Power management device

The power management device addresses sudden demand fluctuations by adjusting bidding strategies and resource utilization, enabling effective power supply management even with unexpected changes in consumer demand.

JP2024151427AActive Publication Date: 2024-10-25TOYOTA JIDOSHA KK
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023064737
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-12
Publication Date
2024-10-25
Estimated Expiration
2043-04-12

AI Technical Summary

Technical Problem

Existing power trading systems face challenges in meeting sudden changes in electricity demand, particularly due to unexpected charging of electric vehicles, which can lead to a mismatch between anticipated and actual consumer demand.

Method used

A power management device that includes a processor to determine provisional reference values and expected demand fluctuations, adjusting bidding strategies based on available resources like rechargeable vehicles, and declaring revised reference values to the supply and demand adjustment market to accommodate increased demand.

Benefits of technology

The system effectively meets adjustment power requests from power transmission and distribution companies by anticipating demand changes, ensuring flexibility in power supply even when unexpected increases occur.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024151427000001_ABST
    Figure 2024151427000001_ABST
Patent Text Reader

Abstract

To easily meet a request of adjustment force from a power transmission / distribution company even when a demand increases.SOLUTION: A processor of a power management device of a transaction company which provides adjustment force of power to a power transmission / distribution company: determines a temporary reference value of demand by an adjustment system in each time frame and a bidding time possible amount, which is a demand predicted to be increased or suppressed by the adjustment system with the temporary reference value as a reference (S112); stores a contract amount of a bidding result which is bidden in a supply and demand adjustment market in a memory with suppliable power to the transmission / distribution company as adjustment force in the frame based on the bidding time possible amount as a bidding amount (S113 and S122); determines an immediate possible amount which is a demand predicted to be increased or suppressed by the adjustment system predicted at time closer to the frame than bidding time (S132); and declares the reference value obtained by adding a part of the immediate possible amount to the temporary reference value to the supply and demand adjustment market when there is allowance in the immediate possible amount with respect to the contract amount (S133).SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a power management device, and more particularly to a power management device of a trading company that provides power adjustment capacity to a power transmission and distribution company. [Background technology]

[0002] In recent years, a supply and demand adjustment market has been established, which is a market for procuring the adjustment capacity of electricity provided by trading companies such as aggregators to general electricity transmission and distribution companies. One of the products handled in this supply and demand adjustment market is tertiary adjustment capacity (2) (to be precise, it is a circled number 2, but here it is written as a parenthesized number 2), which is an adjustment capacity corresponding to the forecast error of renewable energy. In order to select a trading company that will conduct electricity trading as a trading company that will provide this tertiary adjustment capacity (2), there is a technology that ranks consumers based on the standard deviation of the difference between the trading company's forecast demand per unit time and the consumer's actual demand (see, for example, Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent Publication No. 2022-089602 Summary of the Invention [Problem to be solved by the invention]

[0004] When a trading company trades electricity, as in the technology of Patent Document 1, it is required to match the electricity demand of consumers with the request of the general electricity transmission and distribution company. On the other hand, if the electricity demand fluctuates due to a sudden charging of an electric vehicle by a consumer, there is a risk that the actual demand cannot be made to follow the request of the general electricity transmission and distribution company.

[0005] This disclosure has been made to solve the above-mentioned problems, and its purpose is to provide a power management device that can easily meet the adjustment capacity requests from power transmission and distribution companies even when demand increases. [Means for solving the problem]

[0006] The power management device according to the disclosure is a power management device of a trading company that provides power adjustment capacity to a power transmission and distribution company, capable of controlling an adjustment system including a power demand resource, and includes a memory that stores a predetermined program, and a processor that executes the predetermined program. The processor executes the predetermined program to determine a provisional reference value of demand by the adjustment system in each time slot and a bidding available amount that is a demand that is expected to be increased or suppressed by the adjustment system based on the provisional reference value, stores in the memory a contract amount of a successful bid in which power that can be supplied as adjustment capacity to the power transmission and distribution company in the slot is set as a bid amount in the supply and demand adjustment market based on the bidding available amount, determines a near available amount that is a demand that is expected to be increased or suppressed by the adjustment system that is expected at a time closer to the slot than the time of the bid, and when there is a surplus in the near available amount relative to the contract amount, declares a reference value obtained by adding a part of the near available amount to the provisional reference value to the supply and demand adjustment market.

[0007] According to this configuration, even if the demand by the adjustment system increases from the time of bidding, the reference value of the demand can be increased at a time close to the corresponding frame. As a result, it is possible to provide a power management device that can easily meet the adjustment capacity request from the power transmission and distribution company even if the demand increases.

[0008] When declaring the reference value to the supply and demand balancing market, the processor may declare a smaller reference value when the contract volume is large compared to when the contract volume is small.

[0009] According to such a configuration, the larger the contract amount, the larger the allowable error in adjustment capability becomes, so that even if the reference value is set small, it is possible to meet the adjustment capability request from the power transmission and distribution company.

[0010] The demand resource may include a plurality of chargeable vehicles. With this configuration, it is possible to meet the adjustment capability request from the power transmission and distribution company by using the chargeable vehicles.

[0011] The demand resource may include a plurality of chargeable vehicles and a plurality of charge / discharge vehicles. According to this configuration, it is possible to meet the adjustment capability request from the power transmission and distribution company by using the chargeable vehicles and the charge / discharge vehicles.

[0012] When the processor declares the reference value to the supply and demand balancing market, if the amount of power that can be discharged by the charge / discharge vehicle is large, the processor may declare a smaller reference value compared to when the amount of power that can be discharged by the charge / discharge vehicle is small.

[0013] With this configuration, the more power that can be discharged by the charging / discharging vehicle, the greater the allowable error in adjustment power. Therefore, even if the reference value is made small, it is possible to meet the adjustment power requirements of the power transmission and distribution company. Effect of the Invention

[0014] According to this disclosure, it is possible to provide a power management device that can easily meet the adjustment capability request from the power transmission and distribution company even when demand increases. [Brief description of the drawings]

[0015] [Figure 1] 1 is a block diagram showing an outline of the configuration of a power management system according to an embodiment of the present invention; [Diagram 2] 10 is a flowchart showing the flow of adjustment power-related processing executed by the aggregator server in this embodiment. [Diagram 3] FIG. 13 is a diagram for explaining a method for determining a bid amount and a reference value according to this embodiment. [Figure 4] 11 is a diagram for explaining the contract amount and the reference value in this embodiment. FIG. [Diagram 5] FIG. 11 is a first diagram showing a modified example of the method of determining a reference value in this embodiment. [Figure 6] FIG. 2 is a second diagram showing a modified example of the method of determining the reference value in this embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0016] Fig. 1 is a block diagram showing an outline of the configuration of a power management system 1 according to this embodiment. With reference to Fig. 1, thick solid lines with arrows indicate the flow of power, and thin solid lines and dashed lines with arrows indicate the flow of data. In the power management system 1, power generated by a power generation company 60 is consigned by a power transmission and distribution company 50 (e.g., a general power transmission and distribution company) to consumers 20 who are retail customers of a retail electricity company 30 (e.g., a regional power company, a new power company).

[0017] The supply and demand adjustment market 40 is a market where the electricity transmission and distribution business operator 50 procures adjustment power for adjusting supply and demand and frequency. The adjustment power includes tertiary adjustment power (2). The tertiary adjustment power (2) is adjustment power provided by the aggregator 10 or the power generation business operator 60 to the electricity transmission and distribution business operator 50 in order to deal with forecast errors of renewable energy such as electricity generated by solar power generation or wind power generation. The bid for the tertiary adjustment power (2) is made to the supply and demand adjustment market 40 by the aggregator 10 or the power generation business operator 60 for a block of the target period (for example, 3 hours) on the day before the block. The aggregator 10 or the power generation business operator 60 is obligated to provide the contracted amount of adjustment power (ΔkW) of the successful bid to the electricity transmission and distribution business operator 50 in the target block based on the reference value (kW) of the demand for electricity. The supply and demand adjustment market and tertiary adjustment power (2) are explained in detail on the websites of the Ministry of Economy, Trade and Industry and the Electricity Transmission and Distribution Grid Council.

[0018] The power generation company 60 has power generation facilities 610 (for example, nuclear power generation facilities, thermal power generation facilities, hydroelectric power generation facilities, solar power generation facilities, wind power generation facilities, geothermal power generation facilities, etc.) that generate electric power, and a power generation company server 600 that manages the power generation business. The power transmission and distribution company 50 has power transmission and distribution facilities 510 that transmit and distribute electric power, and a power transmission and distribution company server 500 that manages the power transmission and distribution business. The power generation facilities 610 and the power transmission and distribution facilities 510 constitute an electric power system (electricity grid). The supply and demand adjustment market 40 has a supply and demand adjustment market server 400 for managing the supply and demand of electric power. The electricity retailer 30 has a retail electricity company server 300 that manages the retail electricity business.

[0019] The consumer 20 has a DSR 210 including at least one of demand equipment (e.g., electrical appliances, machines, electric vehicles that can be charged or discharged, etc.) which is an energy resource connected below the receiving point, storage equipment (e.g., stationary batteries, electric vehicles that can be charged or discharged, etc.), and power generation equipment (e.g., solar power generation equipment, wind power generation equipment, etc.), and a Home Energy Management System (HEMS) 200 which manages the DSR 210.

[0020] The aggregator 10 includes an aggregator server 100. The aggregator server 100 controls and manages the DSR 210 or DER (Distributed Energy Resources) 310 including at least one of a power generation facility or a power storage facility (for example, a rechargeable electric vehicle, a rechargeable electric vehicle, or a stationary battery) that is an energy resource directly connected to the power grid.

[0021] The aggregator server 100 includes a processor 110, a memory 120, an input unit 130, an output unit 140, an auxiliary storage device 160, and a communication unit 190. The memory 120 includes a random access memory (RAM), a read only memory (ROM), a flash memory, etc., and stores software such as a program executed by the aggregator server 100 and data to be processed. The auxiliary storage device 160 includes a hard disk drive (HDD), a solid state drive (SSD), a removable media drive, etc., and supports the memory 120 to store a large amount of data compared to the memory 120, and stores software such as a program executed by the aggregator server 100 and data to be processed. The input unit 130 includes input devices such as a keyboard and a mouse, and transmits information input by a user from the input device to the processor 110. The output unit 140 includes output devices such as a display and a speaker, and outputs information received from the processor 110 to the output device. The communication unit 190 is a device capable of communicating with external devices such as other servers via a communication network 900 such as the Internet, and transmits and receives predetermined information between the external devices. The processor 110 processes data from the input unit 130 or the communication unit 190 or data stored in the memory 120 or the auxiliary storage device 160 according to a program stored in the memory 120 or the auxiliary storage device 160, and outputs the data to the output unit 140 or the communication unit 190, or stores the data in the memory 120 or the auxiliary storage device 160.

[0022] The electricity retailer server 300, the supply and demand balancing market server 400, the electricity transmission and distribution company server 500, and the power generation company server 600 have the same configuration as the aggregator server 100 described above.

[0023] The HEMS 200 can communicate with external devices such as the aggregator server 100, the retail electricity supplier server 300, or the electricity transmission and distribution supplier server 500 via a communication network 900, and controls the supply and demand of electricity at the DSR 210, and acquires the measured amount of electricity from a smart meter that measures the amount of electricity exchanged between the DSR 210 and the power grid.

[0024] The HEMS 200 may have a function of a smart meter. The aggregator server 100 may control or manage the DSR 210 directly or indirectly.

[0025] In such an electricity management system 1, a product handled in the supply and demand adjustment market 40 is tertiary adjustment capacity (2), which is an adjustment capacity corresponding to prediction errors of renewable energy. When a trading company providing this tertiary adjustment capacity (2) trades electricity, it is required to match the electricity demand of the consumer 20 with the request of the electricity transmission and distribution company 50. On the other hand, if a fluctuation occurs in the electricity demand due to a sudden charging of an electric vehicle at the consumer 20, there is a risk that the actual demand cannot be made to follow the request of the electricity transmission and distribution company 50.

[0026] Therefore, the processor 110 of the aggregator server 100 determines a provisional reference value for demand by DER310 or DSR210 in each time slot frame, and a bidding available amount, which is demand that is expected to be increased or suppressed by DER310 or DSR210 based on the provisional reference value, stores in the memory 120 the contracted amount of the successful bid made to the supply and demand adjustment market 40 as the bid amount for electricity that can be supplied to the electricity transmission and distribution company 50 as adjustment power in the slot based on the bidding available amount, determines a near-term available amount, which is demand that is expected to be increased or suppressed by DER310 or DSR210 at a time closer to the slot than the time of the bidding, and if there is a surplus in the near-term available amount relative to the contracted amount, declares to the supply and demand adjustment market 40 a reference value obtained by adding a part of the near-term available amount to the provisional reference value.

[0027] This makes it possible to increase the reference value of demand at a time close to the corresponding frame even if the demand by the DER 310 or the DSR 210 increases from the time of bidding. As a result, even if the demand increases, it is possible to easily meet the adjustment capacity request from the electricity transmission and distribution company 50.

[0028] Fig. 2 is a flowchart showing the flow of adjustment capacity-related processing executed by the aggregator server 100 in this embodiment. Referring to Fig. 2, the processor 110 of the aggregator server 100 judges whether the current time is the bidding timing (step S111). The bidding timing is a specific time such as a predetermined time before the bidding deadline, and in the case of tertiary adjustment capacity (2), since the bidding time is from 12:00 to 14:00 on the previous day, for example, it is 13:00, one hour before the bidding deadline of 14:00.

[0029] If it is determined that the current time has come for bidding (YES in step S111), processor 110 determines the bid volume, provisional reference value, and bid price from the volume predicted to be available for supply by DER 310 (or DSR 210) during the time period subject to bidding (step S112).

[0030] FIG. 3 is a diagram for explaining a method of determining the bid amount and the reference value in this embodiment. Referring to FIG. 3, the provisional reference value is the demand required for the tertiary control capacity (2) block (when the DER 310 is an electric vehicle, the charging power of the electric vehicle that must be charged). The available amount is the adjustment capacity of the power demand that is predicted from the information of the DER 310 and is expected to be increased. The power that is calculated by adding a safety margin to this available amount is set as the tertiary control capacity (2), and the bid amount is determined. Note that, as shown in FIG. 3, the bid amount may be set to the determined bid amount minus the amount added to the reference value.

[0031] Returning to FIG. 2, the processor 110 submits a bid for the bid amount and bid unit price determined in step S112 to the supply and demand adjustment market server 400 (step S113).

[0032] If it is determined that the current time is not the bidding timing (NO in step S111), or after step S113, the processor 110 determines whether or not the contract result has been notified from the supply and demand adjustment market server 400 (step S121). If it is determined that the contract result has been notified (YES in step S121), the processor 110 stores the contract result in the memory 120 or the auxiliary storage device 160 (step S122).

[0033] 4 is a diagram for explaining the contract amount and the reference value in this embodiment. With reference to FIG. 4, the contract amount of the tertiary control reserve (2) is determined within the range of the bid amount shown in FIG.

[0034] 2, if it is determined that the timing has not come when the contract result has been received (NO in step S121), or after step S122, processor 110 determines whether the current time is the timing to declare the reference value (step S131). The timing to declare the reference value is a specific time, such as a predetermined number of minutes before the deadline for declaring the reference value, and in the case of tertiary control capacity (2), since the deadline is one hour before the start of the target period, it is, for example, 30 minutes before the deadline.

[0035] When it is determined that the current time has come to the timing for reporting the reference value (YES in step S131), the processor 110 determines whether the current available amount of tertiary control capacity (2) exceeds the contract amount stored in step S122 (step S132). When it is determined that the current available amount does not exceed the contract amount (NO in step S132), there is no room in the available amount, so the processor 110 reports the current amount as the reference value to the supply and demand adjustment market server 400 without adding to the provisional reference value determined in step S112 (step S134).

[0036] Fig. 5 is a first diagram showing a modified example of the method of determining the reference value in this embodiment. Referring to Fig. 5, in step S134, the provisional reference value may be reduced and a value declared as the reference value. Also, the provisional reference value may be reduced and the reference value declared as 0. This increases the possibility that the adjustment capacity will be within the allowable error of the contract amount.

[0037] Returning to FIG. 2, if it is determined that the current available volume exceeds the contract volume (YES in step S132), there is a margin in the available volume, so the processor 110 declares to the supply and demand adjustment market server 400 a reference value obtained by adding a portion of the current available volume to the provisional reference value determined in step S112, as shown in FIG. 4 (step S133).

[0038] FIG. 6 is a second diagram showing a modified example of the method of determining the reference value in this embodiment. FIG. 6(A) is a diagram for explaining the difference in the method of determining the reference value depending on the difference in the contract amount. Referring to FIG. 6(A), in order to respond to a sudden charging request from a user of an electric vehicle, it is possible to declare a large amount of addition to the reference value. In this case, when the contract amount of the tertiary regulation capability (2) is small, the allowable error of the regulation capability is small, so it is desirable to add a large amount to the reference value. However, when the contract amount of the tertiary regulation capability (2) is large, the allowable error of the regulation capability is large compared to when the contract amount is small, so the amount of addition to the reference value can be reduced. As a result, the surplus of the regulation capability can be directed to responding to other sudden changes.

[0039] Fig. 6(B) is a diagram for explaining how to determine the reference value when DER 310 includes chargeable electric vehicles in addition to chargeable electric vehicles. With reference to Fig. 6(B), when DER 310 includes chargeable electric vehicles, the amount of dischargeable capacity can be reduced compared to when DER 310 does not include such vehicles. As a result, the surplus of adjustment capability can be directed toward responding to other sudden changes.

[0040] Returning to FIG. 2, if it is determined that the current time is not the timing to declare the reference value (NO in step S131), or after step S133 or step S134, processor 110 determines whether the current time is the start of the target frame (step S141).

[0041] If it is determined that the current time is the start of the target frame (YES in step S141), the processor 110 starts controlling the DER 310 (or DSR 210) to adjust the power exchanged between the transmission and distribution equipment 510 of the transmission and distribution company 50 based on the agreement result and in accordance with instructions from the transmission and distribution company server 500, and controls the power so that it is within the acceptable range for the command value (step S142).

[0042] If it is determined that the current time is not the start time of the target frame (NO in step S141), or after step S142, processor 110 returns the process to be executed to the upper process that called this adjustment power related process.

[0043] [Variations] (1) In the above-described embodiment, as shown in Fig. 1 etc., the DER 310 (or the DSR 210) mainly includes a demand facility such as a chargeable electric vehicle, and may additionally include a power storage facility such as a chargeable and dischargeable electric vehicle. However, the present invention is not limited to this, and the DER 310 (or the DSR 210) may include at least one of a demand facility, a power storage facility, and a power generation facility.

[0044] [summary] (1) As shown in Fig. 1, the power management device (e.g., aggregator server 100, power generation company server 600) is a power management device of a trading company (e.g., aggregator 10, power generation company 60) that provides power adjustment capacity to a power transmission and distribution company 50. As shown in Fig. 1, the power management device is capable of controlling an adjustment system (e.g., DER 310, DSR 210) including power demand resources (e.g., rechargeable electric vehicles, rechargeable electric vehicles, stationary batteries), and includes a memory 120 that stores a predetermined program, and a processor 110 that executes the predetermined program. As shown in Figures 2 to 6, the processor 110 executes a predetermined program to determine a provisional reference value of the demand by the adjustment system in each time slot and a bidding possible amount, which is the demand that is expected to be increased or suppressed by the adjustment system based on the provisional reference value (for example, step S112), store in memory the contract amount of the successful bid in the supply and demand adjustment market, in which the bid amount is the electricity that can be supplied to the power transmission and distribution company as adjustment power in the slot based on the bidding possible amount (for example, steps S113, S122), determine a near-term possible amount, which is the demand that is expected to be increased or suppressed by the adjustment system at a time closer to the slot than the time of the bidding (for example, step S132), and, if there is a surplus in the near-term possible amount compared to the contract amount, declare to the supply and demand adjustment market a reference value obtained by adding a part of the near-term possible amount to the provisional reference value (for example, step S133).

[0045] This makes it possible to increase the reference value of demand at a time close to the corresponding frame even if the demand according to the adjustment system increases from the time of bidding. As a result, even if the demand increases, it becomes easier to meet the adjustment capacity request from the electricity transmission and distribution company 50.

[0046] (2) As shown in Figures 2 and 6, when the processor declares the reference value to the supply and demand adjustment market 40, if the contract volume is large, the processor may declare a smaller reference value compared to when the contract volume is small (e.g., step S133).

[0047] As a result, since the allowable error in adjustment capability increases as the contract amount increases, the adjustment capability can be matched to the request for adjustment capability from the power transmission and distribution company 50 even if the reference value is set small.

[0048] (3) As shown in Fig. 1 and Fig. 2, the demand resource may include a plurality of chargeable vehicles. This allows the chargeable vehicles to be used to meet the adjustment power request from the power transmission and distribution company 50.

[0049] (4) As shown in Fig. 1 and Fig. 2, the demand resource may include a plurality of chargeable charging vehicles and a plurality of charge / discharge vehicles. This makes it possible to meet the adjustment power request from the power transmission and distribution company 50 by using the chargeable charging vehicles and the charge / discharge vehicles.

[0050] (5) As shown in Figures 2 and 6, when the processor declares the reference value to the supply and demand adjustment market 40, if there is a lot of electricity that can be discharged by the charging / discharging vehicle, the processor may declare a smaller reference value (for example, step S133) compared to when there is less electricity.

[0051] As a result, since the allowable error in adjustment capability increases as the amount of dischargeable power by charge / discharge vehicles increases, the adjustment capability request from the power transmission and distribution company 50 can be met even if the reference value is set small.

[0052] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present disclosure is defined by the claims, not by the description of the embodiments described above, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]

[0053] 1 Power management system, 10 aggregator, 20 consumer, 30 retail electricity supplier, 40 supply and demand adjustment market, 50 power transmission and distribution supplier, 60 power generation supplier, 100 aggregator server, 110 processor, 120 memory, 130 input section, 140 output section, 160 auxiliary storage device, 190 communication section, 200 HEMS, 210 DSR, 300 retail electricity supplier server, 310 DER, 400 supply and demand adjustment market server, 500 power transmission and distribution supplier server, 510 power transmission and distribution equipment, 600 power generation supplier server, 610 power generation equipment, 900 communication network.

Claims

1. A power management device of a trading company that provides power adjustment power to a power transmission and distribution company, The power management device includes: A regulation system including a demand resource for electricity is controllable; A memory for storing a predetermined program; A processor for executing the predetermined program, The processor executes the predetermined program, determining a provisional standard value of the demand by the adjustment system for each time slot and a bidding available amount, which is a demand that is expected to be increased or suppressed by the adjustment system based on the provisional standard value; A contract quantity of a successful bid in the supply and demand adjustment market is stored in the memory as a bid quantity for the power that can be supplied as adjustment capacity to the power transmission and distribution company in the block based on the available quantity at the time of bidding; determining a near-term available quantity, which is a demand that is expected to be increased or reduced by the adjustment system at a time closer to the time of the bid; When the most recent available amount has a surplus relative to the contract amount, the power management device declares to the supply and demand adjustment market a reference value obtained by adding a portion of the most recent available amount to the provisional reference value.

2. The power management device according to claim 1 , wherein the processor, when reporting the reference value to the supply and demand balancing market, reports a smaller reference value when the contract amount is large compared to when the contract amount is small.

3. The power management apparatus of claim 1 or 2, wherein the demand resource includes a plurality of chargeable vehicles.

4. The power management apparatus according to claim 1 or 2, wherein the demand resources include a plurality of chargeable vehicles and a plurality of charge / discharge vehicles.

5. The power management device according to claim 4 , wherein the processor, when declaring the reference value to the supply and demand balancing market, declares a smaller reference value when the amount of power dischargeable by the charge / discharge vehicle is large compared to when the amount of power dischargeable by the charge / discharge vehicle is small.

Citation Information

Patent Citations

  • Bid condition determination device for power transaction with movable body, and power transaction system

    JP2022065828A

  • Computer and power adjustment method

    JP2023041314A

  • Computer and power adjustment method

    JP2023046867A

  • Information processing device, information processing method, and program

    JP2022089602A