Equipment management system
The equipment management system addresses inefficiencies in remote monitoring by analyzing operational data to provide real-time insights and notifications, improving industrial equipment performance.
Patent Information
- Application Number
- JP2023080987
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-16
- Publication Date
- 2024-11-28
AI Technical Summary
Existing remote management systems for industrial equipment do not effectively monitor normal operation status, leading to inefficiencies and missed opportunities for improvement, and lack reliable notification mechanisms for on-site workers.
An equipment management system that includes industrial equipment, a cloud server, and a terminal device, which collects and analyzes log information to provide real-time operational data, calculates statistical and equipment information, and generates access rights for on-site workers to view optimization recommendations.
Enhances operational efficiency by providing detailed operational insights and reliable notifications to on-site workers, enabling timely adjustments and improvements.
Smart Images

Figure 2024165109000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a device management system that remotely manages the operating status of industrial devices. [Background technology]
[0002] As a technology for remotely monitoring the condition of construction machinery, for example, the technology shown in Patent Document 1 is disclosed. The technology shown in Patent Document 1 is a remote monitoring method for construction machinery that uses a communication line to monitor a construction machinery located at a distance, and includes a failure determination process for receiving equipment status data indicating the status of the target equipment to be monitored in the construction machinery via the communication line and determining whether or not a failure has occurred in the construction machinery based on the received equipment status data, and primary and secondary failure cause analysis processes for analyzing the cause of the failure of the construction machinery based on the failure data related to the cause of the failure if it is determined in the failure determination process that a failure has occurred in the construction machinery.
[0003] Furthermore, as a technology for remotely managing safety at a construction site, for example, the technology shown in Patent Document 2 has been disclosed. In the technology shown in Patent Document 2, a remote safety management system includes a construction machine equipped with various sensors and an alarm electrically connected to the sensors via a signal circuit, a transmitter electrically connected to the signal circuit and acquiring an alert signal acquired by the sensor, a server device that receives the alert signal transmitted from the transmitter and transmits an alert content information signal corresponding to the received alert signal, and a management terminal that receives the alert content information signal and displays the alert content information. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2020-136973 A [Patent Document 2] JP 2023-22536 A Summary of the Invention [Problem to be solved by the invention]
[0005] The technologies shown in Patent Documents 1 and 2 are both capable of remote management when an abnormality such as a breakdown or an alert occurs, but are not capable of remotely managing the on-site conditions during normal operation in detail. Therefore, even if the equipment is not operating properly within the normal range or is being operated inefficiently, the operational conditions cannot be noticed unless an obvious abnormality occurs, resulting in a missed opportunity to improve efficiency.
[0006] In addition, the technologies shown in Patent Documents 1 and 2 perform remote management when an abnormal condition occurs, making it relatively easy to grasp the situation. However, it is difficult for both on-site workers and remote managers to grasp how to respond to slight improper operations during normal operation or malfunctions that may occur in the future, so there is a demand for technology that can reliably notify on-site workers of such situations.
[0007] The present invention aims to provide an equipment management system that can improve the operational efficiency of industrial equipment by constantly monitoring the operational status of the industrial equipment and reliably notify on-site workers of response instructions. [Means for solving the problem]
[0008] The equipment management system according to the present invention is an equipment management system comprising industrial equipment that has been provided to a customer, a cloud server that manages log information of the industrial equipment, and a terminal device that is owned by an operator of the industrial equipment and can access the cloud server, wherein the industrial equipment comprises a control means for controlling the operation of the industrial equipment, a transmission means for transmitting log information relating to the operation of the industrial equipment under the control of the control means to the cloud server, and a display control means for receiving access right information transmitted from the cloud server and displaying it on a screen, and the cloud server comprises a log information storage means for receiving and storing the log information transmitted from the industrial equipment, a statistical means for calculating statistical information for each of the industrial equipment from the log information, and a display control means for displaying the log information based on the statistical information. the terminal device comprises an equipment information calculation means for calculating equipment information relating to a state and an evaluation of the industrial equipment, a provision information calculation means for calculating provision information calculated based on the statistical information and the equipment information and including information necessary for the customer to optimize the operation of the industrial equipment, an access right generation means for generating access right information for accessing the statistical information, the equipment information, and / or provision target information including the provision information, and a transmission means for transmitting the access right information to the industrial equipment, and the terminal device comprises an imaging means for imaging the access right information displayed on a screen of the industrial equipment, an analysis means for analyzing the access right information, and a display for displaying the provision target information stored in an area indicated by the access right information.
[0009] As described above, the equipment management system according to the present invention is an equipment management system comprising industrial equipment that has been provided to a customer, a cloud server that manages log information of the industrial equipment, and a terminal device that is owned by an operator of the industrial equipment and can access the cloud server, wherein the industrial equipment comprises a control means for controlling the operation of the industrial equipment, a transmission means for transmitting log information relating to the operation of the industrial equipment under the control of the control means to the cloud server, and a display control means for receiving access right information transmitted from the cloud server and displaying it on a screen, and the cloud server comprises a log information storage means for receiving and storing the log information transmitted from the industrial equipment, a statistical means for calculating statistical information for each of the industrial equipment from the log information, and an equipment information calculation means for calculating equipment information relating to a state and evaluation of the industrial equipment based on the statistical information. The industrial equipment includes a provision information calculation means for calculating provision information including information required for the customer to optimize the operation of the industrial equipment, an access right generation means for generating access right information for accessing the provision information including the statistical information, the equipment information, and / or the provision information, and a transmission means for transmitting the access right information to the industrial equipment, and the terminal device includes an imaging means for capturing an image of the access right information displayed on the screen of the industrial equipment, an analysis means for analyzing the access right information, and a display for displaying the provision information stored in an area indicated by the access right information, so that it is possible to grasp how the customer is operating the industrial equipment, and it is possible to present the customer with equipment information including, for example, the good or bad operation status, precautions, warnings, improvements, etc. In other words, it is possible for the customer to improve the efficiency of work on site based on this information.
[0010] In addition, access information for accessing the information to be provided is presented to the operator at least when the industrial equipment is in operation or stopped, which has the effect of ensuring that the information to be provided can be notified to the site. [Brief description of the drawings]
[0011] [Figure 1] 1 is a system configuration diagram of a device management system according to a first embodiment. [Diagram 2] 1 is a functional block diagram illustrating an example of a configuration of an industrial device in a device management system according to a first embodiment. [Diagram 3] 2 is a functional block diagram showing the configuration of a cloud server in the device management system according to the first embodiment. FIG. [Figure 4] 2 is a functional block diagram showing a configuration of a terminal device in the device management system according to the first embodiment. [Diagram 5] 5 is a flowchart showing an operation performed when an operator of an industrial device accesses information to be provided in the device management system according to the first embodiment. [Figure 6] 5 is a flowchart showing an operation when log information of an industrial device is transmitted to a cloud server 3 in the device management system according to the first embodiment. [Figure 7] 4 is a first flowchart showing the operation of a cloud server in the device management system according to the first embodiment. [Figure 8] 6 is a second flowchart showing the operation of the cloud server in the device management system according to the first embodiment. [Figure 9] FIG. 11 is a system configuration diagram of a device management system according to a second embodiment. [Figure 10] FIG. 11 is a functional block diagram showing the configuration of a cloud server in a device management system according to a second embodiment. [Figure 11] 13 is a flowchart of a leasing process using an equipment management system according to a second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] (First embodiment of the present invention) The equipment management system according to this embodiment will be described with reference to Figs. 1 to 8. The equipment management system according to this embodiment constantly collects log information related to the operation of industrial equipment provided to a customer, calculates statistical information from the log information, and calculates equipment information related to the status and evaluation of the corresponding industrial equipment based on the statistical information. Furthermore, it calculates information to be provided to the customer from the obtained statistical information and equipment information. When feeding back this calculated information to the customer, it is done through the screen of the industrial equipment, so that the customer can reliably refer to it.
[0013] 1 is a system configuration diagram of an equipment management system according to this embodiment. The equipment management system 1 according to this embodiment includes industrial equipment 2 provided to a customer and operated by the customer, a cloud server 3 managed by an administrator and storing and analyzing log information sent from the industrial equipment 2, and a terminal device 4 managed by the customer for accessing information provided by the cloud server 3 and other information.
[0014] The industrial equipment 2 includes, for example, a crushing machine, a construction machine, an industrial robot, a natural energy power generation device, etc., and includes those that have been transferred or loaned (rented, leased, etc.) to a customer. Each industrial equipment 2 is equipped with a control unit for controlling the operation of the driving unit of the industrial equipment 2 (for example, an electric driving unit, a hydraulic driving unit, an engine, a flywheel, a battery such as a secondary battery, a power generation device, a display device, etc.), and the industrial equipment 2 is operated by being driven according to the control of the control unit. Specific examples of the control unit include a PLC (Programmable Logic Controller) and a microcomputer. In addition, various sensors for detecting the operation of the driving unit are installed in the driving unit of the industrial equipment 2, and the operating information of the driving unit is constantly detected. The operating information includes various parameters that can be obtained for each industrial equipment 2 and each driving unit of the industrial equipment 2, such as a voltage value, a current value, a power value, a rotation speed, a frequency, a vibration frequency, a torque, a pressure, a temperature, a speed, an acceleration, and a time. The detected operating information and the log of the control unit are sent to the cloud server 3 as log information by a communication protocol such as FTP.
[0015] The cloud server 3 stores the log information transmitted from each industrial device 2, calculates statistical information on the operation of the industrial device 2, calculates device information indicating the state and evaluation of the corresponding industrial device 2 based on the calculated statistical information, and calculates information to be provided to a customer based on the calculated statistical information and device information. The statistical information is information calculated from the log information, and includes, for example, a measurement value for each predetermined period and its integrated value, a change over time and a rate of change of the measurement value, a frequency of use in a predetermined period, a usage time in a predetermined period, a continuous usage time, a downtime, a minimum value, a maximum value, and an average value of each measurement value. In addition to this, information such as an error code indicating a malfunction, a caution, a warning, etc. that has occurred in the industrial device 2 is included. Based on this statistical information, device information indicating the state and evaluation of the industrial device 2 is calculated.
[0016] The state of the industrial equipment 2 includes, for example, the validity of the measurement value based on the difference between a preset threshold value and the measurement value, the degree of wear based on the frequency of use and duration of use, the usage rate of the drive unit based on the operation time and downtime, etc. Furthermore, the evaluation of the industrial equipment 2 includes, for example, the productivity relative to the operation time of the industrial equipment 2 (productivity obtained from the measurement value), the productivity relative to the power consumption and energy consumption, the productivity relative to the degree of wear of the equipment, etc.
[0017] When the statistical information and the equipment information are calculated, information to be provided to a customer is calculated based on this information. The information to be provided includes information required to optimize the operating state of the industrial equipment 2 and to resolve malfunctions. For example, the information includes information on the timing and method of replacement based on the degree of wear of parts of the industrial equipment 2, manual information for dealing with malfunctions that have occurred, and information on settings for operating the industrial equipment 2 more appropriately.
[0018] The cloud server 3 feeds back the statistical information, the equipment information relating to the state and evaluation of the industrial equipment 2 obtained based on the statistical information, and the above-mentioned provision information (hereinafter, these are collectively referred to as information to be provided) to the client who operates the industrial equipment 2, and at this time generates access right information for the client to access the information to be provided. The access right information will be described in detail later, and includes, for example, a QR code (registered trademark) or text information of a URL. The generated access right information is transmitted to the industrial equipment 2, and the control unit of the industrial equipment 2 displays this access right information on the display of the industrial equipment 2.
[0019] The terminal device 4 is a terminal device used by a customer who operates the industrial equipment 2, and accesses the information to be provided using the access right information displayed on the display of the industrial equipment 2, and displays the information to be provided on the display of the terminal device 4. Depending on the content of the information to be provided, it becomes possible to further access a link destination from there and perform processing such as purchasing parts. The terminal device 4 may also be used as a remote control terminal device for operating the industrial equipment 2 or sending instructions to the industrial equipment 2.
[0020] The configuration of each device will be described in detail below. Fig. 2 is a functional block diagram showing an example of the configuration of an industrial device in the device management system according to this embodiment. The industrial device 2 includes a control unit 21 that controls the operation of the entire device, a drive unit 22 that operates based on the control of the control unit 21, an analog unit 23 that converts analog signals to digital signals, a sensor unit 24 installed at various locations in the industrial device 2, a memory 25 that stores information obtained from the drive unit 22 and the sensor unit 24 and other necessary information, a communication unit 26 for communicating with external devices, an input / output unit 27 for inputting and outputting information, a power supply unit 28 for supplying power to the entire device, and a battery 29 having a secondary battery that charges and discharges power. Note that the configuration of the industrial device 2 shown in Fig. 2 is merely an example, and is not limited to this configuration.
[0021] Specific examples of the drive unit 24 include a hydraulic motor and an electric motor. A hydraulic pump and an inverter for controlling each motor are also included in the drive unit 24. For example, in the case of a stone crushing device, the rotation speed of various motors for moving the crushing blades is controlled according to the size, hardness, and size after crushing of the raw stone to be crushed.
[0022] The analog unit 23 performs conversion processing to convert analog signals into digital signals and digital signals into analog signals, and converts analog measurement values measured by the sensor section 24 into digital signals that can be handled by the control section 21. In addition, the analog unit 23 performs processing such as converting digital signals handled by the control section 21 into analog signals and converting analog signals from the drive section 22 into digital signals. Note that the analog / digital signal conversion function may be provided for each drive section 22.
[0023] The sensor unit 24 is a sensor installed in each drive unit 22 and other units, and measures various parameters as described above. Specifically, in the case of an electric motor controlled by an inverter, information such as electrical characteristics and rotation speed can be obtained from the inverter, but in the case of an electric motor not controlled by an inverter, electrical characteristics are measured using sensors such as CT and VT. In addition to this, sensors that measure physical parameters such as vibration frequency, temperature, and pressure may also be included.
[0024] The memory 25 stores a log of the operation of the driving units 22 and information measured by the sensor unit 24. Information is written to and read from the memory 25 via the control unit 21. The memory 25 also stores setting values for operating the industrial equipment 2, and the control unit 21 reads out the setting values and controls the operation of each driving unit 22 based on the setting values.
[0025] The communication unit 26 is a processing unit that communicates with external devices, and includes a SIM card that can communicate using a 4G line, a 5G line, or the like.
[0026] The input / output unit 27 is a processing unit that inputs information to the industrial equipment 2 and outputs information from the industrial equipment 2, such as an input / output device such as a touch panel, a display, an operation panel, a keyboard, and the like.
[0027] The power supply unit 28 supplies each unit with power supplied from an external generator or commercial power source.
[0028] Battery 29 stores the power supplied from power supply unit 28 in a secondary battery such as a lithium ion battery, and supplies the power stored in the secondary battery to each unit. Battery 29 functions as a standby power supply, and can also function as an auxiliary power supply that assists power from an external power supply. Charging and discharging of the secondary battery in battery 29 is controlled by a BMS (Battery Management System) (not shown), and signals can be exchanged between control unit 21 and the BMS.
[0029] The control unit 21 is a processing unit that manages the operation of the entire industrial equipment 2 by controlling the operation of each driving unit 22, and is composed of a PLC or a microcomputer. Log information regarding the operation of each driving unit 22 and measurement information measured by the sensor unit 24 are stored in the memory 25 by the control unit 21 and periodically transmitted to the cloud server 3 by a protocol such as FTP. In addition, when an error or an alert occurs, the content is immediately transmitted to the cloud server 3. In addition, when access right information (e.g., QR code (registered trademark) or text information of a URL) described later is transmitted from the cloud server 3, it is stored in the memory 25 via the communication unit 26, and the control unit 21 displays the access right information on the display of the input / output unit 27. A customer, that is, an operator who operates the industrial equipment 2, can recognize the notification from the cloud server 3 displayed on the display, and refer to the provided information of the access destination of the access right information displayed on the display using the terminal device 4.
[0030] 3 is a functional block diagram showing the configuration of a cloud server in the device management system according to the present embodiment. The cloud server 3 includes a log information acquisition unit 31 that acquires log information transmitted from the industrial device 2, a log information storage unit 32 that stores the acquired log information, an analysis processing unit 33 that performs analysis processing based on the acquired log information, an analysis data storage unit 34 that stores the analysis result, an access right generation unit 35 that generates access right information for accessing the analysis result, and an access control unit 36 that controls access to the analysis result and other accesses from the outside. The analysis processing unit 33 includes a statistical processing unit 33a that performs statistical processing based on the log information of the industrial device 2 stored in the log information storage unit 32, a device information calculation unit 33b that calculates the state and evaluation of the industrial device 2 based on the result of the statistical processing, and a provision information calculation unit 33c that calculates provision information to be provided to a customer based on the calculated statistical information and device information.
[0031] The log information acquisition unit 31 receives log information transmitted from the industrial equipment 2 periodically or irregularly using a communication protocol such as FTP, and writes the log information in the log information storage unit 32. As described above, the log information includes drive information when the drive unit 24 actually drives and measurement information obtained from the sensor unit 24 at that time. For example, when an electric motor is driven, the log information includes values of current, voltage, power, and frequency obtained from an inverter or various sensor units 24. This information is received periodically, for example, every 5 minutes, and accumulated as log information in the log information storage unit 32. In addition, when a highly urgent event such as a malfunction or a caution or warning occurs, abnormality information such as a corresponding alert or error code is immediately transmitted from the industrial equipment 2, stored as log information, and sent to the access right generation unit 35.
[0032] The statistical processing unit 33a calculates statistical values such as an average value, a median value, a maximum value, a minimum value, a rate of change, a representative value, and a mode value for a predetermined period for each industrial device 2 from the log information accumulated in the log information storage unit 32. The calculated statistical information is stored in the analysis information storage unit 34.
[0033] For example, in the case of an electric motor, the statistical information may be values such as current, voltage, power, and rotation speed according to the time lapse from when the motor starts to drive until when it stops, or information such as the average value, maximum value, minimum value, and integrated value of power consumption of each parameter. Note that this statistical information may be processed and displayed by a statistical display unit (not shown in FIG. 3) so that it is easy for an administrator (corresponding to the equipment provider who provides the industrial equipment 2 to the customer) who manages the cloud server 3 and the customer to visually confirm. For example, the values obtained as the statistical information may be processed and displayed as graphs or charts for each customer or each industrial equipment 2.
[0034] The equipment information calculation unit 33b calculates a difference based on the calculated statistical information by comparing it with a preset threshold value and statistical information of the industrial equipment 2 provided to other customers, and calculates equipment information that digitizes the state and evaluation of the industrial equipment 2. The calculated equipment information is stored in the analysis information storage unit 34.
[0035] Regarding the state of the industrial equipment 2, for example, the operation state of the industrial equipment 2 is judged to be appropriate based on whether the difference between the current value of the motor in the drive unit 24 and a preset threshold value is within a predetermined range. If the difference between the measured value and the threshold value is equal to or greater than a predetermined magnitude, the operation state is judged to be inappropriate, and the appropriateness is calculated according to the magnitude of the difference. Specifically, the difference between the measured value and the threshold value is normalized between 1 and 0, and the appropriateness is calculated as a numerical value such that the state of the industrial equipment 2 deviates more from the normal state as the value becomes smaller. In addition, for example, it is also possible to calculate the hardness of the raw material and the operation mode based on the waveform of the current or voltage that operates the crushing blades of the stone crushing device. Specifically, for example, if the peak of the current waveform is sharp, it is possible to judge that hard raw materials are being crushed, and if the peak is gentle, it is possible to judge that soft raw materials are being crushed. In addition, if the peak value is large, it is possible to judge that large raw materials are being crushed, and if the peak value is small, it is possible to judge that small raw materials are being crushed. In other words, the operation state of the industrial equipment 2 is calculated from the state of the waveform of the electrical characteristics.
[0036] In addition, for example, when the difference between the statistical information of the measured values when one customer operates the system and the statistical information of the measured values when multiple other customers operate the system under substantially the same or similar conditions is outside a predetermined range, the appropriateness of the operating state of the one customer may be determined to be low, and a calculation may be performed to lower the appropriateness. Even if the state is determined to be within the appropriate range, if the total time or continuous time under high load exceeds a predetermined threshold, a calculation may be performed to lower the appropriateness. Furthermore, even if the measured value regarding the driving state of the driving unit 22 is within the appropriate range, if the measured values of the surrounding thermometer and vibration meter are high or large, a calculation may be performed to lower the appropriateness by taking into account multiple factors.
[0037] Regarding the evaluation of the industrial equipment 2, for example, the power value of the motor in the drive unit 24 is quantified and calculated as the production volume per unit of power from the ratio of the production volume to the power consumption. The production volume can be calculated, for example, from the measured value of a weight sensor installed in a storage area where the products are stored, or from changes in electrical characteristics such as the current, voltage, and power consumed when transporting the products on a conveyor belt or the like (the greater the production volume and the heavier the weight, the greater the load on the drive unit 24). In addition to this, the production volume per unit time, the production volume per operating hour, the continuous normal operation time without abnormal stops, etc. can also be included in the evaluation.
[0038] When calculating information on the state and evaluation of the industrial equipment 2, the parameters prioritized may differ depending on the individual circumstances of each customer. For example, there may be a variety of customers, such as a customer who prioritizes productivity even if it means the industrial equipment 2 wears out or deteriorates faster, a customer who prioritizes a long life for the industrial equipment 2 with moderate productivity, a customer who wants to operate everything averagely, and a customer who wants to minimize energy consumption. Therefore, it may be possible to set thresholds and reference values that serve as indicators for calculating the state and evaluation of the industrial equipment 2 for each customer.
[0039] The provision information calculation unit 33c calculates provision information to be provided to the customer based on the device information obtained by the device information calculation unit 33b. The calculated provision information is stored in the analysis information storage unit .
[0040] The provided information may be information resulting from the necessary response considered by an engineer familiar with the industrial equipment 2 based on the information on the state and evaluation, or information to be provided that is patterned in advance for each state and evaluation of the industrial equipment 2 and registered in the analysis data storage unit 34 may be extracted, or the provided information may be created by an AI that has learned the information resulting from the consideration by the engineer and data collected during actual operation. Specifically, for example, when the load on the motor is determined to be high, the time of use and the number of years elapsed are tallied to determine whether or not replacement is recommended. At this time, the determination may be based on the replacement time recommended by the manufacturer, but it may also be determined that it is time to replace the motor even if the replacement time recommended by the manufacturer has not yet arrived by taking into consideration the actual usage time and usage state (measured information indicates that the motor has been used for a long time or under a high load). When replacement is recommended, the information to that effect (information encouraging replacement) may include estimate information required for replacement, link destination information for directly proceeding to order processing if replacement is to be performed, and the like. When replacement is not recommended, an approximate target time for replacement may be calculated and provided.
[0041] In addition, for industrial equipment 2 or its parts that are low in the appropriateness of the state or low in the evaluation, link information for accessing the manual of the industrial equipment 2 or the parts may be included. In particular, when it is determined that the operational efficiency of the industrial equipment 2 is not good, information on an appropriate value for improving the operational efficiency may be included. The information on the appropriate value for improving the operational efficiency may be information registered in advance, may be input by the engineer's judgment, or may include a value obtained by referring to the setting values of other customers with good operational efficiency (for example, an average of the setting values of multiple other customers who handle the same industrial equipment 2). By associating the calculated provided information with highly relevant statistical information or equipment information, it is possible to provide the statistical information and equipment information to the customer together with the provided information, and it is possible to provide a higher quality service. In this case, the provided information may be associated with the statistical information or equipment information based on common items such as the identification number of each industrial equipment 2 and the statistical period.
[0042] Although it has been shown that AI can be used to create the provided information, AI can also be used to calculate statistical information and device information. In this case, just like the provided information, it is possible to collect various patterns of statistical information and device information calculation processes and have them learn from them to grow into an analytical AI.
[0043] The access right generating unit 35 generates an access right for the customer to access the statistical information, device information and / or provided information (i.e., information to be provided). The information to be provided includes any one of statistical information, device information and provided information, but when information to be provided that has not been provided to the customer is newly calculated, it is desirable to always include the new information to be provided in the information to be provided. Typical access right information is a QR code (registered trademark), and a QR code (registered trademark) in which a URL for accessing the information to be provided is registered is generated. At this time, it is possible to request input of a password registered in advance for each customer in order to refer to the information to be provided linked by the QR code (registered trademark). In addition to the QR code (registered trademark), it is also possible to simply generate text information of a URL for accessing the information to be provided.
[0044] On the other hand, when the log information acquisition unit 31 receives the above-mentioned abnormality information from the industrial equipment 2, it is necessary to immediately notify the customer, so an email or short message to be sent to inform the customer that an abnormality has occurred is created. The email or short message is preferably addressed to the email address or telephone number of the customer's person in charge or operator who manages the industrial equipment 2. Alternatively, an email may be sent to the industrial equipment 2, and the control unit 21 of the industrial equipment 2 may receive the email using a dedicated app. The email or short message contains the above-mentioned access right information, and the operator can access the link to refer to the type of malfunction contained in the information to be provided and the manual required to deal with the malfunction.
[0045] The access control unit 36 performs processes of transmitting the access right information generated by the access right generation unit 35 to the industrial equipment 2, receiving an access request from the terminal device 4 based on the access right information, and, if the access request is valid, reading out the corresponding information to be provided from the analysis data storage unit 34 and providing it to the terminal device 4. In addition, if the access right generation unit 35 has created transmission information for e-mail or short mail, the access control unit 36 also performs processes of transmitting e-mail or short mail to the destinations.
[0046] 4 is a functional block diagram showing the configuration of a terminal device in the device management system according to this embodiment. The terminal device 4 includes a camera 41 that captures access right information transmitted from the cloud server 3 to the industrial device 2 and displayed on the display of the input / output unit 27 of the industrial device 2, a display control unit 42 that displays the captured access right information on the display 43 and also displays information to be provided from the cloud server 3 on the display 43, an access analysis unit 44 that analyzes the read access right information, and a communication unit 45 that accesses the cloud server 3 according to the analyzed access right information and receives the information to be provided transmitted from the cloud server 3.
[0047] The camera 41 captures the access right information displayed on the industrial equipment 2. Specifically, as described above, the access right information is a QR code (registered trademark) or a URL of a link destination of the information to be provided, and the image of the QR code (registered trademark) or the text of the URL is captured. The text information of the URL may be encrypted. The image captured by the camera 41 is displayed on the display 43, and the access analysis unit 44 decodes the captured access right information. In the case of a QR code (registered trademark), the image information is decoded using a dedicated app or a function attached to the camera 41 to derive the URL of the access destination. In the case of the text of the URL, character recognition is performed similarly using a dedicated app or a function attached to the camera 41 to derive the link of the URL indicated by the characters. In the case of an encrypted URL, a dedicated decryption app or the like is installed in the terminal device 4, and the URL is derived by decrypting the URL using the function of the dedicated app. When an operator who is a user of the terminal device 4 performs a predetermined operation (selecting the read URL, etc.), the communication unit 45 accesses the link destination of the URL of the cloud server 3 and acquires the information to be provided. The acquired information to be provided is received by the communication unit 45 and displayed on the display 43 by the display control unit 42 .
[0048] By accessing as described above, the operator who has been provided with the industrial equipment 2 can refer to the provided information from the terminal device 4. As described above, the provided information includes statistical information on the operation of the industrial equipment 2, information on the status, information on evaluation, information on countermeasures, information that serves as a reference for proper operation, and the like, and therefore can be used to improve the operation of the industrial equipment 2.
[0049] Next, the operation of the equipment management system according to the present embodiment will be described. FIG. 5 is a flowchart showing the operation when an operator of an industrial equipment accesses the information to be provided in the equipment management system according to the present embodiment. First, the industrial equipment 2 is started by the operator's operation (S1). When the industrial equipment 2 is started and no notification is displayed on the display of the input / output unit 27, the industrial equipment 2 is operated as is in normal operation (S2). When a notification is displayed on the display, the camera 41 of the terminal device captures an image of the notification (=access right information) displayed on the display of the industrial equipment 2 by the operator's operation (S3). The display control unit 42 displays the access right information captured by the camera 41 on the display 43 (S4), and the access analysis unit 44 analyzes the access right information displayed on the display 43 to obtain the URL of the access destination (S5). The communication unit 45 accesses the link destination of the obtained URL and obtains the information to be provided from the cloud server 3 (S6). The industrial equipment 2 is reconfigured or the like so as to be operated appropriately by the operator's operation with reference to the information to be provided (S7). The industrial equipment 2 operates with the reconfigured settings (S8), and when work for the day is completed, the industrial equipment 2 is stopped by an operator (S9). The next day, the process returns to S1 and is restarted.
[0050] FIG. 6 is a flowchart showing an operation when the log information of the industrial equipment is transmitted to the cloud server 3 in the equipment management system according to the present embodiment. When the industrial equipment 2 is started by the operation of the operator (S1), the power supply unit 28 starts supplying power to the industrial equipment 2 (S2). The control unit 21 judges whether the access right information is transmitted from the cloud server 3 and stored in the memory 25 (S3), and if unsupported access right information is stored in the memory 25, displays the access right information on the display of the input / output unit 27 (S4). Note that, when the provision target information indicated by the URL of the access right information is accessed from the operator's terminal device 4, the cloud server 3 may transmit information to that effect to the industrial equipment 2. By doing so, the control unit 21 of the industrial equipment 2 may update the memory 25 with the access right information as the access right information that has been accessed (i.e., supported), and may be in a state of waiting for the reception of new access right information thereafter. Then, based on the provision target information indicated by the link destination of the access right information displayed on the display, the access right information is reset by the operation of the operator (S5).
[0051] If the access right information has not been transmitted in S3, or after the access right information has been reset in S5, the control unit 21 controls the industrial equipment 2 to start normal operation (S6). The control unit 21 collects log information on the actual operation of the drive unit 22 and measurement information measured by the sensor unit 24 while controlling the operating state of the industrial equipment 2 (S7), and stores the log information stored in the memory 25 (S8). The communication unit 26 periodically transmits the log information stored in the memory 25 to the cloud server 3 (S9). The control unit 21 determines whether the industrial equipment 2 is operating (S10), and while the industrial equipment 2 is operating, S3 to S8 are repeated, and when the industrial equipment 2 is stopped, the process is terminated. Note that it is desirable to transmit information including information that the industrial equipment 2 has stopped to the cloud server 3, and therefore, when the industrial equipment 2 is stopped, the log information including the stop information of the industrial equipment 2 may be transmitted to the cloud server 3 immediately before the power supply to the equipment is completely cut off.
[0052] Fig. 7 is a first flowchart showing the operation of the cloud server in the device management system according to this embodiment. The flowchart shown in Fig. 7 is a flowchart showing a process of analyzing the industrial device 2 based on the log information transmitted from the industrial device 2 and transmitting the obtained access right information for accessing the provided information to the industrial device 2.
[0053] When the log information is transmitted from the industrial equipment 2, the log information acquisition unit 31 receives the log information and stores it in the log information storage unit 32 (S1). The log information acquisition unit 31 determines whether the log information includes an error code (S2). If the log information includes an error code, the access right information generation unit 35 generates access right information for accessing provided information corresponding to the error code preregistered in the analysis data storage unit 34 (for example, link destination information such as a manual corresponding to the error code) (S3). If the error code is not included, the statistical processing unit 33a performs statistical processing on the log information in the log information storage unit 32, and stores the obtained statistical information in the analysis data storage unit 34 (S4). Note that the statistical processing is performed by performing the calculations as described above, but the statistical processing may be performed at predetermined intervals, such as every day, every week, every month, or every year.
[0054] When a certain amount of statistical information (for example, several minutes to several months when calculating the state of the industrial equipment 2, or several hours to several years when calculating the evaluation of the equipment) is accumulated by the statistical processing, the equipment information calculation unit 33b calculates equipment information indicating the state and evaluation of the industrial equipment 2 as described above, and stores it in the analysis data storage unit 34 (S5). When the equipment information is calculated, the provision information calculation unit 33c calculates the provision information as described above, and stores it in the analysis data storage unit 34 (S6). The access right information generation unit 35 converts and generates a URL for accessing the information to be provided including the calculated provision information into access right information such as a QR code (registered trademark) (S7). The access control unit 36 transmits the access right information generated in S3 or S7 to the industrial equipment 2 (S8). The system waits until new log information is transmitted from the industrial equipment 2 (S9), and when the new log information is transmitted, the processes of S1 to S8 are repeated.
[0055] Fig. 8 is a second flowchart showing the operation of the cloud server in the device management system according to the present embodiment. The flowchart shown in Fig. 8 is a flowchart showing a process of providing the provision information to the terminal device 4 when the provision information is accessed from the terminal device 4.
[0056] When the terminal device 4 analyzes the access right information displayed on the display of the industrial equipment 2 and performs access processing, the access control unit 36 extracts the information to be provided indicated by the access right information (S1). The access control unit 36 transmits the extracted information to be provided to the terminal device 4 (S2). At the same time, the access control unit 36 transmits information indicating that the information to be provided corresponding to the access right information has been transmitted to the industrial equipment 2 (S3), and ends the processing.
[0057] Here, specific examples of the statistical information, device information, and provided information calculated by the cloud server 3 are shown below. First, there is the statistical information, device information, and provided information based on log information of a battery such as a secondary battery (e.g., a lithium ion battery) mounted on the industrial equipment 2. Secondary batteries are subject to extremely complex control by a BMS or the like, and detailed measures are taken with safety in mind. Regarding such secondary batteries, the BMS can obtain various information (e.g., information about batteries that can generally be obtained by a BMS, such as battery voltage, temperature, remaining battery capacity, charging time, and discharging time), so by transmitting the information obtainable by the BMS to the cloud server 3 as log information, it is possible to optimize charge / discharge control and voltage control, thereby lengthening the battery life and improving energy efficiency.
[0058] Specifically, in the case of a battery installed in a stone crushing device, the difference between the actual measurement value transmitted as log information and an optimal setting value or theoretical value obtained based on information such as the size and hardness of the raw stone and the size of the target stone (the optimal setting value or theoretical value may be a value registered in advance, or may be a value calculated by an AI that has been sufficiently trained based on information such as the size and hardness of the raw stone and the size of the target stone) can be calculated, and information to the effect that the setting value should be reset to approach the optimal setting value or theoretical value can be calculated as provided information. In addition, the state of the motor and flywheel that drive the crushing blades may be analyzed, and in the case of an operation in which it is determined that there is insufficient energy for the load, a setting value that allows the battery power to be used as an assist may be provided.
[0059] Also, an optimal setting value or theoretical value may be calculated as the provided information according to the environment (weather, temperature, season, time of day, etc.) in which the industrial equipment 2 is operated. In this case, the optimal setting value or theoretical value may be a value registered in advance, or may be a value calculated by a sufficiently trained AI.
[0060] Furthermore, if a warm-up operation (idling) is required when driving the industrial equipment 2, an appropriate warm-up operation start time corresponding to the work start time may be calculated as the provided information. The warm-up operation start time is calculated as the provided information from information on the pre-registered operation schedule of the industrial equipment 2 (operation schedule based on a calendar function or the like) taking into consideration information such as the temperature and weather at that time. It is desirable for this provided information to be notified a predetermined time before the warm-up operation start time, so it is desirable for access right information for accessing the provided information to be created a predetermined time before the warm-up operation start time and transmitted to the operator's email address or telephone number.
[0061] Furthermore, for example, in a stone crushing device, the wear state of the crushing blades, etc. may be calculated based on a set value (the value of the gap that allows the crushed stones to pass through). For example, the set value is set to a large value when generating larger stones, and to a small value when generating smaller stones. However, if the set value is changed to a small value even though stones of the same size are generated (the size of the generated stones can be obtained from the operator's input information), it can be assumed that the crushing blades have worn down and the gaps have become larger. Therefore, it is possible to calculate the degree of wear of the crushing blades by quantifying the value after the set value is changed.
[0062] The access right generated by the access right generating unit 35 may have different security depending on the type and / or content of the information to be provided. For example, if the information to be provided includes or is determined to include confidential matters for the customer in operating the industrial equipment 2, the security may include, as an access requirement, correct input of a pre-registered password or a temporary password with time and number of times limited when accessing the information to be provided by QR code (registered trademark). On the other hand, if the information to be provided is generally publicly available manual information, security is not required, so the URL for accessing the manual information may be used as the access right information. In addition, it is desirable to vary the security level of the access right information depending on the level of confidential matters set in advance. That is, when the level of confidential matters is high, multiple decryption processes are required to access the information to be provided, and the number of decryption processes is reduced as the level of confidential matters decreases. This makes it possible to change the security level.
[0063] The access control unit 36 may also change the transmission method and destination of the access right information depending on the type and / or content of the information to be provided. For example, as described above, when the log information includes an error code, it is necessary to notify the operator of the error code as soon as possible, so the transmission method and destination are determined so that an e-mail or a short message is sent to the terminal device 4 held by the operator. That is, when an abnormality occurs in the industrial equipment 2 or when a time to respond is determined (for example, when the warm-up operation starts as described above), the access control unit 36 transmits the access right information to an e-mail address or a telephone number set in the terminal device 4 held by the operator so that the operator can immediately refer to the information to be provided, thereby making it possible to notify the operator of the information to be provided in real time. At this time, the access right information to the information to be provided may also be transmitted to the industrial equipment 2 at the same time.
[0064] Furthermore, the processing of calculating the state and evaluation of the industrial equipment 2 by the equipment information calculation unit 33b may be performed by performing image recognition using AI on waveforms and graphs created based on log information and statistical information. That is, an AI that has previously learned various patterns of waveforms and graphs of various parameters (for example, an AI that has learned data that judges whether the state of the industrial equipment 2 is good / bad based on the shapes of various graphs and waveforms, and data that judges whether the evaluation is good / bad) may be prepared, and the state and evaluation of the industrial equipment 2 may be output by inputting the waveforms and graphs obtained as log information or statistical information to this AI. In this way, it is possible to calculate equipment information using image recognition, which is a relatively good skill of AI.
[0065] In this way, the device management system 1 according to this embodiment makes it possible to grasp how the customer is operating the industrial devices, and can present the customer with device information including, for example, the operating status, precautions, warnings, improvements, etc. In other words, the customer can improve the efficiency of work on-site based on this information.
[0066] In addition, access information for accessing the information to be provided is displayed on the screen of the industrial equipment at least when the industrial equipment is operating or stopped, so that the operator can be provided with the information to be provided reliably.
[0067] Furthermore, if necessary, parts that constitute the industrial equipment 2 that are deteriorated or worn, or parts that are due for replacement within a specified period, can be extracted based on the condition of the industrial equipment 2, and information regarding an estimate for replacing the parts can be provided to the customer as target information.This makes it possible to notify the customer of the appropriate timing for part replacement, etc., based on the actual state of use of the industrial equipment 2, rather than the guideline for part replacement recommended by the part manufacturer.At the same time, by presenting information regarding the estimate, the effort required for part replacement can be simplified, which can help improve work efficiency at the customer's site.
[0068] Furthermore, if necessary, by creating the provided information to include manual information for accessing manual information related to the state or location where the malfunction occurred based on information about the state of the industrial equipment 2 when a malfunction occurs in the industrial equipment 2, it becomes possible to immediately access information that can serve as a solution when a malfunction occurs, and it becomes possible to significantly improve work efficiency when dealing with malfunctions.
[0069] Furthermore, by varying the security content of the access right information depending on the type and / or content of the information to be provided as necessary, it is possible to efficiently access the necessary information while reliably protecting the customer's confidential information according to its confidentiality level.
[0070] Furthermore, by varying the transmission method and destination of the access right information according to the type and / or content of the information to be provided as necessary, it is possible to distinguish the transmission method and destination of the access right information depending on whether it is an emergency or not, or whether it is preferable to notify in real time. In particular, by making it a rule that the access right information is transmitted to the industrial equipment 2, and by making it so that the access right information is also transmitted to the operator's terminal device 4 in exceptional cases such as an emergency or when real time notification is preferable, it is possible to make the operator more sensitive to the notification of the exception, and to promptly and reliably encourage access to the information to be provided.
[0071] (Second embodiment of the present invention) The equipment management system according to this embodiment will be described with reference to Figures 9 to 11. The equipment management system according to this embodiment is an application of the equipment management system described in the first embodiment to leasing of industrial equipment. Note that the description of this embodiment that overlaps with the first embodiment will be omitted.
[0072] Services such as rental and leasing (hereafter simply referred to as leasing) of various devices are becoming more common, and the fee structure is based on the lease period. In other words, the longer the lease period, the higher the fee. However, with this fee structure, the fee is high when the device is leased for a long period despite low usage, and conversely, the fee is low when the device is leased for a short period despite high usage, resulting in a very poor balance. In addition, if the lease period is the same, the fee is the same whether the device is heavily loaded, i.e. requiring a lot of maintenance work, or lightly loaded, i.e. requiring little maintenance work, so the same balance is observed as above.
[0073] Therefore, in the equipment management system of this embodiment, the lease fee is calculated based on equipment information, which is statistical information and information on the status and evaluation of the industrial equipment 2, making it possible to charge an appropriate fee according to the actual usage conditions.
[0074] Fig. 9 is a system configuration diagram of the equipment management system according to this embodiment. The equipment management system 1 according to this embodiment includes industrial equipment 2 that is rented to a customer and operated by the customer, and a cloud server 3 that is managed by an administrator, accumulates and analyzes log information sent from the industrial equipment 2, and manages leasing of the industrial equipment 2. The terminal device 4 shown in Fig. 1 does not need to be a required component, and may be included as a device used for checking lease fees, etc., as described later.
[0075] Here, an example will be described in which a lease contract is made for the industrial equipment 2. That is, the industrial equipment 2 in FIG. 9 is leased to a customer by an administrator who manages the cloud server 3. As described in the first embodiment, the industrial equipment 2 periodically transmits log information related to the usage state to the cloud server 3, and the cloud server 3 calculates statistical information, calculates equipment information indicating the state and evaluation of the industrial equipment 2, and calculates information to be provided including a lease fee based on the statistical information and equipment information, based on the log information transmitted from the industrial equipment 2. In addition, the industrial equipment 2 and the cloud server 3 are linked to control mode states such as a drive mode / stop mode / pre-drive mode using key information as described later.
[0076] Regarding the calculation of the lease fee, as described above, not only is a fee calculated according to the lease period, but the lease fee is also calculated based on the status and evaluation calculated based on information obtained when the industrial equipment 2 is operated, such as the operating time of the industrial equipment 2 (continuous operating time or total operating time), operating frequency, number of days of operation, high load / low load condition, wear level of parts (need for maintenance), and productivity.
[0077] In the cloud server 3 in the first embodiment, the access right generating unit 35 generates access right information for accessing the information to be provided and the access control unit 36 controls the access, and the same processing is performed in the present embodiment. However, in the present embodiment, as in the first embodiment, the access right information may be displayed on the display of the industrial equipment 2 and then the information to be provided may be accessed from the terminal device 4, but it is preferable to directly notify the terminal device 4 of the access right information by email or short mail.
[0078] The configuration of each device will be described in detail below. The configuration of the industrial equipment 2 is the same as that shown in the functional block diagram of Fig. 2 in the first embodiment, but in this embodiment, a new function is added regarding the start-up control of the industrial equipment 2. As described above, the leased industrial equipment 2 has three mode states: a stop mode in which start-up by the operator's operation is not possible, a drive mode in which start-up is possible as usual, and a pre-drive mode in which start-up is possible only when a predetermined condition set in advance is satisfied while in the stop mode.
[0079] Regarding switching between the drive mode and the stop mode, the industrial equipment 2 is in the stop mode before the lease period begins and after the lease period ends, and is in the drive mode during the lease period. The pre-drive mode is an exceptional mode during the stop mode, but for example, when the industrial equipment 2 is transported to a work site, the industrial equipment 2 may be started and moved by self-propelling. In addition, there may be cases where start-up is required outside the lease period for initial settings or operation checks. In such cases, the mode state is controlled to the pre-drive mode.
[0080] The control of the above mode state is performed by the control unit 21 of the industrial equipment 2, and the mode is switched according to key information generated in advance. Hereinafter, the process of switching modes using key information will be described. The key information is generated in advance by the cloud server 3, as will be described in detail later. This key information includes the conditions for switching modes, such as the date of the lease period and the conditions for the pre-driving mode (driving time (several minutes to several hours), driving functions (movement, initial settings, and minimum functions required for operation check)). In addition to this, the key information includes trigger information required for driving the industrial equipment 2. When the key information is generated, a management program for acquiring (downloading) this key information is stored in, for example, a USB memory stick, and the USB memory stick is shipped in advance to the leasing customer.
[0081] The customer who receives the USB memory stick during transportation inserts the USB memory stick into a PC or the like and starts the management program. When the management program starts, the above key information can be obtained by accessing the cloud server 3 from the management screen. In other words, security can be strengthened by making the key information accessible only through the management program. The obtained key information is downloaded to the USB memory stick. The customer can then insert this USB memory stick into the industrial device 2 to be transported, thereby controlling the mode state of the industrial device 2.
[0082] In the industrial equipment 2 into which the USB memory stick with the downloaded key information is inserted, the key information is inputted by the input / output unit 27, and the control unit 21 copies the key information to the memory 25. Thereafter, the control unit 21 controls the mode state according to the key information in the memory 25. The control unit 21 switches the mode state to the stop mode or the drive mode by comparing the date of the lease period included in the key information with the time stamp. In addition, in the stop mode, the industrial equipment 2 is started within a range that satisfies the conditions of the pre-drive mode. For example, in the stop mode, the control unit 21 controls so that the industrial equipment 2 can be started freely within the drive time determined by the key information, and in the stop mode, the control unit 21 controls so that only the drive unit 22 involved in the function determined by the key information can be driven. In the drive mode and the pre-drive mode, the control unit 21 reads out the trigger information included in the key information to enable the start of the industrial equipment 2. In other words, the industrial equipment 2 cannot be started unless the trigger information is read out.
[0083] By controlling the mode state using such key information, it is possible to strictly manage the startup state of the industrial equipment 2 and strengthen security regarding operation, thereby controlling the industrial equipment 2 so that only the lease contract holder can use it.
[0084] Although the case where the key information is acquired using a hardware USB memory stick has been described here, it may be transmitted as an electronic key to a device owned by the customer, for example. If it is desired to omit acquiring the key information, the key information may be written in advance to the memory 25 of the industrial equipment 2, or the key information may be transmitted from the cloud server 3 to the industrial equipment 2 and the received key information may be stored in the memory 25.
[0085] The industrial equipment 2 according to this embodiment has the same configuration and functions as those in the first embodiment, except for the control of the mode state.
[0086] FIG. 10 is a functional block diagram showing the configuration of a cloud server in the equipment management system according to the present embodiment. The difference from FIG. 3 in the first embodiment is that the provision information calculation unit 33c calculates the lease fee based on the statistical information and / or equipment information, and stores the calculated lease fee in the analysis data storage unit 34 as provision information. In addition, the present embodiment includes a key management unit 101 that generates key information having condition information for controlling the mode state of the industrial equipment 2 after the lease contract for the industrial equipment 2 is concluded and trigger information required to drive the industrial equipment 2 based on lease information 100 input from the outside. The generated key information is stored in a key information storage unit 102. In addition to generating key information, the key management unit 101 reads out corresponding key information from the key information storage unit 102 in response to an inquiry from a customer's management program 103, returns the key information to the management program 103, and updates the corresponding key information in the key information storage unit 102 when an operation to change the contents of the key information is performed.
[0087] As described above, the calculation of the lease fee by the provided information calculation unit 33c is not simply calculated according to the lease period of the industrial equipment 2, but the fee is calculated taking into consideration the actual usage state. Specifically, for example, the time from the start time to the stop time of the industrial equipment 2 is integrated, and the fee is calculated according to the total driving time. At this time, if the continuous driving time is a predetermined length or more (for example, continuous driving for 5 hours or more), the fee may be added. Also, for example, the time during which the current, rotation speed, torque, etc. of the motor that is the driving unit 22 in the driving state of the industrial equipment 2 are equal to or greater than a predetermined value may be integrated, and if the predetermined time is exceeded, the fee may be added. Furthermore, even if the industrial equipment 2 is in a driving state, if the mode state is the pre-driving mode (the log information transmitted from the industrial equipment 2 includes information on the mode state), it is not added to the driving time for calculating the lease fee.
[0088] In addition to this, for example, charges could be added for use on hot days or on rainy or snowy days since this places a greater strain on the industrial equipment 2, or if a malfunction or error occurs when an abnormal setting value is set, it can be determined that the operator is not using the equipment properly, and a charge could be added depending on the number of times this occurs.
[0089] As described above, the key information generated by the key management unit 101 includes information on the conditions for switching the mode of the industrial equipment 2 and trigger information for driving the industrial equipment 2. When the lease period date and the conditions for the pre-driving mode are input as the lease information 100, the key management unit 101 generates key information based on the lease information 100 and stores it in the key information storage unit 102. At this time, the key management unit 101 generates the key information including the trigger information corresponding to each individual industrial equipment 2. The trigger information may be, for example, a plurality of random character strings, and only when this character string information is correctly input to the corresponding industrial equipment 2, the industrial equipment 2 can be started.
[0090] When accessed by a management program 103 running on a customer's personal computer or the like, the key management unit 101 receives inquiry information via the access control unit 36. If the inquiry information is for obtaining key information, the key management unit 101 reads out the corresponding key information from the key information storage unit 102 and returns it to the management program 103. This allows the customer to obtain the key information. Having obtained the key information, the customer can operate the industrial equipment 2 while controlling the mode state, as described above.
[0091] The provided information calculation unit 33c calculates the lease fee, but may also create an invoice and details at the same time and store them as provided information. This allows the customer to make payment according to the invoice and details included in the provided information, simplifying accounting.
[0092] The cloud server 3 may also be configured to include a deposit receiving unit (not shown) that receives deposit information deposited (charged) by a customer, and maintains the mode state of the industrial equipment 2 as long as the total amount of the deposited amounts is within the range of the lease fee calculated by the provided information calculation unit 33c, and if the total amount of the deposited amounts falls below the lease fee, the provided information calculation unit 33c generates a command signal to switch the mode state of the industrial equipment 2 to the stop mode, and a signal transmission unit (not shown) that transmits the command signal to the industrial equipment 2.
[0093] Furthermore, if the customer wishes to extend the lease period, the management program 103 may access the cloud server 3 to execute the extension procedure. In this case, when the extension permission process is completed in the cloud server 3, the lease period of the key information is updated, and at the same time, the updated key information is returned to the management program 103 and downloaded to the customer's USB memory stick. The customer can extend the lease period by controlling the mode state of the industrial equipment 2 with the updated key information.
[0094] The configuration of the terminal device 4 is the same as the functional block diagram shown in Fig. 4 in the first embodiment. If necessary, it is possible to refer to information such as the lease fee and the invoice included in the information to be provided on the display 43 of the terminal device 4. As described above, when referring to the lease fee in this embodiment, it is preferable to access the information to be provided based on the access right information described in the email or short mail sent from the cloud server 3, but the information to be provided may also be accessed based on the access right information displayed on the display of the industrial equipment 2.
[0095] Next, a series of processing steps related to leasing will be described. FIG. 11 is a flowchart of leasing processing using the equipment management system according to this embodiment. The cloud server 3 is accessed from a customer's device (which may be the terminal device 4 or another device owned by the customer), and the delivery location of the industrial equipment 2 to be leased, the type of the industrial equipment 2, and the lease period are input, thereby accepting an order procedure (S1). The cloud server 3 acquires the information input in S1 as leasing information 100 (S2). The key management unit 101 generates key information based on the leasing information 100 and stores it in the key information storage unit 102 (S3). The key management unit 101 writes the management program 103, which has been set to correspond to the generated key information, to an external USB memory stick (S4). The USB memory stick to which the management program 103 has been written is shipped to the customer.
[0096] The customer who received the USB memory stick inserts the USB memory stick into the customer's device, and the management program 103 stored therein is started in response to the customer's operation (S5). The cloud server 3 is accessed from the management program 103, and key information associated with the management program 103 is downloaded from the key information storage unit 102 to the USB memory stick via the key management unit 101 (S6). The USB memory stick is later inserted into industrial equipment 2 to be transported, and the industrial equipment 2 is operated (S7).
[0097] When a USB memory stick is not used to obtain the key information, the industrial equipment 2 may be shipped to the customer with the key information written in advance in the memory 25 of the industrial equipment 2. Also, the industrial equipment 2 and the cloud server 3 may be kept in constant communication mode so that the industrial equipment 2 can refer to the key information in the cloud server 3 in real time.
[0098] Thereafter, the provision information is provided to the operator (customer) by executing the processes in Fig. 5 to Fig. 8 in the first embodiment. In this embodiment, as described above, a function is added in which the provision information calculation unit 33c calculates the lease fee as the provision information based on the statistical information and the device information.
[0099] As described above, in the equipment management system according to the present embodiment, the equipment management system 1 includes an industrial device 2 that has been loaned to a customer and a cloud server 3 that manages the log information of the industrial device 2. The industrial device 2 includes a control unit 21 that controls the operation of the industrial device 2, and a communication unit 26 that transmits log information related to the operation of the industrial device 2 under the control of the control unit 21 to the cloud server 3. The cloud server 3 includes a log information storage unit 32 that receives and stores the log information transmitted from the industrial device 2, a statistical processing unit 33a that calculates statistical information for each industrial device 2 from the log information, an equipment information calculation unit 33b that calculates equipment information related to the state and evaluation of the industrial device 2 based on the statistical information, and a provided information calculation unit 33c that converts the information obtained from the equipment information into a rental fee and calculates it as provided information. Therefore, when calculating the fee for leasing or renting the industrial device 2, it is possible to calculate the fee not only based on the contract period but also based on the usage state when the industrial device 2 is actually used, and the industrial device can be loaned at an appropriate price.
[0100] In addition, the equipment information calculation unit 33b digitizes information related to the load on the industrial equipment 2 based on statistical information and calculates it as equipment information, and the provision information calculation unit 33c converts the digitized information related to the load into a lease fee. Therefore, when the industrial equipment 2 is used under a high load, for example, it is possible to add a fee taking into account wear and tear on parts, etc., and the service can be provided at an appropriate lease fee.
[0101] Furthermore, when the cloud server 3 lends the industrial equipment 2 to a customer, it has a key management unit 101 that generates key information that serves as a key for operating the provided industrial equipment 2. When controlling the startup of the industrial equipment 2, the control unit 21 of the industrial equipment 2 controls the mode state to a startup mode in which the industrial equipment 2 is started based on conditions set in the key information, or a stop mode in which the industrial equipment 2 is not started, so that the startup management of the industrial equipment 2 can be strictly performed by the provider.
[0102] Furthermore, when certain conditions set in advance by the provider of the industrial equipment 2 are met, the control unit 21 of the industrial equipment 2 changes the mode to a pre-drive mode, which enables the industrial equipment 2 to be started up from the stopped mode. This allows strict startup management to be performed so that the industrial equipment 2 does not operate more than necessary, while also enabling transportation, initial settings, and operation checks before and after the industrial equipment 2 is actually operated, making it possible to provide a service with a high level of satisfaction.
[0103] Furthermore, the cloud server 3 is equipped with a deposit receiving unit that receives deposit information sent from the customer, and a signal transmitting unit that transmits a command signal to change the mode to the industrial equipment 2, and the provided information calculation unit 22 accumulates the lease fee according to the customer's use of the industrial equipment 2, and when the lease fee exceeds the amount of the deposit information, generates a command signal to change the mode of the industrial equipment 2 to stopped mode, and the signal transmitting unit transmits the generated command signal to the industrial equipment 2, so that the customer can operate the industrial equipment 2 only for the amount charged in advance, and can lease while taking into consideration the budget. [Explanation of symbols]
[0104] 1. Equipment Management System 2. Industrial Equipment 3. Cloud Server 4 Terminal Equipment 21 Control section 22 Drive unit 23 Analog Unit 24 Sensor section 25 Memory 26 Communication Unit 27 Input / output section 28 Power supply section 29 Battery 31 Log information acquisition unit 32 Log information storage unit 33 Analysis processing section 33a Statistical Processing Unit 33b Device information calculation section 33c Provided information calculation section 34 Analysis data storage unit 35 Access Rights Generation Unit 36 Access Control Section 41 Camera 42 Display control section 43 Display 44 Access Analysis Section 45 Communications Department
Claims
1. An equipment management system including industrial equipment provided to a customer, a cloud server that manages log information of the industrial equipment, and a terminal device that is owned by an operator of the industrial equipment and can access the cloud server, The industrial equipment, A control means for controlling the operation of the industrial equipment; a transmission means for transmitting log information regarding an operation of the industrial equipment under the control of the control means to the cloud server; a display control means for receiving the access right information transmitted from the cloud server and displaying the access right information on a screen; The cloud server, a log information storage means for receiving and storing the log information transmitted from the industrial equipment; a statistical means for calculating statistical information for each of the industrial devices from the log information; an equipment information calculation means for calculating equipment information related to a state and an evaluation of the industrial equipment based on the statistical information; a provision information calculation means for calculating provision information that is calculated based on the statistical information and the equipment information and includes information required for the customer to optimize the operation of the industrial equipment; an access right generating means for generating access right information for accessing the statistical information, the device information, and / or the provision information; a transmitting means for transmitting the access right information to the industrial equipment; The terminal device, an imaging means for imaging the access right information displayed on a screen of the industrial equipment; an analysis means for analyzing the access right information; a display that displays the provision target information stored in an area indicated by the access right information.
2. 2. The device management system according to claim 1, an information provision calculation means for extracting, from among the parts constituting the industrial equipment, parts that are deteriorated or worn, or parts that are due for replacement within a predetermined period, based on the condition of the industrial equipment, and creating the information to be provided by including information regarding an estimate for replacing the parts.
3. 3. The device management system according to claim 1, An equipment management system characterized in that the provision information calculation means creates manual information for accessing manual information related to the state or location where a malfunction occurred in the industrial equipment, based on information regarding the state of the industrial equipment when a malfunction occurs in the industrial equipment, by including it in the provision information to be provided.
4. 3. The device management system according to claim 1, The device management system according to claim 1, wherein the access right generating means changes security contents of the access right information according to the type and / or contents of the information to be provided.
5. 3. The device management system according to claim 1, The device management system according to claim 1, wherein the transmitting means changes a method for transmitting the access right information and a destination for transmitting the access right information depending on a type and / or content of the information to be provided.
Citation Information
Patent Citations
Remote monitoring method for construction machine and remote monitoring system for construction machine
JP2020136973A
Remote safety management system and remote safety management method
JP2023022536A
