Piping construction support device, piping construction support method, and piping construction support program
The piping construction support device simplifies on-site construction by importing 3D CAD data and generating necessary construction information on a tablet, addressing the inefficiencies of converting 3D to 2D drawings.
Patent Information
- Application Number
- JP2023071990
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-26
- Publication Date
- 2024-11-08
AI Technical Summary
The conversion of 3D CAD data to 2D drawings for piping construction is cumbersome and costly, requiring additional man-hours and resources, making it inefficient for on-site construction.
A piping construction support device using a tablet terminal that imports 3D CAD data, generates pipe axis data, and displays construction support information, including attribute data and reference distances, to facilitate easy on-site measurements.
Enables efficient and cost-effective on-site construction by utilizing pre-designed 3D CAD data, reducing the need for additional equipment and minimizing man-hours.
Smart Images

Figure 2024157587000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a piping installation support device, a piping installation support method, and a piping installation support program. [Background technology]
[0002] In recent years, piping design has been carried out using 3D CAD devices in various plant designs. For example, Patent Document 1 proposes a piping layout design system that generates a piping route connecting a start point and an end point of a pipe, the piping layout design system having a memory unit that stores at least one of piping layout standard information indicating basic design conditions related to the piping layout design and detailed design information indicating detailed design conditions related to the piping layout design, and a route generating unit that generates the piping route based on at least one of the piping layout standard information and the detailed design information. Such a piping layout design system can automatically generate piping routes that satisfy many constraints, thereby reducing the design burden. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent Publication No. 2022-86310 Summary of the Invention [Problem to be solved by the invention]
[0004] However, when constructing an actual piping plant based on a piping plant model designed using a 3D CAD device, the designed 3D CAD data must be converted into a 2D CAD drawing, and then the layout of various pipes must be confirmed based on the 2D drawing printed on paper, and measurements must be taken on site to determine the positions of various pipes and supports.
[0005] This requires the cumbersome task of converting 3D CAD data into 2D CAD drawings using a computer with a dedicated drawing conversion program installed. However, if such computers and printers are to be brought to the construction site to carry out the work, there is the issue of additional labor and costs being incurred, such as the need to secure installation space.
[0006] In view of the above-mentioned problems in the conventional art, an object of the present invention is to provide a piping construction support device, a piping construction support method, and a piping construction support program that can easily obtain the necessary construction information at a construction site by utilizing pre-designed 3D CAD data. [Means for solving the problem]
[0007] In order to achieve the above-mentioned object, a first characteristic configuration of a piping construction support device according to the present invention is a piping construction support device configured with a tablet terminal, comprising: an import processing unit that imports a 3D CAD data file of a piping plant model converted into a predetermined intermediate file and including a piping model; a display processing unit that displays the piping plant model imported by the import processing unit on a screen; a data supplement processing unit that supplements piping attribute data associated with the piping model that has not been acquired by the import processing unit; a pipe axis center data generation processing unit that generates pipe axis center data indicating a pipe axis center of the piping model selected from the piping plant model displayed on the screen; a reference generation processing unit that generates reference data specifying a reference for piping construction based on an arbitrary component selected from the piping plant model displayed on the screen and displays the reference on the screen in a state in which the reference can be distinguished from the piping plant model; and a construction support data generation processing unit that calculates a reference distance from the reference to the pipe axis center based on the reference data and the pipe axis center data, and displays the reference data, the pipe axis center data, and the reference distance on the screen as a construction support screen.
[0008] The piping construction support device is configured with a tablet terminal that can be easily brought into the construction site. An import processing unit provided in the tablet terminal imports a 3D CAD data file of a piping plant model configured with a piping model and various devices, and a display processing unit displays the piping plant model on the screen. In order to utilize the tablet terminal, which has limited computing power and memory capacity, in a general-purpose manner without being restricted to a specific 3D CAD data file, a general-purpose intermediate file is used as the 3D CAD data file. Therefore, there are cases where the attribute data of the imported piping is not properly captured. In preparation for such a case, a data supplement processing unit supplements piping attribute data that is associated with the piping model and has not been acquired by the import processing unit. In the pipe axis data generation processing unit, pipe axis data indicating the pipe axis of the piping model selected by the operator from the piping plant model is generated. This is to supplement the pipe axis data in case it cannot be imported by the import process.
[0009] In the reference generation processing unit, reference data is generated that specifies the reference for piping construction based on any component selected by the operator from the piping plant model displayed on the screen, and the reference is displayed on the screen in a state where it can be distinguished from the piping plant model. The reference is a reference for measuring the position of the piping on-site, and is composed of points and surfaces. When measuring the installation position of the piping on-site based on the wall surface, column surface, or wall center or column center included in the 3D CAD data, even if measurement is difficult due to other plant equipment in between, the reference can be flexibly set, making it easy to measure the required dimensions on-site.
[0010] In the construction support data generation processing unit, the distance from the reference plane to the pipe axis center is calculated based on the reference plane data and the pipe axis center data, and the reference plane data, the pipe axis center data, and the distance are displayed on the screen as a construction support screen. The construction worker visually checks the construction support screen displayed on the tablet, measures the distance from the reference plane corresponding to the reference plane data of the construction site, and efficiently proceeds with the installation work while confirming the installation position of the piping.
[0011] The second characteristic configuration is that, in addition to the first characteristic configuration described above, it is equipped with an attribute display processing unit that displays specific attribute information, including any of the diameter, fluid type, and material of the piping models displayed on the screen that exist within a predetermined range from the camera center, in the vicinity of the piping models.
[0012] The attribute display processing unit displays specific attribute information, including diameter, fluid type, or material, for piping models that exist within a specified range from the center of the camera, allowing the operator to easily understand the attributes of the main piping models displayed on the screen and the attribute retention status.
[0013] The third characteristic configuration is, in addition to the first characteristic configuration described above, that a specific piping display processing unit is provided which selects and displays only a specific piping model based on the piping attribute data associated with the piping model, and the specific piping display processing unit is configured to be able to switch between displaying all of the piping plant model or displaying only the specific piping model.
[0014] The specific piping display processing unit switches between displaying the entire piping plant model or displaying only the specific piping model based on the piping attribute data, and by displaying it as a specific piping model, the screen can be made easier to view.
[0015] The fourth characteristic configuration is, in addition to the first characteristic configuration described above, a screen lock processing unit that locks any screen display state including the construction support screen and refuses to accept new screen operations, and the screen lock processing unit displays an identification display on the screen to identify whether it is in a locked state or an unlocked state.
[0016] For example, if a worker inadvertently touches a screen that displays the positional relationship between a reference plane and a specific pipe, the display state may change. If the screen can be set to a locked state, it is possible to prevent the display state from changing inadvertently. Furthermore, the identification display makes it easy to determine whether the state is locked or unlocked.
[0017] The fifth characteristic configuration is, in addition to the first characteristic configuration described above, that the system further includes a file input unit that reads a data file in which data including specification values related to the piping model is defined, and a linking processing unit that associates the data file read by the file input unit with each piping model and displays them.
[0018] A data file that specifies data including specific specification values for each piping model included in the 3D CAD data file is read through the file input unit, and is linked to each piping model by the linking processing unit. As a result, when any piping model is selected, detailed information such as the specification values for that model can be viewed, and the specification values of parts corresponding to each piping model can be confirmed on the tablet at the construction site.
[0019] A first characteristic configuration of the piping construction support method according to the present invention is a piping construction support method configured with a tablet terminal, which executes the following steps: an import process for importing a 3D CAD data file of a piping plant model converted into a predetermined intermediate file and including a piping model; a display process for displaying the piping plant model imported by the import process on a screen; a data supplement process for supplementing piping attribute data associated with the piping model that has not been acquired by the import process; a pipe axis center data generation process for generating pipe axis center data indicating a pipe axis center of the piping model selected from the piping plant model displayed on the screen; a reference generation process for generating reference data specifying a reference for piping construction based on an arbitrary component selected from the piping plant model displayed on the screen, and displaying the reference on the screen in a state in which the reference is identifiable from the piping plant model; and a construction support data generation process for calculating a reference distance from the reference to the pipe axis center based on the reference data and the pipe axis center data, and displaying the reference data, the pipe axis center data, and the reference distance on the screen as a construction support screen.
[0020] The second characteristic configuration is, in addition to the first characteristic configuration described above, to execute an attribute display process for displaying specific attribute information, including any of the diameter, fluid type, and material of the piping models displayed on the screen that exist within a predetermined range from the camera center, in the vicinity of the piping models.
[0021] The third characteristic configuration, in addition to the first characteristic configuration described above, is to select and display only a specific piping model based on the piping attribute data accompanying the piping model, and to execute a specific piping display process that can switch between displaying all of the piping plant model or displaying only the specific piping model.
[0022] The fourth characteristic configuration is, in addition to the first characteristic configuration described above, that it further executes a screen lock process that locks any screen display state including the construction support screen and refuses to accept any new screen operations, and displays a lock state to distinguish between the locked state and the unlocked state.
[0023] The fifth characteristic configuration is, in addition to the first characteristic configuration described above, to further execute a linking process of reading a data file in which data including specification values related to the piping model is defined, and associating the read data file with each piping model and displaying them.
[0024] A characteristic configuration of the piping construction support program according to the present invention is that the piping construction support program is executed on a tablet terminal, and is configured to execute the following: an import process for importing a 3D CAD data file of a piping plant model converted into a predetermined intermediate file and including a piping model; a display process for displaying the piping plant model imported by the import process on a screen; a data supplement process for supplementing piping attribute data associated with the piping model that has not been acquired by the import process; a pipe axis center data generation process for generating pipe axis center data indicating a pipe axis center of the piping model selected from the piping plant model displayed on the screen; a reference generation process for generating reference data specifying a reference for piping construction based on an arbitrary component selected from the piping plant model displayed on the screen, and displaying the reference on the screen in a state in which the reference is identifiable from the piping plant model; and a construction support data generation process for calculating a reference distance from the reference to the pipe axis center based on the reference data and the pipe axis center data, and displaying the reference data, the pipe axis center data, and the reference distance on the screen as a construction support screen. Effect of the Invention
[0025] As described above, according to the present invention, it is possible to provide a piping construction support device, a piping construction support method, and a piping construction support program that can easily obtain the construction information required at the construction site by utilizing pre-designed 3D CAD data. [Brief description of the drawings]
[0026] [Figure 1] 1A is an explanatory diagram of the hardware of the piping construction support device, and FIG. 1B is an explanatory diagram of functional blocks configured by the software of the piping construction support device. [Diagram 2] 3 is a flowchart showing an overall piping installation support method executed by the piping installation support device. [Diagram 3] 13 is a flowchart showing a data replenishment process. [Figure 4] 13 is a flowchart showing a reference plane setting process. [Diagram 5] 13 is a flowchart showing a construction support data generating process. [Figure 6] 13 is a flowchart showing a screen lock process. [Figure 7] FIG. 11 is an explanatory diagram of a reference plane setting process. [Figure 8] FIG. 2 is an explanatory diagram of a first aspect of the construction support data generation process. [Figure 9] FIG. 2 is an explanatory diagram of a first aspect of the construction support data generation process. [Figure 10] FIG. 11 is an explanatory diagram of a pipe axis data generation process. [Figure 11] FIG. 2 is an explanatory diagram of a basic screen of the piping construction support device. [Figure 12] FIG. 11 is an explanatory diagram of an attribute display process. [Figure 13] 1A is an explanatory diagram of a layer setting screen displayed as a pop-up, and FIG. 1B is a detailed explanatory diagram of the layer setting screen. [Figure 14] 13A is an explanatory diagram of a reference creation screen, and FIG. 13B is a detailed explanatory diagram of a reference plane movement setting screen. [Figure 15]13A is an explanatory diagram of a criteria list display screen displayed as a pop-up, and FIG. 13B is a detailed explanatory diagram of the criteria list display screen. [Figure 16] 1A is an explanatory diagram of a layer property display screen displayed as a pop-up, and FIG. 1B is a detailed explanatory diagram of the layer property display screen. [Figure 17] 1A is an explanatory diagram of a distance measurement setting screen, and FIG. 1B is a detailed explanatory diagram of the distance measurement setting screen. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0027] Hereinafter, a piping installation support device, a piping installation support method, and a piping installation support program according to the present invention will be described with reference to the drawings. Figure 1(a) shows the hardware configuration of a touch-panel tablet computer (hereinafter abbreviated as "tablet") that constitutes a piping construction support device 1, Figure 1(b) shows the hardware configuration of a 3D CAD device to which the present invention is applied, and Figure 1(b) shows the configuration of functional blocks that are realized by executing a piping construction support program installed on the tablet.
[0028] This tablet is brought to the construction sites of various piping plants and operated by workers involved in the construction, allowing the construction work to proceed efficiently. Workers operate the icons displayed on the screen to calculate and display the dimensions of components required for construction, and the construction site is measured based on the results to determine the installation positions of pipes and supports. It is also used to proceed with work while checking the information on components used in construction by referring to the screen display. Since workers at the construction site wear gloves, the screen is basically operated with a touch pen.
[0029] The piping construction support device 1 is equipped with a CPU that executes a piping construction support program, a GPU that performs distance calculations, etc., main memory that stores the OS and application programs, etc., an output device with an LCD display screen that displays piping models and icons, a touch panel arranged on the LCD display screen, a touch pen, a keyboard that is displayed on the screen as needed, an input device consisting of a mouse, keyboard, etc. that can be connected to a tablet, and storage as an auxiliary storage device that can be attached to the tablet.
[0030] The piping construction support device 1 may be configured as a standalone type, or may be configured in such a manner that an API that enables it to function as a terminal is installed and the function of the piping construction support device 1 is realized in conjunction with the cloud server by connecting to the cloud server.
[0031] The piping construction support device 1 has functional blocks such as an import processing unit 1A, a display processing unit 1B, an attribute display processing unit 1C, a data supplement processing unit 1D, a pipe axis center data generation processing unit 1E, a construction support data generation processing unit 1F, a file input unit 1G, a linking processing unit 1H, a reference generation processing unit 1I, a specific piping display processing unit 1J, a data input / output processing unit 1K, and a screen lock processing unit 1L.
[0032] The import processing unit 1A is a functional block that imports a 3D CAD intermediate data file that corresponds to a 3D CAD data file of a piping plant model including a piping model, designed by a dedicated 3D CAD, and converted into a predetermined intermediate file. The display processing unit 1B is a functional block that displays the piping plant model imported by the import processing unit 1A on a screen.
[0033] The attribute display processing unit 1C is a functional block that displays specific attribute information including the diameter, fluid type, or material of the piping models displayed on the screen that are located within a predetermined range from the center of the camera, in the vicinity of the piping models displayed on the screen.
[0034] The data supplementation processing unit 1D is a functional block that supplements piping attribute data that cannot be obtained by the import processing unit 1A among piping attribute data associated with a piping model. The pipe axis center data generation processing unit 1E is a functional block that generates pipe axis center data that indicates the pipe axis center of a piping model selected from a piping plant model displayed on the screen. It is provided to generate pipe axis center data that cannot be obtained by the import processing unit 1A.
[0035] The reference generation processing unit 1I is a functional block that generates reference data that specifies a reference for piping construction based on any component selected from the piping plant model displayed on the screen, such as a wall, a column, or the surface of an equipment, and displays the reference on the screen in a state in which the reference can be identified from the piping plant model. Points, lines, surfaces, etc. can be defined as references. The construction support data generation processing unit 1F is a functional block that calculates the distance from the reference to the pipe axis center of the piping to be installed based on the three-dimensional reference data and the pipe axis center data, and displays the distance from the reference to the pipe axis center on the screen as a construction support screen. It is also possible to set the coordinates of the upper or lower end of the piping instead of the pipe axis center of the piping. The coordinates of the upper or lower end of the piping are obtained by shifting the information or downward by the radius of the piping in the Z-axis direction from the pipe axis center.
[0036] The file input unit 1G is a functional block that reads in a data file including specification values related to the piping model. The linking processing unit 1H is a functional block that associates the data file read in the file input unit 1G with each piping model and displays them. Examples of data files include Excel files and PDF files.
[0037] The specific piping display processing unit 1J is a functional block that selects and displays only a specific piping model based on piping attribute data associated with the piping model, and is configured to be able to switch between displaying the entire piping plant model or displaying only the specific piping model.
[0038] The data input / output processing unit 1K is a functional block that exchanges data with the auxiliary storage device, writing data executed by each of the above-mentioned functional blocks to the auxiliary storage device, or reading data required by each of the above-mentioned functional blocks from the auxiliary storage device.
[0039] There are various types of application programs for 3D CAD devices, and the data formats of 3D CAD data files are also various. Therefore, it is difficult to import data files of piping plant models designed by all 3D CAD devices into the piping construction support device 1. Therefore, the data files of piping plant models designed by a dedicated 3D CAD device are converted into general-purpose intermediate files and then imported into the piping construction support device 1.
[0040] As such intermediate files, data files in DXF format and IFC format, each of which has a defined information description format, are preferably adopted. Note that intermediate files that can be used in the present invention are not limited to these. To reduce the calculation load on the piping construction support device 1, the data that can be imported is limited. Note that each piping model that constitutes the piping plant model is managed so as to be identifiable on a layer-by-layer basis.
[0041] DXF is an extension for AutoCAD version compatibility developed by AutoDesk, and it mainly holds 2D drawing information and figure information (2D shapes), but can also hold 3D figure information. However, additional information, such as layer data and color data, which are similar to drawings, is often added.
[0042] In the DXF format, POLYLINE, INSERT, 3DFACE, LINE, 3DSOLID can be imported as data that includes the center coordinate data of the piping model, and LAYER and COLOR can be imported as data that does not include the center coordinate data of the piping model. However, data such as ACAD_PROXY_ENTITY, ARC, ATTDEF, ATTRIB, BODY, and CLRCLE cannot be imported.
[0043] In addition, IFC is an extension for architectural CAD that contains architectural information (attribute information such as whether the object is a pipe, wall, or steel material, its material and standard, etc.) in addition to three-dimensional geometric information (columns, cylinders, etc.), and multiple attribute information is added to one part data.
[0044] In the IFC format data, layers containing the center coordinate data of the piping model, and 3D shapes and color information not containing the center coordinate data of the piping model are configured to be imported. However, 2D shapes (lines) cannot be read.
[0045] Among the data set in the original 3D CAD, unique data that is not in the description format defined by the extension, such as the JIS standard for each component, may not be output from the 3D CAD and may be lost. Also, even if the description format itself is supported in the extension, if the 3D CAD is not set to output that data, or if it does not support data output, data may be lost.
[0046] In preparation for the case where a general-purpose intermediate file is used as the 3D CAD data file and the imported piping attribute data is limited, the data supplementation processing unit 1D supplements, via operator operation, piping attribute data associated with the piping model that has not been acquired in the import process.
[0047] 11 shows an example of an operation screen including display contents processed by the display processing unit 1B. A three-dimensional piping plant model is displayed on the screen, and various icons are displayed near the top, bottom, left, and right frames of the screen.
[0048] The "File" icon starts file read / write processing, and the "Settings" icon switches to the options screen. The "Undo" and "Redo" icons control the return and progress of processing. The "Viewpoint Cube" icon switches between six-sided views such as front view and plan view, and the "Projection" icon (called the projection icon) changes the projection method on the screen. The projection icon allows switching between parallel projection (projection method without perspective) and perspective projection (projection method with perspective). The "Move" icon performs movement processing, the "Rotate" icon performs rotation processing, and the "Zoom" icon performs zooming processing. The center of the display screen is the camera (coordinate) center, and operations such as the "Move" and "Rotate" icons change the 3D piping model viewed around the camera center.
[0049] The "Layer" icon pops up a list of layers (see Fig. 13(b)) that define each model (see Fig. 13(a)), the "Reference List" icon pops up a list of references (see Fig. 13(b)) (see Fig. 15(a)), the "Properties" icon pops up properties (see Fig. 16(b)) (see Fig. 16(a), and the "Screen Lock" icon switches the display state of the screen between locked and unlocked. The "Reference Creation" icon displays a screen for creating references (reference points, reference surfaces) (see Figs. 14(a) and (b)), and the "Distance Measurement" icon calculates the distance between the reference and the piping model (see Figs. 17(a) and (b)).
[0050] [Overall piping installation support processing] FIG. 2 shows a processing procedure of a piping installation support method executed by the piping installation support device 1. When the tablet is powered on and the piping construction support program is launched (SA1), the user operates the screen to select whether the piping construction support to be started is a new piping construction support project or a piping construction support project in progress (SA2), and if it is a piping construction support project in progress, the project data stored in the memory unit, which is an auxiliary storage device, is read out (SA8).
[0051] In the case of a new piping construction support project, a new 3D CAD intermediate file is imported (SA3), and various data files indicating specific specification values and design values of each piping model are read (SA4). As shown in Fig. 12 and Fig. 16, the operator checks whether attribute information is present or not based on the attribute display state of the piping plant model displayed on the screen (SA5), and if attribute information is missing, the operator supplements the attribute information (SA6) and stores it in the storage unit in an identifiable manner as new project data (SA7). The process of supplementing missing information, such as the process of supplementing piping attributes, will be described later with reference to Fig. 3.
[0052] Next, a reference generation process is executed, and reference data is generated to specify a reference plane for piping construction based on an arbitrary component selected by the operator from the piping plant model displayed on the screen, and the generated reference is displayed on the screen in a state where it can be distinguished from the piping plant model (SA9). The reference becomes the reference for measuring the position of the piping at the construction site. When measuring based on the wall center or column center included in the 3D CAD data, even if other plant equipment is an obstacle and makes measurement difficult, the reference can be set appropriately, allowing for flexible response at the construction site.
[0053] Next, a piping model selection process is executed (SA10), and the dimension between the selected piping model and the reference plane is calculated and displayed (SA11). Each process from step SA8 to step SA10 is repeated until confirmation of all piping dimensions required for construction is completed (SA12). When display of all required dimensions is completed, the processed data including the piping dimensions is stored in the memory unit as verification data, etc. (SA13).
[0054] [Pipe Attribute Replenishment Processing] The piping attribute supplementation process from step SA5 to step SA7 will be further described with reference to Fig. 3. These processes are executed before the tablet is carried into the construction site. The display process executed by the display processing unit 1B displays the piping plant model, which is a 3D object, on the screen (SB1), and executes a process of associating each piping model with a specification data file, etc. (SB2). Each piping model is managed on a layer basis, and each layer is linked to the specification data file of the piping model corresponding to it (file path setting).
[0055] Next, the attribute display process is executed (SB3). An example of the attribute display process is shown in FIG. 12. Among the piping models displayed on the screen, specific attribute information including any of the diameter, fluid type, and material of the piping models existing within a predetermined range from the camera center (inside a 5 m circle in this example) is displayed near the piping models. The attribute display process displays specific attribute information including any of the diameter, fluid type, and material for the piping models to be constructed existing within a predetermined range from the camera center, so that the operator can grasp the attributes of the piping models and the attribute retention state based on the display contents (whether the attributes are displayed or left blank).
[0056] The attributes of each pipe can be displayed by switching the display state of the piping plant model using the "projection" icon, "movement" icon, "rotation" icon, etc. Also, the attributes of each pipe can be displayed by selecting the piping model individually.
[0057] Figure 16 shows an example of the property screen for each piping model. When a piping model is selected and the "Properties" icon is operated, layers are displayed and, as shown in the example, attribute data that has not been imported is left blank, allowing the operator to understand the missing state of attribute information (SB3).
[0058] For piping with missing attribute information (SB4), the bore and fluid (type of fluid flowing through the pipe) are supplemented (SB5), and attribute information such as material, insulation material, and insulation thickness is input (SB6). Furthermore, if pipe axis center data is missing, a pipe axis center data generation process is executed, and pipe axis center data indicating the pipe axis center of the piping model selected by the operator from the piping plant model is generated (SB7). In this way, when the necessary attribute data has been supplemented for all piping models (SB8), the supplemented project data is written to the memory unit (SB9). The operator can obtain the supplemented attribute data by referring to the piping specifications or the original 3D CAD data.
[0059] FIG. 10 shows an example of a piping model arranged parallel to the floor selected by an operator from a piping plant model drawn in an XYZ local coordinate system displayed on a screen. In order to obtain the pipe axis of the piping model, a plane perpendicular to the piping model is generated, a cross section A of the piping model located on the plane is generated, and the center coordinate of the cross section A of the piping model is calculated as the pipe axis data of the piping. Since the diameter of the piping model is determined by attribute data, the center coordinate of the cross section A is calculated from the diameter. In this example, the top end coordinate of the piping model is obtained by adding the value of the radius in the Z-axis direction from the center coordinate, and the bottom end coordinate of the piping model is obtained by subtracting the value of the radius in the Z-axis direction. Even if the piping model is arranged perpendicular to the floor, the center coordinate is similarly obtained from the cross section of the piping model formed on a plane parallel to the floor.
[0060] [Reference plane setting process] Fig. 4 shows the reference setting process when a plane is used as the reference. When a piping plant model is displayed on the screen by the display process executed by the display processing unit 1B (SC1), and an arbitrary component is selected (SC2), a reference plane is defined on the plane of the component to which the selected point belongs, and the normal direction defined on the plane of the selected component becomes the normal direction of the reference plane (SC3). The reference component is an arbitrary model other than a piping model. For example, it may be a wall surface, a column, or the panel surface of an equipment.
[0061] If there is no problem with the reference plane (SC4, OK), it is confirmed as the reference plane and recorded in the reference plane list (SC6), and if there is a problem (SC4, NG), the reference plane is moved in the normal direction (SC5). Cases where there is a problem with the reference plane include cases where the distance from the reference plane to the piping model to be installed cannot be measured due to obstacles such as other equipment, or cases where the distance from the reference plane to the piping model to be installed is very long and cannot be measured easily.
[0062] 14 shows an example of a guide screen for moving a reference plane that passes through the X-axis and extends in the Z-axis direction in its normal direction. When a reference plane is selected, an input screen for defining the reference plane pops up and guides the user to input the name of the reference plane as well as the distance to move. The user can directly input the amount of movement as a numerical value or tap the arrow multiple times to add and input the movement value in units of a specified value.
[0063] The process from step SC2 to step SC6 is repeated until all reference planes required for the construction of each piping model are set (SC7), and when the process is completed, the reference plane setting data is stored in the storage unit (SC8). Note that the process may be configured to set a corresponding reference plane each time a piping is constructed, and execute the piping construction dimension display process described later.
[0064] FIG. 15 shows the criteria list screen that pops up when the "criteria list" icon is operated. A list of multiple criteria along the X, Y, and Z axis directions is displayed. By operating the display icon on the left side of the list, the corresponding criteria can be switched between being displayed or not displayed, and a unique name can be registered. It is also possible to delete a criterion by operating the trash can on the right side.
[0065] [Pipe installation dimension display processing] The piping construction dimension display process is shown in Figure 5. With a piping plant model displayed (SD1), a piping model to be constructed is selected (SD2), and a reference for the piping model is selected (SD3). The relative dimensions of the reference and the piping model are calculated (SD4), and the piping dimensions from the reference to the piping model are displayed (SD5). The construction site is measured based on the displayed piping dimensions, and the installation position of the piping is determined.
[0066] The processes from step SD2 to step SD5 are repeated (SD6) until the dimensions from each reference plane are calculated for the necessary piping models, and when finished, the calculated dimensional data is stored in the storage unit (SD7).
[0067] Figure 8 shows an example of the piping installation dimension display process when the reference point is a point selected on one side of a column. The linear distance and each component distance of XYZ between the specified point on the pipe axis center of the selected piping model and the reference point are calculated and displayed. In response to the linear distance and each component distance of XYZ displayed on the tablet, the construction position of the piping is determined by actually measuring each component distance of XYZ and linear distance from the reference point of the corresponding column at the construction site.
[0068] Figure 9 shows an example of the piping installation dimension display process when the reference plane is set as a plane. The linear distance between the specified point on the pipe axis of the selected piping model and the reference plane is calculated and displayed. In response to the linear distance displayed on the tablet, the installation position of the pipe is determined by actually measuring the linear distance from the corresponding reference plane at the installation site. [Specific piping display processing] 8 and 9, when the distance information between the reference and the piping model is displayed, if other piping models and devices are displayed at the same time, it becomes very difficult to see. Therefore, the system is configured to execute a specific piping display process that selects and displays only a specific piping model based on piping attribute data associated with the piping model, and can switch between displaying the entire piping plant model or displaying only the specific piping model.
[0069] The specific piping display processing unit switches between displaying the entire piping plant model or displaying only the specific piping model based on the piping attribute data, and by displaying only the piping to be constructed as the specific piping model, the screen can be made easier to view.
[0070] [Screen lock processing] For example, as shown in Fig. 8 and Fig. 9, if some operation is performed by mistake on the screen displaying the distance information between the reference and the piping model, it may be difficult to continue the work thereafter. Therefore, the system is configured to be able to execute a screen lock process that switches the state between a locked state that prevents the acceptance of erroneous operations and an unlocked state that allows the acceptance of operations.
[0071] As shown in Fig. 6, when the screen lock icon is operated continuously for a predetermined time (SE1, SE2), it is determined whether the screen is in a locked state (SE3), and if the screen is not in a locked state (SE3, N), the screen transitions to a locked state (SE4) and a message indicating that the screen is in a locked state is displayed (SE5). If the screen is in a locked state (SE3, Y), the screen transitions to an unlocked state (SE6) and the message indicating that the screen is in an unlocked state is cancelled (SE7). For example, by switching the display colour of the screen lock icon, it is possible to distinguish whether the screen is in a locked state or an unlocked state. The distinguishing display is not limited to switching the display colour of the icon, and can be set as appropriate, such as switching between blinking and lighting the icon or displaying a message indicating the state in text.
[0072] As described above, the piping construction support program according to the present invention is a piping construction support program executed on the above-mentioned tablet terminal, and is configured to execute the following: an import process for importing a 3D CAD data file of a piping plant model including a piping model, which is converted into a predetermined intermediate file; a display process for displaying the piping plant model imported by the import process; a data supplement process for supplementing piping attribute data associated with the piping model that has not been acquired by the import process; a pipe axis center data generation process for generating pipe axis center data indicating the pipe axis center of a piping model selected from the piping plant model displayed on the screen; a reference generation process for generating reference data specifying a reference for piping construction based on an arbitrary component selected from the piping plant model displayed on the screen, and displaying the reference on the screen in a state in which the reference can be identified from the piping plant model; and a construction support data generation process for calculating a reference distance from the reference to the pipe axis center based on the reference data and the pipe axis center data, and displaying the reference data, the pipe axis center data, and the reference distance on the screen as a construction support screen.
[0073] The piping construction support program is configured to execute an attribute display process that displays specific attribute information, including any of the diameter, fluid type, and material, of piping models displayed on the screen that are present within a specified range from the center of the camera, in the vicinity of the piping models.
[0074] The piping construction support program is configured to select and display only specific piping models based on piping attribute data associated with the piping models, and to execute a specific piping display process that can switch between displaying the entire piping plant model or displaying only the specific piping model.
[0075] The piping construction support program is configured to further execute a screen lock process that locks any screen display state including the construction support screen and refuses to accept any new screen operations, and displays a lock state to distinguish between the locked state and the unlocked state.
[0076] The piping construction support program is configured to read a data file in which data including specification values related to a piping model is defined, and further to execute a linking process for associating the read data file with each piping model and displaying them.
[0077] The above-described embodiment is merely one aspect of the present invention, and the technical scope of the present invention is not limited by the description. It goes without saying that the specific configuration of each part can be appropriately modified within the scope of the effect of the present invention. [Explanation of symbols]
[0078] 1: Piping construction support equipment 1A: Import processing section 1B: Display processing section 1C: Attribute display processing section 1D: Data supplementation processing section 1E: Pipe axis data generation processing unit 1F: Construction support data generation processing unit 1G: File input section 1H: Linking processing section 1I: Reference surface generation processing unit 1J: Specific piping display processing unit 1K: Data input / output processing section 1L: Screen lock processing part
Claims
1. A piping construction support device composed of a tablet terminal, an import processing unit that imports a three-dimensional CAD data file of a piping plant model including a piping model, the three-dimensional CAD data file being converted into a predetermined intermediate file; a display processing unit that displays the piping plant model imported by the import processing unit on a screen; a data supplementation processing unit that supplements piping attribute data that is not yet acquired by the import processing unit among piping attribute data associated with the piping model; a pipe axis data generation processing unit that generates pipe axis data indicating a pipe axis of the piping model selected from the piping plant model displayed on the screen; a standard generation processing unit that generates standard data specifying a standard for piping construction based on an arbitrary component selected from the piping plant model displayed on the screen, and displays the standard on the screen in a state in which the standard can be distinguished from the piping plant model; a construction support data generation processing unit that calculates a reference distance from the reference to the pipe axis center based on the reference data and the pipe axis center data, and displays the reference data, the pipe axis center data, and the reference distance on the screen as a construction support screen; A piping construction support device equipped with the above.
2. The piping construction support device according to claim 1, further comprising an attribute display processing unit that displays, in the vicinity of the piping models displayed on the screen, specific attribute information including any one of the diameter, fluid type, and material of the piping models that exist within a predetermined range from the center of the camera.
3. a specific piping display processing unit that selects and displays only a specific piping model based on the piping attribute data associated with the piping model; 2. The piping construction assistance device according to claim 1, wherein the specific piping display processing unit is configured to be capable of switching between displaying the entire piping plant model and displaying only the specific piping model.
4. a screen lock processing unit that locks any screen display state including the construction support screen and refuses to accept any new screen operation; 2. The piping construction assistance device according to claim 1, wherein the screen lock processing unit displays an identification indication on the screen to indicate whether the screen is in a locked state or an unlocked state.
5. a file input unit that reads a data file in which data including specification values related to the piping model is defined; a linking processing unit that links the data file read by the file input unit with each piping model and displays them; The piping construction support device according to claim 1 , further comprising:
6. A piping construction support method comprising a tablet terminal, an import process of importing a three-dimensional CAD data file of a piping plant model including a piping model, the three-dimensional CAD data file being converted into a predetermined intermediate file; a display process for displaying the piping plant model imported by the import process on a screen; A data supplementation process for supplementing piping attribute data associated with the piping model with piping attribute data that has not been acquired in the import process; a pipe axis data generating process for generating pipe axis data indicating a pipe axis of the piping model selected from the piping plant model displayed on the screen; a standard generation process for generating standard data for specifying a standard for piping construction based on an arbitrary component selected from the piping plant model displayed on the screen, and displaying the standard on the screen in a state in which the standard can be distinguished from the piping plant model; A construction support data generation process for calculating a reference distance from the reference to the pipe axis center based on the reference data and the pipe axis center data, and displaying the reference data, the pipe axis center data, and the reference distance on the screen as a construction support screen; A piping installation support method that performs the above.
7. The piping construction support method according to claim 6, further comprising: executing an attribute display process for displaying, in the vicinity of the piping models displayed on the screen, specific attribute information including any one of the diameter, fluid type, and material of the piping models that exist within a predetermined range from the center of the camera.
8. 7. The piping construction support method according to claim 6, further comprising: executing a specific piping display process that selects and displays only a specific piping model based on the piping attribute data associated with the piping model, and that can switch between displaying all of the piping plant model or displaying only the specific piping model.
9. The piping construction support method according to claim 6, further comprising a screen lock process for locking any screen display state including the construction support screen to refuse to accept new screen operations, and for displaying a locked state to distinguish between a locked state and an unlocked state.
10. The piping construction support method according to claim 6, further comprising the steps of: reading a data file in which data including specification values related to the piping model is defined; and performing a linking process in which the read data file is associated with each piping model and displayed.
11. A piping construction support program executed on a tablet terminal, an import process of importing a three-dimensional CAD data file of a piping plant model including a piping model, the three-dimensional CAD data file being converted into a predetermined intermediate file; a display process for displaying the piping plant model imported by the import process on a screen; A data supplementation process for supplementing piping attribute data that has not been acquired by the import process among piping attribute data associated with the piping model; a pipe axis data generating process for generating pipe axis data indicating a pipe axis of the piping model selected from the piping plant model displayed on the screen; a standard generation process for generating standard data for specifying a standard for piping construction based on an arbitrary component selected from the piping plant model displayed on the screen, and displaying the standard on the screen in a state in which the standard can be distinguished from the piping plant model; A construction support data generation process for calculating a reference distance from the reference to the pipe axis center based on the reference data and the pipe axis center data, and displaying the reference data, the pipe axis center data, and the reference distance on the screen as a construction support screen; A piping installation assistance program configured to execute the above.
Citation Information
Patent Citations
Pipe arrangement design system
JP2022086310A
Cited By
Input assistance device, method, and storage medium
CN121657876A