Proposal device and proposal method
The proposing device and method address ESG investment challenges by generating proposal flows that enhance resource circulation and promote sustainable management through project combinations based on preference rules and contribution levels.
Patent Information
- Application Number
- JP2023058363
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-31
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2043-03-31
AI Technical Summary
Existing ESG investments face challenges in addressing global environmental issues like global warming and uneven resource distribution, particularly in biogeochemical cycles, necessitating a more efficient circulation of resources.
A proposing device and method that utilizes a storage device to store rule data and information about operations, generating business credit data and proposing flows that promote resource circulation by combining projects based on preference rules and contribution levels.
Facilitates the generation of proposal flows that enhance resource circulation, addressing uneven distribution and promoting sustainable resource management through efficient project combinations.
Smart Images

Figure 2024145838000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a proposal device and a proposal method. [Background technology]
[0002] In recent years, the number of companies investing in companies that are proactive about ESG (Environment, Social, Governance) has increased. ESG investment is attracting attention. Generally, companies that are highly evaluated for ESG are This is because they are being evaluated as having high economic significance and sustainability. This also serves as an opportunity to demonstrate that your investment is contributing to society.
[0003] ESG investment can be a transaction that responds to global environmental issues. One of the most common global environmental issues is the so-called global warming problem. Carbon credit trading is one example of this. Assign carbon credit creators a method for generating credits to create the demand for credits As a technology for this purpose, we have a demand acquisition unit that acquires the demand for carbon credits and a Multiple methods for generating credits and the carbon credits of each method a methodology database that stores the carbon credit generation capacity of the A creator that associates and stores the creation method that each creator can realize with the creator. Refer to the database and calculate the amount of carbon credits required to generate the above-mentioned demand amount. One or more creators may allocate one or more creation methods to the extent feasible. and an allocation unit for allocating the allocation method. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent No. 7138390 Summary of the Invention [Problem to be solved by the invention]
[0005] However, there are various important environmental issues, including global warming. One of these is the "biogeochemical cycle." The problem of global warming is The main issue is the amount of carbon (carbon dioxide concentration) in the biogeochemical cycle. The problem is that resources are unevenly distributed (e.g., concentrated in certain parts of the world). This becomes a problem.
[0006] Therefore, in order to make appropriate ESG investments regarding biogeochemical cycle issues, In addition to reducing the total amount of resources, Conversely, projects that are the subject of ESG investments should also be It should be constructed from the perspective of
[0007] The present invention has been made in view of the above circumstances, and its object is to promote the circulation of resources. To provide a suggestion device and a suggestion method capable of proposing actions to promote be. [Means for solving the problem]
[0008] One of the present inventions for solving the above problem is a method for indicating the relationship between a plurality of processes with respect to a resource. A storage device that stores rule data, which is data, and information on a task that processes a specified resource. Individual business credit data is generated for a plurality of businesses. Based on the generation process, the rule data, and the generated individual business credit data, A flow of a task that is composed of any two or more tasks among the plurality of tasks, A task combination generation process that generates a proposed task flow that circulates a specified resource and an output process of outputting information indicating the generated proposed flow to an output device. The proposed device is equipped with a device. Effect of the Invention
[0009] According to the present invention, it is possible to propose actions that promote the circulation of resources. Configurations and effects other than those described above will become apparent from the following description of the embodiments. [Brief description of the drawings]
[0010] [Figure 1] FIG. 1 is a diagram illustrating an example of a configuration of a proposed system according to an embodiment of the present invention. [Diagram 2] FIG. 11 is a diagram showing an example of preference rule data. [Diagram 3] FIG. 2 is a diagram illustrating an example of a hardware configuration of each information processing device in the proposed system. [Figure 4] 1 is a flow diagram illustrating an overview of a proposal support process performed in the proposal system. [Diagram 5] FIG. 11 is a flow diagram illustrating details of an individual project credit data generation process. [Figure 6] FIG. 13 is a diagram showing an example of individual project credit data. [Figure 7] FIG. 13 is a flow diagram illustrating details of an individual project preference calculation process. [Figure 8] FIG. 11 is a diagram showing an example of preference table data. [Figure 9] FIG. 11 is a flow diagram illustrating details of a project combination generation process. [Figure 10] FIG. 13 is a diagram showing an example of an investment proposal screen. [Figure 11] FIG. 13 is a diagram showing an example of an investment proposal screen. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail with reference to the drawings. FIG. 1 is a diagram showing an example of the configuration of a proposal system 1 according to the present embodiment. 1 includes one or more individual project executor devices 10, a credit authority device 20, a provider The information processing device includes a proposal device 30 (intermediary device) and one or more investor devices 40. These information processing devices are connected to each other via, for example, the Internet, LAN (Local Area Network), etc. Area Network), WAN (Wide Area Network), or dedicated line, or other wired or wireless communication network. They may be connected via a network or directly via communication lines.
[0012] The investor device 40 is an information processing device used by investors who invest in the following project. It is a processing device.
[0013] The individual project executor device 10 is a device for executing a task of processing a predetermined resource (hereinafter, a project This project is an information processing device managed by a company that runs a For households, it is the subject of so-called ESG investment (ESG: Environment, Social, Governance) This includes the following tasks:
[0014] The project aims to eliminate pollutants such as phosphorus, nitrogen, or potassium. This project is concerned with the biogeochemical cycle of substances. This contributes to the smooth circulation of materials (so that circulating materials are not concentrated in a specific area). The processes carried out in this project are, for example, separation (removal), purification of a substance, production of another substance, or use of another substance (more on this later) In the following, in this embodiment, the resources targeted by the project are phosphorus, nitrogen, and It shall be potassium.
[0015] The individual project implementer device 10 stores data on the contents of such projects. The project executor data 11 is stored as For example, the resources covered by the project, information on the area covered by the project, Information on the amount of resources that can be processed by a project (hereinafter referred to as the processing amount) (the basis for the contribution amount described below) information on which the resource is based) and the processing efficiency of that resource (e.g., the removal performance of a resource by a given device). include.
[0016] The credit authority device 20 is an information processing device managed by an authority that certifies projects. It is a device.
[0017] The credit authority device 20 is a project manager data 11. The registered credit data 21, which is data on the authentication result (whether authentication was performed, etc.), is stored. In addition, the information on the registered credit data 21 includes the certified result regarding the amount of contribution, which will be described later. Contains fruits.
[0018] The credit authority device 20 also detects the distribution or bias of resources targeted by the project. The individual project execution monitoring data 22 is data showing the current status of each project.
[0019] The individual project execution monitoring data 22 may be collected, for example, by sensors, satellites, or other The data is obtained by remote sensing from a specified device of an aircraft such as a drone, or is based on a specified The abundance or concentration of resources in each area covered by the project, obtained from the database. The individual project implementation monitoring data22 is collected from the remote The image data may be generated from the image data acquired by the individual project implementation. The transaction monitoring data 22 is collected by the credit authority device 20 in communication with the above-mentioned predetermined device. The information may be obtained by receiving the information.
[0020] Next, the proposal device 30 includes an individual project credit data generating unit 31, The inter-project preference calculation unit 32, the project combination generation unit 33, and the output unit 34 are Prepare.
[0021] The individual project credit data generation unit 31 is a task of processing resources (authenticated projects Generate individual business credit data, which is information on each business, for multiple businesses and Store in project credit data 100 (individual business credit data generation process) For example, individual operational credit data is data on the area where the operations related to the project are carried out. For example, individual business credit data includes the types of processing related to a project. Includes data on.
[0022] In addition, the individual project credit data generating unit 31 generates individual business credit data and The amount of contribution, which is the amount of resources processed by the process in the project, is calculated by dividing the Generate for the project.
[0023] The individual inter-project preference calculation unit 32 calculates the preference between two consecutive processes that target resources. Rule data, which is information indicating the relationship, is stored as preference rule data 200. In addition, the individual inter-project preference calculation unit 32 calculates the individual inter-project preference based on the preference rule data 200. Preference table data 300 is generated that stores the relationship of preferences between projects.
[0024] Specifically, the preference rule data 200 is a set of two processes that are performed successively. Each user stores preferences that indicate the quantitative contribution of the management to resource circulation.
[0025] For example, preference is the contribution of two successive treatments in the same region. This includes same-area preferences, which are the degree of preference when two successive treatments are identical. In addition, preference is related to the order and type (effect) of two consecutive treatments. The effect preference indicates the contribution of the two consecutive treatments (effects) to each other. (The preference is high when the target of two consecutive treatments is the same.) The preference is also Includes the same resource preference, which indicates that the resources targeted by two successive operations are the same. are identical).
[0026] Next, the project combination generating unit 33 generates rule data (preference rule data 200 ) and the individual project credit data generated by the individual project credit data generation unit 31 Based on the data, the individual business credit data is composed of multiple projects. It is a business flow that consists of multiple projects that circulate resources. A proposed flow is generated (task combination generation process).
[0027] Specifically, the project combination generating unit 33 generates a combination of projects in the circulation of resources based on the preferences. A proposal flow is generated in which the preference of a project exceeds a predetermined contribution.
[0028] For example, the project combination generating unit 33 may generate a combination of the same region preferences and individual project classes. The data generated by the credit data generation unit 31 is used to generate data on the area where the project is to be processed. Based on this, a proposed flow is generated in which the preference of the process in the circulation of the resource exceeds a predetermined contribution.
[0029] In addition, for example, the project combination generation unit 33 may be configured to generate a combination of effect preferences and individual projects. Based on the data of the type of project processing generated by the credit data generating unit 31, , generate proposed flows whose process preferences in the circulation of resources exceed a predetermined contribution.
[0030] In addition, the project combination generating unit 33 generates a proposed flow and The contribution amount of the resources processed by the flow is calculated by the individual project credit data generating unit 31. The calculation is based on the data of each contribution amount generated in
[0031] The output unit 34 outputs information indicating the flow generated by the project combination generation unit 33. The output is sent to the device (output processing).
[0032] In addition, the output unit 34 outputs information indicating the contribution amount calculated by the project combination generation unit 33. Output.
[0033] (Preference rule data) FIG. 2 is a diagram showing an example of the preference rule data 200. is the rule ID 201 of each rule, and the resource condition data that constitutes the rule. The efficiency of each process of two consecutive projects that constitute a certain target resource 202 and its rules The effect type 203, which is data on the conditions related to the type of effect, The target area 204 is data on the conditions of the area where the processing of the project is executed, and the rule It has data on the preference calculation method 205 when applied.
[0034] The calculation method 205 is for one or both of the two consecutive projects to which the rule is applied. The formula specifies the amount by which the preference value is increased for each option.
[0035] In the example shown in the figure, if two consecutive projects both involve processing the same resource, , rule R1 is applied and 10 is added to the preference of both projects (same resource preference).
[0036] Also, the type of processing (effect) of the first project of two consecutive projects The first project type (effect) is a "refining project" and the second project type (effect) is a "removal project". If the second project is the "sub-project", rule R2 is applied and the The preference for the "Removal Project" (the "Effect Preference") is increased by 10 (effect preference).
[0037] In addition, if two consecutive projects are both carried out in the same region, the rule R1 is applied and both projects are given a preference of 10 (same area preference) .
[0038] Next, FIG. 3 shows one example of the hardware configuration of each information processing device in the proposed system 1. Each information processing device is a calculation device such as a CPU (Central Processing Unit). 91 and main memory such as RAM (Random Access Memory) or ROM (Read Only Memory) A storage device 92 and an external device such as a hard disk drive (HDD) or a solid state drive (SSD) A storage device 93, an input device 94 such as a keyboard, a mouse, or a touch panel, and a display An output device 95 such as a raster or touch panel, a NIC (Network Interface Card), wireless communication communication module, USB (Universal Serial Interface) module, or serial communication module A communication device 96 is provided, which is composed of a module and the like, and these devices are connected by a bus 97. It has been done.
[0039] The functions of the functional units of the information processing devices in the proposed system 1 described above are implemented by a computing device. 91 is realized by reading a program from the main memory device 92 or the external memory device 93. Each program may be distributed, for example, by recording it on a portable or fixed recording medium. In addition, these programs can be used in whole or in part, for example, Virtualization technology and process space isolation technology, such as the virtual servers provided by Udo Systems, It may also be realized using virtual information processing resources provided using technology or the like. In addition, all or part of these programs may be used by, for example, a cloud system using an API (Application Programming Interface). This may be achieved by a service provided via a standardized application programming interface (API), etc. . Next, the processing performed by the proposed system 1 will be described.
[0040] FIG. 4 is a flow diagram for explaining an outline of the proposal process performed by the proposal system 1. For example, when the proposal device 30 is started, the project executor data 11, the registered credit card number, When the project data 21 or individual project execution monitoring data 22 is updated Or, when a predetermined input is made to the proposal device 30 from the individual project implementer device 10, It will begin.
[0041] First, the proposal device 30 selects a certified project (hereinafter referred to as We generate individual project credit data 100, which is information on each project (called candidate projects). Then, the individual project credit data generation process s100 is executed to generate individual project credit data.
[0042] The suggestion device 30 then calculates the preference rule data 200 and the individual project credits. Based on the individual project credit data 100 generated in the data generation process s100 , if two consecutive candidate projects are conducted, A process for calculating individual inter-project preferences that generates preference table data 300 storing preferences Run 200.
[0043] The proposal device 30 calculates the inter-project preference table data 3 00, a project combination generation process s300 is executed to generate a proposed flow. .
[0044] The proposal device 30 generates a proposal flow in the project combination generation process s300. Then, an output process s400 is executed to output information related to the proposed flow. will end. Each process will be described in detail below.
[0045] <Individual project credit data generation process> FIG. 5 is a flow chart explaining the details of the individual project credit data generation process s100. FIG.
[0046] The individual project credit data generation unit 31 generates information on the projects of each company. The information is obtained (s101).
[0047] For example, the individual project credit data generating unit 31 may The project manager data 11 is received from the project manager 10. The credit data generating unit 31 receives the registered credit data from the credit authentication institution device 20. The data 21 and the individual project execution monitoring data 22 are received.
[0048] The individual project credit data generation unit 31 adds the amount of contribution to the information acquired in s101. Whether or not the data (hereinafter referred to as reference data) that can be used to calculate For example, the individual project credit data generating unit 31 checks (s102). The individual project execution monitoring data22 obtained in 01 is added to the project Determine whether the data includes data on the abundance or concentration of resources in each region of the country.
[0049] If reference data is included (s102: YES), individual project credits The data generating unit 31 executes the process of s103. On the other hand, if the reference data is not included If (s102: NO), the individual project credit data generation unit 31 The amount of processing in the project manager data 11 is set as the amount of contribution, and then the process of s104 is executed.
[0050] In s103, the individual project credit data generating unit 31 Based on the external data collected in step s101 and the project owner data11 obtained in step s102, the amount of contribution was calculated. A correction amount for the amount of processing is calculated for the calculation.
[0051] For example, the individual project credit data generating unit 31 may Whether the amount (or concentration) of a resource in a given area is insufficient or excessive relative to a given standard value Then, the individual project credit data generating unit 31 determines whether the credit is insufficient. In this case, the project will involve the use of a type of treatment that can increase the amount (or concentration) of the resource. Identify the projects (e.g., production or application of phosphorus-based fertilizers) and A predetermined correction amount (e.g., processing efficiency) is set. On the other hand, individual project credit data If the amount (or concentration) of the resource is excessive, the data generating unit 31 Identify projects that perform types of processing (e.g., resource removal) that can reduce ,Setting a predetermined correction amount (e.g., processing efficiency) for the processing amount of the identified project. .
[0052] In s104, the individual project credit data generating unit 31 Based on the information and the correction amount calculated in s103 (if the process of s103 is executed), Based on this, individual project credit data is generated.
[0053] For example, the individual project credit data generating unit 31 may The correction amount calculated in s103 is added to the included processing amount (for example, by adding or multiplying). The contribution amount is calculated by calculating the individual project credit data. 31 sets the calculated contribution amount to the individual project credit data 100. The individual project credit data generating unit 31 receives the information in s101. Among the projects, certified projects are extracted as candidate projects.
[0054] (Individual project credit data) FIG. 6 is a diagram showing an example of the individual project credit data 100. The project credit data 100 includes the project ID 101 of each candidate project, A target resource 102 is a resource targeted by a candidate project. Effect type 103, which is the type of processing (or its effect) performed on the target resource, and its candidates The target area where the project will be carried out104 and the contributions that the candidate project will achieve It has data on 105 donations.
[0055] The effect type 103 may be, for example, removal of a target resource (from a given location) in a target area, refining of elephant resources, producing other resources or substances using the resources as raw materials (e.g. fertilizer production); A process that uses the target resource less than usual (e.g., a process that uses the resource to a minimum. For example, fertilizer.), etc.
[0056] <Individual project preference calculation process> FIG. 7 is a flow diagram for explaining the details of the individual project preference calculation process s200. The individual inter-project preference calculation process s200 is carried out, for example, by the proposal device 30 receiving a request from the manager. It starts when a specific input is received.
[0057] The individual inter-project preference calculation unit 32 reads the preference rule data 200 (s2 01).
[0058] In addition, the individual project preference calculation unit 32 calculates the individual project preference obtained in s101. From the credit data 100, permutations of two candidate projects (two candidate projects Then, all combinations of the above (with their order distinguished) are generated (s202).
[0059] The individual project preference calculation unit 32 calculates the preference between the two candidate projects generated in s202. Select one of the permutations of the candidate projects and compare the preferences (same resource preferences) of the selected permutation. The preference rule data 200 read in s201 (preference, effect preference, same region preference) The identification is made by referring to the above (s203).
[0060] Specifically, the individual inter-project preference calculation unit 32 calculates each of the preference rule data 200. By referring to the record, the target resource 202, effect type 203, or The condition indicated by the target area 204 is selected above and the two candidate projects generated in s202 are Determine whether each candidate project in the permutation of projects meets the criteria. The inter-object preference calculation unit 32 acquires each preference indicated by the calculation method 205 of the record. The individual project preference calculation unit 32 calculates the current preference for the permutation of the two candidate projects. The obtained preferences are added to the current preference.
[0061] For example, the individual project preference calculation unit 32 calculates the individual project preference between the two candidate projects generated in s202. The effect of the first project (refining) and the second project (E1, E2) in the permutation of The effect (removal) of the project is the effect of the first process of effect type 203 and the effect of the second process of effect type 204. Records corresponding to the effect of the second process ("Refining project -> Removal project") When a record 206 is found, the effect preference ( Get the effect preference of the second (later) project (10). The preference calculation unit 32 calculates the current preference for the permutation of the two candidate projects (E1, E2). The effect preference is added to the preference.
[0062] Next, the individual project preference calculation unit 32 performs the process of s203. It is determined whether there is a permutation of two candidate projects that is not yet completed (s204). If there are two candidate projects that have not been processed in s203 (s204 : YES), the individual project preference calculation unit 32 performs the process of s205 to select the permutation. The order of two candidate projects that have not yet undergone S203 processing is as follows: If there is no column (s204: NO), the individual project preference calculation unit 32 Execute the process.
[0063] In s205, the individual project preference calculation unit 32 calculates the individual project preference by the process up to s204. The calculated preferences are stored in the preference table data 300. The degree calculation process S200 ends.
[0064] (Preference table data) FIG. 8 is a diagram showing an example of the preference table data 300. The preference table data 300 is Row 30 of the first candidate project in the permutation of two candidate projects 1 and the second candidate project column 302. The data includes the preference 303 for the permutation of the complementary projects. The preference for project E2 after project E1 is 30.
[0065] <Project combination generation process> FIG. 9 is a flow diagram for explaining the details of the project combination generation process s300. The object combination generation process s300 is, for example, performed when the proposal device 30 receives a predetermined input from an administrator. It was started as a result of the acceptance of
[0066] The project combination generating unit 33 reads the preference table data 300 (s301).
[0067] The project combination generating unit 33 generates a combination of the candidate projects of the preference table data 300. The candidate project to be carried out following the candidate project (hereinafter referred to as the previous candidate) Identify the combination (permutation of two candidate projects) of the final candidate (hereafter referred to as the final candidate) ( s302).
[0068] For example, the project combination generating unit 33 selects a certain row 301 from the preference table data 300. A record is acquired, and among the preferences 303 of each column 302 set in the acquired record, The column 302 with the highest preference is identified.
[0069] In addition, when the maximum preference is 2 or more, the project combination generating unit 33 selects a combination of projects according to a predetermined rule. According to the rules (e.g., rules regarding project IDs), only one column 302 is specified. In addition, the project combination generating unit 33 sets the combination of the highest preference 303 in the column 302. The candidate project in question is the candidate project in the row 301 from which the record was obtained (i.e. If the candidate is the same as the previous candidate, then that column 302 may be selected.
[0070] The project combination generation unit 33 generates a plurality of permutations based on each permutation identified in s302. The sequence of the candidate projects is used to find a pattern (i.e., a proposal flow) that will result in a cycle of candidate projects. Then, the project combination generating unit 33 searches for the searched pattern (s303). Each candidate project that constitutes the project combination is selected from the processing targets of the project combination generation process s300. In addition, the project combination generating unit 33 excludes candidate projects from the list of candidates when the candidate projects are completely circulated. Even if the pattern does not exist, it is recommended to search for patterns that have a certain degree of circulation. Do not interfere.
[0071] The project combination generation unit 33 is a processing target of the project combination generation process s300. It is determined whether or not there is a candidate project remaining (s304). If there is any remaining (s304: YES), the project combination generating unit 33 performs the process of s302. If there are no candidate projects remaining (s304: NO), the process is repeated. The combination generating unit 33 executes the process of s305.
[0072] In s305, the project combination generating unit 33 selects the proposals searched for in the process up to s304. Calculate the contribution to the proposal flow.
[0073] Specifically, first, the project combination generating unit 33 selects the proposed flow searched in s304. The contributions Ci of the n candidate projects i that make up the project i are summed up to obtain the total contribution C(=C1 +C2+···+Cn). Then, the project combination generation unit 33 calculates the contribution amount The total value C of the above is corrected by calculating predetermined parameters related to the candidate projects.
[0074] For example, the project combination generating unit 33 may set the importance parameters of the resources targeted by the proposed flow. Metric R (e.g., importance or criticality, which indicates the degree to which biogeochemical cycles should be made efficient) The total contribution amount C is multiplied by the quantity (R(C1+C2+···+Cn)). The importance parameter R is, for example, The self-sufficiency rate of each resource in the region, or the economic impact (lost profits, etc.) of a shortage of each resource, etc. Calculation is based on the above.
[0075] In addition, for example, the project combination generating unit 33 may determine whether the proposed flow is a complete circulation flow of resources. Whether or not the object is a topological object is determined by judging whether or not topological sorting is possible, and Alternatively, the project combination generating unit 33 sets a parameter L indicating the result of the proposed Calculate the parameter L, which indicates the degree of circulation of the plan flow. Then, generate project combinations. The unit 33 uses the parameter L to correct the total contribution amount C (L(C1+C2+ + Cn)). Note that this parameter L is the value chain of the candidate projects. This is a parameter that indicates the strength of the signal.
[0076] Also, for example, the project combination generation unit 33 may select each candidate project that constitutes the proposed flow. Based on the attributes of the projects or the relationships between consecutive candidate projects, the total contribution amount C may be corrected.
[0077] For example, the proposal device 30 may be configured to indicate the business execution capabilities of the business operators who will carry out each candidate project. Information (hereinafter referred to as node strength. For example, the number of past projects, capital, etc.) Financial information) is stored in advance or acquired from the individual project implementer device 10. The proposal device 30 receives information indicating the strength of the relationship between businesses (hereinafter, referred to as link strength). For example, , information on capital relations.) are stored in advance or obtained from the individual project implementer device 10.
[0078] Then, the project combination generating unit 33 generates a project combination for the proposed flow based on the node strength. The strong connectivity of the candidate projects required to break the connectivity of the proposed flow is a parameter, V( In addition, the project combination generation unit 33 calculates the number of projects based on the node strength. The parameter A related to the proposed flow is the effective edge strong connectivity (to make the proposed flow less connected). Then, calculate the number of adjacent candidate projects required to The match generation unit 33 uses the vertex strong connectivity V and the effective edge strong connectivity A to calculate the total contribution C. Correct ((V×m+A×n)(C1+C2+C3+···). m and n are V and A, respectively. A coefficient that represents the weight of .
[0079] Furthermore, the proposal device 30 calculates the contribution amount Ci based on the economic benefit from the execution of the proposal flow. In other words, the proposing device 30 may calculate the associated reference value (s306). The amount of revenue of the business operator from implementing the project (recurring revenue) and the number of candidate projects The total amount of sales (total sales) from all business activities of the business using the target resource is calculated as the forecast. The project execution device 10 stores the project execution information and acquires it from the individual project execution device 10. The generation unit 33 generates a sales ratio (cycle ratio) as a reference value for each candidate project in the proposed flow. Calculate (circular sales) / (total sales).
[0080] This allows each company to decide on its own project even if there are multiple candidate projects with the same contribution amount. It is possible to understand that the economic value of candidate projects differs depending on the scale of business. Note that the sales ratio shown here is just an example, and other economic indicators may also be used. good.
[0081] Next, the output unit 34 outputs the proposed flow identified in s303 and the contribution calculated in s305. A designated screen that displays the donation amount (and reference value) as information on projects to be invested in (hereinafter referred to as the investment proposal screen) is output to a predetermined device (for example, the investor device 40).
[0082] (Investment proposal screen) 10 is a diagram showing an example of an investment proposal screen. This investment proposal screen 1000 shows Information about each candidate project that constitutes the proposal flow in which the 01. In addition, the investment proposal screen 1000 has a display area 1001 between which the A cyclical figure (a circle in this figure) is formed by a predetermined connecting figure 1002 (an arrow in this figure). It is drawn.
[0083] The investment proposal screen 1000 also displays the contribution amount 1003 in the entire proposal flow. In addition, the display area 1001 for each candidate project displays the contribution amount and and the reference value 1004 is displayed.
[0084] The output unit 34 outputs an investment flow indicating the candidate projects that were not specified as the proposed flow. A proposal screen may be output.
[0085] Figure 11 is an example of an investment proposal screen showing candidate projects that were not identified as proposed flows. This is a diagram showing an example of an investment proposal screen 1100. Information about the project 1101 is displayed.
[0086] As described above, the proposed device 30 of this embodiment processes the specified resources (nitrogen, phosphorus, potassium). The individual business credit data, which is the information on the projects managed by the (individual project credit data 100) and resources (nitrogen, phosphorus, potassium) Data showing the relationship between multiple processes for each task (preference rule data 200) Based on the credit data, any one of the above projects A flow of a project consisting of a predetermined resource (candidate project), and outputting information indicating the generated proposed flow to an output device. .
[0087] That is, the proposal device 30 of this embodiment circulates a predetermined resource based on the information of each project. This allows you to generate and present a project flow that , and a combination of projects that promote resource circulation, e.g. biogeochemical circulation. For example, the investment proposal for such a combination of projects can be Combinations of products can be suggested.
[0088] As described above, according to the proposal device 30 of the present embodiment, actions that promote the circulation of resources can be implemented. The company can make proposals for the
[0089] In addition, the proposed device 30 of this embodiment is capable of analyzing the resources of each process in two processes that are performed consecutively. A proposed flow is generated based on preferences indicating the contribution of the source to the circulation.
[0090] In this way, we generate a proposed flow based on the preference for two consecutive processes. This will promote more efficient resource circulation.
[0091] In addition, the proposal device 30 of this embodiment uses data on the area where the project-related processing is performed. Generate individual business credit data including Based on the same-region preference, which indicates the contribution when the two are the same, and the individual business credit data, , generate a proposed flow.
[0092] In this way, by using the same-area preference, it is possible to propose a framework that circulates resources in the same area. This allows the generation of a law that can be used to, for example, identify situations where resources are unevenly distributed in a particular region. In a situation where circulation is insufficient, promote circulation of resources in the area and eliminate uneven distribution. It is possible.
[0093] In addition, the proposal device 30 of the present embodiment provides individual data including data on the type of processing related to the project. Generate separate transaction credit data and correspond to the sequence and type of two consecutive transactions. Based on the effect preference, which indicates the contribution of the project to the total amount of the project, and the individual business credit data, the proposal flow is Generate.
[0094] In this way, by using effect preference, we can organize the types of treatments that promote resource circulation. This will promote a more efficient circulation of resources. It is possible.
[0095] In addition, the proposal device 30 of the present embodiment provides information indicating the economic benefits of implementing the project. (In this embodiment, the sales ratio) is generated and output.
[0096] This makes it possible to present information regarding the proposed flow from an economic perspective.
[0097] In addition, the proposal device 30 of this embodiment is Calculate the contribution of resources processed by the proposed flow based on the data of the contribution, which is the amount of Information indicating the calculated contribution amount is output.
[0098] In this way, by presenting the information on the resource throughput of the proposed flow, You can know the extent to which you contribute to resource circulation.
[0099] In addition, the proposed device 30 of this embodiment has the characteristics of processing in individual business credit data. The parameters that represent the weighting parameter R, the parameter L, the strong vertex connectivity V, and the strong edge connectivity A ) and correct the contribution amount based on the calculated parameters.
[0100] This allows the proposed flow for resource circulation to be more clearly understood based on the actual situation of resource circulation or economic circumstances. For example, by using the strong connectivity of points V, It is also possible to consider the risk that the proposed flow will not be established if a small number of businesses in the area go out of business. By using the strong connectivity of effective edges, A, the number of partnerships between businesses in the proposed flow is reduced. This allows consideration of the risk that the proposed flow will not be established due to the cancellation of the loop.
[0101] The resource related to the proposed device 30 of this embodiment is a pollutant. This makes it possible to prevent various types of environmental pollution caused by uneven distribution or retention of pollutants.
[0102] The resources related to the proposed device 30 of this embodiment are nitrogen, phosphorus, or potassium. This may result in, for example, damage to the fertility of oceans, rivers, lakes, etc., due to the excess of these substances. Prevention of fertility, adverse effects on fishery resources, or agricultural production due to the lack of these substances. This can prevent a decline in strength (insufficient fertilizer supply).
[0103] The present invention is not limited to the above-described embodiment, and may be modified without departing from the spirit and scope of the present invention. The present invention can be implemented using any desired components. The above-described embodiments and modifications are merely examples. The present invention is not limited to these contents as long as the characteristics of the invention are not impaired. Although various embodiments and modifications have been described above, the present invention is not limited to these. Other embodiments that are conceivable within the scope of the technical concept of the present invention are also included in the present invention. Included in the range.
[0104] For example, some of the hardware included in each device of this embodiment may be provided in another device. .
[0105] In addition, each program of each device may be provided in another device, or a certain program may be provided in multiple devices. It may consist of several programs, or several programs may be integrated into one program. Good too.
[0106] In this embodiment, the proposal system 1 is a system for making proposals to investors. However, this is not limited to investors, but may also include, for example, those involved in the promotion of biogeochemical cycles. It may also be a system that provides information to the general public.
[0107] In addition, the resources targeted by the proposed system 1 are nitrogen, phosphorus, and potassium, which are mainly described in this embodiment. It is not limited to pollutants, but can be applied to pollutants in general, or to any resource circulating in a given area. It is possible.
[0108] In addition, the contents of the project (contents, types, etc. of processing) described in this embodiment are merely examples. , may include any business content.
[0109] The contents of the preference rule data 200 described in this embodiment are merely examples. For example, Preference-based rules regarding project execution entities may be established.
[0110] In addition, in the individual project credit data generation process s100 described in this embodiment, The method of calculating the contribution amount is one example. For example, the transportation process of resources, the specific accuracy of resources, Other factors such as the manufacturing method, the type of material produced from the resource, etc. may also be taken into account. Investor Relations (IR) information, especially environmental performance data, can be used. Cut.
[0111] In addition, the candidate projects in the project combination generation process s300 described in this embodiment How to identify the combination of projects (proposed flow) (Top trading cycle mechanism The application of the recycling system is one example, and the composition of candidate projects that can realize (part of) resource circulation is Any algorithm capable of finding permutations may be employed. [Explanation of symbols]
[0112] 1 Proposal system, 30 Proposal device, 200 Preference rule data, 300 Preference table data data, 100 individual project credit data
Claims
1. A storage device for storing rule data which is data indicating a relationship between a plurality of processes for a resource. Placement, and Individual business credit data, which is information on business that processes a specified resource, is collected for multiple businesses. An individual business credit data generation process; Based on the rule data and the generated individual business credit data, A flow of a task that is composed of any two or more tasks among the tasks, A task combination generation process for generating a proposed flow, which is a task flow to be circulated; an output process of outputting information indicating the generated proposed flow to an output device; The proposed device comprises a computing device for executing the above.
2. The storage device stores, as the rule data, each process in two processes that are performed successively. storing preferences indicative of the contribution of the management to the circulation of said resources; In the business combination generation process, a business combination is generated based on the preference. generating a proposed flow in which the preference of the process in the proposed flow exceeds a predetermined contribution; The proposal device according to claim 1 .
3. The storage device stores two consecutive processes as preferences in the rule data. storing a same-area preference indicating a contribution when the process is performed in the same area; In the individual business credit data generation process, the arithmetic unit generating data including data on the area where the processing is performed as git data; In the business combination generation process, the same region preference and the generated process Based on the data of the area in which the process is carried out, the preference of the process in the circulation of the predetermined resource is set to a predetermined value. Generate proposal flows that exceed contributions, The proposal device according to claim 2 .
4. The storage device stores two consecutive processes as preferences in the rule data. storing effect preferences indicating contributions corresponding to the order and type of processes; In the individual business credit data generation process, the arithmetic unit generating data of the type of processing as git data; In the task combination generation process, the effect preference and the type of the generated process Based on the data, the preference of the treatment in the circulation of the predetermined resource exceeds a predetermined contribution. Generate the proposed flow; The proposal device according to claim 2 .
5. The computing device, in the task combination generation process, Generate information indicative of profits; In the output process, information indicating the generated economic profit is output. The proposal device according to claim 1 .
6. In the individual business credit data generation process, the arithmetic unit As git data, data on the amount of contribution, which is the amount of the specified resource processed by the process. for the plurality of tasks, In the business combination generation process, the proposed flow is generated, and The contribution amount of the predetermined resource processed by the proposed flow generated by Calculated based on data, In the output process, information indicating the calculated contribution amount is output. The proposal device according to claim 1 .
7. The arithmetic device, in the task combination generation process, Calculating a parameter representing a characteristic of the processing in the individual business credit data; Correcting the contribution amount based on the obtained parameters. The proposal device according to claim 6.
8. The storage device stores a rule data that indicates a relationship between a plurality of treatments for a contaminant. The data is stored, The computing device includes: In the individual business credit data generation process, information on the business of treating a specific pollutant is Generate individual business credit data, which is information on multiple businesses, In the task combination generation process, the rule data and the generated individual task classes are Based on the credit data, the system is configured by any one of the plurality of businesses. A proposed flow is a flow of work for circulating the specified pollutant. Generate The proposal device according to claim 1 .
9. The storage device stores data indicating relationships between multiple treatments for nitrogen, phosphorus, or potassium. storing rule data, The computing device includes: In the individual business credit data generation process, nitrogen, phosphorus, or potassium is processed. Generate individual business credit data, which is information on the businesses to be managed, for each of the multiple businesses; In the task combination generation process, the rule data and the generated individual task classes are Based on the credit data, the system is configured by any one of the plurality of businesses. A process flow for circulating the nitrogen, phosphorus, or potassium. Generate the proposed flow; The proposal device according to claim 8.
10. A computing device and rule data that indicates the relationship between multiple processes on resources A proposed method for an information processing device including a storage device for storing data, the calculation device comprising: Individual business credit data, which is information on business that processes a specified resource, is collected for multiple businesses. An individual business credit data generation process; Based on the rule data and the generated individual business credit data, A flow of a task that is composed of any two or more tasks among the tasks, A task combination generation process for generating a proposed flow, which is a task flow to be circulated; an output process of outputting information indicating the generated proposed flow to an output device; A proposed method for carrying out the above.
Citation Information
Patent Citations
Device and method for supporting process designing
JP2002041749A
Tool for supporting construction of on-site system
JP2008284504A
Retrieving and repolymerizing textile fibers
US20210246581A1
Information processing device, information processing method, program, and information processing system
JP7138390B1