Method, information processing apparatus, and program
The information processing device optimizes delivery tasks by assigning vehicles with maximum capacity and adjusting for new packages, enhancing efficiency and reducing confusion, thus improving logistics systems.
Patent Information
- Application Number
- JP2023059352
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-31
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2043-03-31
AI Technical Summary
Conventional logistics systems face inefficiencies due to the inability to adjust delivery tasks once assigned, leading to potential delays and decreased efficiency when new packages arrive, even if delivery vehicles have sufficient capacity.
An information processing device assigns delivery tasks to vehicles with maximum loading capacity and modifies these tasks when new packages arrive, ensuring that multiple packages are loaded and delivered together, optimizing vehicle utilization.
This approach enhances delivery efficiency by reducing the need for additional vehicles and minimizing worker confusion, thereby improving overall logistics performance.
Smart Images

Figure 2024146451000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a method, an information processing device, and a program. [Background technology]
[0002] Conventionally, a logistics system that delivers packages stored in a warehouse to a recipient is known. For example, Patent Document 1 discloses that in a logistics system that assigns packages in a logistics warehouse to a transport vehicle, the logistics warehouse is instructed to prepare for the entry or exit of packages according to a preparation plan, which is a plan for preparation for the entry or exit of packages, and when a delay in the preparation from the preparation plan is detected, the transport vehicle is notified of the delay information. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] International Publication No. 2020 / 054490 Summary of the Invention [Problem to be solved by the invention]
[0004] In conventional logistics systems, a method is generally adopted to manage the entire delivery plan by assigning a task to deliver packages stored in a warehouse to a delivery vehicle. In such a method, it is not usually done to change the content of a task once it has been assigned, since it may cause confusion among workers, for example. On the other hand, if a new package is received in the warehouse after a task is assigned to a delivery vehicle, inconveniences may occur, such as the new package being delivered by a different delivery vehicle even though the delivery vehicle has a spare loading capacity, and the overall delivery efficiency may decrease.
[0005] In view of the above circumstances, an object of the present disclosure is to improve delivery efficiency in logistics systems. [Means for solving the problem]
[0006] According to one embodiment of the present disclosure, the method comprises: A method executed by an information processing device, comprising: assigning a task of collectively loading and delivering the first group of packages to a delivery vehicle having a maximum load capacity equal to or greater than the load capacity of the first group of packages stored in the warehouse; and When a second group of packages is received at the warehouse between the time the task is assigned and a specified time, a first correction process is executed to correct the task so that the first group of packages and the second group of packages are loaded and delivered together based on the load of the first group of packages, the load of the second group of packages, and the maximum load capacity of the delivery vehicle.
[0007] An information processing device according to an embodiment of the present disclosure includes: An information processing device having a control unit, The control unit is assigning a task of loading and delivering the first group of packages collectively to a delivery vehicle having a maximum load capacity equal to or greater than the load capacity of the first group of packages stored in the warehouse; When a second group of packages is received at the warehouse between the time the task is assigned and a specified time, a first modification process is executed to modify the task so that the first group of packages and the second group of packages are loaded and delivered together based on the cargo volume of the first group of packages, the cargo volume of the second group of packages, and the maximum load capacity of the delivery vehicle.
[0008] A program according to an embodiment of the present disclosure includes: In the information processing device, assigning a task of collectively loading and delivering the first group of packages to a delivery vehicle having a maximum load capacity equal to or greater than the load capacity of the first group of packages stored in the warehouse; and When a second group of packages is received at the warehouse between the time the task is assigned and a specified time, a first correction process is executed to correct the task so that the first group of packages and the second group of packages are loaded and delivered together based on the cargo volume of the first group of packages, the cargo volume of the second group of packages, and the maximum load capacity of the delivery vehicle. Effect of the Invention
[0009] According to one embodiment of the present disclosure, delivery efficiency in a logistics system is improved. [Brief description of the drawings]
[0010] [Figure 1] 1 is a block diagram showing a schematic configuration of an information processing device according to an embodiment of the present disclosure. [Diagram 2] 11 is a flowchart showing a first example of the operation of the information processing device. [Diagram 3] A figure showing a first example of a first group of luggage and a second group of luggage. [Figure 4] 13 is a flowchart showing a second example of the operation of the information processing device. [Diagram 5] A figure showing a second example of a first group of luggage and a second group of luggage. [Figure 6] A figure showing a third example of the first group of luggage and the second group of luggage. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, embodiments of the present disclosure will be described.
[0012] (Overview of the embodiment) An overview of an information processing device 10 according to an embodiment of the present disclosure will be described with reference to Fig. 1. The information processing device 10 is, for example, a computer such as a PC (Personal Computer) or a server. In this embodiment, the information processing device 10 is used to provide a logistics service.
[0013] In a typical logistics service, parcels to be delivered to a consignee such as a store are stored in a warehouse. The parcels stored in the warehouse are temporarily stored. Then, when a certain amount of parcels accumulate in the warehouse, a delivery vehicle such as a truck is assigned the task of loading and delivering the group of parcels accumulated in the warehouse. For example, a worker such as a driver of the delivery vehicle loads the group of parcels collectively at the warehouse onto the delivery vehicle and delivers them to the respective consignees. Then, when the delivery of the parcels is completed, the task is completed. In this way, tasks related to the delivery of parcels are managed in a typical logistics service.
[0014] First, an overview of this embodiment will be described, and details will be described later. The information processing device 10 assigns a task of loading and delivering the first group of packages collectively to a delivery vehicle having a maximum load capacity equal to or greater than the load capacity of the first group of packages stored in a warehouse. Then, when a second group of packages is received in the warehouse between the assignment of the task and a predetermined time, the information processing device 10 executes a first correction process to correct the task so that the first group of packages and the second group of packages are loaded and delivered collectively based on the load capacity of the first group of packages, the load capacity of the second group of packages, and the maximum load capacity of the delivery vehicle.
[0015] Thus, according to this embodiment, after the task of loading and delivering the first group of parcels together is assigned to a delivery vehicle, the task is permitted to be modified so that the first group of parcels and the second group of parcels are loaded and delivered together only for the second group of parcels newly received in the warehouse by the specified time. This reduces the possibility that the overall delivery efficiency will decrease, for example, the second group of parcels will be delivered by another delivery vehicle even though the delivery vehicle has a margin in its loading capacity. In addition, by appropriately setting the specified time, the possibility of a situation that may cause confusion for workers, such as the task being modified just before the delivery vehicle that has finished loading the first group of parcels leaves the warehouse, is reduced. Therefore, according to this embodiment, the overall delivery efficiency can be improved while reducing the possibility of causing confusion for workers.
[0016] (Configuration of information processing device) Next, a detailed description will be given of each component included in the information processing device 10. As shown in FIG.
[0017] The communication unit 11 includes one or more communication interfaces for connecting to a network such as the Internet. The communication interface corresponds to a mobile communication standard such as 4G (4th Generation) or 5G (5th Generation), a wired LAN (Local Area Network) standard, or a wireless LAN standard, but is not limited to these and may correspond to any communication standard. The communication unit 11 may further include a communication interface for directly communicating with an external device. The communication interface corresponds to a short-range wireless communication standard such as infrared or Bluetooth (registered trademark), but is not limited to these and may correspond to any communication standard.
[0018] The storage unit 12 includes one or more memories. The memories are, for example, but not limited to, semiconductor memories, magnetic memories, or optical memories. Each memory included in the storage unit 12 may function as, for example, a main storage device, an auxiliary storage device, or a cache memory. The storage unit 12 stores any information used in the operation of the information processing device 10. For example, the storage unit 12 may store a system program, an application program, a database, and the like.
[0019] The control unit 13 includes one or more processors, one or more programmable circuits, one or more dedicated circuits, or a combination of these. The processor is, for example, but is not limited to, a general-purpose processor such as a CPU (Central Processing Unit) or a GPU (Graphics Processing Unit), or a dedicated processor specialized for a specific process. The programmable circuit is, for example, but is not limited to, an FPGA (Field-Programmable Gate Array). The dedicated circuit is, for example, but is not limited to, an ASIC (Application Specific Integrated Circuit). The control unit 13 controls the operation of the entire information processing device 10.
[0020] (Operation of information processing device) The operation of the information processing device 10 will be described with reference to FIG.
[0021] Step S100: The control unit 13 of the information processing device 10 assigns a task of loading and delivering the first group of packages collectively to a delivery vehicle having a maximum load capacity equal to or greater than the load capacity of the first group of packages stored in the warehouse.
[0022] Specifically, the control unit 13 assigns the task to the delivery vehicle by linking the task with the target vehicle and the driver and storing the task in the storage unit 12. The "task" is, for example, information indicating the consignee who is the delivery destination of each package to be delivered (here, each package included in the first package group), the load of the first package group, the scheduled start time and scheduled completion time of loading work, and the scheduled start time and scheduled completion time of delivery work, but is not limited to these, and may include any information regarding the work to be performed by the driver of the target vehicle. The control unit 13 may also notify the assigned task to a terminal device used by the driver of the target vehicle via the communication unit 11. The driver of the target vehicle can perform the task while checking the information notified via the terminal device, for example.
[0023] In this embodiment, the "amount of luggage" is indicated by the number of pieces of luggage, but is not limited to this and may be indicated by, for example, weight or volume.
[0024] Step S101: The control unit 13 determines whether or not the second group of packages has been received in the warehouse. If it is determined that the second group of packages has been received (step S101-Yes), the process proceeds to step S103. On the other hand, if it is determined that the second group of packages has not been received (step S101-No), the process proceeds to step S102.
[0025] Specifically, when the control unit 13 receives information indicating that the storing operation of the second group of parcels has been completed from, for example, a terminal device of a worker in charge of the storing operation in the warehouse, the control unit 13 determines that the second group of parcels has been stored in the warehouse. The information may include any information related to the second group of parcels, such as information on the consignees of each parcel included in the second group of parcels and information indicating the amount of the second group of parcels.
[0026] Step S102: If it is determined in step S101 that the second group of packages has not been received (step S101-No), the control unit 13 determines whether the current time has reached a predetermined time. If it is determined that the current time has reached the predetermined time (step S102-Yes), the process ends. On the other hand, if it is determined that the current time has not reached the predetermined time (step S102-No), the process returns to step S101.
[0027] In other words, in the above-mentioned steps S101 and S102, the control unit 13 waits for the second group of packages to enter the warehouse until the current time becomes the predetermined time. In this embodiment, the "predetermined time" is the scheduled completion time of the loading operation of the first group of packages on the delivery vehicle, or the scheduled completion time of the loading operation of the first group of packages on the first delivery vehicle, or the time when it is determined that the loading operation of the first group of packages is completed. Here, any method can be adopted to determine whether the loading operation of the first group of packages is completed. For example, the control unit 13 may determine that the loading operation of the first group of packages is completed when it receives information indicating that the loading operation of the first group of packages is completed from a terminal device used by the driver of the delivery vehicle. Note that the "predetermined time" is not limited to the above-mentioned example, and may be any time before the scheduled start time of the delivery operation related to the task.
[0028] Step S103: If it is determined in step S101 that the second group of packages has been received (step S101-Yes), the control unit 13 determines whether the total load of the first group of packages and the second group of packages is equal to or less than the maximum load of the delivery vehicle. If it is determined that the total load is equal to or less than the maximum load (step S103-Yes), the process proceeds to step S104. On the other hand, if it is determined that the total load is greater than the maximum load (step S103-No), the process ends.
[0029] Step S104: If it is determined in step S103 that the total load amount is equal to or less than the maximum load amount (step S103-Yes), the control unit 13 executes a first correction process.
[0030] The "first modification process" is a process for modifying the task assigned to the target vehicle in step S101 so that the first group of packages and the second group of packages are loaded and delivered together.
[0031] The first correction process will be specifically described with reference to Fig. 3. In the example shown in Fig. 3, the first group of parcels includes 10 parcels whose delivery destination is a consignee "Store 01". The second group of parcels includes 15 parcels whose delivery destination is a consignee "Store 01". By executing the first correction process, the task assigned to the target vehicle in step S101, i.e., the task "load the 10 parcels included in the first group of parcels together and deliver them to Store 01", is corrected to the task "load the total of 25 parcels included in the first group of parcels and the second group of parcels together and deliver them to Store 01".
[0032] As described above, the information processing device 10 according to this embodiment assigns a task of loading and delivering the first group of packages collectively to a delivery vehicle having a maximum load capacity equal to or greater than the load capacity of the first group of packages stored in the warehouse. Then, when the second group of packages is received at the warehouse between the time the task is assigned and a predetermined time, the information processing device 10 executes a first correction process to correct the task so that the first group of packages and the second group of packages are loaded and delivered collectively based on the load capacity of the first group of packages, the load capacity of the second group of packages, and the maximum load capacity of the delivery vehicle.
[0033] According to this configuration, after the task of loading and delivering the first group of packages together is assigned to a delivery vehicle, the task is permitted to be modified so that the first group of packages and the second group of packages are loaded and delivered together only for the second group of packages newly received in the warehouse by the specified time. This reduces the possibility of a decrease in delivery efficiency overall, for example, in the case where the second group of packages is delivered by another delivery vehicle even though the delivery vehicle has a margin in its loading capacity. In addition, by appropriately setting the specified time, the possibility of a situation that may cause confusion for workers, such as a situation where the task is modified just before the delivery vehicle that has finished loading the first group of packages leaves the warehouse, is reduced. Therefore, according to this embodiment, the possibility of causing confusion for workers can be reduced while improving delivery efficiency overall.
[0034] Although the present disclosure has been described based on the drawings and examples, it should be noted that those skilled in the art may make various modifications and alterations based on the present disclosure. Therefore, it should be noted that these modifications and alterations are included in the scope of the present disclosure. For example, the functions included in each component or step can be rearranged so as not to be logically inconsistent, and multiple components or steps can be combined or divided into one.
[0035] For example, in the above-described embodiment, the configuration and operation of the information processing device 10 may be distributed among a plurality of computers capable of communicating with each other.
[0036] In the above embodiment, an example has been described in which the process ends when it is determined in step S103 shown in Fig. 2 that the total load of the first group of packages and the second group of packages exceeds the maximum load of the delivery vehicle (step S103-No). However, a modified example is also possible in which the process continues even when it is determined that the total load exceeds the maximum load.
[0037] The modified example will be specifically described with reference to Fig. 4. The operation of the information processing device 10 shown in Fig. 4 differs from that of Fig. 2 in that steps S105 to S107 are added. Steps S105 to S107 will be described below.
[0038] Step S105: If it is determined in step S103 that the total cargo weight exceeds the maximum load weight (step S103-No), the control unit 13 acquires attributes of each of the cargoes included in the first group of cargoes and the second group of cargoes.
[0039] An "attribute" is any information related to the delivery of a parcel. Here, an example will be described in which information on the consignee, the delivery destination, is used as an attribute. In the example shown in FIG. 5, the first group of parcels includes 10 parcels whose delivery destination consignee is "Store 01" and 15 parcels whose delivery destination consignee is "Store 02". The second group of parcels includes 12 parcels whose delivery destination consignee is "Store 01". Here, the attribute indicating that the delivery destination consignee is "Store 01" is referred to as the "first attribute". Also, the attribute indicating that the delivery destination consignee is "Store 02" is referred to as the "second attribute".
[0040] Step S106: The control unit 13 determines whether the total load of each of the parcels having the first attribute among the first parcel group and the second parcel group is equal to or less than the maximum load of the delivery vehicle. If it is determined that the total load is equal to or less than the maximum load (step S106-Yes), the process proceeds to step S107. On the other hand, if it is determined that the total load is greater than the maximum load (step S106-No), the process ends.
[0041] In the example shown in Fig. 5, the total amount of each of the first and second packages having the first attribute (i.e., each package whose delivery destination is the consignee "Store 01") is 22. Therefore, it is determined whether 22 is equal to or less than the maximum load amount.
[0042] Step S107: If it is determined in step S106 that the total load amount is equal to or less than the maximum load amount (step S106-Yes), the control unit 13 executes a second correction process.
[0043] The "second modification process" is a process for modifying the task assigned to the target vehicle in step S101 so that each piece of luggage having the first attribute among the first group of luggage and the second group of luggage is loaded and delivered together.
[0044] In the example shown in FIG. 5, the second correction process is executed, and the task assigned to the delivery vehicle in step S101, i.e., the task of "loading a total of 25 packages included in the first package group and delivering them to store 01 and store 02," is corrected to the task of "loading 10 packages included in the first package group addressed to store 01 and 12 packages included in the second package group addressed to store 01 and delivering them to store 01." By correcting the task through the second correction process, the target vehicle does not need to visit both store 01 and store 02 in one delivery. Therefore, the work time of the delivery work by the target vehicle is shortened, and the overall delivery efficiency can be improved.
[0045] Although an example in which information on a consignee, which is a delivery destination, is used as an attribute has been described, the attribute is not limited to this example. For example, information indicating a time period during which the consignee, which is a delivery destination, can receive the parcel may be used as an attribute. The "receiving time period" is a time period during which the consignee is allowed to receive the parcel. In addition, in a store such as a shopping mall, the receiving time period may differ depending on the product category of the parcel (for example, "daily necessities", "medicine", or "clothing"). In the example shown in FIG. 6, the first parcel group includes 10 parcels whose delivery destination is the consignee "Store 01" and whose receiving time period is "10:00-12:00", and 15 parcels whose receiving time period is "12:00-14:00". In addition, the second parcel group includes 12 parcels whose delivery destination is the consignee "Store 01" and whose receiving time period is "10:00-12:00". Here, the attribute indicating that the receiving time period is "10:00-12:00" is referred to as the "first attribute". Additionally, the attribute indicating that the receipt time period is "12:00-14:00" is called the "second attribute."
[0046] In this case, the total amount of parcels having the first attribute (i.e., parcels whose receiving time slot is "10:00-12:00") among the first and second parcel groups is 22. Therefore, in the above-mentioned step S106, it is determined whether 22 is equal to or less than the maximum load. Also, in the above-mentioned step S107, the second correction process is executed, so that the task assigned to the delivery vehicle in step S101, i.e., the task of "loading a total of 25 parcels included in the first parcel group together, delivering 10 parcels of category A to store 01 between 10:00 and 12:00, and delivering 15 parcels of category B to store 01" is corrected to the task of "loading 10 parcels of category A included in the first parcel group and 12 parcels of category A included in the second parcel group together, and delivering them to store 01 between 10:00 and 12:00". By modifying the task through the second modification process, the target vehicle does not need to deliver the loaded packages to the store 01 at different time slots. Therefore, the work time of the delivery work by the target vehicle is shortened, and the overall delivery efficiency can be improved.
[0047] Also, for example, an embodiment is possible in which a general-purpose computer functions as the information processing device 10 according to the above-described embodiment. Specifically, a program describing the processing contents for realizing each function of the information processing device 10 according to the above-described embodiment is stored in the memory of the general-purpose computer, and the program is read and executed by a processor. Therefore, the present disclosure can also be realized as a program executable by a processor, or a non-transitory computer-readable medium that stores the program.
[0048] Some of the embodiments of the present disclosure will be described below as examples. However, it should be noted that the embodiments of the present disclosure are not limited to these examples. [Appendix 1] A method executed by an information processing device, comprising: assigning a task of collectively loading and delivering the first group of packages to a delivery vehicle having a maximum load capacity equal to or greater than the load capacity of the first group of packages stored in the warehouse; and When a second group of packages is received at the warehouse between the time when the task is assigned and a predetermined time, a first correction process is executed to correct the task so that the first group of packages and the second group of packages are loaded and delivered together, based on the load of the first group of packages, the load of the second group of packages, and the maximum load capacity of the delivery vehicle. A method comprising: [Appendix 2] 2. The method according to claim 1, comprising: The method, wherein the specified time is a scheduled completion time of loading the first group of packages onto the delivery vehicle or a time when it is determined that the loading operation of the first group of packages has been completed. [Appendix 3] 3. The method according to claim 1 or 2, The information processing device executes the first correction process when a total load of the first group of packages and the second group of packages is less than or equal to a maximum load capacity of the delivery vehicle. [Appendix 4] 4. The method according to any one of claims 1 to 3, comprising: When a total load of the first group of packages and the second group of packages exceeds a maximum load capacity of the delivery vehicle, acquiring attributes of each package included in the first group of packages and the second group of packages; and executing a second modification process for modifying the task so as to collectively load and deliver a plurality of parcels selected from the first group of parcels and the second group of parcels, the plurality of parcels having a total load volume equal to or less than a maximum load volume of the delivery vehicle, based on the acquired attributes; The method further comprises: [Appendix 5] 5. The method according to any one of claims 1 to 4, comprising: the first group of parcels includes parcels having a first attribute and parcels having a second attribute; the second group of luggage includes luggage having the first attribute, In the second modification process, when the total load of each piece of luggage having the first attribute among the first group of luggage and the second group of luggage is less than the maximum load capacity of the delivery vehicle, the information processing device modifies the task so that each piece of luggage having the first attribute is loaded and delivered together. [Appendix 6] 6. The method according to any one of claims 1 to 5, comprising: The first attribute is information indicating that the delivery destination is a first consignee, The method, wherein the second attribute is information indicating that the delivery destination is a second consignee. [Appendix 7] 7. The method according to any one of claims 1 to 6, comprising: The first attribute is information indicating that a receiving time period of a consignee who is a delivery destination is a first time period, The method, wherein the second attribute is information indicating that the consignee, who is the delivery destination, is available for receipt during a second time period. [Appendix 8] An information processing device having a control unit, The control unit is assigning a task of loading and delivering the first group of packages collectively to a delivery vehicle having a maximum load capacity equal to or greater than the load capacity of the first group of packages stored in the warehouse; an information processing device that executes a first correction process to correct the task so that the first group of packages and the second group of packages are loaded and delivered together, when a second group of packages is received at the warehouse between the time the task is assigned and a specified time, based on the cargo volume of the first group of packages, the cargo volume of the second group of packages, and the maximum load capacity of the delivery vehicle. [Appendix 9] 9. The information processing device according to claim 8, The specified time is a scheduled completion time of loading the first group of packages onto the delivery vehicle, or a time when it is determined that the loading operation of the first group of packages has been completed. [Appendix 10] The information processing device according to claim 8 or 9, The control unit is an information processing device that executes the first correction process when a total load weight of the first group of packages and the second group of packages is less than or equal to a maximum load weight of the delivery vehicle. [Appendix 11] An information processing device according to any one of appendixes 8 to 10, The control unit is When the total amount of the first group of packages and the second group of packages exceeds the maximum load capacity of the delivery vehicle, attributes of each package included in the first group of packages and the second group of packages are acquired; an information processing device that executes a second modification process that modifies the task so as to load and deliver multiple packages selected from the first group of packages and the second group of packages based on the acquired attributes, the multiple packages having a total load volume equal to or less than a maximum load capacity of the delivery vehicle, together. [Appendix 12] An information processing device according to any one of appendixes 8 to 11, the first group of parcels includes parcels having a first attribute and parcels having a second attribute; the second group of luggage includes luggage having the first attribute, In the second correction process, the control unit corrects the task so that the parcels having the first attribute among the first group of parcels and the second group of parcels are loaded and delivered together when the total load of the parcels having the first attribute among the first group of parcels and the second group of parcels is less than or equal to the maximum load capacity of the delivery vehicle. [Appendix 13] An information processing device according to any one of appendixes 8 to 12, The first attribute is information indicating that the delivery destination is a first consignee, The second attribute is information indicating that the delivery destination is a second consignee. [Appendix 14] An information processing device according to any one of appendixes 8 to 13, The first attribute is information indicating that a receiving time period of a consignee who is a delivery destination is a first time period, The second attribute is information indicating that the receiving party, who is the delivery destination, can receive the package during a second time period. [Appendix 15] In the information processing device, assigning a task of collectively loading and delivering the first group of packages to a delivery vehicle having a maximum load capacity equal to or greater than the load capacity of the first group of packages stored in the warehouse; and When a second group of packages is received at the warehouse between the time when the task is assigned and a predetermined time, a first correction process is executed to correct the task so that the first group of packages and the second group of packages are loaded and delivered together, based on the load of the first group of packages, the load of the second group of packages, and the maximum load capacity of the delivery vehicle. A program to execute. [Appendix 16] 16. The program of claim 15, The information processing device is a program that executes the first correction process when a total load weight of the first group of packages and the second group of packages is less than or equal to a maximum load weight of the delivery vehicle. [Appendix 17] The program according to claim 15 or 16, The information processing device includes: When a total load of the first group of packages and the second group of packages exceeds a maximum load capacity of the delivery vehicle, acquiring attributes of each package included in the first group of packages and the second group of packages; and executing a second modification process for modifying the task so as to collectively load and deliver a plurality of parcels selected from the first group of parcels and the second group of parcels, the plurality of parcels having a total load volume equal to or less than a maximum load volume of the delivery vehicle, based on the acquired attributes; Further executing the program. [Appendix 18] 18. The program according to any one of appendices 15 to 17, the first group of parcels includes parcels having a first attribute and parcels having a second attribute; the second group of luggage includes luggage having the first attribute, In the second correction process, when the total load of each piece of luggage having the first attribute among the first group of luggage and the second group of luggage is less than or equal to the maximum load capacity of the delivery vehicle, the information processing device corrects the task so that each piece of luggage having the first attribute is loaded and delivered together. [Appendix 19] 19. The program according to any one of appendices 15 to 18, The first attribute is information indicating that the delivery destination is a first consignee, The second attribute is information indicating that the delivery destination is a second consignee. [Appendix 20] The program according to any one of claims 15 to 19, The first attribute is information indicating that a receiving time period of a consignee who is a delivery destination is a first time period, The second attribute is information indicating that the receiving party, who is the delivery destination, can receive the item during a second time period. [Explanation of symbols]
[0049] 10. Information processing device 11 Communications Department 12 Storage section 13 Control section
Claims
1. A method executed by an information processing device, comprising: assigning a task of collectively loading and delivering the first group of packages to a delivery vehicle having a maximum load capacity equal to or greater than the load capacity of the first group of packages stored in the warehouse; and When a second group of packages is received at the warehouse between the time when the task is assigned and a predetermined time, a first correction process is executed to correct the task so that the first group of packages and the second group of packages are loaded and delivered together, based on the load of the first group of packages, the load of the second group of packages, and the maximum load capacity of the delivery vehicle. A method comprising:
2. 2. The method of claim 1 , The method, wherein the specified time is a scheduled completion time of loading the first group of packages onto the delivery vehicle or a time when it is determined that loading the first group of packages has been completed.
3. 2. The method of claim 1 , The method further comprises: the information processing device executing the first correction process when a total load of the first group of packages and the second group of packages is less than or equal to a maximum load capacity of the delivery vehicle.
4. 4. The method according to claim 1 , further comprising the steps of: When a total load of the first group of packages and the second group of packages exceeds a maximum load capacity of the delivery vehicle, acquiring attributes of each package included in the first group of packages and the second group of packages; and executing a second modification process for modifying the task so as to collectively load and deliver a plurality of parcels selected from the first group of parcels and the second group of parcels, the plurality of parcels having a total load amount equal to or less than a maximum load capacity of the delivery vehicle, based on the acquired attributes; The method further comprises:
5. 5. The method of claim 4, the first group of luggage includes luggage having a first attribute and luggage having a second attribute; the second group of luggage includes luggage having the first attribute, In the second modification process, when the total load of each piece of luggage having the first attribute among the first group of luggage and the second group of luggage is less than the maximum load capacity of the delivery vehicle, the information processing device modifies the task so that each piece of luggage having the first attribute is loaded and delivered together.
6. 6. The method of claim 5, The first attribute is information indicating that the delivery destination is a first consignee, The method, wherein the second attribute is information indicating that the delivery destination is a second consignee.
7. 6. The method of claim 5, The first attribute is information indicating that a receiving time period of a consignee who is a delivery destination is a first time period, The method, wherein the second attribute is information indicating that the consignee, who is the delivery destination, is available for receipt during a second time period.
8. An information processing device having a control unit, The control unit is assigning a task of loading and delivering the first group of packages collectively to a delivery vehicle having a maximum load capacity equal to or greater than the load capacity of the first group of packages stored in the warehouse; When a second group of packages is received at the warehouse between the time the task is assigned and a specified time, an information processing device executes a first modification process to modify the task so that the first group of packages and the second group of packages are loaded and delivered together based on the cargo volume of the first group of packages, the cargo volume of the second group of packages, and the maximum load capacity of the delivery vehicle.
9. 9. The information processing device according to claim 8, The specified time is a scheduled completion time of loading the first group of packages onto the delivery vehicle, or a time when it is determined that the loading operation of the first group of packages has been completed, an information processing device.
10. 9. The information processing device according to claim 8, The control unit executes the first correction process when a total load of the first group of packages and the second group of packages is less than or equal to a maximum load capacity of the delivery vehicle.
11. 11. The information processing device according to claim 8, The control unit is When the total amount of the first group of packages and the second group of packages exceeds the maximum load capacity of the delivery vehicle, attributes of each package included in the first group of packages and the second group of packages are acquired; An information processing device executes a second modification process that modifies the task so that multiple packages selected from the first group of packages and the second group of packages based on the acquired attributes, and whose total load is less than or equal to the maximum load capacity of the delivery vehicle, are loaded and delivered together.
12. The information processing device according to claim 11, the first group of luggage includes luggage having a first attribute and luggage having a second attribute; the second group of luggage includes luggage having the first attribute, In the second correction process, the control unit corrects the task so that the parcels having the first attribute among the first group of parcels and the second group of parcels are loaded and delivered together when the total load of the parcels having the first attribute among the first group of parcels and the second group of parcels is less than the maximum load capacity of the delivery vehicle.
13. The information processing device according to claim 12, The first attribute is information indicating that the delivery destination is a first consignee, The second attribute is information indicating that the delivery destination is a second consignee.
14. The information processing device according to claim 12, The first attribute is information indicating that a receiving time period of a consignee who is a delivery destination is a first time period, The second attribute is information indicating that the receiving party, who is the delivery destination, can receive the package during a second time period.
15. In the information processing device, assigning a task of collectively loading and delivering the first group of packages to a delivery vehicle having a maximum load capacity equal to or greater than the load capacity of the first group of packages stored in the warehouse; and When a second group of packages is received at the warehouse between the time when the task is assigned and a predetermined time, a first correction process is executed to correct the task so that the first group of packages and the second group of packages are loaded and delivered together, based on the load of the first group of packages, the load of the second group of packages, and the maximum load capacity of the delivery vehicle. A program to execute.
16. The program according to claim 15, The information processing device is a program that executes the first correction process when a total cargo volume of the first group of packages and the second group of packages is less than or equal to a maximum load capacity of the delivery vehicle.
17. 17. The program according to claim 15 or 16, The information processing device includes: When a total load of the first group of packages and the second group of packages exceeds a maximum load capacity of the delivery vehicle, acquiring attributes of each package included in the first group of packages and the second group of packages; and executing a second modification process for modifying the task so as to collectively load and deliver a plurality of parcels selected from the first group of parcels and the second group of parcels, the plurality of parcels having a total load amount equal to or less than a maximum load capacity of the delivery vehicle, based on the acquired attributes; Further executing the program.
18. 18. The program according to claim 17, the first group of luggage includes luggage having a first attribute and luggage having a second attribute; the second group of luggage includes luggage having the first attribute, In the second correction process, the information processing device corrects the task so that the parcels having the first attribute are loaded and delivered together when the total load of each parcel having the first attribute among the first group of parcels and the second group of parcels is less than or equal to the maximum load capacity of the delivery vehicle.
19. 20. The program of claim 18, The first attribute is information indicating that the delivery destination is a first consignee, The second attribute is information indicating that the delivery destination is a second consignee.
20. 20. The program of claim 18, The first attribute is information indicating that a receiving time period of a consignee who is a delivery destination is a first time period, The second attribute is information indicating that the receiving party, who is the delivery destination, can receive the package during a second time period.
Citation Information
Patent Citations
Method for planning allocation of freight car
JP2000030179A
Operation management device, operation management system, terminal device, operation management method, and program
JP2020009304A
Transportation adjustments based on recommended shipping packages
US20180374031A1
Distribution system and distribution method
WO2020054490A1
