Order receiving and placing and delivery management computer system for construction material, management method, and program

A computer-based system integrates order and delivery management for construction materials, providing centralized tracking and color-coded status updates, addressing communication challenges and ensuring timely delivery in civil engineering and construction projects.

JP2024142647APending Publication Date: 2024-10-11FUJIMORI SANGYO CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2023054884
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

Existing systems fail to provide a comprehensive and efficient management of construction material ordering and delivery status in civil engineering and construction projects, leading to cumbersome communication and potential delays due to separate management of ordering and shipping, lack of centralized information, and inconsistent delivery schedules.

Method used

A computer-based management system that integrates order information reception, delivery schedule management, and delivery confirmation, using terminals and a central computer system to track and display ordering, delivery schedule, and confirmation status through a calendar interface with color-coded indicators.

Benefits of technology

Enables centralized management and easy understanding of construction material ordering and delivery status, facilitating timely and efficient delivery, reducing delays and improving project coordination.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024142647000001_ABST
    Figure 2024142647000001_ABST
Patent Text Reader

Abstract

To unitarily manage order receiving, placing, and delivery information such as an order placement state, a delivery schedule, an actual delivery state of each construction material used for civil engineering works and construction works.SOLUTION: In a method, an order receiving, placing, and delivery management computer system accepts material specifying information of construction material to be ordered, and order information such as order quantity and delivery request date and time from an ordering process terminal, notifies the accepting information of the order information to an order receiving process terminal, accepts delivery schedule information of the ordered construction material from a shipping process terminal, accepts delivery confirmation information from an arrival process terminal, provides order receiving, placing, and delivery information and calendar information to an information viewing terminal, attaches delivery request display to a date and time field corresponding to a delivery requesting date and time on the calendar information according to acceptance of the order information, attaches delivery scheduled display to a date and time field corresponding to the delivery scheduled date and time on the calendar information according to acceptance of the delivery schedule information, and attaches delivery confirmation display to a date and time field corresponding to the delivery confirmation date and time on the calendar information according to acceptance of the delivery confirmation information.SELECTED DRAWING: Figure 7
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a system, a management method, and a program for managing construction materials used in civil engineering works such as tunnels, bridges, and roads, and in construction works such as buildings, and in particular to a system for managing the ordering and delivery of construction materials by computer. [Background technology]

[0002] Typically, the ordering and shipping of construction materials used in civil engineering and construction work is managed separately by the ordering and shipping personnel. Patent Document 1 discloses an inventory management support system that stores in a computer the types and quantities of materials needed according to the geological distribution of the natural ground, calculates the types and quantities of materials used from the progress of tunnel excavation, and estimates the stock quantities of the corresponding materials. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2023-003212 A Summary of the Invention [Problem to be solved by the invention]

[0004] For example, when a construction worker at a construction site wanted to check whether construction materials had been ordered or when they were scheduled for delivery, he or she had to make inquiries to the ordering and shipping workers individually by phone or email, which was cumbersome. In addition, many types of construction materials are required for civil engineering and architectural construction work, and it is desirable for each construction material to be ordered, shipped, and delivered in a timely manner in line with the progress of the work, but it was difficult for individual workers to comprehensively grasp the ordering status, delivery schedule, and actual delivery status of each construction material. There were also cases where some construction materials were not available, which affected the construction schedule. In view of the above circumstances, the present invention aims to provide a system etc. that centrally manages ordering and delivery information such as the ordering status, delivery schedule, and actual delivery status of each construction material used in civil engineering and architectural works, thereby enabling each person in charge to easily grasp the ordering and delivery status and delivery status. [Means for solving the problem]

[0005] In order to solve the above problems, the system according to the present invention is a management computer system for managing orders and deliveries of construction materials for civil engineering or construction work, An order information receiving unit that receives, from an order processing terminal, order information including material identification information that identifies the construction materials to be ordered, and an order quantity and a desired delivery date and time of the construction materials; an order notification unit that notifies an order processing terminal of receipt information of the order information; a delivery schedule information receiving unit that receives delivery schedule information including a delivery schedule date and time of the ordered construction materials from a shipment processing terminal; a delivery information receiving unit that receives delivery confirmation information including the delivery confirmation date and time of the construction materials from an arrival processing terminal; an information providing section that provides at least the order information and calendar information among the order / delivery information consisting of the order information, delivery schedule information, and delivery confirmation information to an information viewing terminal; The information providing unit includes: In response to receipt of the order information, a delivery request indication is added to a date and time field corresponding to the delivery request date and time in the calendar information; In response to receipt of the delivery schedule information, a delivery schedule display is added to a date and time field corresponding to the delivery schedule date and time in the calendar information; In response to receipt of the delivery confirmation information, a delivery confirmation indication is added to a date and time field in the calendar information that corresponds to the delivery confirmation date and time.

[0006] Preferably, the delivery request display, the delivery schedule display, and the delivery confirmation display are highlighted in different colors.

[0007] Preferably, the delivery request display, the delivery schedule display and the delivery confirmation display each include an order / delivery information request button for requesting the information providing section to provide the order / delivery information.

[0008] The method of the present invention is a management method for managing the ordering and delivery of construction materials for civil engineering or construction work by a computer, A step in which the computer receives, from the order processing terminal, material identification information for identifying the construction materials to be ordered, and order information including the order quantity and desired delivery date and time of the construction materials; a step of notifying an order processing terminal of receipt of the order information by the computer; A step of receiving delivery schedule information including a scheduled delivery date and time of the ordered construction materials from a shipping processing terminal by the computer; A step of receiving delivery confirmation information including a delivery confirmation date and time of the construction materials from an arrival processing terminal by the computer; a step of providing at least the order information and calendar information of the order / delivery information consisting of the order information, delivery schedule information, and delivery confirmation information to an information viewing terminal by the computer; a step of the computer adding a desired delivery indication to a date and time field corresponding to the desired delivery date and time in the calendar information in response to receipt of the order information; a step of the computer adding a delivery schedule display to a date and time field corresponding to the scheduled delivery date and time in the calendar information in response to receipt of the delivery schedule information; a step of the computer adding a delivery confirmation indication to a date and time field corresponding to the delivery confirmation date and time in the calendar information in response to receipt of the delivery confirmation information; The present invention is characterized by comprising:

[0009] The program according to the present invention is a program for managing the ordering and delivery of construction materials for civil engineering or construction work by a computer, A process of receiving, from an order processing terminal, material identification information for identifying the construction materials to be ordered, and order information including an order quantity and a desired delivery date and time of the construction materials; A process of notifying an order processing terminal of receipt of the order information; A process of receiving delivery schedule information including a scheduled delivery date and time of the ordered construction materials from a shipment processing terminal; A process of receiving delivery confirmation information including a delivery confirmation date and time of the construction materials from an arrival processing terminal; providing at least the order information and calendar information of the order / delivery information consisting of the order information, delivery schedule information, and delivery confirmation information to an information viewing terminal; In response to receipt of the order information, a process of marking a desired delivery date and time in a date and time field corresponding to the desired delivery date and time in the calendar information; In response to receipt of the delivery schedule information, a process of adding a delivery schedule display to a date and time field corresponding to the delivery schedule date and time in the calendar information; In response to receipt of the delivery confirmation information, a process of adding a delivery confirmation indication to a date and time field corresponding to the delivery confirmation date and time in the calendar information; The present invention is characterized in that the computer is caused to execute the above steps. Effect of the Invention

[0010] According to the present invention, order and delivery information such as the ordering status, delivery schedule, and actual delivery status of each construction material used in civil engineering and architectural works can be managed in a centralized manner, allowing each person in charge to easily grasp the order and delivery status. [Brief description of the drawings]

[0011] [Figure 1] FIG. 1 is a configuration diagram showing an overview of a construction material ordering and delivery processing system according to one embodiment of the present invention. [Diagram 2] FIG. 2 is a block diagram showing the structure of a storage unit of the order / delivery management computer system of the order / delivery processing system. [Diagram 3] FIG. 3 is a block diagram showing the functional configuration of the order / delivery management computer system of the order / delivery processing system. [Figure 4]FIG. 4 is a diagram showing an example of an order screen of the order / delivery management computer system. [Diagram 5] FIG. 5 is a diagram showing an example of an order / delivery information screen of the order / delivery management computer system. [Figure 6] FIG. 6 shows an example of a calendar screen display by the order / delivery management computer system, where FIG. 6(a) shows the ordering stage, FIG. 6(b) shows the scheduled delivery stage, and FIG. 6(c) shows the delivered stage. [Figure 7] FIG. 7 is a flowchart of the ordering and delivery processing of construction materials in the ordering and delivery processing system. [Figure 8] FIG. 8 is a flowchart of post-order information browsing processing in the order receiving and delivery processing system. [Figure 9] FIG. 9 is a flowchart of a delivery schedule input process in the order / delivery processing system. [Figure 10] FIG. 10 is a flowchart of the pre-delivery information browsing process in the order / delivery processing system. [Figure 11] FIG. 11 is a flow chart of the delivery confirmation input process in the order / delivery processing system. [Figure 12] FIG. 12 is a flowchart of the post-delivery information browsing process in the order / delivery processing system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, one embodiment of the present invention will be described with reference to the drawings. Fig. 1 shows an overview of a construction material ordering and delivery processing system 1. In this embodiment, the construction work is, for example, the construction of a mountain tunnel T, and the construction materials 2 include, for example, rock bolts, long bolts for reinforcement, H-shaped steel and other steel materials for shoring, cement for lining, and organic chemicals for filler. The construction materials 2 are shipped from a shipping location F such as a factory, and delivered to a construction site G (delivery location) such as a mountain tunnel T.

[0013] The order / delivery processing system 1 includes an order processing terminal 3, an order processing terminal 4, a shipping processing terminal 5, an arrival processing terminal 6, an information viewing terminal 7, and an order / delivery management computer system 10. The terminals 3 to 6 are configured by personal computers (PCs), such as desktop computers, smartphones, tablets, etc.

[0014] In detail, the order processing terminal 3 is used by the orderer A to input (order processing) order information for the required construction materials 2. The order information includes material identification information, order quantity, desired delivery date and time, etc. The material identification information is information that identifies the construction materials 2, and includes the product name, model number, serial number, etc. of the construction materials 2. The order processing terminal 4 is used by the order taker B to carry out order processing such as receiving and confirming order information, and arranging for production and shipping. The shipment processing terminal 5 is used by the shipping person C to input scheduled delivery information including the scheduled delivery date and time. The receiving processing terminal 6 is used by the receiving person D to perform processing such as inputting delivery confirmation information including the delivery confirmation date and time of the construction materials 2 that have actually been delivered. The information viewing terminal 7 is used by the information viewer E to view the order information, delivery schedule information, delivery confirmation information, and the like of the construction materials 2.

[0015] The ordering person A and the receiving person D may be the same person. The order processing terminal 3 and the receiving processing terminal 6 may be the same terminal. The order taker B and the shipper C may be the same person. The order processing terminal 4 and the shipping processing terminal 5 may be the same terminal. The information viewer E may be the same person as the persons A to D in charge of ordering, receiving, shipping, and receiving, or may be, for example, a construction manager, different from the persons A to D. The terminals 4 to 6 of the persons A to D may also function as the information viewing terminal 7.

[0016] Each of the terminals 3-7 is connected to the order / delivery management computer system 10 via a public communication line 9 such as the Internet so as to be able to communicate with the order / delivery management computer system 10. A dedicated communication line may be used instead of the public communication line 9. Each of the personnel A-D and the information viewer E is issued an authentication code, and can access the order / delivery management computer system 10 by inputting the authentication code into the terminals 3-7. Each of the terminals 3-7 stores viewing and editing software for viewing management information provided by the order / delivery management computer system 10 and editing the management information (including new input, update, deletion, etc.). The management information includes order information, delivery schedule information, and delivery confirmation information for the construction materials 2. A general-purpose browser may be used as the viewing and editing software, or viewing and editing software dedicated to the order / delivery management system 1 may be used.

[0017] As shown in Fig. 1, the order / delivery management computer system 10 is configured by a cloud computer, but is not limited to this and may be configured by a physical server. The order / delivery management computer system 10 includes a CPU 11, a storage unit 12, and a communication unit 13. As shown in Fig. 2, the storage unit 12 stores a management program 12p and is provided with a management information accumulation area 12a.

[0018] The management program 12p causes the order / delivery management computer system 10 to execute processing for managing the ordering, receipt, and delivery of the construction materials 2. As shown in Fig. 3, when executing the management processing, the order / delivery management computer system 10 functions as an order information receiving section 21, an order notification section 22, a delivery schedule information receiving section 23, a delivery confirmation information receiving section 24, an information providing section 25, and the like.

[0019] 2, the management information storage area 12a stores, as management information 12d, order / delivery information 14 and calendar information 15. The order / delivery information 14 includes information related to order / delivery input from the terminals 4 to 6, that is, order information 14a (received order information), delivery schedule information 14b, and delivery confirmation information 14c.

[0020] As shown in Fig. 1 and Fig. 4, the order information 14a is inputted through an order screen 30 of the order processing terminal 3. As exemplified in Fig. 4, the order screen 30 is preferably a list 31 including a construction material field 32, a stock quantity display field 33, an order quantity input field 34, a desired delivery date and time input field 35, etc. In the construction material field 32, material specific information of the construction materials 2 used in tunnel construction is listed. In the stock quantity display field 33, the current stock quantity of the corresponding construction material 2 is displayed. Preferably, the order / delivery management computer system 10 is linked to an inventory management support system (see Patent Document 1, etc.), and information on the current stock quantity is obtained from the inventory management support system.

[0021] 5, the order / delivery information 14 including the order information 14a can be displayed as an order / delivery information screen on each of the terminals 3 to 7. The order / delivery information screen 40 includes a construction material specific display 41 showing the ordered construction material 2, an order (received order) quantity display input field 42, a desired delivery date / time display input field 43, a scheduled delivery date / time display input field 44, a delivery confirmation date / time display input field 45, and the like.

[0022] As shown in Fig. 6, the calendar information 15 is information for displaying a calendar 50 on the screen of the information viewing terminal 7, 3 to 6, and is created by a general-purpose or dedicated calendar creation application 12q (Fig. 2) constituting one of the programs 12p. The calendar creation application may be installed in the information viewing terminal 7, 3 to 6, and the calendar information 15 of the order / delivery management computer system 10 may be information for starting the calendar creation application of the information viewing terminal 7, 3 to 6 for editing or the like.

[0023] Furthermore, as shown in Fig. 2, additional information 16 is added to the calendar information 15. The additional information 16 includes delivery request display information 16a, delivery schedule display information 16b, and delivery confirmation display information 16c. The delivery request display information 16a is information for attaching a delivery request display 51 (Fig. 6(a)) to the date and time field corresponding to the desired delivery date and time of the calendar 50 displayed on the screen, and is linked to the order information 14a. The delivery request display 51 also serves as an order / delivery information request button that requests the information providing unit 25 to provide the order / delivery information 14 such as the corresponding order information 14a.

[0024] The delivery schedule display information 16b is information for attaching a delivery schedule display 52 (FIG. 6(b)) to the date and time field corresponding to the scheduled delivery date and time of the calendar 50 displayed on the screen, and is linked to the delivery schedule information 14b. The delivery schedule display 52 also serves as an order / delivery information request button that requests the information providing unit 25 to provide the order / delivery information 14 such as the corresponding order information 14a and delivery schedule information 14b.

[0025] The delivery confirmation display information 16c is information for attaching a delivery confirmation display 53 (FIG. 6(c)) to the date and time field corresponding to the delivery confirmation date and time of the calendar 50 displayed on the screen, and is linked to the delivery confirmation information 14c. The delivery confirmation display 53 also serves as an order / delivery information request button that requests the information providing unit 25 to provide the order / delivery information 14 such as the corresponding order information 14a and delivery confirmation information 14c.

[0026] Preferably, the delivery request display 51 (FIG. 6(a)), delivery schedule display 52 (FIG. 6(b)), and delivery confirmation display 53 (FIG. 6(c)) are highlighted in different colors. Each display 51-53 may have additional notes about the ordered construction materials. Examples of additional notes include the name of the construction type (such as tunnel auxiliary construction), the names of construction materials, etc.

[0027] As shown in the flowcharts of FIGS. 7 to 12, in the order and delivery processing system 1, information processing and management of the order and delivery of the construction materials 2 are performed as follows. As shown in Fig. 7, when placing an order, an orderer A accesses the order / delivery management computer system 10 using the order processing terminal 3 (steps 100-101) and opens the order screen 30 (Fig. 4) by the management program 12p (step 102). The order information is input on the displayed order screen 30 (step 103). For example, the orderer refers to the current stock quantity column 33 etc. to select the construction material 2 to be ordered, inputs the order quantity in the order quantity input column 34 for that construction material 2, and inputs the desired delivery date and time in the desired delivery date and time input column 35. The input order information is transmitted (step 104).

[0028] The order / delivery management computer system 10 (order information receiving unit 21) receives the order information transmitted from the order processing terminal 3 (step 110) and stores it as order information 14a in the management information storage area 12a of the memory unit 12 (step 111). Furthermore, the order / delivery management computer system 10 (information providing section 25) adds the delivery request display information 16a to the calendar information 15 in response to the receipt of the order information (step 112).

[0029] Furthermore, the order / delivery management computer system 10 (order notification section 22) automatically notifies the order processing terminal 4 of the receipt of the order information by e-mail or the like (step 113). By receiving the notification via the order processing terminal 4 (step 120), order taker B is informed that an order (order) has been placed.

[0030] When checking the details of the order, order recipient B accesses the order / delivery management computer system 10 using the order processing terminal 4 (steps 121-122), opens the order management screen 4d (FIG. 1) of the management program 12p (step 123), and issues a request to view the order information on the order management screen 4d (FIG. 1) to the order / delivery management computer system 10 (step 124).

[0031] The order / delivery management computer system 10 (order notification section 22) receives the order information viewing request (step 125), reads out the order information 14a from the memory section 12 (step 126), and transmits the order information 14a to the order processing terminal 4 as order information (step 127). This is received by the order processing terminal 4 (step 128). As a result, the order information screen, i.e., the order / delivery information screen 40 at the order / order stage, is displayed on the order processing terminal 4 (step 129). In more detail, the material specific information, order quantity (order quantity), desired delivery date and time, etc. in the order information 14a are displayed. A list 31 similar to the order screen 30 may be displayed as the order information screen. In this case, the order processing terminal 4 constitutes an information viewing terminal.

[0032] As shown in the flowchart of FIG. 8, order taker B can also issue a calendar viewing request to the order / delivery management computer system 10 on the order management screen 4d (FIG. 1) of the order processing terminal 4 (information viewing terminal) (step 130). The order / delivery management computer system 10 receives the calendar viewing request (step 131) and reads out the calendar information 15 from the storage unit 12 (step 132). The read out calendar information 15 includes delivery request display information 16a as additional information 16. The order / delivery management computer system 10 (information providing unit 25) transmits the calendar information 15 to the order processing terminal 4 (step 133).

[0033] The order processing terminal 4 receives the calendar information 15 (step 134). As a result, as shown in FIG. 6(a), a calendar 50A for the order placement stage based on the calendar information 15 is displayed on the screen of the order processing terminal 4 (information viewing terminal) (step 135). A desired delivery display 51 is added to the date and time field in calendar 50A that corresponds to the desired delivery date and time. The desired delivery display 51 is preferably displayed in highlighted form. This allows order taker B to confirm the desired delivery date at a glance.

[0034] When the order-receiving clerk B clicks or touches the delivery request display 51 (order / delivery information request button) on the calendar screen of the order processing terminal 4, an order information viewing request is sent from the order processing terminal 4 to the order / delivery management computer system 10 (step 136). In response to this, the order / delivery management computer system 10 sequentially executes the processes of receiving the order information viewing request (step 137), reading the corresponding order (received) information 14a (step 138), and sending it (step 139). When the receiving processing terminal 4 receives this (step 140), the order / delivery information 14 at the order / delivery stage is displayed on the order processing terminal 4 (information viewing terminal) as the order / delivery information screen 40 (Fig. 5) (step 141). Based on this, the order-receiving clerk B can appropriately make arrangements for the production and shipment of the construction materials 2 that he has received.

[0035] Preferably, in the same manner as in steps 120 to 136, a person in charge A other than the order receiving person B and an information viewer E can view the order receiving and delivery information 14 and calendar information 15 at the order receiving and placing stage using terminals 3, 5 to 7 other than the order processing terminal 4.

[0036] As shown in the flow chart of FIG. 9, the shipper C accesses the order / delivery management computer system 10 by the shipment processing terminal 5 (steps 200-201) and opens the delivery schedule input screen 5d (FIG. 1) by the management program 12p (step 202). On the delivery schedule input screen 5d, the shipper C inputs the delivery schedule information of the ordered construction materials 2 (step 203). Preferably, the delivery schedule input screen 5d is substantially the same as the order / delivery information screen 40 (FIG. 5), and the shipper C inputs the scheduled delivery date and time in the delivery schedule date and time display input field 44 (FIG. 5). The input delivery schedule information is sent to the order / delivery management computer system 10 (step 204).

[0037] The order / delivery management computer system 10 (delivery schedule information receiving unit 23) receives the delivery schedule information from the shipping processing terminal 5 (step 205), and stores it in the management information accumulation area 12a of the memory unit 12 as delivery schedule information 14b (step 206). In addition, the order / delivery management computer system 10 (information providing unit 25) adds the delivery schedule display information 16b to the calendar information 15 in response to the receipt of the delivery schedule information (step 207). The delivery request display information 16a may be changed or overwritten with the delivery schedule display information 16b.

[0038] As shown in the flow chart of Fig. 10, when an information viewer E (or personnel A to D) views the order / delivery status at the delivery schedule stage (undelivered stage), the information viewer E accesses the order / delivery management computer system 10 using the information viewer terminal 7 (or the processing terminals 3 to 6) (steps 210 to 211) and opens the information view screen 7d (Fig. 1) by the management program 12p (step 212). For example, a calendar view request is issued to the order / delivery management computer system 10 on the information viewer screen 7d (step 213).

[0039] The order / delivery management computer system 10 (information providing unit 25) receives the calendar viewing request (step 214) and reads out the calendar information 15 from the storage unit 12 (step 215). The read out calendar information 15 includes delivery schedule display information 16b as additional information 16. The order / delivery management computer system 10 (information providing unit 25) transmits the calendar information 15 to the information viewing terminal 7 (step 216).

[0040] The information viewing terminal 7 receives the calendar information 15 (step 217). As a result, as shown in FIG. 6(b), the information viewing terminal 7 displays a calendar 50B in the delivery schedule stage based on the calendar information 15 on its screen (step 218). A delivery schedule display 52 is added to the date and time field corresponding to the delivery schedule date and time in the calendar 50B. Instead of the delivery request display 51 (FIG. 6(a)), the delivery schedule display 52 may be displayed, or both the delivery request display 51 and the delivery schedule display 52 may be displayed. Preferably, the delivery schedule display 52 is highlighted in a different color from the delivery request display 51. This allows the information viewer E to check the scheduled delivery date at a glance. Moreover, it is easy to distinguish whether it is a desired delivery date or a scheduled delivery date. In addition, it is easy to distinguish whether an order has been placed and a delivery schedule has not been input, or whether a delivery schedule has been input.

[0041] When information viewer E clicks or touches the delivery schedule display 52 (order / delivery information request button) on the calendar screen of the information viewing terminal 7 (step 219), a request to view order / delivery information is sent to the order / delivery management computer system 10 (step 220). The order / delivery management computer system 10 (information providing unit 25) receives the order / delivery information browsing request (step 221) and reads out the order / delivery information 14, such as the order information 14a and delivery schedule information 14b, from the storage unit 12 (step 222). The read order / delivery information 14 is sent to the information browsing terminal 7 (step 223).

[0042] The information viewing terminal 7 receives the transmitted order / delivery information 14 (step 224). As a result, the material specific information of the construction material 2 to be ordered or delivered, the scheduled delivery quantity or ordered quantity, the scheduled delivery date and time, etc. are displayed on the screen of the information viewing terminal 7 (step 225). This allows the information viewer E to confirm details of the order / delivery status at the undelivered stage, such as the scheduled delivery of the construction material 2.

[0043] As shown in FIG. 1, when construction materials 2 are shipped from a shipping location F and delivered to a delivery location G, a receiving clerk D performs an input process for confirming delivery. More specifically, as shown in the flow chart of FIG. 11, receiving staff D accesses the order / delivery management computer system 10 using the receiving processing terminal 6 (steps 230-231) and opens the delivery confirmation input screen 6d (FIG. 1) by the management program 12p (step 232). Preferably, the delivery confirmation input screen 6d is substantially the same as the order / delivery information screen 40 (FIG. 5), and on said screen 6d, input processing of delivery confirmation information including the delivery confirmation date and time of the delivered construction materials 2 is performed (step 233). The input delivery confirmation information is sent to the order / delivery management computer system 10 (step 234).

[0044] The order / delivery management computer system 10 (delivery confirmation information receiving unit 24) receives the delivery confirmation information from the arrival processing terminal 6 (step 235) and stores it in the management information accumulation area 12a of the memory unit 12 as delivery confirmation information 14c (step 236). In addition, the order / delivery management computer system 10 (information providing unit 25) adds the delivery confirmation display information 16c to the calendar information 15 in response to receipt of the delivery confirmation information (step 237). The registered display information 16a, 16b may be changed or overwritten with the delivery confirmation display information 16c.

[0045] As shown in the flow chart of Fig. 12, when an information viewer E (or a person in charge A to D) checks the order / delivery status at the stage of delivery completion, the information viewer E accesses the order / delivery management computer system 10 using the information viewer terminal 7 (or the processing terminal 3 to 6) (steps 300 to 301) and opens the information view screen 7d (Fig. 1) (step 302). For example, a calendar view request is issued to the order / delivery management computer system 10 on the information view screen 7d (step 303).

[0046] The order / delivery management computer system 10 (information providing unit 25) receives the calendar viewing request (step 304) and reads out the calendar information 15 from the storage unit 12 (step 305). The read out calendar information 15 includes the delivery confirmation display information 16c as additional information 16. The order / delivery management computer system 10 (information providing unit 25) transmits the calendar information 15 to the information viewing terminal 7 (step 306).

[0047] The information viewing terminal 7 receives the calendar information 15 (step 307). As a result, as shown in FIG. 6(c), the information viewing terminal 7 displays a calendar 50C based on the calendar information 15 after the delivery confirmation (step 308). A delivery confirmation display 53 is added to the date and time field corresponding to the delivery confirmation date and time in the calendar 50C. Preferably, the delivery confirmation display 53 is displayed instead of the delivery request display 51 (FIG. 6(a)) and the delivery schedule display 52 (FIG. 6(b)). The delivery request display 51 and the delivery schedule display 52 may be displayed together with the delivery confirmation display 53. Preferably, the delivery confirmation display 53 is highlighted in a color different from the delivery request display 51 and the delivery schedule display 52. ​​This allows the information viewer E to check at a glance whether the delivery has been confirmed, that is, whether the actual delivery has been made. Moreover, it is easy to determine whether the delivery is confirmed, the delivery request date, or the delivery schedule date. In addition, it is easy to determine whether the delivery has been made or not.

[0048] When information viewer E clicks or touches the delivery confirmation display 53 (order / delivery information request button) on the calendar screen of the information viewing terminal 7 (step 309), a request to view order / delivery information is sent to the order / delivery management computer system 10 (step 310). The order / delivery management computer system 10 (information providing unit 25) receives the order / delivery information browsing request (step 311) and reads out the order / delivery information 14, such as the order information 14a and the delivery confirmation information 14c, from the storage unit 12 (step 312). The read order / delivery information 14 is sent to the information browsing terminal 7 (step 313).

[0049] The information viewing terminal 7 receives the transmitted order / delivery information 14 (step 314). As a result, the information viewing terminal 7 displays the order / delivery information screen 40 (FIG. 5) based on the latest order / delivery information 14 (step 315). In detail, the material specific information, delivered quantity, delivery confirmation date and time, etc. of the delivered construction materials 2 are displayed on the screen. If only a portion of the ordered construction materials 2 has been delivered, the undelivered construction materials and delivered construction materials are displayed separately on the screen, with the scheduled delivery date and time displayed for the undelivered construction materials and the delivery confirmation date and time displayed for the delivered construction materials. This allows the information viewer E to easily check the details of the delivery status of the construction materials 2.

[0050] In this way, according to the order and delivery processing system 1, order and delivery information such as the ordering, delivery schedule, and actual delivery status of each construction material 2 can be centrally managed by the order and delivery management computer system 10, and each of the personnel A to D and the information viewer E can easily grasp the order and delivery status.

[0051] The present invention is not limited to the above-described embodiment, and various modifications can be made. For example, the present invention can be applied to the ordering and delivery management of construction materials for various civil engineering works such as bridges and roads, as well as building construction such as architectural works. The process in which the information providing unit 25 of the order / delivery management computer system 10 adds the delivery request display 51, delivery schedule display 52, delivery confirmation display 53, etc. to the calendar information 15 is not necessarily executed when order information, delivery schedule information, or delivery confirmation information is input, respectively, but may also be executed when a viewing request is made from the information viewing terminal 7. [Industrial Applicability]

[0052] The present invention can be applied to computer-based ordering and delivery management of construction materials for civil engineering works such as tunnel construction. [Explanation of symbols]

[0053] 1. Order and delivery processing system 2. Construction materials 3. Order processing terminal 4. Order processing terminal 4d order management screen 5. Shipping Processing Terminal 5d Delivery schedule input screen 6. Incoming goods processing terminal 6d Delivery confirmation input screen 7 Information viewing terminal 7d Information viewing screen 10 Order and delivery management computer system (computer) 11 CPU 12 Storage section 12a Management information storage area 12c Calendar information storage area 12d Management information 12p Management Program 12q Calendar creation application 13. Communications Department 14 Order and delivery information 14a Ordering Information 14b Delivery schedule information 14c Delivery confirmation information 15 Calendar Information 16 Additional Information 16a Delivery request information 16b Delivery schedule display information 16c Delivery confirmation display information 21 Order Information Reception Department 22 Order Notification Department 23 Delivery Schedule Information Reception Department 24 Delivery confirmation information reception department 25 Information Provision Department 30 Order Screen 31 Construction materials list 32 Construction materials column 33 Stock quantity display column 34 Order quantity input field 35 Desired delivery date and time input field 40 Order / Delivery Information Screen 41 Construction material specific indication 42 Order quantity display / input field 4 43 Delivery date / time display / input field 44 Delivery date / time display / input field 45 Delivery confirmation date / time display / input field 50 Calendar 50A Ordering Calendar 50B Scheduled delivery schedule 50C Calendar of delivery stage 51 Delivery request display (Order / delivery information request button) 52 Delivery schedule display (Order / delivery information request button) 53 Delivery confirmation display (order / delivery information request button)

Claims

1. A management computer system for managing orders and deliveries of construction materials for civil engineering or construction work, An order information receiving unit that receives, from an order processing terminal, order information including material identification information that identifies the construction materials to be ordered, and an order quantity and a desired delivery date and time of the construction materials; an order notification unit that notifies an order processing terminal of receipt information of the order information; a delivery schedule information receiving unit that receives delivery schedule information including a delivery schedule date and time of the ordered construction materials from a shipment processing terminal; a delivery information receiving unit that receives delivery confirmation information including the delivery confirmation date and time of the construction materials from an arrival processing terminal; an information providing section that provides at least the order information and calendar information among the order / delivery information consisting of the order information, delivery schedule information, and delivery confirmation information to an information viewing terminal; The information providing unit includes: In response to receipt of the order information, a delivery request indication is added to a date and time field corresponding to the delivery request date and time in the calendar information; In response to receipt of the delivery schedule information, a delivery schedule display is added to a date and time field corresponding to the delivery schedule date and time in the calendar information; A computer system for managing ordering and delivery of construction materials, characterized in that, in response to receipt of the delivery confirmation information, a delivery confirmation indication is added to a date and time field in the calendar information that corresponds to the delivery confirmation date and time.

2. 2. An order / delivery management computer system according to claim 1, wherein said delivery request display, said delivery schedule display and said delivery confirmation display are displayed in different highlighted colors.

3. 3. An order / delivery management computer system according to claim 1, wherein said delivery request display, said delivery schedule display and said delivery confirmation display include an order / delivery information request button for requesting said information providing section to provide said order / delivery information.

4. A method for managing orders and deliveries of construction materials for civil engineering or construction work by a computer, comprising: A step in which the computer receives, from the order processing terminal, material identification information for identifying the construction materials to be ordered, and order information including the order quantity and desired delivery date and time of the construction materials; a step of notifying an order processing terminal of receipt of the order information by the computer; A step of receiving delivery schedule information including a scheduled delivery date and time of the ordered construction materials from a shipping processing terminal by the computer; A step of receiving delivery confirmation information including a delivery confirmation date and time of the construction materials from an arrival processing terminal by the computer; providing at least the order information and calendar information of the order / delivery information consisting of the order information, delivery schedule information, and delivery confirmation information to an information viewing terminal by the computer; a step of the computer adding a desired delivery indication to a date and time field corresponding to the desired delivery date and time in the calendar information in response to receipt of the order information; a step of the computer adding a delivery schedule display to a date and time field corresponding to the scheduled delivery date and time in the calendar information in response to receipt of the delivery schedule information; a step of the computer adding a delivery confirmation indication to a date and time field corresponding to the delivery confirmation date and time in the calendar information in response to receipt of the delivery confirmation information; A construction material ordering and delivery management method comprising:

5. A program for managing the ordering and delivery of construction materials for civil engineering or construction work by computer, A process of receiving, from an order processing terminal, material identification information for identifying the construction materials to be ordered, and order information including an order quantity and a desired delivery date and time of the construction materials; A process of notifying an order processing terminal of receipt of the order information; A process of receiving delivery schedule information including a scheduled delivery date and time of the ordered construction materials from a shipment processing terminal; A process of receiving delivery confirmation information including a delivery confirmation date and time of the construction materials from an arrival processing terminal; providing at least the order information and calendar information out of the order / delivery information consisting of the order information, delivery schedule information, and delivery confirmation information to an information viewing terminal; In response to receipt of the order information, a process of marking a desired delivery date and time in a date and time field corresponding to the desired delivery date and time in the calendar information; In response to receipt of the delivery schedule information, a process of adding a delivery schedule display to a date and time field corresponding to the delivery schedule date and time in the calendar information; In response to receipt of the delivery confirmation information, a process of adding a delivery confirmation indication to a date and time field corresponding to the delivery confirmation date and time in the calendar information; A program for causing the computer to execute the above.

Citation Information

Patent Citations

  • Purchase request device, purchase request method and computer readable storage medium

    JP2000076170A

  • Construction work management system, construction work management server, and client terminal

    JP2002056051A

  • Work control system