Information processing device and congestion prediction system
The information processing device predicts store congestion to optimize payment terminal operations, enhancing store efficiency by aligning terminal usage with expected customer traffic.
Patent Information
- Application Number
- JP2023062267
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-06
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2043-04-06
AI Technical Summary
Existing store operation management systems fail to efficiently determine the number of operating payment terminals due to the time required for preparing and unpreparing payment devices, leading to inefficiencies in store operations.
An information processing device that acquires operation data from building equipment to predict store congestion levels, allowing for efficient adjustment of payment terminal operations based on predicted congestion.
Enables efficient store operations by anticipating congestion, optimizing payment terminal usage, and adjusting staffing and layout to match expected customer traffic.
Smart Images

Figure 2024148806000001_ABST
Abstract
Description
[Technical field]
[0001] An embodiment of the present invention relates to an information processing device and a congestion prediction system. [Background technology]
[0002] Conventionally, there is known a store operations management device that includes a customer number measurement unit that measures the number of customers in a store and determines the number of operating settlement terminals based on the measurement results by the customer number measurement unit (for example, Patent Document 1). This store operations management device aims to operate the store efficiently by determining the number of operating settlement terminals depending on the congestion level in the store.
[0003] However, it generally takes a certain amount of time to operate a payment terminal and prepare it to execute payment processing. It also takes a certain amount of time to stop operation of a payment device and inform customers that it is not in use. For this reason, if the number of operating payment devices is determined after detecting the congestion level in the store, the payment devices will not be ready in time, which is not sufficient in terms of efficient store operation. Summary of the Invention [Problem to be solved by the invention]
[0004] The problem to be solved by the present invention is to provide an information processing device and a congestion prediction system that can make store operations more efficient by predicting the congestion state of a store. [Means for solving the problem]
[0005] The information processing device of the embodiment includes an acquisition means for acquiring operation data indicating the operating status of equipment installed in a building in which a store is located, a congestion prediction means for predicting the congestion level of the store based on the operation data acquired by the acquisition means, and an output means for outputting store congestion information indicating the congestion level of the store predicted by the congestion prediction means. [Brief description of the drawings]
[0006] [Figure 1] FIG. 1 is a diagram illustrating an overview of a congestion prediction system according to the first embodiment. [Diagram 2] FIG. 2 is a diagram showing the data configuration of a building management table stored in the storage unit of the building information management device of the first embodiment. [Diagram 3] FIG. 3 is a block diagram showing a main hardware configuration of the server device according to the first embodiment. [Figure 4] FIG. 4 is a diagram illustrating a data configuration of the historical data management table stored in the storage unit of the server device of the first embodiment. [Diagram 5] FIG. 5 is a diagram illustrating a data configuration of a congestion level setting table stored in the storage unit of the server device of the first embodiment. [Figure 6] FIG. 6 is a diagram illustrating a data configuration of a recommended operation rate setting table stored in the storage unit of the server device according to the first embodiment. [Figure 7] FIG. 7 is a diagram illustrating a data configuration of a congestion level management table stored in the storage unit of the server device of the first embodiment. [Figure 8] FIG. 8 is a diagram illustrating a data configuration of a notification information management table stored in the storage unit of the server device of the first embodiment. [Figure 9] FIG. 9 is a block diagram illustrating a main functional configuration of a control unit of the server device according to the first embodiment. [Figure 10] FIG. 10 is a sequence chart showing the flow of operations of the congestion prediction system of the first embodiment. [Figure 11] FIG. 11 is a flowchart illustrating a flow of congestion degree prediction processing by the control unit of the server device according to the first embodiment. [Figure 12] FIG. 12 is a flowchart illustrating a flow of congestion level notification processing by the control unit of the server device according to the first embodiment. [Figure 13] FIG. 13 is a block diagram illustrating a main functional configuration of a control unit of a server device according to the second embodiment. [Figure 14]FIG. 14 is a sequence chart showing the flow of operations of the congestion prediction system according to the second embodiment. [Figure 15] FIG. 15 is a flowchart showing the flow of a store device control process performed by the control unit of the server device according to the second embodiment. [Figure 16] FIG. 16 is a diagram illustrating an overview of a congestion prediction system according to a modified example of the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0007] Hereinafter, an information processing device and a congestion prediction system according to an embodiment will be described with reference to the drawings. Note that the present invention is not limited to the embodiment described below. For example, in the embodiment described below, an example will be described in which a server device managed by a store is used as the information processing device, but the present invention is not limited to this. The information processing device may be managed by a business that provides a congestion prediction service. In other words, the congestion prediction service provided by the information processing device may be provided by a so-called on-premise service or a public cloud service.
[0008] In the embodiment described below, an example will be described in which the congestion level of a store predicted by the information processing device is set to three levels, "crowded," "normal," and "quiet," but this is not limiting. The congestion level of a store may be set to any number of levels. The information processing device may output the prediction result every time it predicts the congestion level of a store, or may output the prediction result only when the prediction result is not "normal," in other words, when the congestion level of the store is predicted to be in an unsteady state.
[0009] Furthermore, in the embodiment described below, an example will be described in which the information processing device acquires operation data of equipment on all floors of a building in which a store is located, but this is not limited thereto. The information processing device may acquire only operation data of equipment on a floor in which a store that provides a congestion prediction service is located.
[0010] (First embodiment) FIG. 1 is a diagram showing an overview of a congestion prediction system 1 according to a first embodiment. The congestion prediction system 1 according to this embodiment is applied to a building in which there are stores such as supermarkets and convenience stores that sell goods or services (hereinafter collectively referred to as "goods"), and provides store congestion information to the stores. The congestion prediction system 1 includes a store system 2 and a building information management device 3. The store system 2 and the building information management device 3 are connected to each other so as to be able to communicate with each other via a network such as the Internet.
[0011] The building information management device 3 manages information on facilities in multiple buildings. Specifically, the building information management device 3 manages, for each building, information on facilities whose operational statuses are to be monitored, i.e., facilities whose operational data is to be acquired. Note that the building information management device 3 may manage information only on buildings in which stores equipped with the store system 2 are located.
[0012] 2 is a diagram showing the data configuration of the building management table 31 stored in the storage unit of the building information management device 3. The building management table 31 stores the building name, management classification, tenant name, monitoring target, and location in association with the building management number.
[0013] The building management number is a management number that identifies a building. The building name is information that indicates the name of the building. The management classification is information that indicates the classification of the location where the equipment that is the subject of operational data acquisition is installed. In the management classification, information such as "shared" and "tenant" is stored. The tenant name is information that indicates the name of the tenant when the management classification is tenant. The monitored object is information that indicates the equipment to be monitored, i.e., the equipment that is the subject of operational data acquisition. The location is information that indicates the location where the monitored equipment is installed. For example, "1E" stored in the location indicates area E on the first floor.
[0014] The building information management device 3 manages operation data indicating the operating status of the equipment to be monitored that is installed in each building. In other words, the building information management device 3 includes a management means for managing operation data indicating the operating status of the equipment to be monitored that is installed in the building. Specifically, the building information management device 3 periodically (at 5-minute intervals, 15-minute intervals, 30-minute intervals, etc.) obtains and manages the operation data of the monitored objects set in the building management table 31 from the system of each building.
[0015] The building information management device 3 then provides the acquired operation data to the store system 2. For example, the building information management device 3 acquires operation data on elevators, lighting, air conditioning, and other equipment in the common areas from the building XXX system. The building information management device 3 also acquires operation data on POS (Point Of Sales) terminals, MFPs (Multifunction Peripherals), and other equipment in the tenant areas from the building XXX system. The building information management device 3 then provides each of these acquired operation data to the store system 2.
[0016] The operation data of each monitored facility is set, for example, as follows: The elevator operation data is the usage rate, specifically the ratio of the number of elevators that are operating for a certain period of time or more (for example, 20 seconds out of 5 minutes) out of the total number of elevators. The lighting operation data is the lighting rate, specifically the ratio of the number of lights that are on for a certain period of time or more (for example, 1 minute out of 5 minutes) out of the total number of lights. The air conditioning operation data is the usage rate, specifically the ratio of the number of air conditioners that are operating for a certain period of time or more (for example, 1 minute out of 5 minutes) out of the total number of air conditioners. Here, it is assumed that elevators only operate when there is a person in them. It is also assumed that the lighting and air conditioners only operate when a person is detected by a human presence sensor.
[0017] The operation rate of a POS terminal is the frequency of use, specifically the number of transactions settled in a five-minute period at all POS terminals in the store. The operation rate of an MFP is the frequency of use, specifically the number of times it has been used in the past hour.
[0018] Next, a description will be given of the store system 2. The store system 2 has a plurality of POS terminals 4, one or more store clerk terminals 5, and a server device 6. The POS terminals 4, the store clerk terminals 5, and the server device 6 are connected to each other so as to be able to communicate with each other via a network such as a LAN (Local Area Network).
[0019] The POS terminal 4 is, for example, a self-service POS terminal where a customer performs operations related to product registration and accounting. The POS terminal 4 executes product registration by reading the product code of the product purchased by the customer through the operation of an operator (customer) and storing product information obtained based on the read product code. The POS terminal 4 also executes accounting and receipt issuing based on the registered product information. The POS terminal 4 may be a POS terminal where a store clerk performs operations related to product registration and accounting, or a semi-self-service POS equipped with a registration device where a store clerk performs operations related to product registration and an accounting device where a customer performs operations related to accounting.
[0020] Accounting processing is processing for customers to make payments, and includes calculation processing, settlement processing, etc. Calculation processing is processing such as calculating the transaction amount. Settlement processing is processing for completing payment of the transaction amount calculated in the calculation processing, and includes calculating and paying out change in cash payments, and communication with a settlement server in cashless payments. Receipt issuance processing is processing for issuing a paper receipt or an electronic receipt.
[0021] The clerk terminal 5 is composed of an information terminal carried by a store clerk or a management PC (Personal Computer) installed in the back yard of the store. The clerk terminal 5 displays various information to the clerk who operates the clerk terminal 5. For example, the clerk terminal 5 acquires from the server device 6 store congestion information indicating the degree of congestion of the store predicted by the server device 6 and displays it. This allows the clerk to recognize the degree of congestion of the store predicted by the server device 6. In response to this, the store can change the operating status of the POS terminal 4, change the placement of clerks, and so on, thereby enabling efficient business operations.
[0022] The server device 6 acquires operation data of monitored equipment in a building in which a store is located from the building information management device 3, and predicts the future congestion level of the store based on the operation data. The server device 6 outputs store congestion information indicating the predicted congestion level of the store to the store staff terminal 5. The server device 6 may also manage other information about the store, such as information about products sold by the store and sales information about the store. The server device 6 may also be configured from multiple computers.
[0023] 3 is a block diagram showing a main hardware configuration of the server device 6. The server device 6 includes a control unit 60, a storage unit 61, a display unit 62, an input unit 63, an output unit 64, and a communication unit 65. The control unit 60, the storage unit 61, the display unit 62, the input unit 63, the output unit 64, and the communication unit 65 are connected to each other via a bus 66 or the like.
[0024] The control unit 60 is configured as a computer including a CPU (Central Processing Unit) 601, a ROM (Read Only Memory) 602, and a RAM (Random Access Memory) 603. The CPU 601, the ROM 602, and the RAM 603 are connected to each other via a bus 66.
[0025] The CPU 601 controls the overall operation of the server device 6. The ROM 602 stores various programs, such as a program used to drive the CPU 601, and various data. The RAM 603 is used as a work area for the CPU 601, and loads various programs and data stored in the ROM 602 and the storage unit 61. The control unit 60 executes various control processes of the server device 6 by the CPU 601 operating in accordance with the control programs stored in the ROM 602 and the storage unit 61 and loaded in the RAM 603.
[0026] The storage unit 61 is configured with a storage medium such as a hard disk drive (HDD) or a flash memory, and maintains the stored contents even when the power is cut off. The storage unit 61 stores a control program 611, an operation data management table 612, a congestion level setting table 613, a recommended operation rate setting table 614, a congestion level management table 615, and a notification information management table 616.
[0027] The control program 611 is a program that realizes functions such as obtaining operation data of monitored equipment installed in the building in which the store is located from the building information management device 3, predicting the degree of congestion in the store based on the obtained operation data, and outputting store congestion information indicating the predicted degree of congestion to the store staff terminal 5.
[0028] The operational data management table 612 is a data table that manages operational data of monitored equipment (hereinafter, may be simply referred to as "monitored object" or "equipment") in a building in which a store is located (hereinafter, may be simply referred to as "building"). The operational data management table 612 is updated every time the server device 6 acquires operational data from the building information management device 3. FIG. 4 is a diagram showing the data configuration of the operational data management table 612. The operational data management table 612 stores date and time, building management number, management classification, monitored object, operational data item name, congestion direction, reference value, operational data, and congestion degree in association with each other.
[0029] The date and time is information indicating the date and time when the associated data was stored in the operational data management table 612. In this embodiment, the server device 6 obtains the operational data of each monitored object from the building information management device 3 every five minutes, and stores the necessary information in the operational data management table 612. Note that the interval at which the server device 6 obtains the operational data of each monitored object can be set appropriately. The building management number is a management number that identifies the building. The management classification is information that indicates the classification of the location where the equipment is installed. The monitored object is information that indicates the equipment to be monitored.
[0030] The operation data item name is information indicating an item of operation data. The congestion direction is information indicating the large / small direction of operation data when the installation location of the monitored object becomes crowded. For example, if the monitored object is an elevator, it can be determined that the elevator is more crowded as the elevator usage rate, which is the operation data, becomes larger, so the congestion direction is set to "large." The congestion direction is set appropriately according to the operation data acquired from the building information management device 3.
[0031] The reference value is, for example, the average operation data for the past year. The operation data is operation data acquired from the building information management device 3. The congestion degree indicates the congestion state of the installation location of the corresponding monitoring target, and is the congestion degree set by the server device 6.
[0032] The congestion degree setting table 613 is a data table used when determining the congestion degree of the installation location of the monitoring target. Fig. 5 is a diagram showing the data configuration of the congestion degree setting table 613. The congestion degree setting table 613 stores the congestion direction, the ratio to the reference value, and the congestion degree in association with each other.
[0033] The congestion direction and congestion level are as explained in the operational data management table 612, so a duplicated explanation will be omitted. The ratio to reference value is information indicating the ratio of the operational data to the reference value. When the server device 6 acquires the operational data from the building information management device 3, it refers to the congestion level setting table 613 to determine the congestion level of the installation location of the monitoring target.
[0034] For example, for operational data with a "high" congestion direction, the server device 6 makes the following judgments. If the operational data acquired from the building information management device 3 is less than 80% of the reference value, the server device 6 judges the congestion degree to be "quiet." Also, if the operational data acquired from the building information management device 3 is within 80% to 120% of the reference value, the server device 6 judges the congestion degree to be "normal." Furthermore, if the operational data acquired from the building information management device 3 is greater than 120% of the reference value, the server device 6 judges the congestion degree to be "congested." Then, the server device 6 registers the determined congestion degree in the congestion degree item of the operational data management table 612.
[0035] For operation data with a "low congestion direction", the server device 6 makes the following judgment. If the operation data acquired from the building information management device 3 is less than 80% of the reference value, the server device 6 judges the congestion degree to be "high congestion". If the operation data acquired from the building information management device 3 is within 80% to 120% of the reference value, the server device 6 judges the congestion degree to be "normal". If the operation data acquired from the building information management device 3 is greater than 120% of the reference value, the server device 6 judges the congestion degree to be "low congestion". The server device 6 then registers the determined congestion degree in the congestion degree item of the operation data management table 612. Operation data with a "low congestion direction" is, for example, the occupancy area per person in an elevator that is in operation.
[0036] The recommended operating rate setting table 614 is a data table for setting a recommended operating rate of the store's equipment according to the future store congestion level predicted based on the congestion level of the installation location of each of the above-mentioned monitoring targets. Here, the store's equipment is, for example, the POS terminal 4 if the store is a supermarket or convenience store, or lighting equipment in guest rooms if the store is a restaurant. The predicted future store congestion level can also be considered as the current congestion level of the entire building in which the store is located. The recommended operating rate is output to the store staff terminal 5 together with store congestion information. FIG. 6 is a diagram showing the data configuration of the recommended operating rate setting table 614. The recommended operating rate setting table 614 stores the store congestion level and the recommended operating rate in association with each other.
[0037] The store congestion level is information indicating the congestion level of the store predicted by the server device 6 based on the congestion level of the installation location of each monitoring target. The recommended operation rate is information indicating the operation rate of the POS terminal 4 that is considered to allow the store to operate efficiently.
[0038] The congestion level management table 615 is a data table that manages the store congestion level, the common area congestion level, and the tenant area congestion level for each hour, which are predicted by the server device 6 based on the operation data acquired from the building information management device 3. In this embodiment, the congestion level management table 615 is updated every five minutes. Fig. 7 is a diagram showing the data configuration of the congestion level management table 615. The congestion level management table 615 stores date and time, the store congestion level, the common area congestion level, and the tenant area congestion level in association with each other.
[0039] The date and time is information indicating the date and time when the corresponding data was registered in the congestion management table 615. The store congestion level is the future congestion level of the store predicted by the server device 6. The predicted store congestion level is the most common congestion level at the installation location of the monitored object determined based on the operation data acquired from the building information management device 3. For example, in the data at 16:00 in the operation data management table 612 shown in FIG. 4, "quiet" is the most common information registered as congestion level, and is predicted as the store congestion level. Since the building in which the store is located is considered to be quiet overall at the moment, the server device 6 predicts the future store congestion level to be "quiet."
[0040] The common area congestion degree is the current congestion degree of the common areas of the building predicted by the server device 6. The predicted common area congestion degree is the most crowded common area congestion degree among the installation locations of the monitored objects determined based on the operation data acquired from the building information management device 3. For example, in the data at 16:00 in the operation data management table 612 shown in Fig. 4, "quiet," which is the most common information registered for the congestion degree corresponding to the management classification "common," is predicted as the congestion degree of the common areas.
[0041] The tenant section congestion degree is the current congestion degree of the tenant section of the building predicted by the server device 6. The predicted tenant section congestion degree is the most crowded degree of the tenant section among the installation locations of the monitored objects determined based on the operation data acquired from the building information management device 3. For example, in the data at 16:00 in the operation data management table 612 shown in FIG. 4, the most common information registered for the congestion degree corresponding to the management classification "tenant" is "quiet," which is predicted as the congestion degree of the tenant section.
[0042] The notification information management table 616 is a data table that manages information to be notified to the store clerk terminal 5. Fig. 8 is a diagram showing the data configuration of the notification information management table 616. The notification information management table 616 stores date and time, store congestion degree, recommended operation rate, common area congestion degree, and tenant area congestion degree in association with each other.
[0043] The date and time is information indicating the date and time when the corresponding data was registered in the notification information management table 616, or information indicating the date and time when the information was output to the store clerk terminal 5. The store congestion level is store congestion information to be output to the store clerk terminal 5, and if a store congestion level different from the previous time is predicted, "none" is registered in the notification information management table 616. In other words, if the server device 6 predicts a store congestion level different from the previous time, it does not output the store congestion information to the store clerk terminal 5. This is to prevent notification of store congestion information based on irregular operation data.
[0044] 7, the store congestion level at 16:00 is "quiet," and the next data at 16:05 is "crowded." Therefore, the store congestion level data at 16:05 in the notification information management table 616 is "none."
[0045] The recommended operating rate is the recommended operating rate of the POS terminal 4 to be output to the store clerk terminal 5. As with the store congestion level, if a store congestion level different from the previously output store congestion level is predicted, "none" is registered in the notification information management table 616.
[0046] The common area congestion degree is information indicating the congestion degree of the common area that is output to the store clerk terminal 5. Similarly, if a common area congestion degree different from the previous time is predicted, "none" is registered in the notification information management table 616.
[0047] The tenant area congestion degree is information indicating the congestion degree of the tenant area which is output to the store clerk terminal 5. Similarly, if a tenant area congestion degree different from the previous time is predicted, "none" is registered in the notification information management table 616.
[0048] Returning to FIG. 3, the hardware configuration of the server device 6 will be described.
[0049] The display unit 62 is a display device and is configured with a liquid crystal display etc. The display unit 62 displays various information under the control of the control unit 60. For example, the display unit 62 displays information of various data tables stored in the storage unit 61 as necessary.
[0050] The input unit 63 is an input device, and is composed of a touch panel provided on the surface of the display unit 62, a keyboard provided separately from the display unit 62, etc. The input unit 63 inputs various information input by an operator's operation to the control unit 60. For example, the input unit 63 inputs information to be registered in the congestion degree setting table 613 and the recommended operation rate setting table 614 to the control unit 60.
[0051] The output unit 64 outputs audio such as sound effects.
[0052] The communication unit 65 is an interface for communicating with external devices such as the building information management device 3, the POS terminal 4, and the store clerk terminal 5. The control unit 60 is connected to an external device via the communication unit 65, thereby enabling transmission and reception of information (data) with the external device.
[0053] Next, the main functional configuration of the control unit 60 of the server device 6 will be described. Fig. 9 is a block diagram showing the main functional configuration of the control unit 60 of the server device 6. The control unit 60 functions as an acquisition means 6001, a registration means 6002, a congestion degree prediction means 6003, a setting means 6004, and an output means 6005 by the CPU 601 operating in accordance with a control program stored in the ROM 602 or the storage unit 61. Each of these functions may be configured using hardware such as a dedicated circuit.
[0054] The acquiring means 6001 acquires operation data indicating the operation status of equipment installed in the building in which the store is located. Specifically, the acquiring means 6001 periodically acquires operation data of each monitoring target installed in the building in which the store is located from the building information management device 3.
[0055] The registration means 6002 stores (registers) various information in the storage unit 61. For example, the registration means 6002 registers the operational data acquired by the acquisition means 6001 in the operational data management table 612. The registration means 6002 also registers the congestion degree of the location where each monitoring target is installed, which is the congestion degree predicted by the congestion degree prediction means 6003 based on the operational data acquired by the acquisition means 6001, in the operational data management table 612.
[0056] The registration means 6002 registers the store congestion degree, the common area congestion degree, and the tenant area congestion degree predicted by the congestion degree prediction means 6003 in a congestion degree management table 615. The registration means 6002 also registers the recommended operation rate of the POS terminal 4 set by the setting means 6004 in a notification information management table 616.
[0057] The congestion prediction means 6003 predicts the congestion level of the store based on the operation data acquired by the acquisition means 6001. For example, the congestion prediction means 6003 predicts the congestion level of the location where each monitoring target is installed based on the operation data acquired by the acquisition means 6001. Specifically, the congestion prediction means 6003 compares the operation data acquired by the acquisition means 6001 with a reference value registered in the operation data management table 612 to predict the congestion level of the equipment where the operation data acquisition target is installed. More specifically, the congestion prediction means 6003 reads out from the congestion setting table 613 a congestion level corresponding to the ratio of the operation data to the reference value calculated from the operation data and the reference value, and sets the congestion level as the congestion level of the installation location of the monitoring target.
[0058] The congestion prediction means 6003 counts the predicted congestion degrees of the installation locations of each monitoring target in the building in which the store is located, and sets the highest congestion degree as the future congestion degree of the store (store congestion degree). The congestion prediction means 6003 also counts the predicted congestion degrees of the installation locations of each monitoring target in the common areas of the building in which the store is located, and sets the highest congestion degree as the congestion degree of the common areas. Similarly, the congestion prediction means 6003 counts the predicted congestion degrees of the installation locations of each monitoring target in the tenant areas of the building in which the store is located, and sets the highest congestion degree as the congestion degree of the tenant areas.
[0059] In predicting the congestion degree of the store, the congestion degree of the common area, and the congestion degree of the tenant area, if there are multiple highest congestion degrees as a result of aggregating the congestion degrees of the installation locations of each monitoring target, the congestion degree prediction means 6003 selects the one that indicates the highest congestion degree. For example, if the congestion degrees corresponding to the common areas are aggregated and the number of "crowded" and "normal" is the same, the congestion degree prediction means 6003 predicts the congestion degree of the common areas as "crowded". Also, if the congestion degrees corresponding to the common areas are aggregated and the number of "normal" and "unoccupied" is the same, the congestion degree prediction means 6003 predicts the congestion degree of the common areas as "normal".
[0060] The setting means 6004 sets a recommended operation rate for the equipment provided in the store based on the store's congestion level predicted by the congestion level prediction means 6003. Specifically, the setting means 6004 reads out a recommended operation rate corresponding to the store's congestion level predicted by the congestion level prediction means 6003 from the recommended operation rate setting table 614.
[0061] The output means 6005 outputs store congestion information indicating the degree of congestion of the store predicted by the congestion degree prediction means 6003 to the store staff terminal 5. This allows the store to recognize the predicted future congestion degree of the store.
[0062] Furthermore, the output means 6005 outputs common area congestion information indicating the degree of congestion in the common area predicted by the congestion degree prediction means 6003, and tenant area congestion information indicating the degree of congestion in the tenant area, to the store clerk terminal 5. This allows the store to recognize the predicted customer base in the future. For example, if the common area is highly crowded, congestion by customers from outside the building is predicted. Also, if the tenant area is highly crowded, congestion by office workers working in the building is predicted. The store can take measures to suit the customer base, such as changing the placement of products or personnel.
[0063] Furthermore, the output means 6005 outputs the recommended operating rate set by the setting means 6004 to the store staff terminal 5. This enables the store to operate the devices installed in the store at the recommended operating rate.
[0064] Next, an overview of the operation of the congestion prediction system 1 having the above configuration will be described.
[0065] When a preset congestion prediction timing arrives, the server device 6 detects the congestion prediction timing (step S1). The server device 6 outputs an operation data request to the building information management device 3 (step S2). The operation data request requests operation data of the building in which the store managed by the server device 6 is located, and includes a building management number that identifies the building in which the store is located, a store code that identifies the store (or a code that identifies the server device 6), etc.
[0066] The building information management device 3 extracts operation data of all monitored targets corresponding to the building management number included in the operation data request (step S3). The building information management device 3 outputs the extracted operation data to the server device 6 that sent the operation data request (step S4). The building information management device 3 may extract and output operation data of some monitored targets corresponding to the building management number included in the operation data request. For example, the building information management device 3 may extract and output operation data of only the floor where the store managed by the server device 6 that sent the operation data request is located, or operation data of monitored targets in the building excluding the monitored targets of the store.
[0067] The server device 6 executes a congestion degree prediction process (step S5). The congestion degree prediction process is a process for predicting the congestion degree of the location where each monitoring target is installed, based on the operation data received from the building information management device 3. The congestion degree prediction process will be described in detail later.
[0068] Next, the server device 6 executes a congestion degree notification process (step S6). The congestion degree notification process is a process of predicting the common area congestion degree, the tenant area congestion degree, and the store congestion degree based on the congestion degree of each location predicted in the congestion degree prediction process, and outputting notification information to the store clerk terminal 5. The notification information includes the common area congestion information, the tenant area congestion information, the store congestion information, and the recommended operation rate. The congestion degree notification process will be described in detail later.
[0069] The clerk terminal 5 receives the notification information output by the congestion degree notification process (step S7). The clerk terminal 5 displays the predicted congestion degrees (common area congestion degree, tenant area congestion degree, store congestion degree) and the recommended operation rate notified by the received notification information (step S8). This allows the clerk to recognize the predicted current congestion degrees of the common areas, the current congestion degree of the tenant areas, the future congestion degree of the store, and the recommended operation rate of the POS terminal 4 set based on these congestion degrees.
[0070] Next, a description will be given of the congestion level prediction process executed by the server device 6. FIG 11 is a flowchart showing the flow of the congestion level prediction process executed by the control unit 60 of the server device 6.
[0071] The congestion degree prediction means 6003 extracts unprocessed operation data for which congestion degree prediction has not been completed from the operation data acquired by the acquisition means 6001 from the building information management device 3 (step S11). In other words, the congestion degree prediction means 6003 extracts operation data for which data is not registered in the congestion degree item in the operation data management table 612.
[0072] The control unit 60 determines whether the extracted operational data is operational data for a "heavy" congestion direction (step S12). If the operational data is operational data for a "heavy" congestion direction (Y in step S12), the control unit 60 determines whether the operational data is greater than 120% of the reference value (step S13).
[0073] If the operation data is greater than 120% of the reference value (Y in step S13), the congestion degree prediction means 6003 sets the congestion degree corresponding to the operation data to "congested" (step S14). In other words, the congestion degree of the location where the equipment that is the subject of the operation data is installed is predicted to be "congested." At this time, the registration means 6002 registers the congestion degree set by the congestion degree prediction means 6003 in the congestion degree item corresponding to the operation data in the operation data management table 612.
[0074] The control unit 60 determines whether or not the congestion degree setting for the operational data of all the monitoring targets has been completed (step S15), and if not (N in step S15), returns to the processing in step S11. If the congestion degree setting for the operational data of all the monitoring targets has been completed (Y in step S15), the control unit 60 ends the congestion degree prediction processing.
[0075] In the process of step S13, if the operation data is 120% or less of the reference value (N in step S13), the control unit 60 judges whether or not the operation data is less than 80% of the reference value (step S16). If the operation data is less than 80% of the reference value (Y in step S16), the congestion degree prediction means 6003 sets the congestion degree corresponding to the operation data to "quiet" (step S17). Then, the control unit 60 proceeds to the process of step S15.
[0076] If the operational data is 80% or more of the reference value (N in step S16), the congestion degree prediction means 6003 sets the congestion degree corresponding to the operational data to "normal" (step S18). Then, the control unit 60 proceeds to the process of step S15.
[0077] In the processing of step S12, if the extracted operational data is operational data for a "low congestion direction" (N in step S12), the control unit 60 determines whether the operational data is smaller than 80% of the reference value (step S19), and if it is smaller (Y in step S19), proceeds to the processing of step S14.
[0078] If the operation data is 80% or more of the reference value (N in step S19), the control unit 60 judges whether the operation data is greater than 120% of the reference value (step S20). If the operation data is greater than 120% of the reference value (Y in step S20), the control unit 60 proceeds to the process of step S17. If the operation data is less than or equal to 120% of the reference value (N in step S20), the control unit 60 proceeds to the process of step S18.
[0079] The control unit 60 predicts the degree of congestion of each location where a monitoring target is installed by the above-mentioned congestion degree prediction process, and registers the prediction result in the congestion degree item of the operation data management table 612.
[0080] Next, a description will be given of the congestion level notification process executed by the server device 6. Fig. 12 is a flowchart showing the flow of the congestion level notification process executed by the control unit 60 of the server device 6.
[0081] The congestion degree prediction means 6003 predicts the current congestion degree of the common area (step S21). Specifically, the congestion degree prediction means 6003 refers to the operation data management table 612, extracts and aggregates the congestion degree of data registered in the management classification of "common area". Then, the most frequent congestion degree is set as the congestion degree of the common area.
[0082] The congestion degree prediction means 6003 predicts the current congestion degree of the tenant portion (step S22). Specifically, the congestion degree prediction means 6003 refers to the operational data management table 612, extracts and aggregates the congestion degree of data in which "tenant" is registered in the management classification. Then, the highest congestion degree is set as the congestion degree of the tenant portion.
[0083] The congestion prediction means 6003 predicts the future congestion degree of the store (step S23). Specifically, the congestion prediction means 6003 refers to the operation data management table 612, extracts and aggregates the congestion degree data for the entire building (common areas and tenant areas). Then, the most frequent congestion degree is set as the congestion degree of the store.
[0084] Next, the setting means 6004 sets a recommended operating rate (step S24). The setting means 6004 refers to the recommended operating rate setting table 614, reads out a recommended operating rate corresponding to the store congestion degree predicted by the congestion degree prediction means 6003, and sets it.
[0085] The output means 6005 transmits notification information including the common area congestion information, the tenant area congestion information, and the store congestion information indicating the results of the congestion degree prediction means 6003, and the recommended operation rate set by the setting unit, to the store clerk terminal 5 (step S25). Then, the control unit 60 ends the congestion degree notification process.
[0086] The control unit 60 transmits to the store staff terminal 5 information useful for the operation of the store through the congestion degree notification process.
[0087] According to the first embodiment, the server device 6 obtains operation data of equipment installed in a building in which a store is located from the building information management device 3, and predicts the future congestion state of the store. Then, the server device 6 periodically transmits store congestion information indicating the predicted future congestion degree of the store to the store staff terminal 5.
[0088] The store clerk operating the store clerk terminal 5 can recognize the predicted future congestion level of the store and can prepare for store operation according to the predicted congestion level. In other words, the server device 6 enables the store operation to be more efficient.
[0089] Second embodiment Next, a second embodiment will be described. The second embodiment differs from the first embodiment in that the server device 6 controls the operation of the POS terminal 4 at an operating rate set by the server device 6. Hereinafter, explanations of configurations and functions similar to those of the first embodiment may be omitted. This is to avoid unnecessary redundancy in the following explanation and to make it easier for those skilled in the art to understand.
[0090] 13 is a block diagram showing the main functional configuration of the control unit 60 of the server device 6 in the second embodiment. The control unit 60 functions as an acquisition unit 6001, a registration unit 6002, a congestion degree prediction unit 6003, a setting unit 6004, an output unit 6005, and a device control unit 6006 by the CPU 601 operating in accordance with a control program stored in the ROM 602 or the storage unit 61. Each of these functions may be configured using hardware such as a dedicated circuit.
[0091] The acquiring means 6001, the registering means 6002, the congestion degree predicting means 6003, the setting means 6004, and the output means 6005 are the same as those in the first embodiment, and therefore the duplicated explanations will be omitted. In the second embodiment, since the server device 6 controls the POS terminal 4, the function of the output means 6005 may not be necessary.
[0092] The device control means 6006 controls the operation state of devices provided in the store based on the store's congestion level predicted by the congestion level prediction means 6003. For example, the device control means 6006 controls the operation of the POS terminal 4 so as to achieve a recommended operation rate corresponding to the store's congestion level predicted by the congestion level prediction means 6003. Specifically, the device control means 6006 controls the power supply to the multiple POS terminals 4 to be turned on and off so as to achieve the recommended operation rate set by the setting means 6004. Note that in this embodiment, the power-off state is not limited to a power-off or shutdown state, but also includes a sleep or hibernation state.
[0093] Next, an outline of the operation of the congestion prediction system 1 in the second embodiment will be described below.
[0094] The processes in steps S1 to S5 are the same as those in the first embodiment, and therefore the overlapping explanations will be omitted. Following the congestion prediction process in step S5, the server device 6 executes a store equipment control process (step S31). The store equipment control process is a process for controlling the operation of the POS terminals 4 in the store based on the operation data received from the building information management device 3. The store equipment control process will be described in detail later.
[0095] The server device 6 transmits a control signal to the POS terminal 4 based on the store equipment control process (step S32). The power of the POS terminal 4 is controlled to be turned on and off by the received control signal (step S33).
[0096] Next, a description will be given of the in-store device control process executed by the server device 6. Fig. 15 is a flowchart showing the flow of the in-store device control process executed by the control unit 60 of the server device 6.
[0097] The congestion degree prediction means 6003 predicts the future congestion degree of the store (step S41). The congestion degree prediction means 6003 predicts the future congestion degree of the store based on the result of the congestion degree prediction process, similar to the first embodiment.
[0098] Next, the setting means 6004 sets a recommended operation rate (step S42). The setting means 6004 refers to the recommended operation rate setting table 614 in the same manner as in the first embodiment, and reads out a recommended operation rate corresponding to the store congestion degree predicted by the congestion degree prediction means 6003.
[0099] The device control means 6006 outputs a control signal to the POS terminal 4 (step S43). The device control means 6006 outputs a control signal to each POS terminal 4 installed in the store so that the operation rate of the POS terminal 4 becomes the operation rate set by the setting means 6004. Then, the control unit 60 ends the store device control process.
[0100] The control unit 60 controls the POS terminals 4 installed in the store to achieve the recommended operating rates through the above-mentioned store equipment control process.
[0101] According to the second embodiment, the server device 6 obtains operation data of the equipment installed in the building in which the store is located from the building information management device 3, and predicts the future congestion state of the store. Then, the server device 6 controls the POS terminal 4 so that the recommended operation rate is set according to the predicted future congestion state of the store.
[0102] This eliminates the need for a store clerk to operate the POS terminal 4 to the recommended operating rate, and the server device 6 can efficiently operate the store without requiring the store clerk to do anything.
[0103] As described above, the server device 6 of the embodiment includes an acquisition means 6001 that acquires operation data indicating the operation status of equipment installed in a building in which a store is located, a congestion degree prediction means 6003 that predicts the congestion degree of the store based on the operation data acquired by the acquisition means 6001, and an output means 6005 that outputs store congestion information indicating the congestion degree of the store predicted by the congestion degree prediction means 6003.
[0104] This allows the server device 6 to notify the store of the predicted degree of congestion in the future, which allows the store to change the operating rate of the equipment and the allocation of personnel according to the predicted degree of congestion, thereby enabling the store to operate efficiently.
[0105] In addition, in the server device 6 of the embodiment, the congestion prediction means 6003 predicts the congestion degree of the common areas and the congestion degree of the tenant areas in the building, and the output means 6005 outputs common area congestion information indicating the congestion degree of the common areas predicted by the congestion prediction means 6003, and tenant area congestion information indicating the congestion degree of the tenant areas.
[0106] This allows the server device 6 to notify the store of the degree of congestion in the common areas of the building and the degree of congestion in the tenant areas, allowing the store to recognize the expected customer base in the future and take measures appropriate to that customer base.
[0107] Furthermore, the server device 6 of the embodiment further includes a setting means 6004 that sets a recommended operating rate of the equipment installed in the store based on the congestion level of the store predicted by the congestion level prediction means 6003, and an output means 6005 outputs the recommended operating rate set by the setting means 6004.
[0108] This allows the server device 6 to notify the store of the recommended operation rate of the store's equipment, for example, the POS terminal 4. This enables the store to operate the equipment at an efficient operation rate.
[0109] In addition, the server device 6 of the embodiment includes an acquisition means 6001 that acquires operation data indicating the operation status of equipment installed in a building in which a store is located, a congestion degree prediction means 6003 that predicts the congestion degree of the store based on the operation data acquired by the acquisition means 6001, and an equipment control means 6006 that controls the operation status of equipment installed in the store based on the congestion degree of the store predicted by the congestion degree prediction means 6003.
[0110] This allows the server device 6 to control the POS terminals 4 installed in the store to achieve the recommended operating rate, thereby enabling the store to operate efficiently without requiring the store staff to do the work.
[0111] The above-described embodiment can be modified as appropriate by changing a part of the above-described configuration or function. Therefore, the following describes a modified example of the above-described embodiment as another embodiment. The following mainly describes the differences from the above-described embodiment, and the details of the common points with the contents already described are omitted. The modified examples described below may be implemented individually or in appropriate combination.
[0112] (Modification) In the above-mentioned second embodiment, the server device 6 (information processing device) controls the power supply of the POS terminal 4 to be turned on and off according to the recommended operating rate, but the devices to be controlled are not limited to this. For example, as shown in Fig. 16, the devices to be controlled may include a service terminal 7 that provides various services set in a store.
[0113] Fig. 16 is a diagram showing an overview of a congestion prediction system according to a modification of the second embodiment. As shown in Fig. 16, a store system 2 according to this modification has a service terminal 7 in addition to the devices described in Fig. 1. The service terminal 7 is a terminal device that provides various services to customers, such as a ticket issuing service terminal and an ATM terminal. The service terminal 7 is under the control of the server device 6, similar to the POS terminal 4.
[0114] Although the number of service terminals 7 is not particularly limited, this modification assumes that multiple service terminals 7 are provided. Also, the service terminals 7 are treated as tenant equipment and are subject to acquisition of operational data, similar to POS terminals, but may be excluded from the acquisition targets.
[0115] Furthermore, the device control means 6006 of this modification controls the operation state of devices provided in the store based on the store's congestion level predicted by the congestion level prediction means 6003. For example, the device control means 6006 controls the operation of the service terminal 7 so as to achieve a recommended operation rate corresponding to the store congestion level predicted by the congestion level prediction means 6003. Specifically, the device control means 6006 controls the power supply of the multiple service terminals 7 to be turned on and off so as to achieve the recommended operation rate set by the setting means 6004.
[0116] This eliminates the need for a store clerk to operate the service terminal 7 to the recommended operating rate, and the server device 6 can efficiently operate the store without requiring the store clerk to do anything.
[0117] In each of the above embodiments, the control program executed by the server device 6 may be provided by recording it on a computer-readable recording medium such as a CD-ROM. Also, the control program executed by the server device 6 may be provided by storing it on a computer connected to a network such as the Internet and downloading it via the network, or may be provided via a network such as the Internet.
[0118] Although the embodiment of the present invention has been described above, this embodiment is presented as an example and is not intended to limit the scope of the invention. This embodiment can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the gist of the invention. [Explanation of symbols]
[0119] 3. Building Information Management Device 6 Server device (information processing device) 6001 Acquisition method 6003 Congestion prediction means 6004 Setting method 6005 Output means 6006 Equipment control means (control means) [Prior art documents] [Patent documents]
[0120] [Patent Document 1] JP 2000-132747 A
Claims
1. An acquisition means for acquiring operation data indicating the operation status of equipment installed in a building in which a store is located; a congestion prediction means for predicting a congestion degree of the store based on the operation data acquired by the acquisition means; an output means for outputting store congestion information indicating the degree of congestion of the store predicted by the congestion degree prediction means; An information processing device comprising:
2. The congestion degree prediction means predicts a congestion degree of a common area and a congestion degree of a tenant area in a building, The output means outputs common area congestion information indicating the congestion degree of the common area predicted by the congestion degree prediction means, and tenant area congestion information indicating the congestion degree of the tenant area. The information processing device according to claim 1 .
3. The store management system further includes a setting unit that sets a recommended operating rate of the equipment installed in the store based on the congestion level of the store predicted by the congestion level prediction unit, The output means outputs the recommended operation rate set by the setting means.
3. The information processing device according to claim 1 or 2.
4. An acquisition means for acquiring operation data indicating the operation status of equipment installed in a building in which a store is located; a congestion prediction means for predicting a congestion degree of the store based on the operation data acquired by the acquisition means; a setting means for setting a recommended operation rate of the equipment installed in the store based on the congestion level of the store predicted by the congestion level prediction means; a control means for controlling the operation state of the device so as to achieve the operation rate set by the setting means; An information processing device comprising:
5. The control means controls the power supply of the equipment installed in the store to be turned on and off. The information processing device according to claim 4.
6. A congestion prediction system including a building information management device that manages information about a building, and an information processing device that predicts a congestion level of a store in the building based on the building information managed by the building information management device, The building information management device includes: A management means for managing operation data indicating an operation state of equipment installed in the building, The information processing device includes: An acquisition means for acquiring the operation data; a congestion prediction means for predicting a congestion degree of the store based on the operation data acquired by the acquisition means; an output means for outputting store congestion information indicating the degree of congestion of the store predicted by the congestion degree prediction means; A congestion prediction system equipped with
7. A congestion prediction system including a building information management device that manages information about a building, and an information processing device that predicts a congestion level of a store in the building based on the building information managed by the building information management device, The building information management device includes: A management means for managing operation data indicating an operation state of equipment installed in the building, The information processing device includes: An acquisition means for acquiring the operation data; a congestion prediction means for predicting a congestion degree of the store based on the operation data acquired by the acquisition means; a setting means for setting a recommended operation rate of the equipment installed in the store based on the congestion level of the store predicted by the congestion level prediction means; a control means for controlling the operation state of the device so as to achieve the operation rate set by the setting means; A congestion prediction system equipped with
Citation Information
Patent Citations
Device and method for managing store operation
JP2000132747A
Method for providing internal information of building, and method for computing and collecting fee for providing internal information of building
JP2002092487A
Elevator system and elevator control method
JP2013124179A
Accounting service support device, accounting service support system, and accounting service support method
JP2015148918A
Information processing system, information processing method and program
JP7201114B1
