Backup support program, information processing apparatus, and backup support method

The backup support program optimizes backup schedules by estimating CPU usage and rearranging backup times to minimize simultaneous operations, reducing execution time and CPU load in multi-customer virtualized environments.

JP2024143771APending Publication Date: 2024-10-11FSAS TECH INC
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023056641
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

In environments where multiple backup servers of different customers are virtualized on the same physical server, simultaneous backup operations lead to increased CPU load and prolonged execution times, affecting the application servers.

Method used

A backup support program that estimates the start and execution times of backups based on CPU usage rates, rearranges backup schedules to avoid simultaneous execution, and notifies administrators to adjust the schedule to minimize CPU load.

Benefits of technology

Reduces backup execution time by optimizing backup order to avoid simultaneous operations, thereby reducing CPU load and improving application server performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024143771000001_ABST
    Figure 2024143771000001_ABST
Patent Text Reader

Abstract

To shorten an execution time of backup of each server in the same physical server.SOLUTION: A physical server 1 includes a plurality of AP servers 22 and a backup server 21 paired with each AP server 22, stores CPU usage rates of each backup server 21 and each AP server 22 at fixed intervals in a load information DB 14, estimates a start time and an execution time of the backup to be next executed by each backup server 21 based on the load information DB 14, and when it is estimated that a time zone in which backups are executed simultaneously occurs, determines an order in which the backup can be shortened in time if they are not executed simultaneously by using the load information DB 14. Processing of the physical server 1 can be applied to estimate an appropriate backup timing, for example, when a plurality of different user systems share a blade server.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a backup support program and the like. [Background technology]

[0002] In an environment in which each server device and each storage device are connected to be able to communicate with each other, a technology has been disclosed in which each server device in such an environment acquires information from other server devices sharing a business environment, predicts the completion time of a data copy process, and predicts the degree of overlap of tasks in the data copy process (for example, see Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2015-132987 A [Patent Document 2] JP 2004-206611 A Summary of the Invention [Problem to be solved by the invention]

[0004] In addition, there are cases where the same physical server contains multiple virtual machines (VMs) that virtualize multiple application servers and backup servers for different customers. In such cases, if multiple backup servers perform backup operations simultaneously, the load on the CPU (Central Processing Unit) increases, and the execution time of each backup becomes longer. As a result, if the backup time becomes longer, the load on the application server that is the backup source increases, affecting the execution of the application.

[0005] In the conventional technology, each server device can obtain information from other server devices and predict the completion time of the data copy process and the degree of overlap of tasks in the data copy process. However, in the conventional technology, when each server device is a server device for a different customer in the same physical server, since the customers are different, information cannot be obtained from the other server devices and the completion time of the data copy process and the degree of overlap of tasks in the data copy process cannot be predicted.

[0006] In one aspect, an object of the present invention is to reduce the time required to execute a backup for each server when the same physical server contains multiple servers for different clients. [Means for solving the problem]

[0007] In one aspect, the backup support program is a backup support program executed by a computer including a plurality of application servers and a backup server paired with each application server, and causes the computer to execute a process of estimating the start time and execution time of the next backup to be executed by each backup server based on first historical information that stores the CPU usage rate of each backup server at each point in time, and, if it is estimated that there will be a period of time when backups are executed simultaneously, determining the order of backups so that there will be no period of time when backups are executed simultaneously and so that the total execution time will be short. Effect of the Invention

[0008] According to one embodiment, the time it takes to perform backup of each server can be reduced. [Brief description of the drawings]

[0009] [Figure 1] FIG. 1 is a diagram illustrating an example of a functional configuration of a physical server according to the embodiment. [Diagram 2] FIG. 2 is a diagram illustrating an example of a load information DB according to the embodiment. [Diagram 3] FIG. 3 is a diagram illustrating an example of a schedule estimation DB according to the embodiment. [Figure 4A] FIG. 4A is a diagram illustrating an example of a notification process according to the embodiment. [Figure 4B] FIG. 4B is a diagram illustrating an example of the notification process according to the embodiment. [Diagram 5] FIG. 5 is a diagram illustrating an example of a flowchart of a backup support process according to the embodiment. [Figure 6] FIG. 6 is a diagram illustrating an example of a computer that executes a backup assistance program. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] Hereinafter, the backup support program, the information processing device, and the backup support method disclosed in the present application will be described in detail with reference to the accompanying drawings. Note that the present invention is not limited to the embodiments. EXAMPLES

[0011] [Physical server functional configuration] FIG. 1 is a block diagram showing an example of a functional configuration of a physical server according to an embodiment. The physical server 1 shown in FIG. 1 supports backup of each system 20 and has a backup support unit 10. The physical server 1 includes a plurality of systems 20, each of which includes a backup server 21 and an application (AP) server 22. In FIG. 1, two systems 20, a system 20A and a system 20B, are included. The backup server 21 is a server that executes backup of the application server 22. The application server 22 is a server that executes an application. The backup server 21 and the application server 22 are each realized by a virtual machine (VM).

[0012] The prerequisites for the physical server 1 according to the embodiment are as follows. The administrators of the physical server 1, the system 20A, and the system 20B are different from each other. The administrator of the physical server 1 knows which VM in each system 20 is the backup server 21, but cannot know what kind of backup setting has been performed. Only the administrator of the system 20A can perform the backup setting of the system 20A. Only the administrator of the system 20B can perform the backup setting of the system 20B. Furthermore, neither the administrator of the system 20A nor the administrator of the system 20B is aware of the existence of a VM that is not under their management. Furthermore, in the embodiment, it is assumed that no notification is given to bring forward the schedule of the backup estimated hereafter.

[0013] The system 20A includes a backup server 21, an AP server 22, and a storage 23. The backup server 21 is realized by a VM and may be described as VM1. The AP server 22 is realized by a VM and may be described as VM3. The backup server 21 (VM1) performs backup of the AP server 22 (VM3). The backup server 21 (VM1) then stores the backup in the storage 23 (S1). The AP server 22 (VM3) executes an application.

[0014] The system 20B has a backup server 21, an AP server 22, and a storage 23. The backup server 21 is realized by a VM and may be described as VM2. The AP server 22 is realized by a VM and may be described as VM4. The backup server 21 (VM2) executes backup of the AP server 22 (VM4). The backup server 21 (VM2) then stores it in the storage 23 (S2). The AP server 22 (VM4) executes an application.

[0015] The backup support unit 10 estimates the start time and execution time of the next backup to be executed by each backup server 21 based on history information that stores the CPU utilization rate of each backup server 21 at regular intervals. If the backup support unit 10 estimates that a time period in which backups are executed simultaneously will occur, it determines the order of backups that can reduce the time if they are not executed simultaneously. The backup support unit 10 has a collection unit 11, an estimation unit 12, a notification unit 13, a load information DB (DataBase) 14, and a schedule estimation DB 15. The collection unit 11 is an example of a first storage unit and a second storage unit. The estimation unit 12 is an example of an estimation unit. The notification unit 13 is an example of a determination unit.

[0016] The load information DB 14 stores the CPU utilization rate measured for each VM at regular intervals as load information. That is, the load information DB 14 stores the CPU utilization rates of the backup server 21 (VM1, VM2) and the AP server 22 (VM3, VM4) at regular intervals. The load information DB 14 stores the load information for the past n days. For example, every regular interval is every minute, but is not limited to this. Note that, when the physical server 1 is configured with multiple CPUs or multiple cores, one CPU utilization rate is the average value of the utilization rates of the cores. Note that the load information DB 14 is generated by the collection unit 11, which will be described later.

[0017] Here, an example of the load information DB 14 will be described with reference to FIG. 2. FIG. 2 is a diagram showing an example of the load information DB according to the embodiment. As shown in FIG. 2, the load information DB 14 stores the CPU usage rate of VM1, the CPU usage rate of VM2, the CPU usage rate of VM3, and the CPU usage rate of VM4 in association with date and time. The CPU usage rate of VM1 is history information of the CPU usage rate measured at regular intervals of the backup server 21 of the system 20A. The CPU usage rate of VM2 is history information of the CPU usage rate measured at regular intervals of the backup server 21 of the system 20B. The CPU usage rate of VM3 is history information of the CPU usage rate measured at regular intervals of the AP server 22 of the system 20A. The CPU usage rate of VM4 is history information of the CPU usage rate measured at regular intervals of the AP server 22 of the system 20B. The regular interval is 1 second, but may be 10 seconds, 30 seconds, or is not limited thereto.

[0018] As an example, when the date and time is "1 / 1 0:00", the CPU usage of VM1 is stored as "61%", the CPU usage of VM2 is stored as "3%", the CPU usage of VM3 is stored as "12%", and the CPU usage of VM4 is stored as "2%".

[0019] 1, the schedule estimation DB 15 stores estimated start times and execution times for backups of each backup server 21. The schedule estimation DB 15 is created by the estimation unit 12, which will be described later.

[0020] Here, an example of the schedule estimation DB 15 will be described with reference to Fig. 3. Fig. 3 is a diagram showing an example of the schedule estimation DB according to the embodiment. As shown in Fig. 3, the schedule estimation DB 15 stores an estimated start time and an execution time for each backup server 21 (VM1, VM2) in association with each other. The estimated start time is an estimated start time of a backup. The execution time is an estimated execution time of a backup.

[0021] As an example, for a backup job of VM1, if the estimated start time is "1 / 1 1:00" (1:00 AM on January 1st), the execution time is stored as "2:05" (2 hours and 5 minutes). If the estimated start time is "1 / 8 1:00" (1:00 AM on January 8th), the execution time is stored as "not yet performed." Also, for a backup job of VM2, if the estimated start time is "1 / 1 1:10" (1:10 AM on January 1st), the execution time is stored as "1:05" (1 hour and 5 minutes). If the estimated start time is "1 / 8 1:10" (1:10 AM on January 8th), the execution time is stored as "not yet performed." The estimated start time with the execution time of "not yet performed" is estimated as the start time of the next backup to be performed.

[0022] Returning to FIG. 1, the collection unit 11 collects load information for each VM. For example, the collection unit 11 measures the CPU usage rate of the backup server 21 (VM1) and AP server 22 (VM3) of the system 20A for a certain period of time, and stores the past n days in the load information DB 14. The collection unit 11 also measures the CPU usage rate of the backup server 21 (VM2) and AP server 22 (VM4) of the system 20B for a certain period of time, and stores the past n days in the load information DB 14. Note that if the physical server 1 is configured with multiple CPUs or multiple cores, the collection unit 11 calculates the average value of the usage rate of each core for one certain period of time, and sets this as the CPU usage rate corresponding to the certain period of time.

[0023] The estimation unit 12 estimates the start time and execution time of the next backup to be executed by each backup server 21 based on the load information DB 14. For example, the estimation unit 12 refers to the load information of the backup server 21 (VM1) of the system 20A stored in the load information DB 14, and identifies a time period in which the CPU utilization rate is equal to or greater than a threshold as the time period of the backup. Then, the estimation unit 12 estimates the start time of the identified time period as the start time of the backup, and estimates the execution time of the identified time period as the execution time of the backup. Similarly, the estimation unit 12 refers to the load information of the backup server 21 (VM2) of the system 20B stored in the load information DB 14, and identifies a time period in which the CPU utilization rate is equal to or greater than a threshold as the time period of the backup. Then, the estimation unit 12 estimates the start time of the identified time period as the start time of the backup, and estimates the execution time of the identified time period as the execution time of the backup. Then, the estimation unit 12 stores the estimated start time and execution time in the schedule estimation DB 15 in association with the backup server 21. Then, for each backup server 21, the estimation unit 12 estimates the start time and execution time of the next backup to be executed, using the start time and execution time of past backups stored in the schedule estimation DB 15. Then, the estimation unit 12 stores the estimated start time and execution time in the schedule estimation DB 15 in association with the backup server 21.

[0024] The notification unit 13 notifies an alert to the administrator of either of the systems 20A and 20B to request a schedule change of the estimated backup schedule.

[0025] For example, the notification unit 13 selects a job of the backup server 21 that is estimated to be executed next from the schedule estimation DB 15. As an example, the notification unit 13 refers to the schedule estimation DB 15 and selects each job of the backup server 21 whose execution time indicates "not executed" at the estimated start time. The notification unit 13 estimates the estimated execution time of each selected job to be the average execution time for the past n days stored in the schedule estimation DB 15. The notification unit 13 determines whether or not a time period during which backups are executed simultaneously occurs when each selected job is executed for the estimated execution time from the estimated start time. If no time period during which backups are executed simultaneously occurs, the notification unit 13 does not notify an alert to the administrators of any of the backup servers 21.

[0026] Furthermore, when there is a time period in which backups are performed simultaneously, the notification unit 13 determines the order of backups that can reduce the time if they are not performed simultaneously. As an example, the notification unit 13 uses the load information DB 14 to calculate the total load during backup when one backup server 21 starts backup earlier than the estimated start time, and the other backup server 21 starts backup after the estimated execution time has elapsed. Furthermore, the notification unit 13 exchanges the order of the backup servers 21 and calculates the total load during backup. The total load can be calculated by calculating the time integral of the CPU utilization rate of the AP server 22 that is paired with the backup server 21. The notification unit 13 then compares the calculated total loads and determines the order of the backup with the smaller total load.

[0027] Furthermore, the notification unit 13 notifies the administrator of the system 20, which is to delay the estimated start time in the determined order, of the amount of delay.

[0028] [Example of notification processing] Here, the notification process executed by the notification unit 13 will be described with reference to Fig. 4A and Fig. 4B. Fig. 4A and Fig. 4B are diagrams showing an example of the notification process according to the embodiment. Note that the notification unit 13 does not perform a notification to bring forward the estimated start time.

[0029] First, the notification unit 13 selects a job of the backup server 21 (VM1, VM2) that is estimated to be executed next from the schedule estimation DB 15. As an example, the notification unit 13 refers to the schedule estimation DB 15 and selects each job of the backup server 21 (VM1, VM2) whose execution time indicates "not executed" at the estimated start time. Here, the job of VM1 is "j1" and the job of VM2 is "j2". The estimated start time of the job "j1" of VM1 is Time(j1), and the estimated start time of the job "j2" of VM2 is Time(j2). The estimated execution time of the job "j1" of VM1 is "t1", and the estimated execution time of the job "j2" of VM2 is "t2". The estimated execution time of the job "j1" of VM1 is calculated as the average value of the execution times for the past n days associated with VM1 in the schedule estimation DB 15. The estimated execution time of job “j2” of VM2 is calculated as the average execution time for the past n days associated with VM2 in the schedule estimation DB 15. It is assumed that the estimated start time of “j1” is earlier than the estimated start time of “j2”.

[0030] Under such circumstances, the notification unit 13 judges whether or not a time period during which backups are executed simultaneously will occur when each selected job is executed for the estimated execution time from the estimated start time. Specifically, the notification unit 13 judges whether or not "j1" is executed first from the estimated start time, and whether or not the estimated start time of "j2" is earlier than the end time of "j1". In other words, the notification unit 13 judges whether or not "Time(j1)+t1" is greater than "Time(j2)".

[0031] Here, if there is no time period during which backups are executed simultaneously, the notification unit 13 does not notify the administrators of the systems 20A and 20B of an alert. Specifically, if "Time(j1)+t1" is equal to or less than "Time(j2)", the notification unit 13 does not notify the administrators of the systems 20A and 20B of an alert. This is because, in such a case, the CPU load will not increase due to the overlapping of backup time periods.

[0032] 4A shows a case where "Time(j1)+t1" is equal to or less than "Time(j2)". In such a case, it is highly likely that job "j1" of VM1 and job "j2" of VM2 are not executed simultaneously. Therefore, the notification unit 13 does not notify the administrators of the systems 20A and 20B of an alert.

[0033] In contrast, the upper diagram of FIG. 4B shows a case where "Time(j1)+t1" is greater than "Time(j2)." In such a case, there will be a time period during which job "j1" of VM1 and job "j2" of VM2 are executed simultaneously, which may result in poor backup efficiency. Therefore, the notification unit 13 notifies an alert to the administrator of either system 20A or system 20B.

[0034] For example, the notification unit 13 uses the load information DB 14 to calculate the total load during backup in the case where one backup server 21 starts backup earlier than the estimated start time and the other backup server 21 starts backup after the estimated execution time has elapsed. Also, the notification unit 13 calculates the total load during backup by switching the order of the backup servers 21.

[0035] The diagram in FIG. 4B ([1]) shows a case where it is assumed that job "j1" of VM1 is executed before job "j2" of VM2. That is, job "j1" of VM1 starts backup earlier than job "j2" of VM2 from the estimated start time Time(j1), and job "j2" of VM2 starts backup after "j1" ends. The total load in this case is calculated by the sum of the CPU usage of VM3, which is the AP server 22 executed while "j1" is being executed (formula (1)), and the sum of the CPU usage of VM4, which is the AP server 22 executed while "j2" is being executed (formula (2)). That is, the total load is expressed as a time integral. Note that Usage(VM3, j1, Time(j1)) in formula (1) indicates the total load of VM3 executed while executing job "j1" from Time(j1). This total load is calculated by the time integral of the CPU usage of VM3 from Time(j1) to Time(j1)+t1, and corresponds to the total load (a) in [1]. In equation (2), Usage(VM4,j2,Time(j1)+t1) indicates the total load of VM4 that runs while executing job "j2" from Time(j1)+t1. This total load is calculated by the time integral of the CPU usage of VM4 from Time(j1)+t1 to Time(j1)+t1+t2, and corresponds to the total load (b) in [1].

[0036]

number

[0037]

number

[0038] Also, the lower diagram of FIG. 4B ([2]) shows a case where it is assumed that job "j2" of VM2 is executed before job "j1" of VM1. That is, job "j2" of VM2 starts backup earlier from the estimated start time Time(j2), and job "j1" of VM1 starts backup after "j2" ends. The total load in this case is calculated by the sum of the CPU usage of VM4, which is the AP server 22 executed while "j2" is being executed (formula (3)), and the sum of the CPU usage of VM3, which is the AP server 22 executed while "j1" is being executed (formula (4)). That is, the total load is expressed as a time integral. Note that Usage(VM4,j2,Time(j2)) in formula (3) indicates the total load of VM4 executing job "j2" from Time(j2). This total load is calculated by the time integral of the CPU usage of VM4 from Time(j2) to Time(j2)+t2, and corresponds to the total load (c) in [2]. In formula (4), Usage(VM3,j1,Time(j2)+t2) indicates the total load of VM3 executing job “j1” from Time(j2)+t2. This total load is calculated by the time integral of the CPU usage of VM3 from Time(j2)+t2 to Time(j2)+t1+t2, and corresponds to the total load (d) of “2”.

[0039]

number

[0040]

number

[0041] Then, the notification unit 13 compares the calculated total loads. That is, the notification unit 13 compares the sum of the total loads of "j1" and "j2" when it is assumed that the job "j1" of VM1 is executed first ([1]) and when it is assumed that the job "j2" of VM2 is executed first ([2]). Specifically, the notification unit 13 compares "the total load of "j1" (a) + the total load of "j2" (b)" ([1]) with "the total load of "j2" (c) + the total load of "j1" (d)" ([2]).

[0042] Then, the notification unit 13 determines the order of the smaller total load as the order of backup. Specifically, if "total load (a) of "j1" + total load (b) of "j2"" ([1]) is smaller than "total load (c) of "j2" + total load (d) of "j1"" ([2]), the notification unit 13 determines the order of "j1" and "j2" as the order of backup. This is because it is estimated that there is a higher possibility that the total backup time can be shortened in the case of [1].

[0043] Furthermore, when "total load (a) of "j1" + total load (b) of "j2"" ([1]) is equal to or greater than "total load (c) of "j2" + total load (d) of "j1"" ([2]), the notification unit 13 determines the order of backup to be "j2" followed by "j1". This is because it is estimated that there is a higher possibility that the total backup time can be shortened in the case of [2].

[0044] Then, the notification unit 13 notifies the administrator of the system 20 whose estimated start time is to be delayed of the amount of delay to be performed. Specifically, when the notification unit 13 determines the order of "j1" and "j2" as the backup order, it notifies the administrator of the system 20B which is later in the order that "it would be better to delay the next job execution start time by 'Time(j1)+t1-Time(j2)'." Note that the notification unit 13 does not notify the administrator of the system 20A which is earlier in the order.

[0045] Furthermore, when the notification unit 13 determines the order of backup to be "j2" and "j1", it notifies the administrator of the later system 20A that "it would be better to delay the next job execution start time by 'Time(j2)+t2-Time(j1)'". Note that the notification unit 13 does not notify the administrator of the earlier system 20B.

[0046] [Flowchart of backup support process] Here, a flowchart of the backup support process performed by the backup support unit 10 will be described with reference to FIG. 5. FIG. 5 is a diagram showing an example of a flowchart of the backup support process according to the embodiment. It is assumed that the physical server 1 is configured with a system 20A and a system 20B. It is also assumed that the backup support unit 10 refers to the load information DB 14 to estimate the start time and execution time of the backup of the backup server 21 (VM1) of the system 20A, and stores the estimate in the schedule estimation DB 15. Similarly, it is assumed that the backup support unit 10 refers to the load information DB 14 to estimate the start time and execution time of the past backup of the backup server 21 (VM2) of the system 20B, and stores the estimate in the schedule estimation DB 15.

[0047] 5, the backup support unit 10 estimates each job to be executed next by each backup server 21 of the system 20A and the system 20B (step S11). For example, the backup support unit 10 estimates the start time and execution time of the next backup job to be executed for each backup server 21 (VM1, VM2) by using the start time and execution time of the past backup job stored in the schedule estimation DB 15.

[0048] Then, the backup support unit 10 judges whether or not there is a possibility that the estimated jobs will be executed overlappingly (step S12). For example, the backup support unit 10 judges whether or not a time period during which backups are executed simultaneously will occur when the estimated backup jobs are executed for the estimated execution time from the estimated start time.

[0049] When it is determined that there is no possibility of overlapping execution of each estimated job (step S12; No), the backup support unit 10 does not issue an alert notification (step S13). Then, the backup support unit 10 ends the backup support process.

[0050] On the other hand, when it is determined that there is a possibility that the estimated jobs are executed overlappingly (step S12; Yes), the backup support unit 10 calculates the total load for the cases (a), (b), (c), and (d) (step S14). (a) here corresponds to the sum (formula (1)) of the CPU usage rates of the AP server 22 (e.g., VM3) executed while executing "j1" when it is assumed that "j1" is executed first, as shown in FIG. 4B. (b) here corresponds to the sum (formula (2)) of the CPU usage rates of the AP server 22 (e.g., VM4) executed while executing the subsequent "j2" when it is assumed that "j1" is executed first, as shown in FIG. 4B. (c) here corresponds to the sum (formula (3)) of the CPU usage rates of the AP server 22 (VM4) executed while executing "j2" when it is assumed that "j2" is executed first, as shown in FIG. 4B. Here, (d) corresponds to the sum (equation (4)) of the CPU usage rates of the AP servers 22 (e.g., VM3) that are executed while the subsequent “j1” is being executed, assuming that “j2” is executed first, as shown in FIG. 4B.

[0051] Then, the backup support unit 10 judges whether or not (a)+(b)<(c)+(d) (step S15). If it is judged that (a)+(b)<(c)+(d) (step S15; Yes), the backup support unit 10 notifies an alert to the administrator of the system 20B (step S16). For example, the backup support unit 10 determines the order of "j1" and "j2" with the smaller total load as the backup order. This is because it is estimated that there is a higher possibility that the total backup time can be shortened when "j1" is assumed to be executed first than when "j2" is assumed to be executed first. Then, the backup support unit 10 notifies the administrator of the system 20B with the later order of the time by which it is better to delay. Then, the backup support unit 10 ends the backup support process.

[0052] On the other hand, if it is determined that (a)+(b)≧(c)+(d) (step S15; No), the backup support unit 10 notifies the administrator of the system 20A of an alert (step S17). For example, the backup support unit 10 determines the order of backup to be "j2" and "j1" which have the smaller total load. This is because it is estimated that there is a higher possibility that the total backup time can be shortened when "j2" is executed first than when "j1" is executed first. Then, the backup support unit 10 notifies the administrator of the system 20A which is executed later in the order of the time by which it is better to delay. Then, the backup support unit 10 ends the backup support process.

[0053] [Effects of the embodiment] According to the above embodiment, the physical server 1 includes a plurality of AP servers 22 and a backup server 21 paired with each AP server 22. The backup support unit 10 in the physical server 1 stores the CPU utilization rate of each backup server 21 for each fixed time in the load information DB 14. The backup support unit 10 stores the CPU utilization rate of each AP server 22 for each fixed time in the load information DB 14. The backup support unit 10 estimates the start time and execution time of the next backup to be executed by each backup server 21 based on the load information DB 14. When it is estimated that a time period in which backups are executed simultaneously will occur, the backup support unit 10 uses the load information DB 14 to determine the order of backups that can reduce the time if they are not executed simultaneously. According to this configuration, the backup support unit 10 can reduce the execution time of backups by avoiding the time period in which backups are executed simultaneously.

[0054] According to the embodiment described above, the backup support unit 10 notifies the administrator who manages the group for which the estimated backup start time is to be delayed of the delay time. With this configuration, the backup support unit 10 can reflect this in the actual backup schedule.

[0055] Also, according to the above embodiment, the backup support unit 10 uses the load information DB 14 to calculate the total load obtained from the CPU utilization rate of the AP server 22 associated with the pair during backup when one backup server 21 starts backup first from the estimated start time and the other backup server 21 starts backup after the estimated execution time, and calculates the total load obtained from the CPU utilization rate of the AP server 22 associated with the pair during backup when the backup servers are switched. The backup support unit 10 compares the calculated total loads and determines the order of the smaller total load as the order of backup. According to this configuration, the backup support unit 10 can shorten the execution time of backup by applying the order of the AP server 22 with the smaller total load during backup.

[0056] [others] Note that each component of the backup support unit 10 in the illustrated physical server 1 does not necessarily have to be physically configured as illustrated. In other words, the specific form of distribution and integration of the backup support unit 10 in the physical server 1 is not limited to that shown in the figure, and all or part of it can be functionally or physically distributed and integrated in any unit according to various loads, usage conditions, etc. Also, a storage unit (not shown) including the load information DB 14 and the schedule estimation DB 15 may be connected to the physical server 1 as an external device via a network.

[0057] Moreover, the various processes described in the above embodiments can be realized by executing a prepared program on a computer such as a personal computer or a workstation. Therefore, an example of a computer that executes a backup support program that realizes the same functions as the backup support unit 10 in the physical server 1 shown in Fig. 1 will be described below. Here, a backup support program that realizes the same functions as the backup support unit 10 in the physical server 1 will be described as an example. Fig. 6 is a diagram showing an example of a computer that executes a backup support program.

[0058] As shown in Fig. 6, the computer 200 has a CPU (Central Processing Unit) 203 that executes various arithmetic processes, an input device 215 that accepts data input from a user, and a display device 209. The computer 200 also has a drive device 213 that reads programs and the like from a storage medium, and a communication I / F (Interface) 217 ​​that transmits and receives data to and from other computers via a network. The computer 200 also has a memory 201 that temporarily stores various information, and a HDD (Hard Disk Drive) 205. The memory 201, the CPU 203, the HDD 205, the display control unit 207, the display device 209, the drive device 213, the input device 215, and the communication I / F 217 are connected by a bus 219.

[0059] The drive device 213 is, for example, a device for the removable disk 211. The HDD 205 stores a backup support program 205a and backup support process related information 205b. The communication I / F 217 manages the interface between the network and the inside of the device, and controls the input and output of data from other computers. For example, a modem or a LAN adapter can be used as the communication I / F 217.

[0060] The display device 209 is a display device that displays a cursor, an icon, a tool box, and data such as documents, images, function information, etc. The display device 209 can be, for example, a liquid crystal display or an organic EL (Electroluminescence) display.

[0061] The CPU 203 reads out the backup support program 205a, loads it in the memory 201, and executes it as a process. Such a process corresponds to each functional unit of the physical server 1. The backup support processing related information 205b includes, for example, the load information DB 14 and the schedule estimation DB 15. And, for example, the removable disk 211 stores each piece of information such as the backup support program 205a.

[0062] It should be noted that the backup support program 205a does not necessarily have to be stored in the HDD 205 from the beginning. For example, the program may be stored in a "portable physical medium" such as a flexible disk (FD), CD-ROM, DVD disk, magneto-optical disk, or IC card that is inserted into the computer 200. The computer 200 may then read out the backup support program 205a from these and execute it.

[0063] Furthermore, the backup support process performed by the physical server 1 described in the above embodiment can be applied to estimating appropriate backup timing, for example, when a blade server is shared by systems of multiple different users. [Explanation of symbols]

[0064] 1 Physical Server 10. Backup Support Department 11 Collection Department 12 Estimation part 13 Notification Department 14 Load information DB 15 Schedule Estimation DB 20A, 20B System 21 Backup Server 22 AP Server 23. Storage

Claims

1. A backup support program to be executed by a computer including a plurality of application servers and a backup server paired with each of the application servers, storing the CPU utilization rate of each backup server at each fixed time period in first history information; storing the CPU utilization rate of each application server for each fixed period of time in second history information; estimating a start time and an execution time of the next backup to be executed by each backup server based on the first history information; If it is estimated that there will be a time period during which backups are performed simultaneously, the second history information is used to determine the order of backups that will reduce the time required if the backups are not performed simultaneously. A backup support program that causes the computer to execute a process.

2. Notifying the administrator who manages the group that will have its estimated backup start time delayed of the amount of time to delay the backup start time in the determined order.

2. The backup support program according to claim 1.

3. The process of determining the order includes: using the second history information, calculating a total load obtained from the CPU utilization of the application servers associated with the pair during backup in a case where one backup server starts backup earlier than the estimated start time and the other backup server starts backup after the estimated execution time, and calculating a total load obtained from the CPU utilization of the application servers associated with the pair during backup in a case where the backup servers are switched; Compare the total loads calculated for each Determine the order of backup based on the lowest total load 2. The backup support program according to claim 1.

4. A first system including an application server and a backup server paired with the application server; a second system including an application server different from the application server and a backup server paired with the application server; A control unit, The control unit is a first storage unit that stores a CPU utilization rate of each backup server for each fixed period of time in first history information; a second storage unit that stores the CPU utilization rate of each application server for each fixed period of time in second history information; an estimation unit that estimates a start time and an execution time of a next backup to be executed by each backup server based on the first history information; a determination unit that, when it is estimated that a time period during which backups are executed simultaneously will occur, determines an order of backups that can reduce the time required if the backups are not executed simultaneously, using the second history information; 13. An information processing device comprising:

5. A backup support method executed by a computer including a plurality of application servers and a backup server paired with each of the application servers, comprising: storing the CPU utilization rate of each backup server at each fixed time period in first history information; storing the CPU utilization rate of each application server for each fixed period of time in second history information; estimating a start time and an execution time of the next backup to be executed by each backup server based on the first history information; If it is estimated that there will be a time period during which backups are performed simultaneously, the second history information is used to determine the order of backups that will reduce the time required if the backups are not performed simultaneously. A backup support method, characterized in that processing is executed by the computer.

Citation Information

Patent Citations

  • Backup controller

    JP2004252829A

  • Information processing apparatus, data copying management method, and data copying management program

    JP2015132987A

  • Adaptively controlling data copy operations that copy data in an electronic environment

    US10261718B1

  • Backup system

    JP2004206611A