bucket, (ii) the swing angle θ of the crane, and (iii) the opening degree R of the bucket, using different functions. The lifting and lowering of the bucket is controlled based on the calculated height H of the bucket. Also, the swing of the crane is controlled based on the calculated swing angle θ of the crane. Also, the opening and closing of the bucket is controlled based on the calculated opening degree R of the bucket. In this way, the operation instruction information generated by the generating unit 113 includes the height H of the bucket, the swing angle θ of the crane, the opening degree R of the bucket, and the like. Also, the operation instruction information generated by the generating unit 113 includes the operation instruction timing specified by the parameter P output by the trained model LM1.

[0116] In step M16, the output unit 114 outputs the operation instruction information generated in step M13. Step M16 is an example of a third step according to the present specification. As an example, the output unit 114 outputs the operation instruction information generated in step M13 to a control device that controls the heavy machinery, thereby causing the heavy machinery on the work vessel to perform marine civil engineering work. At this time, the lifting and lowering of the bucket, the rotation of the crane, and the opening and closing of the bucket may be controlled in sequence or in parallel.

[0117] Moreover, the output unit 114 may output operation instruction information to an output device connected to the input / output IF 14 or the communication IF 13. Here, the output device includes, for example, a display, a projector, a printing device, a portable terminal, and / or a speaker. As an example, the output unit 114 may display the calculation results of (i) the height H of the bucket, (ii) the rotation angle θ of the crane, and (iii) the opening degree R of the bucket side by side on a display device, or may give voice instructions from a speaker. This display allows the operator to understand the amount of operation to be performed at each time. As described above, the lifting and lowering of the bucket, the rotation of the crane, and the opening and closing of the bucket are not limited to being operated individually, but may be operated in parallel.

[0118] In step M17, the information output device 10 determines whether to end the work. For example, the information output device 10 may determine that the work is to be ended when the condition of the seabed, which is the target of the civil engineering work, satisfies a predetermined condition. In addition, the number of times to perform the excavation process S2, which is the main process, in the civil engineering work, may be set at the beginning. Other processes such as the bucket lowering process S1, the bucket raising process S3, and the bucket rotating process S4 are linked to the set number of times of the excavation process S2 and are performed the required number of times. If the civil engineering work is to be ended (step M15; YES), the information output device 10 ends the processing. On the other hand, if the civil engineering work is to be continued (step M15; NO), the information output device 10 returns to the processing of step M12.

[0119] In this way, when one cycle (steps M12 to M16) of civil engineering work is completed and the next civil engineering work is started, the generation unit 113 again determines the parameters of each function (parameters related to the maximum excavation depth, excavation speed, excavation start time, etc.) in step M12.

[0120] <7. Flow of trained model generation method> Next, a method for generating the trained model LM1 will be described with reference to the drawings. Fig. 17 is a flow diagram showing an example of the flow of the trained model generating method executed by the information output device 10.

[0121] In step M31, the second acquisition unit 151 acquires time series data representing the motion of the second work vessel, which is equipped with heavy machinery that has previously performed offshore civil engineering work, measured immediately before the second work vessel starts the offshore civil engineering work. As an example, the second acquisition unit 151 acquires the time series data included in the work log WL ​​stored in the memory unit 12.

[0122] In step M32, the second calculation unit 152 calculates the motion characteristics of the second work vessel using the time-series data acquired in step M31. The method by which the second calculation unit 152 calculates the motion characteristics is similar to the method by which the first calculation unit 112 calculates the motion characteristics described above.

[0123] In step M33, the training data calculation unit 153 generates training data including one or more sets of information indicating the specifications of the second work vessel and the motion characteristics of the second work vessel calculated by the second calculation unit 152, and the parameter PT determined by the training data calculation unit 153. The parameter PT in the training data calculation unit 153 is generally an appropriate parameter when approximating the time-series data included in the work log WL ​​with a function, and is determined by trial and error consideration while widely varying the parameter. However, the method is not limited to this.

[0124] Also, the training data calculation unit 153 may determine the parameter Pt from the time series data included in the work log WL. More specifically, the training data calculation unit 153 may determine the parameter Pt by a learning method such as linear regression, a decision tree method, a support vector machine, or a neural network using the time series data included in the work log WL. More specifically, as an example, the training data calculation unit 153 may determine the parameter Pt by machine learning the correlation between the explanatory variable (elapsed time t) and the objective variable (bucket height H, crane rotation angle θ, bucket opening degree R, weight height H, etc.) using the time series data.

[0125] In step M34, the model generation unit 154 generates a trained model LM1 by machine learning the correlation between the information indicating the specifications of the second work vessel and the motion characteristics of the second work vessel calculated by the second calculation unit 152, and the parameters Pt determined by the training data calculation unit 153. As an example, the model generation unit 154 generates the trained model LM1 by a training method of a convolutional neural network. However, the training method of the trained model LM1 is not limited to the above example, and other training methods may be used.

[0126] <8. Effects of information output devices> In this embodiment, the motion characteristics used in the machine learning of the trained model LM1 are the motion characteristics of the second work ship measured when the second work ship is not performing marine civil engineering work, i.e., the motion characteristics of external force-induced motion that does not include motion caused by work. When heavy equipment on the first work ship performs marine civil engineering work, motions almost the same as the motions caused by work that occurred on the second work ship also occur on the first work ship. Therefore, by using the trained model LM1 that has been machine-learned in advance using the motion characteristics caused by external forces that do not include motion caused by work, it is possible to reproduce the operation contents of a skilled operator using the motion characteristics caused by external forces. This makes it possible to generate operation instruction information that takes into account both the influence of motion caused by external forces when performing marine civil engineering work and the influence of motion caused by work that occurs due to work.

[0127] <9. Variation 1> The training data used to construct the trained model LM1 is not limited to the examples described in the above-mentioned embodiment, and may be other data. The trained model LM1 may be a trained model generated by machine learning the correlation between the motion caused by external forces in the motion of the second work ship during the marine civil engineering work by the heavy equipment on the second work ship and the operation content performed on the heavy equipment on the second work ship, using, for example, (i) information representing the specifications of the second work ship on which the heavy equipment is placed and the motion characteristics of the second work ship when the marine civil engineering work is being performed when the atmospheric and sea conditions are calm, and (ii) operation instruction information for the heavy equipment on the second work ship when the heavy equipment on the second work ship is performing the operation of the marine civil engineering work other than when the atmospheric and sea conditions are calm, the operation of the heavy equipment, and time-series data representing the motion of the second work ship measured by the second measuring device 20-2 attached to the second work ship during the operation. Here, calm conditions refer to conditions in which ships can be moored safely and work is not hindered when wave heights are less than 0.5 m and wind speeds are less than 0.3 m / s.

[0128] <9. Variation 2> In the above embodiment, the second calculation unit 152 calculates the motion characteristics used as the training data TD by analyzing time series data representing the motion of the second work vessel when the second work vessel is not performing marine civil engineering work. The calculation method of the motion characteristics used as the training data TD is not limited to the above example, and the second calculation unit 152 may calculate the motion characteristics used as the training data TD by other methods. For example, the second calculation unit 152 may calculate the motion characteristics of the external force factors from the motion data during work in a calm state and the motion data during work in a non-calm state.

[0129] As another example, the second calculation unit 152 may separate work-induced vibrations and external force-induced vibrations by performing frequency spectrum analysis on time series data representing vibrations measured while the second work vessel is performing offshore civil engineering work, and may use the vibration characteristics calculated from the external force-induced vibrations obtained by the separation as training data TD.

[0130] [Embodiment 2] Other embodiments of the present invention will be described below. For ease of explanation, the same reference numerals will be used to designate parts and configurations having the same functions as those described in the above embodiment, and the description thereof will not be repeated.

[0131] 18 is a block diagram showing a functional configuration of an information output device 10B according to another embodiment. The trained model LM2 according to this embodiment further has time-series data representing the motion of the second work boat and the operation of the heavy equipment on the second work boat as explanatory variables (input data), and the generation unit 113B generates the operation instruction information by using the trained model LM2 generated by machine learning using teacher data (training data) having operation instruction information for the heavy equipment on the second work boat according to the numerical value of the motion by a skilled operator as a target variable (output data).

[0132] In addition, the model generation unit 154B generates a learned model LM2 using training data in which time series data representing the motion of the second work vessel and the operations of the heavy equipment on the second work vessel are used as explanatory variables, and operational instruction information for the heavy equipment on the second work vessel by an experienced operator in response to the numerical value of the motion is used as a target variable.

[0133] In addition, in this embodiment, the model generation unit 154B may compare the operation instruction information generated by the generation unit 113B for the heavy equipment on the new work ship based on the learned model LM2 with the operation instruction information of the experienced operator for the heavy equipment on the new work ship, and use only the information for which the difference between the operation instruction information for the heavy equipment on the new work ship by the experienced operator and the operation instruction information generated by the generation unit 113B for the heavy equipment on the new work ship is within a threshold as teacher data for re-learning, and perform re-learning on the learned model LM2. In this case, the generation unit 113B generates the operation instruction information using the re-learned model re-learned by the model generation unit 154B.

[0134] According to this embodiment, by generating operation instruction information using a trained model LM2 that has been machine-learned using teacher data that removes abnormal values ​​due to operational errors by experienced operators from data showing the actual operations of heavy machinery on a work ship, it is possible to generate operation instruction information suitable for the content of marine civil engineering work performed by heavy machinery on a work ship. In particular, it is possible to update the trained model LM2 to an optimal one suited to each work ship for each work ship or site, for example.

[0135] In addition, according to this embodiment, by re-learning the trained model LM2 using operation instruction information from an experienced operator, it is possible to generate operation instruction information that is more suitable for operating heavy machinery performing offshore civil engineering work.

[0136] [Additional Note 1] The functions of the information output devices 10 and 10B according to the above-mentioned first and second embodiments may be realized by a single device, or may be realized by a system in which a plurality of devices work together. For example, a first device implementing the estimation phase executing unit 110 and a second device implementing the learning phase executing unit 150 may be configured as separate devices, and the above-mentioned information output device 10B may be realized by the cooperation of the first device and the second device.

[0137] [Additional Note 2] In the above embodiment, the motion characteristics included in the training data are calculated from data representing the motion of the second work vessel measured when the second work vessel is not performing offshore civil engineering work (for example, immediately before starting offshore civil engineering work), but the calculation method of the motion characteristics included in the training data is not limited to that shown in the above embodiment. For example, the second calculation unit 152 may perform a spectrum analysis on data representing the motion of the second work vessel measured when the second work vessel is performing offshore civil engineering work, to separate the data into motion caused by the work and motion caused by an external force, and use the motion characteristics caused by the external force as the training data.

[0138] [Software implementation example] The functions of the information output device 10, 10B (hereinafter referred to as the "device") can be realized by a program for causing a computer to function as the device, and a program for causing a computer to function as each control block of the device (particularly each part included in the control unit 11).

[0139] In this case, the device includes a computer having at least one control device (e.g., a processor) and at least one storage device (e.g., a memory) as hardware for executing the program. The control device and storage device execute the program to realize each function described in each of the above embodiments.

[0140] The program may be non-transitory and may be recorded in one or more computer-readable recording media. The recording media may or may not be included in the device. In the latter case, the program may be provided to the device via any wired or wireless transmission medium.

[0141] In addition, some or all of the functions of each of the control blocks can be realized by a logic circuit. For example, an integrated circuit in which a logic circuit that functions as each of the control blocks is formed is also included in the scope of the present invention. In addition, the functions of each of the control blocks can be realized by, for example, a quantum computer.

[0142] Furthermore, each process described in each of the above embodiments may be executed by AI (Artificial Intelligence). In this case, the AI ​​may be operated by the control device or another device (for example, an edge computer or a cloud server).

[0143] The present invention is not limited to the above-described embodiments, and various modifications are possible within the scope of the claims. Embodiments obtained by appropriately combining the technical means disclosed in different embodiments are also included in the technical scope of the present invention. [Explanation of symbols]

[0144] 10, 10B Information output device 11 Control section 12 Storage section 110 Estimation Phase Execution Unit 111 First acquisition part 112 First Calculation Section 113, 113B generation part 114 Output section 150 Learning Phase Execution Unit 151 Second acquisition part 152 Second Calculation Section 153 Training Data Calculation Unit 154, 154B Model generation section

Claims

1. an acquisition unit that acquires time series data representing the motion of a first work vessel carrying heavy machinery for performing marine civil engineering work, the data being measured by a measuring device attached to a predetermined position of the first work vessel and measuring the motion of the first work vessel when the first work vessel is not performing the marine civil engineering work; A calculation unit that analyzes the time series data and calculates the motion characteristics of the first work vessel; (i) The motion characteristics of the second work vessel when not working, analyzed based on information representing the specifications of a second work vessel carrying heavy machinery and time series data representing the motion of the second work vessel measured by a measuring device attached to the second work vessel when no marine civil engineering work is being performed; and (ii) time-series data of an operator's operation representing the operation of the heavy equipment on the second work vessel when the heavy equipment is performing marine civil engineering work; and A trained model is generated by machine learning the correlation between a total vibration, which is a combination of vibrations caused by external forces in the vibrations occurring on the second work vessel during marine civil engineering work by the heavy equipment on the second work vessel and vibrations caused by the heavy equipment due to the operation of the operator, and the operation content performed on the heavy equipment on the second work vessel, using the trained model. a generation unit that generates operation instruction information for operating heavy machinery on the first work vessel by inputting information representing the motion characteristics of the first work vessel in a state in which no marine civil engineering work is being performed and specifications of the first work vessel calculated by the calculation unit into the trained model; and An information output device comprising:

2. the information representing the operation content includes a parameter included in a function that formulates a relationship between operation instruction information given to the second work vessel and time, 2. The information output device according to claim 1.

3. The motion characteristics include at least one of a motion amplitude, a motion period, and a phase difference of the work vessel.

3. The information output device according to claim 1 or 2.

4. The trained model is a trained model that receives information on the specifications of the work vessel and the motion characteristics of the work vessel as input, and outputs parameters included in a function that represents the relationship between operation instruction information for heavy machinery on the work vessel and time, the generation unit generates the operation instruction information by using parameters obtained by inputting the motion characteristics calculated by the calculation unit and information related to the specifications of the first work vessel into the trained model.

3. The information output device according to claim 1 or 2.

5. The learned model further includes time series data representing the motion of the second work vessel and an operation of a heavy machine on the second work vessel as input data, The generation unit generates the operation instruction information using a trained model generated by machine learning using teacher data in which operation instruction information for the heavy equipment on the second work vessel in accordance with the numerical value of the oscillation by an experienced operator is used as output data.

5. The information output device according to claim 4.

6. Operation instruction information generated by the generation unit for a new heavy equipment on a work ship based on the learned model; Operation instruction information of an experienced operator for the heavy machinery on the new work vessel; Compare, Operation instruction information for the heavy machinery on the new work vessel by the skilled operator; and The generation unit generates the operation instruction information using a re-learned model that re-learns the trained model using only information whose difference from the operation instruction information generated by the generation unit for the heavy equipment on the new work boat is within a threshold value as training data for re-learning.

6. The information output device according to claim 5.

7. The operation instruction information includes at least one of information for controlling the lifting and lowering of a suspended bucket or weight, which is an operation of the heavy equipment, opening and closing of the bucket, and information for controlling the speed, timing, angle, and boom hoisting angle of a crane, which is a heavy equipment that suspends the weight or bucket, for turning.

5. The information output device according to claim 4.

8. a work control unit that causes heavy machinery on the first work vessel to perform marine civil engineering work using the operation instruction information generated by the generation unit, instead of an operator; The information output device according to claim 1 , further comprising:

9. an acquisition unit that acquires time series data representing the motion of a work vessel carrying heavy machinery for performing offshore civil engineering work, the data being measured by a measuring device attached to a predetermined position of the work vessel and measuring the motion of the work vessel when the work vessel is not performing the offshore civil engineering work; a calculation unit that analyzes the time series data and calculates the motion characteristics of the work vessel; (i) a generation unit that generates a trained model by machine learning the correlation between information representing the specifications of the work vessel and the motion characteristics calculated by the calculation unit, and (ii) information representing the operation content performed on the heavy machinery on the work vessel; and A trained model generation device comprising:

10. A program for causing a computer to function as the information output device according to claim 1 , the program causing a computer to function as the acquisition unit, the calculation unit, and the generation unit.

11. 10. A program for causing a computer to function as the trained model generation device according to claim 9, the program causing a computer to function as the acquisition unit, the calculation unit, and the generation unit.

12. A trained model generated by machine learning the correlation between (i) the motion characteristics of a work vessel obtained by analyzing time series data representing the motion of the work vessel when the work vessel is not performing offshore civil engineering work, measured by a measuring device attached to a predetermined position on the work vessel that measures the motion of the work vessel carrying heavy equipment used for offshore civil engineering work, and (ii) information representing the operations performed on the heavy equipment on the work vessel.

13. a first step of acquiring time series data representing the motion of a first work vessel carrying heavy machinery for performing marine civil engineering work, the data being measured by a measuring device attached to a predetermined position of the first work vessel and representing the motion of the first work vessel when the first work vessel is not performing the marine civil engineering work; A second step of analyzing the time series data and calculating the motion characteristics of the first work vessel; (i) The motion characteristics of the second work vessel when not working, analyzed based on information representing the specifications of a second work vessel carrying heavy machinery and time series data representing the motion of the second work vessel measured by a measuring device attached to the second work vessel when no marine civil engineering work is being performed; and (ii) time-series data of an operator's operation representing the operation of the heavy equipment on the second work vessel when the heavy equipment is performing marine civil engineering work; and A trained model is generated by machine learning the correlation between a total vibration caused by an external force in the vibration of the second work ship during marine civil engineering work by the heavy equipment on the second work ship and a vibration caused by the heavy equipment due to the operation of the operator, and the operation content performed on the heavy equipment on the second work ship, a third step of generating operation instruction information for operating heavy machinery on the first work vessel by inputting information representing the rolling characteristics of the first work vessel when not performing marine civil engineering work calculated in the second step and the specifications of the first work vessel; The operation instruction information generating method is executed by an information output device.

Citation Information

Patent Citations

  • Automatic operation method and device for work vessel borne crane

    JP1998329787A

  • Suspended load swing suppression device

    JP2021091529A