Management device
RPA workflows enhance attendance management by detecting and correcting attendance data errors and fraud, addressing labor-intensive configuration issues and expanding beyond PC-related work.
Patent Information
- Application Number
- JP2024043819
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing attendance management systems face challenges in accurately detecting mistakes and fraud related to attendance data, requiring significant labor for device configuration and being limited to managing work related to PCs, rather than a wide range of activities.
Utilizing robotic process automation workflows (RPA) to acquire, analyze, and update attendance data, including the detection of missing clock-out times and deviations from normal work patterns, without the need for programming expertise.
Enhances attendance management by accurately detecting and correcting errors and fraud, reducing labor requirements for system configuration and expanding beyond PC-related work to a broader range of activities.
Smart Images

Figure 2024146819000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a management device. [Background technology]
[0002] Time cards and other such devices are used to record attendance data, including arrival and departure times, to manage the attendance of employees, etc. However, with this type of management, there is concern that the attendance of employees, etc. may not be accurately understood due to mistakes such as failing to punch in and out. There is also concern that with this type of management, fraudulent punching of arrival and / or departure times may occur. For these reasons, there is a demand for a means to detect mistakes and fraudulent attendance data and support attendance management.
[0003] Regarding supporting attendance management, Patent Document 1 discloses a server characterized by having an external communication unit that receives sensor data acquired by a sensor node using a sensor and work information to a computer operated by a worker, a work quality evaluation unit that calculates a behavioral index indicating the behavioral state of the worker from the sensor data, a work identification unit that identifies the work of the worker from the work information, and a work quality calculation unit that associates the behavioral index with the identified work as work quality information that indicates the quality of the work.
[0004] The technology of Patent Document 1 may make it possible to record the quality of work performed on a PC and for each file created as a result of that work. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2009-211574 A Summary of the Invention [Problem to be solved by the invention]
[0006] However, the technology of Patent Document 1 requires additional work, such as providing a sensor node having a sensor in addition to a computer operated by a worker and configuring a server to be able to receive sensor data from the sensor node, etc. Therefore, the technology of Patent Document 1 has room for further improvement in terms of reducing the work involved in configuring a device / system that supports the management of attendance data.
[0007] In addition, the technology of Patent Document 1 can only record the quality of work related to a PC. Therefore, there is room for further improvement in the technology of Patent Document 1 in terms of detecting mistakes and fraud related to a wide range of attendance data itself, not limited to work related to a PC, and supporting attendance management.
[0008] The object of the present invention is to detect mistakes and frauds related to the attendance data itself to support attendance management while reducing the additional labor required for said support. [Means for solving the problem]
[0009] As a result of intensive research into solving the above problems, the inventors have found that the above object can be achieved by using a robotic process automation workflow (RPA workflow) to determine attendance data and to provide notifications based on the determination. The inventors have then completed the present invention. Specifically, the present invention provides the following.
[0010] The present invention provides an attendance data management device comprising: an attendance data acquisition unit capable of acquiring attendance data; an RPA execution unit capable of executing a robotic process automation workflow (RPA workflow) on the attendance data; and an attendance data update unit capable of updating the attendance data at a source from which the attendance data was acquired using the execution result of the RPA workflow, wherein the attendance data includes one or more pieces of attendance time data, the attendance time data being associated with a working day and having an attendance time and / or a clock-out time, and the RPA workflow includes a workflow for detecting scheduled attendance time data that has the attendance time and does not have the clock-out time, notifying the existence of the detected scheduled attendance time data, and assigning a scheduled clock-out time that is later than the attendance time to the scheduled attendance time data.
[0011] Robotic process automation workflows (RPA workflows) are used to monitor and identify when a user executes a workflow on an application's graphical user interface (GUI), create an action list, and execute automation by repeating the recorded workflow directly on the GUI. Because RPA workflows do not require coding to write programs and scripts, even users with no programming experience can record workflows without spending a lot of effort to become proficient in coding.
[0012] The present invention detects scheduled attendance time data that includes an attendance time but does not include a attendance time, i.e., that is suspected to contain some kind of error or fraud, and executes a workflow that notifies the existence of the detected scheduled attendance data by using an RPA workflow. As a result, the present invention can detect errors and fraud in the attendance data itself to support attendance management, while reducing the additional labor required for such support by using an RPA workflow.
[0013] In addition, the present invention executes an RPA workflow that assigns a later designated clock-out time to the designated clock-out data in which the above-mentioned error or fraud related to the clock-out time has been detected, and the execution result of this RPA workflow can be used to update the attendance data at the source. This reduces the effort required to reflect the correction results related to the detected error or fraud one by one in the attendance data at the source. Effect of the Invention
[0014] The present invention can detect mistakes and fraudulent acts related to the attendance data itself to support attendance management while reducing the additional labor required for such support. [Brief description of the drawings]
[0015] [Figure 1] FIG. 1 is a block diagram showing an example of the hardware configuration and software configuration of a system S of the present embodiment. [Diagram 2] FIG. 2 is an example of the attendance data 121. [Diagram 3] FIG. 3 is a main flowchart showing an example of a preferable flow of the management process executed by the management device 1 of this embodiment. [Figure 4] FIG. 4 is a continuation of FIG. [Diagram 5] FIG. 5 is a continuation of FIG. [Figure 6] FIG. 6 is a continuation of FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] Hereinafter, an example of an embodiment of the present invention will be described in detail with reference to the drawings.
[0017] <System S> 1 is a block diagram showing an example of a hardware configuration and a software configuration of a system S of this embodiment. Hereinafter, an example of a preferred embodiment of the system S of this embodiment will be described with reference to FIG.
[0018] The system S includes at least a management device 1. The system S preferably further includes a terminal T capable of communicating with the management device 1 via a network N. This allows the existing terminal T to use the functions of the management device 1 via the network N.
[0019] [Management device 1] The management device 1 includes a control unit 11, a storage unit 12, and a communication unit 13. The type of the management device 1 is not particularly limited. The type of the management device 1 may be, for example, a server device, a cloud server, a terminal, etc. The terminal may be, for example, a personal computer, a laptop computer, a smartphone, a tablet terminal, etc.
[0020] [Control unit 11] The control unit 11 includes a central processing unit (CPU), a random access memory (RAM), and a read only memory (ROM).
[0021] The control unit 11 cooperates with the storage unit 12 and / or the communication unit 13 as necessary. The control unit 11 then realizes software components of the program of this embodiment executed by the management device 1, such as an attendance data acquisition unit 111, a workload acquisition unit 112, an RPA execution unit 113, a confirmation unit 114, an attendance data update unit 115, and a machine learning unit 116. The functions provided by each of the software components of the program of this embodiment will be described in the description of a preferred flow of the management process described later.
[0022] [Storage section 12] The storage unit 12 is a device in which data and / or files are stored, and includes a data storage unit such as a hard disk, a semiconductor memory, a recording medium, and a memory card.
[0023] The storage unit 12 may have a mechanism that enables connection via the network N to a storage device or storage system such as a NAS, a SAN, cloud storage, a file server, and / or a distributed file system.
[0024] The storage unit 12 stores a program executed by a microcomputer, a robot capable of executing a robotic process automation workflow (RPA workflow), etc. In addition, the storage unit 12 may store attendance data 121, machine learning data, etc.
[0025] The program is preferably obtainable from a server or the like via a code (gift code) associated with the program. This allows a user of the management device 1 to share with a third party the program that enables a terminal or the like to be used as the management device 1 by the simple procedure of transmitting the gift code. The third party can obtain the program using the received gift code and use the terminal or the like that he or she uses as the management device 1.
[0026] (Attendance data 121) The attendance data 121 includes one or more pieces of attendance / leave time data. Each of the one or more pieces of attendance / leave time data is associated with a work date. Each of the attendance / leave time data includes a work arrival time and / or a work leaving time. By storing the attendance data 121 including such attendance / leave time data in the memory unit 12, the management device 1 can detect mistakes, fraud, etc. related to the attendance data and support attendance management.
[0027] It is preferable that the attendance data 121 further includes employee information that can identify employees, etc. This allows the management device 1 to manage attendance for each employee. It is preferable that the attendance data 121 further includes the amount of work related to the arrival and departure time data. This allows the management device 1 to manage the amount of work related to working hours.
[0028] It is preferable that the attendance data 121 stores the attendance time data ID that can identify the attendance time data and the corresponding attendance time data in association with each other. In this way, the management device 1 can manage the subject information using the attendance time data ID.
[0029] FIG. 2 is an example of the attendance data 121. In the example shown in FIG. 2, for the attendance / leave time data ID "T0001", the attendance / leave time data and the workload "50" are stored, which indicate that the employee "Yamada Taro" clocked in at the attendance time "9:00" on the attendance date "April 1, 2023" but did not clock out at the time of leaving. In addition, in the example shown in FIG. 2, for the attendance / leave time data ID "T0002", the attendance / leave time data and the workload "100" are stored, which indicate that the employee "Yamada Taro" clocked in at the attendance time "9:00" on the attendance date "April 2, 2023" and clocked out at the time of leaving "17:00".
[0030] 2 is stored in the memory unit 12, the management device 1 can manage the attendance of employee "Yamada Taro" for "April 1, 2023" and "April 2, 2023". For example, since Yamada Taro's working hours were 8 hours and his workload was 100 on April 1, 2023, the management device 1 can estimate the working hours on April 1, 2023, which has a workload of 50, to be about 4 hours, and perform management to prompt the employee to add the predicted leaving time based on this to the arrival and leaving time data for April 1, 2023.
[0031] (Machine learning data) The machine learning data includes work pattern discrimination machine learning data related to discrimination of whether the arrival time and the departure time are within the normal work pattern. The work pattern discrimination machine learning data is data that has learned to discriminate whether the arrival time and the departure time are within the normal work pattern based on the acquired attendance data. By storing the work pattern discrimination machine learning data in the memory unit 12, the management device 1 can execute a workflow that discriminates whether the arrival time and the departure time data are within the normal work pattern based on machine learning, and notifies special arrival and departure time data that is not determined to be within the normal work pattern.
[0032] (robot) The robot is data indicating the operation of a robotic process automation workflow (RPA workflow) executed by the RPA execution unit 113. The format of the robot is not particularly limited.
[0033] The memory unit 12 stores at least a first robot capable of executing a first workflow that detects, from specified attendance data, predetermined attendance time data that has an attendance time and does not have a clock-out time, notifies the existence of the detected predetermined attendance time data, and assigns a predetermined clock-out time that is later than the attendance time to the predetermined attendance time data.
[0034] It is preferable that the memory unit 12 stores a second robot capable of executing a second workflow that detects, from the specified attendance data, specific attendance time data in which the time from the arrival time to the departure time is not included in a specific range, notifies the existence of the detected specific attendance time data, and updates the specific departure time so that the time from the arrival time is included in the specific range.
[0035] It is preferable that the memory unit 12 stores a third robot capable of executing a third workflow that determines, based on machine learning from specified attendance data, whether arrival and departure time data is within a normal work pattern, and notifies special arrival and departure time data that is not determined to be within the normal work pattern.
[0036] It is preferable that the memory unit 12 stores a fourth robot capable of executing a workflow that determines, from specified attendance data, whether the amount of work for working hours based on arrival and departure time data is within a specified range, and notifies the designated arrival and departure time data for the designated amount of work that is not determined to be within the specified range.
[0037] [Communications Section 13] The communication unit 13 is not particularly limited as long as it connects the management device 1 to the network N and enables communication with the terminal T, etc. Examples of the communication unit 13 include a wireless device compatible with a mobile phone network, a device connectable to a wireless LAN, and a network card compatible with the Ethernet standard.
[0038] [Network N] The type of the network N is not particularly limited as long as it enables communication between the management device 1 and the terminals T. The type of the network N is, for example, the Internet, a mobile phone network, a wireless LAN, or the like.
[0039] [Terminal T] The terminal T is not particularly limited as long as it can be used to manage attendance data. The terminal T is, for example, a personal computer, a laptop computer, a smartphone, a tablet terminal, or the like.
[0040] Terminal T is capable of executing, with regard to the management processing described below, an attendance data designation process that designates the attendance data to be processed, a display process that displays various information used to decide whether or not to update the attendance data, and a judgment result provision process that provides the management device with the result of the decision made by the user of terminal T as to whether or not to update the attendance data.
[0041] [Main Flowchart of Management Processing] Fig. 3 is a main flow chart showing an example of a preferable flow of the management process executed by the management device 1 of this embodiment. Fig. 4 is a diagram continuing from Fig. 3. Fig. 5 is a diagram continuing from Fig. 4. Fig. 6 is a diagram continuing from Fig. 5. Below, an example of a preferable flow of the management process executed by the management device 1 of this embodiment will be described with reference to Figs. 3 to 6.
[0042] [RPA Recording Steps] The management process preferably includes an RPA recording step for recording operations related to various robots capable of executing the above-mentioned various workflows, such as a first RPA recording step for recording operations related to a first robot capable of executing the above-mentioned first workflow. This allows the management device 1 to record operations related to robots capable of executing workflows without requiring a user with no programming experience to expend a great deal of effort to become proficient in coding. In other words, the management device 1 can record workflows with less effort for various applications with different procedures for obtaining, viewing, editing, etc. of attendance data.
[0043] The management device 1 executes an attendance data acquisition step (steps S1 to S2) for acquiring attendance data.
[0044] [Step S1: Determine whether to obtain attendance data] The control unit 11 cooperates with the storage unit 12 and the communication unit 13 to execute the attendance data acquisition unit 111. Then, the control unit 11 executes a process related to the attendance data acquisition unit 111 to determine whether to acquire attendance data (step S1, attendance data acquisition determination step). If it is determined that the attendance data is to be acquired, the control unit 11 shifts the process to step S2. If it is determined that the attendance data is not to be acquired, the control unit 11 shifts the process to step S1.
[0045] The attendance data acquisition determination step is not particularly limited. For example, the attendance data acquisition determination step may be a procedure for determining that attendance data is to be acquired when an instruction is received from a user via the terminal T, or a procedure for determining that attendance data is to be acquired at a predetermined timing before payday.
[0046] Since the attendance data acquisition determination step includes a procedure for determining that attendance data should be acquired when an instruction is received from a user via terminal T, an employer can check whether there are any missed punches in the attendance data and make corrections at any time when the employer feels the need to manage the attendance of an employee.
[0047] By including a procedure for determining that attendance data should be acquired if the step of determining whether or not the attendance data has been acquired is at a specified timing before payday, the employer can check whether there are any missed punches in the attendance data before paying the salary and can manage the correction.
[0048] [Step S2: Obtain attendance data] The control unit 11 executes a process for acquiring the attendance data determined to be acquired in step S1, which is related to the attendance data acquisition unit 111 (step S2, attendance data acquisition execution step). The control unit 11 moves the process to step S3.
[0049] The attendance data acquisition execution step is not particularly limited as long as it executes a process of acquiring attendance data. The attendance data acquisition execution step includes, for example, a procedure of acquiring attendance data specified by a user from the memory unit 12, the terminal T, or an external storage. The format of the attendance data acquired in the attendance data acquisition execution step is not particularly limited. The format is preferably CSV format. This allows the user to manage the attendance data by the management device 1 as long as the attendance data can be output in CSV format.
[0050] The management device 1 is preferably configured to execute a workload acquisition step (steps S3 to S4) of acquiring the workload.
[0051] [Step S3: Determine whether to obtain the amount of work] The control unit 11 cooperates with the storage unit 12 and the communication unit 13 to execute the workload acquisition unit 112. Then, the control unit 11 executes a process related to the workload acquisition unit 112 to determine whether to acquire the workload related to the attendance data acquired in step S2 (step S3, workload acquisition determination step). If it is determined that the workload is to be acquired, the control unit 11 shifts the process to step S4. If it is not determined that the workload is to be acquired, the control unit 11 shifts the process to step S5.
[0052] [Step S4: Obtain the amount of work] The control unit 11 executes a process related to the workload acquisition unit 112 to acquire the workload determined to be acquired in step S3 (step S4, workload acquisition execution step). The control unit 11 moves the process to step S5.
[0053] The work amount acquisition execution step is not particularly limited as long as it executes a process of acquiring the work amount related to the attendance data acquired in step S2. The work amount acquisition execution step includes, for example, a procedure of acquiring the work amount related to the attendance data acquired in step S2 from the storage unit 12, the terminal T, or an external storage.
[0054] When the attendance data and the like are acquired, the management device 1 executes an RPA execution step (steps S5 to S18) for executing various RPA workflows such as an RPA workflow related to the predetermined arrival and departure time data.
[0055] The RPA execution step includes at least a first RPA step (steps S5 to S8) for executing an RPA workflow related to the predetermined clock-in / clock-out time data. This allows the management device 1 to perform attendance management by detecting and notifying attendance data that includes a missed clock-out time stamp in the clock-in / clock-out time data.
[0056] [Step S5: Execute RPA workflow related to scheduled attendance time data] The control unit 11 cooperates with the storage unit 12 and the communication unit 13 to execute the RPA execution unit 113. The control unit 11 then executes a process related to the RPA execution unit 113, which is a process for executing an RPA workflow (RPA workflow related to predetermined arrival and departure time data) of the first workflow that detects predetermined arrival and departure time data that has an arrival time and does not have a departure time from the attendance data acquired in step S2 (step S5, first workflow execution step). The control unit 11 moves the process to step S6.
[0057] [Step S6: Determine whether the scheduled arrival and departure time data is detected] The control unit 11 executes a process related to the RPA execution unit 113, which determines whether or not predetermined arrival and departure time data has been detected in step S5 (step S6, first workflow detection step). If it is determined that the data has been detected, the control unit 11 moves the process to step S7. If it is not determined that the data has been detected, the control unit 11 moves the process to step S9.
[0058] [Step S7: Notify the presence of detected scheduled arrival and departure time data] The control unit 11 executes a process related to the RPA execution unit 113, which is a process of notifying the presence of the predetermined arrival and departure time data determined to have been detected in step S6 (step S7, first workflow notification step). The control unit 11 moves the process to step S8.
[0059] [Step S8: Confirmation of designated end time] The control unit 11 cooperates with the storage unit 12 and the communication unit 13 to execute the confirmation unit 114. The control unit 11 then executes a process related to the confirmation unit 114, which is a process for confirming whether a predetermined clock-out time that is later than the clock-in time is assigned to the predetermined clock-out time data notified in step S7 (step S8, first workflow confirmation step). The control unit 11 moves the process to step S19.
[0060] The "confirmation regarding the assignment of a designated clock-out time" in the first workflow confirmation step is a confirmation regarding the assignment of a designated clock-out time that is later than the clock-in time to the designated clock-out time data. This allows the management device 1 to assign a designated clock-out time based on the user's confirmation. The designated clock-out time is not particularly limited as long as it is later than the clock-in time. The designated clock-out time may be, for example, the employee's normal clock-out time related to the attendance data, or the clock-out time when overtime work is performed.
[0061] The RPA execution step preferably includes a second RPA step (steps S9 to S12) for executing an RPA workflow related to the specific attendance time data. This allows the management device 1 to perform attendance management by detecting and notifying attendance data in which the working hours indicated by the attendance time data are different from the range of normal working hours (specific range).
[0062] [Step S9: Execute RPA workflow related to specific attendance time data] The control unit 11 executes a process related to the RPA execution unit 113, which is a process for executing an RPA workflow (RPA workflow related to specific attendance time data) that detects specific attendance time data in which the time from the attendance time to the clock-out time is not included in a specific range from the second workflow, for the attendance data acquired in step S2 (step S9, second workflow execution step). The control unit 11 moves the process to step S10.
[0063] The specific range is not particularly limited as long as it is a range that indicates that the time from the start time to the end time is not included in the normal working pattern. The specific range may be, for example, a time designated by a manager, such as within 10 hours, the normal working hours of the employee related to the attendance data, or the maximum working hours when overtime is involved.
[0064] [Step S10: Determine whether specific arrival / departure time data is detected] The control unit 11 executes a process related to the RPA execution unit 113, which determines whether specific arrival / leave time data has been detected in step S9 (step S10, second workflow detection step). If it is determined that the data has been detected, the control unit 11 moves the process to step S11. If it is not determined that the data has been detected, the control unit 11 moves the process to step S13.
[0065] [Step S11: Notify the presence of detected specific arrival / departure time data] The control unit 11 executes a process related to the RPA execution unit 113, which is a process of notifying the existence of the specific arrival / departure time data determined to have been detected in step S10 (step S11, second workflow notification step). The control unit 11 moves the process to step S12.
[0066] [Step S12: Execute confirmation regarding the update of specific clock-out time] The control unit 11 cooperates with the storage unit 12 and the communication unit 13 to execute the confirmation unit 114. The control unit 11 then executes a process related to the confirmation unit 114, which is a process for confirming the update of the clock-out time (specific clock-out time) included in the specific clock-out time data notified in step S11 (step S12, second workflow confirmation step). The control unit 11 moves the process to step S19.
[0067] The "confirmation regarding the update of the specific clock-out time" in the second workflow confirmation step is a confirmation regarding updating the specific clock-out time so that the time from the clock-in time falls within a specific range. This allows the management device 1 to update the specific clock-out time based on the user's confirmation. The specific clock-out time is not particularly limited as long as the time from the clock-in time falls within a specific range. The specific clock-out time may be, for example, the clock-out time obtained by adding the employee's normal working hours related to the attendance data to the clock-in time, or the clock-out time obtained by adding the working hours in the case of overtime, etc., to the clock-in time.
[0068] The RPA execution step preferably includes a third RPA step (steps S13 to S15) for executing an RPA workflow related to special attendance data. This allows the management device 1 to perform attendance management based on machine learning, detecting and notifying attendance data whose attendance data differs from a normal work pattern.
[0069] As a result, for example, if an employee whose normal work arrival time is between 8:45 and 8:55 has a work arrival / departure time of 9:05 included in the attendance data, the management device 1 can detect and notify the work arrival / departure time as special work arrival / departure time data.
[0070] [Step S13: Execute RPA workflow related to special attendance time data] The control unit 11 executes a process related to the RPA execution unit 113, which is a process for executing an RPA workflow (RPA workflow related to special arrival / leave time data) of the third workflow that determines whether the arrival / leave time data is within a normal work pattern based on machine learning for the attendance data acquired in step S2 (step S13, third workflow execution step). The control unit 11 moves the process to step S14.
[0071] [Step S14: Determine whether special arrival / departure time data is detected] The control unit 11 executes a process related to the RPA execution unit 113, which determines whether special arrival / leave time data has been detected in step S13 (step S14, third workflow detection step). If it is determined that the special arrival / leave time data has been detected, the control unit 11 moves the process to step S15. If it is not determined that the special arrival / leave time data has been detected, the control unit 11 moves the process to step S16.
[0072] [Step S15: Notify the presence of detected special entry / exit time data] The control unit 11 executes a process related to the RPA execution unit 113, which is a process of notifying the existence of the special arrival / departure time data determined to have been detected in step S14 (step S15, third workflow notification step). The control unit 11 shifts the process to step S19.
[0073] The RPA execution step preferably includes a fourth RPA step (steps S16 to S18) for executing an RPA workflow related to the designated attendance time data. This allows the management device 1 to perform attendance management by detecting and notifying attendance data in which the relationship between the attendance time data and the workload is not within the normal range (designated range).
[0074] [Step S16: Execute the RPA workflow related to the designated entry and exit time data] The control unit 11 executes a process related to the RPA execution unit 113, which is a process for executing a determination RPA workflow (RPA workflow related to designated arrival and departure time data) of the fourth workflow for determining whether the workload (productivity) for the working hours based on the arrival and departure time data falls within a designated range for the attendance data acquired in step S2 and the workload acquired in step S4 (step S16, fourth workflow execution step). The control unit 11 moves the process to step S17.
[0075] [Step S17: Determine whether there is any work volume outside the specified range] The control unit 11 executes a process related to the RPA execution unit 113, which determines whether there is a workload outside the specified range in step S16 (step S17, fourth workflow detection step). If it is determined that there is a workload outside the specified range, the control unit 11 shifts the process to step S18. If it is not determined that there is a workload outside the specified range, the control unit 11 shifts the process to step S21.
[0076] [Step S18: Notify of the presence of designated arrival and departure time data] The control unit 11 executes a process related to the RPA execution unit 113, which is a process of notifying the existence of designated start / stop time data related to the workload determined to have been detected in step S17 (step S18, fourth workflow notification step). The control unit 11 moves the process to step S19.
[0077] [Step S19: Determine whether to update attendance data] The control unit 11 cooperates with the storage unit 12 and the communication unit 13 to execute the confirmation unit 114. The control unit 11 then executes a process related to the confirmation unit 114, which is a process for determining whether to update the attendance data acquired in step S2 (step S19, confirmation step). If it is determined that the data should be updated, the control unit 11 shifts the process to step S20. If it is determined that the data should not be updated, the control unit 11 shifts the process to step S21.
[0078] The confirmation step includes a procedure for determining that the attendance data is to be updated when a user or the like who is requested to make a confirmation instructs the updating of the attendance data in response to the confirmation by the confirmation unit 114 executed in step S8, step S12, etc. The instruction may be an instruction to update the attendance data to the content indicated in the confirmation by the confirmation unit 114, or an instruction to update the attendance data to the content different from the content indicated in the confirmation by the confirmation unit 114.
[0079] This allows the management device 1 to update the attendance data through reliable processing based on the user's confirmation.
[0080] [Step S20: Update attendance data at source] The control unit 11 cooperates with the storage unit 12 and the communication unit 13 to execute the attendance data update unit 115. The control unit 11 then executes a process related to the attendance data update unit 115, which is a process for updating the attendance data acquired in step S2 at the acquisition source based on the execution result of the executed RPA workflow (step S20, attendance data update step). The control unit 11 moves the process to step S21.
[0081] When the third RPA step is included in the management process, it is preferable that the management process includes a machine learning step (step S21) that performs machine learning related to determining whether the arrival time and departure time are within a normal work pattern.
[0082] [Step S21: Run machine learning] The control unit 11 cooperates with the storage unit 12 and the communication unit 13 to execute the machine learning unit 116. The control unit 11 then executes a process related to the machine learning unit 116, which is a process for performing machine learning related to determining whether the arrival time and the departure time are within the normal work pattern based on the attendance data acquired in step S2 (step S21, machine learning step). The control unit 11 ends the management process and moves the process to step S1.
[0083] The machine learning step includes a procedure for updating the machine learning data stored in the storage unit 12 based on the machine learning. Through the machine learning step, the management device 1 can improve the accuracy of determining whether or not a work pattern is within a normal work pattern as attendance data accumulates.
[0084] [Data generation step] The management process preferably includes a data generation step of generating data such as a pay slip based on the attendance data updated in step S20. This allows the management device 1 to further reduce additional efforts related to supporting attendance management.
[0085] The data generation step is preferably realized by an RPA workflow. In addition, the data generation step preferably includes a procedure for distributing the generated data via email or the like. This allows the management device 1 to further reduce additional labor involved in supporting attendance management. The data generated in the data generation step is not particularly limited, and includes, for example, pay slips, FB data for bank transfers, FB data for resident taxes, and the like.
[0086] [Productivity calculation step] The management process preferably includes a productivity calculation step of calculating the amount of work (productivity) relative to working hours. This allows the user to compare the productivity of his or her own company with that of other companies in the same industry. The productivity calculation step is preferably realized by an RPA workflow.
[0087] <Example of use of management device 1> An example of how the management device 1 is used will now be described.
[0088] [Acquisition of attendance data] A user specifies attendance data to be managed. The attendance data is, for example, a time card output in CSV format. The management device 1 acquires the specified attendance data from a source such as a terminal T or cloud storage.
[0089] [Obtaining the amount of work] The user specifies the amount of work. The amount of work is, for example, a daily amount of a deliverable recorded in the terminal T, cloud storage, etc. The management device 1 acquires the specified amount of work from an acquisition source such as the terminal.
[0090] [Check for missing stamps] The management device 1 executes the first workflow by the first robot. Then, the management device 1 determines whether the user has missed punching in the clock-out time in the first workflow. If the user has missed punching in the clock-out time, the management device 1 notifies the user of the missed punching via the terminal T and presents a suggested correction to the clock-out time to prompt the user to confirm it. The user confirms the suggested correction via the terminal T and continues executing the first workflow to correct the clock-out time to the same as the suggested correction. If necessary, the user manually corrects the clock-out time to a different time from the suggested correction.
[0091] [Check for stamping errors] The management device 1 executes the second workflow by the second robot. Then, the management device 1 determines whether there was a working time within a specific range in the second workflow. If there was a working time within the specific range, that is, if a clock-out error is suspected, the management device 1 notifies the user of the working time via the terminal T and presents a suggested correction to the clock-out time to prompt confirmation. The user confirms the suggested correction via the terminal T and continues executing the second workflow to correct the clock-out time to the same as the suggested correction. If necessary, the user manually corrects the clock-out time to a different time from the suggested correction.
[0092] [Machine learning checks] The management device 1 executes the third workflow by the third robot. Then, the management device 1 determines whether there is an abnormal pattern of attendance in the third workflow. If there is an abnormal pattern of attendance, the management device 1 notifies the user of such attendance via the terminal T. If necessary, the user takes measures such as correcting attendance data and interviewing the employee who attended the corresponding attendance.
[0093] [Checking the amount of work per hour] The management device 1 executes the fourth workflow by the fourth robot. Then, the management device 1 determines whether the amount of work per working hour in the fourth workflow was different from normal. If the amount of work per working hour was different from normal, the management device 1 notifies the user of such a case via the terminal T. If necessary, the user takes measures such as correcting attendance data and interviewing employees related to the amount of work.
[0094] An example of a preferred embodiment of the present invention has been described above. However, within the scope of the concept of the present invention, a person skilled in the art may come up with various modifications and alterations. Therefore, it is understood that such modifications and alterations are within the scope of the present invention, as is the case with the above-mentioned example. For example, if a person skilled in the art appropriately adds, deletes, or modifies the design of the above-mentioned embodiment, or adds, omits, or modifies the conditions of a process, these modifications and alterations are included in the scope of the present invention, as is the case with the above-mentioned example, as long as they include the gist of the present invention. [Explanation of symbols]
[0095] S System 1 Management device 11 Control section 111 Attendance Data Acquisition Department 112 Work amount acquisition part 113 RPA Execution Department 114 Verification Department 115 Attendance Data Update Department 116 Machine Learning Department 12 Storage section 121 Attendance Data 13. Communications Department N Network T-Terminal
Claims
1. An attendance data acquisition unit capable of acquiring attendance data; An RPA execution unit capable of executing a robotic process automation workflow (RPA workflow) on the attendance data; an attendance data update unit capable of updating the attendance data at a source where the attendance data was acquired using an execution result of the RPA workflow; Equipped with The attendance data includes one or more pieces of arrival and departure time data, The work arrival / departure time data is associated with a work date and has a work arrival time and / or a work departure time, The RPA workflow includes a workflow for detecting predetermined clock-in / out time data that has the clock-in time and does not have the clock-out time, notifying the presence of the detected predetermined clock-in / out time data, and assigning a predetermined clock-out time that is later than the clock-in time to the predetermined clock-in / out time data. A device for managing attendance data.
2. The management device of claim 1, wherein the RPA execution unit is capable of executing a workflow that detects specific attendance time data where the time from the arrival time to the departure time is not included in a specific range, notifies the existence of the detected specific attendance time data, and updates the specific attendance time data so that the time from the arrival time is included in the specific range.
3. The system further includes a machine learning unit capable of performing machine learning to determine whether the arrival time and departure time of a work shift are within a normal work pattern based on the acquired attendance data, The RPA execution unit is capable of executing a workflow that determines whether the arrival / leave time data is within a normal work pattern based on the machine learning, and notifies the user of special arrival / leave time data that is not determined to be within the normal work pattern. The management device according to claim 1 .
4. A workload acquisition unit capable of acquiring a workload related to the arrival and departure time data, The RPA execution unit is capable of executing a workflow that determines whether the workload for the working hours based on the arrival and departure time data is within a designated range, and notifies designated arrival and departure time data related to a designated workload that is not determined to be within the designated range. The management device according to claim 1 .
Citation Information
Patent Citations
Server and sensor network system for measuring quality of activity
JP2009211574A
