Information processing apparatus, information processing method, and information processing program
The information processing device improves project prediction accuracy by integrating project history, manager, and personnel data through a learning model, providing comprehensive risk evaluations and countermeasures, addressing the limitations of conventional stakeholder-dependent methods.
Patent Information
- Application Number
- JP2023049579
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-27
- Publication Date
- 2024-10-09
AI Technical Summary
Conventional project success rate predictions rely heavily on the performance level required and the evaluation of project stakeholders, leading to inaccuracies that depend on the project manager and owner, often failing to achieve desired levels of accuracy.
An information processing device that includes a reception unit for project and user questionnaire data, a calculation unit for predicting future project outcomes using a learning model, and an output unit for delivering comprehensive risk evaluations, incorporating project history, manager, and personnel information to enhance prediction accuracy.
Enables high-accuracy project future predictions, including delivery dates, profit forecasts, risk levels, and deviation assessments, allowing for better project selection, monitoring, and risk management by identifying high-risk projects and suggesting countermeasures.
Smart Images

Figure 2024138865000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to an information processing device, an information processing method, and an information processing program. [Background technology]
[0002] There are cases where the success rate of a target project is predicted. For example, in the prior art, a technique has been proposed for predicting the success rate of a project based on the performance level required for the project's completion and the evaluation value of the project's stakeholders (see, for example, Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2016-170718 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, there is a demand for more accurate prediction of the future of projects. For example, in the conventional technology, the success rate is predicted based on the performance level required for the achievement of the project and the evaluation value of the project's stakeholders, but the accuracy of the predicted success rate may not reach the level required by the project manager or project owner. [Means for solving the problem]
[0005] Therefore, in order to solve the above problems and achieve the objective, the information processing device of the present invention is characterized by having a reception unit that receives information regarding a project and information regarding a user survey about risks, a calculation unit that calculates a specified prediction using at least one of the information regarding the project and the information regarding the user survey about the risks, and an output unit that outputs information regarding a future forecast of the project using the specified prediction calculated by the calculation unit. Effect of the Invention
[0006] The present invention has an effect of enabling highly accurate future prediction of a project. [Brief description of the drawings]
[0007] [Figure 1] FIG. 1 is a diagram showing an overview of a comprehensive risk assessment of a project according to an embodiment. [Diagram 2] FIG. 2 is a diagram illustrating an example of a functional block diagram of the information processing device according to the embodiment. [Diagram 3] FIG. 3 is a diagram illustrating an example of the configuration of the information processing device according to the embodiment. [Figure 4] FIG. 4 is a table illustrating an example of learning data according to the embodiment. [Diagram 5] FIG. 5 is a table diagram illustrating an example of learning data according to the embodiment. [Figure 6] FIG. 6 is a table diagram illustrating an example of learning data according to the embodiment. [Figure 7] FIG. 7 is a diagram illustrating an example of learning of a learning model according to an embodiment. [Figure 8] FIG. 8 is a diagram showing an outline of calculation of a predicted value of a delivery date based on a learning model according to the embodiment. [Figure 9] FIG. 9 is a diagram showing an outline of calculation of a predicted value of profit based on a learning model according to the embodiment. [Figure 10] FIG. 10 is a diagram illustrating an example of calculation of a predicted risk level according to the embodiment. [Figure 11] FIG. 11 is a diagram illustrating an example of calculation of a deviation prediction according to the embodiment. [Figure 12] FIG. 12 is a diagram showing an example of output of information related to the comprehensive risk assessment according to the embodiment. [Figure 13] FIG. 13 is a diagram illustrating an example of an output screen according to the embodiment. [Figure 14] FIG. 14 is a diagram illustrating an example of an output screen according to the embodiment. [Figure 15] FIG. 15 is a diagram illustrating an example of a flowchart of the information processing method according to the embodiment. [Figure 16] FIG. 16 is a diagram illustrating an example of a computer in which the information processing device according to the present embodiment is realized. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0008] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. Note that the information processing device, information processing method, and information processing program according to the present disclosure are not limited to the embodiment. In addition, in the following embodiments, the same components are denoted by the same reference numerals, and duplicated descriptions will be omitted.
[0009] [1. Introduction] The information processing device 100 according to the present embodiment provides a technique for implementing a comprehensive risk assessment (success / failure prediction and risk extraction) as a future prediction of a project. From here, as an introduction, an overview of the comprehensive risk assessment of a project and an overview of information processing by the information processing device 100 will be described.
[0010] [1-1. Overview of comprehensive project risk assessment] First, an overview of the overall risk evaluation of a project realized by an information processing device 100 according to this embodiment will be described with reference to Fig. 1. Fig. 1 is a diagram showing an overview of the overall risk evaluation of a project according to the embodiment.
[0011] The information processing device 100 according to this embodiment performs a comprehensive risk assessment using a learning model that is trained using project history information, information about the project manager, and information about personnel, in addition to predictions based on the past performance of previous projects and user rules of thumb ((1) in FIG. 1).
[0012] This enables the information processing device 100 to predict the future of the project being evaluated with greater accuracy than ever before ((2) in FIG. 1). Furthermore, the information processing device 100 enables the selection of projects to be accepted and the review of projects based on a comprehensive risk evaluation of the projects ((3) in FIG. 1). Furthermore, the information processing device 100 enables the monitoring of high-risk projects based on a comprehensive risk evaluation of the projects ((4) in FIG. 1).
[0013] 1-2. Overview of information processing by information processing device Next, an overview of information processing by the information processing device 100 will be described with reference to Fig. 2. Fig. 2 is a diagram showing an example of a functional block diagram of the information processing device 100 according to an embodiment. Note that in Fig. 2, detailed functions of each functional unit will be described later, and only the flow of processing will be described in this section.
[0014] The information processing device 100 performs learning of a learning model for calculating predetermined predicted values (predicted delivery time, predicted profit) used in comprehensive risk assessment. First, the learning unit 131 learns a learning model for calculating the predetermined predicted values using project history information 121a, information on the project manager 121b, and information on personnel 121c as previously prepared learning data ((1) in FIG. 2).
[0015] Next, the information processing device 100 calculates a predetermined prediction. As shown in Fig. 2, the receiving unit 132 receives, as input data, information 123a related to the project and information 123b related to a user questionnaire about risks ((2) in Fig. 2).
[0016] The calculation unit 133 calculates a predetermined prediction using the input data accepted by the acceptance unit 132. Specifically, the calculation unit 133 calculates a delivery date prediction based on a learning model in which the project-related information 123a and the user questionnaire information 123b on risks are input ((3-1) in FIG. 2). The calculation unit 133 also calculates a profit prediction based on a learning model in which the project-related information 123a and the user questionnaire information 123b on risks are input ((3-2) in FIG. 2).
[0017] The calculation unit 133 also calculates a prediction of the degree of risk using the information 123a about the project and the information 123b about the user questionnaire about risks received by the reception unit 132 ((3-3) in FIG. 2). The calculation unit 133 also calculates a prediction of the degree of deviation using the information 123a about the project and the information 123b about the user questionnaire about risks received by the reception unit 132 ((3-4) in FIG. 2).
[0018] The output unit 134 uses the delivery date prediction, profit prediction, risk prediction, and deviation prediction calculated by the calculation unit 133 to output information regarding a comprehensive risk assessment of the project to be evaluated to the user's terminal device 200, etc. ((5) in Figure 2).
[0019] 2. Configuration of Information Processing Device From here, the information processing device 100 according to the embodiment will be described with reference to Fig. 3. Fig. 3 is a diagram showing an example of the configuration of the information processing device 100 according to the embodiment. As shown in Fig. 3, the information processing device 100 has a communication unit 110, a storage unit 120, and a control unit 130.
[0020] (Communication unit 110) The communication unit 110 is realized by, for example, a network interface card (NIC) etc. The communication unit 110 is connected by a predetermined network in a wired or wireless manner, and transmits and receives information to and from the terminal device 200, for example.
[0021] (Storage unit 120) The storage unit 120 is realized by, for example, a semiconductor memory element such as a RAM or a flash memory, or a storage device such as a hard disk or an optical disk. As shown in FIG. 3 , the storage unit 120 includes a learning data storage unit 121, a learning model storage unit 122, an input data storage unit 123, a prediction information storage unit 124, and a solution information storage unit 125.
[0022] (Learning data storage unit 121) The learning data storage unit 121 stores information used by the learning unit 131 described below for learning a predetermined learning model. Specifically, the learning data storage unit 121 stores project history information 121a, information 121b related to the project manager, and information 121c related to personnel. The information stored in the learning data storage unit 121 will now be described with reference to Figs. 4 to 6. Figs. 4 to 6 are table diagrams showing an example of learning data according to an embodiment.
[0023] (Project History Information 121a) First, the project history information 121a will be described with reference to Fig. 4. The project history information 121a is information about projects carried out in the past. For example, the project history information 121a may include departments of organizations that carried out projects carried out in the past, project attributes, client information, management indicators, man-hour information, and the like.
[0024] Specifically, as shown in Fig. 4, project history information 121a may be stored in the form of a list having items such as "No." and "Variable Name." For example, project history information 121a may include information such as "Division" as the variable name identified by No. "1." Note that the items shown in Fig. 4 are merely examples, and the items included in project history information 121a are not limited to these.
[0025] (Project Manager Information 121b) Next, the information 121b about the project manager will be described with reference to Fig. 5. The information 121b about the project manager is information about a person who supervises a project in a specific organization (hereinafter, referred to as a "project manager"). For example, the information 121b about the project manager may include information about the identification information, experience, evaluation, skills, etc. of a project manager who belongs to a specific organization.
[0026] Specifically, as shown in Fig. 5, the information 121b about the project manager may be stored in the form of a list having items such as "No." and "Variable Name." For example, the information 121b about the project manager may include information such as "Employee ID" as a variable name identified by No. "1." Note that the items shown in Fig. 5 are merely examples, and the items included in the information 121b about the project manager are not limited to these.
[0027] (Personnel Information 121c) Next, the personnel information 121c will be described with reference to Fig. 6. The personnel information 121c is personnel information of the project manager related to the target project. For example, the personnel information 121c may include information such as the project manager's years of experience (qualifications and appointment period, etc.) and the number of years since joining the company.
[0028] Specifically, as shown in Fig. 6, the personnel-related information 121c may be stored in the form of a list having items such as "No." and "Variable Name." For example, the personnel-related information 121c may include information such as "Number of months since start of appointment as project manager" where the variable name identified by No. "1." Note that the items shown in Fig. 6 are merely examples, and the items included in the personnel-related information 121c are not limited to these.
[0029] (Learning model storage unit 122) Here, the explanation will be continued by returning to Fig. 3. The learning model storage unit 122 stores a learning model used when a calculation unit 133 described later performs calculation. For example, the learning model storage unit 122 can store a learning model that receives project-related information 123a and risk-related user questionnaire-related information 123b as input, and outputs a delivery date prediction value and a profit prediction value.
[0030] In the present embodiment, the learning model is described on the assumption that it is a LightGBM (Light Gradient Boosting Machine), but is not limited to this as long as the learning model is capable of calculating the above-mentioned predicted value. The learning model storage unit 122 may store a learning model learned by an external device in addition to the learning model learned by the learning unit 131. The learning model storage unit 122 may store a supervised learning model, an unsupervised learning model, a reinforcement learning model, etc. as the learning model.
[0031] (Input data storage unit 123) The input data storage unit 123 stores input data used when the calculation unit 133 described later calculates a predetermined prediction. Specifically, the input data storage unit 123 stores information 123a related to the project and information 123b related to a user questionnaire about risks.
[0032] (Project Information 123a) The project-related information 123a is information about the project to be evaluated. For example, the project-related information 123a may include customer information, a system overview, profit targets, man-hours, management man-hours, a process plan, contract details, high-risk viewpoints, a risk cost ratio, contracts by process, construction period man-hours by process, risk comments (free input), etc. In addition to the above-mentioned information, the input data storage unit 123 can store any information included in the category of project-related information as the project-related information 123a.
[0033] (Information on user surveys about risk 123b) The information 123b on the user questionnaire about risks is information on the risk of the project to be evaluated. For example, the information 123b on the user questionnaire about risks may include the results of the user's questionnaire responses about the situation related to the project (e.g., customer information, the situation of the company, characteristics of the system, etc.).
[0034] (Prediction information storage unit 124) The prediction information storage unit 124 stores a predetermined prediction (future prediction) calculated by the calculation unit 133 described later. Specifically, the prediction information storage unit 124 stores a delivery date prediction 124a, a profit prediction 124b, a risk level prediction 124c, and a deviation degree prediction 124d.
[0035] (Delivery time forecast 124a) The delivery date prediction 124a is a future prediction of the delivery date for the project to be evaluated, calculated by the calculation unit 133 described later. For example, the delivery date prediction 124a may include a delivery date prediction value such as a numerical value or text indicating the number of days from the time of prediction to completion, such as "the number of days required for the completion of the project is xx days." Furthermore, the delivery date prediction 124a may include a deviation of the delivery date calculated by the calculation unit 133 using the user's delivery date prediction value and the above-mentioned delivery date prediction value. Furthermore, the delivery date prediction 124a may include a risk assessment of the delivery date calculated by the calculation unit 133 using the above-mentioned deviation of the delivery date.
[0036] (Profit Forecast 124b) The profit prediction 124b is a future prediction of profits related to the project to be evaluated, calculated by the calculation unit 133 described below. For example, the profit prediction 124b may include a profit prediction value such as a numerical value or text, such as "gross profit: xxx%" or "operating profit: xxx%". The profit prediction 124b may also include a profit deviation calculated by the calculation unit 133 using the user's profit prediction value and the above-mentioned profit prediction value. The profit prediction 124b may also include a risk assessment of profits calculated by the calculation unit 133 using the above-mentioned profit deviation.
[0037] (Risk Prediction 124c) The risk level prediction 124c is a future prediction of the risk level of the project to be evaluated, calculated by the calculation unit 133 described below. For example, the risk level prediction 124c may include an index such as a "risk point" indicating the magnitude of risk calculated based on the result of a user's questionnaire response regarding the situation related to the project. In addition, the risk level prediction 124c may include an evaluation of the risk level calculated by the calculation unit 133 using the risk point described above.
[0038] (Deviation prediction 124d) The deviation prediction 124d is a future prediction of the deviation between the project to be evaluated and similar projects, calculated by the calculation unit 133 described below. For example, the deviation prediction 124d may include an index (predicted deviation value) indicating the deviation between the past project and the project to be evaluated. Furthermore, the deviation prediction 124d may include a risk assessment of the deviation calculated by the calculation unit 133 described below using the predicted deviation value.
[0039] (Solution information storage unit 125) The solution information storage unit 125 stores information on past risks and solutions (countermeasures) for the past risks that are stored in advance and used when the output unit 134 described below outputs information on risk countermeasures. Specifically, the solution information storage unit 125 can store information on the contents of risks that occurred in the past (e.g., risk classification, occurrence date, impact level, etc.) and countermeasures for the risks (countermeasures taken to eliminate the occurred risk, etc.). Note that the solution information storage unit 125 is not limited to the above-mentioned information, and may store information that falls within the category of past risks and solutions (countermeasures) for the past risks.
[0040] (Control unit 130) The control unit 130 is a controller, and is realized, for example, by a CPU (Central Processing Unit), MPU (Micro Processing Unit), etc., executing various programs (corresponding to an example of an information processing program) stored in a storage device inside the information processing device 100 using a RAM as a working area. The control unit 130 is also a controller, and is realized, for example, by an integrated circuit such as an ASIC (Application Specific Integrated Circuit) or an FPGA (Field Programmable Gate Array).
[0041] 3, the control unit 130 has a learning unit 131, a receiving unit 132, a calculation unit 133, and an output unit 134, and realizes or executes the information processing action described below. Note that the internal configuration of the control unit 130 is not limited to the configuration shown in FIG. 3, and may be other configurations as long as they perform the information processing described below.
[0042] (Learning Section 131) The learning unit 131 learns a learning model that outputs a predicted value of a delivery date or a predicted value of a profit, using the project history information 121a, the information 121b about the project manager, and the information 121c about personnel as learning data. Note that in this embodiment, it is assumed that the learning unit 131 performs learning using LightGBM. In addition, the learning unit 131 is not limited to a learning model that can calculate the above-mentioned predicted value, and can learn, for example, a supervised learning model, an unsupervised learning model, a reinforcement learning model, etc.
[0043] Here, learning of the learning model will be described with reference to FIG. 7. FIG. 7 is a diagram showing an example of learning of the learning model according to the embodiment. In the example shown in FIG. 7, learning was performed by dividing all 424 pieces of data into 80% (339 pieces) as learning data and 20% (85 pieces) as test data (input data). The divided data was flagged as "success" and "failure", and the data divided so that the ratio of "success" to "failure" was approximately the same during the above-mentioned division was used. In the following, the explanation will be given on the assumption that the calculation unit 133 performs calculations using the learning model learned in the example of FIG. 7.
[0044] (Reception department 132) Here, returning to FIG. 3, the description will be continued. The reception unit 132 receives predetermined information used to calculate a predetermined prediction of the project to be evaluated. Specifically, the reception unit 132 receives information 123a related to the project and information 123b related to a user questionnaire about risks as input data. For example, the reception unit 132 can receive, as the information 123a related to the project, customer information, system overview, profit target, man-hours, management man-hours, process plan, contract details, high risk viewpoint, risk cost ratio, contract by process, construction period man-hours by process, risk comments (free input), and the like. In addition, the reception unit 132 can receive the results of a user's questionnaire response about the situation related to the project (for example, customer information, the company's situation, system characteristics, and the like) as information 123b related to the user questionnaire about risks.
[0045] In addition, the receiving unit 132 can receive learning data used by the learning unit 131 to learn a predetermined learning model. Specifically, the receiving unit 132 can receive the above-mentioned project history information 121a, information 121b related to the project manager, and information 121c related to personnel.
[0046] For example, the reception unit 132 can receive, as the project history information 121a, the department of an organization that handled a past project, project attributes, client information, management indicators, man-hour information, etc. Furthermore, the reception unit 132 can receive, as the project manager information 121b, the identification information, experience, evaluation, skill information, etc. of a project manager belonging to a specific organization. Furthermore, the reception unit 132 can receive, as the personnel information 121c, information such as the project manager's years of experience (qualification and appointment period, etc.) and the number of years since joining the company.
[0047] (Calculation unit 133) The calculation unit 133 calculates a predetermined prediction using at least one of the information 123a about the project and the information 123b about the user survey about risks. Specifically, the calculation unit 133 calculates at least one of the delivery date prediction 124a, the profit prediction 124b, the risk level prediction 124c, and the deviation degree prediction 124d as the predetermined prediction using the information 123a about the project and the information 123b about the user survey about risks.
[0048] The calculation unit 133 inputs at least one of the following items included in the information on the project: customer information, system overview, profit target, man-hours, management man-hours, process plan, contract details, high-risk viewpoint, risk cost ratio, contract by process, construction period man-hours by process, and free-entry risk comments, and calculates one or more of the delivery date prediction 124a, the profit prediction 124b, and the success rate prediction using a learning model. The calculation unit 133 may use a learning model learned by the learning unit 131, or may use a learning model learned in an external device.
[0049] Here, the calculation of the predicted value of the delivery date based on the learning model will be described with reference to Fig. 8. Fig. 8 is a diagram showing an outline of the calculation of the predicted value of the delivery date based on the learning model according to the embodiment. Note that the calculation method of the predicted value of the delivery date shown in Fig. 8 is merely a conceptual description of the regression analysis based on the learning model, and the actual calculation method is not limited thereto.
[0050] As shown in Fig. 8, the calculation unit 133 performs a regression analysis based on the learning model (LightGBM) learned by the learning unit 131, and calculates a predicted value of the delivery date. For example, the calculation unit 133 judges whether or not the delivery date included in the information on the project input in the first layer satisfies the condition of "delivery date target 120 days or more". If the above-mentioned condition is satisfied, the calculation unit 133 further judges whether or not the cost per labor included in the information 123a on the project input in the next layer satisfies the condition of "cost per labor 900,000 yen or more". In this way, the calculation unit 133 can repeat the judgment in multiple layers to calculate a predicted value of the delivery date (for example, 100 days, etc.).
[0051] The calculation unit 133 calculates the deviation of the delivery date by using the user's predicted delivery date and the predicted delivery date calculated based on the learning model. For example, the calculation unit 133 can calculate the deviation of the delivery date "30%" by using the user's predicted delivery date "130 days" and the predicted delivery date "100 days" based on a calculation formula such as "deviation (%) = (user's predicted delivery date - predicted delivery date) ÷ predicted delivery date × 100".
[0052] The calculation unit 133 calculates a "risk evaluation of delivery date" as a prediction of the delivery date based on a predetermined calculation condition of risk evaluation using the calculated deviation of the delivery date. For example, the calculation unit 133 can calculate the risk evaluation of the delivery date as "A" based on the predetermined calculation condition of risk evaluation (0 or more is "A", -10 or more and less than 0 is "B", -15 or more and less than -10 is "C", -20 or more and less than -15 is "D", -20 or less is "E", etc.).
[0053] Next, calculation of a predicted value of profit based on a learning model will be described with reference to Fig. 9. Fig. 9 is a diagram showing an outline of calculation of a predicted value of profit based on a learning model according to an embodiment. Note that the calculation method of the predicted value of profit shown in Fig. 9 is merely a conceptual description of regression analysis based on a learning model, and is not limited to an actual calculation method.
[0054] As shown in FIG. 9, the calculation unit 133 performs a regression analysis based on the learning model (LightGBM) learned by the learning unit 131, and calculates a predicted value of profit. For example, the calculation unit 133 judges whether or not the operating profit included in the information 123a on the project input in the first layer satisfies the condition of "target operating profit ratio of 10% or more". If the above condition is satisfied, the calculation unit 133 further judges whether or not the cost per man-hour included in the information 123a on the project input in the next layer satisfies the condition of "cost per man-hour of 900,000 yen or more". In this way, the calculation unit 133 can repeat the judgment in multiple layers to calculate a predicted value of profit (for example, 12%).
[0055] The calculation unit 133 calculates the profit deviation degree by using the user's profit prediction value and the profit prediction value calculated based on the learning model. For example, the calculation unit 133 can calculate the profit deviation degree "8.6%" by using the user's profit prediction value "38%" and the profit prediction value "35%" based on the calculation formula "deviation degree (%) = (user's profit prediction value - profit prediction value) ÷ profit prediction value × 100".
[0056] The calculation unit 133 calculates a "risk evaluation of profit" as a profit prediction based on a predetermined calculation condition of risk evaluation using the calculated deviation degree of profit. For example, the calculation unit 133 can calculate the risk evaluation of profit as "B" based on a preset calculation condition of risk evaluation (less than 0 is "A", 0 or more and less than 10 is "B", 10 or more and less than 15 is "C", 15 or more and less than 20 is "D", 20 or more is "E", etc.).
[0057] Furthermore, the calculation unit 133 calculates a predicted value of a predetermined success rate for the project as a predetermined prediction. As described above, the calculation unit 133 inputs at least one of the customer information, system overview, profit target, man-hours, management man-hours, process plan, contract contents, high-risk viewpoint, risk cost ratio, contract by process, construction period man-hours by process, and free-form risk comments included in the project-related information 123a, and calculates a prediction of the success rate of the project using a learning model. For example, the calculation unit 133 may use information included in the project-related information 123a described above to calculate a predicted value such as "success rate XX%" for the project to be evaluated. The prediction of the success rate of this project can be used to output information on the future prediction of the project by the output unit 134 described later.
[0058] Next, an example of a method for calculating a prediction of a risk level included in a predetermined predicted value will be described with reference to Fig. 10. Fig. 10 is a diagram showing an example of calculation of a prediction of a risk level according to the embodiment.
[0059] The calculation unit 133 assigns the contents of the questionnaire results on risk included in the information 123b on the user questionnaire on risk to scoring items based on a predetermined threshold value, and calculates a prediction of the risk level (assessment of the risk level). Specifically, the calculation unit 133 assigns a preset score to each answer to the questionnaire included in the information 123b on the user questionnaire on risk, and calculates a risk point that is an index of the magnitude of the risk.
[0060] For example, the questionnaire 10 in FIG. 10 asks, "How many experienced people in the same type and scale among the managers and key members of the client's system department?" Furthermore, the questionnaire 10 asks, "(1) X% or more of the total," "(2) Y% or more of the total," "(3) Around Z%, or none," and "(4) Mostly inexperienced." The calculation unit 133 calculates risk points based on a score table 11 (for example, "(1) 2 points," "(2) 4 points," "(3) 6 points," and "(4) 10 points") set for each answer option as shown in FIG. 10. The score may be changed as appropriate.
[0061] Furthermore, the calculation unit 133 counts the calculated risk points for each predetermined classification, and calculates a predicted risk level for each classification (for example, A being the lowest risk on a five-level scale from A to E).The calculation unit 133 then calculates a predicted risk level (assessment of the risk level) using the predicted risk levels counted for each predetermined classification.
[0062] For example, the calculation unit 133 calculates a risk level evaluation of "D" based on a risk point of "30" for the category "customer" as shown in risk level evaluation list 12. Then, the calculation unit 133 calculates a risk level evaluation of "C" based on a total risk point of "80" obtained by adding up the risk points of all items.
[0063] Next, an example of a method for calculating a deviation prediction will be described with reference to Fig. 11. Fig. 11 is a diagram showing an example of calculation of a deviation prediction according to an embodiment. First, the calculation unit 133 selects a project similar to the project to be evaluated from past projects. Note that the selection of a similar project may be performed based on items such as "scale," "system characteristics," and "matching customer characteristics," for example.
[0064] Next, the calculation unit 133 calculates a prediction of the deviation between the similar project and the project to be evaluated (risk assessment of the deviation) based on the predetermined index and the preset conditions. Specifically, the calculation unit 133 calculates the prediction value of the deviation using the average value of a predetermined item of the similar project flagged as "success" included in the project history information 121a and the average value of a predetermined item of the project to be evaluated. Note that the predetermined item here may be set arbitrarily, and may be, for example, "gross profit margin," "management man-hour ratio," "cost per man-hour," "sales expense ratio to cost," etc.
[0065] For example, in the case of gross profit margin, the calculation unit 133 uses information (average values) that the similar projects have an "average of 40%" and the evaluation target project has an "average of 45%." Then, using the aforementioned average values, the calculation unit 133 can calculate a predicted deviation value of "2.8%" based on a calculation formula such as "deviation (%) = (average value of the evaluation target project - average value of similar projects) / average value of the evaluation target project x 100."
[0066] Next, the calculation unit 133 calculates a risk assessment of the deviation as "A" using the predicted value of the deviation for the gross profit margin based on the list 20. Then, the calculation unit 133 multiplies the score corresponding to the risk assessment (for example, "1" for A) by a predetermined coefficient to calculate a score of "1". In this way, the calculation unit 133 calculates a risk assessment of the deviation as "D" based on the total value of the scores calculated for each item, as shown in the risk assessment result 21 in FIG. 11.
[0067] (Output unit 134) The output unit 134 outputs information on the future prediction of the project using the predetermined prediction calculated by the calculation unit 133. Specifically, the output unit 134 outputs information on the future prediction of the project including information on the risk assessment of the project and information on measures against the risk, using one or more combinations of the delivery date prediction 124a (risk assessment of delivery date), the profit prediction 124b (risk assessment of profit), the risk level prediction 124c (assessment of risk level), and the deviation degree prediction 124d (risk assessment of deviation degree), which are the predetermined predictions calculated by the calculation unit 133.
[0068] Here, the output of information related to the overall risk evaluation of the project will be described with reference to Fig. 12. Fig. 12 is a diagram showing an example of the output of information related to the overall risk evaluation according to the embodiment. As described above, the output unit 134 can output the overall risk evaluation of the project using the delivery date prediction 124a, the profit prediction 124b, the risk level prediction 124c, and the deviation level prediction 124d calculated by the calculation unit 133.
[0069] 12, the overall risk assessment list 30 shows that the predicted delivery time is "A", the predicted profit is "B", the predicted risk level is "C", the deviation from similar projects is "D", and the overall risk assessment is "B". In this embodiment, the "risk assessment" is output in four alphabetical levels from A to D.
[0070] Each of the letters mentioned above has the following meaning: A means "low risk, high probability of completion as planned." B means "risky, but high probability of results close to plan." C means "risky, possibility of not proceeding as expected." D means "high risk, high probability of results contrary to expectations (be careful)."
[0071] The comprehensive risk assessment list 30 includes the items "point allocation," "coefficient," and "score." The points are assigned points corresponding to the alphabets shown in the "assessment" item, and are preset, for example, A is "1," B is "2," C is "3," and D is "4." Note that the points shown in FIG. 12 are not limited and may be changed.
[0072] The coefficients are weighting values multiplied with each prediction result. For example, the coefficients are set as follows: delivery date prediction is "0.5", profit prediction is "0.5", risk prediction is "1.0", deviation prediction is "0.7", etc. Note that the coefficients shown in FIG. 12 are not limited and may be changed. The score is calculated as a value obtained by multiplying the assigned points by the coefficients.
[0073] The output unit 134 outputs information about the overall risk evaluation based on the sum of the scores calculated for each risk evaluation and the overall risk evaluation calculation condition 31. For example, in the example shown in Fig. 12, the output unit 134 can output the overall risk evaluation as "B" based on the total score of "7.3".
[0074] From here, an example of the output screen will be described with reference to Fig. 13 and Fig. 14. Fig. 13 and Fig. 14 are diagrams showing an example of the output screen according to the embodiment. The output unit 134 can output information related to the above-mentioned overall risk assessment of the project to be evaluated in a format such as an output screen 40 shown in Fig. 13. For example, the output screen 40 may include an overall risk assessment of the project to be evaluated ((1) in Fig. 13), such as "comprehensive diagnosis judgment," and a comment on the level of risk, etc. output in natural language text ((2) in Fig. 13).
[0075] The output screen 40 may also include information such as "Comparison with Similar Projects" that shows the results of a comparison between the project to be evaluated and similar projects (e.g., gross profit margin, management labor-hour ratio, cost per labor hour, sales ratio to cost, etc.) (FIG. 13(3)). The output screen 40 may also include information such as the results of a comparison between forecast values and target values (e.g., profit forecast, construction period forecast, construction period labor-hour ratio, etc.) (FIG. 13(4)).
[0076] In addition, the output unit 134 outputs information regarding countermeasures to risks by matching keywords contained in information regarding a user survey about risks with keywords contained in information regarding solutions previously stored in the solution information storage unit 125.
[0077] Specifically, the output unit 134 can output information on measures against risks in a format such as an output screen 50 shown in FIG. 14 for solutions based on information on the comprehensive risk assessment of the project described above. For example, the output unit 134 can output the results of risk assessment classified into "perspectives with high risk" and "other risk perspectives" for each prediction perspective (e.g., customer, system, offshore, following current practice, etc.) on the output screen 50 ((1) in FIG. 14). In addition, the output unit 134 can output risk countermeasures corresponding to each of the risk assessments described above. In addition, the output unit 134 can output natural language sentences such as "Risk level 4 (65 points) Project with slightly low risk", "Risk cost may be low", and "Management man-hours may be low" ((2-1) and (2-2) in FIG. 14).
[0078] When a specific keyword is included in a sentence by extracting nouns through "word segmentation" (word type) or morphological analysis, the output unit 134 can output information on countermeasures for related risks that is stored in advance in the solution information storage unit 125. For example, when the word "offshore" is included, the output unit 134 can output "Offshore-related risks and countermeasures."
[0079] In addition, the output unit 134 can use the “project success rate prediction” calculated by the calculation unit 133 in combination with the above-mentioned specified prediction to output information regarding the future prediction of the project, including information regarding risk assessment of the project and information regarding countermeasures to the risks.
[0080] (Terminal device 200) The terminal device 200 is an information processing terminal that receives information related to the comprehensive risk assessment output from the information processing device 100 and displays it to a user, etc. Note that the terminal device 200 according to this embodiment may be, for example, a smartphone, a PDA (Personal Digital Assistant), a tablet terminal, a notebook PC (Personal Computer), etc., and is not limited thereto.
[0081] 3. Processing Procedure From here, the information processing procedure of the information processing device 100 according to the present embodiment will be described with reference to Fig. 15. Fig. 15 is a diagram showing an example of a flowchart of the information processing method according to the embodiment. Note that the steps may be interchanged and executed, and some steps may not be executed.
[0082] The receiving unit 132 receives information about the project and information about the user survey about risks (step S101). The calculation unit 133 calculates a predetermined prediction using at least one of the information about the project and the information about the user survey about risks (step S102).
[0083] Specifically, the calculation unit 133 performs regression analysis based on the learning model (LightGBM) learned by the learning unit 131, and calculates a predicted value of profit. Next, the calculation unit 133 calculates a profit deviation using the user's profit predicted value and the profit predicted value calculated based on the learning model. Then, the calculation unit 133 calculates a "profit risk assessment" as a profit prediction using the calculated profit deviation based on a predetermined risk assessment calculation condition.
[0084] Furthermore, the calculation unit 133 performs regression analysis based on the learning model (LightGBM) learned by the learning unit 131, and calculates a predicted value of profit. Next, the calculation unit 133 calculates a profit deviation using the user's profit predicted value and the profit predicted value calculated based on the learning model. Then, the calculation unit 133 calculates a "profit risk assessment" as a profit prediction using the calculated profit deviation based on a predetermined risk assessment calculation condition.
[0085] Furthermore, the calculation unit 133 assigns a preset score to each answer to the questionnaire included in the information on the user questionnaire about risk, and calculates a risk point that is an index of the magnitude of risk. Next, the calculation unit 133 tallies the calculated risk points for each predetermined classification, and calculates a predicted risk level for each classification. Then, the calculation unit 133 calculates a predicted overall risk level (risk level evaluation) using the predicted risk level tallied for each predetermined classification.
[0086] Furthermore, the calculation unit 133 calculates a predicted value of the deviation using the average value of a predetermined item of a similar project flagged as "success" included in the project history information and the average value of a predetermined item of the project to be evaluated. Next, the calculation unit 133 calculates a risk evaluation of the deviation using the predicted value of the deviation. Then, the calculation unit 133 multiplies the points corresponding to the risk evaluation by a predetermined coefficient to calculate the score. In this way, the calculation unit 133 calculates the total value of the scores calculated for each item, and calculates the risk evaluation of the deviation.
[0087] The output unit 134 outputs information on the future forecast of the project using a predetermined prediction (step S103). Specifically, the output unit 134 outputs information on the future forecast of the project including information on the risk assessment of the project and information on measures against the risk, using one or more combinations of the delivery date prediction (risk assessment of delivery date), profit prediction (risk assessment of profit), risk level prediction (assessment of risk level), and deviation degree prediction (risk assessment of deviation degree), which are the predetermined predictions calculated by the calculation unit 133. Then, the information processing device 100 ends the process.
[0088] [4. Effects] From here, the effects provided by the information processing device 100 of this embodiment will be described. The reception unit 132 of the information processing device 100 according to this embodiment receives information related to the project and information related to a user survey about risks. The calculation unit 133 of the information processing device 100 calculates a predetermined prediction using at least one of the information related to the project and the information related to the user survey about risks. The output unit 134 of the information processing device 100 is characterized in that it outputs information related to a future prediction of the project using the predetermined prediction calculated by the calculation unit 133.
[0089] Specifically, the calculation unit 133 of the information processing device 100 uses information on the project and information on a user questionnaire about risk to calculate at least one of a delivery date prediction, a profit prediction, a risk level prediction, and a deviation prediction as a predetermined prediction. As a result, the information processing device 100 calculates four future predictions, namely, a delivery date prediction, a profit prediction, a risk level prediction, and a deviation prediction. As a result, it is possible to perform a future prediction of the project to be evaluated with higher accuracy than a future prediction that simply uses the performance data of the project that has been conventionally performed.
[0090] The learning unit 131 of the information processing device 100 learns a learning model that outputs a delivery date prediction value or a profit prediction value using the project history information, information on the project manager, and information on personnel as learning data. The calculation unit 133 of the information processing device 100 has a feature that it inputs at least one of the following items included in the project information: customer information, system overview, profit target, man-hours, management man-hours, process plan, contract details, high-risk viewpoint, risk cost ratio, contract by process, construction period man-hours by process, and free-form risk comments, and calculates one or more of the delivery date prediction, profit prediction, and success rate prediction using the learning model. In this way, the information processing device 100 calculates the future prediction used to output the future prediction of the project to be evaluated based on the learning model. As a result, it is possible to perform a future prediction of the project to be evaluated with higher accuracy than a future prediction that simply uses the performance data of the project that has been implemented in the past.
[0091] The calculation unit 133 of the information processing device 100 has a feature of calculating a predicted risk level by allocating the contents of the questionnaire results on risks included in the information on the user questionnaire on risks to scoring items based on a predetermined threshold value. This allows the information processing device 100 to calculate information such as "what is the degree of risk occurrence" for the project to be evaluated.
[0092] The calculation unit 133 of the information processing device 100 has a feature of calculating a predicted deviation between similar projects and the project to be evaluated based on a predetermined index and a preset condition. This allows the information processing device 100 to calculate information such as "how likely is the risk to occur" based on the deviation between the project to be evaluated and a similar past successful project.
[0093] The output unit 134 of the information processing device 100 uses one or more combinations of the delivery date prediction, profit prediction, risk prediction, and deviation prediction, which are the predetermined predictions calculated by the calculation unit 133, to output information on the future prediction of the project, including information on the risk assessment of the project and information on measures against the risks. The output unit 134 of the information processing device 100 has a feature of outputting information on measures against risks by matching keywords included in the information on the risk assessment of the project with keywords included in the information on the measures stored in advance. As a result, the information processing device 100 can output rich information such as "in what respects the success rate is high" and "what risks are predicted" for the project to be evaluated, rather than simply calculating the success rate, etc., as in the conventional technology. As a result, the information processing device 100 realizes a more accurate future prediction of the project to be evaluated than ever before.
[0094] Due to the above-mentioned features, the information processing device 100 according to the present embodiment has the effect of enabling highly accurate prediction of the future of projects. Therefore, the information processing device 100 enables screening of all possible projects, such as the success or failure and risk extraction, based on the information on the overall risk evaluation of the project to be evaluated that is output. On the other hand, the information processing device 100 enables the extraction of high-risk cases by simultaneous checks, etc., and the pinpoint investigation of the target projects.
[0095] The information processing device 100 also simulates the success rate and expected risks when project conditions are changed, making it possible to consider improvements to the plan. The information processing device 100 also combines the output of information related to the comprehensive risk assessment described above with reviews by experienced people involved in project execution, making it possible to predict the future of the target project with higher accuracy than ever before.
[0096] [5. Hardware Configuration] Next, a hardware configuration example of the information processing device 100 according to the embodiment will be described. Fig. 16 is a diagram showing an example of a computer in which the information processing device 100 according to the embodiment is realized. Referring to Fig. 16, the information processing device 100 is realized by a computer 1000.
[0097] The computer 1000 includes, for example, a processor 801, a ROM 802, a RAM 803, a host bus 804, a bridge 805, an external bus 806, an interface 807, an input device 808, an output device 809, a storage 810, a drive 811, a connection port 812, and a communication device 813. Note that the hardware configuration shown here is an example, and some of the components may be omitted. Also, the computer 1000 may include components other than those shown here.
[0098] (Processor 801) The processor 801 functions, for example, as an arithmetic processing device or control device, and controls all or part of the operation of each component based on various programs recorded in the ROM 802, the RAM 803, the storage 810, or the removable recording medium 901.
[0099] (ROM802, RAM803) The ROM 802 is a means for storing the programs read into the processor 801, data used in calculations, etc. The RAM 803 temporarily or permanently stores, for example, the programs read into the processor 801 and various parameters that change appropriately when the programs are executed.
[0100] (host bus 804, bridge 805, external bus 806, interface 807) The processor 801, ROM 802, and RAM 803 are connected to each other via, for example, a host bus 804 capable of high-speed data transmission. On the other hand, the host bus 804 is connected to an external bus 806 having a relatively low data transmission speed via, for example, a bridge 805. In addition, the external bus 806 is connected to various components via an interface 807.
[0101] (Input device 808) The input device 808 may be, for example, a mouse, a keyboard, a touch panel, a button, a switch, a lever, etc. Furthermore, a remote controller capable of transmitting control signals using infrared rays or other radio waves may also be used as the input device 808. The input device 808 may also include an audio input device such as a microphone.
[0102] (Output Device 809) The output device 809 is a device capable of visually or audibly notifying the user of acquired information, such as a display device such as a CRT (Cathode Ray Tube), LCD, or organic EL, an audio output device such as a speaker or a headphone, a printer, a mobile phone, or a facsimile. The output device 809 according to this embodiment also includes various vibration devices capable of outputting tactile stimulation. The output device 809 may also include an AI speaker or a wearable device.
[0103] (Storage 810) The storage 810 is a device for storing various types of data. For example, a magnetic storage device such as a hard disk drive (HDD), a semiconductor storage device, an optical storage device, or a magneto-optical storage device may be used as the storage 810.
[0104] (Drive 811) The drive 811 is a device that reads information recorded on a removable recording medium 901 such as a magnetic disk, an optical disk, a magneto-optical disk, or a semiconductor memory, and writes information to the removable recording medium 901 .
[0105] (Connection port 812) The connection port 812 is a port for connecting an external device 902, such as a Universal Serial Bus (USB) port, an IEEE1394 port, a Small Computer System Interface (SCSI), an RS-232C port, or an optical audio terminal.
[0106] (Communication device 813) The communication device 813 is a communication device for connecting to a network, such as a communication card for wired or wireless LAN, Bluetooth (registered trademark), or WUSB (Wireless USB), a router for optical communications, a router for ADSL (Asymmetric Digital Subscriber Line), or a modem for various types of communications.
[0107] (Removable recording media 901) The removable recording medium 901 is, for example, a DVD medium, a Blu-ray (registered trademark) medium, an HD DVD medium, various semiconductor storage media, etc. Of course, the removable recording medium 901 may be, for example, an IC card equipped with a non-contact type IC chip, an electronic device, etc.
[0108] (External connection device 902) The external connection device 902 is, for example, a printer, a portable music player, a digital camera, a digital video camera, or an IC recorder.
[0109] The information processing device 100 according to the embodiment is realized by a ROM 802, a RAM 803, and a storage 810. The control unit 130 realized by the processor 801 reads out and executes each control program (for example, an information processing program according to the embodiment) from the ROM 802, the RAM 803, etc.
[0110] [6. Other] Among the above-mentioned processes, all or part of the processes described as being performed automatically may be performed manually. Also, all or part of the processes described as being performed manually may be performed automatically by a known method. In addition, the information including the processing procedures, specific names, various data and parameters shown in the above documents and drawings may be changed arbitrarily unless otherwise specified. For example, the various information shown in each drawing is not limited to the illustrated information.
[0111] Moreover, each component of each device shown in the figure is a functional concept, and does not necessarily have to be physically configured as shown in the figure. In other words, the specific form of distribution and integration of each device is not limited to that shown in the figure. Furthermore, each component may be configured by distributing and integrating functionally or physically in any unit, in whole or in part, depending on various loads, usage conditions, etc. Furthermore, each process described above may be executed in an appropriate combination within a range that does not contradict.
[0112] The above describes the embodiments of the present application in detail with reference to several drawings. However, these are merely examples, and the present invention can be embodied in other forms that incorporate various modifications and improvements based on the knowledge of those skilled in the art, including the aspects described in the Disclosure of the Invention section. [Explanation of symbols]
[0113] 10. Survey 11 Scoring Table 12,20 List 21 Risk Assessment Results 30. List of comprehensive risk assessments 31 Calculation conditions for comprehensive risk assessment 40,50 Output screen 100 Information processing device 110 Communications Department 120 Storage section 121 Learning data storage unit 121a Project History Information 121b Project Manager Information 121c Personnel Information 122 Learning model memory unit 123 Input data storage unit Information about the 123a project 123b Information about user surveys on risks 124 Prediction information storage unit 124a Delivery time forecast 124b Profit forecast 124c Risk Prediction 124d Deviation Prediction 125 Solution information storage unit 130 Control section 131 Learning Department 132 Reception 133 Calculation section 134 Output section 200 Terminal Equipment
Claims
1. a reception unit that receives information regarding the project and information regarding a user questionnaire regarding risks; a calculation unit that calculates a predetermined prediction using at least one of information about the project and information about the user questionnaire regarding the risk; an output unit that outputs information regarding a future forecast of a project using the predetermined forecast calculated by the calculation unit; 13. An information processing device comprising:
2. A learning unit is further provided for learning a learning model that outputs a delivery date prediction value or a profit prediction value using project history information, information on the project manager, and information on personnel as learning data.
2. The information processing apparatus according to claim 1,
3. The calculation unit is calculating at least one of a delivery date prediction, a profit prediction, a risk level prediction, and a deviation prediction as the predetermined prediction using information about the project and information about the user survey about the risk; 2. The information processing apparatus according to claim 1,
4. The calculation unit inputs at least one of the following items included in the information about the project: customer information, system overview, profit target, man-hours, management man-hours, process plan, contract details, high-risk viewpoint, risk cost ratio, contract by process, construction period man-hours by process, and free-form risk comments, and calculates one or more of a delivery date prediction, a profit prediction, and a success rate prediction using a learning model; 4. The information processing apparatus according to claim 1, wherein the information processing apparatus further comprises: a first input section;
5. the calculation unit assigns contents of a questionnaire result on risk included in the information on the user questionnaire on risk to scoring items based on a predetermined threshold value, and calculates a prediction of a risk level; 4. The information processing apparatus according to claim 1, wherein the information processing apparatus is a computer.
6. the calculation unit calculates a prediction of a degree of deviation between similar projects and the project to be evaluated based on a predetermined index and a preset condition; 4. The information processing apparatus according to claim 1, wherein the information processing apparatus is a computer.
7. the output unit uses one or more combinations of the predetermined predictions calculated by the calculation unit, which are the delivery date prediction, the profit prediction, the risk prediction, and the deviation prediction, to output information on a future forecast of the project, including information on a risk assessment of the project and information on measures to deal with the risks; 4. The information processing apparatus according to claim 1, wherein the information processing apparatus further comprises: a first input section;
8. the output unit outputs information regarding countermeasures against risks by matching keywords included in the information regarding risk assessment of the project with keywords included in pre-stored information regarding countermeasures.
8. The information processing apparatus according to claim 7,
9. An information processing method to be performed by an information processing device, a receiving step of receiving information regarding the project and information regarding a user questionnaire regarding risks; a calculation step of calculating a predetermined prediction using at least one of information about the project and information about the user questionnaire regarding the risk; an output step of outputting information regarding a future forecast of a project using the predetermined forecast value calculated by the calculation step; 13. An information processing method comprising:
10. a reception procedure for receiving information regarding the project and information regarding a user survey regarding risks; a calculation step of calculating a predetermined prediction using at least one of information about the project and information about the user survey regarding the risk; an output step of outputting information regarding a future forecast of a project using the predetermined forecast value calculated by the calculation step; An information processing program characterized by causing a computer to execute the above.
Citation Information
Patent Citations
Project success diagnostic device
JP2016170718A
Cited By
Information processing device and information processing method
JP7936503B1