Construction planning system and construction planning method
The system predicts odor index values based on human olfactory responses and construction conditions to generate plans that mitigate odor issues during renovation, enhancing user comfort and worker safety.
Patent Information
- Application Number
- JP2023060912
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-04
- Publication Date
- 2024-10-17
- Estimated Expiration
- 2043-04-04
AI Technical Summary
Existing construction plans fail to adequately consider human tolerance to odors generated by building materials during renovation work, leading to potential complaints from users due to unpredictable odor levels, even when using VOC concentration prediction methods.
A system and method that predict time-series odor index values based on human olfactory responses and construction conditions, allowing for the generation of construction plans that account for odor generation, ventilation, and material selection to ensure user comfort.
Generates appropriate construction plans that minimize odor impact on users and workers by considering human tolerance and ventilation, improving working environments and user comfort during and after construction.
Smart Images

Figure 2024148032000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a construction plan generating system and a construction plan generating method for generating a construction plan. [Background technology]
[0002] Patent Document 1 discloses a method for predicting the concentration of VOCs (volatile organic compounds) emitted from materials constituting a building within the building. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 7089924 Summary of the Invention [Problem to be solved by the invention]
[0004] Recently, the demand for building renovation work has been increasing, and the proportion of "renovation work while occupying the building" where renovation work is done while the building is in use is increasing. Renovation work while occupying the building has the advantage that the renovation work can be done while maintaining the productivity or sales related to the use of the building. However, in interior work during renovation work while occupying the building, odors generated from building materials such as paint and primers used for decorative boards are often a problem, which can lead to complaints from users.
[0005] In order to prevent this problem, it is necessary to properly plan the construction (construction) schedule, including the timing when the building users can start using the construction room where the renovation work will be performed (start of use), the building materials to be used, and the ventilation schedule during construction. In other words, it is necessary to plan the construction in consideration of the building users during and after the construction work.
[0006] Since VOC concentration affects odor, it is possible to use the VOC concentration prediction method shown in Patent Document 1 when planning construction work. However, depending on the type of VOC, some VOCs have a strong odor even at low concentrations, while others have a weak odor even at high concentrations. Therefore, it is not possible to determine whether the odor emitted from a building is at a level that is tolerable to humans based on the VOC concentration alone. Therefore, simply using the VOC concentration prediction method shown in Patent Document 1 when planning construction work does not necessarily result in an appropriate construction plan.
[0007] The present invention has been made in consideration of the above, and has an object to provide a construction plan generating system and a construction plan generating method capable of generating an appropriate construction plan. [Means for solving the problem]
[0008] In order to achieve the above-mentioned object, the construction plan generation system of the present invention comprises a unit index value acquisition means for acquiring a unit index value based on human olfactory sense of odor generated from a building material per unit amount of the building material used in the construction work according to the elapsed time since the construction work using the building material, a condition information acquisition means for acquiring condition information indicating the conditions of the construction work including the amount of the building material used in the construction work, a prediction means for predicting a time-series odor index value generated at the construction site when construction work using the building material is carried out from the unit index value acquired by the unit index value acquisition means and the condition information acquired by the condition information acquisition means, and a construction plan generation means for generating a construction plan based on the time-series odor index value predicted by the prediction means.
[0009] In the construction plan generating system according to the present invention, the time series odor index value occurring at the site is predicted from the unit index value based on human olfactory sense and condition information, and a construction plan is generated based on the predicted index value. Therefore, the construction plan is generated with more appropriate consideration of the odor generated by the construction. In this way, the construction plan generating system according to the present invention can generate an appropriate construction plan.
[0010] The unit index value acquiring means may acquire a unit index value when a predetermined ventilation is performed, and the condition information acquiring means may acquire condition information including information related to the ventilation. With this configuration, it is possible to generate an appropriate construction plan that takes ventilation into consideration.
[0011] The construction plan generating means may generate a construction plan by comparing the time-series odor index value predicted by the prediction means with a preset threshold value. With this configuration, an appropriate construction plan based on the threshold value can be generated.
[0012] The construction plan generating means may calculate, as the construction plan, a time when the building on which construction is to be performed will be made available to users.The construction plan generating means may determine, as the construction plan, candidate types of building materials to be used in the construction.The construction plan generating means may determine, as the construction plan, ventilation during the construction.With these configurations, these specific construction plans can be generated.
[0013] The condition information acquisition means may acquire condition information including information indicating the area of the construction target relative to the entire area affected by odors caused by the construction. With this configuration, it is possible to generate an appropriate construction plan that takes into account the area of the construction target relative to the area affected by odors caused by the construction.
[0014] Incidentally, the present invention can be described not only as an invention of a construction plan generation system as described above, but also as an invention of a construction plan generation method as described below. These are essentially the same inventions, with the only difference being in different categories, and they have similar functions and effects.
[0015] In other words, the construction plan generation method of the present invention is a construction plan generation method that is an operation method of a construction plan generation system, and includes a unit index value acquisition step of acquiring a unit index value based on human olfactory sense of odor generated from a building material per unit amount of the building material used in the construction work according to the elapsed time since the construction work using the building material, a condition information acquisition step of acquiring condition information indicating the conditions of the construction work including the amount of the building material used in the construction work, a prediction step of predicting a time-series odor index value that will be generated at the construction site when construction work using the building material is carried out from the unit index value acquired in the unit index value acquisition step and the condition information acquired in the condition information acquisition step, and a construction plan generation step of generating a construction plan based on the time-series odor index value predicted in the prediction step. Effect of the Invention
[0016] According to the present invention, an appropriate construction plan can be generated. [Brief description of the drawings]
[0017] [Figure 1] 1 is a diagram showing a functional configuration of a construction plan generation system according to an embodiment of the present invention. [Diagram 2] 1 is an example of a graph showing odor concentration versus time since application of a building material. [Diagram 3] 1 is an example of a graph of non-acceptance rate as a function of time since application of a building material. [Figure 4] FIG. 1 is a diagram for explaining the entrance-type odorless chamber method. [Diagram 5] FIG. 1 is a diagram for explaining the triple-bag odor comparison method. [Figure 6] 1 is a graph showing an example of a calibration curve illustrating the relationship between odor concentration and non-acceptance rate. [Figure 7] 13 is a graph showing an example of predicted odor concentration values according to the elapsed time from application of a building material. [Figure 8] 1 is a graph showing an example of a calibration curve illustrating the relationship between odor concentration and non-acceptance rate for each type of building material. [Figure 9]13 is a graph showing an example of predicted odor concentration values for each type of building material according to the elapsed time from application of the building material. [Figure 10] 13 is a graph showing an example of predicted odor concentration for each ventilation frequency according to the elapsed time from application of a building material. [Figure 11] FIG. 13 is a diagram showing a construction room, part of which is a construction area. [Figure 12] 13 is an example of a graph showing predicted odor concentrations for each target area according to the elapsed time since application of a building material. [Figure 13] 2 is a flowchart showing a construction plan generating method which is a process executed in the construction plan generating system according to the embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0018] Hereinafter, an embodiment of a construction plan generating system and a construction plan generating method according to the present invention will be described in detail with reference to the drawings. In the description of the drawings, the same elements are given the same reference numerals and duplicated explanations will be omitted.
[0019] Fig. 1 shows the functional configuration of a construction plan generation system 10 according to this embodiment. The construction plan generation system 10 is a system (apparatus) that generates (drafts) construction plans. The construction related to the generated construction plan is carried out using building materials that produce odors. The construction plan generation system 10 generates a construction plan that takes into account odors produced by the building materials.
[0020] For example, the construction work is construction work to renovate a building. The construction work may also be a renovation (renewal) work in which rooms are renovated while the building is in use. Building materials that produce odors and are used in the construction work include, for example, paint and primers used for decorative boards. In this embodiment, these building materials are described as examples of building materials that produce odors. The building materials may also be primers for decorative films, construction anchors (e.g., chemical anchors), paints, etc.
[0021] Construction using building materials (construction of building materials) includes installation of building materials and application of building materials. The construction plan generated by the construction plan generation system 10 is, for example, the time when users of the building where the construction work is to be carried out can start using the construction room (room) where the renovation work is to be carried out (start of use time), the setting of building materials to be used in the construction work, and the ventilation plan during the construction work. However, the construction plan generated by the construction plan generation system 10 is not limited to the above and may be any plan related to the construction work.
[0022] By generating construction plans that take into account odors emitted by building materials, it is possible to improve the working environment of construction workers carrying out the work and reduce the impact of odors on users of the building where the work is being carried out.
[0023] Specifically, the construction plan generation system 10 is a PC (personal computer) that is a computer including hardware such as a CPU (Central Processing Unit) and a memory, or a server device. Each function of the construction plan generation system 10, which will be described later, is realized by these components operating through programs, etc. The construction plan generation system 10 may be realized by one computer, or may be realized by a computer system configured by connecting multiple computers to each other through a network.
[0024] Next, the functions of the construction plan generation system 10 according to this embodiment will be described. As shown in Fig. 1, the construction plan generation system 10 includes a unit index value acquisition unit 11, a condition information acquisition unit 12, a prediction unit 13, and a construction plan generation unit 14.
[0025] The unit index value acquisition unit 11 is a unit index value acquisition means for acquiring a unit index value based on human olfactory sense of odor generated from a building material per unit amount of the building material used in the construction work according to the time elapsed since the construction work using the building material. The unit index value acquisition unit 11 may acquire a unit index value when a predetermined ventilation is performed.
[0026] The odor index value in this embodiment is based on the human sense of smell. For example, the odor index value in this embodiment is an odor concentration. FIG. 2 shows an example of a graph of unit index values according to the elapsed time from application of a building material (construction using a building material), acquired by unit index value acquisition unit 11. As shown in FIG. 2, the unit index value is the value of odor concentration D according to the above-mentioned elapsed time. The odor concentration is the dilution factor at which the odor becomes odorless when diluted with odorless clean air, that is, the dilution factor required to deodorize the odor.
[0027] In this embodiment, the value of the non-acceptance rate P according to the elapsed time corresponding to the odor concentration is also used. FIG. 3 shows an example of a graph of the non-acceptance rate P according to the elapsed time from the application of the building material (construction using the building material). The non-acceptance rate P is the percentage of people who found the odor unacceptable out of the total number of subjects. The non-acceptance rate P is used to generate a construction plan by the construction plan generation unit 14. The odor concentration D and the non-acceptance rate P are both values evaluated by a person's sense of smell. The values of the odor concentration D and the non-acceptance rate P used in this embodiment are values under conditions that are set in advance, as described below.
[0028] The above-mentioned non-acceptance rate and odor concentration values (for example, the values of the graphs shown in FIG. 2 and FIG. 3) are prepared in advance. For example, the above-mentioned non-acceptance rate and odor concentration values can be obtained by the following method. The non-acceptance rate is obtained by the entry-type odorless room method (hereinafter referred to as the entry method). The entry method is shown in Yoshiaki Iwasaki: Olfactory Measurement of Odor, Public Interest Incorporated Association, Scent and Fragrance Environment Association, 2004, pp. 52-53 (Non-Patent Document 1), and Architectural Institute of Japan: Architectural Institute of Japan Environmental Standards AIJES-A0003-2019 Indoor Odor Countermeasures, Maintenance and Management Standards, and Commentary, 2019, pp. 12-13 (Non-Patent Document 2).
[0029] The entry method is a method in which an odor is filled in a room of a certain size, and subjects smell the odor and make an evaluation. For example, building materials that are used in construction and are a source of odor are applied to the interior of a modular house as shown in Figure 4(a). After application, subjects enter the room after a preset time (0, 24, 72 hours) has passed, and evaluate the odor using a questionnaire as shown in Figure 4(b). The questionnaire asks subjects to choose between "acceptable" and "unacceptable" (of the odor). This is conducted on approximately 60 subjects, and the non-acceptance rate is calculated from the questionnaire results using the following formula. Unacceptability rate = (number of people who answered unacceptable) / (total number of subjects)
[0030] In addition, odors in the room are collected immediately before or after the evaluation of the non-acceptance rate, and the odor concentration of the collected odors is evaluated (measured) using the triangle odor bag method described in Non-Patent Document 1.
[0031] The three-way odor bag method is carried out, for example, as follows. As shown in Figure 5, a total of three bags are prepared: one bag filled with the captured odor (original odor: hatched) and two bags filled with odorless air (original odor: unhatched). The subject smells these three bags and answers the number of the bag that smells. If this answer matches the number of the bag filled with the captured air, the same procedure is then carried out using an odor obtained by diluting the captured odor. This is repeated until the subject makes a mistake, and the highest dilution ratio that the subject can answer is determined. This is carried out on six people to determine the odor concentration.
[0032] The amount of the building material applied during the entrance method is the unit amount of the building material. For example, the load factor of the building material at this time is used as a value indicating the unit amount of the building material at this time. The load factor of the building material is calculated using the following formula. Load factor of building materials = applied area of building materials / room volume
[0033] In addition, in the entry method, ventilation may be performed. For example, the ventilation rate is calculated by the following formula: Air change rate = volume of air delivered to a room per hour / volume of the room
[0034] For example, by implementing the above-mentioned three-point odor bag method and room entry method, the odor concentration and non-acceptance rate can be obtained for each elapsed time (0, 24, 72 hours). In addition, since the odor concentration and non-acceptance rate are evaluated (measured) for the same odor at each elapsed time, a calibration curve showing the relationship between the odor concentration and the non-acceptance rate can be generated from the obtained odor concentration and non-acceptance rate values. FIG. 6 shows a graph of an example of the calibration curve. In the calibration curve shown in FIG. 6, the vertical axis is the non-acceptance rate P, and the horizontal axis is the odor concentration D. The calibration curve can be obtained by performing a regression analysis using a preset model based on the odor concentration and non-acceptance rate values at the same elapsed time (0, 24, 72 hours). The preset model is, for example, a regression equation for logistic analysis. Note that Non-Patent Documents 1 and 2 do not disclose the calculation of these values and the like for building materials used in construction work, or the evaluation of them over time.
[0035] The unit index value acquisition unit 11 acquires, as the unit index value, the value of odor concentration D for each preset elapsed time (for example, 0, 24, 72 hours). Instead of the value for each preset elapsed time, the unit index value acquisition unit 11 may acquire a regression equation obtained from the value of odor concentration D for each elapsed time as shown in the dotted line graph in FIG. 2. The regression equation is, for example, an exponential function. The regression equation may also be a model other than an exponential function. The unit index value acquisition unit 11 acquires, as information related to the unit index value, information indicating the load factor and ventilation rate of the above-mentioned building material corresponding to the value of odor concentration D (or information for calculating these), and information indicating a calibration curve between odor concentration and non-acceptance rate.
[0036] For example, the unit index value acquisition unit 11 acquires information by accepting input operations of these pieces of information by a user of the construction plan generation system 10 (e.g., a construction contractor). In this case, the user of the construction plan generation system 10 acquires each piece of information in advance by the above-mentioned methods. The unit index value acquisition unit 11 may acquire each piece of information by a method other than the above. The unit index value does not necessarily have to be the above information as long as it is based on the human sense of smell of the odor generated from a building material according to the elapsed time since construction using the building material per unit amount of the building material. The non-acceptance rate and odor concentration values may be acquired by a method other than the above. The odor index value based on the human sense of smell may be based on something other than the above.
[0037] The information acquired by the unit index value acquisition unit 11 is information specific to the building materials used in the construction work. Therefore, when making a construction plan using different types of building materials, the unit index value acquisition unit 11 acquires information for each type of building material. In addition, the building materials may be candidates for use in the construction work.
[0038] The unit index value acquisition unit 11 outputs the acquired unit index value and information related thereto to the prediction unit 13. The unit index value acquisition unit 11 outputs information indicating the acquired calibration curve between odor concentration and non-acceptance rate to the construction plan generation unit 14.
[0039] The condition information acquisition unit 12 is a condition information acquisition means for acquiring condition information indicating the conditions of the construction work, including the amount of building materials used in the construction work. The condition information acquisition unit 12 may acquire condition information including information related to ventilation. The condition information is used by the prediction unit 13 to predict the index value of the time series of odor generated at the construction site when construction work using building materials is carried out.
[0040] For example, the amount of a building material used in a construction project is the load factor of that building material. The load factor of a building material is calculated using the following formula: Load factor of building material = application area of building material / volume of application room
[0041] The condition information may also include information indicating the ventilation rate of the construction room where the construction work is to be performed. For example, the ventilation rate is calculated by the following formula: Ventilation rate = amount of air supplied to the work room per hour / volume of the work room
[0042] The condition information acquisition unit 12 acquires information indicating the load rate and ventilation rate of the building materials (or information for calculating these). For example, the condition information acquisition unit 12 acquires the information by accepting an input operation of the information by the user of the construction plan generation system 10. In this case, the user of the construction plan generation system 10 acquires each piece of information in advance. The condition information acquisition unit 12 may also acquire each piece of information by a method other than the above. The condition information may be information other than the above, so long as it indicates the conditions of the construction, including the amount of building materials used in the construction. The condition information acquisition unit 12 outputs the acquired condition information to the prediction unit 13.
[0043] The prediction unit 13 is a prediction means that predicts the time-series odor index value that will occur at a construction site when construction work using building materials is carried out, based on the unit index value acquired by the unit index value acquisition unit 11 and the condition information acquired by the condition information acquisition unit 12.
[0044] The prediction unit 13 predicts the time-series odor index value occurring at the site, for example, as follows. The prediction unit 13 inputs the unit index value and related information from the unit index value acquisition unit 11. The prediction unit 13 inputs the condition information from the condition information acquisition unit 12. The prediction unit 13 predicts the time-series odor index value from the input information based on a pre-stored prediction method. The predicted index value is the same odor concentration as the unit index value. The predicted time-series odor index value occurring at the site is an index value corresponding to the elapsed time from the application of building materials (construction using building materials) when such application is performed. FIG. 7 shows an example of the time-series odor index value predicted by the prediction unit 13.
[0045] For example, the prediction unit 13 stores an equation for predicting the odor index value at the site from the unit index value for each elapsed time since application of the building material, and predicts the index value by inputting the value indicated by the input information into the stored equation. The equation for predicting the index value is, for example, the following equation. D 2t =D 1t × L2 / L1× n1 / n2 Here, the meaning of each letter is as follows: D 2t : Odor concentration (predicted value) at time t after application of building materials at the construction site (construction room) D 1t : Odor concentration at time t elapsed since application of building materials, which is the unit index value L1: Load factor of the building material corresponding to the unit index value (load factor of the building material in the test) L2: Load factor of building materials indicated by condition information (load factor at the construction site (construction room)) n1: ventilation rate corresponding to the unit index value (ventilation rate in the test) n2: Ventilation rate indicated by condition information (ventilation rate at the construction site (work room))
[0046] The prediction unit 13 predicts the odor concentration for each elapsed time (0, 24, 72 hours) at which the unit index value was measured. For example, the odor concentration for each elapsed time may be calculated using a regression equation acquired by the unit index value acquisition unit 11. Alternatively, the unit index value acquired by the unit index value acquisition unit 11 corresponding to the predicted odor concentration for each elapsed time at the site may be used. In this case, the prediction unit 13 may complement the odor concentration for elapsed times other than the above elapsed times from the odor concentration for the above elapsed times. For example, as shown in FIG. 7, the odor concentration may be complemented so that there is a linear relationship between the odor concentrations for the adjacent elapsed times (for example, between the odor concentration at 0 hours and the odor concentration at 24 hours, and between the odor concentration at 24 hours and the odor concentration at 72 hours).
[0047] The prediction unit 13 may also predict the time-series odor index value occurring at the site by a method other than the above, as long as the prediction uses the unit index value and condition information. The prediction unit 13 outputs information indicating the predicted time-series odor index value to the construction plan generation unit 14.
[0048] The construction plan generating unit 14 is a construction plan generating means that generates a construction plan based on the time series odor index value predicted by the prediction unit 13. The construction plan generating unit 14 may generate a construction plan by comparing the time series odor index value predicted by the prediction unit 13 with a preset threshold value. The construction plan generating unit 14 may calculate, as the construction plan, the time when the building on which construction is to be performed will be made available to users. The construction plan generating unit 14 may determine, as the construction plan, candidates for the type of building material to be used in the construction. The construction plan generating unit 14 may determine, as the construction plan, ventilation during the construction.
[0049] The construction plan generating unit 14 generates a construction plan, for example, as follows. First, an example of generating a construction plan that is a start-of-service time that is the time when users of the building subject to construction can start using the construction room after the building material is applied will be described. The construction plan generating unit 14 inputs information indicating a calibration curve between odor concentration and non-acceptance rate from the unit index value acquiring unit 11. The construction plan generating unit 14 inputs information indicating a predicted value of the time-series odor index value from the predicting unit 13. The input of this information is similarly performed in the other examples below.
[0050] First, the construction plan generating unit 14 sets the odor concentration threshold value used to generate the construction plan. The construction plan generating unit 14 acquires the non-acceptance rate threshold value in order to set the odor concentration threshold value. In Non-Patent Document 2, the grades of the non-acceptance rate are shown as follows: Grade A: Unacceptable rate 15% or less Grade B: Non-acceptance rate 20% or less Grade C: Unacceptable rate 30% or less Grade A's "unacceptable rate of 15% or less" indicates that the percentage of people who find the odor in the target space "unacceptable" is 15% or less of the total. The above indicators are values set by the Architectural Institute of Japan based on the concept of ISO17772-1 (2017).
[0051] The construction plan generating unit 14 may acquire a threshold value of the non-acceptance rate according to the above-mentioned grade. For example, for grade A, the threshold value of the non-acceptance rate is 15%. The threshold value of the non-acceptance rate may be arbitrarily set by the user of the construction plan generating system 10 according to the purpose of the building or the construction room to be constructed. The construction plan generating unit 14 acquires the threshold value of the non-acceptance rate, for example, by accepting an input operation by the user of the construction plan generating system 10.
[0052] The construction plan generating unit 14 sets the odor concentration corresponding to the acquired threshold value of the non-acceptance rate in the calibration curve of the odor concentration and the non-acceptance rate input from the unit index value acquiring unit 11 as the odor concentration threshold value. For example, as shown in FIG. 6, if the threshold value of the non-acceptance rate (the set non-acceptance rate) is 15%, the odor concentration threshold value that is set is 9. Note that the odor concentration threshold value does not necessarily have to be set from the threshold value of the non-acceptance rate (the same applies below). For example, the construction plan generating unit 14 may acquire the odor concentration threshold value by accepting an input operation of the odor concentration threshold value by the user of the construction plan generating system 10.
[0053] When the odor concentration threshold is set, the time from application of the building material to the construction room where the work is to be performed until the odor concentration reaches the odor concentration threshold can be calculated from the time series of odor concentrations predicted by the prediction unit 13. The construction plan generation unit 14 calculates this time and generates a construction plan based on the calculated time. For example, when the odor concentration threshold is set to 9 as described above, the above time is calculated to be 60 hours in the predicted time series of odor concentrations shown in FIG. 7.
[0054] The construction plan generating unit 14 generates a construction plan that sets the time calculated as above (for example, 60 hours) as the period from application of the building material to the start of use. By setting the start of use in this way, users can use the room comfortably by avoiding the period when they feel uncomfortable due to the odor generated by the building material. For example, when renovation work is being carried out while the user is in the room, it is possible to present how much time should be allowed for people using the room to be repaired before they can use the room without feeling an unpleasant odor.
[0055] Next, an example of setting the building materials to be used as a construction plan will be described. In this case, the prediction unit 13 predicts the odor concentration for each type of building material that is a candidate for the building material to be used in the construction. A calibration curve of the odor concentration and the non-acceptance rate is also prepared for each type of building material. In this case, the construction plan generation unit 14 acquires the threshold value of the non-acceptance rate in the same manner as above. The construction plan generation unit 14 uses the calibration curve for each type of building material to set the odor concentration threshold value from the threshold value of the non-acceptance rate for each type of building material.
[0056] For example, as shown in Figure 8, there are two types of building materials that are candidates for use, and if the arbitrarily set threshold for the non-acceptance rate is 20%, the odor concentration threshold set for material A will be 6, and the odor concentration threshold set for material B will be 12.
[0057] Next, the construction plan generating unit 14 calculates, for each type of construction material, the time from when the construction material is applied in the construction room where the construction work is to be performed until the odor concentration reaches the odor concentration threshold value, from the time series of odor concentration predicted by the predicting unit 13 in the same manner as described above. For example, as shown in Fig. 9, for material A, whose odor concentration threshold value is set to 6, the above time is calculated to be 66 hours. For material B, whose odor concentration threshold value is set to 12, the above time is calculated to be 30 hours.
[0058] The construction plan generating unit 14 sets the building material with the shorter time calculated as above as the building material to be used for the construction in the construction plan to be generated. For example, in the above example, material B is set as the building material to be used for the construction. By setting the building material to be used for the construction in this way, it is possible to propose a building material that will cause the occupant of the room to feel uncomfortable for a shorter period of time after the renovation work (after the building material is applied).
[0059] Next, an example of generating a ventilation plan for construction work will be described as a construction plan. In this case, the prediction unit 13 predicts the odor concentration for each of a plurality of ventilation frequencies set in advance. For example, the condition information acquisition unit 12 acquires condition information for each ventilation frequency, and the prediction unit 13 predicts the odor concentration for each of the condition information for each ventilation frequency.
[0060] The construction plan generating unit 14 obtains the threshold value of the non-acceptance rate in the same manner as described above. The construction plan generating unit 14 sets the odor concentration threshold value from the threshold value of the non-acceptance rate using the calibration curve. For example, as shown in FIG. 6, if the threshold value of the non-acceptance rate is 15%, the odor concentration threshold value is 9.
[0061] Next, the construction plan generating unit 14 calculates, for each of a plurality of ventilation rates, the time from application of the building material in the construction room to the time when the odor concentration reaches the odor concentration threshold, from the time series of odor concentration predicted by the predicting unit 13 in the same manner as above. For example, when the odor concentration threshold is set to 9 as described above, in the predicted time series of odor concentration shown in Fig. 10, the above time is calculated to be 40 hours for the ventilation rate a, and 60 hours for the ventilation rate b.
[0062] The construction plan generating unit 14 determines the number of ventilations during construction as a construction plan based on the time calculated as above. For example, the construction plan generating unit 14 receives an input operation from a user to acquire information indicating the service start time determined in advance, and sets the number of ventilations according to the service start time. The construction plan generating unit 14 determines the number of ventilations during construction that provides the shortest period from application of the building material to the service start time as the number of ventilations during construction. By determining the ventilation during construction in this manner, appropriate ventilation can be performed during construction.
[0063] The condition information acquisition unit 12 may acquire condition information including information indicating the area of the construction target relative to the entire area affected by odor caused by the construction. The prediction unit 13 predicts the odor index value over time based on the information.
[0064] For example, as shown in Figure 11, if only one corner of a large room is subject to renovation work, the impact on users of the room during construction can be understood by including the area not subject to renovation work in the volume of the room. For example, if the ventilation rate is 7.5 times / h and the floor area is 100 m, 2 , 25m in a room with a ceiling height of 2.5m 2 is the construction area (the hatched area in Fig. 11, the construction target area). When the paint application area is 12.5%, the load factor of the construction area is 0.2 m 2 / m 3 However, when considering the entire room, the load factor is 0.05m 2 / m 3 It becomes.
[0065] The information included in the condition information indicating the area of the construction target relative to the entire area affected by odors due to the construction may be, for example, the area or volume of the construction section (area of the construction target) relative to the entire construction room (the entire area affected by odors due to the construction), or the ratio of these. The condition information may also include the area or volume of the entire construction room. By setting the condition information in this way, the prediction unit 13 can predict the odor concentration over time for the construction section and the entire construction room.
[0066] The construction plan generating unit 14 obtains the threshold value of the non-acceptance rate in the same manner as described above. The construction plan generating unit 14 sets the odor concentration threshold value from the threshold value of the non-acceptance rate using the calibration curve. For example, as shown in FIG. 6, if the threshold value of the non-acceptance rate is 15%, the odor concentration threshold value is 9.
[0067] Next, the construction plan generating unit 14 calculates the time from application of the building material in the construction room to when the odor concentration reaches the odor concentration threshold value for each of the construction section and the entire construction room, from the time series of odor concentration predicted by the predicting unit 13 in the same manner as above. For example, if the odor concentration threshold value is set to 9 as above, in the predicted time series of odor concentration shown in Figure 12, the above time is calculated to be 60 hours in the construction section, and 0 hours in the entire construction room.
[0068] The construction plan generating unit 14 generates a construction plan in which the construction section is put into service at 60 hours, and the entire construction room (parts other than the construction section) is put into service at 0 hours. Therefore, in this case, it can be determined that there is no problem in using the parts of the construction room other than the construction section during construction. On the other hand, it can be determined that it will take 60 hours until the construction section can be used (until the odor concentration reaches the threshold).
[0069] The construction plan generating unit 14 does not necessarily need to generate the construction plan using the above-mentioned method, but may generate the construction plan based on the time-series odor index value predicted by the predicting unit 13.
[0070] The construction plan generating unit 14 outputs information indicating the generated construction plan. For example, the construction plan generating unit 14 displays the information indicating the generated construction plan on a display device provided in the construction plan generating system 10. Alternatively, the construction plan generating unit 14 transmits the information indicating the generated construction plan to a user's terminal. The user can refer to the output information indicating the construction plan and use it for construction. These are the functions of the construction plan generating system 10 according to this embodiment.
[0071] Next, a construction plan generating method, which is a process executed by the construction plan generating system 10 according to this embodiment, will be described with reference to the flowchart of FIG. 13. In this process, the unit index value acquiring unit 11 acquires a unit index value based on human olfactory sense of odor generated from a building material per unit amount of the building material used in the construction according to the time elapsed since the construction using the building material (S01, unit index value acquiring step). In addition, the condition information acquiring unit 12 acquires condition information indicating the conditions of the construction including the amount of the building material used in the construction (S02, condition information acquiring step). Note that the acquisition of the unit index value (S01) and the acquisition of the condition information (S02) can be performed independently of each other, and do not necessarily have to be performed in the above order.
[0072] Next, the prediction unit 13 predicts a time series odor index value that will occur at the site when construction using the building material is carried out, based on the unit index value acquired by the unit index value acquisition unit 11 and the condition information acquired by the condition information acquisition unit 12 (S03, prediction step). Next, the construction plan generation unit 14 generates a construction plan based on the time series odor index value predicted by the prediction unit 13 (S04, construction plan generation step). Next, the construction plan generation unit 14 outputs information indicating the generated construction plan (S05). This concludes the construction plan generation method according to this embodiment.
[0073] In this embodiment, the index value of the time series of odors occurring at the site is predicted from the unit index value based on human olfaction and condition information, and a construction plan is generated based on the predicted index value. Therefore, the construction plan is generated with more appropriate consideration given to the odors generated by the construction (e.g., people's tolerance for the odors). In this way, according to this embodiment, an appropriate construction plan can be generated. For example, as described above, an appropriate construction plan can be generated when carrying out renovation work while remaining in the building. As a result, appropriate construction can be carried out. For example, as described above, it is possible to improve the working environment of construction workers performing the work, or reduce the impact of odors on users of the building where the work is being carried out.
[0074] Furthermore, the construction work targeted by the construction plan generation system 10 may not be a renovation work but may be a new building work. By targeting new building work, for example, the construction plan generated by the construction plan generation system 10 can be used when gradually opening a building to service from the part where the new building work is completed.
[0075] As in this embodiment, the unit index value acquisition unit 11 may acquire a unit index value when a predetermined ventilation is performed, and the condition information acquisition unit 12 may acquire condition information including information related to ventilation. With this configuration, an appropriate construction plan that takes ventilation into consideration can be generated. However, in the construction plan generation system 10, the information related to ventilation does not necessarily need to be used.
[0076] As in this embodiment, the construction plan generating unit 14 may generate a construction plan by comparing the time-series odor index value predicted by the predicting unit 13 with a preset threshold value. With this configuration, an appropriate construction plan based on the threshold value can be generated. However, the construction plan generating unit 14 may generate a construction plan without using a threshold value.
[0077] As in this embodiment, the construction plan may be the time when the building where construction is to be carried out will be made available to users. The construction plan may also be the type of building materials to be used in the construction. The construction plan may also be regarding ventilation during construction. With these configurations, these specific construction plans can be generated. However, the construction plan to be generated may be other than the above, as long as it is generated based on the predicted time-series odor index value.
[0078] As in this embodiment, the condition information may include information indicating the area to be worked on (e.g., the work area) relative to the entire area affected by odors due to the work during the work (e.g., the entire work room). With this configuration, it is possible to generate an appropriate work plan that takes into account the area to be worked on relative to the area affected by odors due to the work. However, the condition information does not necessarily have to include the above information.
[0079] In this embodiment, the unit index value acquired by the unit index value acquisition unit 11 and the index value predicted by the prediction unit 13 are odor concentrations. However, the index value may be something other than odor concentration as long as it is an index value based on the human sense of smell of odors generated from building materials.
[0080] The main odor detected by humans is VOC. Conventional odor sensors use semiconductors or films that react to VOC. Therefore, it is considered that there is a correlation between index values based on human olfaction, such as odor concentration, and the response value of conventional odor sensors. Therefore, the value of the conventional odor sensor may be used as the index value used in the construction plan generation system 10. Alternatively, the VOC concentration of each type of building material used in the construction may be used as the index value. In these cases, for example, when measuring the above-mentioned non-acceptance rate and odor concentration, the odor in the room is measured using an odor sensor, or the VOC concentration is measured using a chemical analysis device such as a gas chromatograph mass spectrometer, and the relationship between the index values based on human olfaction other than the VOC concentration and the odor sensor value or VOC concentration for each type of building material is clarified in advance.
[0081] The construction plan generating system and construction plan generating method disclosed herein have the following configuration. [1] A unit index value acquisition means for acquiring a unit index value of a human olfactory sense of an odor generated from a building material per unit amount of the building material used in construction work according to the elapsed time since the construction work using the building material; A condition information acquisition means for acquiring condition information indicating the conditions of the construction work, including the amount of the building materials used in the construction work; a prediction means for predicting a time-series odor index value that will occur at a construction site when construction work using the building material is carried out, based on the unit index value acquired by the unit index value acquisition means and the condition information acquired by the condition information acquisition means; a construction plan generating means for generating a construction plan based on the time-series odor index value predicted by the prediction means; A construction plan generation system comprising: [2] The unit index value acquisition means acquires a unit index value when a predetermined ventilation is performed, The construction plan generation system according to [1], wherein the condition information acquisition means acquires condition information including information related to ventilation. [3] The construction plan generation system according to [1] or [2], wherein the construction plan generation means compares the time-series odor index value predicted by the prediction means with a preset threshold value to generate a construction plan. [4] The construction plan generating system according to any one of [1] to [3], wherein the construction plan generating means calculates, as the construction plan, a time when the building on which construction is to be performed will be made available to users. [5] The construction plan generating system according to any one of [1] to [4], wherein the construction plan generating means determines, as the construction plan, candidates for types of building materials to be used in the construction. [6] The construction plan generating system according to any one of [1] to [5], wherein the construction plan generating means determines ventilation during construction as the construction plan. [7] A construction plan generation system according to any one of [1] to [6], wherein the condition information acquisition means acquires condition information including information indicating the area to be constructed relative to areas that will be affected by odors caused by the construction during the construction. [8] A construction plan generation method which is an operation method of a construction plan generation system, comprising: A unit index value acquisition step of acquiring a unit index value of a human olfactory sense of an odor generated from a building material per unit amount of the building material used in the construction work according to the time elapsed since the construction work using the building material; A condition information acquisition step of acquiring condition information indicating conditions of the construction work, including the amount of the building material used in the construction work; a prediction step of predicting a time-series odor index value that will occur at a construction site when construction work using the building material is carried out, based on the unit index value acquired in the unit index value acquisition step and the condition information acquired in the condition information acquisition step; a construction plan generating step of generating a construction plan based on the time-series odor index value predicted in the prediction step; A construction plan generating method including: [Explanation of symbols]
[0082] 10...construction plan generation system, 11...unit index value acquisition unit, 12...condition information acquisition unit, 13...prediction unit, 14...construction plan generation unit.
Claims
1. A unit index value acquisition means for acquiring a unit index value of a human olfactory sense of an odor generated from a building material per unit amount of the building material used in the construction work according to the time elapsed since the construction work using the building material; A condition information acquisition means for acquiring condition information indicating the conditions of the construction work, including the amount of the building materials used in the construction work; a prediction means for predicting a time-series odor index value that will occur at a construction site when construction work using the building material is carried out, based on the unit index value acquired by the unit index value acquisition means and the condition information acquired by the condition information acquisition means; a construction plan generating means for generating a construction plan based on the time-series odor index value predicted by the prediction means; A construction plan generation system comprising:
2. The unit index value acquisition means acquires a unit index value when a predetermined ventilation is performed, The construction plan generating system according to claim 1 , wherein the condition information acquiring means acquires condition information including information related to ventilation.
3. 3. The construction plan generating system according to claim 1, wherein the construction plan generating means generates a construction plan by comparing the time-series odor index value predicted by the prediction means with a preset threshold value.
4. 3. The construction plan generating system according to claim 1, wherein the construction plan generating means calculates, as the construction plan, a time when the building on which construction is to be performed will be made available to users.
5. 3. The construction plan generating system according to claim 1, wherein the construction plan generating means determines candidates for types of building materials to be used in the construction as the construction plan.
6. The construction plan generating system according to claim 1 or 2, wherein the construction plan generating means determines ventilation during construction as the construction plan.
7. 3. The construction plan generating system according to claim 1, wherein the condition information acquiring means acquires condition information including information indicating an area to be subjected to construction work relative to an entire area that will be affected by odors caused by the construction work.
8. A construction plan generation method which is an operation method of a construction plan generation system, comprising: A unit index value acquisition step of acquiring a unit index value of a human olfactory sense of an odor generated from a building material per unit amount of the building material used in the construction work according to the time elapsed since the construction work using the building material; A condition information acquisition step of acquiring condition information indicating conditions of the construction work, including the amount of the building material used in the construction work; a prediction step of predicting a time-series odor index value that will occur at a construction site when construction work using the building material is carried out, based on the unit index value acquired in the unit index value acquisition step and the condition information acquired in the condition information acquisition step; a construction plan generating step of generating a construction plan based on the time-series odor index value predicted in the prediction step; A construction plan generating method including:
Citation Information
Patent Citations
Odor measuring device
JP1993188027A
Estimating method for paint
JP1994341984A
Design support system, server, terminal equipment, program, and recording medium
JP2004110468A
Prediction method for gaseous contaminant concentration, designing method based on prediction method, and construction method for building designed by designing method
JP2007322108A
Informing system, space purification system, and informing method
JP2022175689A