Project management system, project management method, and project management program

The project management system addresses the challenge of unrealized profit tracking in consolidated accounting by calculating and displaying unrealized profits, enhancing management efficiency and accelerating settlement processes.

JP2024141586AActive Publication Date: 2024-10-10OBIC CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2023053320
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-10
Estimated Expiration
2043-03-29

AI Technical Summary

Technical Problem

Existing project management systems fail to quickly grasp unrealized profits associated with transactions when projects are divided among consolidated companies, leading to delayed and inefficient consolidated accounting processes.

Method used

A project management system equipped with a control section that associates and registers profit margins with suppliers subject to consolidated accounting, calculates unrealized profits by multiplying tax-excluded amounts by profit rates, and generates an unrealized profit statement, while excluding unregistered products and accounts.

Benefits of technology

Enables quick grasping of unrealized profits, allowing for accelerated consolidated settlement and improved management efficiency by managing unrealized software suspense accounts and consolidated asset amounts on a detailed and timely basis.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

To early grasp unrealized gain due to a transaction when executing a project by allotment within enterprizes which are connection objects.SOLUTION: A project management system includes: a connection object supplier master registering a connection object supplier and profit margin; an asset object commodity master registering asset generating commodity, account title in completion, and account title when incomplete; project registration means for registering contract details including project identification information and state classification specifying completion or incompletion of the project; initial cost registration means for registering purchase data including purchase source, commodity, tax excluded cost, and project identification information; and unrealized gain calculation means for performing counting for each project identification information based on the purchase data, and calculating unrealized gain amount obtained by multiplying the tax excluded amount by profit margin acquired from the connection object supplier master using the supplier as a key, regarding the commodity registered in the supplier registered in the connection object supplier master and in the asset object commodity master.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a project management system, a project management method, and a project management program. [Background technology]

[0002] For example, in the IT industry, software package development is often shared among consolidated group companies. In such cases, the costs incurred in developing a single piece of software involve buying and selling. In the case of group companies, the parent company's software suspense account includes unrealized profits, so when viewed on a consolidated basis, it is necessary to understand the amount that has been excluded. For example, Patent Document 1 is a conventional system for managing unrealized profits in consolidated accounting. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2023-3320 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, the above-mentioned Patent Document 1 does not state anything about early detection of unrealized profits accompanying a project when the project is shared and executed by consolidated companies.

[0005] The present invention has been made in consideration of the above, and aims to provide a project management system, a project management method, and a project management program that make it possible to grasp unrealized profits associated with a transaction at an early stage when a project is shared and executed by consolidated companies. [Means for solving the problem]

[0006] In order to solve the above-mentioned problems and achieve the object, the present invention provides a project management system having a control unit, the control unit being configured to be able to access a memory area storing a consolidated supplier master in which suppliers to be consolidated are registered in association with their profit margins, and an asset target product master in which products to be capitalized, account items at completion, and account items at incomplete are registered in association with each other, the system being characterized in that the system is equipped with: a project registration means for registering contract details including project identification information and a status class specifying whether the project is completed or not in the memory area; a cost registration means for registering purchase data including a date, a voucher number, a supplier, a product, an amount excluding tax, and project identification information in the memory area; and an unrealized profit calculation means for calculating an unrealized profit amount by multiplying the amount excluding tax by the profit margin obtained from the consolidated supplier master using the supplier as a key, based on the purchase data.

[0007] In addition, according to one embodiment of the present invention, the unrealized profit calculation means may create and output an unrealized profit statement including project identification information, supplier, product, amount excluding tax, unrealized profit amount calculated by multiplying the amount excluding tax by profit margin, net asset amount calculated by subtracting the amount excluding tax from the amount excluding unrealized profit, and account name.

[0008] According to another aspect of the present invention, the unrealized profit calculation means may not tally up any products that are not registered in the asset target product master.

[0009] Furthermore, according to one aspect of the present invention, the unrealized profit calculation means may set the "account name" of the unrealized profit statement by retrieving a "account item at completion" from the asset object product master using the product as a key if the status classification in the contract details is "completed," and by retrieving a "account item at incompletion" from the asset object product master using the product as a key if the status classification in the contract details is "incomplete."

[0010] According to another aspect of the present invention, the control unit may further include an asset information processing means for creating asset information based on the unrealized profit statement and outputting the asset information to a fixed asset system.

[0011] According to another aspect of the present invention, the completed account item may include software, and the not-yet-completed account item may include a software suspense account.

[0012] In addition, in order to solve the above-mentioned problems and achieve the object, the present invention provides a project management method executed by an information processing device having a control unit, the control unit being configured to be able to access a memory area storing a consolidated supplier master in which suppliers to be consolidated are registered in association with their profit margins, and an asset target product master in which products to be capitalized, account items at completion, and account items at incomplete are registered in association with each other, the method comprising the steps of: a project registration step executed by the control unit, for registering contract details including project identification information and a status class specifying whether the project is completed or not in the memory area; a cost registration step, for registering purchase data including a date, a voucher number, a supplier, a product, an amount excluding tax, and project identification information in the memory area; and an unrealized profit calculation step, for calculating an unrealized profit amount by multiplying the amount excluding tax by the profit margin obtained from the consolidated supplier master using the supplier as a key, for a supplier registered in the consolidated supplier master and a product registered in the asset target product master.

[0013] In addition, in order to solve the above-mentioned problems and achieve the object, the present invention provides a project management program to be executed by an information processing device having a control unit, the control unit being configured to be able to access a memory area storing a consolidated supplier master in which suppliers to be consolidated are registered in association with their profit margins, and an asset target product master in which products to be capitalized, account items at completion, and account items at incomplete are registered in association with each other, the control unit being configured to execute a project registration step of registering contract details including project identification information and a status class specifying whether the project is completed or not in the memory area, a cost registration step of registering purchase data including a date, a voucher number, a supplier, a product, an amount excluding tax, and project identification information in the memory area, and an unrealized profit calculation step of calculating an unrealized profit amount by multiplying the amount excluding tax by the profit margin obtained from the consolidated supplier master using the supplier as a key, for a supplier registered in the consolidated supplier master and a product registered in the asset target product master. Effect of the Invention

[0014] According to the present invention, when a project is shared and executed by consolidated companies, it is possible to grasp the unrealized profits accompanying the transaction at an early stage. [Brief description of the drawings]

[0015] [Figure 1] FIG. 1 is a diagram showing an example of a configuration of a project management system according to the present embodiment. [Diagram 2] FIG. 2 is a diagram showing an example of the configuration of the linked supplier master data. [Diagram 3] FIG. 3 is a diagram illustrating an example of the configuration of the asset target product master. [Figure 4] FIG. 4 is a flow diagram showing an example of the overall processing of the project management system according to this embodiment. [Diagram 5]FIG. 5 is a diagram for explaining a specific example of the process of the control unit of the project management system according to the present embodiment. [Figure 6] FIG. 6 is a diagram for explaining a specific example of the process of the control unit of the project management system according to the present embodiment. [Figure 7] FIG. 7 is a diagram for explaining a specific example of the process of the control unit of the project management system according to the present embodiment. [Figure 8] FIG. 8 is a diagram for explaining a specific example of the process of the control unit of the project management system according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0016] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of a project management system, a project management method, and a project management program according to the present invention will be described in detail with reference to the accompanying drawings. Note that the present invention is not limited to the preferred embodiments.

[0017] [1: Overview] For example, in the IT industry, it is common for a company to outsource software development to a consolidated corporation, entrusting all or part of the software development to the company. In such cases, it is assumed that the outsourcing costs paid to the consolidated corporation include profits. In other words, if you only look at individual accounting figures, the software in progress account will include unrealized profits for consolidated accounting purposes until the software is completed, and the assets that are capitalized when the software is completed will also include unrealized profits for consolidated accounting purposes. Since the software in progress account, excluding unrealized profits, is the actual amount, understanding it without waiting for legal consolidation will lead to improved management efficiency.

[0018] However, in the past, accurate suspense accounts could not be determined without waiting until the end of the quarter due to complex linked accounting procedures.

[0019] In this embodiment, therefore, a system has been constructed that, when a project is shared and executed by consolidated companies, makes it possible to grasp early the unrealized profits accompanying the transaction.

[0020] Specifically, in the project management system of this embodiment, a system that takes consolidated accounting into consideration, which is not found in conventional project management system + fixed asset systems, has been constructed. By setting the profit margin for each company, it is possible to manage unrealized profits and consolidated asset amounts (net asset amounts). By utilizing the project management system + fixed asset system, it is possible to centrally manage unrealized software suspense accounts + software on a detailed basis, and to grasp the latest amounts that take depreciation costs into account on a monthly basis.

[0021] In the project management system of this embodiment, by managing unrealized profits, the consolidated asset amount can be confirmed immediately before linking to the fixed asset system or consolidated accounting system, so that the processing can proceed faster than the consolidation procedure of a normal consolidated accounting system, and consolidated settlement can be accelerated. By managing the depreciation calculation of the consolidated asset amount in parallel with the fixed asset management of each company, the figures can be grasped at an earlier stage than when depreciation is calculated after linking to the consolidated accounting system, and consolidated settlement can be accelerated. In addition, even if the unit of consolidated settlement in the consolidated accounting system is not monthly, by utilizing the project management system + fixed asset system, figures can be grasped on a monthly basis for each individual company, and management figures taking into consideration the consolidated accounting can be grasped at an earlier stage.

[0022] The project management system of the present invention is widely applicable to industries in which projects are shared and executed by consolidated companies, such as IT companies, the service industry, and the construction industry.

[0023] [2. Configuration] An example of the configuration of the project management system according to this embodiment will be described with reference to Fig. 1 etc. The project management system according to this embodiment can be suitably used, for example, in a parent company that shares the project with a company subject to consolidated accounting. Fig. 1 is a block diagram showing an example of the configuration of the project management system 100 according to this embodiment.

[0024] The project management system 100 is, for example, a commercially available desktop personal computer or a workstation.

[0025] The project management system 100 includes a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. The units included in the project management system 100 are connected to each other so as to be able to communicate with each other via any communication path.

[0026] The communication interface unit 104 communicatively connects the project management system 100 to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via the communication line. Here, the network 300 has a function of communicatively connecting the project management system 100 with the server 200, the fixed asset management system 400, and the consolidated accounting system 500, and is, for example, the Internet or a LAN (Local Area Network).

[0027] An input device 112 and an output device 114 are connected to the input / output interface unit 108. The output device 114 may be a monitor (including a home television), a speaker, or a printer. The input device 112 may be a keyboard, a mouse, a microphone, or a monitor that cooperates with a mouse to realize a pointing device function. In the following, the output device 114 may be referred to as the monitor 114, and the input device 112 may be referred to as the keyboard 112 or the mouse 112. Displaying information on the monitor 114 and the user operating the input device 112 may be referred to as a "user operation via a UI."

[0028] Various databases, tables, files, etc. are stored in the storage unit 106. Computer programs for cooperating with an OS (Operating System) to give instructions to a CPU (Central Processing Unit) to perform various processes are recorded in the storage unit 106. For example, memory devices such as RAM (Random Access Memory) and ROM (Read Only Memory), fixed disk devices such as hard disks, flexible disks, optical disks, etc. can be used as the storage unit 106.

[0029] The storage unit 106 stores, for example, a consolidated supplier master 106a, an asset target product master 106b, a contract details table 106c, a purchase table 106d, an unrealized profit statement, an asset information table 106e, etc. Fig. 2 is a diagram showing an example of the configuration of the consolidated supplier master 106a. Fig. 3 is a diagram showing an example of the configuration of the asset target product master 106b.

[0030] The consolidated supplier master 106a is a master for setting the profit margin for each supplier of the consolidated accounting target, and can be configured with a table in which the supplier (supplier CD and / or supplier name) and the profit margin are registered in association with each other, as shown in Fig. 2. The supplier CD is the primary key.

[0031] The asset target product master 106b is a master for setting information on products to be converted into assets, and can be configured with a table or the like in which products (product CD and / or product name), completion account CD, completion account item name, non-completion account CD, and non-completion account item name are associated and registered, as shown in Fig. 3. The supplier CD is the primary key.

[0032] The contract details table 106c is a table for storing contract details. The contract details may include project identification information (contract detail number and / or contract detail name), a direct / indirect cost classification that specifies the classification of direct or indirect costs, a classification name that specifies the direct or indirect cost, a department CD, a division name, and a status classification that specifies the completion or incomplete status of the project. The contract detail number is the primary key.

[0033] The purchase table 106d is a table for storing purchase data. The purchase data may include date, slip number, supplier (supplier CD and / or supplier name), product (product CD and / or product name), tax-excluded amount, and project identification information (contract specification number and / or contract specification name). The contract specification number, supplier CD, and product CD are primary keys.

[0034] The asset information table 106e is a table for storing asset information. The asset information may include an asset number, an asset name, an asset type CD, an asset type name, a depreciation method, a useful life, a memorandum value, a net depreciation method, a net useful life, and a net memorandum value for tax purposes, and an acquisition amount, a depreciation method, a useful life, a memorandum value, a net acquisition amount, a net depreciation method, a net useful life, and a net memorandum value for accounting purposes.

[0035] Returning to Fig. 1, the control unit 102 is a CPU or the like that performs overall control of the project management system 100. The control unit 102 has an internal memory for storing control programs such as an OS, programs that define various processing procedures, required data, and the like, and executes various types of information processing based on these stored programs.

[0036] The control unit 102 is configured to be able to access the consolidated supplier master 106a, the asset target product master 106b, the contract details table 106c, the purchase table 106d, the unrealized profit statement, the material information table 106e, and the like stored in the storage unit 106. Note that the consolidated supplier master 106a, the asset target product master 106b, the contract details table 106c, the purchase table 106d, the unrealized profit statement, the material information table 106e, and the like may be provided in another location (for example, the server 200) as long as the control unit 102 is able to access them.

[0037] The control unit 102 conceptually includes, in terms of functions, a master maintenance unit 102a, a project registration unit 102b, a cost registration unit 102c, an unrealized profit calculation unit 102d, an asset information processing unit 102e, and a screen display control unit 102f.

[0038] The master maintenance unit 102a performs settings such as data input, addition, change, and update for the linked target supplier master 106a and the asset target product master 106b in response to, for example, an operator's operation on a master maintenance screen (not shown) displayed on the monitor 114.

[0039] The project registration unit 102b inputs contract details regarding direct costs and indirect costs in response to, for example, an operator's operation on a project registration screen (not shown) displayed on the monitor 114, and registers the details in the contract details table 106c.

[0040] The cost registration unit 102c is for registering cost information such as purchase data, and for example, registers the purchase data in a purchase table 106d in response to an operator's operation on a purchase input screen (not shown) displayed on the monitor 114.

[0041] The unrealized profit calculation unit 102d performs aggregation for each project identification information based on the purchasing data, and for a supplier registered in the consolidated supplier master 106a and a product registered in the asset target product master 106b, calculates the amount of unrealized profit by multiplying the tax-excluded amount by the profit rate obtained from the consolidated supplier master 106a using the supplier as a key.

[0042] The unrealized profit calculation unit 102d further creates an unrealized profit statement including project identification information, supplier, product, amount excluding tax, unrealized profit amount calculated by multiplying the amount excluding tax by profit margin, net asset amount calculated by subtracting the amount excluding tax from the amount excluding unrealized profit, and account name, and displays and outputs the statement on an unrealized profit statement screen while also registering it in the memory unit 106.

[0043] Moreover, the unrealized profit calculation unit 102d may not tally up products that are not registered in the asset target product master 106b.

[0044] In addition, the unrealized profit calculation unit 102d may set the "account name" of the unrealized profit statement by retrieving the "account item at completion" from the asset target product master 106b using the product as a key if the status classification in the contract details is "completed," and by retrieving the "account item at incompletion" from the asset target product master 106b using the product as a key if the status classification in the contract details is "incomplete."

[0045] The asset information processing unit 102e creates asset information based on an unrealized profit statement in response to, for example, an operator's operation on an asset information creation screen displayed on the monitor 114, registers the same in the asset information table 106e, and outputs the same to the fixed asset system 500.

[0046] The screen display control unit 102f controls the display and input of various screens (for example, a project registration screen, a purchase input screen, an unrealized profit statement screen, an asset information creation screen, a master maintenance screen, etc.) displayed on the monitor 114.

[0047] [3. Specific Examples] A specific example of the process of the control unit 102 of the project management system 100 in this embodiment will be described with reference to FIGS.

[0048] (3-1. Overall processing) FIG. 4 is a flowchart for explaining an outline of the overall processing of the control unit 102 of the project management system 100 in this embodiment.

[0049] With reference to FIG. 4, an outline of the overall processing of the control unit 102 of the project management system 100 in this embodiment will be described. In FIG. 4, the project registration unit 102b executes a contract details registration process (step S1). Specifically, in the contract details registration process, the project registration unit 102b registers contract details for direct costs in the contract details table 106c, for example, in response to an operator's operation on a project registration screen (not shown) displayed on the monitor 114. The project registration unit 102b also executes an indirect project registration process (step S2). Specifically, in the indirect project registration process, the project registration unit 102b registers contract details for indirect costs in the contract details table 106c, for example, in response to an operator's operation on a project registration screen (not shown) displayed on the monitor 114.

[0050] The cost registration unit 102c executes a purchase input process (step S3). Specifically, in the purchase input process, the cost registration unit 102c registers purchase data in the purchase table 106d in response to, for example, an operator's operation on a purchase input screen (not shown) displayed on the monitor 114.

[0051] The unrealized profit calculation unit 102d executes the unrealized profit statement output process (step S3). Specifically, in the unrealized profit statement output process, the unrealized profit calculation unit 102d performs aggregation for each contract detail number based on the purchase data, and first, for a supplier registered in the consolidated supplier master 106a and a commodity registered in the asset target commodity master 106b, calculates the unrealized profit amount by multiplying the tax-excluded amount by the profit rate acquired from the consolidated supplier master 106a using the supplier as a key, creates an unrealized profit statement including project identification information, supplier, commodity, tax-excluded amount, unrealized profit amount calculated by tax-excluded amount x profit rate, net asset amount calculated by tax-excluded amount - unrealized profit amount, and account name, and displays and outputs the statement on the unrealized profit statement screen displayed on the monitor 114, and stores it in the storage unit 106.

[0052] In this case, unrealized profits may not be calculated for suppliers that are not subject to consolidated accounting in the consolidated supplier master 106a. Products that are not registered as asset target products in the asset target product master 106b may not be tallied. Regarding the "account item", if the status category in the contract details is "completed", the "account item at completion" is obtained and set from the asset target product master 106b using the product CD as a key, and if the status category in the contract details is "uncompleted", the "account item at incompletion" is obtained and set from the asset target product master 106b using the product CD as a key.

[0053] The asset information processing unit 102e executes an asset information additional input process (step S5). Specifically, in the asset information input process, the asset information processing unit 102e extracts and displays reference data from the unrealized profit statement and contract details using the specified project identification information as a key in response to an operator's operation on the asset information creation screen displayed on the monitor 114, and further creates asset information to which information related to assets has been added, and registers the information in the asset information table 106e.

[0054] The asset information processing unit 102e executes an asset information output process (step S6). Specifically, the asset information processing unit 102e outputs the asset information registered in the asset information table 106e to other systems such as the fixed asset management system 400 and the consolidated accounting system 500.

[0055] (3-2. Sample data) 5 to 8 are diagrams showing sample data for explaining a specific example of the processing by the control unit 102 of the project management system 100 in this embodiment. A specific example of the processing by the control unit 102 of the project management system 100 in this embodiment will be explained with reference to Figs. 5 to 8.

[0056] (Master maintenance processing) A specific example of the master maintenance process will be described with reference to Fig. 5. The master maintenance unit 102a sets data in advance in the linked supplier master 106a and the asset target product master 106b in response to, for example, an operator's operation on a master maintenance screen (not shown) displayed on the monitor 114.

[0057] Fig. 5(A) is a diagram showing a setting example of the consolidated supplier master 106a. As shown in Fig. 2, the consolidated supplier master 106a has the fields of supplier CD, supplier name, and profit margin. In the example shown in the figure, the first line has supplier CD "S001", supplier name "Company A", and profit margin "10%", the second line has supplier CD "S002", supplier name "Company B", and profit margin "9%", and the third line has supplier CD "S003", supplier name "Company C", and profit margin "11%".

[0058] 5B is a diagram showing a setting example of the asset target product master 106b. The asset target product master 106b has the items of product CD, product name, completion account CD, completion account item name, incomplete account CD, and incomplete account item name. In the example shown in the figure, the first line is product CD "H001", product name "outsourcing cost (asset)", completion account CD "K001", completion account item name "software", incomplete account CD "K002", and incomplete account item name "software suspense account", and the second line is product CD "L001", product name "outsourcing cost (building)", completion account CD "K101", completion account item name "building", incomplete account CD "K102", and incomplete account item name "construction suspense account".

[0059] (S1: Contract details registration processing and S2: Indirect project registration processing) A specific example of the contract details registration process and the indirect project registration process will be described with reference to Fig. 6. The project registration unit 102b inputs contract details regarding direct costs and indirect costs in response to, for example, an operator's operation on a project registration screen (not shown) displayed on the monitor 114, and registers them in the contract details table 106c.

[0060] FIG. 6A is a diagram showing an example of contract details registered in the contract details table 106c. The contract details include the following items: contract detail number, contract detail name, direct / indirect cost category specifying the category of direct cost (1) or indirect cost (2), category name specifying direct cost or indirect cost, department (CD), division name, and status category specifying the status of the project, whether completed or incomplete.

[0061] In the example shown in the figure, the first line shows contract details regarding direct costs, with contract detail number "0001," contract detail name "PJ-01," direct / indirect category "1," category name "direct," department CD "B1," department name "System 1," and status category "completed." The fourth line shows contract details regarding indirect costs, with contract detail number "1001," contract detail name "System 1 Project," direct / indirect category "2," category name "indirect," department CD "B1," department name "System 1," and status category "not completed."

[0062] (S3: Purchase input processing) A specific example of the purchase input process will be described with reference to Fig. 6. The cost registration unit 102c registers purchase data in the purchase table 106d in response to, for example, an operator's operation on a purchase input screen (not shown) displayed on the monitor 114.

[0063] 6B is a diagram showing an example of purchase data registered in the purchase table 106d. The purchase data includes the following fields: date, slip number, supplier CD, supplier name, product CD, product name, amount excluding tax, contract specification number, and contract specification name. In the example shown in the figure, the first line contains the date "2022 / 4 / 1", slip number "123456789", supplier CD "S001", supplier name "Company A", product CD "H001", product name "Outsourcing cost (asset)", amount excluding tax "1,000,000", contract specification number "0001", and contract specification name "PJ-01".

[0064] The supplier "S004: Company D" on lines 7 and 8 is not registered as a supplier subject to consolidation in the consolidated supplier master 106a, and is therefore a supplier not subject to consolidation, so unrealized profits are not calculated in the unrealized profit statement. The product "H002: Advances" on lines 9 to 11 is not registered as an asset target product in the asset target product master 106b, and is therefore a product not subject to asset, so it is not included in the calculations in the unrealized profit statement.

[0065] (S4: Unrealized profit statement output processing) A specific example of the unrealized profit statement output process will be described with reference to Fig. 7. The unrealized profit calculation unit 102d performs aggregation for each contract detail number based on the purchase data, and first, for a supplier registered in the consolidated supplier master 106a and a commodity registered in the asset target commodity master 106b, calculates an unrealized profit amount by multiplying the tax-excluded amount by the profit rate obtained from the consolidated supplier master 106a using the supplier as a key, creates an unrealized profit statement including the contract detail number, contract detail name, supplier CD, supplier name, commodity CD, commodity name, tax-excluded amount, unrealized profit amount calculated by tax-excluded amount x profit rate, net asset amount calculated by tax-excluded amount - unrealized profit amount, account CD and account name obtained from the asset target commodity master 106b, and displays and outputs the unrealized profit statement screen displayed on the monitor 114, and stores it in the storage unit 106.

[0066] In this case, unrealized profits are not calculated for suppliers that are not subject to consolidated accounting in the consolidated supplier master 106a. Products that are not registered as asset target products in the asset target product master 106b are not tallied. For "account item", if the status category in the contract details is "completed", the "account item at completion" is obtained and set from the asset target product master 106b using the product CD as a key, and if the status category in the contract details is "uncompleted", the "account item at incompletion" is obtained and set from the asset target product master 106b using the product CD as a key.

[0067] 7 is a diagram showing an example of data of an unrealized profit statement. The unrealized profit statement includes a contract detail number, a contract detail name, a supplier CD, a supplier name, a product CD, a product name, a tax-excluded amount, an unrealized profit amount, a net asset amount, an account CD, and an account name.

[0068] In the example shown in the figure, the first line contains the contract detail number "0001," contract detail name "PJ-01," supplier CD "S001," supplier name "Company A," product CD "H001," product name "Subcontract cost (asset)," amount excluding tax "1,000,000," unrealized profit amount "100,000," net asset amount "900,000," account CD "K001," and account "Software." Specifically, since the profit margin for "Company A" is 10% in the consolidated supplier master 106a, the unrealized profit amount is calculated as follows: tax-excluded amount (actually paid amount) "1,000,000" x profit margin "10%" = 100,000, and the net asset amount is calculated as tax-excluded amount "1,000,000" - unrealized profit amount "100,000" = 900,000. As the status category is "Completed" in the contract details, the account name is obtained and set by using the product CD "H001: Subcontract cost (asset)" as the key and obtaining the completion account item "Software" from the asset target product master 106b.

[0069] In the example shown in the figure, unrealized profits are not calculated for "Company D," which is not registered as a consolidated accounting target in the consolidated supplier master 106a. No aggregation is done for the product "Advance Payments," which is not registered as an asset target product in the asset target product master 106b. Note that for the first to third lines, the status category is "Completed" in the contract details, so the completed account item "Software" obtained from the asset target product master 106b using the product CD "H001: Subcontract Costs (Asset)" as the key is set as the "Account Name." For the fourth and subsequent lines, the status category is "Uncompleted" in the contract details, so the uncompleted account item "Software Suspense Account" obtained from the asset target product master 106b using the product CD "H001: Subcontract Costs (Asset)" as the key is set as the "Account Name."

[0070] (S5: Asset information additional input process) A specific example of the asset information additional input process will be described with reference to Fig. 8. For example, in response to an operator's operation on the asset information creation screen displayed on the monitor 114, the asset information processing unit 102e extracts and displays reference data from the unrealized profit statement and the contract details using a specified contract number as a key, creates asset information by adding information related to the asset, and registers the information in the asset information table 106e.

[0071] 8(A) is a diagram showing an example of reference data extracted from the unrealized profit statement and the contract details using the contract number as a key. The person in charge refers to the reference data and adds information related to the assets to create asset information.

[0072] On the asset information creation screen, the following items are displayed as reference data: contract detail number, contract detail name, account CD, account name, acquisition amount, net asset amount, department CD, and department name, as shown in Figure 8(A). The example shown in the figure shows the case where the contract detail number "0001" is specified.

[0073] Fig. 8(B) is a diagram showing an example of asset information to be created. On the asset information creation screen, the following items are displayed: asset number, asset name, asset type CD, asset type name, depreciation method, useful life, memorandum value, net depreciation method, net useful life, and net memorandum value for tax purposes, and acquisition amount, depreciation method, useful life, memorandum value, net acquisition amount, net depreciation method, net useful life, and net memorandum value for accounting purposes. The acquisition amount and net acquisition amount are automatically displayed. When the operator inputs the items other than the amount and presses a registration button (not shown), for example, asset information as shown in Fig. 8(B) is registered in the asset information table 106e.

[0074] (S6: Asset information output process) A specific example of the asset information output process will be described with reference to Fig. 8. The asset information processing unit 102e outputs the asset information registered in the asset information table 106e to the fixed asset management system 400 in cooperation with the asset information processing unit 102e, and also outputs the asset information to other systems such as the consolidated accounting system 500.

[0075] As described above, according to this embodiment, there are provided a consolidated supplier master 106a which is a master for setting the profit margin for each supplier of the consolidated accounting target, and in which the supplier and the profit margin are registered in association with each other, an asset target product master 106b which is a master for setting information on products to be capitalized, and in which products, account items at completion, and account items at incomplete are registered in association with each other, a project registration unit 102b which registers in the storage unit 106 contract details including project identification information and a status classification specifying whether the project is completed or not, and a date, slip number, supplier, product, tax-excluded amount, project The system is equipped with a cost registration unit 102c which registers purchase data including identification information in the memory unit 106, and an unrealized profit calculation unit 102d which performs compilation for each project identification information based on the purchase data, and calculates the amount of unrealized profit by multiplying the tax-excluded amount by the profit rate obtained from the consolidated supplier master 106a using the supplier as a key, for a supplier registered in the consolidated supplier master 106a and a commodity registered in the asset target commodity master 106b. Therefore, when a project is shared and executed by consolidated companies, it becomes possible to grasp the unrealized profit associated with the transaction at an early stage.

[0076] [4. Contribution to the United Nations-led Sustainable Development Goals (SDGs)] This embodiment can contribute to improving business efficiency and promoting appropriate management decisions by companies, thereby contributing to goals 8 and 9 of the SDGs.

[0077] Furthermore, this embodiment can contribute to reducing waste and promoting paperless and electronic systems, thereby contributing to the achievement of goals 12, 13, and 15 of the SDGs.

[0078] Furthermore, this embodiment can contribute to strengthening control and governance, making it possible to contribute to Goal 16 of the SDGs.

[0079] 5. Other embodiments The present invention may be embodied in various different embodiments other than those described above within the scope of the technical concept set forth in the claims.

[0080] For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically using known methods.

[0081] In addition, the processing procedures, control procedures, specific names, registered data for each process, information including parameters such as search conditions, screen examples, and database configurations shown in this specification and drawings may be changed as desired unless otherwise specified.

[0082] Furthermore, with regard to the project management system 100, each of the components shown in the figures is merely a functional concept, and does not necessarily have to be physically configured as shown in the figures.

[0083] For example, the processing functions of the project management system 100, particularly the processing functions performed by the control unit, may be realized in whole or in part by a CPU and a program interpreted and executed by the CPU, or may be realized as hardware using wired logic. The program is recorded on a non-transient computer-readable recording medium that includes programmed instructions for causing an information processing device to execute the processes described in this embodiment, and is mechanically read by the project management system 100 as necessary. That is, a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded in a storage unit such as a ROM or HDD (Hard Disk Drive). This computer program is executed by being loaded into a RAM, and cooperates with the CPU to form the control unit.

[0084] In addition, this computer program may be stored in an application program server connected to the project management system 100 via any network, and it is also possible to download all or part of it as needed.

[0085] In addition, the program for executing the process described in this embodiment may be stored in a non-transient computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes any "portable physical medium" such as a memory card, a Universal Serial Bus (USB) memory, a Secure Digital (SD) card, a flexible disk, a magneto-optical disk, a ROM, an Erasable Programmable Read Only Memory (EPROM), an Electrically Erasable and Programmable Read Only Memory (EEPROM (registered trademark)), a Compact Disk Read Only Memory (CD-ROM), a Magneto-Optical disk (MO), a Digital Versatile Disk (DVD), and a Blu-ray (registered trademark) Disc.

[0086] Moreover, a "program" is a data processing method written in any language or description method, and may be in any form, such as source code or binary code. Note that a "program" is not necessarily limited to a single configuration, but also includes a distributed configuration as multiple modules or libraries, and a program that works with a separate program, such as an OS, to achieve its function. Note that the specific configuration and reading procedure for reading a recording medium in each device shown in the embodiments, as well as the installation procedure after reading, may use well-known configurations and procedures.

[0087] The various databases etc. stored in the memory unit are storage means such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and store various programs, tables, databases, and web page files etc. used for various processes and providing websites.

[0088] The project management system 100 may be configured as an information processing device such as a known personal computer or workstation, or may be configured as the information processing device to which any peripheral device is connected. The project management system 100 may be realized by installing software (including programs, data, etc.) that causes the device to realize the processing described in this embodiment.

[0089] Furthermore, the specific form of distribution and integration of the devices is not limited to that shown in the drawings, and all or part of them can be functionally or physically distributed and integrated in any unit according to various additions or functional loads. In other words, the above-mentioned embodiments can be implemented in any combination, or the embodiments can be implemented selectively. [Explanation of symbols]

[0090] 100 Project Management Systems 102 Control section 102a Master Maintenance Department 102b Project Registration Department 102c Cost Registration Department 102d Unrealized Profit Calculation Section 102e Asset Information Processing Department 102f Screen display control unit 104 Communication interface section 106 Storage section 106a Consolidated Supplier Master 106b Asset target product master 106c Contract Details Table 106d Purchase Table 106e Asset Information Table 108 Input / Output Interface Section 112 Input Devices 114 Output Device 200 Servers 300 Network 400 Fixed Asset Management System 500 Consolidated Accounting System

Claims

1. A project management system including a control unit, The control unit is The consolidated supplier master data that associates the consolidated supplier with the profit margin, Asset target product master that associates and registers the product to be capitalized, the account item at completion, and the account item at incomplete, and The storage area storing the a project registration means for registering in the storage area contract details including project identification information and a status class specifying whether the project is completed or not; a cost registration means for registering purchase data including a date, a slip number, a supplier, a product, a tax-excluded amount, and project identification information in the storage area; an unrealized profit calculation means for calculating an unrealized profit amount by multiplying the tax-excluded amount by the profit rate obtained from the consolidated target supplier master using the relevant supplier as a key, for a supplier registered in the consolidated target supplier master and a commodity registered in the asset target commodity master, based on the supplier data, for each project identification information; A project management system comprising:

2. The project management system according to claim 1, characterized in that the unrealized profit calculation means creates and outputs an unrealized profit statement including project identification information, supplier, product, amount excluding tax, unrealized profit amount calculated by multiplying the amount excluding tax by profit margin, net asset amount calculated by subtracting the amount excluding tax from the amount of unrealized profit, and account name.

3. 2. A project management system according to claim 1, wherein said unrealized profit calculation means does not tally up any product that is not registered in said asset target product master.

4. 3. A project management system as described in claim 2, characterized in that the unrealized profit calculation means, for the "account name" of the unrealized profit statement, if the status classification in the contract details is "completed", sets it by obtaining an "account item at completion" from the asset object product master using the product as a key, and if the status classification in the contract details is "incomplete", sets it by obtaining an "account item at incompletion" from the asset object product master using the product as a key.

5. The control unit further 3. A project management system according to claim 2, further comprising an asset information processing means for creating asset information based on said unrealized profit statement and outputting the information to a fixed asset system.

6. 6. A project management system according to claim 1, wherein the completed account item includes software, and the not-yet-completed account item includes a software suspense account.

7. A project management method executed by an information processing device having a control unit, The control unit is The consolidated supplier master data that associates the consolidated supplier with the profit margin, Asset target product master that associates and registers the product to be capitalized, the completed account item, and the uncompleted account item, and The storage area storing the Executed in the control unit: a project registration step of registering contract details including project identification information and a status class designating whether the project is completed or not in the storage area; a cost registration step of registering purchase data including a date, a slip number, a supplier, a product, a tax-excluded amount, and project identification information in the storage area; an unrealized profit calculation step of calculating an unrealized profit amount by multiplying the tax-excluded amount by the profit rate obtained from the consolidated target supplier master using the supplier as a key, for a supplier registered in the consolidated target supplier master and a commodity registered in the asset target commodity master, based on the supplier data, for each project identification information; 1. A project management method comprising:

8. A project management program to be executed by an information processing device having a control unit, The control unit is The consolidated supplier master data that associates the consolidated supplier with the profit margin, Asset target product master that associates and registers the product to be capitalized, the completed account item, and the uncompleted account item, and The storage area storing the In the control unit, a project registration step of registering contract details including project identification information and a status class designating whether the project is completed or not in the storage area; a cost registration step of registering purchase data including a date, a slip number, a supplier, a product, a tax-excluded amount, and project identification information in the storage area; an unrealized profit calculation step of calculating an unrealized profit amount by multiplying the tax-excluded amount by the profit rate obtained from the consolidated target supplier master using the supplier as a key, for a supplier registered in the consolidated target supplier master and a commodity registered in the asset target commodity master, based on the supplier data, for each project identification information; A project management program for implementing.

Citation Information

Patent Citations

  • Method regarding planning, designing, structuring, maintenance, and operation of bsm

    JP2001357190A

  • Plan making processing method of connection base and recording medium

    JP2002149934A

  • Unrealized profit management system, unrealized profit management method, and unrealized profit management program

    JP2023003320A