Plan analysis device, plan analysis method, and plan analysis program
The plan analysis device and method address the lack of priority in personnel planning by calculating correlations and outputting improvement plans based on thresholds, facilitating detailed and efficient personnel adjustments in retail settings.
Patent Information
- Application Number
- JP2023063515
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-10
- Publication Date
- 2024-10-23
AI Technical Summary
Existing personnel planning systems lack a clear priority order for evaluation indices, making it difficult to determine the extent of personnel increases or reductions needed, and thus fail to translate these into concrete actions.
A plan analysis device and method that includes a processor and storage unit to calculate correlations between workload data, required man-hour data, and employee data, outputting improvement plan information based on threshold values to prioritize personnel adjustments.
Enables step-by-step analysis and proposal of appropriate improvement plans in retail industry personnel planning, ensuring effective personnel allocation and resource optimization.
Smart Images

Figure 2024150210000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a plan analysis device, a plan analysis method, and a plan analysis program. [Background technology]
[0002] Patent Document 1 describes a system that proposes improvement actions such as "increasing personnel" and "reducing personnel" in the retail industry according to evaluation indexes generated from "sales amount," "sales number," "working hours," and "traffic." Specifically, "sales amount," "sales number," "working hours," and "traffic" are generated sequentially for each time period as business data from data obtained by measuring the business situation. Then, a predicted value of "number of customers served," as business data, is calculated from "working hours" and "traffic." It describes the generation of multiple evaluation indexes from these business data, and the selection of improvement actions that match these evaluation indexes from multiple types of predetermined improvement actions. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 6220940 Summary of the Invention [Problem to be solved by the invention]
[0004] However, improvements to personnel planning, such as "increasing personnel" and "reducing personnel," should be analyzed in detail. In particular, in Patent Document 1, since there is no priority for each evaluation index value, it is difficult to consider how much "personnel should be increased" or "reduced." As a result, it is difficult to translate this into concrete actions in the actual workplace.
[0005] An object of the present disclosure is to provide a technology that can analyze staffing plans in stages, for example in a retail store, and propose appropriate improvement plan information according to the stage. [Means for solving the problem]
[0006] A plan analysis device according to one embodiment of the present disclosure includes a memory unit and a processor, and the processor cooperates with the memory unit to acquire (i) workload data, (ii) required man-hours data, and (iii) employee data including at least one of employee working conditions data and skill data for a target period, and if a first correlation value calculated as a correlation between the workload data and the required man-hours data is less than a first threshold, preferentially outputs improvement plan information corresponding to the first correlation value, and if the first correlation value is equal to or greater than the first threshold and the second correlation value calculated as a correlation between the workload data and the employee data is less than a second threshold, outputs improvement plan information corresponding to the second correlation value.
[0007] A plan analysis method according to one embodiment of the present disclosure acquires (i) workload data, (ii) required man-hours data, and (iii) employee data including at least one of employee working conditions data and skill data for a target period, and if the first correlation value calculated as a correlation between the workload data and the required man-hours data is less than a first threshold, preferentially outputs improvement plan information corresponding to the first correlation value, and if the first correlation value is equal to or greater than a threshold and the second correlation value calculated as a correlation between the workload data and the employee data is less than a second threshold, outputs improvement plan information corresponding to the second correlation value.
[0008] A plan analysis program according to one embodiment of the present disclosure causes a computer to execute the following: acquire (i) workload data, (ii) required man-hours data, and (iii) employee data including at least one of employee working conditions data and skill data for a target period; if the first correlation value calculated as a correlation between the workload data and the required man-hours data is less than a first threshold, output improvement plan information corresponding to the first correlation value preferentially; if the first correlation value is equal to or greater than a threshold and the second correlation value calculated as a correlation between the workload data and the employee data is less than a second threshold, output improvement plan information corresponding to the second correlation value.
[0009] Furthermore, these comprehensive or specific aspects may be realized by a system, an apparatus, a method, an integrated circuit, a computer program, or a recording medium, or may be realized by any combination of a system, an apparatus, a method, an integrated circuit, a computer program, and a recording medium. Effect of the Invention
[0010] According to the present disclosure, in personnel planning for a store in the retail industry, for example, the personnel plan can be analyzed in stages and appropriate improvement proposal information can be proposed according to the stage. [Brief description of the drawings]
[0011] [Figure 1] FIG. 1 is a diagram showing an example of a configuration of a plan analysis system according to an embodiment of the present invention. [Diagram 2] FIG. 1 is a diagram showing an example of customer number forecast data, required man-hour data, and planned man-hour data according to the present embodiment; [Diagram 3] FIG. 1 is a diagram illustrating an example of customer number prediction according to an embodiment of the present invention. [Figure 4] FIG. 2 is a diagram for explaining the required man-hours according to the present embodiment. [Diagram 5] FIG. 1 is a diagram showing an example of a personnel planning pattern according to the present embodiment. [Figure 6] FIG. 1 is a diagram for explaining a plan analysis according to the present embodiment. [Figure 7]FIG. 13 is a diagram showing an example of improvement plan information regarding required man-hour data according to the present embodiment. [Figure 8A] FIG. 13 is a diagram showing an example of a first page of improvement proposal information regarding employee data according to the embodiment. [Figure 8B] FIG. 13 is a diagram showing an example of a linked page after selection of improvement plan information related to employee data according to the embodiment; [Figure 9] FIG. 13 is a diagram showing an example of improvement plan information regarding revised planned man-hour data according to the present embodiment. [Figure 10] FIG. 1 is a diagram for explaining man-hour fulfillment rate analysis according to the present embodiment. [Figure 11] FIG. 13 is a diagram showing an example of a screen for man-hour fulfillment rate analysis according to the present embodiment. [Figure 12] FIG. 13 is a diagram showing an example of a screen for analyzing man-hour fulfillment rates by day of the week according to the present embodiment; [Figure 13] FIG. 13 is a diagram showing an example of a screen showing the working conditions of available and unavailable personnel in the manpower filling rate analysis according to the present embodiment. [Figure 14] FIG. 13 is a diagram showing an example of a screen showing the skills of available and unavailable personnel in a manpower filling rate analysis according to the present embodiment. [Figure 15] FIG. 13 is a diagram showing an example of a screen showing the available work hours of available and unavailable personnel in the manpower fulfillment rate analysis according to the present embodiment. [Figure 16] FIG. 1 is a diagram showing an example of a flow of a plan analysis according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] Hereinafter, the embodiments of the present disclosure will be described in detail with reference to the drawings as appropriate. However, more detailed description than necessary may be omitted. For example, detailed description of already well-known matters and duplicated description of substantially the same configuration may be omitted. This is to avoid the following description becoming unnecessarily redundant and to facilitate understanding by those skilled in the art. Note that the accompanying drawings and the following description are provided to enable those skilled in the art to fully understand the present disclosure, and are not intended to limit the subject matter described in the claims.
[0013] (Present embodiment) <About the Planning Analysis System> First, the plan analysis system 1 will be described. FIG. 1 is a diagram showing an example of the configuration of the plan analysis system according to the present embodiment. FIG. 2 is a diagram showing examples of customer number prediction data, required man-hour data, and planned man-hour data according to the present embodiment, where (a) is an example of customer number prediction data, (b) is an example of required man-hour data, and (c) is an example of planned man-hour data. FIG. 3 is a diagram explaining an example of customer number prediction according to the present embodiment. FIG. 4 is a diagram explaining required man-hours according to the present embodiment. FIG. 5 is a diagram showing an example of a manpower planning pattern according to the present embodiment. The plan analysis system 1 includes a plan analysis device 100, a plan generation device 200, a prediction system 300, one or more worker terminals 400, and one or more store / headquarters terminals 500. The plan analysis device 100, the plan generation device 200, the prediction system 300, the worker terminals 400, and the store / headquarters terminals 500 can transmit and receive information and data to and from each other via a wired cable or a communication network. Examples of wired cables include an HDMI (registered trademark) cable and a USB cable. Examples of communication networks include wired LAN, wireless LAN, LTE, 4G, 5G, the Internet, and a Virtual Private Network (VPN).
[0014] The plan analysis system 1 is used to analyze and evaluate the created personnel plan in a retail company that has multiple stores, such as a supermarket. The assumed target retail company has multiple stores and a headquarters that manages each store. In the plan analysis system 1, the plan analysis device 100 analyzes and evaluates the employee personnel plan and personnel plan pattern (see FIG. 5) generated by the plan generation device 200 using information such as customer number forecast data, arrival and shipment plans, production plans, and work records generated by the prediction system 300. The personnel plan and the analysis results can be viewed by the worker terminal 400 or the store / headquarters terminal 500. Then, based on the analysis results of the plan analysis device 100, the user can modify the personnel plan via the plan generation device 200. The plan analysis device 100, the plan generation device 200, the prediction system 300, the worker terminal 400, and the store / headquarters terminal 500 are electronic devices such as personal computers, servers, smartphones, or tablets. The plan analysis system 1 may be used to analyze and evaluate personnel plans in companies in the logistics industry. Employees include full-time employees, contract employees, part-time employees, and part-timers, regardless of the type of contract. In the case of the logistics industry, for example, a target company has multiple transportation bases and a headquarters that manages each transportation base.
[0015] The plan analysis apparatus 100 includes a processor 110, a storage unit 120, and a display unit 130. The processor 110 realizes the functions of a correlation value calculation unit 111 and a data output unit 112. The storage unit 120 stores workload prediction data 121, employee data 122, required man-hours data 123, planned man-hours data 124, and improvement plan information 125.
[0016] The processor 110 realizes various functions by executing a program stored in the storage unit 120. The processor 110 calculates each correlation value and outputs corresponding improvement plan information, as will be described in detail later. Examples of the processor 110 include a central processing unit (CPU), a micro processing unit (MPU), a controller, a large scale integration (LSI), an application specific integrated circuit (ASIC), a programmable logic device (PLD), and a field-programmable gate array (FPGA). The plan generating device 200, the forecasting system 300, the worker terminal 400, and the store / headquarters terminal 500 may also include a similar processor.
[0017] The correlation value calculation unit 111 calculates a first correlation value between the workload prediction data 121, which is workload data for a target period acquired from the storage unit 120 or from outside, and the required man-hour data 123. The target period is a target year, a target month, a target week, a target day, or a target time. The correlation value calculation unit 111 also calculates a second correlation value between the workload prediction data 121 and the employee data 122 acquired from the storage unit 120 or from outside. For example, the workload prediction data 121 may be customer number prediction data shown in FIG. 2(a) and FIG. 3 in the case of the retail industry. For example, the workload prediction data 121 may be logistics prediction data (prediction data of the number of packages to be transported) in the case of the logistics industry. The second correlation value may be a correlation value between the workload prediction data 121 and the planned man-hour data 124. The planned man-hour data 124 is generated based on the employee data 122 and the required man-hour data 123. The customer number forecast data as the workload forecast data 121, the employee data 122, the required man-hours data 123, and the planned man-hours data 124 will be described in detail later.
[0018] The data output unit 112 outputs improvement plan information corresponding to the first correlation value, the second correlation value, and the third correlation value under certain conditions. The output may be to display the information on the display unit 130, or to transmit the information to another electronic device inside or outside the plan analysis system 1. The certain conditions will be described in detail later.
[0019] The storage unit 120 stores programs and data handled by the processor 110. The storage unit 120 may include a volatile memory and a non-volatile memory. The storage unit 120 may also include a read-only memory (ROM) and a random access memory (RAM). The plan generating device 200, the prediction system 300, the worker terminal 400, and the store / headquarters terminal 500 may also include a similar storage unit.
[0020] In this embodiment, the workload prediction data 121 is the customer number prediction data of FIG. 2(a). As shown in FIG. 2(a), the customer number prediction data includes a company code, a store code, a team code, a date, a time period, and a predicted number of customers. A team is, for example, a grocery team, a daily necessities team, or a cashier team, which exist in a group that exists in a single store. The customer number prediction data, which is the workload prediction data 121, is predicted for each business day characteristic and for each store or team, since the number of customers has a tendency for each business day characteristic as shown in FIG. 3. The business day characteristic is a characteristic of the bias of the number of customers due to weekdays, holidays, sale days, holidays, or the presence or absence of events in the vicinity of the target store. In other words, the number of customers tends to change depending on the business day characteristic. For example, the future customer number prediction data may be generated by performing machine learning using past actual data of the number of customers as learning data. The customer number prediction data does not have to be generated by machine learning, and may be generated, for example, by a staff member of the target store manually predicting based on past experience. The customer number prediction data may be generated using both information generated by machine learning and information manually predicted. Furthermore, as shown in FIG. 3, future customer number prediction data may be generated by performing machine learning using the relationship between past customer numbers and required man-hours as learning data for each business day characteristic.
[0021] Employee data 122 includes data on working conditions (available days to work, available hours to work, employment type, etc.) of each employee belonging to the target store or target team, data on skills (which skills they possess and at what level, etc.), data on desired days off, and data on compatibility with other employees.
[0022] The required man-hour data 123 includes a company code, a store code, a team code, a task code, a date, a time period, and a required man-hour, as shown in FIG. 2(b). The required man-hour is the man-hour required to perform a task (how much man-hour is required for each task), and is obtained by dividing the predicted number of customers by the number of customers per man-hour, as shown in FIG. 4. A man-hour is one person and a unit of one hour. The number of customers per man-hour indicates how many customers one employee can handle per hour. The predicted number of customers per man-hour is calculated for each business day characteristic by accumulating the past number of customers per man-hour as shown in FIG. 3 and performing machine learning or the like. The required man-hour is not limited to the number obtained by dividing the predicted number of customers by the number of customers per man-hour, but may be the required man-hour after correction using monthly working hours, or the required man-hour for each day, time period, and task calculated by comparing with the manpower planning pattern set by the store. Furthermore, the required man-hour for each day, time period, and task may be a value manually corrected by the manager of the supermarket store. The task code specifies the type of task, such as "preparation of prepared food," "preparation of prepared food," or "cleaning of prepared food."
[0023] The planned man-hour data 124 is data in which employees are assigned to required man-hours based on at least one of the employee's working condition data (included in the employee data 122) and skill data (included in the employee data 122) and the required man-hour data 123. The planned man-hour data 124 includes a company code, a store code, a team code, a task code, a date, a time period, required man-hours, and an employee code, as shown in FIG. 2(c). The planned man-hour data 124 is determined while taking into consideration the employee's working conditions (such as which days of the week they work, and what time they work), skills (the level of skills they have for each task item (or task code)), holiday requests, compatibility settings, and the like, included in the employee data 122, while satisfying the required man-hours calculated in the required man-hour data 123 as much as possible. Therefore, the data is obtained by adding an employee code indicating the assigned employee to the required man-hour data 123.
[0024] The improvement plan information 125 includes "improvement plans for the maximum and minimum values of the personnel planning pattern" and "proposals for reassignment of personnel with appropriate skills and changes to contracts," etc. Details will be described later.
[0025] The display unit 130 may include a liquid crystal display device, an organic EL device, or other display devices. The display unit 130 displays various data and information. The plan generating device 200, the prediction system 300, the worker terminal 400, and the store / headquarters terminal 500 may also be equipped with similar display units.
[0026] The plan generating device 200 uses at least one of the information such as customer number forecast data, arrival and shipment plans, production plans, and work results from the forecasting system 300 to perform work volume forecast and man-hour forecast, and generates at least one of a manpower plan and a manpower plan pattern. As shown in FIG. 5, the manpower plan pattern indicates the minimum required man-hours and the maximum required man-hours for each business day characteristic. The minimum required man-hours is the man-hours required to perform the minimum required work. The maximum required man-hours is the man-hours required when it is assumed that variable work is added due to a large amount of work such as the number of customers. In FIG. 5, the business day characteristics are three characteristics: weekdays (excluding special sale days), special sale days, and weekends and holidays (excluding special sale days). The manpower plan pattern may be generated for each store, team, or task on a daily or hourly basis. The manpower plan is a monthly work plan, a daily work plan, or a work plan for each staff member, which is generated by allocating personnel (employees) based on the manpower pattern. A manpower planning pattern may have a single required man-hour value, but by having both minimum and maximum required man-hour values, a range of man-hours can be provided, making it possible to respond to unexpected happenings or unplanned events.
[0027] The prediction system 300 generates information such as customer number prediction data, arrival and shipment plans, production plans, and work records.
[0028] The worker terminal 400 is a terminal used by each worker among the employees of each store. The store / headquarters terminal 500 is a terminal installed in each store and the headquarters. For example, when a company that operates a supermarket chain uses this plan analysis system 1, the plan analysis device 100, plan generation device 200, prediction system 300, and store / headquarters terminal 500 may be installed in the headquarters or some of the stores, and the worker terminal 400 is used by the target worker among the employees of each store.
[0029] <About planning analysis> Next, the plan analysis will be described. FIG. 6 is a diagram for explaining the plan analysis according to this embodiment. FIG. 7 is a diagram showing an example of improvement plan information related to required man-hour data according to this embodiment. FIG. 8A and FIG. 8B are diagrams showing an example of improvement plan information related to employee data according to this embodiment, FIG. 8A shows the initial screen, and FIG. 8B shows the screen of the link destination after selection. FIG. 9 is a diagram showing an example of improvement plan information related to corrected planned man-hour data according to this embodiment. FIG. 7 to FIG. 9 show screens displayed on at least one of the display unit 130, the display unit included in the worker terminal 400, and the display unit included in the store / headquarters terminal 500.
[0030] The plan generation device 200 generates a staffing plan based on the past customer numbers, past staffing plans, and experience. Conventionally, it has been difficult to analyze and evaluate the staffing plan pattern (FIG. 5) generated by the plan generation device 200, and to identify improvement plans. Therefore, the plan analysis device 100 according to the present embodiment prioritizes the indices to be analyzed, and preferentially outputs improvement plan information corresponding to the indices with higher priorities.
[0031] A detailed description will be given with reference to FIG. 6. The correlation value calculation unit 111 of the plan analysis device 100 first calculates a first correlation value between the workload prediction data 121 and the required man-hours data 123 in the staffing plan pattern. The workload prediction data 121 here is a customer number prediction. The correlation value is calculated by a formula for obtaining a general correlation. If the value of the required man-hours before the specific allocation of personnel is not correlated with the customer number prediction, it is difficult to generate a staffing plan that matches the customer number prediction even if the personnel allocation is devised. Therefore, for each business day characteristic, it is preferentially analyzed and evaluated whether the required man-hours data 123 of the staffing plan pattern is correlated with the customer number prediction of the workload prediction data 121.
[0032] If this first correlation value is lower than the first threshold, it may be because, for example, "the man-hours are constant on all days regardless of the business day characteristics" or "there is no correlation with the fluctuation in the number of customers" (FIG. 6:1-i). Therefore, the data output unit 112 outputs improvement plan information 125 corresponding to the first correlation value preferentially. An example of the output improvement plan information 125 is shown in FIG. 7. Area C in FIG. 7 shows the current manpower planning pattern that is determined to have a poor correlation, and the improved manpower planning pattern proposed as an improvement plan. It can be seen that the correlation value increases from 0.26 to 0.81 by improving the manpower planning pattern.
[0033] In addition to area C, the display screen shown in FIG. 7 also displays information in areas A, B, and D. Area A displays a list of each team in the same store, and an alert is displayed if each correlation value of each team is lower than each threshold. Area B displays the first correlation value, second correlation value, and third correlation value of the target team, and information indicating whether each correlation value is equal to or higher than each threshold (a triangular mark is displayed when each correlation value is lower than each threshold in FIG. 7). If the first correlation value is lower than the first threshold, the triangular mark may be displayed only in the column indicating the first correlation value. Area D displays a graph of the relationship between the current situation of the personnel planning pattern and the personnel planning (man-hours) when the improvement plan is adopted, and the customer number forecast, for each day. This graph allows visual confirmation that the first correlation value is improved by adopting the improvement plan. The user then checks the improvement plan information 125 output by the display screen of Fig. 7 and considers revising the maximum and minimum required man-hours of the manpower planning pattern (Fig. 6:1-ii). Then, the user actually revises the manpower planning pattern using the plan generating device 200 (Fig. 6:1-iii). In this way, the issues and revision plans relating to improvement are displayed on the display screen. This makes it easy for the user to make improvements.
[0034] In addition, when the first correlation value is less than the first threshold, improvement plan information 125 corresponding only to the first correlation value may be output, regardless of the second correlation value or the third correlation value described below.
[0035] Next, if the first correlation value is equal to or greater than the first threshold, it can be said that the manpower planning pattern is correlated with the customer number prediction of the workload prediction data 121. In that case, the correlation value calculation unit 111 calculates a second correlation value between the workload prediction data 121 and the employee data 122. The planned man-hour data 124 may be used as the employee data 122. If this second correlation value is lower than the second threshold, for example, "the manpower planning pattern does not match the days of the week when the skill holder can work" or "there is a shortage of skill holders for the manpower planning pattern" may be cited as the cause (FIG. 6: 2-i). Therefore, if the second correlation value is lower than the second threshold, the data output unit 112 outputs improvement plan information 125 corresponding to the second correlation value. As the output of the improvement plan information 125 corresponding to the second correlation value, information on at least one of the shortage and surplus of man-hours by day of the week and by time period is displayed. An example of the output improvement plan information 125 is shown in FIG. 8.
[0036] In FIG. 8A, as shown in area B, it can be seen that the first correlation value is equal to or greater than the first threshold value, and the second correlation value is lower than the second threshold value. In the upper part of area E, for each day of the week and each task, it is shown how many employees have the skills to perform that task, and whether the required man-hours are sufficient (man-hour surplus / deficiency information). In FIG. 8A, it can be seen that there is basically a shortage of employees who can perform "food_task A" on Mondays. For other tasks, there is a surplus of personnel. In the lower part of area E, it is shown how many employees have the skills to perform that task, for each day of the week and each time, and whether the required man-hours are sufficient. In FIG. 8A, it can be seen that there is basically a shortage of employees who can perform "food_task A" on the selected day of the week around 8:00. This makes it possible to confirm how many employees have the skills to perform that task, for each task, at what time on each day of the week.
[0037] In FIG. 8B, based on the information on man-hour surplus / deficiency by task, day of the week, and time shown in FIG. 8A, at least one of information on contract change and reassignment is further displayed as an improvement proposal. In FIG. 8B, from the left, a list of available personnel who have skills assigned to other tasks, a list of recommended personnel for training who can perform the task by training the target skill, and a list of recommended personnel for contract change who can perform the task by changing the contract (e.g., working hours) are shown. Based on this improvement proposal, the user checks the shortage or surplus of man-hours on average by task day (by time zone) and considers candidates for contract change or skill training (FIG. 6: 2-ii). Then, actually, training, reassignment, or change of working conditions is implemented (FIG. 6: 2-iii). As a result, the second correlation value can also be improved.
[0038] Next, if the first correlation value is equal to or greater than the first threshold and the second correlation value is equal to or greater than the second threshold, it can be said that the manpower planning pattern and employee data 122 (planned man-hour data 124) are correlated with the customer number prediction of the workload prediction data 121. In this case, the correlation value calculation unit 111 calculates a third correlation value between the workload prediction data 121 and the revised planned man-hours. The revised planned man-hours are the planned man-hours data 124, which are planned man-hours (included in the manpower plan) generated by the plan generating device 200 and have been manually corrected by the user of the company (such as a manager). If there is no correction by the user of the company, the second correlation value and the third correlation value will be the same. If this third correlation value is lower than the third threshold, for example, "user's manual correction error" or the like can be cited as a cause (FIG. 6: 3-i). Therefore, if the third correlation value is lower than the third threshold, the data output unit 112 outputs improvement plan information 125 corresponding to the third correlation value. An example of the output improvement plan information 125 is shown in Fig. 9. In this case, as shown in area B, it can be seen that the first correlation value and the second correlation value are equal to or greater than the first threshold and the second threshold, respectively, and the third correlation value is lower than the third threshold.
[0039] As improvement plan information 125, area F shows a graph for each day showing the relationship between the required man-hours, the planned man-hours, the revised planned man-hours after manual correction, and the predicted number of customers. By checking this graph, the user can confirm the difference between the required man-hours, the planned man-hours, and the revised planned man-hours, and can review the manual corrections (Figure 6: 3-ii). Then, the user can actually reflect the contents of the review when creating the next plan (Figure 6: 3-iii). As a result, the third correlation value can also be improved.
[0040] The first threshold, the second threshold, and the third threshold may be the same or different. Since each correlation value improves as the analysis, evaluation, and improvement are repeated, each threshold may be gradually increased in value according to the improvement. The first correlation value, the second correlation value, and the third correlation value may be calculated using the required man-hours, the planned man-hours, and the planned man-hours after manual correction of the past days, and the actual number of customers. As shown in the area A of Figs. 7 to 9, the first correlation value, the second correlation value, and the third correlation value of each of the multiple teams are displayed so that the teams that are less than the first threshold, the second threshold, and the third threshold can be visually recognized. This allows the correlation status of the multiple teams to be confirmed.
[0041] <About manpower fulfillment rate analysis> Next, a case where the first correlation value, the second correlation value, and the third correlation value are equal to or greater than the first threshold, the second threshold, and the third threshold, respectively, will be described. FIG. 10 is a diagram for explaining man-hour fulfillment rate analysis according to this embodiment. FIG. 11 is a diagram showing an example of a screen of man-hour fulfillment rate analysis according to this embodiment. FIG. 12 is a diagram showing an example of a screen of man-hour fulfillment rate analysis by day of the week according to this embodiment. FIG. 13 is a diagram showing an example of a screen showing the working conditions of available and unavailable personnel in man-hour fulfillment rate analysis according to this embodiment. FIG. 14 is a diagram showing an example of a screen showing the skills of available and unavailable personnel in man-hour fulfillment rate analysis according to this embodiment. FIG. 15 is a diagram showing an example of a screen showing the available working hours of available and unavailable personnel in man-hour fulfillment rate analysis according to this embodiment. FIGS. 11 to 15 show screens displayed on at least one of the display unit 130, the display unit included in the worker terminal 400, and the display unit included in the store / headquarters terminal 500.
[0042] When the first correlation value, the second correlation value, and the third correlation value are equal to or greater than the first threshold, the second threshold, and the third threshold, respectively, analysis information of the man-hour fulfillment rate, which indicates the total man-hour difference between the contracted man-hours and the required man-hours, is displayed. The analysis information of the man-hour fulfillment rate is shown in FIG. 11. The contracted man-hours are calculated based on the contracted working hours conditions (prescribed working hours) contracted with each employee, and are the total man-hours of each store, each group, and each team when each employee belonging to each store, each group, and each team works 100% of the contracted hours. The man-hour fulfillment rate in FIG. 11 is the value obtained by dividing the contracted man-hours by the required man-hours for each team, and also includes the value of the contracted man-hours and the value of the required man-hours based on the forecast number of customers. In addition, the screen in FIG. 11 may also display sales for each store, group, or team, actual man-hours input, man-hour sales (sales per man-hour), the required skill possession rate of the responsible personnel, average skill proficiency, monthly work hour plan ratio, and the like. The user checks the screen in FIG. 11 and confirms the difference between the contracted man-hours and the required man-hours (before rebates) (FIG. 10: i). If there is a difference, in order to check whether there is a trend for the day of the week (FIG. 10: ii), the plan analysis device 100 displays the man-hour fulfillment rate by day of the week shown in FIG. 12 as analysis information of the man-hour fulfillment rate. FIG. 12 shows the man-hour fulfillment rate by day of the week for a certain month for each group and team. This makes it possible to check the man-hour fulfillment rate in detail. At this time, it is also advisable to display the ratio compared to the same month of the previous year in FIG. 12. This makes it possible to check the trend in the man-hour fulfillment rate.
[0043] Returning to Figure 10, after checking whether there is a trend for days of the week (Figure 10: ii), check the working conditions of employees on days of the week when there is a shortage or excess (Figure 10: iii). The working conditions of employees on days of the week when there is a shortage or excess can be confirmed on the display screen in Figure 13. Figure 13 displays each employee's employee number, employee group name, employment category, remaining paid vacation days, and upper limit of working hours per day, week, month, and year. It is a good idea to display employees separately as those who are available to work and those who are not available to work.
[0044] After checking Figure 13, the user checks the staffing rate for each day of the week for the store, group, or entire team in preparation for creating the work plan for the next month, and considers measures to address the surplus or shortage (reassignment, change of working conditions, or hiring). Measures include (A1) allocating a multi-skilled employee from surplus days to shortage days, (A2) considering changing the working conditions for the entire team if there are no shortage days or tasks within the team and there is no place to assign the surplus personnel, and (A3) considering hiring if there are no employees to assign to shortage days or tasks within the team.
[0045] For example, if a staff shortage occurs on Tuesday, the user can select Tuesday, causing the plan analysis device 100 to display a screen as shown in Fig. 14. Fig. 14 shows the level of skills possessed by each employee for each task. By checking this screen, the user can consider allocating a multi-skilled employee from surplus days to shortage days (reassignment).
[0046] Furthermore, by the user selecting Tuesday, the plan analysis device 100 can display a screen as shown in Fig. 15. Fig. 15 shows the employment type and available working hours for each day of the week as contract conditions and working conditions. By checking this screen, if there are no shortages of days or tasks within the team and there is no place to assign surplus personnel, it is possible to consider changing the working conditions of the entire team. If there are no employees to assign to the shortages of days or tasks within the team after checking Figs. 14 and 15, it is a good idea to consider hiring someone.
[0047] By checking the improvement plan information 125, the user can make corrections to the manpower plan and manpower plan pattern, and generate a new manpower plan and manpower plan pattern via the plan generating device 200.
[0048] <Flow of the planning analysis method> Next, the flow of the plan analysis method will be described. FIG. 16 is a diagram showing an example of the flow of the plan analysis according to the present embodiment. The order of the flow may be changed unless there are restrictions. The following flow may be executed by a computer that executes a program.
[0049] The processor 110 acquires the workload prediction data 121 for the target period, the required man-hour data 123, and the employee data 122 including at least one of the employee's working conditions data and skill data from the prediction system 300 (ST1). The workload prediction data 121 may be a customer number prediction.
[0050] The correlation value calculation unit 111 calculates a first correlation value between the workload prediction data 121 and the required man-hours data 123. Then, when the first correlation value is less than a first threshold value (ST2: NO), the data output unit 112 preferentially outputs improvement plan information 125 corresponding to the first correlation value (ST3).
[0051] If the first correlation value is equal to or greater than the first threshold (ST2: YES), a second correlation value between the workload prediction data 121 and the employee data 122 is calculated. The employee data 122 may be planned man-hour data 124. The correlation value calculation unit 111 calculates the second correlation value between the workload data and the employee data 122 (planned man-hour data 124). Then, if the second correlation value is less than the second threshold (ST4: NO), the data output unit 112 outputs improvement plan information 125 corresponding to the second correlation value (ST5).
[0052] If the second correlation value is equal to or greater than the second threshold (ST4: YES), a third correlation value is calculated between the workload forecast data 121 and the revised planned man-hour data after the user has revised the planned man-hour data. The correlation value calculation unit 111 calculates the third correlation value between the workload data and the revised planned man-hour data. Then, if the third correlation value is less than the third threshold (ST6: NO), the data output unit 112 outputs improvement plan information 125 corresponding to the third correlation value (ST7).
[0053] If the third correlation value is equal to or greater than the third threshold (ST6: YES), the data output unit 112 displays the analysis information of the man-hour filling rate (ST8), and the process ends.
[0054] (Summary of this embodiment) The above description of the embodiments discloses the following techniques.
[0055] <Technology 1> The plan analysis device 100 according to this embodiment includes a memory unit 120 and a processor 110. The processor 110 cooperates with the memory unit 120 to acquire (i) workload (forecast) data 121, (ii) required man-hours data 123, and (iii) employee data 122 including at least one of employee working conditions data and skill data for a target period. If a first correlation value calculated as a correlation between the workload (forecast) data 121 and the required man-hours data 123 is less than a first threshold, the processor 110 preferentially outputs improvement plan information 125 corresponding to the first correlation value. If the first correlation value is equal to or greater than the first threshold and a second correlation value calculated as a correlation between the workload (forecast) data and employee data 122 is less than a second threshold, the processor 110 outputs improvement plan information 125 corresponding to the second correlation value. This makes it possible to analyze staffing plans in a retail store, for example, in stages and propose appropriate improvement plan information 125 for each stage.
[0056] <Technology 2> In the plan analysis device 100 described in Technique 1, the business volume (forecast) data 121 is customer number forecast data (customer number forecast). This makes it possible to effectively analyze manpower planning in stages in the retail industry and propose appropriate improvement plan information 125 according to the stage.
[0057] <Technology 3> In the plan analysis device 100 described in technique 1 or 2, the employee data 122 includes planned man-hours data 124 in which employees are allocated based on at least one of the employee's working conditions data and skill data, and required man-hours data 123. This makes it possible to more effectively analyze the personnel plan in stages and propose appropriate improvement plan information 125 according to the stage.
[0058] <Technology 4> In the plan analysis apparatus 100 described in any one of Techniques 1 to 3, when the first correlation value is less than a first threshold value, the processor 110 outputs improvement plan information 125 corresponding to the first correlation value regardless of the second correlation value, and does not output improvement plan information corresponding to the second correlation value. This makes it possible to reliably analyze personnel planning in stages and to preferentially propose appropriate improvement plan information 125 according to the stage.
[0059] <Technology 5> In the plan analysis device 100 described in any one of Techniques 1 to 4, the processor 110 further (iv) acquires revised planned man-hour data after a user has revised the planned man-hour data 124, and when the first correlation value is equal to or greater than a first threshold, the second correlation value is equal to or greater than a second threshold, and a third correlation value calculated as a correlation between the workload (forecast) data 121 and the revised planned man-hour data is less than a third threshold, outputs improvement plan information 125 corresponding to the third correlation value. As a result, even when the user manually modifies the planned man-hour data 124, the manpower plan can be analyzed in stages, appropriate improvement proposal information 125 according to the stage can be preferentially proposed, and an appropriate final manpower plan pattern can be generated.
[0060] <Technology 6> In the plan analysis apparatus 100 described in Technique 5, when the first correlation value is less than a threshold value, the processor 110 outputs improvement plan information 125 corresponding to the first correlation value regardless of the second correlation value and the third correlation value, and does not output the improvement plan information corresponding to the second correlation value and the third correlation value. This makes it possible to reliably analyze personnel planning in stages and to preferentially propose appropriate improvement plan information 125 according to the stage.
[0061] <Technology 7> In the plan analysis apparatus 100 according to any one of the first to sixth aspects, the display unit 130 displays issues and revision proposals relating to improvements as output of the improvement proposal information 125. This makes it possible to analyze the personnel plan in stages and propose issues and corrections as improvement plan information 125 appropriate for each stage.
[0062] <Technology 8> In the plan analysis device 100 described in any one of Techniques 1 to 7, the display unit 130 displays improvement plans for the maximum required man-hours and the minimum required man-hours of the man-hour plan as an output of the improvement plan information 125 corresponding to the first correlation value. This allows for a maximum and minimum range to be set for man-hour planning, making it possible to display flexible improvement proposals.
[0063] <Technology 9> In the plan analysis apparatus 100 described in any one of Techniques 1 to 8, the display unit 130 displays information regarding at least one of a shortage and surplus of man-hours by day of the week and by time period as an output of the improvement plan information 125 corresponding to the second correlation value. This makes it possible to propose detailed information as improvement plan information 125 appropriate for each stage.
[0064] <Technology 10> In the plan analysis apparatus 100 described in Technique 9, the display unit 130 further displays at least one of information relating to contract modification and information relating to reassignment as an output of the improvement plan information 125 corresponding to the second correlation value. This makes it possible to propose detailed information as improvement plan information 125 appropriate for each stage.
[0065] <Technology 11> In the plan analysis device 100 described in any one of Techniques 1 to 10, the processor 110 acquires (i) workload (forecast) data 121, (ii) required man-hours data 123, and (iii) employee data 122 for each of the multiple teams, calculates at least one of a first correlation value and a second correlation value for each of the multiple teams, and displays, on the display unit 130, at least one of the multiple teams whose first correlation value is less than a first threshold value and whose second correlation value is less than a second threshold value. As a result, in personnel planning for a store in the retail industry, for example, the personnel planning for the entire store can be analyzed in stages, and appropriate improvement plan information 125 can be proposed according to the stage.
[0066] <Technology 12> In the plan analysis device 100 described in any one of Techniques 1 to 11, when the first correlation value is equal to or greater than a first threshold, the second correlation value is equal to or greater than a second threshold, and the third correlation value is equal to or greater than a third threshold, the display unit 130 displays analytical information of the man-hour fulfillment rate. This makes it possible to perform step-by-step analysis of staffing plans in retail stores, for example, and even display man-hour fulfillment rates.
[0067] <Technology 13> In the plan analysis device 100 described in Technique 12, the analysis information of the man-hour fulfillment rate includes a man-hour fulfillment rate by day of the week. This makes it possible to perform step-by-step analysis of staffing plans in retail stores, for example, and display detailed staffing rates.
[0068] <Technology 14> In the plan analysis device 100 described in Technique 12 or 13, the analysis information of the man-hour fulfillment rate includes the man-hour fulfillment rate compared to the same month of the previous year. This makes it possible to perform step-by-step analysis of staffing plans in retail stores, for example, and display detailed staffing rates.
[0069] <Technology 15> In the plan analysis device 100 described in Technique 13 or 14, when a day of the week is selected for the day-by-day man-hour fulfillment rate, the display unit 130 displays employees who are available to work on the selected day of the week. This makes it possible to perform a step-by-step analysis of staffing plans for stores in the retail industry, for example, and display detailed manpower utilization rates and available employees.
[0070] <Technology 16> In the plan analysis device 100 described in Technique 13 or 14, when a day of the week is selected for the day-by-day man-hour fulfillment rate, the display unit 130 displays possessed skill information of employees who can work on the selected day of the week. This makes it possible to perform step-by-step analysis of staffing plans for stores in the retail industry, for example, and display detailed manpower-hour fulfillment rates and the skills of employees available to work.
[0071] <Technology 17> In the plan analysis device 100 described in Technique 13 or 14, when a day of the week is selected for the day-by-day man-hour fulfillment rate, the display unit 130 displays at least one of the employee's contract conditions and working conditions. This makes it possible to perform a step-by-step analysis of staffing plans for a retail store, for example, and display detailed man-hour fulfillment rates and at least one of the contract terms and working conditions of available employees.
[0072] <Technology 18> The plan analysis method according to the present embodiment acquires (i) workload (forecast) data 121, (ii) required man-hours data 123, and (iii) employee data 122 including at least one of employee working conditions data and skill data for a target period, and if a first correlation value calculated as a correlation between the workload (forecast) data 121 and the required man-hours data 123 is less than a first threshold, preferentially outputs improvement plan information 125 corresponding to the first correlation value, and if the first correlation value is equal to or greater than the first threshold and a second correlation value calculated as a correlation between the workload (forecast) data and employee data 122 is less than a second threshold, outputs improvement plan information 125 corresponding to the second correlation value. This makes it possible to analyze staffing plans in a retail store, for example, in stages and propose appropriate improvement plan information 125 for each stage.
[0073] <Technology 19> The plan analysis program of this embodiment causes a computer to acquire (i) workload (forecast) data 121, (ii) required man-hours data 123, and (iii) employee data 122 including at least one of employee working conditions data and skill data for a target period, and if a first correlation value calculated as a correlation between the workload (forecast) data 121 and the required man-hours data 123 is less than a first threshold, output improvement plan information 125 corresponding to the first correlation value preferentially, and if the first correlation value is equal to or greater than the first threshold and a second correlation value calculated as a correlation between the workload (forecast) data and employee data 122 is less than a second threshold, output improvement plan information 125 corresponding to the second correlation value. This makes it possible to analyze staffing plans in a retail store, for example, in stages and propose appropriate improvement plan information 125 for each stage.
[0074] Although the embodiments have been described above with reference to the accompanying drawings, the present disclosure is not limited to such examples. It is clear that a person skilled in the art can conceive of various modifications, corrections, substitutions, additions, deletions, and equivalents within the scope of the claims, and it is understood that these also belong to the technical scope of the present disclosure. In addition, the components in the above-mentioned embodiments may be arbitrarily combined within the scope of the invention. [Industrial Applicability]
[0075] The technology disclosed herein can analyze staffing plans in a retail store, for example, in stages and propose improvement plan information according to the stage. [Explanation of symbols]
[0076] 1 Planning and Analysis System 100 Planning Analysis Device 110 Processor 111 Correlation value calculation unit 112 Data output section 120 Storage section 121 Business volume forecast data 122 Employee Data 123 Required man-hour data 124 Planned man-hour data 125 Improvement proposal information 130 Display section 200 Plan Generation Device 300 Prediction System 400 Worker terminal 500 store / headquarters terminals
Claims
1. A storage unit and a processor are provided, The processor, in cooperation with the memory unit, Acquire (i) workload data, (ii) required man-hour data, and (iii) employee data including at least one of employee working conditions data and skill data for a target period; When a first correlation value calculated based on a correlation between the workload data and the required man-hours data is less than a first threshold, outputting improvement plan information corresponding to the first correlation value with priority; outputting improvement plan information corresponding to the second correlation value when the first correlation value is equal to or greater than the first threshold value and a second correlation value calculated based on the correlation between the workload data and the employee data is less than a second threshold value; Planning analysis device.
2. The business volume data is customer number prediction data. The plan analysis apparatus according to claim 1 .
3. The employee data includes planned man-hours data to which employees are allocated based on at least one of working condition data and skill data of employees and the required man-hours data. The plan analysis apparatus according to claim 1 .
4. The processor, when the first correlation value is less than the first threshold, output improvement suggestion information corresponding to the first correlation value regardless of the second correlation value, and do not output improvement suggestion information corresponding to the second correlation value; The plan analysis apparatus according to claim 1 .
5. The processor, Furthermore, (iv) acquiring revised planned man-hour data after a user has revised the planned man-hour data; outputting improvement plan information corresponding to the third correlation value when the first correlation value is equal to or greater than the first threshold value, the second correlation value is equal to or greater than the second threshold value, and a third correlation value calculated as a correlation between the workload data and the revised planned man-hour data is less than a third threshold value; The plan analysis apparatus according to claim 3 .
6. The processor, when the first correlation value is less than the first threshold value, output improvement plan information corresponding to the first correlation value regardless of the second correlation value and the third correlation value, and do not output improvement plan information corresponding to the second correlation value and improvement plan information corresponding to the third correlation value; The plan analysis apparatus according to claim 5 .
7. Further comprising a display unit, The display unit displays an improvement-related issue and a correction proposal as an output of the improvement proposal information. The plan analysis apparatus according to claim 1 .
8. Further comprising a display unit, the display unit displays improvement plans for the maximum required man-hours and the minimum required man-hours of the man-hour plan as an output of improvement plan information corresponding to the first correlation value. The plan analysis apparatus according to claim 1 .
9. Further comprising a display unit, the display unit displays information regarding at least one of a shortage and a surplus of man-hours by day of the week and by time period as an output of improvement plan information corresponding to the second correlation value. The plan analysis apparatus according to claim 1 .
10. the display unit further displays at least one of information regarding a contract change and information regarding a reassignment as an output of the improvement plan information corresponding to the second correlation value. The plan analysis apparatus according to claim 9.
11. Further comprising a display unit, The processor, Acquire (i) the workload data, (ii) the required man-hours data, and (iii) the employee data for each of a plurality of teams; Calculating at least one of the first correlation value and the second correlation value for each of the plurality of teams; displaying, on the display unit, at least one of the teams whose first correlation value is less than the first threshold value and the team whose second correlation value is less than the second threshold value among the plurality of teams; The plan analysis apparatus according to claim 5 .
12. Further comprising a display unit, if the first correlation value is greater than or equal to the first threshold, the second correlation value is greater than or equal to the second threshold, and the third correlation value is greater than or equal to the third threshold, The display unit displays analysis information of man-hour fulfillment rate. The plan analysis apparatus according to claim 5 .
13. The analysis information of the man-hour fulfillment rate includes a man-hour fulfillment rate by day of the week, The plan analysis apparatus according to claim 12.
14. The analysis information on the man-hour fulfillment rate includes a man-hour fulfillment rate compared to the same month of the previous year, The plan analysis apparatus according to claim 12.
15. The display unit is When any day of the week is selected for the day-by-day man-hour fulfillment rate, Displaying employees available to work on the selected days of the week; The plan analysis apparatus according to claim 13.
16. The display unit is When any day of the week is selected for the day-by-day man-hour fulfillment rate, Displaying skill information of employees who are available to work on the selected day of the week; The plan analysis apparatus according to claim 13.
17. The display unit is When any day of the week is selected for the day-by-day man-hour fulfillment rate, Displaying the employee's contract terms and / or working conditions; The plan analysis apparatus according to claim 13.
18. Acquire (i) workload data, (ii) required man-hour data, and (iii) employee data including at least one of employee working conditions data and skill data for a target period; When a first correlation value calculated based on a correlation between the workload data and the required man-hours data is less than a first threshold, outputting improvement plan information corresponding to the first correlation value with priority; outputting improvement plan information corresponding to the second correlation value when the first correlation value is equal to or greater than the first threshold value and a second correlation value calculated based on the correlation between the workload data and the employee data is less than a second threshold value; Planning analysis methods.
19. Acquire (i) workload data, (ii) required man-hour data, and (iii) employee data including at least one of employee working conditions data and skill data for a target period; When a first correlation value calculated based on a correlation between the workload data and the required man-hours data is less than a first threshold, outputting improvement plan information corresponding to the first correlation value with priority; outputting improvement plan information corresponding to the second correlation value when the first correlation value is equal to or greater than the first threshold value and a second correlation value calculated based on the correlation between the workload data and the employee data is less than a second threshold value; Make the computer do that, Planning Analysis Program.