Ortho-image acquisition method, design drawing creation method, design drawing creation system and member for survey

The ortho-image acquisition method using a surveying member with orthogonal surfaces and 3D model calculation addresses inaccuracies in anchor bolt positioning, ensuring precise design drawings for steel members on concrete piers, enhancing manufacturing efficiency.

JP2024141074AActive Publication Date: 2024-10-10JFE ENGINEERING CORP
View PDF 15 Cites 0 Cited by

Patent Information

Application Number
JP2023052524
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-10
Estimated Expiration
2043-03-29

AI Technical Summary

Technical Problem

Existing methods for determining the position of anchor bolts in concrete piers are inaccurate and time-consuming, particularly when dealing with protrusions, as they rely on manual corrections and have variations due to individual interpretation, leading to inefficiencies in manufacturing steel members.

Method used

An ortho-image acquisition method that involves photographing protrusions from two different directions perpendicular to the object plane using a surveying member with orthogonal surfaces, constructing a 3D model, and calculating an ortho-image viewed from the front to accurately determine the position and inclination of anchor bolts, facilitating precise design drawing creation.

Benefits of technology

Enables the easy and accurate acquisition of ortho-images with minimal deviation from the perpendicular direction, allowing for efficient and reliable design drawing creation of steel members attached to concrete piers, reducing time and effort in manufacturing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024141074000001_ABST
    Figure 2024141074000001_ABST
Patent Text Reader

Abstract

To easily acquire an ortho-image in the front view with a little deviation from a direction orthogonal to an object plane when a protruding object protruding from the plane is viewed from the front with respect to the plane.SOLUTION: An ortho-image acquisition method includes: a member for survey installation step of installing a member 10 for survey which has two orthogonal planes 14A1, 14B1 that extend in two different directions orthogonal to an object plane, and which has a dimension portion at least a partial dimension of which is grasped in advance on the object plane; an imaging step of capturing photographs of a protruding object 54 and the member 10 for survey together as subjects from at least two different directions; a three-dimensional model construction step of constructing a three-dimensional model of the protruding object 54 by using the data of the captured photographs; and an ortho-image acquisition step of acquiring an ortho-image in which the constructed three-dimensional model is viewed from the front with respect to the object plane. In ortho-image acquisition step, the direction in which the three-dimensional model is viewed from the font is the direction parallel to both of the two orthogonal planes 14A1, 14B1 of the member 10 for survey.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an orthoimage acquisition method, a design drawing creation method, a design drawing creation system, and surveying components, and in particular to a method for acquiring an orthoimage of a protrusion protruding from a plane of an object, a design drawing creation method and design drawing creation system that use orthoimage data, and surveying components used to acquire an orthoimage. [Background technology]

[0002] It is common to attach steel members (such as steel brackets for jacking up or brackets to prevent bridges from falling) to the wall surface of a concrete pier. In such cases, holes are often drilled into the wall surface of the concrete pier to fix anchor bolts, and the steel members are then attached to the anchor bolts.

[0003] Since it is impossible to make the position of the hole drilled in the wall of a concrete pier completely error-free from the hole position in the design drawing, tracing paper is placed on the wall of the pier at the site, and the worker records the actual hole position on the tracing paper, and then modifies the hole position in the design drawing to reflect the result. After the anchor bolt is fixed in the actually drilled hole, a plywood board with a hole corresponding to the fixed anchor bolt (a plywood board with a hole drilled according to the design drawing with the hole position previously modified) is brought to the site to check the inclination of the fixed anchor bolt, and it is actually confirmed on site whether the anchor bolt is properly inserted through the hole in the plywood. If the inclination of the fixed anchor bolt is greater than a certain level, the fixed anchor bolt cannot pass through the hole in the plywood even if the hole position in the wall of the pier and the hole position in the plywood exactly match. In this case, the holes drilled in the plywood are elongated or enlarged in diameter to reflect the inclination of the fixed anchor bolt, so that the fixed anchor bolt can pass through the holes in the plywood. Then, based on the plywood with holes machined to allow the fixed anchor bolt to pass through, final revisions are made to the design drawings for the steel members such as brackets, and the steel members are manufactured. Generally, steel members to be attached to the wall surface of a concrete pier are manufactured using the method described above, but the commonly used method is very time-consuming.

[0004] In response to this, Patent Document 1 discloses a method for easily determining the position of an anchor bolt fixed to the wall surface of a concrete pier (the position of the anchor bolt including the inclination) by obtaining the positions of the tip and base of the anchor bolt by three-dimensional photogrammetry from image data obtained by capturing images from at least two different directions, and by showing these positions by superimposing them on the shape of the wall surface when viewed from the front. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Patent No. 7084891 Summary of the Invention [Problem to be solved by the invention]

[0006] However, the method disclosed in Patent Document 1 does not disclose how to superimpose the positions of the tip and base of the anchor bolt obtained by 3D photogrammetry as described above on the shape viewed from the front, i.e., how to accurately determine the direction perpendicular to the wall surface that is the mounting surface, so it is unclear whether the positions obtained for the tip and base of the protruding part of the anchor bolt can be accurately viewed from the front in a direction perpendicular to the wall surface that is the mounting surface. In response to this point, it is possible to select any three points on the wall surface in a 3D image obtained using close-up photogrammetry or the like to define a surface and determine the direction perpendicular to the surface, i.e., the front view direction, but with this method, there is a risk of variation in accuracy due to the fact that the arbitrary three points selected on the wall surface differ depending on the person or system, and it is also time-consuming to determine the front view direction, which results in the risk of not being able to easily determine the position of the anchor bolt.

[0007] The present invention has been made in consideration of the above points, and has an objective to provide an orthoimage acquisition method that can easily acquire an orthoimage viewed from the front with little deviation from the direction perpendicular to an object plane when a protrusion protruding from an object plane is viewed from the front on the plane, surveying components used therein, and a method and system for creating design drawings using the acquired orthoimage. [Means for solving the problem]

[0008] The present invention is an invention that solves the above-mentioned problems, and provides an orthoimage acquisition method, a design drawing creation method, a design drawing creation system, and surveying components as described below.

[0009] That is, a first aspect of the orthoimage acquisition method of the present invention is a method for acquiring an orthoimage of a protrusion protruding from an object plane, which is a flat surface of an object, comprising a surveying member installation step of installing a surveying member on the object plane, the surveying member having two orthogonal planes extending in two different directions perpendicular to the object plane and having a dimensional portion whose dimensions at least some of which are known in advance; a photographing step of taking photographs including the protrusion and the surveying member together as subjects from at least two different directions; a 3D model construction step of constructing a 3D model of the protrusion using data of the photographs taken in the photographing step; and an orthoimage acquisition step of acquiring an orthoimage of the 3D model constructed in the 3D model construction step viewed from the front with respect to the object plane, wherein in the orthoimage acquisition step, the direction in which the 3D model is viewed from the front is parallel to both of the two orthogonal planes of the surveying member extending in the two different directions.

[0010] In this application, a plane refers to a flat surface, regardless of the orientation of the plane, and includes, for example, a plane extending in the horizontal direction, a plane extending in the vertical direction, and a plane extending in a direction inclined at a predetermined angle with respect to the horizontal plane.

[0011] Furthermore, a "dimensional portion" is a portion whose dimensions are at least partially known in advance, which can be photographed, and which is visible from the outside.

[0012] In addition, in this application, an "orthoimage" is an image in which the object plane is viewed from the front so that the width of one pixel, which is one of the pixels that make up the image, is 1 mm or less in terms of the actual size of the subject.

[0013] In this application, "constructing a three-dimensional model" does not require the actual creation of a three-dimensional replica (copy) or the actual display of a three-dimensional image on a display. It is considered to be satisfied if data on the position coordinates of each point of the outline can be obtained through computation so that an orthoimage satisfying the required accuracy can be calculated in the orthoimage acquisition process.

[0014] A second aspect of the orthoimage acquisition method according to the present invention is a method for acquiring an orthoimage of a protrusion protruding from an object plane, which is a plane of an object, comprising a surveying member installation step of installing a surveying member on the object plane, the surveying member having two orthogonal planes extending in two different directions perpendicular to the object plane, a dimensional portion having at least a part of dimensions known in advance, and a predetermined reference point; a photographing step of taking photographs including the protrusion and the surveying member together as subjects from at least two different directions; and a method of generating an orthoimage of a protrusion protruding from an object plane, the ...gonal planes extending in two different directions perpendicular to the object plane, a dimensional portion having at least a part of dimensions known in advance, and a predetermined reference point; and an ortho-image acquisition process for acquiring an ortho-image of the 3D model constructed in the 3D model construction process viewed from the front with respect to the object plane, wherein in the surveying member installation process, the surveying member is installed on the object plane so that the predetermined reference point of the surveying member is located at a predetermined position that serves as a reference for the position of the protrusion on the object plane, and in the ortho-image acquisition process, the direction in which the 3D model is viewed from the front is set to a direction parallel to both of the two orthogonal planes extending in the two different directions of the surveying member.

[0015] A third aspect of the orthoimage acquisition method of the present invention is an aspect in which, in the orthoimage acquisition method of the first or second aspect, the object plane is a mounting plane on which other components are attached.

[0016] A fourth aspect of the orthoimage acquisition method of the present invention is an aspect in which, in the orthoimage acquisition method of any of the first to third aspects, marking lines that serve as a reference for the position of the protrusion on the object plane are drawn in two directions so as to intersect, and the predetermined position that serves as a reference for the position of the protrusion on the object plane in the surveying member installation process is the position where the intersecting marking lines intersect.

[0017] A fifth aspect of the ortho-image acquisition method of the present invention is an aspect in which, in the ortho-image acquisition method of any of the first to third aspects, marking lines that serve as a reference for the position of the protrusion on the object plane are drawn in two directions so as to intersect at right angles, the two orthogonal planes of the surveying member are perpendicular to each other, the predetermined position that serves as a reference for the position of the protrusion on the object plane in the surveying member installation step is the intersecting position of the marking lines that intersect at right angles, and in the surveying member installation step, the surveying member is installed on the mounting plane so that the two orthogonal planes of the surveying member are positioned in accordance with the marking lines that intersect at right angles.

[0018] Here, the two orthogonal surfaces are arranged "in line with the scribe lines that intersect at right angles" means that the two orthogonal surfaces are arranged so as to be parallel to one of the "scribe lines that intersect at right angles." Note that "parallel" here also includes cases where the scribe lines are included in the extended plane of the orthogonal surfaces.

[0019] A sixth aspect of the orthoimage acquisition method according to the present invention is an orthoimage acquisition method according to any one of the first to fifth aspects, characterized in that in the 3D model construction process, convergent calculations are performed to minimize deviation of the photograph used from the data, thereby constructing the 3D model.

[0020] A first aspect of the design drawing creation method according to the present invention is a design drawing creation method characterized by having a design drawing creation step of creating design drawings of components to be attached to the object plane via the protrusion, using orthoimage data acquired by an orthoimage acquisition method of any one of the third to fifth aspects.

[0021] A second aspect of the design drawing creation method according to the present invention is the design drawing creation method of the first aspect, characterized in that the object is a structure fixed to the ground surface.

[0022] A third aspect of the design drawing creation method according to the present invention is the design drawing creation method of the first aspect, characterized in that the object is a substructure of a bridge.

[0023] A first aspect of the design drawing creation system according to the present invention is a design drawing creation system that creates design drawings of a component to be attached to an object plane via a protrusion protruding from an object plane, which is a flat surface of an object, and is characterized by having: a surveying component having two orthogonal surfaces that extend in two different directions perpendicular to the object plane and having a dimensional portion whose dimensions at least part of which are known in advance; an imaging means that takes photographs of the surveying component installed on the object plane together with the protrusion from at least two different directions; a 3D model construction unit that constructs a 3D model of the protrusion using data about the photographs taken by the imaging means; an orthoimage calculation unit that calculates an orthoimage of the 3D model constructed by the 3D model construction unit viewed from the front with respect to the object plane; and a design drawing creation unit that creates design drawings of the component to be attached to the object plane via the protrusion using data of the orthoimage calculated by the orthoimage calculation unit.

[0024] A second aspect of the design drawing creation system according to the present invention is a design drawing creation system for creating design drawings of a component to be attached to an object plane via a protrusion protruding from an object plane, which is a flat surface of an object, comprising: a surveying component having two orthogonal surfaces extending in two different directions perpendicular to the object plane, a dimensional portion whose dimensions at least part of which are known in advance, and further having a predetermined reference point; an imaging means for taking photographs of the surveying component installed on the object plane together with the protrusion from at least two different directions; a 3D model construction unit for constructing a 3D model of the protrusion and the surveying component using data on the photographs taken by the imaging means; an orthoimage calculation unit for calculating an orthoimage of the 3D model constructed by the 3D model construction unit viewed from the front with respect to the object plane; and a design drawing creation unit for creating a design drawing of the component to be attached to the object plane via the protrusion using data on the orthoimage calculated by the orthoimage calculation unit.

[0025] A first aspect of the surveying member of the present invention is a surveying member used to obtain an orthoimage of a protrusion protruding from an object plane, which is a flat surface on an object, characterized in that the surveying member has a reference plane arranged parallel to the object plane, two orthogonal planes extending in two different directions perpendicular to the reference plane, and a dimensional portion, at least some of the dimensions of which are known in advance.

[0026] A second aspect of the surveying member according to the present invention is the surveying member of the first aspect, characterized in that the two orthogonal surfaces are orthogonal to each other.

[0027] A third aspect of the surveying device of the present invention is a surveying device of the first or second aspect, characterized in that, when viewed from a direction perpendicular to the reference plane, it has two walls that intersect perpendicularly in a cross shape, and the two perpendicular planes are the wall surfaces of the two walls. Effect of the Invention

[0028] According to the present invention, it is possible to provide an orthoimage acquisition method that can easily acquire an orthoimage viewed from the front with little deviation from the direction perpendicular to the object plane when a protrusion protruding from an object plane is viewed from the front on the plane, surveying components used therein, and a design drawing creation method and design drawing creation system that use the acquired orthoimage. [Brief description of the drawings]

[0029] [Figure 1] FIG. 1 is a block diagram showing a configuration of a design drawing creation system 8 according to an embodiment of the present invention. [Diagram 2] FIG. 2 is an enlarged perspective view showing a schematic enlargement of a portion where the bracket 30 is attached to the bridge 50 (an attachment plane 52A on a side surface of a pier 52 of the bridge 50). [Diagram 3] FIG. 13 is an enlarged perspective view showing a schematic view of the bracket 30 attached to the attachment plane 52A of the pier 52. [Figure 4] A flowchart showing the procedure of an orthoimage acquisition method according to an embodiment of the present invention. [Diagram 5] 1A and 1B are diagrams showing a surveying member 10, in which FIG. 1A is a perspective view showing the surveying member 10 and FIG. 1B is a plan view showing the surveying member 10. FIG. [Figure 6] 1A and 1B are diagrams showing a surveying member 60, in which FIG. 1A is a perspective view showing the surveying member 60 and FIG. 1B is a plan view showing the surveying member 60. [Figure 7] 1A and 1B are diagrams showing a surveying member 70, in which (A) is a perspective view showing the surveying member 70 and (B) is a plan view showing the surveying member 70. FIG. [Figure 8] 1A and 1B are diagrams showing a surveying member 80, in which (A) is a perspective view showing the surveying member 80 and (B) is a plan view showing the surveying member 80. FIG. [Figure 9] 1A and 1B are diagrams showing a surveying member 90, in which (A) is a perspective view showing the surveying member 90 and (B) is a plan view showing the surveying member 90. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0030] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. In the description of the embodiment of the present invention, it is assumed that a suitable ortho-image is acquired for use in creating a design drawing (a design drawing of the bracket 30 in which holes corresponding to each of the anchor bolts 54 are provided in the appropriate shape and at the correct position) for producing a bracket 30 as shown in FIG. 3, that is, a bracket 30 to be attached to a group of a plurality of anchor bolts 54 fixed to a mounting plane 52A on the side of a pier 52 of a bridge 50, and a design drawing for producing the bracket 30 is created based on the acquired suitable ortho-image. However, the subject of the design drawing created using the ortho-image acquired by the present invention is not limited to this, and can be a wide range of components to be attached to an object plane.

[0031] (1) Embodiments of an orthoimage acquisition method, a design drawing creation method, and a design drawing creation system FIG. 1 is a block diagram showing the configuration of a design drawing creation system 8 according to an embodiment of the present invention, FIG. 2 is an enlarged perspective view showing, in a magnified schematic manner, the portion where a bracket 30 is attached to a bridge 50 (mounting plane 52A on the side of a pier 52 of the bridge 50), and FIG. 3 is an enlarged perspective view showing, in a magnified schematic manner, the manner in which the bracket 30 is attached to the mounting plane 52A of the pier 52.

[0032] The design drawing creation system 8 according to an embodiment of the present invention is a design drawing creation system that creates design drawings of an attachment member (here, a bracket 30) to be attached to an object plane (here, the attachment plane 52A of a pier 52 of a bridge 50), which is a flat surface of an object, via a protrusion (here, a group of anchor bolts 54) that protrudes from the object plane, and is a design drawing creation system that can calculate accurate orthoimages and create appropriate design drawings of the attachment member (here, the bracket 30), and is equipped with a surveying member 10, a digital camera 20, and a computer 22. Specifically, the surveying member 10 is placed on the mounting plane 52A of the pier 52, and photographs of the surveying member 10 together with a group of anchor bolts 54 are taken from at least two different directions using the digital camera 20, and the photographed photograph data is stored in the recording unit 20A. The photograph data stored in the recording unit 20A is imported into the computer 22, a three-dimensional model of the group of anchor bolts 54 and the surveying member 10 is constructed in the three-dimensional model construction unit 22A, an orthoimage of the constructed three-dimensional model viewed accurately from the front on the mounting plane 52A of the pier 52 is calculated in the orthoimage calculation unit 22B, and the calculated orthoimage data is read into and reflected in the CAD software of the design drawing creation unit 22C, and a design drawing of the bracket 30 is created.

[0033] As shown in Fig. 3, the bracket 30 has a mounting steel plate 30A, an upper steel plate 30B, and a reinforcing steel plate 30C, which are connected by welding to form the bracket 30. The mounting steel plate 30A has through holes (not shown) for inserting the anchor bolts 54, which are provided in correspondence with the respective anchor bolts 54, and each anchor bolt 54 is inserted into the through hole of the mounting steel plate 30A. The mounting steel plate 30A is then placed on the mounting plane 52A of the pier 52 so that the surfaces of the mounting steel plate 30A abut against the mounting plane 52A of the pier 52, and is attached to the mounting plane 52A of the pier 52 as shown in Fig. 3 by tightening nuts 56 attached to each anchor bolt 54.

[0034] The holes provided for installing the anchor bolts 54 on the mounting plane 52A of the pier 52 may be provided at positions shifted from the original design positions for reasons such as avoiding reinforcing bars in the pier 52. Even if there is no such reason, it is difficult to provide the holes for installing the anchor bolts 54 with zero error from the original design positions. In addition, it is difficult to fix the anchor bolts 54 inserted into the holes provided for installing the anchor bolts 54 so that they are completely perpendicular to the mounting plane 52A, and each anchor bolt 54 provided on the mounting plane 52A is fixed to the mounting plane 52A in a state inclined from the perpendicular direction, although the degree of inclination varies. For this reason, even if holes for the anchor bolts 54 are opened in the mounting steel plate 30A of the bracket 30 at the original design positions (design positions of the holes for the anchor bolts 54 provided on the mounting plane 52A), it is not always possible for the group of anchor bolts 54 to be smoothly inserted through the holes opened in the mounting steel plate 30A, and it is not always possible to attach the bracket 30 to the mounting plane 52A.

[0035] Therefore, it is necessary to drill holes for anchor bolts 54 in mounting steel plate 30A of bracket 30 so as to appropriately reflect the position and inclination of each anchor bolt 54 provided on mounting plane 52A. If anchor bolts 54 are inclined from a direction perpendicular to mounting plane 52A, the holes provided in mounting steel plate 30A of bracket 30 are elongated or have a larger diameter in anticipation of the inclination so that bracket 30 can be attached to mounting plane 52A.

[0036] However, even if the bracket 30 is attached to the attachment plane 52A as described above, if the entire group of anchor bolts 54 is misaligned from the appropriate position, the bracket 30 cannot be said to be properly attached. To give a specific example, if it is necessary to arrange the bracket 30 so that its center position is located directly below the main girder (not shown) of the bridge 50 (directly below the center position of the main girder in the width direction), the bracket 30 cannot be said to be properly attached if its center position is misaligned from the center position of the main girder of the bridge 50, and if the amount of misalignment becomes greater than a certain amount and exceeds the allowable value, it will be necessary to reattach the bracket 30, which will require a lot of effort and cost.

[0037] In order to properly attach bracket 30 to the attachment location on bridge 50 (mounting plane 52A on the side of pier 52 of bridge 50), holes corresponding to each of the multiple anchor bolts 54 (holes that take into account the inclination state of each anchor bolt 54) must be provided in the mounting steel plate 30A of bracket 30 with an appropriate shape and in the correct position, and if the entire group of anchor bolts 54 is misaligned from the appropriate position, it is necessary to drill holes in the mounting steel plate 30A of bracket 30 taking into account that misalignment so that the position of bracket 30 after attachment to mounting plane 52A is appropriate.

[0038] To achieve this, the position and shape of the holes to be drilled in the mounting steel plate 30A of the bracket 30 must be determined by appropriately reflecting the position and inclination of each anchor bolt 54 on the mounting plane 52A, and if the group of anchor bolts 54 as a whole is misaligned from the appropriate position, it is necessary to create design drawings that take into account and correct this misalignment.

[0039] When creating such appropriate design drawings, the orthoimage acquired by implementing the orthoimage acquisition method according to this embodiment can make a great contribution. In the orthoimage acquisition method according to this embodiment, a predetermined surveying member (here, the surveying member 10) is installed at a predetermined position (here, the intersection of the horizontal marking line 32B and the vertical marking line 32A drawn on the mounting plane 52A of the pier 52 of the bridge 50) on the object plane (here, the mounting plane 52A of the pier 52 of the bridge 50), and photographs including a protrusion (here, a group of anchor bolts 54) protruding from the object plane and the predetermined surveying member (here, the surveying member 10) as subjects are taken from at least two different directions, and a three-dimensional model of the group of anchor bolts 54 and the surveying member 10 is constructed using the data of the photographs, and an orthoimage of the constructed three-dimensional model viewed from the front is obtained. The ortho-image acquired by implementing the ortho-image acquisition method of this embodiment is an image in which the group of anchor bolts 54 and surveying members 10 protruding from the mounting plane 52A of the pier 52 of the bridge 50 are viewed accurately from the front with respect to the mounting plane 52A, and the image reflects the position and inclination state of each anchor bolt 54 and the arrangement positions of the surveying members 10. Therefore, if holes are drilled in the mounting steel plate 30A of the bracket 30 to be attached to the mounting plane 52A based on the data of this ortho-image, the bracket 30 can be securely and properly attached to the mounting plane 52A.

[0040] Hereinafter, a procedure for acquiring an orthoimage by carrying out the orthoimage acquisition method according to the embodiment of the present invention will be described with reference to FIG. 4 (a flowchart showing the procedure of the orthoimage acquisition method according to the embodiment of the present invention) and the like.

[0041] (Step S1) As shown in Fig. 2, a group of anchor bolts 54 is provided on a mounting plane 52A of a pier 52 of a bridge 50, and a scribe line 32 is drawn on the mounting plane 52A as a reference position for mounting the bracket 30 at an appropriate position. The scribe lines 32 are drawn in the vertical and horizontal directions, with the vertical scribe line 32A being a scribe line drawn in the vertical direction and the horizontal scribe line 32B being a scribe line drawn in the horizontal direction. The vertical scribe line 32A is a scribe line indicating a position directly below the main girder (not shown) of the bridge 50 (a position directly below the center position of the main girder in the width direction), and the horizontal scribe line 32B is a scribe line for guiding the height position of the bracket 30 to be mounted on the mounting plane 52A to an appropriate height position.

[0042] When carrying out the orthoimage acquisition method of this embodiment, first, the surveying member 10 is attached to a predetermined position on the mounting plane 52A (the intersection of the vertical marking line 32A and the horizontal marking line 32B) (step S1 in the flowchart of Figure 4).

[0043] Here, the surveying member 10, which plays an important role in the orthoimage acquisition method according to this embodiment, will be described. Fig. 5 shows the surveying member 10, Fig. 5(A) is a perspective view showing the surveying member 10, and Fig. 5(B) is a plan view showing the surveying member 10. Note that the indication line of the reference plane 12B in Fig. 5(A) is a dashed line, but this is intended to indicate the hidden back surface.

[0044] The surveying member 10 includes a reference plate 12, a protruding wall 14 protruding perpendicularly from the front surface 12A of the reference plate 12, and a plurality of dimension reference points 16. The surveying member 10 serves to accurately determine the direction perpendicular to the mounting plane 52A (the direction in which the mounting plane 52A is viewed from the front), and also serves to provide a dimensional reference so that the dimensions of the anchor bolt 54 can be calculated from the photograph by appearing in the same photograph as the anchor bolt 54. Another role of the surveying member 10 is to link the position of the anchor bolt 54 in the acquired orthoimage with the position of the actual pier 52 on the mounting plane 52A by arranging the surveying member 10 so that the reference point 14X of the surveying member 10 corresponds to a predetermined position on the mounting plane 52A.

[0045] The reference plate 12 is a part that is disposed parallel to the mounting plane 52A and is attached to the mounting plane 52A. A protruding wall 14 is disposed on the front surface 12A of the reference plate 12, and the back surface of the reference plate 12 (the surface opposite to the front surface 12A on which the protruding wall 14 is disposed) forms a flat reference plane 12B. The flat reference plane 12B of the reference plate 12 is attached, for example, by adhesive or a suction cup, to a predetermined position that serves as a reference for the mounting plane 52A of the pier 52.

[0046] As shown in Figs. 5(A) and 5(B), dimension reference points 16 are provided at a plurality of locations on the front surface 12A of the reference plate 12, and a plurality of dimension reference points 16 are provided on the surveying member 10. The dimension reference points 16 provided at a plurality of locations are provided in a manner that allows them to be distinguished from one another, so that it is possible to determine at which location on the surveying member 10 the dimension reference point 16 shown in the photograph is provided. In addition, the distance between two dimension reference points 16 (for example, the distance between the centers of the two dimension reference points 16, the distance between the opposing sides, etc.) is accurately measured in advance, and a pair of two dimension reference points 16 constitutes a dimension reference portion that serves as a reference for dimensions. The surveying member 10 has a plurality of dimension reference points 16, and therefore has at least one dimension reference portion.

[0047] The protruding wall 14 is provided so as to protrude from the front surface 12A of the reference plate-like body 12 in a direction perpendicular to the front surface 12A and the reference plane 12B, and is composed of two walls (a first protruding wall 14A and a second protruding wall 14B) that intersect perpendicularly. The center position of the intersection of the first protruding wall 14A and the second protruding wall 14B is the reference point 14X of the surveying member 10. The protruding wall 14 (first protruding wall 14A and second protruding wall 14B) are arranged to protrude from the front surface 12A in a direction perpendicular to the front surface 12A and the reference plane 12B, and when the reference plate body 12 is installed on the mounting plane 52A of the pier 52, the orthogonal surface 14A1 which is the wall surface of the first protruding wall 14A and the orthogonal surface 14B1 which is the wall surface of the second protruding wall 14B are perpendicular to the mounting plane 52A of the pier 52. Therefore, when the protruding wall 14 (the first protruding wall 14A and the second protruding wall 14B) is photographed in a direction perpendicular to the mounting plane 52A (the direction in which the mounting plane 52A is viewed from the front), that is, in a direction parallel to both of the two orthogonal planes 14A1 and 14B1 extending in two different directions of the surveying member 10, the orthogonal planes 14A1 and 14B1, which are the wall surfaces of the protruding wall 14 (the first protruding wall 14A and the second protruding wall 14B), are not captured. On the other hand, if the orthogonal planes 14A1 and 14B1, which are the wall surfaces of the protruding wall 14 (the first protruding wall 14A and the second protruding wall 14B), are captured in the photograph, the direction in which the photograph was taken is a direction parallel to both of the two orthogonal planes 14A1 and 14B1 extending in two different directions of the surveying member 10, that is, a direction shifted from the direction perpendicular to the mounting plane 52A (the direction in which the mounting plane 52A is viewed from the front). The data of the photographs taken is input into computer 22, and by having the orthoimage calculation unit 22B of computer 22 perform calculations based on the manner in which orthogonal planes 14A1 and 14B1 are captured, the direction perpendicular to mounting plane 52A (the direction in which mounting plane 52A is viewed from the front) can be easily determined.

[0048] In step S1, the surveying member 10 described above is attached to the mounting plane 52A of the pier 52 so that the reference plane 12B (the surface opposite to the surface 12A on the front side on which the protruding wall 14 is arranged) on the back side of the reference plate-like body 12 abuts the mounting plane 52A of the pier 52. In detail, as shown in FIG. 2, the surveying member 10 is attached to the mounting plane 52A so that the first protruding wall 14A is aligned with the vertical marking line 32A and the second protruding wall 14B is aligned with the horizontal marking line 32B, and the surveying member 10 is installed so that the reference point 14X of the surveying member 10 is located on the intersection of the vertical marking line 32A and the horizontal marking line 32B (on a straight line extending from the intersection of the vertical marking line 32A and the horizontal marking line 32B in a direction perpendicular to the mounting plane 52A).

[0049] (Step S2) In step S1, the surveying member 10 is installed so that the reference point 14X of the surveying member 10 is located on the intersection of the vertical marking line 32A and the horizontal marking line 32B (on a straight line extending from the intersection of the vertical marking line 32A and the horizontal marking line 32B in a direction perpendicular to the mounting plane 52A), and then in step S2, photographs including the anchor bolt 54 and the surveying member 10 as subjects are taken from at least two different directions. For the photographing, a commercially available high-resolution digital camera with 20 million pixels or more can be used. In step S4 described later, a three-dimensional model is constructed (data on the position coordinates of each point of the outer shape of the anchor bolt 54 is calculated), and a convergence calculation is performed based on the photographed photographic data to construct the three-dimensional model so that the deviation from the photographic data used is minimized. Therefore, from the viewpoint of improving the accuracy of the constructed three-dimensional model, it is preferable to take many photographs (three or more photographs) from different directions. Furthermore, by importing data from many photographs taken from multiple directions into computer 22 and analyzing it, it is possible to correct distortions in the lens of the digital camera used, etc., and improve the accuracy of the 3D model created in step S4. However, since it is sufficient in step S4 to construct a 3D model with the required accuracy (calculate data on the position coordinates of each point on the outline of anchor bolt 54 with the required accuracy), it is sufficient to take as many photographs as necessary to achieve that purpose.

[0050] (Step S3) The photographed data is input to the analysis computer 22. The digital camera 20 may be provided with a communication means (not shown) so that the photographed data can be wirelessly input to the analysis computer 22. In this case, the photographed data can be input to the computer 22 almost simultaneously with the photographing in step S2, and the 3D model construction process in the next step S4 (the process of calculating the data on the position coordinates of each point of the outer shape of the anchor bolt 54 and the surveying member 10) can be performed almost in real time. In addition, when the number of photographic data is insufficient to construct a 3D model with the required accuracy (calculating the data on the position coordinates of each point of the outer shape of the anchor bolt 54 and the surveying member 10 with the required accuracy) or when photographic data taken from a specific direction is insufficient, the necessary photographs can be additionally taken almost in real time.

[0051] (Step S4) Using the photographic data imported into the analysis computer 22, data on the position coordinates of each point on the outer shapes of the anchor bolt 54 and the surveying member 10 is calculated to construct a three-dimensional model of the anchor bolt 54 and the surveying member 10. At this time, the analysis computer 22 refers to the distance data between the two dimensional reference points 16 to calculate data on the position coordinates of each point on the outer shapes of the anchor bolt 54 and the surveying member 10, thereby linking the position coordinates of each point on the outer shapes of the anchor bolt 54 and the surveying member 10 to the actual dimensions.

[0052] (Step S5) Of the photographic data imported into the computer 22, the orthoimage calculation unit 22B of the computer 22 performs an analysis based on the data on the orthogonal surfaces 14A1 and 14B1 of the surveying member 10, and determines the direction perpendicular to the mounting plane 52A. The orthoimage calculation unit 22B then regards the determined direction as the direction perpendicular to the mounting plane 52A, and calculates an orthoimage of the anchor bolt 54 and the surveying member 10 by viewing the 3D model of the anchor bolt 54 and the surveying member 10 from the front with respect to the mounting plane 52A. The direction in which the orthoimage calculation unit 22B views the mounting plane 52A from the front is the direction that the orthoimage calculation unit 22B of the computer 22 performs an analysis based on the data on the orthogonal surfaces 14A1 and 14B1 of the surveying member 10 and determines as the direction perpendicular to the mounting plane 52A, and since it is a direction that is accurately perpendicular to the mounting plane 52A, the orthoimage calculation unit 22B can calculate an accurate orthoimage.

[0053] (Step S6) The orthoimage data calculated in step S5 is imported into the CAD software of the design drawing creation unit 22C and reflected in the drawing for manufacturing the bracket 30. The orthoimage calculated in step S5 is an image in which the group of anchor bolts 54 protruding from the mounting plane 52A of the pier 52 of the bridge 50 is viewed accurately from the front with respect to the mounting plane 52A, and is an image that reflects the position and inclination state of each anchor bolt 54, so that if holes are drilled in the mounting steel plate 30A of the bracket 30 to be attached to the mounting plane 52A based on the orthoimage data, the bracket 30 can be reliably attached to the mounting plane 52A.

[0054] The orthoimage also depicts the surveying member 10, and the reference point 14X of the surveying member 10 is located on the intersection of the vertical scribing line 32A and the horizontal scribing line 32B (on a straight line extending from the intersection of the vertical scribing line 32A and the horizontal scribing line 32B in a direction perpendicular to the mounting plane 52A), so that the shape and position data of each anchor bolt 54 in the orthoimage can be linked to the mounting plane 52A of the pier 52 of the bridge 50, which is the actual site, based on the reference point 14X of the surveying member 10 depicted in the orthoimage, to create a design drawing of the bracket 30. Therefore, when the entire group of anchor bolts 54 is deviated to a certain degree from the appropriate position as a whole (when the deviation is such that it can be dealt with by adjusting the positions of a group of holes to be drilled in the mounting steel plate 30A of the bracket 30), the deviation can be corrected and reflected to create a design drawing of the bracket 30.

[0055] In addition, when it is clear that the overall position of the group of anchor bolts 54 is appropriate, the bracket 30 may be manufactured on the premise that the overall position of the group of anchor bolts 54 is appropriate, and since it is not necessary to consider that the overall position of the group of anchor bolts 54 is misaligned, the bracket 30 may be manufactured with an emphasis on reliably attaching the bracket 30 to the attachment plane 52A. In other words, on the premise that the overall position of the group of anchor bolts 54 is appropriate, holes may be drilled in the attachment steel plate 30A of the bracket 30 to be attached to the attachment plane 52A based on the data of the obtained ortho-image (the ortho-image reflecting the position and inclination state of each anchor bolt 54). In this case, the 3D model constructed in step S4 may not include the surveying member 10, and a 3D model may be constructed only with the group of anchor bolts 54. In this case, the surveying member 10 is not included in the ortho-image calculated in step S5 either.

[0056] (2) Supplementary information In the above embodiment, the bracket 30 is attached to the pier 52, but the object to which the bracket 30 is attached is not limited to the pier 52, and the bracket 30 can be similarly applied to a substructure such as an abutment (not shown) of a bridge 50, and can also be applied to a superstructure of a bridge. The present invention can also be applied to a wide range of protrusions that protrude from the object plane.

[0057] In the above-described embodiment, a pair of two dimension reference points 16 of the surveying member 10 constitutes a dimension reference portion that is a reference for dimensions, but the dimension reference portion is not limited to this configuration, and for example, a long plate-like member (e.g., a plate-like member having a shape generally used as a ruler) whose length has been measured in advance can also be used as the dimension reference portion. Also, the length of the side of the reference plate-like body 12 of the surveying member 10 and each dimension of the protruding wall body 14 can be measured in advance and used as the dimension reference portion.

[0058] Furthermore, the shape, etc. of the surveying member that can be used in the present invention is not limited to the shape, etc. of the surveying member 10. Any surveying member that has two orthogonal planes that extend in two different directions perpendicular to the object plane and has dimensional parts whose dimensions at least part of which are known in advance can be used in the present invention. In implementing the present invention, it is also possible to use, for example, surveying members 60, 70, 80, 90 as shown in Figures 6 to 9 instead of the surveying member 10.

[0059] Below, we will briefly explain these surveying members 60, 70, 80, and 90. However, among the components of the surveying members 60, 70, 80, and 90 shown in Figures 6 to 9, components that are similar to the components of the surveying member 10 will, as a general rule, be given the same symbols and their explanations will be omitted.

[0060] The surveying members 60, 70, and 80 shown in Figs. 6 to 8 are surveying members in which protrusions 62, 72, and 82 are provided on the front surface 12A of the reference plate-like body 12. As shown in Fig. 6, the protrusion 62 of the surveying member 60 is a rectangular parallelepiped, and the wall surfaces 62A and 62B of the rectangular parallelepiped are perpendicular to the reference plane 12B, which is the back surface of the reference plate-like body 12. As shown in Fig. 7, the protrusion 72 of the surveying member 70 is a triangular prism, and the wall surfaces 72A, 72B, and 72C of the triangular prism are perpendicular to the reference plane 12B, which is the back surface of the reference plate-like body 12. As shown in Fig. 8, the protrusion 82 of the surveying member 80 is a cylinder, and the wall surface 82A of the cylinder is perpendicular to the reference plane 12B, which is the back surface of the reference plate-like body 12. Wall surface 82A of the cylinder can be considered to be composed of a large number of rectangular wall surfaces, each having a very small width, arranged in the circumferential direction and perpendicular to reference plane 12B.

[0061] A surveying member 90 shown in Fig. 9 is a surveying member in which the thickness of the reference plate-like body 12 of the surveying member 10 itself is increased to form a protrusion 92. The protrusion 92 is a quadrangular prism with a square cross section, and its back surface is a flat reference plane 92B, and wall surfaces 92A1 and 92A2 of the protrusion 92 (quadratic prism with a square cross section) are perpendicular to the reference plane 92B.

[0062] In addition to the variations shown in Fig. 6 to Fig. 9, various surveying members can be used in place of the surveying member 10 when implementing the present invention. Although not shown in the figures, specific examples include an embodiment in which the square-shaped reference plate body 12 is made into an equilateral triangle (a total of three dimension reference points 16 are arranged near the vertices of the front surface of the equilateral triangle), and an embodiment in which the protruding body 92 (a quadrangular prism with a square cross section) of the surveying member 90 shown in Fig. 9 is replaced with a triangular prism with a regular triangular cross section (a total of three dimension reference points 16 are arranged near the vertices of the front surface of the equilateral triangle). [Explanation of symbols]

[0063] 8…Design drawing creation system 10, 60, 70, 80, 90...Surveying materials 12...Reference plate 12A…Front surface 12B, 92B…Reference plane 14...Protruding wall body 14A…First protruding wall body 14A1, 14B1...orthogonal surfaces 14B…Second protruding wall body 14X…Reference point 16…Dimension reference point 20...Digital camera 20A…Recording section 22. Computer 22A…3D model construction section 22B…Ortho image calculation section 22C…Design Drawing Department 30…Bracket 30A…Mounting steel plate 30B…Upper steel plate 30C…Reinforced steel plate 32…Screen line 32A…Vertical lines 32B…Horizontal score line 50…Bridge 52...Pier 52A…Mounting plane 54…Anchor bolt 56...Nut 62, 72, 82, 92...protruding body 62A, 62B, 72A, 72B, 72C, 82A, 92A1, 92A2...Wall

Claims

1. A method for acquiring an ortho-image of a protrusion protruding from an object plane, the method comprising the steps of: a surveying member installation step of installing a surveying member on the object plane, the surveying member having two orthogonal planes extending in two different directions perpendicular to the object plane and a dimensional portion at least a part of which dimensions are known in advance; a photographing step of photographing the protrusion and the surveying member together as subjects from at least two different directions; a three-dimensional model construction step of constructing a three-dimensional model of the protrusion using data of the photograph taken in the photographing step; an orthoimage acquisition step of acquiring an orthoimage of the three-dimensional model constructed in the three-dimensional model construction step viewed from the front with respect to the object plane; having An orthoimage acquisition method characterized in that, in the orthoimage acquisition process, the direction in which the three-dimensional model is viewed from the front is set to be parallel to both of the two orthogonal planes extending in the two different directions of the surveying member.

2. A method for acquiring an ortho-image of a protrusion protruding from an object plane, the method comprising the steps of: a surveying member installation step of installing a surveying member on the object plane, the surveying member having two orthogonal planes extending in two different directions perpendicular to the object plane, a dimensional portion having at least a part of dimensions known in advance, and a predetermined reference point; a photographing step of photographing the protrusion and the surveying member together as subjects from at least two different directions; a three-dimensional model construction step of constructing a three-dimensional model including the protrusion and the surveying member together using data of the photograph taken in the photographing step; an orthoimage acquisition step of acquiring an orthoimage of the three-dimensional model constructed in the three-dimensional model construction step viewed from the front with respect to the object plane; having In the surveying member installation step, the surveying member is installed on the object plane so that the predetermined reference point of the surveying member is located at a predetermined position that is a reference for the position of the protrusion on the object plane, An orthoimage acquisition method characterized in that, in the orthoimage acquisition process, the direction in which the three-dimensional model is viewed from the front is set to be parallel to both of the two orthogonal planes extending in the two different directions of the surveying member.

3. The method for acquiring an ortho-image according to claim 2 , wherein the object plane is a mounting plane on which other members are mounted.

4. On the object plane, scribe lines serving as references for the position of the protrusion on the object plane are drawn in two directions so as to intersect with each other; 4. The orthoimage acquisition method according to claim 3, wherein the predetermined position serving as a reference for the position of the protrusion on the object plane in the surveying member installation step is a position where the intersecting marking lines intersect.

5. On the object plane, scribe lines serving as references for the position of the protrusion on the object plane are drawn in two directions so as to intersect at right angles, The two orthogonal planes of the surveying member are orthogonal to each other, In the surveying member installation step, the predetermined position serving as a reference for the position of the protrusion on the object plane is a position where the marking lines intersect at right angles, The orthoimage acquisition method according to claim 3, characterized in that in the surveying member installation process, the surveying member is installed on the mounting plane so that the two orthogonal surfaces of the surveying member are aligned with the marking lines that intersect perpendicularly.

6. The orthoimage acquisition method according to any one of claims 1 to 5, characterized in that in the three-dimensional model construction process, a convergent calculation is performed so as to minimize the deviation of the photograph used from the data, thereby constructing the three-dimensional model.

7. A design drawing creation method comprising a design drawing creation step of creating a design drawing of a component to be attached to the object plane via the protrusion using data of an orthoimage acquired by the orthoimage acquisition method according to any one of claims 3 to 5. A design drawing creation method.

8. 8. The method for creating design drawings according to claim 7, wherein the object is a structure fixed to the ground surface.

9. 8. The method for creating design drawings according to claim 7, wherein the object is a substructure of a bridge.

10. A design drawing creation system for creating a design drawing of a component to be attached to an object plane via a protrusion protruding from the object plane, the design drawing system comprising: A surveying member having two orthogonal planes extending in two different directions perpendicular to the object plane and having a dimensional portion, at least a part of which has a dimension known in advance; a photographing means for photographing the surveying member installed on the object plane together with the protruding object from at least two different directions; a three-dimensional model construction unit that constructs a three-dimensional model of the protrusion using data on the photograph taken by the photographing means; an orthoimage calculation unit that calculates an orthoimage in which the three-dimensional model constructed by the three-dimensional model construction unit is viewed from the front with respect to the object plane; A design drawing creation unit that creates a design drawing of a member to be attached to the object plane via the protrusion using the orthoimage data calculated by the orthoimage calculation unit; A design drawing creation system comprising:

11. A design drawing creation system for creating a design drawing of a component to be attached to an object plane via a protrusion protruding from the object plane, the design drawing system comprising: A surveying member having two orthogonal planes extending in two different directions perpendicular to the object plane, a dimensional portion having at least a part of dimensions previously known, and a predetermined reference point; a photographing means for photographing the surveying member installed on the object plane together with the protruding object from at least two different directions; a three-dimensional model construction unit that constructs a three-dimensional model of the protrusion and the surveying member using data on the photograph taken by the photographing means; an orthoimage calculation unit that calculates an orthoimage in which the three-dimensional model constructed by the three-dimensional model construction unit is viewed from the front with respect to the object plane; A design drawing creation unit that creates a design drawing of a member to be attached to the object plane via the protrusion using the orthoimage data calculated by the orthoimage calculation unit; A design drawing creation system comprising:

12. A surveying tool used to obtain an ortho-image of a protrusion protruding from an object plane, the object plane being a plane of the object, a reference plane arranged parallel to the object plane; Two orthogonal planes extending in two different directions perpendicular to the reference plane; A dimensional portion having at least a part of dimensions known in advance; A surveying instrument comprising:

13. 13. The surveying member according to claim 12, wherein the two orthogonal planes are orthogonal to each other.

14. When viewed from a direction perpendicular to the reference plane, the wall has two walls that intersect perpendicularly in a cross shape, 14. The surveying member according to claim 12 or 13, wherein the two orthogonal surfaces are wall surfaces of the two wall bodies.

Citation Information

Patent Citations

  • Method for associating coordinates of non-overlapping field of vision binocular vision measurement stations

    CN107543497A

  • Method and device for creating two-dimensional diagram by using three-dimensional model of anchor bolt

    CN115018956A

  • Target for photogrammetry

    JP1999160069A

  • Object for calibration

    JP2003042726A

  • Image correlation method, survey method and measuring system using them

    JP2005077385A