Storage battery system state estimation device, and storage battery system state estimation method

The storage battery system state estimation device and method address the challenge of real-time, accurate performance assessment by calculating feature amounts and selecting calculation means to account for capacity and resistance degradation, enhancing estimation accuracy and reducing costs.

JP2024141190APending Publication Date: 2024-10-10HITACHI LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2023052696
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-10

AI Technical Summary

Technical Problem

Existing methods for estimating the performance of large-scale storage battery systems are unable to provide real-time, highly accurate assessments of maximum capacity and upper limit output due to the need for statistical analysis of voltage values and the inability to account for individual battery variations in capacity and resistance degradation.

Method used

A storage battery system state estimation device and method that calculates feature amounts of SOHQ and SOHR distributions, selects appropriate calculation means based on these values, and estimates system performance by considering the combined effects of capacity and resistance deterioration.

Benefits of technology

Enables highly accurate, real-time estimation of storage battery system performance with reduced calculation costs by accounting for individual battery variations and distribution shapes, ensuring timely detection of performance declines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024141190000001_ABST
    Figure 2024141190000001_ABST
Patent Text Reader

Abstract

To provide a storage battery system state estimation device that can accurately estimate the state of a storage battery system in a short time.SOLUTION: A storage battery system state estimation device estimates the state of a storage battery system in which a plurality of storage battery cells are connected in series and in parallel, and has: a feature quantity calculation unit that calculates a feature quantity of the distribution of state amounts indicating the deterioration states of the plurality of storage battery cells; and an operation means selection unit that selects operation means estimating the state of the storage battery system on the basis of the feature quantity.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a battery system state estimation device and a battery system state estimation method for estimating the state of a battery system, and in particular to a technology that is effective when applied to a large-scale battery system having a large number of batteries. [Background technology]

[0002] The introduction of renewable energy sources such as solar and wind power generation is expanding. However, the output of solar and wind power generation fluctuates depending on the weather and time of day, making it difficult to adjust supply and demand in the power grid. To solve this problem, it is expected that energy storage systems will be used to adjust supply and demand. In addition, studies are being conducted on using energy storage systems to supply inertial force to the grid.

[0003] The battery pack system that constitutes the energy storage system realizes the required output and capacity by connecting many storage batteries in series and parallel. For such storage battery systems, it is necessary to accurately grasp the performance such as the upper limit output and maximum capacity that the system can achieve.

[0004] The performance of a battery system decreases according to the state of health quality (SOHQ) and state of resistance quality (SOHR) of each battery. In a system with a large number of batteries, the SOHQ and SOHR of the batteries in the system will not be constant due to individual differences. Therefore, in order to accurately estimate the performance of a battery system and determine whether it meets the required performance, it is necessary to consider both the distributions that SOHQ and SOHR follow.

[0005] Conventional methods for evaluating the performance of a battery storage system include a method in which a characteristic quantity (voltage variation) of a storage device is calculated based on a voltage value measured from the storage device, which is charged and discharged according to a discharge command value, and an evaluation function for the deterioration state of the storage device is derived according to the difference between the distribution of the charge and discharge command values ​​and a reference distribution, and the deterioration state of the storage device is evaluated based on the derived evaluation function and the calculated characteristic quantity (see, for example, Patent Document 1), and a method in which a distribution of the deterioration levels of SOHQ and SOHR is obtained and a failure rate is calculated (see, for example, Patent Document 2). [Prior art documents] [Patent documents]

[0006] [Patent Document 1] International Publication No. 2019 / 106754 [Patent Document 2] Patent Publication No. 2021-60198 Summary of the Invention [Problem to be solved by the invention]

[0007] The former method requires a certain number of samples to be prepared in order to statistically analyze the voltage values ​​measured from an energy storage device that is controlled to charge and discharge according to a discharge command value, and it may not be possible to estimate in real time performance such as the upper limit output and maximum capacity that the system can achieve.

[0008] The latter method involves obtaining the distribution of SOHQ and SOHR and calculating the failure rate for each threshold value, but it is not possible to estimate performance such as the upper limit output or maximum capacity that the system can achieve.

[0009] Therefore, an object of the present invention is to provide a storage battery system state estimating device and a storage battery system state estimating method that are capable of performing state estimation with high accuracy in a short period of time. [Means for solving the problem]

[0010] In order to solve the above problems, the present invention provides a battery system state estimation device that estimates a state of a battery system in which a plurality of storage battery cells are connected in series and in parallel, and is characterized in having a feature calculation unit that calculates a feature of a distribution of state quantities that indicate a deterioration state of the plurality of storage battery cells, and a calculation means selection unit that selects a calculation means that estimates the state of the battery system based on the feature.

[0011] The present invention also provides a battery system state estimation method for estimating a deterioration state of a battery system in which a plurality of storage battery cells are connected in series and in parallel, the method comprising: (a) a step of calculating a feature of a distribution of state quantities indicating the deterioration states of the plurality of storage battery cells; and (b) a step of selecting a calculation means for estimating the state of the battery system based on the feature calculated in the step (a). Effect of the Invention

[0012] According to the present invention, it is possible to realize a storage battery system state estimating device and a storage battery system state estimating method that are capable of performing state estimation with high accuracy in a short period of time.

[0013] Problems, configurations and effects other than those described above will become apparent from the following description of the embodiments. [Brief description of the drawings]

[0014] [Figure 1] FIG. 1 is a block diagram showing an energy storage system according to a first embodiment of the present invention. [Diagram 2] 2 is a block diagram showing a configuration example of the storage battery system 1 of FIG. [Diagram 3] 3 is a block diagram showing an example of the configuration of a storage battery system evaluation unit 2 in FIG. 2. [Figure 4] 4 is a flowchart showing the operation of the feature amount calculation unit 24 in FIG. 3. [Diagram 5] 4 is a diagram showing an example of an output result of the feature amount calculation unit 24 in FIG. 3. [Figure 6] 4 is a flowchart showing the operation of the calculation means selection unit 25 of FIG. 3. [Figure 7] 7 is a flowchart showing an example of the operation of step S2 in FIG. 6. [Figure 8] FIG. 13 is a diagram showing an example of a calculation means table T3. [Figure 9] FIG. 13 is a diagram showing an example of a calculation means selection table T4. [Figure 10] FIG. 13 is a diagram showing an example of a calculation means selection table T5. [Figure 11] 5A to 5C are diagrams illustrating calculation results of a system output and a system capacity according to the storage battery system state estimating method according to the first embodiment of the present invention. [Figure 12] FIG. 13 is a diagram showing a display example of a system performance evaluation screen 31. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail with reference to the drawings. In the drawings, the same components are designated by the same reference numerals, and detailed description of overlapping parts will be omitted. EXAMPLES

[0016] First, an energy storage system 100 according to the present invention will be described with reference to Fig. 1. Fig. 1 is a block diagram showing an energy storage system 100 according to a first embodiment of the present invention.

[0017] The energy storage system 100 of this embodiment supplies active power and reactive power to the AC system 41. The energy storage system 100 may be connected to industrial equipment or the like to improve the power quality of the industrial equipment or the like.

[0018] 1, the energy storage system 100 includes a transformer 42, a filter 43, an AC / DC converter 44, and a storage battery system 1. The transformer 42 is connected to an AC system 41, and transmits energy between a plurality of windings by using electromagnetic induction. The filter 43 removes a predetermined frequency component.

[0019] When the energy storage system 100 is connected to a power distribution system, it is preferable that the AC / DC converter 44 is a two-level or three-level converter, and the output voltage of the storage battery system 1 connected to the AC / DC converter 44 is, for example, 1 kV or less. When the energy storage system 100 is connected to a power transmission system, it is preferable that the AC / DC converter 44 is a multi-level converter, and the output voltage of the storage battery system 1 connected to the AC / DC converter 44 is, for example, 40 kV or less.

[0020] The storage battery system 1 is charged by application of a DC voltage output by the AC / DC converter 44. In addition, the charged storage battery system 1 is discharged to the AC system 41 via the AC / DC converter 44.

[0021] The details of the storage battery system 1 will be described with reference to Fig. 2. Fig. 2 is a block diagram showing an example of the configuration of the storage battery system 1 of Fig. 1.

[0022] The storage battery system 1 includes, for example, an assembled battery 101, a storage battery system evaluation unit 2, and a storage battery system monitoring unit 3, as shown in Fig. 2. The assembled battery 101 may be configured with a plurality of storage battery modules 12 connected in series and in parallel. Each storage battery module 12 is configured with a plurality of storage battery cells 11 connected in series or in parallel, and a battery management system (BMS) 13 that collects information such as the voltage, charge amount, and deterioration state of each storage battery cell 11, and controls the storage battery cells 11. The battery management system 13 may be configured with, for example, a microprocessor.

[0023] The configuration of the battery pack 101 is not limited to the configuration in which series units are connected in parallel as shown in Figure 2, but may also be a configuration in which parallel units in which storage battery modules 12 are connected in parallel are connected in series, or a configuration in which multiple series-connected units are connected in parallel and then connected in series.

[0024] The battery system evaluation unit 2 collects information such as the voltage, charge amount, and deterioration state of each battery cell 11 from each battery management system 13, and estimates system performance such as the upper limit output and maximum capacity of the entire battery system 1. The battery system evaluation unit 2 can be configured, for example, by a microcomputer.

[0025] The battery system monitoring unit 3 is connected to the battery system evaluation unit 2 via a communication network. The battery system monitoring unit 3 generates screen data displaying estimated system performance based on the information obtained from the battery system evaluation unit 2, and displays the generated screen data on a monitor. A battery system monitor understands the state of the assembled battery 101 by referring to the screen on the monitor. The communication network connecting the battery system evaluation unit 2 and the battery system monitoring unit 3 may be a wireless network, a wired network, or a combination of these. The communication protocol may be a protocol uniquely defined for the battery system 1, or a general-purpose protocol.

[0026] Fig. 3 is a block diagram showing an example of the configuration of the battery system evaluation unit 2 in Fig. 2. Details of the battery system evaluation unit 2 will be described below with reference to Fig. 3.

[0027] As shown in FIG. 3, the storage battery system evaluation unit 2 acquires storage battery information obtained from each battery management system 13 by the information acquisition unit 21. Examples of the acquired storage battery information include parameters such as the voltage of each storage battery cell 11 required for calculating the deterioration distribution, and the deterioration degree of each storage battery cell 11 itself. The acquired storage battery information is passed to the deterioration degree evaluation unit 22. The deterioration degree evaluation unit 22 calculates the distribution of SOHQ and SOHR of the storage battery cells 11 included in the assembled battery 101 based on the acquired storage battery information. As a calculation method of these distributions, for example, the technology of the above-mentioned Patent Document 2 can be used. The storage battery cells 11 can be lithium ion battery cells, nickel metal hydride battery cells, lead battery cells, etc. Also, the deterioration degree evaluation unit 22 may calculate the SOHQ and SOHR of each storage battery cell 11 from the acquired storage battery information and calculate the distribution. Also, the deterioration degree evaluation unit 22 may calculate the positions to which the storage battery cells 11 with the maximum and minimum deterioration degrees are connected in the assembled battery 101 from the acquired storage battery information. In the following, in this specification, an example in which a lithium-ion battery cell (nominal voltage: 3.2-4.2 V) is used is assumed.

[0028] The system performance calculation unit 23 estimates performance such as the upper limit output and maximum capacity of the storage battery system 1 from the distribution of SOHQ and SOHR calculated by the deterioration degree evaluation unit 22. The system performance calculation unit 23 is composed of a feature calculation unit 24 and a calculation means selection unit 25.

[0029] In order to accurately evaluate the performance such as the upper limit output and maximum capacity that the system can exhibit, it is necessary to take into account the combined effect of both degradation degrees on the system performance. One example of the system performance that is combinedly affected by both degradation degrees is voltage. The voltage of the system increases in voltage fluctuation range due to capacity degradation and decreases due to resistance degradation, so it is necessary to evaluate it taking into account the effects of both degradation degrees. Since the output of the system is the product of voltage and current, and the capacity is expressed by the product of the amount of stored charge and voltage, it is considered that a combined evaluation of both degradation degrees is necessary. Therefore, in the method of Patent Document 2, which handles the distributions of SOHQ and SOHR independently, it may be difficult to evaluate the performance reflecting the combined effects of capacity degradation and resistance degradation.

[0030] The feature calculation unit 24 calculates feature amounts of the distributions, such as the mean, median, maximum, and minimum values ​​of the SOHQ and SOHR distributions. In addition, the feature calculation unit 24 acquires information on the positions in the battery pack 101 to which the storage battery cells 11 with the maximum and minimum degrees of deterioration are connected from the deterioration level evaluation unit 22, etc.

[0031] The calculation means selection unit 25 compares the distribution feature values ​​obtained from the feature value calculation unit 24 and the position information of the storage battery cells 11 with the maximum and minimum degradation levels with the calculation means table T3, and selects a calculation means for the system performance. The system performance calculation unit 23 uses the selected calculation means to calculate the upper limit output and maximum capacity of the system. The calculation means table T3 stores calculation means that take into account, for example, estimation accuracy and calculation cost. The calculation means table T3 and the calculation means will be described in detail below.

[0032] FIG. 4 is a flowchart showing the operation of the feature amount calculation unit 24 in FIG.

[0033] When the operation of the feature calculation unit 24 starts, first, in step S1, the distribution of SOHQ and SOHR of the storage battery obtained from the deterioration level evaluation unit 22 is acquired.

[0034] In the next step S2, it is determined whether each distribution is a normal distribution. As a method for determining whether the distribution is a normal distribution or not, for example, a method of calculating the skewness or kurtosis of the distribution and regarding it as a normal distribution when the skewness or kurtosis is equal to or less than a certain threshold can be used.

[0035] If it is determined in step S2 that the distribution is not normal (N), a non-normal distribution is assumed in the following step S3, and the shape parameters are calculated. The non-normal distribution assumed in step S3 can be a Weibull distribution or a uniform distribution. As a method for obtaining the shape parameters, a method of assuming the above function form and calculating the shape parameters by fitting can be used.

[0036] On the other hand, if it is determined to be a normal distribution (Y), or in step S4 following step S3, the distribution feature quantities are calculated. Examples of the distribution feature quantities calculated in step S4 include the standard deviation, mean, median, maximum, and minimum values ​​of the distribution.

[0037] In the next step S5, information on the position of the storage battery cell 11 having the specified feature amount is acquired, and the process ends. An example of the position acquired in step S5 is the position in the assembled battery 101 of the storage battery cell 11 that exhibits the maximum or minimum values ​​of SOHQ and SOHR. In the example of Fig. 2, for example, the series direction is represented as a column, the parallel direction is represented as a row, and the position in the assembled battery 101 is represented as the row and column position of the cell counted from the upper left storage battery cell 11, with the upper left storage battery cell 11 being represented as row 1 and column 1.

[0038] Fig. 5 shows an example of output from the feature calculation unit 24 as a result of the operation shown in the flowchart of Fig. 4. Output result T1 shows the feature of the SOHQ distribution, and output result T2 shows the feature of the SOHR distribution.

[0039] As shown in output table T1, for example, the normal distribution, σ, SOHQmax, SOHQmin, SOHQave, SOHQmed, X row Y column, Z row Y column, V row W column (V, W, X, Y, Z are natural numbers) are stored in the distribution shape, standard deviation, maximum value, minimum value, average value, median value, minimum SOHQ cell position, maximum SOHQ cell position in the same series as the minimum SOHQ cell, and maximum SOHQ cell position in a different series from the minimum SOHQ cell, respectively. SOHR is also stored in the same way.

[0040] An example of battery cell positions is shown below. The position of the battery cell with the smallest SOHQ and the largest SOHR is in row X, column Y. Therefore, SOHQ = SOHQmin and SOHR = SOHRmax for the cell in row X, column Y. Also, the position of the battery cell with the largest SOHQ and the smallest SOHR in column Y, which is the same column as the battery cell with the smallest SOHQ, is in row Z, column Y, and SOHQ of the battery cell in row Z, column Y = SOHQ A max, SOHR=SOHR Amin. In addition, the position of the battery cell with the maximum SOHQ and the minimum SOHR among the battery cells other than the Y column is the V row and the W column, and the SOHQ of the battery cell in the V row and the W column is SOHQ B max, SOHR=SOHR B It is expressed as min.

[0041] Therefore, in the case of Figure 5, SOHQmax is SOHQ A max or SOHQ B max and SOHRmin is SOHR A min or SOHR B These evaluation items are calculated according to the flowchart in Figure 4.

[0042] The evaluation items are not limited to those shown in Figures 4 and 5, and include various modified examples. The items do not need to be the same throughout the operation period of the battery storage system, and can be added as appropriate in response to deterioration of the battery during operation or changes in distribution. For example, if the distribution shape becomes asymmetric during operation, shape parameters such as kurtosis and skewness that represent the asymmetry can be added.

[0043] FIG. 6 is a flowchart showing the operation of the calculation means selection unit 25 in FIG.

[0044] When the operation of the calculation means selection unit 25 starts, first, in step S1, the output information calculated by the feature amount calculation unit 24 is obtained.

[0045] In the next step S2, a calculation means is selected according to the characteristic amount of the distribution, and the predicted performance of the battery system is calculated, and the process ends.

[0046] Fig. 7 is a flowchart showing an example of the operation of step S2 in the flowchart of Fig. 6. Fig. 7 shows a flowchart in the case where the distribution shape, the mean value, the median value, the maximum and minimum cell positions of SOHQ and SOHR, and the standard deviation are used as parameters for selecting the calculation means.

[0047] As described above, first, in step S1, the output information of the feature amount calculation unit 24 is acquired.

[0048] In the next step S201, the distribution shape column of the calculation means selection table is set to the distribution. The details of the calculation means selection table will be described later with reference to Figs.

[0049] In the next step S202, it is determined whether the distribution shape is symmetric or asymmetric. In this embodiment, the distribution is limited to being symmetric or asymmetric, but the distribution shape may be classified into normal distribution, uniform distribution, Weibull distribution, one-sided normal distribution, etc.

[0050] If the distribution shape is determined to be symmetric (Y), then in step S203, the average value is recorded in the feature value column of the calculation means selection table. On the other hand, if the distribution shape is determined to be asymmetric (N), then in step S204, the median value is recorded in the feature value column of the calculation means selection table. Note that when making detailed judgments for each distribution shape, it is also possible to record different feature values ​​for each distribution shape.

[0051] In the next step S205, the difference between the maximum and minimum SOHQ values ​​is compared. A max-SOHQmin| and the maximum / minimum difference of SOHQ in another series |SOHQ B max-SOHQmin| is compared, and the difference between the maximum and minimum SOHR differences in the same series|SOHR A max-SOHRmin| and the maximum and minimum difference of SOHR in another series|SOHR B An example of comparing max-SOHRmin| is shown below.

[0052] If it is determined in step S205 that the difference within the same series is large (Y), then in step S206, "same series" is recorded in the maximum and minimum cell position of the calculation means selection table. On the other hand, if it is determined that the difference between different series is large (N), then in step S207, "different series" is recorded in the maximum and minimum cell position of the calculation means selection table. This reflects the connection configuration of storage battery cells with a large degree of degradation and storage battery cells with a small degree of degradation in the storage battery system, making it possible to evaluate performance such as the system capacity and output.

[0053] In the next step S208, it is determined whether the standard deviation σ of the distribution is less than a first threshold σ_th1. If it is determined that the standard deviation σ is less than σ_th1 (Y), in the next step S209, "less than σ_th1" is recorded in the standard deviation column of the calculation means selection table. On the other hand, if the standard deviation σ is equal to or greater than the threshold σ_th1 (N), in step S210, the standard deviation σ is compared with a second threshold σ_th2.

[0054] If it is determined in step S210 that the standard deviation σ is less than σ_th2 (Y), then in step S211, "greater than σ_th1 and less than σ_th2" is recorded in the standard deviation column of the calculation means selection table. On the other hand, if it is determined in step S210 that the standard deviation σ is greater than σ_th2 (N), then in step S212, "greater than σ_th2" is recorded in the standard deviation column of the calculation means selection table.

[0055] In the following step S213, the calculation means table T3 is checked against the obtained calculation means selection table to select a calculation means.

[0056] In the next step S214, the system performance such as the upper limit output and maximum capacity that the system can exhibit for the given deterioration degree distribution is calculated, and the process ends.

[0057] Fig. 8 shows an example of the calculation means table T3 referred to in the above step S213. Fig. 8 shows the calculation means corresponding to the cases of the evaluation items of the distribution shape, the standard deviation, the distribution feature amount, and the maximum and minimum cell positions determined in step S2 of Fig. 6 (i.e., steps S201 to S214 of Fig. 7).

[0058] The * in the calculation means table T3 indicates that it is not dependent on the evaluation item. For example, if the standard deviation is determined to be less than σ_th1, calculation means 1 is selected regardless of other items marked with *. If the distribution shape is determined to be a Weibull distribution, the standard deviation is greater than or equal to σ_th1 and less than σ_th2, the feature amount is the median, and the maximum and minimum cell positions are * (not dependent on the evaluation item), means 5 is selected.

[0059] The first threshold value σ_th1 and the second threshold value σ_th2 can be determined, for example, by recording the error between the estimated performance and the actual performance in advance by a simulation or the like, and as threshold values ​​at which the calculation means needs to be changed when the standard deviation σ increases. The number of threshold values ​​is not limited to two, and any number of threshold values ​​may be used. Furthermore, the number of evaluation items, the contents of case distinction, and the number of calculation means are not limited to the above embodiment, and can be modified in various ways. Furthermore, the calculation means table T3 may be updated according to changes in the degree of deterioration during operation.

[0060] Examples of calculation means in the calculation means table T3 are shown below.

[0061] Means 1 is a calculation means selected when the standard deviation is less than σ_th1, and can be, for example, a method of calculating the system performance by regarding the battery system as one battery having the average values ​​of SOHQ and SOHR. For example, the method of calculating the system performance can be a method of multiplying the capacity and output of a battery cell having the average values ​​of SOHQ and SOHR by the number of series n and the number of parallel m.

[0062] Means 2 is a calculation means selected when the distribution shape is normal and the standard deviation is greater than or equal to σ_th1 and less than σ_th2. For example, the method can be used to regard a battery system as a system in which m-1 series units, each made up of a battery cell with the minimum SOHQ and maximum SOHR and n-1 battery cells with the average SOHQ and SOHR, are connected in series, and n(m-1) series units, each made up of batteries with the average SOHQ and SOHR, are connected in parallel, to calculate system performance.

[0063] One method for calculating system performance is to multiply the capacity and output of a battery cell having the average SOHQ and SOHR by nm-1 and then calculate the sum of the capacity and output of a battery cell having the minimum SOHQ and maximum SOHR.

[0064] Means 3 is a calculation means selected when the distribution shape is normal, the standard deviation is σ_th2 or greater, and the maximum and minimum cell positions are in the same series. For example, the battery system can be regarded as a system in which m-1 series units each composed of n(m-1) battery cells having the average SOHQ and SOHR are connected in parallel, including one battery cell with the minimum SOHQ and maximum SOHR, and the same battery cell in series with the maximum SOHQ and minimum SOHR, and the series unit composed of n-2 battery cells having the average SOHQ and SOHR, are connected in parallel, and the system performance can be calculated.

[0065] One method for calculating the system performance is to multiply the capacity and output of a battery cell having the average SOHQ and SOHR by nm-2, and calculate the sum of the capacity and output of the battery cell with the minimum SOHQ and maximum SOHR, and the capacity and output of the battery cell with the maximum SOHQ and minimum SOHR connected in series.

[0066] Means 4 is a calculation means selected when the distribution shape is normal, the standard deviation is σ_th2 or greater, and the maximum and minimum cell positions are in separate series. For example, the battery system can be regarded as a system in which m-2 series units each consisting of a battery cell with the minimum SOHQ and maximum SOHR and n-1 battery cells having the average values ​​of SOHQ and SOHR are connected in series, a battery cell with the maximum SOHQ and minimum SOHR and n-1 battery cells having the average values ​​of SOHQ and SOHR in another series connection, and n-2 series units each consisting of n(m-2) battery cells having the average values ​​of SOHQ and SOHR are connected in parallel, and this can be a method for calculating system performance.

[0067] One method for calculating the system performance is to multiply the capacity and output of a battery cell having the average SOHQ and SOHR by nm-2, and then calculate the sum of the capacity and output of a battery cell with the minimum SOHQ and maximum SOHR, and the capacity and output of a battery cell with the maximum SOHQ and minimum SOHR connected in series.

[0068] Means 5 is a calculation means selected when the distribution shape is a Weibull distribution and the standard deviation is greater than or equal to σ_th1 and less than σ_th2. For example, the method can be used to regard the battery system as a system in which a series unit is made up of one battery cell with the minimum SOHQ and maximum SOHR and n-1 batteries with the median SOHQ and SOHR connected in series, and m-1 series units are made up of n(m-1) batteries with the median SOHQ and SOHR connected in parallel, and calculate the system performance.

[0069] One method for calculating system performance is to multiply the capacity and output of the battery cell with the median SOHQ and SOHR by nm-1 and calculate the sum of the capacity and output of the battery cell with the minimum SOHQ and maximum SOHR.

[0070] Means 6 is a calculation means selected when the distribution shape is a Weibull distribution, the standard deviation is σ_th2 or greater, and the maximum and minimum cell positions are in the same series. For example, the battery system can be regarded as a system in which m-1 series units each composed of n(m-1) battery cells having the median SOHQ and SOHR are connected in parallel, including one battery cell with the minimum SOHQ and maximum SOHR, and the same battery cell in series with that battery cell with the maximum SOHQ and minimum SOHR, and the series unit composed of n-2 battery cells having the median SOHQ and SOHR, are connected in parallel, and the system performance can be calculated.

[0071] One method for calculating the system performance is to multiply the capacity and output of the battery cell having the median SOHQ and SOHR by nm-2, and then calculate the sum of the capacity and output of the battery cell with the minimum SOHQ and maximum SOHR, and the capacity and output of the battery cell with the maximum SOHQ and minimum SOHR connected in series.

[0072] Means 7 is a calculation means selected when the distribution shape is a Weibull distribution, the standard deviation is σ_th2 or more, and the maximum and minimum cell positions are in separate series. For example, the battery system can be regarded as a system in which m-2 series units each consisting of n(m-2) battery cells with the median SOHQ and SOHR are connected in series with one battery cell with the minimum SOHQ and maximum SOHR, and n-1 battery cells with the median SOHQ and SOHR, are connected in series with another battery cell with the maximum SOHQ and minimum SOHR, and m-2 series units each consisting of n(m-2) battery cells with the median SOHQ and SOHR, are connected in parallel, and the system performance can be calculated.

[0073] One method for calculating the system performance is to multiply the capacity and output of the battery cell having the median SOHQ and SOHR by nm-2, and then calculate the sum of the capacity and output of the battery cell with the minimum SOHQ and maximum SOHR, and the capacity and output of another battery cell in series with the maximum SOHQ and minimum SOHR.

[0074] As in the means 1 to 7 of this embodiment, by selecting the feature to be considered depending on the standard deviation of the distribution of SOHQ and SOHR, it is possible to incorporate the combined effect of the degradation of capacitance and resistance on the system performance into the performance estimation.

[0075] 9 and 10 show examples of calculation means selection tables T4 and T5 created according to the flowchart of FIG.

[0076] Calculation means selection table T4 is the case when the standard deviation is determined to be less than σ_th1, and means 1 is selected according to calculation means table T3. Calculation means selection table T5 is the case when the distribution shape is a Weibull distribution, and the standard deviation is determined to be equal to or greater than σ_th1 and less than σ_th2, and means 5 is selected according to calculation means table T3.

[0077] In this way, judgments are made during the operation of the system, and a calculation means is selected according to the case classification of each evaluation item. In the storage battery system 1, even if the SOHR and SOHQ have a distribution shape close to a normal distribution in the initial state as the storage battery deteriorates, it is considered that they will show an asymmetric distribution shape such as a Weibull distribution after several years. Therefore, by selecting the optimal means for each distribution shape and standard deviation as described above when calculating the system performance, it is possible to estimate the state of the storage battery system with high accuracy at any stage during operation.

[0078] Furthermore, when estimating the state of the storage battery system 1, it is possible to reduce calculation costs by using an appropriate feature amount without taking into consideration the states of all of the storage battery cells 11.

[0079] As a result, it is possible to estimate the performance of a large-scale battery storage system 1 such as that shown in FIG. 2 with high accuracy and low calculation cost.

[0080] 11 is a diagram showing the results of calculating the system output and the system capacity according to the battery system performance estimation method of the present embodiment. Graph G1 shows the calculation results of the system output for each standard deviation, and graph G2 shows the calculation results of the system capacity.

[0081] The dashed and dotted line in Fig. 11 indicates values ​​simulating changes in actual system performance. The solid line indicates estimated values ​​according to this embodiment. When the standard deviation on the horizontal axis is less than the first threshold value σ_th1, estimation is performed by means 1. When the standard deviation increases and becomes equal to or greater than σ_th1 and less than the second threshold value σ_th2, the calculation means is changed from means 1 to means 4. When it becomes equal to or greater than σ_th2, the means is changed from means 4 to means 7 and estimation is performed.

[0082] Next, the effect of selecting the estimation method will be explained. As the standard deviation of the degradation distribution increases, the performance of the system, such as output and capacity, decreases as shown in graphs G1 and G2. If the system falls below its allowable output or capacity as a result of this decrease in performance, a failure will occur, so it is necessary to detect the state in which the allowable values ​​are exceeded at an early stage.

[0083] In graph G2, the standard deviation below the allowable capacity is σ_Last. If estimation by means 4 is continued even after the capacity exceeds σ_th2, as shown by the dotted line in graph G2, the standard deviation below the allowable capacity becomes a value larger than σ_Last, and accurate estimation cannot be performed.

[0084] Therefore, by selecting the means 7 when the capacity is equal to or greater than σ_th2 as in this embodiment, it is possible to accurately estimate the capacity falling below the allowable capacity while appropriately reflecting the distribution variance. Also, by considering the relationship between the increase in standard deviation and time, it is possible to estimate the system lifespan.

[0085] FIG. 12 shows an example of a system performance evaluation screen 31 displayed on the display device of the battery system monitoring unit 3.

[0086] On the left side of this screen, the SOHQ distribution, the SOHR distribution, and the feature display section 32 are displayed. The SOHQ distribution and the SOHR distribution are updated at regular time intervals. The feature display section 32 also displays the output results of the feature calculation section 24. This may be displayed as in the output tables T1 and T2 of Fig. 5, updated at regular time intervals, or displayed as time-series data according to the elapsed time.

[0087] On the right side of the screen, a message display section 33 that displays various messages, an estimated system upper limit output value, and an estimated system maximum capacity value are displayed. A message according to the performance of the storage battery system 1 is displayed on the message display section 33. For example, if the upper limit output of the storage battery system 1 is estimated to be equal to or greater than the allowable value, and the maximum capacity is estimated to be equal to or greater than the allowable value, a message such as "The storage battery system can operate normally" is displayed. If the upper limit output of the storage battery system 1 is estimated to be equal to or greater than the allowable value, and the maximum capacity is estimated to be equal to or less than the allowable value, a failure alert message such as "The storage battery system is short of capacity" is displayed. An estimated period until a failure occurs may also be displayed. The message may be displayed in another form, such as a pop-up display.

[0088] In the above, an embodiment has been described in which the effect of each degradation level on system performance is evaluated in a comprehensive manner based on features such as the shape and magnitude of variation of the distribution of both the capacity degradation level (SOHQ) and the resistance degradation level (SOHR), and a calculation means for system performance that is optimal in terms of estimation accuracy and calculation speed is selected. However, depending on the configuration and application of the battery storage system, it is also possible to select a calculation means based on features of the distribution of at least one of the capacity degradation level (SOHQ) and the resistance degradation level (SOHR).

[0089] Furthermore, the present invention is not limited to the above-mentioned embodiment, and various modifications are included. For example, the above-mentioned embodiment has been described in detail to clearly explain the present invention, and is not necessarily limited to those having all of the configurations described. Furthermore, it is possible to replace a part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. Furthermore, it is possible to add, delete, or replace a part of the configuration of each embodiment with another configuration. [Explanation of symbols]

[0090] 1. Battery storage system 2. Battery system evaluation section 3. Battery system monitoring section 11…Battery cell 12…Battery module 13...Battery management system (BMS) 21…Information acquisition department 22…Deterioration evaluation section 23...System performance calculation section 24…Feature calculation unit 25...Calculation means selection unit 31...System performance evaluation screen 32…Feature display section 33...Message display section 41…AC system 42...Trans 43…Filter 44...AC / DC converter 100…Energy storage system 101...Battery pack T1, T2...output table (output result) of the feature amount calculation unit 24 T3…Calculation means table T4, T5...output table of the calculation means selection unit 25 (calculation means selection table) G1, G2: Estimated system output and capacity

Claims

1. A battery system state estimation device that estimates a state of a battery system in which a plurality of battery cells are connected in series and in parallel, a feature amount calculation unit that calculates a feature amount of a distribution of state amounts indicating a deterioration state of the plurality of storage battery cells; a calculation means selection unit that selects a calculation means for estimating a state of the storage battery system based on the feature amount; A battery storage system state estimating device comprising:

2. The battery system state estimating device according to claim 1, the feature calculation unit calculates a feature according to a distribution based on at least one of a capacity deterioration degree and a resistance deterioration degree of the storage battery cell.

3. The battery system state estimating device according to claim 1, the feature calculation unit calculates a feature including a mean, a median, a maximum, a minimum, a standard deviation, and a shape of a distribution of kurtosis or skewness of a distribution based on a distribution of at least one of a capacity deterioration degree and a resistance deterioration degree of the storage battery cell.

4. The battery system state estimating device according to claim 1, the feature calculation unit calculates, based on a distribution of at least one of a capacity deterioration degree and a resistance deterioration degree of the storage battery cell, a feature including any one of a mean, a median, a maximum, a minimum, a standard deviation, and a distribution shape of a kurtosis or a skewness of the distribution by fitting using a normal distribution or a Weibull distribution.

5. The battery system state estimating device according to claim 1, The storage battery system state estimating device is characterized in that the feature calculation unit acquires information regarding the positions of the storage battery cells with the maximum and minimum degrees of degradation.

6. The battery system state estimating device according to claim 1, The storage battery system state estimating device, wherein the calculation means is a means for estimating an upper limit output and a maximum capacity that the storage battery system can exhibit.

7. The battery system state estimating device according to claim 1, The feature calculation unit calculates a standard deviation of the distribution of the deterioration state, The storage battery system state estimating device, wherein the calculation means selection unit selects the calculation means based on the magnitude of the standard deviation calculated by the feature calculation unit.

8. The battery system state estimating device according to claim 7, the calculation means selection unit selects the calculation means based on the magnitude of the standard deviation calculated by the feature calculation unit and the connection positions of the storage battery cells with the maximum and minimum state quantities.

9. The battery system state estimating device according to claim 8, The storage battery system state estimation device is characterized in that, when the standard deviation is smaller than a first threshold value, the calculation means selection unit selects a calculation method of multiplying the capacity and output of a storage battery cell having an average or median value of SOHQ and SOHR by the number n of series connections and the number m of parallel connections, and estimates an upper limit output and maximum capacity that can be delivered by the storage battery system.

10. The battery system state estimating device according to claim 8, the calculation means selection unit, when the standard deviation is equal to or greater than a first threshold, selects a calculation method for calculating the sum of the capacity and output of the storage battery cell having the average or median SOHQ and SOHR, multiplied by the product of the number n of series connections and the number m of parallel connections minus 1, and the capacity and output of the storage battery cell having the minimum SOHQ and maximum SOHR.

11. The battery system state estimating device according to claim 8, the calculation means selection unit, when the standard deviation is equal to or greater than a second threshold value that is greater than the first threshold value, selects a calculation method for calculating the sum of the capacity and output of the storage battery cell having the average or median SOHQ and SOHR, the capacity and output of the storage battery cell having the minimum SOHQ and maximum SOHR, and the capacity and output of the storage battery cell having the maximum SOHQ and minimum SOHR.

12. A method for estimating a state of a storage battery system in which a plurality of storage battery cells are connected in series and in parallel, comprising: (a) calculating a feature quantity of a distribution of state quantities indicating deterioration states of a plurality of storage battery cells; (b) selecting a calculation means for estimating a state of the storage battery system based on the feature amount calculated in the step (a); and A method for estimating a state of a storage battery system, comprising:

Citation Information

Patent Citations

  • Method for inspecting secondary battery

    JP2002334722A

  • Battery state estimation device

    JP2021060198A

  • Evaluation device, power storage system, evaluation method, and computer program

    WO2019106754A1