Electric power measuring device and electric power measuring method

The power measurement device with self-diagnosing clamp-type current sensors addresses accuracy issues by verifying proper installation and operation, ensuring reliable power measurement.

JP2024165362AActive Publication Date: 2024-11-28NEC PLATFROMS LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2023081505
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-17
Publication Date
2024-11-28
Estimated Expiration
2043-05-17

AI Technical Summary

Technical Problem

Existing power measurement devices using clamp-type current sensors face accuracy issues due to gaps between fitting surfaces, leading to inaccurate current measurement without detection of the malfunction.

Method used

A power measurement device and method utilizing main and sub-side clamp-type current sensors with self-diagnosis functionality to verify accurate current measurement, and a self-diagnosis process to ensure proper installation and operation of current and voltage sensors.

Benefits of technology

Ensures accurate power measurement by detecting and correcting installation errors in current and voltage sensors, preventing inaccurate data and improving measurement reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024165362000001_ABST
    Figure 2024165362000001_ABST
Patent Text Reader

Abstract

To provide an electric power measuring device that is capable of verifying whether or not a clamp type current sensor can measure current at a predetermined accuracy.SOLUTION: An electric power measuring device comprises: a main side current sensor which is provided on a path portion closer to a main power generator side than a load in a connection path which electrically connects the main power generator and a sub power generator via the load, and detects current flowing in the path portion; a sub-side current sensor which is provided on a path portion closer to the sub power generator side than the load in the connection path, and detects current flowing in the path portion; and a voltage sensor provided on the connection path. Therein the main side current sensor and the sub side current sensor are clamp type current sensors having a clamp part, and have a self-checking function that can check whether or not being capable of measuring current at a predetermined accuracy.SELECTED DRAWING: Figure 12
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a power measurement device and a power measurement method. [Background technology]

[0002] In recent years, with the spread of home power generation devices, it is becoming common to use both a commercial power source and a power generation device as a method of supplying power to various power consumption devices (hereinafter, simply referred to as "loads").

[0003] Moreover, it is becoming common for the power generated by the power generation device to not only be consumed by the load but also be supplied to a commercial power source and then sold to the power company as power to be sold.

[0004] In such a case, a power measuring device is required that measures the power supplied from the commercial power source to the load as purchased power and measures the power supplied from the power generation device to the commercial power source as sold power. Patent Document 1 discloses a technology related to such a power measuring device.

[0005] FIG. 11 is a block diagram showing the system described in Patent Document 1 (FIG. 2 in Patent Document 1, but with altered reference numerals). As shown in Figure 11, the power measuring device described in Patent Document 1 is composed of a supply power calculation unit 937 that measures the power of a commercial power source 924, a generated power calculation unit 938 that measures the generated power of a power generation device 922, a sign control unit 939 that compares the measured power of the supply power calculation unit 937 with the measured power of the generated power calculation unit 938 and performs sign control, a control unit 940 that changes the sign of the main phase power data, and a memory unit 941 that stores the power data.

[0006] The power measuring device described in Patent Document 1, which has such a configuration, reverses the sign of the main phase power data going back to the past when it determines that it is necessary to change the sign of the main phase power data due to improper installation of the current sensor or voltage sensor. [Prior art documents] [Patent documents]

[0007] [Patent Document 1] JP 2016-102653 A Summary of the Invention [Problem to be solved by the invention]

[0008] However, this related technology uses a clamp-type current sensor, and if the mating surfaces of the two split cores are not in tight contact with each other without any gaps, the current flowing through the voltage line to which the clamp-type current sensor is attached will cause the magnetic flux generated in the core of the current sensor to leak through the gaps in the mating surfaces, making it impossible to measure the current with the specified accuracy.

[0009] Therefore, in this related technology, there is no verification as to whether the clamp-type current sensor can measure the current with the specified accuracy between the time when the clamp-type current sensor is attached to the voltage line and the time when the power is measured, so there is the inconvenience that even if the current is not detected correctly, it goes unnoticed.

[0010] An object of the present invention is to provide a power measuring device and a power measuring method that solves the above-mentioned problems. [Means for solving the problem]

[0011] The present invention is a power measuring device comprising a main side current sensor provided in a path portion on the main generating unit side of the load in a connection path electrically connecting a main generating unit and a sub generating unit via a load, the main side current sensor being provided in a path portion on the sub generating unit side of the load, the sub side current sensor being provided in a path portion on the connection path on the sub generating unit side of the load, the sub side current sensor being provided in the connection path, the sub side current sensor being a clamp-type current sensor having a clamp portion, and having a self-diagnosis function to determine whether the current can be measured with the specified accuracy.

[0012] The present invention also provides a power measurement method using a power measuring device that includes a main side current sensor provided in a path portion on the main power generating unit side of the load in a connection path that electrically connects a main power generating unit and a sub power generating unit via a load, and detects a current flowing in the path portion, a sub side current sensor provided in a path portion on the sub power generating unit side of the load in the connection path, and detects a current flowing in the path portion, and a voltage sensor provided on the connection path, wherein the power measurement method is characterized in that it includes a self-diagnosis process in which the main side current sensor and the sub side current sensor, which are clamp-type current sensors having clamp portions, self-diagnose whether they can measure current with a specified accuracy. Effect of the Invention

[0013] According to the present invention, it is possible to verify whether a clamp-type current sensor can measure current with a specified accuracy. [Brief description of the drawings]

[0014] [Figure 1] 1 is a diagram illustrating a configuration of a power measuring device according to a first embodiment of the present invention. [Diagram 2] FIG. 2 is a diagram showing a polarity control circuit according to the first embodiment of the present invention. [Diagram 3] 1 is a diagram showing a current sensor according to a first embodiment of the present invention. [Figure 4] FIG. 2 is a flow diagram showing a power measurement method according to the first embodiment of the present invention. [Diagram 5] FIG. 2 is a flow diagram showing a power measurement method according to the first embodiment of the present invention. [Figure 6] FIG. 2 is a flow diagram showing a power measurement method according to the first embodiment of the present invention. [Figure 7] FIG. 2 is a diagram illustrating a specific example of a power measurement method according to the first embodiment of the present invention. [Figure 8] 5A to 5C are diagrams illustrating conditions for inverting the positive and negative signs of power values ​​in the first embodiment of the present invention. [Figure 9]FIG. 11 is a configuration diagram showing a power measuring device according to a second embodiment of the present invention. [Figure 10] FIG. 11 is a flow diagram showing a power measurement method according to a second embodiment of the present invention. [Figure 11] FIG. 1 illustrates a configuration of a power measuring device according to a related art. [Figure 12] FIG. 1 is a diagram showing a minimum configuration of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] [First embodiment] <Power measurement device> As shown in FIG. 12, the minimum configuration of the power measuring device 1 of the first embodiment of the present invention includes a main side current sensor 6 provided in a path portion on the main power generating unit 2 side of the load 4 in a connection path 5 electrically connecting the main power generating unit 2 and the sub power generating unit 3 via a load 4, the main side current sensor 6 detecting the current flowing in the path portion, a sub side current sensor 7 provided in a path portion on the connection path 5 on the sub power generating unit 3 side of the load 4, the sub side current sensor 7 detecting the current flowing in the path portion, and a voltage sensor 8 provided in the connection path 5. Furthermore, the main side current sensor 6 and the sub side current sensor 7 are clamp-type current sensors having a clamp portion, and have a self-diagnosis function to check whether they can measure the current with a specified accuracy.

[0016] The power measuring device according to this embodiment will be described in detail below. As shown in FIG. 1, the power measuring device 10 of this embodiment is composed of a commercial power source 20 (main power generating device), a private power generating device 24 (sub-power generating device), and a power measuring unit 21 that measures the power supplied by the commercial power source 20 and the private power generating device 24.

[0017] The commercial power source 20 is a power source that supplies power from an electric power company to ordinary households, businesses, etc. (hereinafter also referred to as "consumers"), and supplies power using a single-phase three-wire system that uses a first voltage line 28 (hereinafter also referred to as "L1 line 28"), a second voltage line 30 (hereinafter also referred to as "L2 line 30"), and a neutral line 29 (hereinafter also referred to as "N line 29").

[0018] The private power generation device 24 is a device provided at a consumer's facility, and supplies electric power generated by a solar power generation device or the like. An L1 line 28, a neutral line 29, and an L2 line 30 are connected to the private power generating device 24 via a power measuring unit 21.

[0019] Various devices that consume power at the consumer's facility are provided as loads 70 on a path that electrically connects the commercial power source 20 and the private power generation device 24 . The load section 70 includes a load device 25 connected between the L1 line 28 and the neutral line 29, a load device 26 connected between the L2 line 28 and the N line 29, and a load device 27 connected between the L1 line 28 and the L2 line 30.

[0020] In addition, the load section 70 is provided closer to the private power generation device 24 than the current sensors 40, 41, 43, and 44 described below, and is provided closer to the commercial power source 20 than the current sensor 42.

[0021] The power measuring unit 21 is composed of a main breaker 22 that opens and closes the connection with the commercial power source 20, a branch breaker 23 that opens and closes the connection with the private power generating device 24, a sensor unit 80, a calculation unit 90, a polarity control circuit 52 for the L1 line, a polarity control circuit 53 for the L2 line, a control unit 54, a memory unit 55, and a constant current circuit 100.

[0022] The main breaker 22 is provided between the commercial power source 20 and the sensor unit 80. In addition, the branch breaker 23 is provided between the load unit 70 and the private power generation device 24. The sensor unit 80 includes a current sensor 40, a current sensor 41, a current sensor 42, a voltage sensor 43, and a voltage sensor 44.

[0023] The current sensor 40 measures the current flowing through the L1 line 28 that connects the commercial power supply 20 and the load section 70 . Further, the current sensor 40 has a means for transmitting the open / closed state of the clamp portion of the current sensor 40 to a polarity control circuit 52 for the L1 line, a polarity control circuit 53 for the L2 line, and a control unit 54. The current sensor 40 also has a self-diagnosis winding 101 through which a constant current for self-diagnosis flows from the constant current circuit 100. The details of the self-diagnosis will be described later.

[0024] The current sensor 41 measures the current flowing through the line L2 that connects the commercial power supply 20 and the load unit 70. Further, the current sensor 40 has a means for transmitting the open / closed state of the clamp portion of the current sensor 40 to a polarity control circuit 52 of the L1 line, a polarity control circuit 53 of the L2 line, and a control portion 54. The current sensor 40 also has a self-diagnosis winding 101 through which a constant current for self-diagnosis from the constant current circuit 100 flows.

[0025] The current sensor 42 measures the current flowing through the L1 line 28 that connects the private power generation device 24 and the load section 70. The current sensor 42 also has means for transmitting the open / closed state of the clamp portion of the current sensor to a polarity control circuit 52 for the L1 line, a polarity control circuit 53 for the L2 line, and a control unit 54. The current sensor 42 also has a self-diagnosis winding 101 through which a constant current for self-diagnosis from a constant current circuit 100 flows.

[0026] Voltage sensor 43 is provided between commercial power supply 20 and load section 70 and measures the voltage between L1 line 28 and N line 29. The voltage sensor 43 also has a means for transmitting the attached / unattached state of the voltage lines (L1 line 28 and N line 29) to a polarity control circuit 52 for the L1 line, a polarity control circuit 53 for the L2 line, and the control unit 54.

[0027] Voltage sensor 44 is provided between commercial power supply 20 and load section 70 and measures the voltage between L2 line 30 and N line 29. Furthermore, the voltage sensor 44 has means for transmitting the attached / non-attached state of the voltage lines (N line 29 and L2 line 30) to the polarity control circuit 52 of the L1 line, the polarity control circuit 53 of the L2 line, and the control unit .

[0028] Next, the circuit configurations of the polarity control circuit 52 for the L1 line and the polarity control circuit 53 for the L2 line will be described with reference to FIG. The polarity control circuits 52 and 53 each include a flip-flop circuit 32 and a comparator 31 .

[0029] The comparator 31 compares the absolute value of the main phase power with the power generation phase power, and outputs an excess signal when the absolute value of the main phase power value becomes larger than the power generation phase power value. The reason for using the case where the absolute value of the main phase power becomes larger than the power generation phase power value as the reference will be described later.

[0030] The flip-flop circuit 32 includes a set section S and a reset section R which are signal input sections, and an output section Q. In the example of Fig. 2, the set section S is electrically connected to the output section of the comparator 31. The reset section R is connected to the current sensors 40, 41, and 42.

[0031] After the excess signal is input from the comparator 31 to the set unit S, the flip-flop circuit 32 continuously outputs the sign-inverted signal from the output unit Q, and when a control signal is applied to the reset unit R, the output of the sign-inverted signal is stopped.

[0032] Next, the configuration of current sensors 40, 41, and 42 with respect to current measurement and self-diagnosis will be described in detail with reference to FIG. The self-diagnosis winding 101 of the current sensors 40, 41, 42 is wound a required number of times around the core 9 so that the clamp-type current sensors 40, 41, 42 can amplify the current to a level that can be measured. If the number of turns of the self-diagnosis winding 101 is T, then the relationship between the current Ia passing through the core 9 and the constant current Ib for self-diagnosis is as follows:

[0033]

number

[0034] Here, clamp-type current sensors 40, 41, 42 are composed of two semicircular cores 9, a self-diagnosis winding 101 wound around one of the cores 9, and a measurement winding 102 wound around the other core 9. The self-diagnosis winding 101 is connected to a constant current circuit 100. The measurement winding 102 is connected to a calculation unit 90.

[0035] The control unit 54 is connected to the calculation unit 90 , the main breaker 22 , the branch breakers 23 , and the constant current circuit 100 . The calculation unit 90 includes an L1 main phase calculator 48 , an L2 main phase calculator 49 , an L1 generating phase calculator 50 , and an L2 generating phase calculator 51 .

[0036] The L1 main phase calculator 48 calculates the current measured by the current sensor 40, the voltage measured by the voltage sensor 43, and the power calculated from these currents and voltages. The L2 main phase calculator 49 calculates the current measured by the current sensor 41, the voltage measured by the voltage sensor 44, and the power calculated from these currents and voltages.

[0037] The L1 power generation phase calculator 50 calculates the current measured by the current sensor 42, the voltage measured by the voltage sensor 43, and the power calculated from these currents and voltages. The L2 power generation phase calculator 51 calculates the current measured by the current sensor 42, the voltage measured by the voltage sensor 44, and the power calculated from these currents and voltages.

[0038] Here, when performing self-diagnosis on the current sensors 40, 41, 42, the control unit 54 first shuts off the breakers (the main breaker 22 and the branch breaker 23) of the voltage lines to which the current sensors 40, 41, 42 are attached.

[0039] Then, based on an instruction from the control unit 54, the constant current circuit 100 starts generating a constant current for self-diagnosis. This constant current Ib for self-diagnosis flows through self-diagnosis winding 101 wound around core 9 of clamp-type current sensors 40, 41, and 42, generating current Ia passing through core 9.

[0040] Next, a magnetic flux 15 is generated in the core 9 by a current Ia passing through the core 9 of the current sensors 40, 41, 42, and a current Ic is detected in the measuring winding 102 wound around the core 9, and the current value is calculated by the calculation unit 90. The calculation unit 90 outputs the current value measured in the self-diagnosis to the control unit 54.

[0041] The control unit 54 determines whether the current value measured by self-diagnosis is within the allowable range of the standard value of the current Ia in equation 1, and if it is within the allowable range of the standard value, it determines that the current sensors 40, 41, and 42 can measure the current with the specified accuracy.

[0042] However, in the power measuring device, if the current sensor or voltage sensor is installed in an incorrect state, the positive and negative signs of the power values ​​are reversed. In the power measuring device of this embodiment, however, it is automatically determined that the sensor is installed in an incorrect state, and the positive and negative signs are reversed as necessary. The conditions for reversing the positive and negative signs will be described with reference to FIG.

[0043] FIG. 8 is a diagram illustrating each of the predetermined conditions for inverting the sign of each main phase power value. In FIG. 8, among the components in FIG. 1, those components that are not related to the description of the predetermined conditions for determining the code are omitted. Here, for ease of explanation, the power supplied via the L1 line 28 and the N line 29 is referred to as "L1 phase power", and the power supplied via the L2 line 30 and the N line 29 is referred to as "L2 phase power".

[0044] First, the first predetermined condition regarding the L1 phase power will be described below. As shown in Fig. 8, let the voltage value of the voltage between the L1 line 28 and the N line 29 be V1, the current value of the current flowing through the L1 line 28 be I1, the current flowing from the L1 line 28 to the load device 25 be IZa, the current flowing from the L1 line 28 to the load device 27 be IZc, the current flowing from the L1 line 28 to the load section 70 be IZ1 (= IZa + IZc), and the power generation current flowing from the self - power generation device 24 to the L1 line 28 (and the L2 line 30) be IPV.

[0045] Also, assume that the mounting directions (polarities) of the current sensor 40 for measuring the current value of I1 shown in Fig. 8 and the current sensor 42 for measuring the current value of IPV are mounted in the directions indicated by the arrows respectively.

[0046] Therefore, the current I1 flowing through the L1 line 28 detected by the current sensor 40 is as follows.

[0047]

Equation

[0048] Thus, the L1 main - trunk phase power value, which is the value of the L1 - phase power, is expressed as follows.

[0049]

Equation

[0050] Also, the surplus power that causes reverse power flow of the power in the direction from the self - power generation device 24 to the commercial power supply 20 occurs when the power generation current (IPV) in the self - power generation device 24 exceeds the load current (IZ1) (IZ1 < IPV). Therefore, the L1 main - trunk phase power value in Equation (2) becomes negative power with a negative value as follows.

[0051]

Equation

[0052] In addition, since the maximum value of the current that can flow reversely from the self - power generation device 24 to the commercial power supply 20 is up to the generated current (IPV), the maximum value of the negative power that can be generated by the reverse power flow is up to the generated phase power (IPV×V1) in the self - power generation device 24.

[0053] Therefore, when expressing the L1 main trunk phase power value (negative power) represented by the right - hand side of Equation (3) using the absolute value, it becomes |IZ1×V1 - IPV×V1| < IPV×V1, and the power flowing reversely (left - hand side) does not exceed the generated power (right - hand side).

[0054] On the other hand, if the mounting direction of the current sensor or voltage sensor is reversed, the following equation is obtained.

[0055]

Equation

[0056] Equation (5) represents that the power flowing reversely exceeds the generated power. Since in reality the power flowing reversely does not exceed the generated power, it can be determined that the mounting direction of the current sensor or voltage sensor is reversed.

[0057] Here, from Equation (1), I1 = IZ1 - IPV. Therefore, the current IZ1 is expressed as follows from this equation.

[0058]

Equation

[0059] Substituting the above - mentioned Equation (6) into Equation (5) results in the following.

[0060]

Equation

[0061] From the above, it can be said that Equation (7) is the condition for reversing the sign regarding the L1 - phase power. Although the above describes how to obtain the predetermined condition related to the L1 phase power, the predetermined condition related to the L2 phase power can be obtained in the same manner, as follows.

[0062]

number

[0063] In other words, it can be said that the condition in equation (8) is that the sign of the L2 phase power should be reversed.

[0064] <Power measurement method>

[0065] Next, the power measuring method of this embodiment will be described with reference to the flowcharts of FIGS. FIG. 4 is a flow chart outlining the operation of the circuit. In step S1 of FIG. 4, the control unit 54 determines the open / closed state of the clamp portions of each current sensor 40, 41, 42 and the attached / non-attached state of the voltage lines (L1 line 28, N line 29, L2 line 30) to each voltage sensor 43, 44 based on the received control signal.

[0066] If, as a result of determining the open / closed state of the current sensors 40, 41, and 42, the control unit 54 determines that all of the clamp sections are in a closed state and that voltage lines are attached to the voltage sensors 43 and 44, the control unit 54 proceeds to step S2.

[0067] On the other hand, if the control unit 54 determines that the clamp portions of the current sensors 40, 41, 42 are in an open state, or that the voltage sensors 43, 44 have no voltage wires attached thereto, it determines that there is a defect in the preparation for installation of the current sensors 40, 41, 42 or the voltage sensors 43, 44 and terminates the processing.

[0068] That is, the control unit 54 detects whether the clamp portions of all of the current sensors 40, 41, 42 are in the open state, and detects the attachment states of all of the voltage sensors 43, 44 to the voltage lines (L1 line 28, N line 29, L2 line 30). If it determines that there is a defect in the preparation for installation of any of the current sensors 40, 41, 42 or the voltage sensors 43, 44, the processing is terminated.

[0069] 4, a self-diagnosis is performed to determine whether the current sensors 40, 41, and 42 can measure with a specified accuracy. The self-diagnosis will be described in detail with reference to the flowchart of FIG. In step Sa1 of FIG. 5, the control unit 54 shuts off the breakers (the main breaker 22 and the branch breaker 23) of the voltage line to which the current sensor is attached.

[0070] Next, in step Sa2, the constant current circuit 100 starts generating a constant current for self-diagnosis in response to a command from the control unit . The constant current Ib for self-diagnosis flows through a self-diagnosis winding 101 wound around the core 9 of the clamp-type current sensors 40, 41, and 42, generating a current Ia that passes through the core 9.

[0071] In step Sa3, a magnetic flux 15 is generated in the core 9 by a current Ia passing through the core 9 of the current sensors 40, 41, 42, and a current Ic is detected in the measurement winding 102 wound around the core 9, and the current value is calculated by the calculation unit 90. The calculation unit 90 outputs the current value measured in the self-diagnosis to the control unit 54.

[0072] In step Sa4, the control unit 54 determines whether the current value measured by self-diagnosis is within the allowable range of the standard value of the current Ia in equation 1. If it is outside the allowable range of the standard value, the control unit 54 proceeds to step Sa54-1. If it is within the allowable range of the standard value, the control unit 54 proceeds to step Sa5.

[0073] In step Sa4-1, the constant current circuit is stopped in response to an instruction from the control unit 54, and the control unit 54 records the result of the self-diagnosis (abnormality) in the storage unit 55 and ends the self-diagnosis.

[0074] In step Sa5, the constant current circuit is stopped in response to an instruction from the control unit 54, and the control unit 54 records the result of the self-diagnosis (normal) in the storage unit 55 and ends the self-diagnosis.

[0075] 4, if the control unit 54 determines that the result of the self-diagnosis is normal, the process proceeds to step S4. On the other hand, if the control unit 54 determines that the result of the self-diagnosis is abnormal, the process determines that there is a malfunction or improper installation of the current sensors 40, 41, 42, and ends the process.

[0076] Step S4 in FIG. 4 will be described in detail with reference to the flowchart in FIG. In step Sb1 of FIG. 6, the control unit 54 writes the power measurement start date and time in the storage unit 55.

[0077] Next, in step Sb2, the control unit 54 receives average power values ​​for a voltage cycle from each calculator (L1 main phase calculator 48, L2 main phase calculator 49, L1 generating phase calculator 50, and L2 generating phase calculator 51).

[0078] For example, if a predetermined voltage period is taken as one period, and the voltage and current measured by voltage sensor 43 and current sensor 40 are 50 Hz AC voltage and AC current, the voltage period is 20 ms. Then, control unit 54 receives the average power for one voltage period from L1 main phase calculator 48 as the L1 main phase power value.

[0079] The control unit 54 can also sequentially receive the L1 main phase power value from the L1 main phase calculator 48 for each predetermined period corresponding to the above-mentioned predetermined voltage cycle. The same applies to the other calculators (the L2 main phase calculator 49, the L1 generating phase calculator 50, and the L2 generating phase calculator 51).

[0080] Next, in step Sb3, the control unit 54 writes the power values ​​from each calculator (L1 main phase calculator 48, L2 main phase calculator 49, L1 power generation phase calculator 50, L2 power generation phase calculator 51) into the memory unit 55 in a manner associated with the respective date and time information.

[0081] Next, in step Sb4, the control unit 54 determines whether or not a sign inversion signal has been output. That is, when the calculators (L1 main phase calculator 48, L2 main phase calculator 49, L1 generating phase calculator 50, L2 generating phase calculator 51) calculate the power values, the polarity control circuits 52, 53 determine whether the above-mentioned sign inversion conditions are met based on the calculated power values ​​and judge whether to start outputting the sign inversion signal.

[0082] If the polarity control circuits 52 and 53 have determined that the output of the sign-inverted signal has not started, the control unit 54 repeats the operations from step Sb2 onward after the determination operation of step Sb4. That is, the control unit 54 writes the calculated power value into the storage unit 55 every moment.

[0083] Here, for example, when the sign of the main phase power value of the L1 line is negative, the polarity control circuit 52 executes the following process. That is, when the absolute value of the main phase power value of the L1 line becomes larger than the absolute value of the generating phase power value of the L1 line (|I1×V1|>IPV×V1), an excess signal is output from the comparator 31 of the polarity control circuit 52. This causes the flip-flop circuit 32 of the polarity control circuit 52 of the L1 line to start outputting a sign inversion signal.

[0084] When the control unit 54 detects that the output of the sign-inverted signal has started (step Sb4 in FIG. 6), it reads information on the measurement start date and time (time T3 in FIG. 7) from the storage unit 55. Then, the control unit 54 changes the positive / negative sign of the supply power value of line L1 that has been written in the storage unit 55 from the measurement start date and time T3 until the sign-inverted signal is output (from time T3 to time T6) to the opposite sign. That is, the control unit 54 corrects the past data (step Sb5).

[0085] In addition, since the output of the sign inversion signal starts, the positive / negative sign of the calculated value output from the L1 main phase calculator 48 is changed to the opposite sign and output, so that data correction in the memory unit 55 is not required.

[0086] Next, a specific example in which power value data is actually corrected using the power measuring method of this embodiment will be described with reference to FIG.

[0087] Normally, when the load devices 25, 26, and 27 are being used by power consumers, the amount of power supplied from the commercial power source 20 varies depending on the operating status of the load devices. In addition, the amount of power generated by the private power generation device 24, such as a solar power generation device, connected to the grid varies depending on the weather.

[0088] Here, it is assumed that the current sensor 40 was attached to the L1 line 28 with the polarity direction reversed. If the self-diagnosis result of the current measurement accuracy of the current sensors 40, 41, 42 is determined to be normal, the sign correction of the data of the past L1 main phase power value from the power measurement start date and time until the polarity direction of the current sensor 40 is corrected will be described.

[0089] Referring to FIG. 7, at time T1, the calculation unit 90 detects that the clamp section of any of the current sensors 40, 41, 42 is in an open state, or that the voltage lines (L1 line 28, N line 29, L2 line 30) are not attached to the voltage sensors 43, 44, and does not perform power calculations.

[0090] At time T2, when it is detected that all the clamps of the current sensors 40, 41, and 42 are closed and the voltage lines (L1 line 28, N line 29, L2 line 30) are attached to the voltage sensors 43 and 44, the polarity reset signal resets the flip-flop circuit 32 to initialize the L1 sign inversion signal. Then, self-diagnosis of the current measurement accuracy of the current sensors 40, 41, and 42 is performed.

[0091] At time T3, if the self-diagnosis result of the current measurement accuracy of current sensors 40, 41, 42 is determined to be normal, control unit 54 writes the power measurement start date and time in memory unit 55. Then, power measurement is started, and the power value from L1 main phase calculator 48 whose sign is not inverted is recorded in memory unit 55 as the L1 main phase power value via signal line 58 and control unit 54 over the period from T3 to T6 until the L1 sign inversion signal is generated.

[0092] At time T6, the absolute value of the negative power value (-1500 W) of the main phase power becomes the generating phase power value (+500 W), satisfying the first predetermined condition (|I1 x V1|>IPV x V1), and an excess signal is generated from the comparator 31 of the polarity control circuit 52. This excess signal is supplied to the set terminal of the flip-flop circuit 32 to set the flip-flop circuit 32.

[0093] The output of the flip-flop circuit 32 is transmitted as an L1 sign inversion signal at time T7 to the L1 main phase calculator 48 and the control unit 54 via signal line 57. Upon receiving the L1 sign inversion signal, the main phase calculator 48 records the sign-inverted power value from T7 at the same time in the memory unit 55 via signal line 58 and control unit 54 as the L1 main phase power value.

[0094] At time T7, the control unit 54 receives the L1 sign inversion signal from the polarity control circuit 52 of the L1 line via signal line 57. The control unit 54 records the date and time of reception in the memory unit 55 and inverts the sign of the past L1 main phase power value data recorded in the memory unit 55 for the period from the date and time T3 of the start of the previous power measurement to time T7. In this manner, the power value data is actually corrected based on the power measurement method of this embodiment.

[0095] According to this embodiment, although a clamp-type current sensor is used, the clamp-type current sensor has a function of self-diagnosing whether or not it is measuring the current with a specified accuracy, which makes it possible to prevent a situation in which the power value cannot be detected correctly due to improper installation of the clamp-type current sensor. For example, if the mating surface 14 of the core 9 shown in FIG. 3 is not tightly fitted with no gaps, the magnetic flux 15 generated in the core 9 will leak from the mating surface 14, but this embodiment can detect this without overlooking it.

[0096] In addition, this embodiment further includes a means for transmitting a polarity control reset signal indicating the closed state of the current sensor and the connection of the voltage wire to the voltage sensor to the polarity control circuit and the control unit, thereby making it possible to correctly detect whether all the current sensors are connected to the desired electric wires and whether the desired voltage wire is connected to the voltage sensor. Therefore, it is possible to correct the sign of the data of the main phase power value measured from the date and time when all of the following conditions are met: all current sensors are attached to the desired electric wires, the desired voltage wires are attached to the voltage sensors, and the self-diagnosis of the current accuracy of all current sensors is determined to be normal, until the polarity direction of the current sensor used to measure the main phase power is corrected. This makes it possible to prevent measurements caused by incorrect installation of current and voltage sensors by construction workers or the like, thereby improving the accuracy of power measurements and the reliability of past power data quality.

[0097] [Second embodiment] Next, a second embodiment of the present invention will be described in detail with reference to the drawings. Note that the description of the same parts as those in the first embodiment will be omitted as appropriate.

[0098] <Power measurement device> As shown in FIG. 9, a power measuring device 10A of this embodiment has a display unit 110 provided in a control unit . If there are current sensors 40, 41, 42 with their clamps open, the display unit 110 displays the locations of those current sensors. Also, if there are voltage sensors 43, 44 to which no voltage wires (L1 wire 28, N wire 29, L2 wire 30) are attached, the display unit 110 displays the locations of those voltage sensors.

[0099] <Power measurement method> Next, the power measurement method of this embodiment will be described. The power measurement method of this embodiment is almost the same as that of the first embodiment shown in FIG. 4, but there are differences in the processes after steps S1 and S3 as shown in FIG.

[0100] In step S1, if the clamps of the current sensors 40, 41, 42 are open or the voltage lines (L1 line 28, N line 29, L2 line 30) are not attached to the voltage sensors 43, 44, the control unit 54 determines that the current sensor or voltage sensor is abnormally attached. The locations of the current sensors 40, 41, 42 or voltage sensors 43, 44 that have not yet been installed are displayed on the display unit 110 to inform the power consumer and the construction worker.

[0101] Furthermore, in step S3 of FIG. 10, if the self-diagnosis of the current measurement accuracy of the current sensor determines that there is an abnormality, the control unit 54 displays the locations of the current sensors 40, 41, 42 determined to be abnormal on the display unit 110 to notify the power consumer and the contractor.

[0102] According to the power measuring device and power measuring method of this embodiment, since a display unit is provided, the location of the current sensor and voltage sensor where a malfunction is occurring can be promptly and appropriately notified to power consumers and construction companies.

[0103] While the present invention has been described above based on the embodiment, it goes without saying that the present invention is not limited to the above embodiment and can be modified in various ways without departing from the spirit and scope of the present invention. For example, in the above embodiment, the main phase calculator for L1 and L2, the power generation phase calculator for L1 and L2, and the polarity control circuits for L1 and L2 are configured as hardware, but these may be implemented by program processing in the control unit 54. In this case, by implementing the functions required for polarity control of the current sensors as program processing, a new effect is achieved in that the scale of the hardware can be reduced. [Explanation of symbols]

[0104] 1 Power measuring device, 2 Main power generating unit, 3 Sub power generating unit, 4 Load, 5 Connection path, 6 Main side current sensor, 7 Sub side current sensor, 8 Voltage sensor, 9 Core, 10 Power measuring device, 10A Power measuring device, 14 mating surface, 15 magnetic flux, 20 commercial power source, 21 power measurement unit, 22 main breaker, 23 branch breaker, 24 private power generation device, 25 load equipment, 26 load equipment, 27 load equipment, 28 first voltage line, 29 neutral conductor, 30 second voltage conductor, 31 comparator, 32 flip-flop circuit, 40 current sensor, 41 current sensor, 42 current sensor, 43 voltage sensor, 44 voltage sensor, 48 main phase calculator, 49 main phase calculator, 50 generating phase calculator, 51 generating phase calculator, 52 polarity control circuit, 53 polarity control circuit, 54 control unit, 55 memory unit, 57 signal line, 58 signal line, 70 load unit, 80 sensor unit, 90 calculation unit, 100: constant current circuit; 101: self-diagnosis winding; 102: measurement winding; 110 display unit, 922 power generation device, 924 commercial power source, 937 power supply calculation unit, 938 power generation calculation unit, 939 code control unit, 940 control unit, 941 storage unit

Claims

1. a main side current sensor that is provided in a path portion on the main power generating unit side of the load in a connection path that electrically connects the main power generating unit and the sub power generating unit via a load, and detects a current flowing in the path portion; a sub-side current sensor provided in a path portion on the sub-power generation device side of the load in the connection path and detecting a current flowing in the path portion; a voltage sensor provided in the connection path, The main side current sensor and the sub side current sensor are clamp-type current sensors having a clamp section, and have a self-diagnosis function to check whether they can measure current with a specified accuracy. A power measuring device comprising:

2. The power measuring device according to claim 1, further comprising a detection means for detecting the open / closed state of the clamp portions of the main side current sensor and the sub side current sensor, and whether or not the voltage sensor is attached to a voltage line.

3. The power measuring device according to claim 1, characterized in that the main side current sensor and the sub side current sensor each include a self-diagnosis winding wound around the clamp portion, and a constant current circuit for passing a constant current through the self-diagnosis winding.

4. A control unit is provided, the control unit calculates a supply power value supplied from the main power generating unit to the load based on the current detected by the main side current sensor and the detection result by the voltage sensor, and Calculating a generated power value output from the sub-power generating device based on the current detected by the sub-side current sensor and the detection result by the voltage sensor.

2. The power measurement device according to claim 1 .

5. a storage unit that stores the supply power value and the generated power value in a manner associated with time information indicating a time when the detection result by the voltage sensor used for the calculation and the current were detected; a sign control unit that, when detecting that the positive / negative sign of the supply power value is inappropriate, controls the positive / negative sign of the supply power value to be reversed by using the supply power value and the generated power value; a correction unit that, when it is detected that the positive / negative sign of the supply power value is inappropriate, changes the positive / negative sign of the supply power value that has been written in the storage unit over a period from a measurement start date and time until it is detected that the positive / negative sign is inappropriate to an inverted sign; 5. The power measurement device according to claim 4, further comprising:

6. a main side current sensor that is provided in a path portion on the main power generating unit side of the load in a connection path that electrically connects the main power generating unit and the sub power generating unit via a load, and detects a current flowing in the path portion; a sub-side current sensor provided in a path portion on the sub-power generation device side of the load in the connection path and detecting a current flowing in the path portion; A power measurement method using a power measurement device including a voltage sensor provided in the connection path, A self-diagnosis step is provided for self-diagnosing whether the main side current sensor and the sub side current sensor, which are clamp-type current sensors having clamp portions, can measure current with a specified accuracy.

13. A power measurement method comprising:

7. a detection step of detecting an open / closed state of a clamp portion of the main side current sensor and the sub side current sensor, and detecting whether or not the voltage sensor is attached to a voltage line; A self-diagnosis step is performed after the detection step.

7. The power measurement method according to claim 6.

Citation Information

Patent Citations

  • Current transformer for instrument and current detecting device using it

    JP1989224674A

  • Installation state determination method for measurement apparatus and current transformer

    JP2015083947A

  • Electric power measuring apparatus and method for measuring electric power

    JP2016102653A

  • Apparatus and method for remotely monitoring a disconnecting device based on leakage current

    JP2022524459A

  • Self calibration by double signal sampling

    US20210165066A1