Failure prediction device of work machine
The failure prediction device uses aerial photographs and operation information to estimate the industry type of construction machinery, addressing the limitation of conventional systems by providing accurate part load and lifespan estimation in new operating areas.
Patent Information
- Application Number
- JP2023053311
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-29
- Publication Date
- 2024-10-10
AI Technical Summary
Conventional systems for predicting spare part replacement in construction machinery rely on load and lifespan data registered in databases, which are not available for new operating areas, limiting their effectiveness.
A failure prediction device that estimates the industry type of a working machine using aerial photographs and operation information, employing machine learning models to determine industry candidates and their reliability, and outputs an industry estimation result based on matching candidates.
Enables accurate estimation of part load and lifespan even in new regions where database data is lacking, by reliably identifying the industry type of the working machine.
Smart Images

Figure 2024141580000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a failure prediction device for a work machine. [Background technology]
[0002] There is a known invention relating to a system for predicting production of spare parts for use in construction machinery and the like (see Patent Document 1 below). This conventional system includes an error / warning information acquisition means, an operation history acquisition means, an operation history storage means, a replacement possibility determination means, and a production prediction means, and when an abnormality occurs in a part constituting a machine, it predicts the production of a spare part to be replaced with that part (Patent Document 1, paragraph 0006 and claim 1).
[0003] The error / warning information acquiring means acquires error information or warning information transmitted and output from the machine, notifying a part in which an abnormality has occurred and the details of the abnormality. The operation history acquiring means acquires the operation history of the machine transmitted and output from the machine. The operation history storing means sequentially stores the acquired operation history.
[0004] The replacement possibility determination means determines whether the part in which an abnormality has occurred is to be replaced with a corresponding supply part based on the error information or warning information acquired by the error / warning information acquisition means and the operation history accumulated by the operation history accumulation means. The production forecasting means predicts production of the supply part to be replaced with the part in question when the replacement possibility determination means determines that replacement is required.
[0005] This conventional system determines whether a part that has developed an abnormality is one that needs to be replaced based on error or warning information issued by the machine and its operating history, and can predict the production of replacement parts based on the condition of the currently operating machine (Patent Document 1, paragraph 0013). [Prior art documents] [Patent documents]
[0006] [Patent Document 1] JP 2005-173979 A Summary of the Invention [Problem to be solved by the invention]
[0007] The replacement possibility determination means of the above conventional system determines the operating area of the construction machine from the location information stored in the location information database, searches for and reads the load on the parts in the operating area (the lifespan of the parts in the operating area) from the operating environment load database, and determines that the part that issued the error information or warning information is to be replaced with a spare part if the part has reached the end of its lifespan in the operating area and the accumulated operating time of the construction machine is equal to or exceeds a predetermined operating time (Patent Document 1, paragraph 0031).
[0008] In this way, in the above conventional system, in order to determine whether a part that has issued error information or warning information is to be replaced or not, it is necessary to register in advance in a database the load and lifespan of the part in the operating area. Therefore, it is not possible to obtain the load and lifespan of the part in a new operating area. In response to this, the inventors of the present application discovered that if it is possible to estimate the type of industry in which the machine performing the work is used, it is possible to estimate the load and lifespan of the part even in a new area where the load and lifespan of the part are not registered in the database, and thus arrived at the present invention.
[0009] The present invention provides a failure prediction device for a work machine that is capable of estimating the load and lifespan of parts by more reliably estimating the type of industry in which the work machine is used. [Means for solving the problem]
[0010] One aspect of the present invention provides an information acquisition unit that acquires an aerial photograph including a work site of a work machine and operation information of the work machine, an image analysis unit that estimates a first industry candidate for the work machine based on the aerial photograph, an operation information analysis unit that estimates a second industry candidate for the work machine based on the operation information, a reliability calculation unit that calculates a first reliability of the first industry candidate estimated by the image analysis unit and a second reliability of the second industry candidate estimated by the operation information analysis unit, and a reliability calculation unit that calculates a reliability of the first industry candidate estimated by the image analysis unit and a second reliability of the second industry candidate estimated by the operation information analysis unit. The failure prediction device for a work machine is characterized by comprising: an industry estimation unit that outputs the first industry candidate or the second industry candidate as the industry estimation result for the work machine when two industry candidates match, and outputs either the first industry candidate or the second industry candidate as the industry estimation result based on the first reliability and the second reliability when the first industry candidate and the second industry candidate do not match; and a replacement time determination unit that determines the time to replace a part of the work machine based on the operation information acquired by the information acquisition unit and the industry estimation result by the industry estimation unit. Effect of the Invention
[0011] According to the above aspect of the present disclosure, it is possible to provide a failure prediction device for a work machine that is capable of estimating the load and lifespan of parts by more reliably estimating the industry in which the work machine is used. [Brief description of the drawings]
[0012] [Figure 1] 1 is a block diagram showing an embodiment of a failure prediction device for a work machine according to the present invention; [Diagram 2] FIG. 2 is a functional block diagram of a failure prediction device for the work machine shown in FIG. 1 . [Diagram 3] 3 is a flow diagram illustrating the operation of the failure prediction device for the work machine shown in FIG. 2. [Figure 4] 3 is a flow diagram illustrating the operation of the failure prediction device for the work machine shown in FIG. 2. [Diagram 5] 3 is a flow diagram illustrating the operation of the failure prediction device for the work machine shown in FIG. 2. [Figure 6] FIG. 2 is an image diagram showing an example of a display screen of the user terminal of FIG. 1. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of a fault prediction device for a work machine according to the present invention will be described with reference to the drawings.
[0014] Fig. 1 is a block diagram showing an embodiment of a work machine failure prediction device according to the present invention. A work machine failure prediction device 52 of this embodiment is configured, for example, by a server device 5 which is a part of a work machine management system 1. The work machine management system 1 is a system that manages, for example, the replacement timing or maintenance timing of one or more parts of each work machine 2, and notifies related parties including the user of the work machine 2. The work machine management system 1 is configured, for example, by one or more work machines 2, a work machine management server 3, an aerial photograph server 4, a server device 5, and one or more user terminals 6.
[0015] The work machine 2 is, for example, a mini-shovel, a hydraulic excavator, a large excavator / loading shovel, a wheeled hydraulic excavator, a wheel loader, an environmental / recycling machine, or a road machine. The work machine 2 includes, for example, a communication unit 21, a vehicle controller 22, a memory unit 23, an on-board sensor 24, and a global navigation satellite system (GNSS) receiver 25.
[0016] The communication unit 21 is, for example, a wireless communication device mounted on the work machine 2. The communication unit 21 is, for example, connected to a network 7 such as the Internet via a wireless communication line, and is configured to communicate information with devices external to the work machine 2, such as the work machine management server 3. The vehicle body controller 22 is, for example, an electronic control unit (ECU) including one or more microcontrollers. The memory unit 23 is, for example, a storage device connected to the vehicle body controller 22, and stores various programs and data.
[0017] The on-board sensors 24 are various sensors attached to the work machine 2, and acquire operation information of the work machine 2 and output it to the vehicle body controller 22. The operation information of the work machine 2 includes, for example, the speed, travel distance, and operation time of the work machine 2. Furthermore, if the work machine 2 is a hydraulic excavator, the operation information may include, for example, the rotation angles and angular velocities of the boom, arm, and bucket, the rotation angle and angular velocity of the rotating body, and the pressure of the hydraulic oil in each hydraulic cylinder. The GNSS receiver 25 receives radio waves transmitted from a plurality of positioning satellites to detect the position of the work machine 2, and outputs it to the vehicle body controller 22.
[0018] The vehicle body controller 22 processes operation information of the work machine 2 input from the on-board sensor 24 and position information of the work machine 2 input from the GNSS receiver 25, and stores this information in the memory unit 23. Furthermore, the vehicle body controller 22 transmits, for example, the operation information of the work machine 2 stored in the memory unit 23 together with identification information of the work machine 2 to a device external to the work machine 2, such as the work machine management server 3, via the communication unit 21 and the network 7. Furthermore, the vehicle body controller 22 receives, for example, various types of information, commands, update programs, and the like from devices external to the work machine 2 via the network 7 and the communication unit 21.
[0019] The work machine management server 3 is, for example, a network server connected to a network 7. The work machine management server 3 includes, for example, a communication unit 31, a daily operation report table 32, a part replacement history table 33, and a customer information table 34. The communication unit 31 is, for example, an input / output device connected to the network 7 and performing information communication with devices external to the work machine management server 3 via the network 7.
[0020] The daily operation report table 32 is, for example, a database in which operation information of each work machine 2 is recorded. The following Table 1 shows an example of the daily operation report table 32 when the work machine 2 is a hydraulic excavator. The operation information of the work machine 2 includes, for example, position information of the work machine 2, such as latitude and longitude acquired by the GNSS receiver 25 and the vehicle controller 22. The work machine management server 3 receives operation information from each work machine 2 via the network 7 and the communication unit 31, for example, by executing a program stored in a storage device such as a ROM or RAM by a central processing unit (CPU), and creates the daily operation report table 32.
[0021] [Table 1]
[0022] The part replacement history table 33 is, for example, a database in which the replacement history of parts of each work machine 2 is recorded. Table 2 below shows an example of the part replacement history table 33 when the work machine 2 is a hydraulic excavator. The part replacement history table 33 records the machine number which is the identification information of each work machine 2, the replacement date of the part replacement of the work machine 2 having that machine number, the part numbers of the replaced parts, and the number of parts. The work machine management server 3, for example, executes a program using a CPU, receives the replacement history of each part of each work machine 2 from each work machine 2 or each user terminal 6 via the network 7 and the communication unit 31, and creates the part replacement history table 33.
[0023] [Table 2]
[0024] The customer information table 34 is, for example, a database in which customer information for each work machine 2 is recorded. An example of the customer information table 34 is shown in Table 3 below. In the example shown in Table 3, the customer information table 34 records the machine number, which is the identification information of each work machine 2, and the name of the customer who is the owner of each work machine 2. The work machine management server 3 receives customer information from each user terminal 6 via the network 7 and the communication unit 31, and creates the customer information table 34, for example, by executing a program using the CPU.
[0025] [Table 3]
[0026] The aerial photograph server 4 is, for example, a network server connected to the network 7. The aerial photograph server 4 may be operated, for example, by a government agency such as the Geospatial Information Authority of Japan, or a private company that provides Internet-related services. The aerial photograph server 4 includes, for example, a communication unit 41, an aerial photograph storage unit 42, and a map information storage unit 43.
[0027] The communication unit 41 is, for example, an input / output device connected to the network 7 and performing information communication with devices external to the aerial photograph server 4 via the network 7. The aerial photograph storage unit 42 stores aerial photographs from all over the world associated with location information including latitude and longitude, for example. The aerial photographs stored in the aerial photograph storage unit 42 include at least aerial photographs, and may also include satellite images. The map information storage unit 43 stores map information associated with location information including latitude and longitude, for example. The aerial photograph server 4 does not have to have the map information storage unit 43.
[0028] The server device 5 is a network server connected to the network 7. The server device 5 includes, for example, a communication unit 51 and a work machine failure prediction device 52. The communication unit 51 is, for example, an input / output device connected to the network 7 and communicating information with devices external to the server device 5 via the network 7. The work machine failure prediction device 52 is, for example, configured with one or more microcontrollers, and estimates the type of industry in which each work machine 2 is used by executing a program stored in RAM or ROM with a CPU. Details of the work machine failure prediction device 52 of this embodiment will be described later with reference to Figs. 2 to 6.
[0029] The user terminal 6 is, for example, a mobile information terminal such as a smartphone, a tablet terminal, or a notebook PC. The user terminal 6 includes, for example, a communication unit 61 such as a wireless communication device, an information acquisition unit 62 that acquires information transmitted from the server device 5 via the network 7 and the communication unit 61, and a display unit 63 configured by a liquid crystal display device, an organic EL display device, or the like.
[0030] Fig. 2 is a functional block diagram of the work machine failure prediction device 52 shown in Fig. 1. The work machine failure prediction device 52 is a device that estimates the industry in which the work machine 2 is used, based on, for example, an aerial photograph AP including the work site of the work machine 2 and operation information OI of the work machine 2. The work machine failure prediction device 52 includes, for example, an information acquisition unit 521, an image analysis unit 522, an operation information analysis unit 523, a reliability calculation unit 524, and an industry estimation unit 525.
[0031] Furthermore, the work machine failure prediction device 52 of this embodiment further includes, for example, a weighting coefficient setting unit 526 and a replacement time determination unit 527. Each unit of the work machine failure prediction device 52 shown in Fig. 2 represents each function of the work machine failure prediction device 52 realized, for example, by a CPU executing a program. Hereinafter, the operation of the work machine failure prediction device 52 of this embodiment will be described with reference to Figs. 3 to 5.
[0032] Figures 3 to 5 are flow diagrams explaining the operation of the work machine failure prediction device 52 shown in Figure 2. When the work machine failure prediction device 52 starts the industry estimation flow PF1 shown in Figure 3, it first executes process P101 for acquiring an aerial photograph and operation information. In this process P101, the information acquisition unit 521 acquires an aerial photograph AP including the work site of the work machine 2 whose industry is to be estimated, and operation information OI of that work machine 2.
[0033] More specifically, the information acquisition unit 521 of the work machine failure prediction device 52 transmits, for example, a request to send operation information of a work machine 2 whose industry is to be estimated, together with the identification information of that work machine 2, to the work machine management server 3 via the communication unit 51 of the server device 5. When the work machine management server 3 receives the request to send operation information and the identification information of the work machine 2 transmitted from the communication unit 51 of the server device 5 via the communication unit 31, it extracts operation information OI of the work machine 2 that matches the identification information from the daily operation report table 32 and transmits it to the server device 5 via the communication unit 31. The operation information OI of the work machine 2 transmitted from the work machine management server 3 to the server device 5 is received by the communication unit 51 of the server device 5 and acquired by the information acquisition unit 521.
[0034] Furthermore, the information acquisition unit 521 of the work machine failure prediction device 52 transmits, for example, a request to send an aerial photograph including the work site of the work machine 2, the industry of which is to be estimated, together with location information of the work site to the aerial photograph server 4 via the communication unit 51 of the server device 5. The location information of the work site includes the latitude and longitude of the point where the work machine 2 works. When the aerial photograph server 4 receives the request for an aerial photograph and the location information of the work site transmitted from the communication unit 51 of the server device 5 via the communication unit 41, it extracts an aerial photograph AP including the work site from the aerial photograph storage unit 42 and transmits it to the server device 5 via the communication unit 41. The aerial photograph AP transmitted from the aerial photograph server 4 to the server device 5 is received by the communication unit 51 of the server device 5 and acquired by the information acquisition unit 521.
[0035] Next, the work machine failure prediction device 52 executes, for example, process P102 for creating teacher data for learning a machine learning model. In this process P102, the information acquisition unit 521 acquires, for example, an aerial photograph AP including a work site of a work machine 2 whose industry is known from the aerial photograph server 4 via the communication unit 51. The information acquisition unit 521 also acquires, for example, operation information OI of a work machine 2 whose industry is known from the work machine management server 3 via the communication unit 51.
[0036] Furthermore, the information acquisition unit 521 creates teacher data that associates, for example, an aerial photograph AP including the work site of the work machine 2 with the known industry KB of the work machine 2, and outputs the teacher data to the image analysis unit 522. The image analysis unit 522 trains a machine learning model using the teacher data input from the information acquisition unit 521. The machine learning model of the image analysis unit 522 is a model that receives as input an aerial photograph AP including the work site of the work machine 2, and outputs a candidate industry of the work machine 2 estimated based on the aerial photograph AP as a first industry candidate C1.
[0037] Furthermore, the information acquisition unit 521 creates teacher data that associates, for example, the operation information OI of the work machine 2 with the known industry KB of the work machine 2, and outputs the teacher data to the operation information analysis unit 523. The operation information analysis unit 523 trains a machine learning model using the teacher data input from the information acquisition unit 521. The machine learning model of the operation information analysis unit 523 is a model that receives as input the operation information OI of the work machine 2, and outputs a candidate industry of the work machine 2 estimated based on the operation information OI as a second industry candidate C2.
[0038] Next, the work machine failure prediction device 52 executes, for example, a process P103 for estimating a first industry candidate C1. In this process P103, the image analysis unit 522 estimates the first industry candidate C1 of the work machine 2 based on the aerial photograph AP including the work site of the work machine 2 whose industry is to be estimated, acquired by the information acquisition unit 521 in the above-mentioned process P101. More specifically, the image analysis unit 522 inputs the aerial photograph AP including the work site of the work machine 2 whose industry is to be estimated, to the machine learning model trained in the above-mentioned process P102. As a result, the machine learning model of the image analysis unit 522 outputs the first industry candidate C1, which is the industry of the work machine 2 estimated from the input aerial photograph AP.
[0039] Next, the work machine failure prediction device 52 executes, for example, a process P104 for estimating a second industry candidate C2. In this process P104, the operation information analysis unit 523 estimates the second industry candidate C2 of the work machine 2 based on the operation information OI of the work machine 2 whose industry is to be estimated, acquired by the information acquisition unit 521 in the above-mentioned process P101. More specifically, the operation information analysis unit 523 inputs the operation information OI of the work machine 2 whose industry is to be estimated, to the machine learning model trained in the above-mentioned process P102. As a result, the machine learning model of the operation information analysis unit 523 outputs the second industry candidate C2, which is the industry of the work machine 2 estimated from the input operation information OI.
[0040] The first industry candidate C1 and the second industry candidate C2 of the work machine 2 estimated by the image analysis unit 522 and the operation information analysis unit 523 are, for example, civil engineering, demolition, quarrying, steelworks, port loading and unloading, metal and automobile recycling, industrial waste disposal, forestry, maritime dredging, road construction, livestock farming and agriculture, snow removal, etc. Next, the work machine failure prediction device 52 executes a process P105 of calculating the first reliability R1 and the second reliability R2.
[0041] In this process P105, the reliability calculation unit 524 calculates, as a first reliability R1, the reliability of the first industry candidate C1 which is the estimation result of the industry of the work machine 2 by the image analysis unit 522 based on the aerial photograph AP including the work site of the work machine 2. In addition, the reliability calculation unit 524 calculates, as a second reliability R2, the reliability of the second industry candidate C2 which is the estimation result of the industry of the work machine 2 by the operation information analysis unit 523 based on the operation information OI of the work machine 2.
[0042] Here, the first reliability R1 and the second reliability R2 are indexes indicating the likelihood that the first industry candidate C1 and the second industry candidate C2 estimated by the image analysis unit 522 and the operation information analysis unit 523 match the true industry of the work machine 2. For example, the closer the first reliability R1 and the second reliability R2 are to 1, the higher the possibility that the first industry candidate C1 and the second industry candidate C2 match the true industry, and the closer they are to 0, the higher the possibility that the first industry candidate C1 and the second industry candidate C2 do not match the true industry.
[0043] The reliability calculation unit 524 may, for example, calculate the first reliability R1 in the process P103 for estimating the first industry candidate C1, and calculate the second reliability R2 in the process P104 for estimating the second industry candidate C2. That is, the process P105 for calculating the first reliability R1 and the second reliability R2 may be performed simultaneously or in parallel with the process P103 for estimating the first industry candidate C1 and the process P104 for estimating the second industry candidate C2. Also, the first reliability R1 may be calculated by the image analysis unit 522, and the second reliability R2 may be calculated by the operation information analysis unit 523. In this case, the reliability calculation unit 524 may be omitted.
[0044] Next, the work machine failure prediction device 52 executes, for example, a process P106 for determining whether the first industry candidate C1 and the second industry candidate C2 match. In this process P106, the industry estimation unit 525 determines whether the first industry candidate C1 of the work machine 2 estimated by the image analysis unit 522 based on the aerial photograph AP matches the second industry candidate C2 of the work machine 2 estimated by the operation information analysis unit 523 based on the operation information OI.
[0045] In this process P106, if the industry estimation unit 525 determines that the first industry candidate C1 and the second industry candidate C2 match (YES), it executes process P107 to output the first industry candidate C1 or the second industry candidate C2 as the industry estimation result BER of the work machine 2. Thereafter, the work machine failure prediction device 52 ends the process flow PF1 shown in Fig. 3. On the other hand, in process P106, if the industry estimation unit 525 determines that the first industry candidate C1 and the second industry candidate C2 do not match (NO), it executes the next processes P108 to P111.
[0046] In processes P108 to P111, the industry estimation unit 525 outputs either the first industry candidate C1 or the second industry candidate C2 as the industry estimation result BER of the work machine 2, for example, based on the first reliability R1 and the second reliability R2 calculated by the reliability calculation unit 524. Specifically, in processes P108 and P110, the industry estimation unit 525 determines whether or not the first reliability R1 and the second reliability R2 exceed the first threshold value Th1 and the second threshold value Th2, respectively.
[0047] The first threshold value Th1 may be, for example, an average value of multiple first reliabilities R1 for multiple first industry candidates C1 outputted when multiple aerial photographs AP including work sites of multiple work machines 2 whose industries are known are inputted to the image analysis unit 522. Similarly, the second threshold value Th2 may be, for example, an average value of multiple second reliabilities R2 for multiple second industry candidates C2 outputted when operation information OI of multiple work machines 2 whose industries are known are inputted to the operation information analysis unit 523. Table 4 below shows an example of the first threshold value Th1 and the second threshold value Th2 for each industry.
[0048] [Table 4]
[0049] More specifically, in process P108, the industry estimation unit 525 determines that the first reliability R1 exceeds the first threshold value Th1 and the second reliability R2 is equal to or less than the second threshold value Th2 (YES). Then, the industry estimation unit 525 executes process P109 to output the first industry candidate C1 based on the aerial photograph AP as the industry estimation result BER of the work machine 2. Thereafter, the work machine failure prediction device 52 ends process flow PF1 shown in FIG.
[0050] On the other hand, if in process P108 the industry estimation unit 525 determines that the first reliability R1 does not exceed the first threshold value Th1 or that the second reliability R2 is not equal to or less than the second threshold value Th2 (NO), it executes the next process P110. In this process P110, it is assumed that the industry estimation unit 525 determines that the first reliability R1 is equal to or less than the first threshold value Th1 and that the second reliability R2 exceeds the second reliability R2 (YES). Then, the industry estimation unit 525 executes process P111 to output the second industry candidate C2 based on the operation information OI as the industry estimation result BER of the work machine 2. Thereafter, the work machine failure prediction device 52 ends the process flow PF1 shown in FIG. 3.
[0051] On the other hand, in process P110, if the business type estimation unit 525 determines that the first reliability R1 is not equal to or less than the first threshold Th1 or that the second reliability R2 does not exceed the second reliability R2 (NO), the business type estimation unit 525 executes process P112 shown in Fig. 4. In this process P112, the business type estimation unit 525 acquires, for example, the first weighting coefficient W1 and the second weighting coefficient W2 from the weighting coefficient setting unit 526. Thereafter, the business type estimation unit 525 executes process P113 to calculate the first evaluation value E1 and the second evaluation value E2.
[0052] In this process P113, the industry estimation unit 525 calculates, for example, the product of the first reliability R1 and the first weighting coefficient W1 divided by the first threshold value Th1 as the first evaluation value E1 (E1=R1×W1 / Th1).The industry estimation unit 525 also calculates, for example, the product of the second reliability R2 and the second weighting coefficient W2 divided by the second threshold value Th2 as the second evaluation value E2 (E2=R2×W2 / Th2).
[0053] The weighting coefficient setting unit 526 sets the first weighting coefficient W1 and the second weighting coefficient W2, for example, as follows. The weighting coefficient setting unit 526 acquires, for example, known industries KB of the multiple work machines 2 from the information acquisition unit 521. Furthermore, the weighting coefficient setting unit 526 acquires multiple industry estimation results BER output from the industry estimation result BER when multiple aerial photographs AP and multiple pieces of operation information OI corresponding to the multiple work machines 2 are input to the image analysis unit 522 and the operation information analysis unit 523, respectively. Then, the weighting coefficient setting unit 526 sets the first weighting coefficient W1 and the second weighting coefficient W2 by repeated adjustment so that the known industries KB of the multiple work machines 2 and the multiple industry estimation results BER output from the industry estimation unit 525 coincide most frequently.
[0054] After the above process P113 is completed, the industry estimation unit 525 executes process P114 to determine whether or not the first evaluation value E1 exceeds the second evaluation value E2. If the industry estimation unit 525 determines in process P114 that the first evaluation value E1 exceeds the second evaluation value E2 (YES), it executes process P115 to output the first industry candidate C1 as the industry estimation result BER. Thereafter, the work machine failure prediction device 52 ends the process flow PF1 shown in FIG. 3.
[0055] On the other hand, in process P114, if the industry estimation unit 525 determines that the first evaluation value E1 does not exceed the second evaluation value E2 (NO), it executes process P116 to determine whether or not the second evaluation value E2 exceeds the first evaluation value E1. In this process P116, if the industry estimation unit 525 determines that the second evaluation value E2 exceeds the first evaluation value E1 (YES), it executes process P117 to output the second industry candidate C2 as the industry estimation result BER. Thereafter, the work machine failure prediction device 52 ends the process flow PF1 shown in FIG. 3.
[0056] On the other hand, when the industry estimation unit 525 determines in process P116 that the second evaluation value E2 does not exceed the first evaluation value E1 (NO), it executes process P118 in which it outputs, for example, the first industry candidate C1 or the second industry candidate C2 as the industry estimation result BER. Thereafter, the work machine failure prediction device 52 ends process flow PF1 shown in Fig. 3. Thereafter, the work machine failure prediction device 52 starts process flow PF2 in which it determines the replacement time of a part of the work machine 2 and issues a notification as necessary, as shown in Fig. 5, for example.
[0057] When the work machine failure prediction device 52 starts the process flow PF2 shown in Fig. 5, first, it executes a process P201 to acquire operation information OI. In this process P201, the replacement time determination unit 527 acquires, from the information acquisition unit 521, the operation information OI of the work machine 2 for which the industry estimation result BER has been output by the industry estimation unit 525. Next, the replacement time determination unit 527 executes a process P202 to acquire the industry estimation result BER output from the industry estimation unit 525, and further executes a process P203 to determine whether or not the usage period of each part of the work machine 2 exceeds a threshold value based on the industry estimation result BER.
[0058] That is, the threshold value of the usage period of each part of the work machine 2 used in process P203 differs depending on the industry estimation result BER. This is because the usage manner of the work machine 2 differs depending on the industry in which it is used, as shown in Table 5 below. That is, since the frequency of use in that usage manner differs depending on the industry, the frequency is set to high, low, medium, or none. The threshold value of the usage period of each part used by the replacement time determination unit 527 to determine the replacement time of each part of the work machine 2 is set for each industry in which the work machine 2 is used, in accordance with differences in the usage manner of the work machine 2 as shown in Table 5, for example.
[0059] [Table 5]
[0060] As shown in the example in Table 5, the frequency of attaching and operating attachments to work machine 2 is higher than the average for all industries when work machine 2 is used in the industry of scrap metal and automobile recycling. Note that with scrap, work such as digging with the bucket of work machine 2 is rarely performed. Also, there are attachments that do not require operation, such as mechanical forks.
[0061] Furthermore, with regard to the frequency of mounting and operating attachments to the work machine 2, when the industry in which the work machine 2 is used is raw materials (quarrying), loading work using a medium-sized excavator is the main activity, and so the frequency is lower than the average for all industries. When the industry in which the work machine 2 is used is industrial waste treatment, the manner in which the work machine 2 is used differs between work within a plant and work at a landfill. When handling industrial waste within a plant, work using attachments is the main activity, but when working at a landfill, attachment operation is less frequent than the average for all industries.
[0062] Furthermore, the amount of swing operation of the work machine 2 is medium, close to the average of all industries, when the industry of the work machine 2 is demolition using raw materials and attachments (A), because there is a high frequency of swings at relatively large angles, and is higher when the industry of the work machine 2 is civil engineering. Furthermore, the amount of non-operation time of the work machine 2 depends on the work of the work machine 2, but because waiting time occurs for the work machine 2 during loading work, it is lower than the average of all industries when the industry of the work machine 2 is raw materials, civil engineering, or demolition using a bucket (B).
[0063] In addition to such differences in the usage manner of the work machine 2 depending on the industry in which the work machine 2 is used, for example, when the industry is civil engineering demolition, damage to the claw portion of the bucket of the work machine 2 tends to be more frequent than in other industries such as scrap and industrial waste processing. The threshold value of the usage period of the part for determining the replacement time of the part of the work machine 2 described above is determined taking into consideration the differences in the usage manner of the work machine 2 depending on the industry in which the work machine 2 is used, as well as the trends specific to the industry as described above. Furthermore, the operation information analysis unit 523 learns the trends of the operation information OI based on the differences in the usage manner of the work machine 2 depending on the industry in which the work machine 2 is used, as shown in Table 5, using a machine learning model, and estimates the second industry candidate C2 based on the operation information OI.
[0064] In process P203 shown in Fig. 5, the industry estimation unit 525 sets a threshold value for the usage period of each part of the work machine 2, based on the industry estimation result BER of the work machine 2 acquired in the previous process P202. Furthermore, the industry estimation unit 525 acquires operation information OI of the work machine 2 including the usage period of each part of the work machine 2. Then, when the industry estimation unit 525 determines that the usage period of each part of the work machine 2 does not exceed the threshold value for the usage period of each part (NO), the work machine failure prediction device 52 ends process flow PF2 shown in Fig. 5, and repeats it at a predetermined cycle.
[0065] On the other hand, when the industry estimation unit 525 determines in process P203 that the usage period of at least one part of the work machine 2 exceeds the threshold value for the usage period of that part (YES), it executes process P204 for outputting a notification. In this process P204, the industry estimation unit 525 notifies the user of the work machine 2 and related parties of the part replacement via the user terminal 6, for example, by transmitting the replacement time TOR of the part whose usage period has exceeded the threshold value to the user terminal 6 via the communication unit 51. Thereafter, the work machine failure prediction device 52 ends process flow PF2 shown in Fig. 5, and executes it repeatedly at a predetermined cycle.
[0066] Fig. 6 is an image diagram showing an example of an image displayed on the display unit 63 of the user terminal 6 of Fig. 1. In the example shown in Fig. 6, the display unit 63 of the user terminal 6 displays forestry as the industry estimation result BER, and an inequality sign indicates that the first industry candidate C1 based on the aerial photograph has been adopted as the industry estimation result BER. In addition, the display unit 63 may display the predicted results of the accumulated damage degree and replacement time of each part, and may display a graph showing the correlation between the accumulated damage degree and the replacement time.
[0067] As described above, the work machine failure prediction device 52 of this embodiment includes an information acquisition unit 521, an image analysis unit 522, an operation information analysis unit 523, a reliability calculation unit 524, and an industry estimation unit 525. The information acquisition unit 521 acquires an aerial photograph AP including the work site of the work machine 2 and operation information OI of the work machine 2. The image analysis unit 522 estimates a first industry candidate C1 of the work machine 2 based on the aerial photograph AP. The operation information analysis unit 523 estimates a second industry candidate C2 of the work machine 2 based on the operation information OI. The reliability calculation unit 524 calculates a first reliability R1 of the first industry candidate C1 estimated by the image analysis unit 522 and a second reliability R2 of the second industry candidate C2 estimated by the operation information analysis unit 523. When the first industry candidate C1 estimated by the image analysis unit 522 and the second industry candidate C2 estimated by the operation information analysis unit 523 match, the industry estimation unit 525 outputs the first industry candidate C1 or the second industry candidate C2 as an industry estimation result for the work machine 2. Furthermore, when the first industry candidate C1 and the second industry candidate C2 do not match, the industry estimation unit 525 outputs either the first industry candidate C1 or the second industry candidate C2 as the industry estimation result BER based on the first reliability R1 and the second reliability R2.
[0068] With such a configuration, the work machine failure prediction device 52 of this embodiment makes it possible for the image analysis unit 522 and the operation information analysis unit 523 to estimate the first industry candidate C1 and the second industry candidate C2 based on the aerial photograph AP for identifying the environment of the work site of the work machine 2 and the operation information OI related to the usage mode of the work machine 2. Furthermore, the industry estimation unit 525 compares the first industry candidate C1 and the second industry candidate C2, and when they match, outputs one of them as the industry estimation result BER, making it possible to more reliably estimate the industry in which the work machine 2 is used based on the aerial photograph AP and the operation information OI. Furthermore, when the first industry candidate C1 and the second industry candidate C2 do not match, outputting one of the first industry candidate C1 and the second industry candidate C2 as the industry estimation result BER based on the first reliability R1 and the second reliability R2, making it possible to more reliably estimate the industry in which the work machine 2 is used based on the aerial photograph AP and the operation information OI. As a result, even in a new area where the load and lifespan of parts are not registered in the database, it becomes possible to estimate the load and lifespan of each part of the work machine 2 based on the industry estimation result BER output from the industry estimation unit 525.
[0069] Furthermore, in the work machine failure prediction device 52 of this embodiment, when the first industry candidate C1 and the second industry candidate C2 do not match, the industry estimation unit 525 determines whether the first reliability R1 and the second reliability R2 exceed the first threshold Th1 and the second threshold Th2, respectively. When the first reliability R1 exceeds the first threshold Th1 and the second reliability R2 is equal to or less than the second threshold Th2, the industry estimation unit 525 outputs the first industry candidate C1 as the industry estimation result BER. When the first reliability R1 is equal to or less than the first threshold Th1 and the second reliability R2 exceeds the second threshold Th2, the industry estimation unit 525 outputs the second industry candidate C2 as the industry estimation result BER.
[0070] With this configuration, the work machine failure prediction device 52 of this embodiment makes it possible to output, as the industry estimation result BER, either the first industry candidate C1 or the second industry candidate C2, whichever has a higher degree of accuracy with respect to the true industry of the work machine 2. Therefore, the work machine failure prediction device 52 of this embodiment makes it possible to more reliably estimate the industry in which the work machine 2 is used.
[0071] Furthermore, in the work machine failure prediction device 52, the industry estimation unit 525 operates as follows when the first reliability R1 exceeds the first threshold value Th1 and the second reliability R2 exceeds the second threshold value Th2, or when the first reliability R1 is equal to or less than the first threshold value Th1 and the second reliability R2 is equal to or less than the second threshold value Th2. The industry estimation unit 525 calculates a first evaluation value E1 obtained by dividing the product of the first reliability R1 and the first weighting coefficient W1 by the first threshold value Th1, and a second evaluation value E2 obtained by dividing the product of the second reliability R2 and the second weighting coefficient W2 by the second threshold value Th2. The industry estimation unit 525 outputs the first industry candidate C1 as the industry estimation result BER when the first evaluation value E1 exceeds the second evaluation value E2, and outputs the second industry candidate C2 as the industry estimation result BER when the second evaluation value E2 exceeds the first evaluation value E1.
[0072] With this configuration, the work machine failure prediction device 52 of this embodiment can calculate the first evaluation value E1 and the second evaluation value E2 using the first reliability R1 and the second reliability R2, the first threshold value Th1 and the second threshold value Th2, and the first weighting coefficient W1 and the second weighting coefficient W2. Then, by comparing the first evaluation value E1 and the second evaluation value E2, one of the first industry candidate C1 and the second industry candidate C2 can be output as the industry estimation result BER. Therefore, even when the first reliability R1 exceeds the first threshold value Th1 and the second reliability R2 exceeds the second threshold value Th2, or when the first reliability R1 is equal to or less than the first threshold value Th1 and the second reliability R2 is equal to or less than the second threshold value Th2, it becomes possible to more reliably estimate the industry in which the work machine 2 is used.
[0073] Moreover, the work machine failure prediction device 52 further includes a weighting coefficient setting unit 526. The weighting coefficient setting unit 526 sets a first weighting coefficient W1 and a second weighting coefficient W2 so as to maximize agreement between the known industries KB of the multiple work machines 2 and the industry estimation result BER of the industry estimation unit 525 using the multiple aerial photographs AP and the multiple pieces of operation information OI corresponding to the multiple work machines 2.
[0074] With this configuration, the work machine failure prediction device 52 of this embodiment can improve the estimation accuracy of the industry estimation result BER based on a comparison between the first evaluation value E1 and the second evaluation value E2 calculated using the first weighting coefficient W1 and the second weighting coefficient W2. Therefore, the work machine failure prediction device 52 of this embodiment can more reliably estimate the industry in which the work machine 2 is used.
[0075] Moreover, the work machine failure prediction device 52 further includes a replacement time determination unit 527. The replacement time determination unit 527 determines the replacement time TOR for parts of the work machine 2 based on the operation information of each work machine 2 acquired by the information acquisition unit 521 and the industry estimation result BER by the industry estimation unit 525.
[0076] With this configuration, the work machine failure prediction device 52 of this embodiment can more reliably estimate the industry in which the work machine 2 is used, so that it becomes possible to more accurately estimate the load and lifespan of parts even in new regions where the load and lifespan of parts are not registered in the database.
[0077] As described above, according to this embodiment, it is possible to provide a work machine failure prediction device 52 that is capable of estimating the load and lifespan of parts by more reliably estimating the type of industry in which the work machine 2 is used.
[0078] An embodiment of a work machine failure prediction device according to the present invention has been described in detail above using the drawings. However, the specific configuration is not limited to this embodiment, and even if there are design changes and the like within the scope that does not deviate from the gist of this disclosure, they are included in the present invention. [Explanation of symbols]
[0079] 2. Work Machinery 52 Failure prediction device 521 Information Acquisition Department 522 Image Analysis Department 523 Operational Information Analysis Department 524 Reliability Calculation Unit 525 Industry Estimation Department 526 Weighting coefficient setting section 527 Replacement time determination section AP aerial photo BER Industry Estimation Results C1 First Industry Candidate C2 2nd Industry Candidate E1 First evaluation value E2 Second evaluation value KB Known Industries OI Operation Information R1 First reliability R2 Second reliability Th1 First threshold Th2 Second threshold TOR replacement period W1 First weighting factor W2 Second weighting factor
Claims
1. an information acquisition unit that acquires an aerial photograph including a work site of the work machine and operation information of the work machine; an image analysis unit that estimates a first industry candidate for the work machine based on the aerial photograph; an operation information analysis unit that estimates a second industry candidate for the work machine based on the operation information; a reliability calculation unit that calculates a first reliability of the first industry candidate estimated by the image analysis unit and a second reliability of the second industry candidate estimated by the operation information analysis unit; an industry estimation unit that outputs the first industry candidate or the second industry candidate as an industry estimation result for the work machine when the first industry candidate estimated by the image analysis unit and the second industry candidate estimated by the operation information analysis unit match, and outputs either the first industry candidate or the second industry candidate as the industry estimation result based on the first reliability and the second reliability when the first industry candidate and the second industry candidate do not match; a replacement time determination unit that determines a time to replace a part of the work machine based on the operation information acquired by the information acquisition unit and the industry estimation result by the industry estimation unit; A failure prediction device for a work machine comprising:
2. The failure prediction device for a work machine according to claim 1, characterized in that, when the first industry candidate and the second industry candidate do not match, the industry estimation unit determines whether the first reliability and the second reliability exceed a first threshold and a second threshold, respectively, and outputs the first industry candidate as the industry estimation result when the first reliability exceeds the first threshold and the second reliability is equal to or less than the second threshold, and outputs the second industry candidate as the industry estimation result when the first reliability is equal to or less than the first threshold and the second reliability exceeds the second threshold.
3. The failure prediction device for a work machine according to claim 2, characterized in that when the first reliability exceeds the first threshold and the second reliability exceeds the second threshold, or when the first reliability is equal to or less than the first threshold and the second reliability is equal to or less than the second threshold, the industry estimation unit calculates a first evaluation value by dividing the product of the first reliability and a first weighting coefficient by the first threshold and a second evaluation value by dividing the product of the second reliability and a second weighting coefficient by the second threshold, and outputs the first industry candidate as the industry estimation result when the first evaluation value exceeds the second evaluation value, and outputs the second industry candidate as the industry estimation result when the second evaluation value exceeds the first evaluation value.
4. The failure prediction device for a work machine as described in claim 3, further comprising a weighting coefficient setting unit that sets the first weighting coefficient and the second weighting coefficient so as to maximize agreement between known industries of the plurality of work machines and the industry estimation result of the industry estimation unit using the plurality of aerial photographs and the plurality of pieces of operation information corresponding to the plurality of work machines.
Citation Information
Patent Citations
Vehicle position estimation system, method, and program
JP2017116363A
Information processing device, information processing method, method for generating learned model, system, and data set for learning
JP2020173556A
Component service life prediction system and maintenance assistance system
WO2022209167A1
Supplemental part production predicting system, supplemental part production predicting method and program
JP2005173979A
