Information processor

The information processing device predicts catalyst lifespan in oil refining processes, enhancing efficiency by scheduling maintenance and optimizing operations based on catalyst deterioration models.

JP2024146372APending Publication Date: 2024-10-15ENEOS CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023059222
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Existing catalysts in oil refining processes reach the end of their lifespan unpredictably, leading to unscheduled maintenance and inefficiencies in oil production, necessitating a method to predict catalyst lifespan and adjust operating conditions accordingly.

Method used

An information processing device that utilizes a deterioration model and life prediction data to forecast catalyst lifespan, generating evaluation information for optimal operation and maintenance scheduling.

Benefits of technology

Enables efficient oil production by accurately predicting catalyst lifespan and adjusting plant operations, reducing unscheduled maintenance and optimizing catalyst utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024146372000001_ABST
    Figure 2024146372000001_ABST
Patent Text Reader

Abstract

To produce efficiently, product oil.SOLUTION: There is provided an information processor which supports operation of a plant device which passes raw material oil to a catalyst for acquiring product oil, the information processor comprises: a storage part for storing, a target operation time limit of the plant device, and a deterioration model which is generated on the basis of operation actual data which is a history in time series of the operation information indicating an operation state of the plant device; a data acquiring part for acquiring operation scheduled data which is a schedule in time series of the operation information; a service life prediction data generation part for generating service life prediction data which predicts a service life of the catalyst, on the basis of the deterioration model and the acquired operation scheduled data; and an evaluation information generation part for generating evaluation information related to an operation state of the plant device in the target operation time limit, on the basis of the generated service life prediction data and the target operation time limit.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to an information processing device. [Background technology]

[0002] Petroleum is refined from crude oil. Crude oil contains about 5% or less sulfur. Sulfur-containing compounds can become sulfurous acid gas when burned, which can worsen the atmospheric environment, and can also cause deterioration of petroleum products, corrosion of equipment, catalyst poisoning, etc. For this reason, petroleum is refined through a desulfurization process in which impurities such as sulfur are removed. The catalyst used in desulfurization has a lifespan due to deterioration caused by the desulfurization process. This lifespan varies depending on various conditions, such as the amount of crude oil in the tank that processes the crude oil, the amount of catalyst, and the temperature. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] International Publication No. 2018 / 117154 Summary of the Invention [Problem to be solved by the invention]

[0004] If a catalyst reaches the end of its life before the scheduled date for shutting down the operation of a plant device based on a maintenance plan, etc., it becomes necessary to carry out unscheduled catalyst replacement for the plant device, making it impossible to efficiently produce refined oil. Therefore, it is desirable not only to predict the life of a catalyst used in a plant device, but also to enable a user to grasp the need for changes to the operating conditions, etc., of the plant device based on the prediction results.

[0005] The present disclosure has been made in consideration of such problems, and has a purpose to provide an information processing device that can efficiently produce refined oil. [Means for solving the problem]

[0006] The information processing device disclosed herein is an information processing device for supporting the operation of a plant equipment that obtains a refined oil by passing a raw material oil through a catalyst, and includes a memory unit that stores a target operating deadline of the plant equipment and a deterioration model generated based on operating performance data, which is a time-series history of operating information that represents the operating status of the plant equipment, a data acquisition unit that acquires operating plan data, which is a time-series plan of the operating information, a life prediction data generation unit that generates life prediction data for predicting the life of the catalyst based on the deterioration model and the acquired operating plan data, and an evaluation information generation unit that generates evaluation information regarding the operating state of the plant equipment at the target operating deadline based on the generated life prediction data and the target operating deadline. Effect of the Invention

[0007] According to the present disclosure, refined oil can be produced efficiently. [Brief description of the drawings]

[0008] [Figure 1] 1 is a diagram illustrating an example of a configuration of an entire system including an information processing system and a plant device according to an embodiment; [Diagram 2] FIG. [Diagram 3] FIG. 1 is a diagram illustrating an example of a hardware configuration of an information processing apparatus according to an embodiment. [Figure 4] 13 is a diagram showing an example in which some of the actual values ​​of the deterioration degree for each operating time calculated from the first operating result data are plotted in a coordinate system in which the horizontal axis represents time and the vertical axis represents the deterioration degree. [Diagram 5] 5 is a diagram showing an example in which the actual values ​​of the degradation degrees shown in FIG. 4 are corrected. [Figure 6] FIG. 1 is a diagram illustrating an unstable period. [Figure 7] FIG. 13 is a diagram showing an example of catalyst deterioration prediction data including a predicted value of a deterioration degree calculated from an intrinsic catalyst deterioration function and operation schedule data for a second operating period. [Figure 8] FIG. 11 is a diagram showing an example of temperature prediction data. [Figure 9]FIG. 13 is a diagram showing an example in which the upper limit operating temperature, the target operating deadline, the number of operating days until the present, the time when the catalyst temperature will reach the upper limit operating temperature, and the actual measured value of the catalyst temperature are displayed in a coordinate system common to the temperature prediction data. [Figure 10] FIG. 4 is a diagram showing an example of evaluation information. [Figure 11] FIG. 11 is a diagram showing an example of evaluation information updated from the state shown in FIG. 10; [Figure 12] FIG. 11 is a diagram showing another example of evaluation information. [Figure 13] 10 is a flowchart showing an example of processing of an information processing device according to an embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, the embodiments of the present disclosure will be described with reference to the drawings. The drawings are simplified, and configurations necessary for implementation other than those shown in the drawings are appropriately provided. Furthermore, when the terms "first", "second", etc. are used in this specification or claims, unless otherwise specified, they do not represent any order or importance, but are used to distinguish one configuration from another.

[0010] <Overall composition> FIG. 1 is a block diagram showing an example of an overall configuration including an information processing system 1 and a plant device 500 according to this embodiment.

[0011] As shown in Fig. 1, the information processing system 1 includes an information processing device 100, a data collection device 200, a user terminal 300, and a network 400. The information processing device 100, the data collection device 200, and the user terminal 300 are connected to each other via the network 400 so as to be able to communicate with each other. The data collection device 200 is connected to a plant device 500 so as to be able to communicate with each other via a wired or wireless connection. One or more user terminals 300 are provided. The information processing system 1 is a system that supports the operation of the plant device 500.

[0012] The plant unit 500 is an oil refining unit (first plant unit) that passes a feed oil through a catalyst to obtain a product oil. The plant unit 500 is installed, for example, in an oil refining plant. Although only one plant unit 500 is shown in FIG. 1, a plurality of plant units 500 may be installed. The plant unit 500 may be a group of units that perform various processes required to obtain a desired product oil.

[0013] The plant equipment 500 is not particularly limited as long as it uses a catalyst, and examples thereof include a hydrodesulfurization equipment that refines petroleum fractions containing impurities such as sulfur using a hydrodesulfurization method in which the petroleum fraction containing impurities such as sulfur is reacted with hydrogen in the presence of a catalyst, and an equipment using a fixed-bed catalytic reactor in which catalytic particles are fixedly packed and a catalytic reaction is performed. An appropriate catalyst is selected for use in the plant equipment 500 depending on the type of the plant equipment 500. For example, when a desulfurization equipment is used as the plant equipment 500, a desulfurization catalyst is selected as the catalyst. In the following description, the plant equipment 500 is mainly assumed to be a desulfurization equipment, but is not limited thereto.

[0014] In the present disclosure, the "operating period" corresponds to the period from the start of a process using a catalyst to the end of the process using the catalyst in a catalyst-filled plant equipment 500. In other words, the "operating period" is the period during which the plant equipment 500 continues to operate using the same catalyst.

[0015] FIG. 2 is a diagram showing an example of an operating period. In the example shown in FIG. 2, the operating period has a first operating period and a second operating period. The second operating period is an operating period different from the first operating period and is an operating period after the first operating period has elapsed. The switch from the first operating period to the second operating period occurs, for example, when the catalyst filled in the plant equipment 500 is replaced with a new catalyst after the operation of the plant equipment 500 in the first operating period has ended, and the plant equipment 500 is operated again. The first operating period is, for example, an operating period that has ended in the past. The second operating period is, for example, an operating period that is still ongoing and has not yet ended.

[0016] Returning to FIG. 1, the operating conditions and other operating status of the plant equipment 500 may be appropriately changed during the operating period by user operation or automatic control, for example, in order to maintain the oil refining process expected of the plant equipment 500.

[0017] The plant equipment 500 is provided with one or more measuring devices that measure state quantities that indicate the operating status of the plant equipment 500. The types of measuring devices provided in the plant equipment 500 are not particularly limited, and examples thereof include a thermometer, a pressure gauge, a vibration meter, a flow meter, a tachometer, an ammeter, and a voltmeter. Measurement values ​​such as temperature, pressure, vibration, flow rate, rotation speed, current value, and voltage value measured by the measuring devices, and various signals that indicate the operating status of the plant equipment 500, such as start, stop, and operating load, are transmitted from the plant equipment 500 to the data collecting device 200 every moment. The various measurement values ​​and various signals constitute a part of the operating performance data described below.

[0018] The network 400 is configured as a communication network including, for example, the Internet, a LAN (Local Area Network), a WAN (Wide Area Network), and various mobile communication systems configured by wireless base stations (not shown). Examples of the mobile communication system include mobile communication systems such as 3G, 4G, and 5G, LTE (Long Term Evolution), and wireless networks (for example, Wi-Fi (registered trademark)) that can be connected to the Internet via a predetermined access point.

[0019] The user terminal 300 is an information processing terminal used by a user. The user terminal 300 is a device for transmitting and receiving various data to and from the information processing device 100 or the data collection device 200. The user terminal 300 is installed depending on the place where the user works, for example, at a head office, a research laboratory, a refinery, or at home in the case of remote work.

[0020] The user terminal 300 may be equipped with an application for exchanging data or information with the information processing device 100 or the data collection device 200. The user terminal 300 may exchange data or information with the information processing device 100 or the data collection device 200 on a web browser basis.

[0021] The data collection device 200 acquires and manages various data used in the information processing device 100 from the user terminal 300 or the plant device 500. The data collection device 200 stores the acquired data in a database 210 inside the data collection device 200. For example, the data collection device 200 transmits various data to the information processing device 100 in response to a request from the information processing device 100. Note that the database 210 may be provided in a device external to the data collection device 200. In this case, the externally provided database and the data collection device 200 may be connected to each other in a wired or wireless manner so as to be able to communicate with each other.

[0022] The data collection device 200 may assign an ID for identifying an operating period to the acquired operating performance data. By assigning an ID, it is possible to easily distinguish the operating period (first operating period, second operating period) to which the operating performance data belongs. In addition, the data collection device 200 may acquire and manage data generated by the information processing device 100.

[0023] The information processing device 100 is a device for supporting the operation of the plant equipment 500. The information processing device 100 acquires various data from the data collection device 200 and the user terminal 300. The information processing device 100 generates evaluation information on the operating state of the plant equipment 500 based on the acquired various data. The information processing device 100 transmits the generated evaluation information to the user terminal 300, for example.

[0024] The information processing device 100 may directly acquire and manage various data transmitted from the user terminal 300 or the plant device 500. In this case, the information processing device 100 realizes the function of the data collection device 200, so that the information processing system 1 can omit the data collection device 200.

[0025] <Hardware configuration> FIG. 3 is a diagram showing an example of a hardware configuration of the information processing device 100 according to the present embodiment.

[0026] 3, the information processing device 100 includes a processor 1001, a memory 1002, a storage device 1003, an input device 1004, a display device 1005, and a communication device 1006. The information processing device 100 is configured as a computer device including a bus connecting these devices. The information processing device 100 may be configured to include one or more of the devices shown in FIG. 3, or may be configured to exclude some of the devices.

[0027] The processor 1001 performs arithmetic processing of various data and controls the information processing device 100 including the display device 1005 etc. The processor 1001 may be configured by a central processing unit (CPU) including an interface with peripheral devices, a control device, an arithmetic unit, a register etc. The processor 1001 reads out programs etc. required for executing processing in the information processing device 100 from at least one of the storage device 1003 and the communication device 1006 into the memory 1002 and executes processing according to these.

[0028] The memory 1002 is a computer-readable storage medium, and may be composed of at least one of, for example, a read only memory (ROM), an erasable program ROM (EPROM), an electrically erasable program ROM (EEPROM), a random access memory (RAM), etc. The memory 1002 stores various data, and stores programs (program codes) and the like required for executing processes in the information processing device 100.

[0029] The storage device 1003 is a non-transitory computer-readable storage medium, and is configured, for example, by a hard disk drive, a solid state drive, or the like. The storage device 1003 stores various programs and various data necessary for executing processing in the information processing device 100, including the program according to this embodiment, and data resulting from processing. The non-transitory computer-readable storage medium may also be configured by at least one of a magnetic tape, a flexible disk, an optical disk, a digital versatile disk, a magneto-optical disk, a memory card, a USB memory, and the like. The storage device 1003 may also be called an auxiliary storage device.

[0030] The input device 1004 is an input device (e.g., a keyboard, a mouse, etc.) that accepts input from the outside. The display device 1005 is a display device (e.g., a display, etc.) that outputs to the outside. The input device 1004 and the display device 1005 may be integrated into one (e.g., a touch panel).

[0031] The communication device 1006 is hardware (transmission / reception device) for performing communication between computers via at least one of a wired network and a wireless network. The communication device 1006 is also called, for example, a network device, a network interface card, a network controller, a network module, a communication module, etc. The communication device 1006 transmits and receives various data to and from, for example, the data collection device 200 and the user terminal 300.

[0032] The information processing device 100 may be configured to include hardware such as a microprocessor, a digital signal processor (DSP), an application specific integrated circuit (ASIC), a programmable logic device (PLD), and a field programmable gate array (FPGA), and some or all of the functional blocks described below may be realized by the hardware. For example, the processor 1001 may be implemented using at least one of these pieces of hardware.

[0033] The information processing device 100 can be realized using a dedicated or general-purpose server computer. The information processing device 100 may be configured from a single information processing device, or may be configured from multiple information processing devices distributed over a communication network. FIG. 3 shows only a part of the main hardware configuration of the information processing device 100, and the information processing device 100 may have other configurations that a server generally has. The hardware configurations of the data collection device 200 and the user terminal 300 may also have the same configuration as the information processing device 100.

[0034] <Functional configuration of information processing system 1> FIG. 1 also illustrates an example of a functional configuration of the information processing system 1.

[0035] As shown in FIG. 1, the information processing device 100 includes a processing unit 110, a storage unit 120, and a communication unit 130 as functional configurations. The information processing device 100 may further include an input unit through which a user inputs data and a display unit that displays data to a user, not shown. The information processing device 100 may receive user instruction data from the input unit in addition to the user terminal 300. The information processing device 100 may also display data resulting from processing by the processing unit 110 on the display unit. These functional configurations are realized by the processor 1001 reading a program into the memory 1002 and executing it. Note that a program that implements at least some of the functions of these functional configurations may be installed in a storage device in multiple storages. The processors of multiple computers may fulfill the functions of multiple functional configurations by reading a program installed in their own machines into the memory and executing it. That is, the functions of multiple functional configurations may be distributed and executed by multiple computers.

[0036] Each function of the data collection device 200 and the user terminal 300, like each function of the information processing device 100, can be realized by loading predetermined software (programs) onto the hardware.

[0037] The data collection device 200 functions as a data server including a database 210 that acquires, stores, provides, and manages various data such as operation record data related to the plant equipment 500 .

[0038] The user terminal 300 includes, as its functional components, a display unit 310 and an input unit 320 .

[0039] The display unit 310 can display, for example, an input screen for inputting data to be used in the information processing device 100. The data input by the input unit 320 is transmitted to the information processing device 100 or the data collection device 200 as, for example, various instruction data, driving record data, driving schedule data, and the like.

[0040] The display unit 310 can display a setting screen for setting the operation of the information processing device 100. The user can check the operation settings of the information processing device 100 through the setting screen displayed on the user terminal 300. The user can also change the operation settings of the information processing device 100 through the setting screen by inputting new operation settings through the input unit 320. The user can change operation settings such as the type of information included in the evaluation information, the timing of generating the evaluation information, and the timing of the information processing device 100 acquiring various data.

[0041] The display unit 310 can display a confirmation screen for confirming various data generated by the information processing device 100. The display unit 310 displays, for example, evaluation information on the confirmation screen. For example, the user can confirm the operating state of the plant equipment 500 and the life of the catalyst based on the information displayed on the display unit 310. Note that the input screen, setting screen, and confirmation screen displayed on the display unit 310 may be a common screen or may be separate screens.

[0042] <Functional configuration of information processing device 100> The communication unit 130 is a communication interface in the information processing device 100, and is connected to the network 400 via an access line. The communication unit 130 communicates with the user terminal 300 or the data collection device 200 via the network 400. The communication unit 130 performs various protocol processing required for communication with the user terminal 300 or the data collection device 200. Examples of the processing of various protocols include processing of the physical layer, data link layer, internet layer, and transport layer. The communication unit 130 may transfer data to be transmitted and received between the OS or application of the processing unit 110.

[0043] The storage unit 120 stores various data. The storage unit 120 may store various data acquired, calculated, or generated by the processing unit 110. The storage unit 120 may store various data, such as, for example, operation performance data, operation schedule data, device data, reference catalyst deterioration function, specific catalyst deterioration function, life prediction data, threshold data, and message data. The above-mentioned various data may be stored in the storage unit 120 in advance. Below, details of representative various data that may be stored in the storage unit 120 will be described.

[0044] The operating performance data is data including operating information that indicates the operating status of the plant equipment 500. The operating performance data is time-series data related to the time-series history of the operating information of the plant equipment 500. The operating performance data is data including, for example, operating information for each operating time (operating time). In the present disclosure, the operating performance data related to the first operating period may be referred to as first operating performance data, and the operating performance data related to the second operating period may be referred to as second operating performance data.

[0045] The operating information includes, for example, measurement values ​​and signals obtained from each measuring instrument installed in the plant equipment 500, values ​​and qualitative information regarding the raw oil that can be obtained by measurement methods known in the oil refining field, values ​​and qualitative information regarding the produced oil that can be obtained by measurement methods known in the oil refining field, and values ​​calculated from these values.

[0046] The operating information includes, for example, at least one of information on operating conditions, information on the properties of the feedstock oil, information on the properties of the product oil, and information on the catalyst, etc. In the present disclosure, the information on operating conditions, information on the properties of the feedstock oil, and information on the properties of the product oil may be referred to as basic information.

[0047] The information on the operating conditions includes, for example, at least one of the catalyst temperature (temperature inside the reaction vessel), the feed oil throughput, the pressure inside the reaction vessel, the reactant gas partial pressure, the reactant gas supply amount, etc. When the reactant gas is hydrogen, the information on the operating conditions may further include information on the hydrogen partial pressure, the hydrogen supply amount, the hydrogen-to-oil ratio (the hydrogen supply amount per feed oil throughput amount), the hydrogen gas components, etc. Note that the hydrogen gas components are useful information from the viewpoint of predicting the catalyst life, since impurities other than hydrogen (e.g., hydrogen sulfide gas, ammonia gas, etc.) lead to catalyst deterioration.

[0048] The information on the properties of the feedstock oil includes, for example, at least one of the sulfur concentration of the feedstock oil, the metal concentration of the feedstock oil, the ratio of the feedstock oil (the composition ratio of the base materials that make up the feedstock oil), the aromatic concentration of the feedstock oil, etc. The information on the properties of the finished oil includes, for example, at least one of the sulfur concentration of the finished oil, the metal concentration of the finished oil, etc.

[0049] The information on the catalyst includes, for example, at least one of a deterioration degree actual value, a deterioration degree correction value, etc. The deterioration degree actual value and the deterioration degree correction value are examples of values ​​calculated based on, for example, basic information. The calculation method of the deterioration degree actual value and the deterioration degree correction value will be described later in detail.

[0050] The operation schedule data is data including operation information scheduled for the plant equipment 500. The operation schedule data is, for example, time-series data regarding the schedule of operation information in the second operation period. The operation schedule data includes, for example, at least one of information regarding operating conditions, information regarding the properties of the feedstock oil, and information regarding the properties of the product oil. The operation schedule data includes, for example, values ​​of operation information corresponding to input variables of the intrinsic catalyst deactivation function.

[0051] The value of the operation information included in the operation schedule data may be set for each operation time, or may be set commonly for the entire second operating period. The value of the operation information included in the operation schedule data may be different from the value of the operation information actually applied to the plant equipment 500 in the second operating period, or may be different from the value of the operation information actually scheduled for the plant equipment 500 in the second operating period. The operation schedule data may be appropriately changed (updated) during the second operating period by receiving it from the user terminal 300, for example.

[0052] The reference catalyst deterioration function is a function that serves as a reference for estimating the deterioration degree of the catalyst. The reference catalyst deterioration function is calculated according to the type of catalyst used in the plant device 500. The reference catalyst deterioration function is used to generate a specific catalyst deterioration function (an example of a deterioration model) described later.

[0053] The reference catalyst deterioration function is a function derived from existing knowledge or experiments. The reference catalyst deterioration function is derived using at least one of technical information such as theoretical formulas described in literature, knowledge of the properties of the produced oil and the deterioration degree of the catalyst under various operating conditions obtained through the use of the plant equipment 500, knowledge of the properties of the produced oil and the deterioration degree of the catalyst under various operating conditions obtained through the use of the experimental equipment of the plant equipment 500, and knowledge of the properties of the produced oil and the deterioration degree of the catalyst under various operating conditions obtained through the use of other oil refining equipment having the same function as the plant equipment 500. The experimental equipment of the plant equipment 500 is, for example, a test equipment that is relatively small in scale compared to the plant equipment 500, and is an equipment that can collect data necessary for the operation of the plant equipment 500 at a lab scale, bench scale, or pilot scale. In addition, other refinery equipment having functions equivalent to those of plant equipment 500 includes, for example, when the plant equipment 500 installed in the plant is a hydrodesulfurization equipment, other hydrodesulfurization equipment installed in the plant, hydrodesulfurization equipment installed in other plants, etc.

[0054] In this embodiment, an example of a function that regresses an output variable with an input variable is shown as the reference catalyst deterioration function, but other types of models such as a neural network may be used. In the case of a neural network, the operating time and the input variables are values ​​given to the input nodes, the parameters are, for example, weighting coefficients between nodes, and the deterioration degree corresponds to a value output from the output node.

[0055] The reference catalyst deterioration function is, for example, a function including an input variable, a deterioration contribution parameter, and an output variable. Note that the reference catalyst deterioration function may include parameters other than the deterioration contribution parameter. Since the reference catalyst deterioration function is, for example, a function derived from existing knowledge or experiments, it may include fixed parameters that are determined in advance by existing knowledge or experiments.

[0056] The input variables are, for example, values ​​of basic information included in the operation performance data. Examples of the input variables include the temperature of the catalyst, the feed oil throughput, the sulfur concentration of the feed oil, the sulfur concentration of the product oil, and the hydrogen-oil ratio. The input variables are not limited to the values ​​of the basic information described above, and the values ​​of the basic information included in the operation performance data can be added or deleted as appropriate.

[0057] The deterioration contribution parameter is a parameter that represents the degree to which an input variable contributes to catalyst deterioration. The deterioration contribution parameter is a parameter whose value varies based on the degree to which an input variable contributes to catalyst deterioration. The deterioration contribution parameter is a parameter that is determined based on, for example, operating performance data. The deterioration contribution parameter is a parameter that is optimized (optimization parameter) based on, for example, operating performance data.

[0058] The output variable is, for example, a value related to the deterioration level. In the present disclosure, the "value related to the deterioration level" includes not only the value of the deterioration level but also a value from which the value of the deterioration level can be calculated by calculation. That is, the "value related to the deterioration level" should be broadly interpreted to mean not only the deterioration level but also the time derivative value of the deterioration level, the time derivative value of the logarithm of the deterioration level, etc. That is, the reference catalyst deterioration function whose output variable is a value related to the deterioration level may be a function whose output variable is not only the value of the deterioration level but also the time derivative value of the deterioration level, the time derivative value of the logarithm of the deterioration level, etc.

[0059] Here, the deterioration degree is an index showing the progress of deterioration of the catalyst. One example of the deterioration degree is the remaining activity ratio of the catalyst shown in the following formula (1). The remaining activity ratio is the ratio of the apparent frequency factor At of the catalyst at time t (time t within the operation period, or time t elapsed since the start of operation) to the apparent frequency factor (indicating the degree of catalytic activity) A0 of the catalyst at the start time of operation (operation time 0 or time 0), and is shown as formula (1). Φ represents the remaining activity ratio.

number

[0060] The value of the remaining activity ratio is 1 at the start of operation (operation time 0 or time 0). The value of the remaining activity ratio gradually decreases as the operation time of the plant equipment 500 progresses. The decrease in the value of the remaining activity ratio (catalyst deterioration) is affected by the operating conditions of the plant equipment 500. Representative catalyst deterioration includes coke deterioration and metal deterioration. Coke deterioration is catalyst deterioration caused by coke accumulating on the catalyst during the catalytic reaction. Metal deterioration is catalyst deterioration caused by metal components contained in the feed oil accumulating on the catalyst during the catalytic reaction. It is desirable for the reference catalyst deterioration function to be a function that reflects coke deterioration and metal deterioration.

[0061] Next, an example of the reference catalyst deterioration function will be described. In this embodiment, for example, the reference catalyst deterioration function is a function in which the time differential of the logarithm of the remaining activity ratio Φ, which is an output variable, is expressed by a plurality of parameters pα ,p β ,p γ, …and multiple input variables H at time (driving time) t 1t ,H 2t ,…,H mt where the parameters p α ,p β ,p γ, ... corresponds to the degradation contribution parameter.

number

[0062] The reference catalyst deterioration function may have the left side (output variable) be the time differential of the logarithm of the remaining activity ratio Φ as shown in the above formula (2), but may have the left side (output variable) be the time differential of the remaining activity ratio Φ as shown in the following formula (2-1). In formula (2-1), the parameter p α , p β , p δ , p ζ corresponds to the degradation contribution parameter, and the parameter p γ , p ε corresponds to the fixed parameters.

number

[0063] The reference catalyst deterioration function may not have the left side (output variable) as the time differential of the logarithm of the remaining activity ratio Φ as shown in the above formula (2), but may have the left side (output variable) as the remaining activity ratio Φ and the right side as shown in the following formula (2-2), which includes the operating time t, i.e., a variable representing the operating time, where exp is an exponential function and s is an arbitrary function.

number

[0064] The parameters included in the above formula (2), formula (2-1), and formula (2-2) may include parameters that are coefficients or multipliers of input variables, and parameters of constant terms. Note that, although some of the symbols of the above parameters and input variables are the same among formula (2), formula (2-1), and formula (2-2), the parameters and input variables in formula (2), formula (2-1), and formula (2-2) do not need to be the same.

[0065] The specific catalyst deterioration function is a function used to predict the life of the catalyst in the second operating period. The specific catalyst deterioration function corresponds to an estimation model (deterioration model) of the deterioration degree. The specific catalyst deterioration function can output a value related to the deterioration degree of the catalyst when a value of basic information is input, for example. The specific catalyst deterioration function is a function that is generated or updated by determining the value of a deterioration contribution parameter of the reference deterioration function based on, for example, actual operating performance data. The method of generating and updating the specific catalyst deterioration function will be described in detail later.

[0066] The specific catalyst deterioration function is generated based on operation record data, and is therefore a function obtained by adapting the reference catalyst deterioration function to the plant equipment 500. Therefore, the specific catalyst deterioration function reflects conditions specific to the plant equipment 500, such as the installation environment of the plant equipment 500, individual differences, and deterioration conditions over time.

[0067] The equipment data includes at least one of information regarding the identification of the plant equipment 500, information regarding the type of the plant equipment 500, information regarding the type of catalyst of the plant equipment 500, information regarding the catalyst loading amount of the plant equipment 500, information regarding the target operating deadline, information regarding the upper limit operating temperature, information regarding the upper limit operating pressure, information regarding the upper limit operating throughput, etc.

[0068] The information on the target operation deadline includes at least a value of the target operation deadline. The target operation deadline is a period that is set in advance based on, for example, a production plan or a maintenance plan related to the plant equipment 500. The target operation deadline is, for example, the number of days of expected continuous operation of the plant equipment 500, the number of days remaining until catalyst replacement scheduled for the plant equipment 500, etc. The target operation deadline can also be changed based on, for example, an instruction from the user terminal 300.

[0069] The information on the operation upper limit temperature includes at least the value of the operation upper limit temperature. The operation upper limit temperature is a temperature that is set in advance based on at least one of the heat-resistant temperature of the catalyst, the heat-resistant temperature of the reaction tank of the plant equipment 500, and the heat-resistant temperature of the product oil, for example. The operation upper limit temperature may be set with a predetermined margin as necessary for the maintenance of the plant equipment 500 and the quality control of the product oil. The operation upper limit temperature may also be changed based on an instruction from the user terminal 300, for example.

[0070] The life prediction data is data generated, for example, based on operation schedule data and a specific catalyst deterioration function (deterioration model). The life prediction data is data for predicting the life of the catalyst of the plant equipment 500 in the second operation period. The life prediction data is data that represents the relationship between an evaluation index whose value varies depending on the degree of catalyst deterioration and operation time. The evaluation index included in the life prediction data may, for example, take a large value depending on the progress of catalyst deterioration, or may take a small value depending on the progress of catalyst deterioration.

[0071] Examples of the life prediction data include catalyst deterioration prediction data, temperature prediction data, etc. The life prediction data may be data that represents changes in information (evaluation index) related to the life of the catalyst according to the operation time, and instead of the operation time, an item that monotonically increases or decreases according to the operation time may be used, for example, the amount of product (gas, solid, or liquid) generated during the process, or the amount of oil refined after the start of operation.

[0072] The catalyst deterioration prediction data is, for example, data that indicates the relationship between a predicted value of the deterioration level of the catalyst and an operating time. Note that a method for generating the catalyst deterioration prediction data will be described in detail later.

[0073] The temperature prediction data is, for example, data that indicates the relationship between the required temperature and the operation time. In this disclosure, the "required temperature" is a predicted value of the catalyst temperature required for the plant equipment 500 to satisfy the operation state included in the operation schedule data. The user can predict the catalyst life by comparing the required temperature with the upper operation limit temperature included in the equipment data in advance, that is, by regarding the time when the required temperature reaches the upper operation limit temperature as the catalyst life. The method of generating the temperature prediction data will be described in detail later.

[0074] The threshold data includes a threshold for comparing with the evaluation index to determine the operating state of the plant equipment 500 at the target operation deadline. The threshold included in the threshold data may be input by the user from the user terminal 300 based on, for example, the evaluation index, the operating performance data, or the equipment data, or may be set in advance and stored in the storage unit 120. The threshold data includes, for example, a first threshold. The threshold data may further include a second threshold. The threshold data may include a third threshold together with or instead of the first threshold. The threshold data may include a fourth threshold in addition to the third threshold.

[0075] The first threshold and the second threshold are thresholds used when an evaluation index used to determine the operating state of the plant equipment 500 takes a large value according to the progress of catalyst deterioration. An example of such an evaluation index is a required temperature. The first threshold is set to a value larger than the second threshold. For example, when the required temperature is used as the evaluation index, the first threshold may be a value of an upper limit temperature for operation, and the second threshold may be a value smaller than the upper limit temperature for operation.

[0076] The third threshold and the fourth threshold are thresholds used when the evaluation index used to determine the operating state of the plant equipment 500 takes a small value according to the progress of deterioration of the catalyst. An example of such an evaluation index is the degree of deterioration. The third threshold is set to a value smaller than the fourth threshold.

[0077] The message data includes, for example, a message to be notified to a user according to the operating state of the plant equipment 500 determined based on the threshold data. Here, the "message" in this disclosure refers to information expressing matters to be conveyed to a user by characters, symbols, signs, numbers, figures, etc.

[0078] The message notified to the user includes, for example, a first message, a second message, and a third message described below. The message notified to the user (for example, a first message) may be generated in advance and stored in the storage unit 120. In this case, the processing unit 110 acquires a message according to the determined operating state of the plant equipment 500 from the storage unit 120. Also, information that is a candidate for constituting the message notified to the user may be generated in advance and stored in the storage unit 120. In this case, the processing unit 110 may select information that is a candidate for constituting the message notified to the user according to, for example, the determined operating state and evaluation index of the plant equipment 500, and generate the message notified to the user.

[0079] The operating state information is, for example, information in which the upper operating temperature limit, the target operating deadline, and the values ​​of each piece of operating information included in the operating performance data or each threshold value included in the threshold data are arranged in a coordinate system common to the life prediction data.

[0080] The evaluation information includes, for example, information regarding the determined state, a message corresponding to the determined driving state (for example, a first message), driving state information, a message not corresponding to the driving state (a fixed message), and the like.

[0081] Next, a description will be given of details of the processing unit 110. The processing unit 110 includes a data acquisition unit 111, a function generation unit 112, a life prediction data generation unit 113, an evaluation information generation unit 114, and a data output unit 115, for example.

[0082] The data acquisition unit 111 acquires various data from the data collection device 200 or the user terminal 300, for example, via the network 400. The data acquisition unit 111 acquires, for example, driving performance data, a reference catalyst deterioration function, an intrinsic catalyst deterioration function, driving schedule data, and device data. The various data acquired by the data acquisition unit 111 may be stored in the storage unit 120.

[0083] For example, when acquiring driving performance data, the data acquisition unit 111 does not need to acquire all of the driving performance data that can be acquired. More specifically, when acquiring driving performance data, the data acquisition unit 111 may acquire driving performance data related to all driving times (driving times), or may thin out the driving times acquired by sampling. Furthermore, when acquiring driving performance data, the data acquisition unit 111 may acquire driving performance data related to all driving information, or may acquire only driving performance data related to driving information required according to catalyst life data to be calculated. By reducing the amount of driving performance data acquired by the acquisition unit 111 at one time, the amount of data processing and the amount of data communication can be reduced.

[0084] When acquiring the second operating performance data, the data acquisition unit 111 may acquire the second operating performance data all at once from the start of operation of the plant equipment 500 to the present time, or may acquire the second operating performance data sequentially for each operating hour, or may acquire the second operating performance data at a predetermined period (time interval).

[0085] When the data acquisition unit 111 acquires the second operating performance data at a predetermined cycle, the cycle is not limited to a specific value as long as it is shorter than the period from the start of the second operating period to the target operating deadline. For example, if the period until the target operating deadline is 350 days, the cycle in which the data acquisition unit 111 acquires the second operating performance data may be in days, such as 1 day, 5 days, 10 days, or 100 days, or may be in hours, such as 1 hour or 2 hours, or may be in minutes, such as 10 minutes or 20 minutes. The cycle in which the data acquisition unit 111 acquires the second operating performance data is, for example, set in advance by a user. The cycle in which the data acquisition unit 111 acquires the second operating performance data may be, for example, stored in advance in the storage unit 120, or may be acquired as instruction data from the user terminal 300.

[0086] The period for the data acquisition unit 111 to acquire the second operation performance data may be changed according to the acquired second operation performance data. That is, the data acquisition unit 111 may change the period according to the operation information (operation status of the plant equipment 500) of the plant equipment 500 included in the acquired second operation performance data. More specifically, the data acquisition unit 111 may acquire the second operation performance data at a shorter period, for example, as the temperature of the catalyst measured in the plant equipment 500 becomes higher. That is, when the latest catalyst temperature included in the acquired second operation performance data is equal to or higher than a predetermined threshold value for the catalyst temperature, the data acquisition unit 111 may shorten the period until the next acquisition of the second operation performance data, compared to when the latest catalyst temperature is less than the threshold value. Thereby, when the catalyst of the plant equipment 500 has a relatively long life, the frequency of acquisition of the second operation performance data can be reduced, and when the catalyst has a relatively short life and prediction accuracy is required by a deterioration model, the frequency of acquisition can be increased. Thereby, a balance can be achieved between improvement in the accuracy of the deterioration model and the amount of data communication according to the operation status of the plant equipment in the second operation period.

[0087] Furthermore, when the latest catalyst temperature included in the acquired second driving performance data is less than a predetermined threshold value for the catalyst temperature, the data acquiring unit 111 may lengthen the period until the next acquisition of the second driving performance data, compared to when the catalyst temperature is equal to or greater than the threshold value. That is, the data acquiring unit 111 may reversibly change the period (time interval) for acquiring the second driving performance data, depending on the acquired second driving performance data.

[0088] When the data acquisition unit 111 determines to change the cycle for acquiring the second driving performance data, the data acquisition unit 111, for example, updates the cycle stored in the storage unit 120. The data acquisition unit 111 controls the timing for acquiring the next second driving performance data based on the updated cycle.

[0089] The above-mentioned predetermined threshold value for the catalyst temperature is determined based on, for example, an upper limit operation temperature of the plant equipment 500. A plurality of threshold values ​​may be set for the catalyst temperature. The threshold value and the cycle for acquiring the second operation performance data may be changed during the second operation period, for example, based on an instruction from the user terminal 300.

[0090] Furthermore, the cycle in which the data acquiring unit 111 acquires the second operation performance data is not limited to being changed based on the temperature of the catalyst when it is changed according to the acquired second operation performance data. The cycle may be changed, for example, based on the value of the deterioration level of the catalyst included in the second operation performance data, or based on the absolute value of the difference between the upper limit operation temperature of the plant equipment 500 and the catalyst temperature of the second operation performance data. For example, when the absolute value of the difference calculated from the latest catalyst temperature included in the second operation performance data is equal to or less than a predetermined threshold value for the absolute value, the cycle until the next acquisition of the second operation performance data may be shortened compared to when the absolute value exceeds the threshold value.

[0091] Also, the period in which the data acquisition unit 111 acquires the second driving performance data may be changed by comparing the first driving performance data with the second driving performance data. For example, when the deviation of the transition of the catalyst temperature included in the first driving performance data and the second driving performance data is equal to or greater than a predetermined threshold, the data acquisition unit 111 may shorten the period in which the data acquisition unit 111 next acquires the second driving performance data when the absolute value of the difference in the catalyst temperature at an arbitrary driving time of interest between the first driving performance data and the second driving performance data becomes equal to or greater than a predetermined threshold. When changing the period in which the data acquisition unit 111 acquires the second driving performance data by comparing the first driving performance data with the second driving performance data, the period (time interval) in which the data acquisition unit 111 acquires the second driving performance data may be changed reversibly, as in the case of changing the period in accordance with the acquired second driving performance data.

[0092] (Calculation of the actual value of the degree of deterioration) The function generating unit 112 generates the inherent catalyst deterioration function based on the driving performance data. For example, when the driving performance data acquired by the data acquiring unit 111 does not include an actual value of the deterioration degree, the function generating unit 112 calculates the actual value of the deterioration degree before generating the inherent catalyst deterioration function.

[0093] The function generating unit 112 calculates the actual value of the deterioration degree for each operating hour in the first operating period based on the first operating result data. A method of calculating the actual value of the deterioration degree of the catalyst during the operating time t will be described in detail below.

[0094] The function generating unit 112 performs the calculation using the formulas (3-1), (3-2) and (4) described below based on the first operational performance data at the operating time t. The formulas (3-1) and (3-2) are formulas for calculating the apparent reaction rate constant k from the sulfur concentration of the feed oil, the sulfur concentration of the product oil and the feed oil throughput. n is the reaction order and is determined in advance. [S] is the sulfur concentration of the product oil at the operating time t and [S]0 is the sulfur concentration of the feed oil. LHSV is the liquid hourly space velocity at the operating time t, i.e., the feed oil throughput at the operating time t. The formula (3-1) is used when n≠1.

number

[0095] Equation (3-2) is used when n=1.

number

[0096] Equation (4) corresponds to the so-called Arrhenius equation.

number

[0097] The function generating unit 112 calculates the apparent reaction rate constant k at the operation time t based on the formulas (3-1) and (3-2) using the values ​​of the feed oil throughput, the sulfur concentration of the feed oil, and the sulfur concentration of the product oil at the operation time t included in the first operation performance data. Using the calculated apparent reaction rate constant k and the reaction temperature (temperature of the catalyst) T at the operation time t included in the first operation performance data, the apparent frequency factor A is calculated based on the formula (4). The calculated apparent frequency factor A corresponds to the apparent frequency factor At at the operation time t of the catalyst. The function generating unit 112 calculates the deterioration degree Φ of the catalyst at the operation time t based on the ratio between the apparent frequency factor At and the apparent frequency factor A0 at the start of operation (operation time t = 0). The calculated deterioration degree Φ corresponds to the actual value of the deterioration degree of the catalyst at the operation time t. The apparent frequency factor A0 is given in advance or calculated in the same manner as the apparent frequency factor At. The function generating unit 112 repeats the above calculation for each operation time in the first operation period, thereby calculating the result value of the deterioration degree for each operation time in the first operation period.

[0098] The function generating unit 112 may calculate the actual value of the deterioration degree for each operating hour in the second operating period in the same manner as the above-mentioned method of calculating the actual value of the deterioration degree for the first operating period.

[0099] The actual value of the deterioration degree may be calculated by the function generating unit 112 at the timing when the driving performance data is acquired by the data acquiring unit 111. The actual value of the deterioration degree may be calculated in advance by a device other than the information processing device 100, such as the user terminal 300 or the data collecting device 200. In this case, the actual value of the deterioration degree calculated in advance may be stored in the data collecting device 200 as information on the catalyst that is part of the first driving performance data or the second driving performance data.

[0100] 4 shows an example of plotting some of the actual values ​​of the deterioration degree for each operating time included in the first operating result data on a coordinate system. The horizontal axis represents time, and the vertical axis represents the deterioration degree. Each square symbol represents the value of the deterioration degree of the catalyst.

[0101] (Calculation of the correction value of the deterioration degree) Here, the operating conditions of the plant equipment 500 actually in operation may be appropriately changed during the operation period. For example, the value of the information on the operating conditions included in the first operating performance data is not necessarily constant during the first operating period. When the operating conditions are changed, it may affect the deterioration degree of the catalyst. As a more specific example, it is known that the higher the hydrogen-oil ratio value, the more the desulfurization reaction of the catalyst is promoted. Therefore, when the hydrogen-oil ratio becomes high at a certain operating time, the catalyst will perform better than its original catalytic performance at the subsequent operating times. That is, even though the deterioration degree of the catalyst itself does not originally change, the actual value of the deterioration degree calculated based on the operating performance data may vary depending on the fluctuation of the operating conditions of the plant equipment 500 during the operating period. Therefore, in order to evaluate the deterioration degree for each operating time under more similar conditions, the function generating unit 112 may correct the actual value of the deterioration degree based on the operating performance data and calculate the correction value of the deterioration degree.

[0102] For example, when the operation result data acquired by the data acquisition unit 111 does not include a correction value of the deterioration degree, the function generation unit 112 calculates the correction value of the deterioration degree. The function generation unit 112 may calculate the correction value of the deterioration degree based on basic information used to calculate the actual value of the deterioration degree, or may calculate the correction value of the deterioration degree based on basic information different from the basic information used to calculate the actual value of the deterioration degree. The basic information used to calculate the correction value of the deterioration degree may be anything that can affect the deterioration degree of the catalyst, and is not limited to the above-mentioned hydrogen-oil ratio. The basic information used to calculate the correction value of the deterioration degree may be, for example, hydrogen partial pressure, aromatic concentration of the feed oil, nitrogen concentration of the feed oil, or metal concentration of the feed oil.

[0103] For example, the function generating unit 112 corrects the actual value of the deterioration degree related to the first operating actual data based on the first operating actual data to calculate the corrected value of the deterioration degree. More specifically, the function generating unit 112 corrects the actual value of the deterioration degree calculated for an arbitrary time in the first operating period based on the value of basic information at the arbitrary time that is included in the first operating actual data and corresponds to the actual value of the deterioration degree.

[0104] The function generating unit 112 calculates the correction value of the deterioration degree, for example, by the correction formula shown in the following formula (5).

number

[0105] The correction term is calculated, for example, for each type of basic information used for the correction. The form of the equation for the correction term and the coefficients included in the equation for the correction term may be derived in advance based on existing knowledge or experiments, as with the above-mentioned reference catalyst deterioration function. The form of the equation for the correction term and the coefficients included in the equation for the correction term may be different for each piece of basic information used for the correction. When there is a plurality of pieces of basic information used to calculate the correction value of the deterioration degree, a correction term may be generated for each type of basic information used for the correction, and the correction term in equation (5) may be obtained by multiplying these correction terms.

[0106] A correction term for the actual value of the deterioration degree for the first operating period is calculated based on the first operating actual data. For example, if the value of the basic information of the first operating actual data at an arbitrary operating time is taken as an actual value, and the value of the basic information of the first operating actual data at an operating time determined to be used as a standard is taken as a reference value (fixed value), the correction term is expressed as a ratio of the reference value to the actual value. That is, the correction term for an operating time t in the first operating period can be obtained by calculating the ratio of the fixed value to the actual value corresponding to the operating time t.

[0107] The function generating unit 112 calculates a correction term for each operating time in the first operating period, and can calculate a correction value of the deterioration degree for each operating time in the first operating period from equation (5) based on the calculated correction term and the actual value of the deterioration degree.

[0108] The reference value used for the correction term may be a fixed value capable of standardizing the value of the basic information of the first driving performance data, and may be the value of the basic information contained in the second driving performance data, or may be a value determined in advance based on existing knowledge, experiments, etc.

[0109] The function generating unit 112 may calculate the correction value of the deterioration degree regarding the second operating period in the same manner as the calculation method of the correction value of the deterioration degree regarding the first operating period described above.

[0110] The function generating unit 112 may calculate the correction value of the deterioration degree continuously after the actual value of the deterioration degree is calculated, or may calculate it at a timing instructed by the user terminal 300. The correction value of the deterioration degree may be calculated in advance by a device other than the information processing device 100, such as the user terminal 300 or the data collecting device 200. In this case, the correction value of the deterioration degree calculated in advance may be stored in advance in the data collecting device 200 as information on the catalyst that is part of the first operating performance data or the second operating performance data.

[0111] FIG. 5 shows an example of correcting the degradation degree performance values ​​shown in FIG. 4. The horizontal axis is time, and the vertical axis is the degradation degree (here, the remaining activity ratio). The correction value of the degradation degree is represented by a circle symbol. The arrow means that the performance value of the square symbol is corrected to the value of the circle symbol. Graph G1 is a curve that smoothly connects the correction values ​​of the degradation degree.

[0112] (Generation of intrinsic catalyst deactivation function) The function generating unit 112 generates a unique catalyst deterioration function based on the operating performance data. The function generating unit 112 generates the unique catalyst deterioration function by determining a value of a deterioration contribution parameter of a reference catalyst deterioration function based on the first operating performance data, for example. The function generating unit 112 generates the unique catalyst deterioration function by fitting the reference catalyst deterioration function based on the first operating performance data, for example. The function generating unit 112 may generate the unique catalyst deterioration function by performing machine learning using the first operating performance data as teacher data, for example.

[0113] When the second operating performance data has been acquired, the function generating unit 112 may use not only the first operating performance data but also the second operating performance data when generating the specific catalyst deterioration function.

[0114] When generating the specific catalyst deterioration function, if the output variable of the reference catalyst deterioration function is the value of the deterioration degree of the catalyst, the function generating unit 112 may use a correction value of the deterioration degree instead of the actual value of the deterioration degree. Note that, when generating the specific catalyst deterioration function, the function generating unit 112 may perform a calculation to match a value included in the driving performance data and a value calculated based on the driving performance data with an input variable or an output variable of the reference catalyst deterioration function, as necessary.

[0115] The function generating unit 112 may generate the specific catalyst deterioration function, for example, at the timing when the data acquiring unit 111 acquires the driving performance data, or may generate the specific catalyst deterioration function at the timing instructed by the user terminal 300. Furthermore, the specific catalyst deterioration function may be generated in advance by a device other than the information processing device 100, such as the user terminal 300 or the data collecting device 200. In this case, the specific catalyst deterioration function generated in advance may be stored in the data collecting device 200, or may be stored in advance in the storage unit 120.

[0116] (Intrinsic catalyst deactivation function update) When the unique catalyst deterioration function exists, the function generating unit 112 may update (regenerate) the unique catalyst deterioration function further based on the second operating result data acquired by the data acquiring unit 111. The function generating unit 112 can update the unique catalyst deterioration function in a manner similar to the method of generating the unique catalyst deterioration function described above.

[0117] The function generating unit 112 updates the inherent catalyst deterioration function by redetermining the deterioration contribution parameters based on, for example, the second operating result data acquired by the data acquiring unit 111. If the inherent catalyst deterioration function is updated by redetermining the deterioration contribution parameters, the amount of calculation required for updating can be reduced.

[0118] When the data acquisition unit 111 acquires the second operating performance data at a predetermined period (time interval), the function generation unit 112 may update (regenerate) the specific catalyst deterioration function further based on the newly acquired second operating performance data. In this case, the function generation unit 112 may update (regenerate) the specific catalyst deterioration function at the period, or may update (regenerate) the specific catalyst deterioration function at a timing different from the period.

[0119] (Determining the end of the unstable period) It is known that, during the initial period after the plant equipment 500 starts operating and the feedstock oil starts to flow through the catalyst, initial deterioration occurs, in which the activity of the catalyst drops sharply. After this period has passed, the change in the activity of the catalyst becomes gradual and the change becomes stable. The period during which the degree of deterioration of the catalyst changes drastically, which occurs immediately after the start of the flow of oil through the plant equipment 500, is called the unstable period.

[0120] FIG. 6 is a diagram illustrating an example of an unstable period. In FIG. 6, the deterioration degree from the start of operation to a certain point in time is plotted. As shown in FIG. 6, the deterioration degree changes drastically from the start of operation until operation time t1, and then changes gradually. In this case, the period until operation time t1 corresponds to the unstable period. The period after operation time t1 corresponds to the stable period. In this way, after the unstable period, the deterioration degree of the catalyst transitions to a stable period in which the change is relatively stable.

[0121] When the function generating unit 112 generates or updates the specific catalyst deterioration function using the second operating performance data, the function generating unit 112 does not need to use the second operating performance data in the unstable period. For example, the function generating unit 112 may use only the second operating performance data acquired in the stable period after the unstable period has elapsed to generate or update the specific catalyst deterioration function.

[0122] The function generating unit 112 may determine the end of the unstable period in the second operating period according to the acquired second operating performance data. The function generating unit 112 may generate or update the specific catalyst deterioration function based on the second operating performance data related to the second operating period in which the end of the unstable period has been determined.

[0123] The function generating unit 112 may determine the end of the unstable period in the second operating period according to the operating time (operating time) of the plant equipment 500 included in the second operating performance data. For example, the user may determine in advance the length of the unstable period in the second operating period (for example, operating time) based on the first operating performance data, and store information on the predetermined length of the unstable period in the storage unit 120. In this case, the function generating unit 112 can determine the end of the unstable period in the second operating period by comparing the stored information on the length of the unstable period with the value of the operating time included in the acquired second operating performance data. More specifically, when the operating time included in the second operating performance data becomes equal to or longer than the predetermined length of the unstable period, the function generating unit 112 can determine that the unstable period in the second operating period has ended at the operating time.

[0124] The function generating unit 112 may determine the end of the unstable period in the second operating period according to the value of the deterioration degree (for example, the actual value or the corrected value) instead of the operating time. The user may determine in advance the value of the deterioration degree corresponding to the end point of the unstable period in the second operating period based on the first operating performance data, and store information on the determined value of the deterioration degree in the storage unit 120. In this case, the function generating unit 112 can determine the end of the unstable period in the second operating period by comparing the stored information on the value of the deterioration degree with the value of the deterioration degree included in the second operating performance data. More specifically, the function generating unit 112 can determine that the unstable period has ended in the operating time when the value of the deterioration degree for each operating time included in the second operating performance data becomes equal to or less than the predetermined value of the deterioration degree.

[0125] The function generating unit 112 may determine the end of the unstable period in the second operating period according to the rate of change of the value of the deterioration degree instead of the operating time. The user may determine in advance the rate of change of the deterioration degree corresponding to the end point of the unstable period in the second operating period based on the first operating performance data, and store information on the determined rate of change of the deterioration degree in the storage unit 120. In this case, the function generating unit 112 can determine the end of the unstable period in the second operating period by comparing the stored information on the rate of change with the rate of change of the value of the deterioration degree included in the second operating performance data. Here, the rate of change of the value of the deterioration degree is the rate at which the value of the deterioration degree has changed during a predetermined operating time. The user can appropriately adjust the length of the operating time for which the rate of change is to be calculated based on the transition or change of the value of the deterioration degree included in the operating performance data or calculated based on the operating performance data.

[0126] When determining the end of the unstable period in the second operating period based on the acquired second operating performance data, the function generation unit 112 may use values ​​other than the operating time, the deterioration degree value, and the rate of change of the deterioration degree as indicators for the determination, or may use an appropriate combination of these to make the determination.

[0127] In the above example, an index for determining the end of the unstable period in the second operating period and a threshold value corresponding to the index are determined in advance based on the first operating performance data, but this is not limited to this. For example, the index may be determined based on operating performance data prior to the first operating performance data, or may be determined based on experimental data of the performance equipment of the plant equipment 500.

[0128] (Generating catalyst deterioration prediction data) The life prediction data generating unit 113 generates catalyst deterioration prediction data based on the inherent catalyst deterioration function and the operation schedule data. The life prediction data generating unit 113 may determine whether the catalyst deterioration prediction data can be generated based on the acquired operation schedule data and inherent catalyst deterioration function. The life prediction data generating unit 113 may determine, for example, whether the types of values ​​of the operation information included in the acquired operation schedule data cover the types of values ​​included in the input variables of the inherent catalyst deterioration function used when calculating the catalyst deterioration prediction data and the above-mentioned formula. The catalyst deterioration prediction data may be generated at a timing when the life prediction data generating unit 113 determines that the catalyst deterioration prediction data can be generated, or may be generated based on an instruction from the user terminal 300. In addition, for example, when the life prediction data generating unit 113 also generates temperature prediction data, the life prediction data generating unit 113 may also determine whether the temperature prediction data can be generated before starting to generate the catalyst deterioration prediction data. Note that, at the time when the function generating unit 112 generates the catalyst deterioration prediction data, the second operation period may not have started yet, or may have started. Hereinafter, a method of generating catalyst deterioration prediction data in the life prediction data generating unit 113 will be described.

[0129] The deterioration degree at the start of the second operating period (operating time 0 or time 0) is set to a predetermined value (e.g., 1). The value of the operation schedule data for operating time t is provided to the input variable of the inherent catalyst deterioration function to obtain the output value (dΦ / dt) of the inherent catalyst deterioration function. The deterioration degree for operating time t is obtained by subtracting the obtained output value from the deterioration degree for operating time t-1. The obtained deterioration degree for operating time t corresponds to the predicted value of the deterioration degree at operating time t. Thereafter, by repeating the same process, the predicted value of the deterioration degree for each operating time in the second operating period can be obtained.

[0130] The method of generating catalyst deterioration prediction data may be other methods as long as they are based on the inherent catalyst deterioration function and the operation schedule data, and is not limited to the above example. For example, if the output of the inherent catalyst deterioration function is a function of deterioration degree Φ as in equation (2-2) instead of dΦ / dt as in equation (2) or (2-1), the operation schedule data and the operation time t may be directly given to the input variables of the inherent catalyst deterioration function to calculate the predicted value of the deterioration degree at the operation time t.

[0131] When the specific catalyst deterioration function or the operation schedule data is updated, the life prediction data generating unit 113 may update (regenerate) the catalyst deterioration prediction data based on the updated specific catalyst deterioration function or the operation schedule data.

[0132] FIG. 7 shows an example of catalyst deterioration prediction data G2 including predicted values ​​of the deterioration degree calculated from the intrinsic catalyst deterioration function and operation schedule data. For comparison, graph G1 from FIG. 5 is also shown. Stars represent predicted values ​​of the deterioration degree in the second operation period. Graph G1 is represented by a dashed line graph, and catalyst deterioration prediction data G2 is represented by a solid line graph. Catalyst deterioration prediction data G2 smoothly connects the predicted values ​​of the deterioration degree indicated by stars.

[0133] (Generating temperature prediction data) The life prediction data generating unit 113 generates temperature prediction data based on the generated catalyst deterioration prediction data and operation schedule data. A method for generating temperature prediction data by the life prediction data generating unit 113 will be described below.

[0134] The life prediction data generation unit 113 calculates a required temperature for each operation time in the second operation period, based on the operation schedule data and the deterioration degree indicated by the catalyst deterioration prediction data. Specifically, based on the operation schedule data for operation time t, the apparent reaction rate constant k for operation time t is calculated from the above formulas (3-1) and (3-2). Based on the predicted value of the deterioration degree for operation time t indicated by the catalyst deterioration prediction data, the apparent frequency factor A (A t ) is calculated. The calculated apparent reaction rate constant k and apparent frequency factor At Based on this, the required temperature T at the operation time t is calculated using the above formula (4).

[0135] When the inherent catalyst deterioration function or the operation schedule data is updated, the life prediction data generating unit 113 may update (regenerate) the temperature prediction data based on the updated inherent catalyst deterioration function or the operation schedule data. That is, the life prediction data generating unit 113 may update (regenerate) the temperature prediction data based on the updated life prediction data and the operation schedule data.

[0136] 8 is a diagram showing an example of temperature prediction data generated by life prediction data generating unit 113. Temperatures calculated for each operating time are plotted by hatched circles in a coordinate system with the catalyst temperature (required temperature) on the vertical axis and time on the horizontal axis. A curve smoothly connecting the plotted points corresponds to temperature prediction data G3. Temperature prediction data G3 is not limited to the form of a curve graph, and may be data or a table including operating time and temperature.

[0137] (Determination of driving state) The evaluation information generating unit 114 may determine the operating state of the plant equipment 500 based on the threshold data and the life prediction data generated by the life prediction data generating unit 113. The evaluation information generating unit 114 may determine the operating state of the plant equipment 500 at the target operation deadline by, for example, comparing an evaluation index whose value varies based on the degree of deterioration of a catalyst included in the life prediction data with the threshold data.

[0138] The evaluation information generating unit 114 determines the operating state of the plant equipment 500 at the target operation deadline to be one of the first state, the second state, and the third state, for example, based on the life prediction data including the evaluation index that takes a large value according to the progress of catalyst deterioration, and the first and second thresholds. More specifically, the evaluation information generating unit 114 determines the operating state of the plant equipment 500 at the target operation deadline to be one of the first state, the second state, and the third state, for example, based on the temperature prediction data, the first and second thresholds. In this case, the evaluation index is the required temperature. Hereinafter, the details of the case where the evaluation information generating unit 114 determines the operating state of the plant equipment 500 at the target operation deadline based on the temperature prediction data, the first and second thresholds will be described.

[0139] The evaluation information generating unit 114 determines that the operating state of the plant equipment 500 is in a first state when the required temperature at the target operation deadline is equal to or lower than a first threshold (e.g., upper operation limit temperature) and equal to or higher than a second threshold. The first state is a state in which the catalyst of the plant equipment 500 will not reach the end of its life before the target operation deadline. The first state is also a good state in terms of the utilization state of the catalyst of the plant equipment 500. In the present disclosure, a "good state" is a state in which the catalyst will not reach the end of its life before the target operation deadline. The first state is also a state in which the catalyst of the plant equipment 500 is utilized economically at or above the level expected by the user (second threshold).

[0140] When the required temperature at the target operation deadline exceeds the first threshold, the evaluation information generating unit 114 determines that the operating state of the plant equipment 500 is in the second state. The second state is a state in which the catalyst of the plant equipment 500 reaches the end of its life before the target operation deadline. The second state is an unfavorable state in terms of utilization of the catalyst of the plant equipment 500. In the present disclosure, an "unfavorable state" is a state in which the catalyst reaches the end of its life before the target operation deadline.

[0141] When the required temperature at the target operation deadline is less than the second threshold, the evaluation information generating unit 114 determines that the operation state of the plant equipment 500 is the third state. The third state is a state in which the catalyst of the plant equipment 500 will not reach the end of its life before the target operation deadline. The third state is also a good utilization state of the catalyst of the plant equipment 500. However, the third state is also a state in which there is a longer margin of time before the catalyst reaches the end of its life compared to the first state. In other words, the third state is a state in which there is room to utilize the catalyst of the plant equipment 500 more economically compared to the first state, and is also a state in which the level expected by the user (the second threshold) has not been reached.

[0142] When determining the operating state of the plant equipment 500 using the temperature prediction data, the evaluation information generating unit 114 may omit determining the third state (omit setting the second threshold value) and may determine only the first state and the second state. In this case, the evaluation information generating unit 114 may determine that the operating state of the plant equipment 500 is the first state when the required temperature at the target operation deadline is equal to or lower than the first threshold value (for example, the upper operation limit temperature). Furthermore, the evaluation information generating unit 114 may determine that the operating state of the plant equipment 500 is the second state when the required temperature at the target operation deadline exceeds the first threshold value. In this case, the first state is a state in which the catalyst of the plant equipment 500 does not reach the end of its life before the target operation deadline. Moreover, the second state is a state in which the catalyst of the plant equipment 500 reaches the end of its life before the target operation deadline. That is, the first state is also a good state in terms of the utilization state of the catalyst of the plant equipment 500, and the second state is also a bad state in terms of the utilization state of the catalyst of the plant equipment 500.

[0143] In the above, the determination of the operating state of the plant equipment 500 has been described when the required temperature is used as an example of an evaluation index that takes a larger value as the catalyst deterioration progresses, but the present invention is not limited to this. If an evaluation index that takes a larger value as the catalyst deterioration progresses is used, the operating state of the plant equipment 500 at the target operation deadline can be determined in the same manner as in the above-mentioned required temperature.

[0144] The evaluation information generating unit 114 may determine the operating state of the plant equipment 500 at the target operation deadline to be one of the first state, the second state, and the third state based on the life prediction data including the evaluation index that takes a smaller value according to the progress of catalyst deterioration, and the third threshold and the fourth threshold. More specifically, the evaluation information generating unit 114 may determine the operating state of the plant equipment 500 at the target operation deadline to be one of the first state, the second state, and the third state based on, for example, the catalyst deterioration prediction data, the third threshold and the fourth threshold. In this case, the evaluation index is the deterioration degree (remaining activity ratio). Hereinafter, the details of the case where the evaluation information generating unit 114 determines the operating state of the plant equipment 500 at the target operation deadline based on the catalyst deterioration prediction data, the third threshold and the fourth threshold will be described.

[0145] For example, when the deterioration degree at the target operation deadline is equal to or greater than the third threshold and equal to or less than the fourth threshold, the evaluation information generating unit 114 determines that the operation state of the plant equipment 500 is the first state. For example, when the deterioration degree at the target operation deadline is less than the third threshold, the evaluation information generating unit 114 determines that the operation state of the plant equipment 500 is the second state. For example, when the deterioration degree at the target operation deadline is greater than the fourth threshold, the evaluation information generating unit 114 determines that the operation state of the plant equipment 500 is the third state. In this case, the first state, the second state, and the third state are the same as the respective states determined based on the temperature prediction data and the first and second thresholds.

[0146] When determining the operating state of the plant equipment 500 using the catalyst deterioration prediction data, the evaluation information generating unit 114 may omit determining the third state (omit setting the fourth threshold value) and determine only the first state and the second state. In this case, for example, when the deterioration degree at the target operation deadline is equal to or greater than the third threshold value, the evaluation information generating unit 114 determines that the operating state of the plant equipment 500 is the first state, and when the deterioration degree at the target operation deadline is less than the third threshold value, the evaluation information generating unit 114 determines that the operating state of the plant equipment 500 is the second state. In this case, the first state and the second state are the same as the respective states determined based on the temperature prediction data and the first threshold value.

[0147] In the above, the determination of the operating state of the plant equipment 500 is described when the deterioration degree is used as an example of an evaluation index that takes a smaller value as the deterioration of the catalyst progresses, but the present invention is not limited to this. If an evaluation index that takes a smaller value as the deterioration of the catalyst progresses is used, the operating state of the plant equipment 500 at the target operation deadline can be determined in the same manner as the deterioration degree described above.

[0148] (Message generation) The evaluation information generating unit 114 may generate a message according to the determined operating state of the plant equipment 500. For example, when it is determined that the plant equipment 500 is in a first state, the evaluation information generating unit 114 may generate a first message. When it is determined that the plant equipment 500 is in a second state, the evaluation information generating unit 114 may generate a second message. When it is determined that the plant equipment 500 is in a third state, the evaluation information generating unit 114 may generate a third message. Note that the first message, the second message, and the third message may be generated in advance and stored in the storage unit 120 as described above.

[0149] The first message may include information notifying that the catalyst is in a good utilization state. The first message may include information proposing to change the operation schedule data, for example, information proposing to the user to change to operation schedule data that shortens the life of the catalyst, or information proposing to the user to change to operation schedule data that increases the required temperature at the target operation deadline. The first message may also include information proposing to the user to change the operation status of the plant equipment 500, for example, information proposing to change the operation status of the plant equipment 500 based on the operation information included in the operation schedule data. The first message may include information proposing to the user to check the prediction accuracy of the specific catalyst deterioration function (deterioration model), or information proposing to update the specific catalyst deterioration function (deterioration model).

[0150] The second message may include information notifying the user that the catalyst utilization state is not good. The second message may include information proposing to the user to change the operation schedule data, for example, to change to operation schedule data that will lengthen the catalyst life, or to change to operation schedule data that will reduce the required temperature at the target operation deadline. The second message may include information proposing to the user to check the prediction accuracy of the specific catalyst deterioration function (deterioration model), or may include information proposing to update the specific catalyst deterioration function (deterioration model).

[0151] The third message may include information notifying the user that the catalyst is in a good utilization state. The third message may include information proposing to change the operation schedule data, for example, information proposing to the user to change to operation schedule data that shortens the catalyst life, or information proposing to the user to change to operation schedule data that increases the required temperature at the target operation deadline. The third message may include information proposing to the user to check the prediction accuracy of the specific catalyst deterioration function (deterioration model), or information proposing to update the specific catalyst deterioration function (deterioration model).

[0152] (Generation of operating state information) The evaluation information generating unit 114 may generate the operating state information based on at least one of the device data, the operating performance data, and the threshold data, and on the life prediction data.

[0153] FIG. 9 shows an example of the operating state information. The example of FIG. 9 is an example of the operating state information generated based on the temperature prediction data. In the example of FIG. 9, the operating upper limit temperature (first threshold), the second threshold, the target operating deadline, the number of operating days up to the present, and the time t2 at which the required temperature of the catalyst reaches the operating upper limit temperature are arranged in a coordinate system common to the temperature prediction data G4. The vertical axis represents the temperature of the catalyst (required temperature), and the horizontal axis represents time. The temperature prediction data G4 is represented by a solid line graph, and shows the transition of the required temperature of the catalyst according to time. In this example, the target operating deadline is 365 days, and the number of operating days up to the present is 200 days. In this example, the first threshold is the value of the operating upper limit temperature, the operating upper limit temperature is 395° C., and the second threshold is 390° C. The operating time (days) at which the temperature of the catalyst reaches the operating upper limit temperature is time t2. Here, the number of remaining days until the end of the life can be grasped by subtracting the number of operating days from time t2 to the present. The processing unit 110 may calculate the number of remaining days and further arrange the number of remaining days in the coordinate system. In the example of Figure 9, the catalyst temperature (required temperature) is calculated in days, so the unit of time t2 is also days. However, if the unit for calculating the required temperature is hours, minutes, or seconds, the unit of time t2 will also be hours, minutes, or seconds accordingly.

[0154] (Generation of evaluation information) The evaluation information generating unit 114 generates evaluation information regarding the operating state of the plant equipment 500 at the target operation deadline. The evaluation information may include at least one of information regarding the determined state, a message according to the determined state, a fixed message, and operating state information. The evaluation information generating unit 114 may update the evaluation information in response to the life prediction data being updated by the life prediction data generating unit 113, for example, by updating the inherent catalyst deterioration function (deterioration model) or the operation schedule data.

[0155] FIG. 10 shows an example of the evaluation information generated by the evaluation information generating unit 114. The example of FIG. 10 is an example of evaluation information regarding the operating state of the plant equipment 500 in the second operating period. In the example of FIG. 10, the plant equipment 500 is determined to be in the third state. The example of FIG. 10 is evaluation information generated based on temperature prediction data, and the required temperature is used as the evaluation index. In the example of FIG. 10, information regarding the determined operating state (in this example, "The current operating state of No. XXX is <good>"), a third message, a fixed message (in this example, "Notification message of operating state (equipment No. XXX)", "This email has been sent automatically", and "Below is a predicted graph of the required temperature at the current time"), and operating state information are included. The operating state information shown in the example of FIG. 10 is the operating state information exemplified in FIG. 9.

[0156] In the example of Figure 10, the third message includes information suggesting that the operation schedule data be changed (in this example, "Please consider using up the catalyst towards the target operation deadline."), information notifying that the catalyst utilization status is good (in this example, "The required temperature at the target operation deadline is below the upper operating temperature limit."), and information suggesting that the user check the predictive accuracy of the deterioration model (in this example, "Please check the accuracy of the simulation if necessary.").

[0157] FIG. 11 shows an example in which the evaluation information has been updated from the state shown in FIG. 10 described above. In the example of FIG. 11, it is determined that the plant equipment 500 is in the first state. The example of FIG. 11 is evaluation information generated based on temperature prediction data, similar to FIG. 10. The example of FIG. 11 includes information on the determined operating state (in this example, "The current operating state of No. XXX is <Good>"), a first message, operating state information, and a fixed message (similar to FIG. 10).

[0158] In the operating state information of FIG. 11, the number of operating days up to the present has been updated from 200 to 250 days. In the operating state information of FIG. 11, the temperature prediction data G5 updated from the temperature prediction data G4 is shown. In FIG. 11, the measured value of the catalyst temperature (the catalyst temperature included in the second operating result data) is shown by a diagonal line square symbol. The time at which the operating upper limit temperature is reached (catalyst life) is time t3, which is earlier than time t2. However, like time t2, time t3 is a time after the target operating deadline, and the required temperature does not reach the operating upper limit temperature (first threshold) at the target operating deadline. That is, the required temperature at the target operating deadline is equal to or lower than the first threshold. Also, the required temperature at the target operating deadline is equal to or higher than the second threshold. Therefore, it can be seen that the example of FIG. 11 is in a state where the catalyst can be used more economically than the example of FIG. 10.

[0159] In the example of FIG. 11, the measured value (actual value) of the catalyst temperature is plotted together with the temperature prediction data G5 in the operating state information. The measured value (actual value) of the catalyst temperature is arranged along the temperature prediction data G5 (request temperature), and there is no large deviation between the plotted measured value and the request temperature. This suggests, for example, that the prediction accuracy of the deterioration model is good, and the accuracy of the evaluation information is good. Therefore, the user can quickly judge the reliability of the evaluation information (determination of the operating state) by comparing the measured value (actual value) of the catalyst temperature and the request temperature (prediction value) arranged in a common coordinate system.

[0160] In the example of FIG. 11, the first message includes information notifying the user that the catalyst is in a good utilization state (in this example, "The required temperature at the target operation deadline is below the upper operating temperature limit."), and information suggesting to the user to change the operating conditions of the plant equipment 500 (in this example, "If necessary, please change the operating conditions of the plant equipment based on the simulation results.").

[0161] FIG. 12 shows another example of evaluation information generated by the evaluation information generating unit 114. The example of FIG. 12 is another example of evaluation information related to the operating state of the plant equipment 500 in the second operating period. In the example of FIG. 12, the plant equipment 500 is determined to be in the second state. FIG. 12 is an example of operating state information generated based on temperature prediction data. The example of FIG. 12 includes information related to the determined operating state of the plant equipment 500 (in this example, "The current operating state of No. XXX is <good>"), a second message, operating state information, and a fixed message (similar to FIG. 10), etc.

[0162] In the example of FIG. 12, the second message includes information notifying the user that the catalyst utilization state is not good (in this example, "The required temperature at the target operation deadline exceeds the upper operating temperature limit."), information suggesting that the operation schedule data be changed (in this example, "Please consider reviewing future operating conditions so that the required temperature is equal to or lower than the upper operating temperature limit."), and information suggesting that the user check the prediction accuracy of the deterioration model (in this example, "Please check the accuracy of the simulation if necessary.").

[0163] In the example of FIG. 12, the operating state information is arranged in a coordinate system common to the temperature prediction data G6, in which the operating upper limit temperature (first threshold), the second threshold, the target operating deadline, the number of operating days up to the present, and the time t4 at which the required temperature of the catalyst reaches the operating upper limit temperature are arranged. The vertical axis represents the temperature of the catalyst (required temperature), and the horizontal axis represents time. The temperature prediction data G6 is represented by a solid line graph, showing the transition of the required temperature of the catalyst according to time. In FIG. 12, the measured value of the catalyst temperature (the catalyst temperature included in the second operating performance data) is indicated by a diagonal line square symbol. In this example, the target operating deadline is 365 days, and the number of operating days up to the present is 200 days. In this example, the first threshold is the value of the operating upper limit temperature, the operating upper limit temperature is 395° C., and the second threshold is 390° C. The operating time (days) at which the temperature of the catalyst reaches the operating upper limit temperature is time t4. Time t4 is a time before the target operating deadline. The required temperature at the target operating deadline exceeds the operating upper limit temperature (first threshold).

[0164] In the example of FIG. 12, the measured value (actual value) of the catalyst temperature is plotted together with the temperature prediction data G6 in the operating state information. In the example of FIG. 12, the measured value (actual value) of the catalyst temperature is arranged on the low temperature side compared to the temperature prediction data G6 (requested temperature), and the deviation between the plotted measured value and the requested temperature increases as the number of operating days approaches 200 days. This deviation suggests, for example, that the prediction accuracy of the deterioration model is not good and that an update of the deterioration model is desired. Therefore, the user can quickly determine the reliability of the evaluation information (determination of the operating state) by comparing the measured value (actual value) of the catalyst temperature and the requested temperature (predicted value) arranged in a common coordinate system.

[0165] In the examples shown in Figs. 10, 11 and 12, the required temperature is used as the evaluation index, but the evaluation information can be generated in the same manner when other evaluation indexes such as the deterioration degree are used. The deterioration degree is an example of an evaluation index that takes a smaller value as the deterioration of the catalyst progresses. Therefore, when the deterioration degree is also used as the evaluation index, that is, when the evaluation information is generated based on the catalyst deterioration prediction data, the graph of the operation information included in the evaluation information becomes a graph in which the value decreases with the operation time (see Fig. 6). In this case, the specific content of the message can be appropriately changed according to the evaluation index according to the judgment included in the evaluation information. For example, when the first message includes information notifying that the catalyst is in a good utilization state, "The deterioration degree at the target operation deadline is equal to or higher than the third threshold value" or the like may be used instead of the example shown in Fig. 11.

[0166] (Evaluation information output) The data output unit 115 may transmit the evaluation information generated by the evaluation information generation unit 114 to the target user terminal 300 via the communication unit 130. The data output unit 115 may transmit the evaluation information to, for example, the user terminal 300 that has requested the information processing device 100 to generate the evaluation information. Furthermore, the data output unit 115 may transmit the evaluation information to, for example, the user terminal 300 of one or more predetermined users or the user terminals 300 of multiple users belonging to a predetermined group.

[0167] The display unit 310 of the user terminal 300 displays the received evaluation information. Furthermore, when the evaluation information generating unit 114 updates the evaluation information, the screen of the display unit 310 of the user terminal 300 may also be updated.

[0168] When the user terminal 300 receives the evaluation information of FIG. 10, the display unit 310 displays the evaluation information of FIG. 10. The user can check the evaluation information displayed on the display unit 310 and evaluate the utilization status of the catalyst in the plant equipment 500 (for example, whether the catalyst is effectively utilized). For example, the user can determine the time when the catalyst will reach the upper limit temperature based on the evaluation information of FIG. 10, that is, the time when the required temperature becomes the upper limit temperature (first threshold value), thereby grasping the time of the catalyst's life. Therefore, the user can determine whether or not to reflect the operation schedule data used in the evaluation information of FIG. 10 in the operation status of the plant equipment 500. In addition, the user can determine whether or not to reflect the operation schedule data used in the evaluation information of FIG. 10 in the operation status of the plant equipment 500 based on the third message included in the evaluation information or information related to the operation state of the plant equipment 500. In the example of FIG. 10, the user can confirm that the temperature of the catalyst will not reach the upper limit temperature at the target operation deadline because the time t2 is after the target operation deadline. Furthermore, since the required temperature is less than the second threshold, the user can determine that the catalyst has a relatively long life. That is, the user can determine that the example of FIG. 10 is the third state, which is a state in which there is room for more economical use of the catalyst of the plant equipment 500 compared to the first state. Therefore, the user can search for operation schedule data so that the required temperature is higher, or compare the operation schedule data used in the evaluation information of FIG. 10 with the operation status of the plant equipment 500 (for example, the operation conditions, the feed oil throughput, etc.) and decide to change the operation status of the plant equipment 500. In this case, if the measured value of the catalyst temperature and the required temperature are arranged in a common coordinate system in the operation information of FIG. 10 as in the examples of FIG. 11 and FIG. 12, the user can quickly determine whether the evaluation information should be trusted by comparing the measured value and the required temperature (predicted value). As described above, based on the evaluation information, the user can change the operating conditions (e.g., operating conditions, etc.) of the plant equipment 500 so that the catalyst approaches the end of its life in line with the target operating deadline, i.e., so that the catalyst can be used efficiently for the target operating deadline.

[0169] The data output unit 115 may output the evaluation information to, for example, a display unit of the information processing device 100. Even in this case, the user can similarly evaluate the utilization status of the catalyst in the plant equipment 500 by checking the evaluation information displayed on the display unit of the information processing device 100.

[0170] <Processing flow> Fig. 13 is a flowchart showing an example of processing of the information processing device 100. In the example shown in Fig. 13, it is assumed that operation of the plant equipment 500 in the second operation period has started. Note that the contents and order of steps described below are merely examples and can be changed as appropriate as long as there is no contradiction with the contents of the present disclosure.

[0171] (Step S100) The data acquisition unit 111 acquires equipment data of the plant equipment 500 from the data collection device 200. The data acquisition unit 111 acquires a reference catalyst deterioration function corresponding to the type of catalyst included in the acquired equipment data. If the data collection device 200 has a specific catalyst deterioration function that is suitable for the plant equipment 500, the data acquisition unit 111 acquires the specific catalyst deterioration function. The data acquisition unit 111 acquires threshold data based on the type of catalyst included in the acquired equipment data, etc. Finally, the data acquisition unit 111 stores the acquired equipment data, reference catalyst deterioration function, specific catalyst deterioration function, and threshold data in the memory unit 120. Then, the process proceeds to the process of step S101.

[0172] (Step S101) The function generating unit 112 determines whether or not there is a specific catalyst deterioration function in the storage unit 120. If the determination is affirmative, the process proceeds to step S110. If the determination is negative, the process proceeds to step S102.

[0173] (Step S102) If a negative determination is made in step S101, the data acquisition unit 111 acquires the first driving performance data from the data collection device 200. The data acquisition unit 111 stores the acquired first driving performance data in the storage unit 120. Then, the process proceeds to step S103.

[0174] (Step S103) The function generating unit 112 generates a specific catalyst deterioration function based on the acquired first operating performance data. When the acquired first operating performance data does not include an actual value or a corrected value of the value related to the deterioration degree for the first operating period, the function generating unit 112 calculates an actual value or a corrected value of the value related to the deterioration degree based on the acquired first operating performance data, and generates a specific catalyst deterioration function using the calculated actual value or the corrected value of the value related to the deterioration degree. Finally, the function generating unit 112 stores the generated specific catalyst deterioration function in the storage unit 120. Then, the process proceeds to the process of step S120.

[0175] (Step S110) If step S101 is judged as positive, the data acquisition unit 111 judges whether or not it is time to acquire the second driving performance data based on the period for acquiring the second driving performance data. If the judgment is judged as positive, the process proceeds to the process of step S111. If the judgment is judged as negative, the process proceeds to the process of step S120.

[0176] (Step S111) If step S110 is judged to be positive, the data acquisition unit 111 acquires second operating performance data for the corresponding cycle in the second operating period from the data collection device 200. The data acquisition unit 111 stores the acquired second operating performance data in the storage unit 120. Then, the process proceeds to step S112.

[0177] (Step S112) The function generating unit 112 determines whether or not to change the cycle for acquiring the second driving performance data according to the acquired second driving performance data. If the determination is affirmative, the process proceeds to step S113. If the determination is negative, the process proceeds to step S114.

[0178] (Step S113) If a positive determination is made in step S112, the data acquiring unit 111 changes the cycle for acquiring the second driving performance data. The data acquiring unit 111 stores the changed cycle in the storage unit 120. Then, the process proceeds to step S114.

[0179] (Step S114) The function generating unit 112 determines whether or not the unstable period in the second operating period has ended based on the acquired second operating result data. If the determination is affirmative, the process proceeds to step S115. If the determination is negative, the process proceeds to step S120.

[0180] (Step S115) The function generating unit 112 updates the specific catalyst deterioration function based on the acquired second operating result data. In addition, when the acquired second operating result data does not include an actual value or a corrected value of the value related to the deterioration degree for the second operating period, the function generating unit 112 calculates an actual value or a corrected value of the value related to the deterioration degree based on the acquired second operating result data, and updates the specific catalyst deterioration function using the calculated actual value or corrected value of the value related to the deterioration degree. Finally, the function generating unit 112 stores the updated specific catalyst deterioration function in the storage unit 120. Then, the process proceeds to the process of step S120.

[0181] (Step S120) The processing unit 110 judges whether it is time to generate evaluation information based on a predetermined condition. If the judgment is positive, the process proceeds to step S121. If the judgment is negative, the process proceeds to step S130. Here, the predetermined condition may be, for example, when a request to generate evaluation information is received from the user terminal 300 or the like, when a specific catalyst deterioration function is newly generated or updated, when evaluation information is preset to be generated periodically and the period has arrived, and the like. Note that the predetermined condition may be other conditions.

[0182] (Step S121) When step S120 is judged as positive, the data acquisition unit 111 acquires operation schedule data of the plant equipment 500 from the user terminal 300. The data acquisition unit 111 stores the acquired operation schedule data in the storage unit 120. Next, the life prediction data generation unit 113 generates life prediction data (for example, temperature prediction data) based on the generated inherent catalyst deterioration function and the acquired operation schedule data. Furthermore, when an updated inherent catalyst deterioration function exists, the life prediction data generation unit 113 generates life prediction data (temperature prediction data) based on the updated inherent catalyst deterioration function and the operation schedule data. The life prediction data generation unit 113 stores the generated life prediction data (temperature prediction data) in the storage unit 120. Then, the process proceeds to the process of step S122.

[0183] (Step S122) The evaluation information generating unit 114 judges whether the required temperature in the target operation deadline included in the generated temperature prediction data exceeds the first threshold included in the threshold data. If the judgment is affirmative, the process proceeds to step S123. If the judgment is negative, the process proceeds to step S124.

[0184] (Step S123) If the result of step S122 is affirmative, the evaluation information generating unit 114 determines that the operating state of the plant equipment 500 is the second state. Then, the process proceeds to step S127.

[0185] (Step S124) If step S122 is judged as negative, the evaluation information generating unit 114 judges whether the required temperature at the target operation deadline included in the generated temperature prediction data is equal to or higher than the second threshold included in the threshold data. If the judgment is judged as positive, the process proceeds to step S125. If the judgment is judged as negative, the process proceeds to step S126.

[0186] (Step S125) If the result of step S124 is affirmative, the evaluation information generating unit 114 determines that the operating state of the plant equipment 500 is the first state. Then, the process proceeds to step S127.

[0187] (Step S126) If a negative decision is made in step S124, the evaluation information generating unit 114 decides that the operating state of the plant equipment 500 is the third state. Then, the process proceeds to the process of step S127.

[0188] (Step S127) The evaluation information generating unit 114 generates a message according to the determined operating state of the plant equipment 500. Then, the process proceeds to the process of step S128.

[0189] (Step S128) The evaluation information generating unit 114 generates the operating state information based on the operating upper limit temperature included in the device data and the generated temperature prediction data. Here, when the acquired second operating performance data exists, the evaluation information generating unit 114 may use the catalyst temperature (measured value) included in the second operating performance data as the operating state information. Then, the process proceeds to the process of step S129.

[0190] (Step S129) The evaluation information generating unit 114 generates evaluation information based on the message corresponding to the determined driving state and the driving state information. The data output unit 115 transmits the generated evaluation information to the target user terminal 300. In addition, in the user terminal 300 that has received the evaluation information, the evaluation information is displayed on the display unit of the user terminal 300. Then, the process proceeds to the process of step S130.

[0191] (Step S130) The processing unit 110 judges whether or not to terminate this process based on the termination condition. If the judgment is affirmative, this process is terminated. If the judgment is negative, the process proceeds to step S101. Here, the termination condition is, for example, when termination instruction data is received from the user terminal 300, when operation of the plant equipment 500 is terminated, etc. The termination condition may be other conditions.

[0192] (Other examples of operation) Some of the steps shown in Fig. 13 may be deleted. For example, steps S100, S110, S112, S113, S114, S124, S127, S128, S130, etc. may be deleted. If step S130 is deleted, this process ends when step S129 is completed or a negative determination is made in step S120, for example.

[0193] Also, a step of performing a process other than the steps shown in Fig. 13 may be added. For example, step S102A of acquiring second operating performance data may be added between steps S102 and S103. In this case, in step S103, an actual value of the deterioration degree and a correction value may be calculated based on the acquired second operating performance data.

[0194] In step S121, when the input variables in the reference catalyst deterioration function and the intrinsic catalyst deterioration function include the catalyst temperature, the life prediction data generating unit 113 may perform a process of simultaneously generating catalyst deterioration prediction data and life prediction data in parallel. More specifically, the life prediction data generating unit 113 calculates the required temperature for the operation time t based on the deterioration degree calculated for the operation time (operation time t-1) and the operation schedule data for the next operation time t (for example, the next day) (for details, see the explanation of the above formulas (3-1), (3-2), and (4)). Furthermore, the life prediction data generating unit 113 calculates the deterioration degree of the catalyst from the intrinsic catalyst deterioration function based on the required temperature calculated for the operation time t and the operation schedule data for the operation time t. Thereafter, the calculation of the temperature and the calculation of the deterioration degree are repeated alternately by increasing t by unit time and performing the same process. In this way, a series of deterioration degrees calculated for each operation time are obtained as catalyst deterioration prediction data, and a series of required temperatures calculated for each operation time are obtained as temperature prediction data.

[0195] (Variation 1) The specific catalyst deteriorating function may be generated based on operational performance data (second plant equipment operational performance data) of a second plant equipment different from the plant equipment 500 (first plant equipment). The second plant equipment is an equipment that passes a feedstock oil through a catalyst to obtain a product oil. Examples of the second plant equipment include a plant equipment having a function equivalent to that of the first plant equipment, an experimental equipment for the first plant equipment, and the like. The definition of the second plant equipment operational performance data of the second plant equipment is the same as that of the first plant equipment (plant equipment 500). The second plant equipment operational performance data is data including operation information common to the first operation performance data used to generate the specific catalyst deteriorating function.

[0196] In this case, the second plant equipment operation performance data is acquired by the data acquisition unit 111 from the user terminal 300 or the data collection device 200. The function generation unit 112 can use the acquired second plant equipment operation performance data together with the first operation performance data to generate the specific catalyst deterioration function. The second plant equipment operation performance data may be acquired from an input unit of the information processing device 100. The acquired second plant equipment operation performance data may be stored in the storage unit 120.

[0197] In this case, for example, step 102B for acquiring second plant equipment operation performance data may be added between step S102 and step S103 shown in Fig. 13. The acquired second plant equipment operation performance data can be used together with the first operation performance data in each subsequent step (e.g., step S103, etc.) that uses the first operation performance data.

[0198] The intrinsic catalyst deterioration function generated in the above-mentioned modified example may be applied not only to the first plant equipment (plant equipment 500) for which the intrinsic catalyst deterioration function was generated, but also to a plant equipment (second plant equipment) having the same function as the first plant equipment.

[0199] (Variation 2) The catalyst used in the plant equipment 500 may be different between the first operating period and the second operating period. Even in this case, the function generating unit 112 can generate an intrinsic catalyst depletion function used to predict the catalyst life in the second operating period based on the operating performance data related to the first operating period, using a method similar to the method for generating the intrinsic catalyst depletion function in the above-mentioned embodiment. Note that "different catalysts" refers to cases where the type (e.g., main component) or application (e.g., desulfurization catalyst) of the catalyst is the same, but the product (product number) or the manufacturer of the catalyst is different.

[0200] In this case, for example, in step S103 shown in FIG. 13, a correction may be made to the actual value of the deterioration degree of the catalyst for the first operating period. More specifically, data on the time-dependent changes in the deterioration degree values ​​of both catalysts may be obtained from past knowledge, experimental equipment, etc. The obtained data on both catalysts may be compared to generate a correction term for the type of catalyst. In this case, the correction term for the type of catalyst may be, for example, a ratio between the deterioration degree value of the catalyst used in the first operating period and the deterioration degree value of the catalyst used in the second operating period, or may be a fixed value calculated based on the obtained data. The generated correction term for the type of catalyst may be used to correct the actual value of the deterioration degree together with other correction terms.

[0201] (Other variations) In the above embodiment, the residual activity ratio of the catalyst shown in the above formula (1) is given as an example of the deterioration degree, but the ratio of the apparent reaction rate constants of the catalyst may be used instead of the residual activity ratio of the catalyst. That is, the deterioration degree may be the ratio of the apparent reaction rate constant kt of the catalyst at time t (time t within the operation period, or the elapsed time t from the start of operation) to the apparent reaction rate constant k0 of the catalyst at the start time of operation (operation time 0 or time 0).

[0202] The information, parameters, etc. described in this disclosure may be expressed using absolute values, may be expressed using relative values ​​from a predetermined value, or may be expressed using corresponding other information. Equations, etc. using these parameters may differ from those explicitly disclosed in this disclosure.

[0203] In this disclosure, the phrase "based on" does not mean "based only on," unless expressly stated otherwise. In other words, the phrase "based on" means both "based only on" and "based at least on."

[0204] When the terms "include," "including," and variations thereof are used in this disclosure, these terms are intended to be inclusive, similar to the term "comprising." Additionally, the term "or" as used in this disclosure is not intended to be an exclusive or.

[0205] The terms "determining" and "determining" in this disclosure may encompass a wide variety of actions. Each of "determining" and "determining" may include, for example, judging, calculating, computing, processing, deriving, investigating, searching (e.g., searching in a table, database, or other data structure), ascertaining, and so forth. Also, each of "determining" and "determining" may include resolving, selecting, choosing, establishing, comparing, and so forth, and so forth. That is, each of "determining" and "determining" may include ascribing some action to "determining" or "determining."

[0206] The present invention may be provided as an information processing method including processing steps performed in the information processing device 100. The present invention may also be provided as a program executed in the information processing device 100. The program may be provided in a form stored in a storage medium such as an optical disk, or may be provided in a form in which the program is downloaded to a computer via a network such as the Internet and installed to make it available.

[0207] Although the present disclosure has been described in detail above, it is clear to those skilled in the art that the present disclosure is not limited to the embodiments and modifications described in the present disclosure. The present disclosure can be implemented as modified and altered forms without departing from the spirit and scope of the present disclosure as defined by the claims. Therefore, the description of the present disclosure is intended to be illustrative and does not have any limiting meaning on the present disclosure.

[0208] Several aspects of the present disclosure are described below.

[0209] The first aspect is an information processing device for supporting the operation of a plant equipment that obtains a refined oil by passing a feed oil through a catalyst, the information processing device comprising: a memory unit that stores a target operating deadline of the plant equipment and a deterioration model generated based on operating performance data, which is a time-series history of operating information representing the operating status of the plant equipment; a data acquisition unit that acquires operating schedule data, which is a time-series schedule of the operating information; a life prediction data generation unit that generates life prediction data for predicting the life of the catalyst based on the deterioration model and the acquired operating schedule data; and an evaluation information generation unit that generates evaluation information regarding the operating state of the plant equipment at the target operating deadline based on the generated life prediction data and the target operating deadline.

[0210] According to the first aspect, the user can grasp evaluation information regarding the operating state when the plant equipment is operated as scheduled until the target operation deadline. Therefore, the user can determine whether the operating status of the plant equipment should be changed based on the operation information included in the operation schedule data. Therefore, the plant equipment can efficiently produce the product oil.

[0211] A second aspect is the information processing device described in the first aspect, wherein the life prediction data is data representing the relationship between an evaluation index whose value varies based on the degree of deterioration of the catalyst and operating time, the memory unit further stores threshold data corresponding to the evaluation index, the evaluation information generation unit determines that the operating state at the target operating deadline is one of a first state and a second state by comparing the evaluation index with the threshold data, and generates the evaluation information based on the determined state of the first state and the second state, the first state being a state in which the catalyst will not reach the end of its life before the target operating deadline, and the second state being a state in which the catalyst will reach the end of its life before the target operating deadline.

[0212] According to the second aspect, the user can more easily grasp the operating state of the plant equipment at the target operation deadline by checking the evaluation information generated based on the operating state of the plant equipment at the determined target operation deadline. Therefore, the user can more quickly determine whether the operating status of the plant equipment should be changed. Therefore, the plant equipment can efficiently produce the refined oil.

[0213] A third aspect is the information processing device according to the first aspect, wherein the life prediction data is data representing the relationship between an evaluation index that takes on a larger value as the deterioration of the catalyst progresses and operating time, the memory unit further stores a first threshold value and a second threshold value that is smaller in value than the first threshold value, and the evaluation information generation unit determines that the plant equipment is in a first state if the evaluation index at the target operation deadline is less than the first threshold value and the evaluation index at the target operation deadline is greater than the second threshold value, determines that the plant equipment is in a second state if the evaluation index at the target operation deadline exceeds the first threshold value, and determines that the plant equipment is in a third state if the evaluation index at the target operation deadline is less than the second threshold value, and generates the evaluation information based on the determined state among the first state, the second state, and the third state.

[0214] According to the third aspect, the user can more easily grasp the operating state of the plant equipment at the target operation deadline by checking the evaluation information generated based on the operating state of the plant equipment at the determined target operation deadline. Therefore, the user can more quickly determine whether the operating status of the plant equipment should be changed based on the operation schedule data. Therefore, the plant equipment can efficiently produce the product oil.

[0215] A fourth aspect is the information processing device according to the first aspect, wherein the life prediction data is data representing the relationship between an evaluation index that takes on a smaller value as the deterioration of the catalyst progresses and operating time, the memory unit further stores a third threshold value and a fourth threshold value that is smaller in value than the third threshold value, and the evaluation information generation unit determines that the plant equipment is in a first state if the degree of deterioration at the target operation deadline is greater than or equal to the third threshold value and is less than or equal to the fourth threshold value, determines that the plant equipment is in a second state if the degree of deterioration at the target operation deadline is less than the third threshold value, and determines that the plant equipment is in a third state if the degree of deterioration at the target operation deadline exceeds the fourth threshold value, and generates the evaluation information based on the determined state among the first state, the second state, and the third state.

[0216] According to the fourth aspect, the user can more easily grasp the operating state of the plant equipment at the target operation deadline by checking the evaluation information generated based on the operating state of the plant equipment at the determined target operation deadline. Therefore, the user can more quickly determine whether the operating status of the plant equipment should be changed based on the operation schedule data. In addition, since the operating status of the plant equipment is determined into three states, the user can grasp the operating status of the plant equipment at the target operation deadline in more detail. Therefore, the user can more accurately determine whether the operating status of the plant equipment should be changed based on the operation schedule data. Therefore, the plant equipment can efficiently produce the product oil.

[0217] A fifth aspect is the information processing device according to the first aspect, wherein the life prediction data is temperature prediction data representing the relationship between a required temperature and an operating time, the required temperature being the temperature of the catalyst required to satisfy the operating schedule data, the memory unit further stores a first threshold value, and the evaluation information generation unit determines that the plant equipment is in a first state if the required temperature at the target operating deadline is equal to or lower than the first threshold value, and determines that the plant equipment is in a second state if the required temperature at the target operating deadline exceeds the first threshold value, and generates the evaluation information based on the determined state out of the first state and the second state.

[0218] According to the fifth aspect, the user can more easily grasp the operating state of the plant equipment at the target operation deadline by checking the evaluation information generated based on the operating state of the plant equipment at the determined target operation deadline. Therefore, the user can more quickly determine whether the operating status of the plant equipment should be changed based on the operation schedule data. Therefore, the plant equipment can efficiently produce the product oil.

[0219] A sixth aspect is the information processing device according to the first aspect, wherein the life prediction data is temperature prediction data representing a relationship between a required temperature and an operating time, the required temperature is a temperature of the catalyst required to satisfy the operation schedule data, the memory unit further stores a first threshold and a second threshold smaller than the first threshold, and the evaluation information generation unit determines that the plant equipment is in a first state if the required temperature at the target operation deadline is equal to or lower than the first threshold and the required temperature at the target operation deadline is equal to or higher than the second threshold, determines that the plant equipment is in a second state if the required temperature at the target operation deadline exceeds the first threshold, and determines that the plant equipment is in a third state if the required temperature at the target operation deadline is less than the second threshold, and generates the evaluation information based on the determined state among the first state, the second state, and the third state.

[0220] According to the sixth aspect, the user can more easily grasp the operating state of the plant equipment at the target operation deadline by checking the evaluation information generated based on the operating state of the plant equipment at the determined target operation deadline. Therefore, the user can more quickly determine whether the operating status of the plant equipment should be changed based on the operation schedule data. In addition, since the operating status of the plant equipment is determined into three states, the user can grasp the operating status of the plant equipment at the target operation deadline in more detail. Therefore, the user can more accurately determine whether the operating status of the plant equipment should be changed based on the operation schedule data. Therefore, the plant equipment can efficiently produce the product oil.

[0221] A seventh aspect is the information processing device according to the fifth or sixth aspect, wherein the first threshold value is an upper limit operation temperature of the plant equipment.

[0222] According to the seventh aspect, the first threshold value is the upper limit temperature of operation. Therefore, the accuracy of the judgment of the operating state of the plant equipment is improved, and the accuracy of the evaluation information is improved. Therefore, the user can more accurately judge whether the operating status of the plant equipment should be changed based on the operation schedule data. As a result, the plant equipment can efficiently produce the refined oil.

[0223] An eighth aspect is the information processing device described in the first aspect, wherein the life prediction data is catalyst deterioration prediction data representing the relationship between the deterioration level of the catalyst and operating time, the memory unit further stores a third threshold value, and the evaluation information generation unit determines that the plant equipment is in a first state if the deterioration level at the target operating deadline is greater than or equal to the third threshold value, and determines that the plant equipment is in a second state if the deterioration level at the target operating deadline is less than the third threshold value, and generates the evaluation information based on the determined state between the first state and the second state.

[0224] According to the eighth aspect, the user can more easily grasp the operating state of the plant equipment at the target operation deadline by checking the evaluation information generated based on the operating state of the plant equipment at the determined target operation deadline. Therefore, the user can more quickly determine whether the operating status of the plant equipment should be changed based on the operation schedule data. Therefore, the plant equipment can efficiently produce the product oil.

[0225] A ninth aspect is the information processing device according to the first aspect, wherein the life prediction data is catalyst deterioration prediction data representing a relationship between the deterioration degree of the catalyst and operating time, the memory unit further stores a third threshold and a fourth threshold that is greater than the third threshold, and the evaluation information generation unit determines that the plant equipment is in a first state if the deterioration degree at the target operation deadline is equal to or greater than the third threshold and the deterioration degree at the target operation deadline is equal to or less than the fourth threshold, determines that the plant equipment is in a second state if the deterioration degree at the target operation deadline is less than the third threshold, and determines that the plant equipment is in a third state if the deterioration degree at the target operation deadline is equal to or greater than the third threshold and the deterioration degree at the target operation deadline exceeds the fourth threshold, and generates the evaluation information based on the determined state among the first state, the second state, and the third state.

[0226] According to the ninth aspect, the user can more easily grasp the operating state of the plant equipment at the target operation deadline by checking the evaluation information generated based on the operating state of the plant equipment at the determined target operation deadline. Therefore, the user can more quickly determine whether the operating status of the plant equipment should be changed based on the operation schedule data. In addition, since the operating status of the plant equipment is determined into three states, the user can grasp the operating status of the plant equipment at the target operation deadline in more detail. Therefore, the user can more accurately determine whether the operating status of the plant equipment should be changed based on the operation schedule data. Therefore, the plant equipment can efficiently produce the product oil.

[0227] A tenth aspect is an information processing device described in any one of the second, fifth, and eighth aspects, wherein the evaluation information generation unit generates the evaluation information including a first message corresponding to the first state when the plant equipment is determined to be in the first state, and generates the evaluation information including a second message corresponding to the second state when the plant equipment is determined to be in the second state.

[0228] According to the tenth aspect, the user can more easily grasp the operating state of the plant equipment at the target operation deadline by checking the message corresponding to the determined state included in the evaluation information. Therefore, the user can more quickly determine whether the operating status of the plant equipment should be changed based on the operation schedule data. Therefore, the plant equipment can efficiently produce the refined oil.

[0229] An eleventh aspect is the information processing device according to the tenth aspect, wherein the second message includes information proposing a change to the operation schedule data or information proposing a change to the operating status of the plant equipment.

[0230] According to the eleventh aspect, the user can check the message included in the evaluation information to understand not only the operating state of the plant equipment at the determined target operation deadline, but also possible measures according to the determined operating state. Therefore, the user can more quickly determine whether the operating status of the plant equipment should be changed based on the operation schedule data. Therefore, the plant equipment can efficiently produce the refined oil.

[0231] A twelfth aspect is an information processing device described in any one of the third, fourth, sixth, and ninth aspects, wherein the evaluation information generation unit generates the evaluation information including a first message corresponding to the first state when the plant equipment is determined to be in the first state, generates the evaluation information including a second message corresponding to the second state when the plant equipment is determined to be in the second state, and generates the evaluation information including a third message corresponding to the third state when the plant equipment is determined to be in the third state.

[0232] According to the twelfth aspect, the user can more easily grasp the operating state of the plant equipment at the target operation deadline by checking the message corresponding to the determined state included in the evaluation information. Therefore, the user can more quickly determine whether the operating status of the plant equipment should be changed based on the operation schedule data. Therefore, the plant equipment can efficiently produce the refined oil.

[0233] A thirteenth aspect is the information processing device according to the twelfth aspect, wherein the third message includes information proposing a change to the operation schedule data or information proposing a change to the operating status of the plant equipment.

[0234] According to the thirteenth aspect, the user can check the message included in the evaluation information to understand not only the operating state of the plant equipment at the determined target operation deadline, but also possible measures according to the determined operating state. Therefore, the user can more quickly determine whether the operating status of the plant equipment should be changed based on the operation schedule data. Therefore, the plant equipment can efficiently produce the refined oil.

[0235] A fourteenth aspect is an information processing device described in the first aspect, wherein the evaluation information generation unit generates operating state information including the target operating deadline and the generated life prediction data, and the evaluation information includes the generated operating state information.

[0236] According to the fourteenth aspect, the user can confirm the target operation deadline and the life prediction data from the operation information included in the evaluation information. Therefore, the user can confirm the accuracy of the operation state at the determined target operation deadline, and can confirm the prediction result of the operation status up to the target operation deadline. Therefore, the user can more accurately determine whether the operation status of the plant equipment should be changed based on the operation schedule data. Therefore, the plant equipment can efficiently produce the product oil.

[0237] A fifteenth aspect is an information processing device according to the first aspect, wherein the life prediction data is temperature prediction data representing the relationship between a required temperature of the catalyst and operating time, the required temperature being the temperature of the catalyst required to satisfy the operating schedule data, the data acquisition unit acquires second operating performance data which is the operating performance data relating to a second operating period which is an operating period after the first operating period has elapsed, the second operating performance data including a measured value of the temperature of the catalyst, the evaluation information generation unit generates operating state information in which the required temperature and the measured value are arranged in a common coordinate system having temperature and time as its axes, and the evaluation information includes the generated operating state information.

[0238] According to the fifteenth aspect, the user can easily determine the prediction accuracy of the deterioration model by comparing the measured temperature (actual value) and the required temperature (predicted value) of the catalyst arranged in a common coordinate system. Therefore, the user can quickly determine the reliability of the evaluation information (determination of the operating state). Therefore, the user can more accurately determine whether the operating status of the plant equipment should be changed based on the operation schedule data. In turn, the plant equipment can efficiently produce the refined oil.

[0239] A sixteenth aspect is the information processing device according to the first aspect, further comprising a data output unit, wherein the data output unit transmits the evaluation information to a user terminal and displays it on a screen of the user terminal.

[0240] According to the sixteenth aspect, the user can more easily or more reliably view the evaluation information. Therefore, the user can more quickly grasp the evaluation information. Therefore, the user can more quickly determine whether the operating status of the plant equipment should be changed based on the operation schedule data. As a result, the plant equipment can efficiently produce the refined oil.

[0241] A 17th aspect is the information processing device described in the first aspect, further comprising a function generation unit that updates the deterioration model, wherein the deterioration model is generated based on first operating performance data, which is the operating performance data for a first operating period, the operating schedule data is data for a second operating period, which is the operating period after the first operating period has elapsed, the data acquisition unit acquires second operating performance data, which is the operating performance data for the second operating period, the function generation unit updates the deterioration model based on the acquired second operating performance data, the evaluation information generation unit updates the evaluation information based on the updated deterioration model, and the second operating period is the operating period after the first operating period has elapsed.

[0242] According to the seventeenth aspect, the evaluation information is updated based on the deterioration model updated based on the second operation result data. Therefore, the deterioration model can reflect the conditions specific to the plant equipment during the second operation period, which is the period for predicting the operation state of the plant equipment, and therefore the prediction accuracy of the life prediction data by the deterioration model can be improved, and the reliability of the evaluation information is improved according to the improvement in the prediction accuracy of the life prediction data. Therefore, the user can more accurately determine whether the operation status of the plant equipment should be changed based on the operation schedule data. As a result, the plant equipment can efficiently produce the product oil.

[0243] An 18th aspect is the information processing device according to the 17th aspect, wherein when a period in which the degree of deterioration of the catalyst changes drastically, which occurs immediately after the start of supplying oil to the plant equipment, is defined as an unstable period, the function generation unit determines the end of the unstable period in the second operating period according to the acquired second operating period, and updates the deterioration model based on the second operating performance data relating to the second operating period in which the end of the unstable period was determined.

[0244] According to the eighteenth aspect, when reflecting the situation specific to the plant equipment in the second operating period in the deterioration model, the second operating result data after the unstable period has passed is used. Therefore, since the situation specific to the plant equipment in the second operating period can be more appropriately reflected in the deterioration model, the prediction accuracy of the life prediction data by the deterioration model can be improved, and the reliability of the evaluation information is improved according to the improvement in the prediction accuracy of the life prediction data. Therefore, the user can more accurately determine whether the operating situation of the plant equipment should be changed based on the operation schedule data. In addition, the plant equipment can efficiently produce the product oil.

[0245] A 19th aspect is the information processing device described in the 17th aspect, wherein the data acquisition unit updates the second operating performance data at a period shorter than the time from the start of operation of the plant equipment in the second operating period to the target operating deadline, and the function generation unit further updates the deterioration model based on the updated second operating performance data.

[0246] According to the nineteenth aspect, since the conditions specific to the plant equipment during the second operating period can be repeatedly reflected in the deterioration model, the prediction accuracy of the life prediction data by the deterioration model can be improved as the second operating period progresses, and the reliability of the evaluation information is improved according to the improvement in the prediction accuracy of the life prediction data. Therefore, the user can more accurately determine whether the operating conditions of the plant equipment should be changed based on the operation schedule data. Therefore, the plant equipment can efficiently produce the product oil.

[0247] A twentieth aspect is the information processing device according to the nineteenth aspect, wherein the data acquisition unit changes the period in accordance with acquired second driving performance data.

[0248] According to the twentieth aspect, the cycle (time interval) until the next acquisition of the second operation performance data is changed according to the acquired second operation performance data. Therefore, it is possible to balance the data communication amount or information processing amount with the update frequency of the deterioration model or the accuracy of the deterioration model according to the operation status of the plant equipment in the second operation period. Therefore, it is possible to balance the data communication amount or information processing amount with the update frequency of the evaluation information or the reliability of the evaluation information according to the operation status of the plant equipment in the second operation period.

[0249] The aspects of the present disclosure are not limited to the above-described embodiments and modifications, but include various conceivable modifications, and the effects of the present disclosure are not limited to the above-described contents. The components in each embodiment may be appropriately combined and applied. In other words, various additions, modifications, and partial deletions are possible within the scope of the conceptual idea and intent of the present disclosure derived from the contents defined in the claims and their equivalents. [Explanation of symbols]

[0250] 1. Information Processing Systems 100 Information processing device 300 User terminals 400 Network 110 Processing section 111 Data Acquisition Section 112 Function Generator 113 Life Prediction Data Generation Unit 114 Evaluation information generation unit 115 Data output section 120 Storage section 130 Communications Department 200 Data Acquisition Device 210 Database 300 User terminals 310 Display section 400 Network 500 Plant Equipment

Claims

1. An information processing device for supporting the operation of a plant device for passing a feedstock oil through a catalyst to obtain a refined oil, A storage unit that stores a target operation deadline of the plant equipment and a deterioration model that is generated based on operation performance data that is a time-series history of operation information that represents an operation status of the plant equipment; A data acquisition unit that acquires operation schedule data, which is a time-series schedule of the operation information; a life prediction data generating unit that generates life prediction data for predicting a life of the catalyst based on the deterioration model and the acquired operation schedule data; and an evaluation information generating unit that generates evaluation information regarding an operating state of the plant equipment at the target operation deadline based on the generated life prediction data and the target operation deadline. Information processing device.

2. the life prediction data is data representing a relationship between an evaluation index whose value varies depending on a degree of deterioration of the catalyst and an operating time, The storage unit is Further storing threshold data corresponding to the evaluation index, The evaluation information generation unit By comparing the evaluation index with the threshold data, it is determined that the operating state at the target operating time limit is one of a first state and a second state; generating the evaluation information based on the determined state of the first state and the second state; The first state is a state in which the catalyst does not reach the end of its life before the target operation time limit, The second state is a state in which the catalyst reaches the end of its life before the target operation deadline. The information processing device according to claim 1 .

3. The life prediction data is data representing a relationship between an evaluation index that takes a large value as deterioration of the catalyst progresses and an operating time, the storage unit further stores a first threshold value and a second threshold value that is smaller than the first threshold value; The evaluation information generation unit determining that the plant equipment is in a first state when the evaluation index at the target operation deadline is equal to or less than the first threshold value and the evaluation index at the target operation deadline is equal to or more than the second threshold value; When the evaluation index in the target operation deadline exceeds the first threshold, it is determined that the plant equipment is in a second state; When the evaluation index at the target operation deadline is less than the second threshold value, it is determined that the plant equipment is in a third state; generating the evaluation information based on a determined state among the first state, the second state, and the third state; The information processing device according to claim 1 .

4. The life prediction data is data representing a relationship between an evaluation index that takes a smaller value as the deterioration of the catalyst progresses and an operating time, the storage unit further stores a third threshold value and a fourth threshold value that is smaller than the third threshold value; The evaluation information generation unit determining that the plant equipment is in a first state when the evaluation index at the target operation deadline is equal to or greater than the third threshold value and when the evaluation index at the target operation deadline is equal to or less than the fourth threshold value; When the evaluation index in the target operation deadline is less than the third threshold value, it is determined that the plant equipment is in a second state; When the evaluation index in the target operation deadline exceeds the fourth threshold, it is determined that the plant equipment is in a third state; generating the evaluation information based on a determined state among the first state, the second state, and the third state; The information processing device according to claim 1 .

5. The life prediction data is temperature prediction data representing a relationship between a required temperature and an operation time, The required temperature is a temperature of the catalyst required to satisfy the operation schedule data, The storage unit further stores a first threshold value, The evaluation information generation unit When the required temperature at the target operation deadline is equal to or lower than the first threshold value, it is determined that the plant equipment is in a first state; When the required temperature at the target operation time limit exceeds the first threshold value, it is determined that the plant equipment is in a second state; generating the evaluation information based on the determined state of the first state and the second state; The information processing device according to claim 1 .

6. The life prediction data is temperature prediction data representing a relationship between a required temperature and an operation time, The required temperature is a temperature of the catalyst required to satisfy the operation schedule data, the storage unit further stores a first threshold value and a second threshold value that is smaller than the first threshold value; The evaluation information generation unit determining that the plant equipment is in a first state when the required temperature at the target operation deadline is equal to or lower than the first threshold value and the required temperature at the target operation deadline is equal to or higher than the second threshold value; When the required temperature at the target operation time limit exceeds the first threshold value, it is determined that the plant equipment is in a second state; When the required temperature at the target operation time limit is less than the second threshold value, it is determined that the plant equipment is in a third state; generating the evaluation information based on a determined state among the first state, the second state, and the third state; The information processing device according to claim 1 .

7. The first threshold value is an upper limit temperature of the operation of the plant equipment.

7. The information processing device according to claim 5 or 6.

8. the life prediction data is catalyst deterioration prediction data that represents a relationship between a deterioration degree of the catalyst and an operating time, The storage unit further stores a third threshold value, The evaluation information generation unit When the deterioration degree at the target operation deadline is equal to or greater than the third threshold, it is determined that the plant equipment is in a first state; When the deterioration degree at the target operation deadline is less than the third threshold value, it is determined that the plant equipment is in a second state; generating the evaluation information based on the determined state of the first state and the second state; The information processing device according to claim 1 .

9. the life prediction data is catalyst deterioration prediction data that represents a relationship between a deterioration degree of the catalyst and an operating time, the storage unit further stores a third threshold value and a fourth threshold value that is greater than the third threshold value; The evaluation information generation unit determining that the plant equipment is in a first state when the deterioration degree at the target operation deadline is equal to or greater than the third threshold value and when the deterioration degree at the target operation deadline is equal to or less than the fourth threshold value; When the deterioration degree at the target operation deadline is less than the third threshold value, it is determined that the plant equipment is in a second state; When the deterioration degree at the target operation deadline exceeds the fourth threshold, it is determined that the plant equipment is in a third state; generating the evaluation information based on a determined state among the first state, the second state, and the third state; The information processing device according to claim 1 .

10. The evaluation information generation unit When it is determined that the plant equipment is in the first state, the evaluation information is generated including a first message corresponding to the first state; When it is determined that the plant equipment is in the second state, the evaluation information is generated, the evaluation information including a second message corresponding to the second state. The information processing device according to claim 2, 5, or 8.

11. The second message includes information proposing a change to the operation schedule data or information proposing a change to the operating status of the plant equipment. The information processing device according to claim 10.

12. The evaluation information generation unit When it is determined that the plant equipment is in the first state, the evaluation information is generated including a first message corresponding to the first state; When it is determined that the plant equipment is in the second state, generating the evaluation information including a second message corresponding to the second state; generating the evaluation information including a third message corresponding to the third state when it is determined that the plant equipment is in the third state; 10. The information processing device according to claim 3, 4, 6, or 9.

13. The third message includes information proposing a change to the operation schedule data or information proposing a change to the operating status of the plant equipment. The information processing device according to claim 12.

14. The evaluation information generation unit generating operating state information including the target operating deadline and the generated life prediction data; The evaluation information includes the generated driving state information. The information processing device according to claim 1 .

15. the life prediction data is temperature prediction data representing a relationship between a required temperature of the catalyst and an operation time, The required temperature is a temperature of the catalyst required to satisfy the operation schedule data, The data acquisition unit is Acquire second operating performance data, which is the operating performance data relating to a second operating period that is an operating period after the first operating period has elapsed; The second operating performance data includes a measurement value of a temperature of the catalyst, The evaluation information generation unit generating operating state information in which the required temperature and the measured temperature are arranged on a common coordinate system having temperature and time as axes; The evaluation information includes the generated driving state information. The information processing device according to claim 1 .

16. Further comprising a data output unit, The data output unit transmits the evaluation information to a user terminal and displays it on a screen of the user terminal. The information processing device according to claim 1 .

17. A function generating unit for updating the degradation model is further provided, The deterioration model is generated based on first operating performance data, which is the operating performance data related to a first operating period, The operation schedule data is data regarding a second operating period which is an operating period after the first operating period has elapsed, The data acquisition unit is acquiring second operating performance data which is the operating performance data relating to the second operating period; The function generation unit updating the deterioration model based on the acquired second operating result data; The evaluation information generation unit updating the evaluation information based on the updated deterioration model; The second operating period is an operating period after the first operating period has elapsed. The information processing device according to claim 1 .

18. When the unstable period is a period in which the deterioration degree of the catalyst changes drastically immediately after the start of supplying oil to the plant equipment, The function generation unit determining an end of the unstable period in the second operating period according to the acquired second operating period; updating the deterioration model based on the second operating result data related to the second operating period in which the end of the unstable period has been determined; The information processing device according to claim 17.

19. The data acquisition unit is updating the second operating result data at a cycle shorter than the time from the start of operation of the plant equipment to the target operation deadline during the second operating period; The function generation unit Further updating the deterioration model based on the updated second operating performance data. The information processing device according to claim 17.

20. The data acquisition unit is changing the period in response to the acquired second operating result data; The information processing device according to claim 19.

Citation Information

Patent Citations

  • Server, method, and program for supplying desulfurization catalyst-related information, and computer-readable recording medium recording same

    WO2018117154A1