Management system and management program

The management system and program enhance work output tracking by using progress status information to manage work completion accurately across multiple locations and organizations, addressing the imprecision in existing systems.

JP2024167506APending Publication Date: 2024-12-04TAKENAKA CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023083618
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-22
Publication Date
2024-12-04

AI Technical Summary

Technical Problem

Existing work management systems lack precision in tracking the progress and output of target work, particularly across multiple locations and organizations, making it difficult to manage work completion accurately.

Method used

A management system and program that acquires progress status information, including intermediate progress, and performs management processing based on this information to track work completion accurately, allowing for precise management of work output across various locations and organizations.

Benefits of technology

Enables precise management of work completion by considering progress up to intermediate stages, facilitating better tracking and output management of target work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024167506000001_ABST
    Figure 2024167506000001_ABST
Patent Text Reader

Abstract

To provide a management system capable of more precisely managing an output of a target work, and a management program.SOLUTION: A management system 100 for managing an output of a target work comprises acquisition means for acquiring progress state information indicative of the progress of the target work, and management means for performing management processing on the management of an output of the target work on the basis of the progress state information acquired by the acquisition means. The progress state information includes midway progress information indicative of the progress to a midway stage before the completion of the target work. The midway progress information indicates information indicative of a standard on the progress of the target work in the midway stage and information indicative of a degree of progress in the target work in the midway state. The target work is performed in a plurality of workplaces in a building. The management means performs management processing in a plurality of workplace units.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a management system and a management program. [Background technology]

[0002] Conventionally, techniques for managing work output have been known (see, for example, Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Publication No. 06-052183 Summary of the Invention [Problem to be solved by the invention]

[0004] Meanwhile, there has been a demand for a technique for more precisely managing the output of a target task, for example.

[0005] The present invention has been made in consideration of the above-mentioned circumstances, and has an object to provide a management system and a management program that can more precisely manage the output of a target task. [Means for solving the problem]

[0006] In order to solve the above-mentioned problems and achieve the objective, the management system described in claim 1 is a management system for managing the progress of a target work, and comprises an acquisition means for acquiring progress status information indicating the progress of the target work, and a management means for performing management processing related to management of the progress of the target work based on the progress status information acquired by the acquisition means, and the progress status information includes intermediate progress information indicating the progress up to an intermediate stage before the target work is completed.

[0007] The management system of claim 2 is the management system of claim 1, wherein the intermediate progress information indicates information indicating a standard regarding the progress of the target work at the intermediate stage and information indicating the degree of progress of the target work at the intermediate stage.

[0008] The management system of claim 3 is the management system of claim 1, wherein the target work is performed at a plurality of work locations in a building, the acquisition means acquires information indicating the progress of the target work at each of the plurality of work locations as the progress status information, and the management means performs the management processing on a per-work location basis.

[0009] The management system of claim 4 is the management system of claim 1, wherein the target work is performed by a predetermined work organization, the acquisition means acquires information indicating the progress of the target work performed by the work organization as the progress status information, and the management means performs the management processing on a work organization basis.

[0010] The management system of claim 5 is the management system of claim 1, in which the target work includes at least a quantity-set target work, for which planned performance quantity information indicating the planned performance quantity for the target work is stored in the management system, and the management means performs the management process of identifying a performance quantity base performance volume, which is the performance volume of the quantity-set target work based on the performance quantity of the quantity-set target work, based on the progress status information acquired by the acquisition means and the planned performance quantity information stored in the management system.

[0011] The management system of claim 6 is the management system of claim 1, wherein the target work is scheduled to be performed in one or more rooms out of a plurality of rooms in a building, the acquisition means acquires information indicating the progress of the target work in each of the one or more rooms as the progress status information, and the management means performs, as the management process, a process of identifying a room number standard performance rate, which is the performance rate of the target work based on the number of rooms in which the target work is performed.

[0012] The management system according to a seventh aspect of the present invention is the management system according to the first aspect, wherein the management means performs at least a process of outputting the amount of work completed for the target task in a predetermined period as the management process.

[0013] The management system of claim 8 is the management system of claim 1, wherein the acquisition means acquires, in addition to the progress status information, labor information indicating labor related to the target work, and the management means performs the management process of identifying the labor-per-unit of the target work based on the progress status information and the labor information acquired by the acquisition means, and outputting an alarm regarding the identified labor-per-unit based on a predetermined criterion.

[0014] The management program described in claim 9 is a management program for managing the progress of a target work, and causes a computer to function as an acquisition means for acquiring progress status information indicating the progress of the target work, and a management means for performing management processing related to management of the progress of the target work based on the progress status information acquired by the acquisition means, and the progress status information includes intermediate progress information indicating the progress up to an intermediate stage before the target work is completed. Effect of the Invention

[0015] According to the management system described in claim 1 and the management program described in claim 9, the volume of work completed for the target work is managed based on progress status information, and the progress status information includes intermediate progress information indicating the progress up to the intermediate stage before the target work is completed. Therefore, for example, the volume of work completed can be managed taking into account the progress up to the intermediate stage before the target work is completed, thereby making it possible to manage the volume of work completed for the target work more precisely.

[0016] According to the management system described in claim 2, the intermediate progress information indicates information indicating a criterion regarding the progress of the target work at an intermediate stage and information indicating the degree of progress of the target work at an intermediate stage, so that, for example, it is possible to take into account the criterion regarding the progress of the target work at an intermediate stage and the degree of progress, thereby making it possible to manage the volume of the target work more precisely.

[0017] According to the management system of claim 3, by performing management processing for a plurality of work sites, it becomes possible to manage the output for each work site, for example.

[0018] According to the management system of claim 4, by performing management processing for each work organization, it becomes possible to manage the amount of work, for example, for each work organization.

[0019] According to the management system described in claim 5, by identifying the output volume based on the quantity performed, it becomes possible to manage the output volume based on the quantity performed, for example, for quantity setting target work for which planned quantity performed information is stored in the management system.

[0020] According to the management system of claim 6, by specifying the room number-based output, it is possible to manage the output based on the number of rooms in which the target work is performed, for example. Also, it is possible to manage the output regardless of whether the planned quantity information is stored in the management system.

[0021] According to the management system of claim 7, by outputting the amount of work completed for a given period, it becomes possible to manage the amount of work completed for a given period, for example.

[0022] According to the management system described in claim 8, by identifying the unit rate of the target work and outputting an alarm regarding the identified unit rate based on a predetermined criterion, it becomes possible to manage the unit rate of the target work, for example. [Brief description of the drawings]

[0023] [Figure 1] 1 is a block diagram showing a functional concept of a management system according to an embodiment of the present invention; [Diagram 2] FIG. 11 is a diagram illustrating an example of work management information. [Diagram 3] FIG. 11 is a diagram illustrating an example of assessment criteria related information. [Figure 4] FIG. 11 is a diagram illustrating an example of input history information. [Diagram 5] 13 is a display example of a reference registration screen. [Figure 6] 13 is a display example of a progress registration screen. [Figure 7] FIG. [Figure 8] 13 is a display example of a quantity-based production volume display screen. [Figure 9] FIG. 13 is an explanatory diagram of overall display graph information. [Figure 10] FIG. 11 is a diagram illustrating an example of work management information. [Figure 11] FIG. [Figure 12] 13 is a display example of a room-based production volume display screen. [Figure 13] FIG. 13 is an explanatory diagram of overall display graph information. [Figure 14] FIG. [Figure 15] 13 is a display example of detailed information related to volume. [Figure 16] 13 is a display example of another progress registration screen. [Figure 17] FIG. 11 is a diagram illustrating an example of input history information. [Figure 18] 13 is a display example of a progress registration screen. [Figure 19] 13 is a display example of a first step progress display screen. [Figure 20] 13 is a display example of a second walking pace display screen. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0024] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of a management system and a management program according to the present invention will be described in detail with reference to the accompanying drawings.

[0025] [I] Basic Concept of the Embodiment First, the basic concept of the embodiment will be described. The embodiment relates to a management system and a management program. The management system according to the present invention is a system for managing the amount of work completed. This management system can be applied to the construction field, for example, and can also be applied to fields other than the construction field.

[0026] "Target work" is work that is to be managed by the management system, and is a concept that includes, for example, work related to construction and any work other than work related to construction.

[0027] "Complete volume" is a concept indicating a quantity related to the progress of work, for example, a quantity corresponding to the degree to which work has been completed, and the specific method of expression is arbitrary, and will be exemplified in the embodiment shown below.

[0028] In the embodiment described below, for example, the management system is applied to the construction field, and the "target work" is work related to construction.

[0029] [II] Specific Contents of the Embodiments Next, the specific contents of the embodiment will be described.

[0030] (composition) First, FIG. 1 is a block diagram showing a functional concept of a management system according to the present embodiment.

[0031] (Configuration Management System) 1 includes, for example, a terminal device 1 and a server device 2, and these devices are capable of communicating with each other. Note that the management system 100 includes a plurality of terminal devices carried by various users (workers of cooperating companies (subcontractors) who perform the work, staff of the prime contractor who manages the work, etc.), but in this embodiment, they are illustrated and described as one terminal device 1 in FIG. 1 as a representative.

[0032] (Configuration - Management System - Terminal Device) The terminal device 1 in FIG. 1 is a device carried by a user, such as a smartphone or a tablet terminal, and includes, for example, a communication unit 11, a touch pad 12, a display 13, a recording unit 14, and a control unit 15.

[0033] The communication unit 11 is a communication means for communicating with an external device (e.g., the server device 2). The touch pad 12 is an operation means for accepting various operation inputs from a user. The display 13 is an image display means for displaying various images, and for example, the touch pad 12 and the display 13 are integrally formed as a touch panel. The recording unit 14 is a recording means for recording programs and various data. The control unit 15 is a control means for controlling the terminal device 1, and is configured using, for example, a CPU, a RAM, and internal memories such as a ROM.

[0034] (Configuration - Management System - Server Device) The server device 2 in FIG. 1 includes, for example, a communication unit 21, a recording unit 22, and a control unit 23.

[0035] (Configuration - Information processing system - Server device - Communication unit) The communication unit 21 in FIG. 1 is a communication unit that communicates with an external device (for example, the terminal device 1).

[0036] (Configuration - Management System - Server Device - Recording Unit) 1 is a recording means for recording programs and various data necessary for the operation of the server device 2. The recording unit 22 includes, for example, a work management information database 221 (hereinafter, the database is referred to as "DB"), an assessment criterion related information DB222, and an input history information DB223.

[0037] (Configuration - Management system - Server device - Recording unit - Work management information DB) The work management information DB 221 in FIG. 1 is a work management information storage unit that stores the work management information.

[0038] Fig. 2 is a diagram illustrating an example of work management information. "Work management information" is information for managing work in each room of a building under construction, and for example, each piece of information illustrated in Fig. 2 is stored in association with each other.

[0039] Note that in Figure 2, only information relating to room 401 on the fourth floor is specifically illustrated; in reality, information is stored about each room on each floor of a four-story building (five rooms, 101 to 105 on the first floor; five rooms, 201 to 205 on the second floor; five rooms, 301 to 305 on the third floor; and five rooms, 401 to 405 on the fourth floor).

[0040] ===Floor name information=== The "floor name information" in FIG. 2 is information indicating the work location, and more specifically, information indicating the floor on which the target work is to be performed (such as "4F" indicating the 4th floor).

[0041] ===Room name information=== The "room name information" in FIG. 2 is information indicating the work location, specifically, information indicating the room in which the target work is performed (such as "401" indicating room 401, which is the name of the room).

[0042] ===Work name information=== 2 is information indicating the name of the target work (such as "marking out" indicating the name of the marking out work). Note that hereinafter, the "target work" will also be simply referred to as "work".

[0043] === Partner Company Information === "Cooperating company information" in FIG. 2 is information indicating the cooperating company (subcontractor) in charge of carrying out the target work. In this embodiment, for example, each work is performed by a predetermined cooperating company. Also, this cooperating company may be interpreted as corresponding to the "organization responsible for the work." For example, "Company C," "Company Z," and "Company A" are shown in FIG. 2.

[0044] ===Setting quantity information=== The "set quantity information" in FIG. 2 is planned quantity information, and more specifically, information indicating the planned quantity, which is the quantity of work that is planned to be performed. Note that any quantity based on any standard can be used as the planned quantity. For example, for work related to door and window frames indicated by "door and window frames" (more specifically, the work of installing door and window frames), the number of door and window frames to be installed can be used as the quantity, and for marking work indicated by "marking out", although not shown in FIG. 2, a width (area) of 40 square meters or the like can be used as the quantity. Note that in this embodiment, it is assumed that the set quantity information is not stored, and in this case it is shown as "none".

[0045] Also, the target work for which the set quantity information is stored (for example, "door and window frame" in FIG. 2) may be referred to as "quantity-set target work", while the target work for which the set quantity information is not stored (for example, "UB and kitchen" in FIG. 2) may be referred to as "quantity-non-set target work". Also, while FIG. 2 shows only information relating to room 401, this embodiment will be described assuming that, for example, for target work for which set quantity information is stored, set quantity information is stored in all rooms in which the work is performed, and for target work for which set quantity information is not stored, set quantity information is not stored in all rooms in which the work is performed.

[0046] ===Evaluation criteria information=== The "assessment criteria information" in Figure 2 is information indicating the progress of the implementation of the target work, specifically, information indicating the progress up to a predetermined intermediate stage before the target work is completed, for example, information indicating the criteria for the progress of the target work at an intermediate stage, and information indicating whether the target work has been completed up to the intermediate stage.

[0047] In this embodiment, the target work is performed through predetermined intermediate stages for each target work, and is then completed up to the final stage (i.e., the end). The number of intermediate stages set for each target work is arbitrary, but in this embodiment, an example is given in which one intermediate stage is set. In other words, in this embodiment, the target work is completed by performing the process up to the intermediate stage (also referred to as the "first process") and the process after the intermediate stage (also referred to as the "second process").

[0048] In FIG. 2, "Delivery Completed" is shown, which indicates that the target work of "door and window frame" has been completed at least to the intermediate stage of delivery, and "Assembly Completed" is shown, which indicates that the target work of "UB and kitchen" has been completed at least to the intermediate stage of assembly. Although not shown in FIG. 2, if the target work has not been completed to the intermediate stage, "Not registered" is recorded as the assessment criteria information indicating that the target work has not been completed to the intermediate stage. In other words, "Delivery Completed" and "Assembly Completed" indicate that the first process has been completed, while "Not registered" can be interpreted as indicating that the first process has not been completed.

[0049] === Assessment criteria registration date and time information === The "assessment standard registration date and time information" in Figure 2 is information indicating the date and time when the target work was completed to a predetermined intermediate stage. For example, information indicating the date and time when information indicating that the target work was completed to a predetermined intermediate stage (i.e., "delivery completed" or "assembly completed", etc.) was stored as appraisal standard information can be used.

[0050] ===Work Status Information=== The "work status information" in Figure 2 is information indicating the progress of the execution of the target work, specifically, information indicating the progress from the intermediate stage mentioned above until the target work is completed, for example, "not started", "work started", "work completed", or "remaining unfinished".

[0051] "Not started" indicates, for example, that the process after the intermediate stage of the target work (second process) has not been started. "Work started" indicates, for example, that the process after the intermediate stage of the target work (second process) has been started and the work is in progress. "Work completed" indicates, for example, that the process after the intermediate stage of the target work (second process) has been completed (i.e., all implementation of the target work has been completed) and there are no remaining defects. "Defects remaining" indicates, for example, that the process after the intermediate stage of the target work (second process) has been completed (i.e., all implementation of the target work has been completed) and there are remaining defects.

[0052] "No good" is a concept that indicates, for example, that the work results are contrary to expectations, and if the "no good" remains, it will become necessary to redo some or all of the work at a later date, or to repair the defective parts (the parts where the work results are contrary to expectations).

[0053] ===Work completion date and time information=== The "work completion date and time information" in Figure 2 is information indicating the date and time when all of the target work was completed. For example, information indicating the date and time when information indicating that all of the target work was completed (i.e., "work completed" or "not completed") was stored as work status information can be used.

[0054] ===Example (door and window frame)=== The information in the fourth row of work-related information in Figure 2 (information associated with "door and window frames" as work name information) shows, for example, that "Company A" is scheduled to perform "2" (two units) of "door and window frames" work in Room 401 on the fourth floor, and that the intermediate stage of "delivery completed" will be completed at "2022 / 11 / 12 0900", and that the process beyond the intermediate stage (second process) will be completed at "2022 / 12 / 15 1000" (i.e., all target work has been completed), and that no damages remain.

[0055] ===Example (UB Kitchen)=== In addition, the information in the fifth row of the work-related information in FIG. 2 (information associated with "UB·Kitchen" as work name information) indicates, for example, that "Company A" is to carry out the work of "UB·Kitchen" in Room 401 on the fourth floor, and that the intermediate stage of "assembly completed" is completed at "2022 / 11 / 12 0900", and the process after the intermediate stage (the second process) is completed at "2022 / 12 / 15 1000" (i.e., all the target work is completed), and that there are remaining defects. In addition, since the set quantity information in this information is "none", it is difficult for the management system 100 to grasp the quantity of work scheduled to be carried out for the work of "UB·Kitchen".

[0056] ===Storage method=== 2 may be stored by any method, for example, floor name information, room name information, work name information, cooperating company information, and set quantity information may be stored by a user (e.g., an employee of the prime contractor) inputting the information via his / her own terminal device 1, or the server device 2 may acquire pre-registered information and store it based on the acquired information. In addition, other information (assessment criteria information, assessment criteria registration date and time information, work status information, and work completion date and time information) is stored by executing an information storage process described later.

[0057] (Configuration - Management system - Server device - Recording unit - Assessment criteria related information DB) The assessment criterion related information DB 222 in FIG. 1 is an assessment criterion related information storage means for storing assessment criterion related information.

[0058] Figure 3 is a diagram showing an example of assessment criterion related information. "Assessment criterion related information" is information related to the assessment criterion information described above, and for example, each piece of information shown in Figure 3 is stored in association with each other. Note that the "task name information" in Figure 3 is the same as the information of the same name in Figure 2.

[0059] ===Unit Information=== The "unit information" in FIG. 3 is information indicating the unit of the quantity of the target work ("locations" and "square meters" (not shown), etc.).

[0060] ===Evaluation criteria candidate information=== The "candidate assessment criteria information" in Figure 3 is information that indicates candidate assessment criteria information to be entered and stored as "assessment criteria information" in the work management information, etc. of Figure 2 (in Figure 3, "delivery completed," etc.).

[0061] ===Accounting ratio information=== The "accrual ratio information" in Figure 3 is information indicating the degree of progress of the target work at an intermediate stage, and specifically, is information indicating at what stage the intermediate stage corresponding to the associated candidate assessment criteria information (i.e., assessment criteria information such as work management information in Figure 2) is located in the overall process of the target work (the process from the start of the work to its completion) (such as "50" indicating 50 percent).

[0062] ===Example (door and window frame)=== The information in the third row of the assessment criteria-related information in FIG. 3 (information associated with "door and window frames" as work name information) indicates, for example, that the unit of quantity for the work of "door and window frames" is "places" (a unit indicating the number of pieces), and that the candidate for the assessment criteria information for the work of "door and window frames" is "delivery completed." It also indicates that "delivery completed" is at the 50% stage of the overall process for the work that is the subject of "door and window frames." In other words, when delivery is completed for the work of "door and window frames" (when the first process is completed), it indicates that 50% of the overall process for the work that is the subject of "door and window frames" has been completed (i.e., half has been completed).

[0063] ===Example (UB Kitchen)=== Furthermore, the information in the fourth row of the assessment criteria related information in Figure 3 (information associated with "UB·Kitchen" as work name information) indicates, for example, that the unit of quantity for the work of "UB·Kitchen" is "places" (a unit indicating the number of pieces), and that the candidate for the assessment criteria information for the work of "UB·Kitchen" is "assembly completed." It also indicates that this "assembly completed" is at the 50% stage of the overall process of the target work of "UB·Kitchen." In other words, when assembly is completed for the work of "UB·Kitchen" (when the first process is completed), it indicates that 50% of the overall process of the target work of "UB·Kitchen" is completed (i.e., half is completed).

[0064] In addition, in FIG. 3, only "50" is shown as the recording ratio information, but it is assumed that in reality, "30" indicating 30 percent, "60" indicating 60 percent, etc. are also stored.

[0065] ===Usage example=== In addition, since the appraisal criteria related information mutually associates the appraisal criteria candidate information (i.e., information corresponding to the appraisal criteria information) and the accounting ratio information, it is possible for the server device 2 to grasp the accounting ratio information corresponding to the appraisal criteria information, and therefore the appraisal criteria information can also be interpreted as indicating the criteria for the progress of the target work at an intermediate stage and the degree of progress of the target work at an intermediate stage.

[0066] ===Storage method=== The method of storing the appraisal criteria-related information in Figure 3 is arbitrary, but for example, for work name information, the same information as the information of the same name in Figure 2 is stored, and other information (unit information, appraisal criteria candidate information, and accounting ratio information) is stored by executing the appraisal criteria-related information registration process described below.

[0067] (Configuration - Management system - Server device - Recording unit - Input history information DB) The input history information DB 223 in FIG. 1 is an input history information storage means for storing input history information.

[0068] Fig. 4 is a diagram illustrating an example of input history information. "Input history information" is a history of information input to the server device 2, that is, information input to and accumulated in the server device 2, and for example, each piece of information illustrated in Fig. 4 is stored in association with each other.

[0069] === Data ID, input date and time information === 4 is identification information for uniquely identifying the input information (a combination of information shown in a horizontal row in FIG. 4). “Input date and time information” in FIG. 4 is information indicating the date and time when the information was input to the server device 2.

[0070] ===Other Information=== The other information in FIG. 4 ("Floor Name Information", "Room Name Information", "Work Name Information", "Assessment Criteria Information", and "Work Status Information") is the same as the information with the same names in FIG.

[0071] ===Storage method=== Such input history information in FIG. 4 may be stored by any method, but for example, it is stored by executing an information storage process to be described later.

[0072] (Configuration - Management system - Server device - Control unit) The control unit 23 in FIG. 1 is a control unit that controls the server device 2, and conceptually functions as, for example, an "acquisition unit" and a "management unit."

[0073] ===Acquisition method=== The "acquisition means" is a means for acquiring progress status information indicating the progress of the target work. Moreover, the "acquisition means" acquires, for example, information indicating the progress of the target work in each of a plurality of work locations as the progress status information. Moreover, the "acquisition means" acquires, for example, information indicating the progress of the target work performed by the work organization as the progress status information. Moreover, the "acquisition means" acquires, for example, information indicating the progress of the target work in each of one or more rooms as the progress status information.

[0074] ===Progress Status Information=== "Progress status information" is information indicating the progress of a target work, and includes, for example, intermediate progress information indicating the progress up to an intermediate stage before the target work is completed. "Intermediate progress information" indicates, for example, information indicating a standard regarding the progress of the target work at an intermediate stage and information indicating the degree of progress of the target work at an intermediate stage.

[0075] ===Management means=== The "management means" is a means for performing management processing related to management of the amount of work performed on the basis of the progress status information acquired by the acquisition means. The "management means" performs management processing, for example, on a multiple work site basis. The "management means" performs management processing, for example, on a work organization basis. The "management means" performs, as a management processing, a processing to determine an implementation quantity standard amount of work performed, which is the amount of work performed on the basis of the implementation quantity of the quantity setting target work, based on the progress status information acquired by the acquisition means and the implementation quantity information stored in the management system 100. The "management means" performs, as a management processing, a processing to determine an implementation room number standard amount of work performed, which is the amount of work performed on the basis of the number of rooms in which the target work was performed. The "management means" performs, as a management processing, a processing to at least output the amount of work performed on the target work for a predetermined period. The processing performed by each part of the control unit 23 will be described later.

[0076] (process) Next, the assessment criteria related information registration process, information storage process, quantity-based output display process, number-of-rooms-based output display process, and output output process executed by the management system 100 according to this embodiment will be described.

[0077] (Processing - Assessment criteria related information registration processing) First, the assessment criterion-related information registration process will be described. The assessment criterion-related information registration process is, roughly speaking, a process executed by the server device 2 (the same goes for other processes), and is, for example, a process for storing (i.e., registering) part of the assessment criterion-related information in FIG. 3. The timing of starting this assessment criterion-related information registration process is arbitrary, but it may be started, for example, when a start command is input to the server device 2 via the terminal device 1, or it may be started by other methods (other processes are similar unless otherwise specified). FIG. 5 is an example of a display of a criteria registration screen.

[0078] === Criteria registration screen === The "criteria registration screen" is a screen for inputting various information to store appraisal criteria-related information, and as shown in Figure 5, for example, has a work name display field 31, a unit information input field 32, an appraisal criteria candidate information input field 33, and an accounting ratio information input field 34.

[0079] The work name display column 31 in Figure 5 is a column that displays the work name information stored in the work management information in Figure 2 and the assessment criteria related information in Figure 3, and displays, for example, "door and window frame" and "UB / kitchen".

[0080] The unit information input field 32 in FIG. 5 is a field for inputting unit information (FIG. 3). For example, 2 This is a field where you can select and input unit information from a list of options such as " (square meters)."

[0081] The assessment criterion candidate information input field 33 in Figure 5 is a field for inputting assessment criterion candidate information (Figure 3), and is a field in which, for example, the user can freely input information (for example, text information).

[0082] The accrual ratio information input field 34 in FIG. 5 is a field for inputting the accrual ratio information (FIG. 3), and is a field in which, for example, the user can freely input information (for example, numerical information).

[0083] ===Processing=== The assessment criterion related information registration process, for example, includes the following first and second processes.

[0084] ==First Process== In the first process, the control unit 23 of the server device 2 generates screen information for displaying the reference registration screen of Figure 5 (a screen on which no information is displayed in each input field) and transmits it to the terminal device 1, thereby displaying the reference registration screen on the display 13 of the terminal device 1.

[0085] ==Second Process== In the second process, the control unit 23 of the server device 2 acquires each piece of information entered by a user (e.g., an employee of the prime contractor) via the criteria registration screen of Figure 5, and stores the assessment criteria-related information of Figure 3 based on the acquired information.

[0086] Here, for example, as shown in FIG. 5, when a user inputs, via the touchpad 12 of his / her terminal device 1, "location," "delivery completed," and "50" (numerical information indicating 50 percent) as unit information, candidate assessment criteria information, and accounting ratio information corresponding to the work of "door and window frame" into the unit information input field 32, candidate assessment criteria information input field 33, and accounting ratio information input field 34, and similarly inputs information relating to "UB / kitchen" and "high floor," and performs a predetermined operation (an operation for sending the input information to the server device 2, such as tapping the "register button" not shown), the terminal device 1 sends each of these input pieces of information to the server device 2.

[0087] Meanwhile, the server device 2 receives and acquires the information transmitted from the terminal device 1, and stores information corresponding to each piece of acquired information as each piece of assessment criteria-related information in Fig. 3. In this manner, the unit information, assessment criteria candidate information, and accrual ratio information in Fig. 3 are stored. Note that information relating to "double bed" is omitted from the illustration in Fig. 3. This concludes the explanation of the assessment criteria-related information registration process.

[0088] (Processing - Information Storage Processing) Next, the information storage process will be described. The information storage process is a process for storing various information, for example, a part of the work management information in Fig. 2 (assessment criteria information, assessment criteria registration date and time information, work status information, and work completion date and time information), and the input history information in Fig. 4. Note that "not registered" and "not started" are stored as the initial values ​​for the assessment criteria information and work status information in Fig. 2. Fig. 6 is an example of the display of the progress registration screen.

[0089] ===Progress registration screen=== The "progress registration screen" is a screen for inputting various information in order to store work management information and input history information, and as shown in Figure 6, for example, has a floor name information input field 41, a room name information input field 42, a work name information input field 43, a work status information input field 44, and an assessment criteria information input field 45.

[0090] The floor name information input field 41, the room name information input field 42, and the work name information input field 43 are fields for inputting floor name information, room name information, and work name information that indicate the floor, room, and target work for which work status information and assessment criteria information are to be entered.

[0091] The floor name information input field 41 may be configured to allow input of floor name information selected from candidates (such as "4F", "3F" (information indicating the third floor, not shown in FIG. 2)) stored in the work management information of Fig. 2. Similarly, the room name information input field 42 and the work name information input field 43 may be configured to allow input of room name information and work name information selected from candidates stored in the work management information of Fig. 2.

[0092] The work status information input field 44 is a field for inputting work status information (FIGS. 2 and 4), and allows the user to select and input work status information from the following candidates: "not started," "work started," "work completed," or "remaining unfinished."

[0093] The assessment criteria information input field 45 is a field for inputting assessment criteria information (Figures 2 and 4), and is a field in which, for example, assessment criteria information can be selected and input from candidates corresponding to the work name information entered in the work name information input field 43.

[0094] It should be noted that "candidates for assessment standard information corresponding to the work name information entered in the work name information input field 43" refer to the candidate assessment standard information associated with the work name information (work name information entered in the work name information input field 43) and "not registered" in the assessment standard related information in Fig. 3. That is, for example, when "door and window frame" is entered in the work name information input field 43, the "candidates for assessment standard information corresponding to the work name information entered in the work name information input field 43" are "delivery completed" and "not registered."

[0095] ===Processing=== The information storage process, for example, includes the following first and second processes.

[0096] ==First Process== In the first process, the control unit 23 of the server device 2 generates screen information for displaying the progress registration screen of FIG.

[0097] It should be noted that the progress registration screen is configured so that, for example, when the user taps on the work status information input field 44 via the touchpad 12, “Not started”, “Work started”, “Work completed”, or “Not done” are displayed as possible work status information to be entered, and one piece of information can be selected and entered.

[0098] In addition, the progress registration screen is configured so that, for example, when a user inputs work name information in the work name information input field 43 via the touchpad 12 and then taps the assessment criteria information input field 45, "candidates for assessment criteria information corresponding to the work name information input in the work name information input field 43" (for example, "delivery completed" and "not registered") are displayed as candidates for assessment criteria information to be input, and the user can select one piece of information and input it.

[0099] The method of realizing this configuration is arbitrary, and for example, when the assessment criteria information input field 45 is tapped after entering work name information in the work name information input field 43, communication is performed between the terminal device 1 and the server device 2, and the server device 2 identifies and displays "candidates for assessment criteria information corresponding to the work name information entered in the work name information input field 43" based on the assessment criteria related information of Figure 3, or the assessment criteria related information of Figure 3 may be transmitted in advance to the terminal device 1 and stored therein, and the terminal device 1 may identify and display "candidates for assessment criteria information corresponding to the work name information entered in the work name information input field 43."

[0100] ==Second Process== In the second process, the control unit 23 of the server device 2 acquires each piece of information input by a user (e.g., a worker of a cooperating company) via the progress registration screen of FIG. 6, and stores a portion of the work management information of FIG. 2 and the input history information of FIG. 4 based on the acquired information.

[0101] Fig. 7 is an explanatory diagram of the process. Note that Fig. 7 illustrates information entered in each entry field of the progress registration screen in Fig. 6 at each date and time.

[0102] The rules for inputting information into each input field on the progress registration screen in Figure 6 are arbitrary, but in this embodiment, for example, from the perspective of managing the progress of the target work up to an intermediate stage, we will explain a case in which the rule is to enter and register assessment criteria information (such as "delivery completed" indicating that the first process has been completed) in the assessment criteria information input field 45 when the target work is completed up to an intermediate stage, and then to enter and register work status information indicating that the target work has been completed when the process after the intermediate stage (the second process) has been completed (i.e., all of the target work has been completed).

[0103] For example, let us assume that a worker (user) of a cooperating company, "Company A," has completed the delivery of two door and window frames into Room 401 and is about to begin post-delivery work related to the door and window frames. The user enters the information in "Number" = "1" in Figure 7 into each input field at "2022 / 11 / 12 0900," which corresponds to the timing immediately after the delivery is completed, and performs a specified operation (an operation to send the entered information to the server device 2, such as tapping the "Register button" not shown). The user will also assume that a worker from "Company A" has then completed all work related to the door and window frames (i.e., all target work has been completed), and enters the information in "Number" = "2" in Figure 7 into each input field at "2022 / 12 / 15 1000," which corresponds to the timing immediately after the completion, and performs a specified operation (as described above).

[0104] Here, for example, when a worker of "Company A" enters each piece of information ("Number" = "1" in Figure 7) into each input field of the progress registration screen in Figure 6 on "2022 / 11 / 12 0900" and performs a specified operation, the terminal device 1 transmits each piece of entered information to the server device 2.

[0105] On the other hand, the control unit 23 of the server device 2 receives and acquires the information transmitted from the terminal device 1, and stores a part of the work management information in FIG. 2 and the input history information in FIG. 4 based on the acquired information.

[0106] = Input history information = Regarding the input history information in Fig. 4, in detail, the control unit 23 of the server device 2 identifies the current date and time using a predetermined method (for example, a method of identifying the date and time using a timer (not shown) provided in the server device 2, etc.), generates a unique data ID, and then stores the generated data ID and information indicating the identified date and time as the data ID and input date and time information in Fig. 4. In addition, as the floor name information, room name information, work name information, assessment standard information, and work status information in Fig. 4, the information entered in the corresponding input fields on the progress registration screen in Fig. 6 and transmitted to the server device 2 is stored.

[0107] For example, if the information "number" = "1" in Fig. 7 is entered and sent, the information associated with "data ID" = "ID001" in Fig. 4 will be stored. Also, for example, if the information "number" = "2" in Fig. 7 is entered and sent, the information associated with "data ID" = "ID051" in Fig. 4 will be stored.

[0108] =Work-related information= Regarding some of the work-related information in Figure 2 (assessment criteria information, assessment criteria registration date and time information, work status information, and work completion date and time information) in detail, the control unit 23 of the server device 2 first identifies the current date and time using a predetermined method.

[0109] Next, in the work management information of Figure 2, the following processing is performed on the assessment criteria information, assessment criteria registration date and time information, work status information, and work completion date and time information associated with the floor name information, room name information, and work name information entered in the floor name information input field 41, room name information input field 42, and work name information input field 43 on the progress registration screen of Figure 6.

[0110] Specifically, when assessment criteria information indicating that the first step is completed (such as "delivery completed") is input and transmitted in the assessment criteria information input field 45 in Fig. 6, the assessment criteria information (such as "delivery completed") is stored as the assessment criteria information in Fig. 2, and the information indicating the specified current date and time is stored as the assessment criteria registration date and time information. Note that, regarding the assessment criteria information input field 45 in Fig. 6, it is assumed that assessment criteria information indicating that the first step is completed (such as "delivery completed") is input and transmitted multiple times (see Fig. 7), but the assessment criteria registration date and time information in Fig. 2 is information indicating the date and time when the target work is completed up to a predetermined intermediate stage, so that the assessment criteria registration date and time information is configured to be stored only when assessment criteria information indicating that the first step is completed (such as "delivery completed") is input for the first time.

[0111] Also, the work status information entered in the work status information input field 44 in Fig. 6 and transmitted is stored as the work status information in Fig. 2. In particular, when work status information indicating that the process up to the intermediate stage (the second process) has been completed (i.e., all of the target work has been completed) is entered and transmitted in the work status information input field 44 in Fig. 6 ("Work Completed" or "Not Done"), the information indicating the specified current date and time described above is stored as the work completion date and time information in Fig. 2. Note that the assessment standard registration date and time information in Fig. 2 is information indicating the date and time when all of the target work has been completed, and therefore is configured not to store any information when information other than "Work Completed" and "Not Done" ("Not Started" or "Work Started") is stored as the work status information.

[0112] Here, for example, if the information "Number" = "1" in Figure 7 is entered and sent, "Delivery completed," "2022 / 11 / 12 0900," and "Work started" (not shown in Figure 2) will be stored as the appraisal criteria information, appraisal criteria registration date and time information, and work status information in Figure 2. Note that in this case, since "Work completed" or "Nothing left to do" is not stored as the work status information, no information will be stored as the work completion date and time information in Figure 2.

[0113] After this, for example, when the information of "number" = "2" in FIG. 7 is entered and transmitted, the information shown in FIG. 2 will be stored as the assessment criteria information, assessment criteria registration date and time information, work status information, and work completion date and time information of FIG. 2. In particular, for the input of "delivery completed" into the work status information input field 44 in "number" = "2" in FIG. 7, this is the second input following the case of "number" = "1" in FIG. 7, so the assessment criteria registration date and time information will remain as "2022 / 11 / 12 0900" stored previously. In addition, since "work completed" was entered into the assessment criteria information input field 45 in "number" = "2" in FIG. 7 and transmitted, "2022 / 12 / 15 1000" will be stored as the work completion date and time information in FIG. 2.

[0114] ===Terminology explanation=== In the above-mentioned second process, the work status information and assessment criteria information input in the work status information input field 44 and the assessment criteria information input field 45 in the progress registration screen in Fig. 6 may be interpreted as corresponding to "progress state information". The assessment criteria information input in the assessment criteria information input field 45 also corresponds to "intermediate progress information", and by referring to the assessment criteria related information in Fig. 3, it is possible to specify the criteria for the progress of the target work at an intermediate stage and the degree of progress of the target work at an intermediate stage, so the assessment criteria information can also be interpreted as indicating information indicating the criteria and information indicating the degree. This concludes the explanation of the information storage process.

[0115] (Processing - Quantity-based production volume display processing) Next, the quantity-based output display process will be described. The quantity-based output display process is a management process related to the management of the output of the target work, and is, for example, a process of displaying a quantity-based output display screen. Figure 8 is a display example of the quantity-based output display screen.

[0116] ===Quantity-based production volume display screen=== The "quantity-based progress display screen" is a screen that displays the progress of the entire building under construction, and more specifically, it is a screen that displays the completed quantity based on the completed quantity, which is the progress of the quantity-setting target work based on the completed quantity of the quantity-setting target work, and has, for example, a cooperating company selection column 51 and an information display column 52, as shown in Figure 8.

[0117] ==Partner company selection section== The cooperating company selection column 51 in Figure 8 is a column that allows a user (e.g., an employee of the prime contractor) to select the cooperating company for which information regarding the completed volume is to be displayed, and includes a selection column (a column displayed as "Company A" in Figure 8) for selecting "Company A" so that the cooperating company indicated in the cooperating company information of the work management information in Figure 2 can be selected.

[0118] ==Information display field== The information display column 52 in FIG. 8 is a column that displays information related to the amount of work completed, and has columns for "task name," "previous month," "current month," "cumulative," and "total amount completed."

[0119] The "task name" field is a field in which task name information indicating the target task (more specifically, the task for which a quantity is to be set) that is to be carried out by the cooperating company selected in the cooperating company selection field 51 is displayed.

[0120] The "Previous Month" column, the "Current Month" column, and the "Cumulative" column are columns that display the previous month's progress, the current month's progress, and the cumulative progress for the target task indicated by the task name information displayed in the "Task Name" column.

[0121] The "volume of the previous month" is, for example, a concept indicating the volume of the previous month, which is the month before the month to which the current date and time belongs. The "volume of the current month" is, for example, a concept indicating the volume of the current month, which is the month to which the current date and time belongs. The "cumulative volume" is, for example, a concept indicating the total volume of the entire period up to the present (including the period of the current month, the previous month, and the month before last).

[0122] The "total output" column is a column where overall display graph information 520 is displayed. Fig. 9 is an explanatory diagram of overall display graph information. "Overall display graph information" 520 is information showing, by the length of a graph, the output from the month before last, the output from the previous month, the output from the current month, and the amount not yet performed, etc., for the target task shown by the task name information displayed in the "task name" column, and as shown in Fig. 9, for example, it has a display portion 521 for the month before last, a display portion 522 for the previous month, a display portion 523 for the current month, and an unperformed display portion 524.

[0123] The two month or earlier display section 521, the previous month display section 522, and the current month display section 523 are sections showing the volume of trading two months or earlier, the volume of trading the previous month, and the volume of trading this month, and have lengths according to the amount of trading volume. Note that the "volume of trading two months or earlier" is a concept showing, for example, the volume of trading two months or earlier (including the month before last), which is the month before the month before the month to which the current date and time belongs. The unexecuted display section 524 is a section showing the volume of trading corresponding to the unexecuted portion, and has a length according to the amount of trading volume.

[0124] ===Processing=== The quantity-based output display process will be described by taking as an example a case where the output of the target work (quantity setting target work) carried out by "Company A" is displayed. Specifically, for example, after carrying out the following premise process, the first to third processes are carried out.

[0125] == Prerequisites == In the premise process, immediately after starting the quantity-based output display process, the control unit 23 of the server device 2 refers to the cooperating company information of the work-related information in FIG. 2, generates screen information for displaying the quantity-based output display screen of FIG. 8 that displays only the cooperating company selection field 51 (a screen without the information display field 52), transmits the information to the terminal device 1 of the user (e.g., an employee of the prime contractor, etc.), and displays the quantity-based output display screen on the terminal device 1. On the other hand, when the user taps to select "Company A" in the cooperating company selection field 51 as the cooperating company for which the user wants to confirm the output, the terminal device 1 transmits the cooperating company information indicating "Company A" to the server device 2, and the server device 2 receives and acquires the transmitted cooperating company information, "Company A." By performing the premise process in this way, it becomes possible for the server device 2 to know that the cooperating company for which the user has displayed the output is "Company A."

[0126] ==First Process== In the first process, the control unit 23 of the server device 2 refers to the cooperating company information and set quantity information, etc. in the work management information in Figure 2, and identifies the work name information in which the set quantity information is stored from the work name information associated with the cooperating company information acquired in the previous process, and identifies the target work indicated by the identified work name information as the target work for which the completed amount is to be displayed.

[0127] Here, for example, "Company A" is obtained in the premise processing, and in the work-related information in Figure 2, "door and window frame" and "UB·Kitchen" are associated with "Company A". However, for "door and window frame", "set quantity information" = "2" is stored, and for "UB·Kitchen", no set quantity information is stored. Therefore, since "door and window frame" is the work for which a quantity is to be set, the "door and window frame" is identified as the work for which the completed amount is to be displayed.

[0128] ==Second Process== In the second process, the control unit 23 of the server device 2 identifies or generates information on the amount of work completed in the information display field 52 in Fig. 8 for the target work identified in the first process based on the work-related information in Fig. 2. For example, the following first to fifth steps are executed.

[0129] Fig. 10 is a diagram illustrating work management information. Note that Fig. 10 focuses on "work name information" = "door and window frame" and illustrates work management information (work management information stored in the work management information DB221 of Fig. 1) related to all rooms of a building under construction. Note that the work management information includes each piece of information shown in Fig. 2, but for ease of explanation, Fig. 10 illustrates only a part of the information, and for each piece of date and time information, only the date is illustrated.

[0130] Each piece of information in FIG. 10 is basically the same as the information of the same name in FIG. 2. In particular, in the "Work name information = Door and window frame" column, it is indicated whether or not "door and window frame" is associated as the work name information in each room indicated by each room name information (that is, whether or not the work of "door and window frame" is set in each room), with "◯" indicating that it is associated and "×" indicating that it is not associated. That is, in this embodiment, as shown in FIG. 10, a case in which the work of "door and window frame" is set for eight rooms, Rooms 401 to 404 and Rooms 301 to 304, is exemplified and described. In addition, it is assumed that the current date and time is December 30, 2022 (hereinafter, the same (the same applies to the modified example) unless otherwise specified).

[0131] =1st step (total planned quantity)= In the first step, the total planned quantity is identified by referring to the set quantity information associated with the work name information indicating the target work identified in the first process in the work-related information in Fig. 10. Here, for example, "10" which is the total of the set quantity information exemplified in Fig. 10 (i.e., the calculation result of "2+1+1+2+1+1+1+1" in Fig. 10) is identified.

[0132] = Second step (Base volume of execution quantity for this month) = In the second step, in the work-related information of Figure 10, focusing on the assessment standard registration date and time information and the work completion date and time information, the implementation quantity standard output for the current month (December to which the current date and time, December 30, 2022, belongs) is identified.

[0133] Specifically, for example, noting that the assessment standard registration date and time information in Fig. 10 indicates the date and time when the target work is completed to a predetermined intermediate stage, and the work completion date and time information in Fig. 10 indicates the date and time when the target work is completely completed, the target work is processed as if it was completed to an intermediate stage at the date and time indicated by the assessment standard registration date and time information, and then the target work is processed as if it was completely completed at the date and time indicated by the work completion date and time information. Also, since the progress degree at the intermediate stage of each work is determined in the recording ratio information of the assessment standard related information in Fig. 3, the work is performed and completed by the degree indicated by the recording ratio information in Fig. 3 (for example, 50% indicated by "50") at the date and time indicated by the assessment standard registration date and time information, and then the work is processed as if it was completed to the end (i.e., 100%) at the date and time indicated by the work completion date and time information.

[0134] In detail, by referring to the appraisal criteria related information in Figure 3, the accounting ratio information associated with the work name information indicating the target work identified in the first process is identified, and the sum of the product of the set quantity information associated with the appraisal criteria registration date and time information and the work completion date and time information in Figure 10 indicating the date in December, which is the current month, and a coefficient based on the aforementioned identified accounting ratio information is identified as the implementation quantity standard output for the current month.

[0135] Fig. 11 is an explanatory diagram of the process. In Fig. 11, on the right side of an arithmetic expression such as "This month (December) =...", an arithmetic expression or explanation showing the basis of the numerical value is written in "()".

[0136] <Example> Here, for example, by referring to the assessment criteria related information in FIG. 3, the calculation ratio information associated with the "door and window frame" identified in the first process is identified as "50", indicating 50%.

[0137] Next, in Figure 10, the work completion date and time information for Room 401 is "2022 / 12 / 15" and "2" is stored as the set quantity information, so the calculation of "2 (Room 401) x 50%" in "Current month (December) = 2 (2 (Room 401) x 50% + 2 (Room 404) x 50%)" in Figure 11 is performed.

[0138] In addition, "2 (Room 401)" indicates "2", which is the set quantity information for Room 401, and "50%" indicates the calculation result of "100% - 50% as the accounting ratio information associated with the "door and window frame"". In other words, it indicates the proportion of the amount of work corresponding to the intermediate stage or later within the entire work of the "door and window frame" (in other words, the proportion of the amount of work for the second process out of the first and second processes mentioned above).

[0139] Next, in FIG. 10, the work completion date and time information for Room 404 is also "2022 / 12 / 15", and "2" is stored as the set quantity information, so the calculation of "2(Room 404) x 50%)" in "Current month (December) = 2(2(Room 401) x 50% + 2(Room 404) x 50%)" in FIG. 11 is performed. Note that the meaning of this calculation is the same as in the case of Room 401.

[0140] Then, these calculation results (multiplication results) are added up, and the result of "2 x 0.5 (50%) + 2 x 0.5 (50%)" is determined to be "2", which is the standard volume of executed quantities for the current month.

[0141] =Third step (previous month's execution quantity base volume)= In the third step, the implementation quantity standard output for the previous month (November) is identified by focusing on the assessment standard registration date and time information and the work completion date and time information in the work-related information in Fig. 10. Note that the specific processing contents are the same as in the second step, so only the outline will be explained (the same applies to the fourth step described later).

[0142] By referring to the appraisal standard related information in Figure 3, the accounting ratio information associated with the work name information indicating the target work identified in the first process is identified, and the sum of the multiplication results of the set quantity information associated with the appraisal standard registration date and time information and the work completion date and time information in Figure 10 indicating a date in November, which is the previous month, and a coefficient based on the identified accounting ratio information is identified as the implementation quantity standard output for the previous month.

[0143] <Example> Here, for example, by referring to the assessment criteria related information in FIG. 3, the calculation ratio information associated with the "door and window frame" identified in the first process is identified as "50", indicating 50%.

[0144] Next, in Figure 10, the appraisal standard registration date and time information for Room 401 is "2022 / 11 / 12", and "2" is stored as the set quantity information, so the calculation of "2 (Room 401) x 50%" in "Previous month (November) = 2.5 (2 (Room 401) x 50% + 1 (Room 402) x 50% + 2 (Room 404) x 50%)" in Figure 11 is performed.

[0145] In addition, "2 (Room 401)" indicates "2", which is the set quantity information for Room 401, and "50%" indicates "50%" as the accounting ratio information associated with the "door and window frame". In other words, it indicates the proportion of the amount of work corresponding to the intermediate stage within the entire work of the "door and window frame" (in other words, the proportion of the amount of work for the first process out of the first and second processes mentioned above).

[0146] Next, in Fig. 10, the work completion date and time information for Room 402 and Room 404 is also "2022 / 11 / 12", and "1" and "2" are stored as the set quantity information, so the calculations of "1 (Room 402) x 50%" and "2 (Room 404) x 50%" in Fig. 11 are performed. Note that the meaning of this calculation is the same as in the case of Room 401.

[0147] Then, these calculation results (multiplication results) are added up, and the result of "2 x 0.5 (50%) + 1 x 0.5 (50%) + 2 x 0.5 (50%)" (2.5) is identified as the implementation quantity standard volume for the previous month.

[0148] = 4th step (Base volume of implementation quantity from the month before last) = In a fourth step, the implementation quantity standard output from the month before last (before October) is identified by focusing on the assessment standard registration date and time information and the task completion date and time information in the task-related information in FIG.

[0149] By referring to the appraisal standard related information in Figure 3, the accounting ratio information associated with the work name information indicating the target work identified in the first process is identified, and the sum of the multiplication results of the set quantity information associated with the appraisal standard registration date and time information and the work completion date and time information in Figure 10 indicating a date before October (including October), which is two months before last, and a coefficient based on the aforementioned identified accounting ratio information is identified as the implementation quantity standard output for the period before last month or earlier.

[0150] <Example> Here, for example, by referring to the assessment criteria related information in FIG. 3, the calculation ratio information associated with the "door and window frame" identified in the first process is identified as "50", indicating 50%.

[0151] Next, in Figure 10, the appraisal standard registration date and time information and work completion date and time information for Room 301 are "2022 / 9 / 8" and "2022 / 10 / 12", and "1" is stored as the set quantity information, so the calculation of "1 (Room 301) x 100%" is performed in "Before last month (October) = 4 (1 (Room 301) x 100% + 1 (Room 302) x 100% + 1 (Room 303) x 100% + 1 (Room 304) x 100%)" in Figure 11.

[0152] Note that "1 (Room 301)" indicates "1", which is the set quantity information for Room 301, and "100%" is the sum of "50%" as the accounting percentage information associated with the "door and window frame" (i.e., the percentage of the amount of work for the first step of the first and second steps mentioned above) and "100% - 50% as the accounting percentage information associated with the "door and window frame" (i.e., the percentage of the amount of work for the second step of the first and second steps mentioned above), which indicates that all of the work for the "door and window frame" has been completed.

[0153] Next, in FIG. 10, the same calculation as for room 301 is performed for rooms 302 to 304.

[0154] Then, the results of these calculations (multiplication results) are added up, and the result of "1 x 1 (100%) + 1 x 1 (100%) + 1 x 1 (100%) + 1 x 1 (100%)" is calculated as "4", which is the standard volume of execution quantities from the month before last.

[0155] =5th step (Overall display graph information)= In the fifth step, based on the processing results of the first to fourth steps, the overall display graph information 520 in Fig. 9 is generated. Note that, for the unexecuted display portion 524, the difference between the total of the planned execution quantities identified in the first step and each execution quantity standard output identified in the second to fourth steps is calculated, and the graph information is generated based on the calculated difference.

[0156] ==Third Process== In the third process, the control unit 23 of the server device 2 displays a quantity database output display screen based on the information specified or generated in the second process. Specifically, although it is arbitrary, for example, the execution quantity base output of the previous month specified in the third step of the second process, the execution quantity base output of the current month specified in the second step of the second process, the total of each output specified in the second step to the fourth step of the second process, and the overall display graph information 520 generated in the fifth step of the second process are displayed in the "previous month", "current month", "cumulative" and "total output" columns in the information display column 52 of Fig. 8, and the control unit 23 displays the quantity base output display screen on the display 13 of the terminal device 1 by generating screen information for displaying the quantity base output display screen and transmitting it to the terminal device 1. Here, for example, the quantity base output display screen of Fig. 8 is displayed.

[0157] ===Terminology explanation=== In the second to fourth steps of the second process described above, processing is performed based on the assessment standard registration date and time information and work completion date and time information in Fig. 10, but the assessment standard registration date and time information is information determined according to the assessment standard information as described above with reference to Fig. 2, and the work completion date and time information is information determined according to the work status information as described above with reference to Fig. 2, so each of the above steps can be interpreted as processing being performed based on the assessment standard information and work status information acquired by the acquisition means. Other processes that use the assessment standard registration date and time information and the work completion date and time information can be interpreted in a similar manner.

[0158] ===Variations=== In addition, in the above-mentioned second process, the process is described as being based on the work management information in Fig. 10, but it is not limited to this, and may be configured to be processed based on the input history information in Fig. 4, for example (the number of rooms-based output display process described later may be configured similarly). This concludes the description of the quantity-based output display process.

[0159] (Processing - Room number based production volume display processing) Next, the number of rooms based output display process will be described. The number of rooms based output display process is a management process related to the management of the output of the target work, for example, a process of displaying a room based output display screen. Figure 12 is a display example of the room based output display screen.

[0160] ===Room-based production volume display screen=== The "room-based progress display screen" is a screen that displays the progress for the entire building under construction, and more specifically, it is a screen that displays the progress based on the number of rooms performed, which is the progress of the target work (work with quantity settings and work without quantity settings) based on the number of rooms in which the target work is performed, and as shown in Figure 12, for example, it has a cooperating company selection column 61 and an information display column 62.

[0161] ==Partner company selection section== The cooperating company selection field 61 in Figure 12 is a field that allows a user (e.g., an employee of the prime contractor) to select a cooperating company for which information regarding the completed volume is to be displayed, and is configured in the same manner as the cooperating company selection field 51 in Figure 8.

[0162] ==Information display field== The information display field 62 in FIG. 12 is a field that displays information related to the amount of work completed, and has a field for "job name," a field for "previous month," a field for "current month," a field for "cumulative," and a field for "total amount completed."

[0163] The "Work name" field is a field that displays work name information indicating the target work (more specifically, work for which a quantity is set and work for which a quantity is not set) that the cooperating company selected in the cooperating company selection field 61 is to carry out.

[0164] The "Previous Month" column, the "Current Month" column, and the "Cumulative Total" column are the same as the columns of the same names in FIG.

[0165] The "total volume" field is a field where total display graph information 620 is displayed. Fig. 13 is an explanatory diagram of total display graph information. Total display graph information 620 is the same as the information of the same name in Fig. 8, and as shown in Fig. 13, for example, has a display portion before the previous month 621, a display portion of the previous month 622, a display portion of the current month 623, and an unexecuted display portion 624. Each of these portions is the same as each portion of the same name in Fig. 9.

[0166] ===Processing=== The number-of-rooms-based volume of work display process will be described by taking as an example a case where the volume of work performed by "Company A" is displayed. That is, for example, after performing the process based on the following premise, the first process to the third process are performed.

[0167] == Prerequisites == In the premise process, immediately after starting the number-of-rooms-based output display process, the control unit 23 of the server device 2 refers to the cooperating company information of the work-related information in Fig. 2, generates screen information for displaying the number-of-rooms-based output display screen of Fig. 12 that displays only the cooperating company selection field 51 (a screen without the information display field 62), transmits this screen information to the terminal device 1 of the user (e.g., an employee of the prime contractor, etc.), and displays the number-of-rooms-based output display screen on the terminal device 1. On the other hand, when the user taps to select "Company A" in the cooperating company selection field 61 as the cooperating company for which the user wants to check the output, the terminal device 1 transmits the cooperating company information indicating "Company A" to the server device 2, and the server device 2 receives and acquires "Company A", which is the transmitted cooperating company information.

[0168] ==First Process== In the first process, the control unit 23 of the server device 2 refers to the cooperating company information in the work management information of Figure 2, etc., to identify work name information associated with the cooperating company information acquired in the previous process, and identifies the target work indicated by the identified work name information as the target work for which the completed amount is to be displayed.

[0169] Here, for example, "Company A" is obtained in the premise processing, and since "door and window framing" and "UB·Kitchen" are associated with "Company A" in the work-related information in Figure 2, the "door and window framing" and "UB·Kitchen" are identified as the target work for which the completed amount is to be displayed.

[0170] ==Second Process== In the second process, the control unit 23 of the server device 2 identifies or generates information on the amount of work completed in the information display field 62 in Fig. 12 for the target work identified in the first process, based on the work-related information in Fig. 2. For example, the following first to fifth steps are executed. Note that, here, the process related to "door and window frame" is exemplified and will be described using the work management information in Fig. 10.

[0171] =1st step (total number of rooms where work is done)= In the first step, the total number of rooms in which the work will be performed is identified by referring to the room name information associated with the work name information indicating the target work identified in the first process in the work-related information in Fig. 10. Here, for example, since there are a total of eight rooms indicated by room name information in Fig. 10 in which "work name information = fitting frame" is "◯", including rooms 401 to 404 and rooms 301 to 304, the total number of rooms in which the work will be performed is identified as "8".

[0172] = Second step (Number of rooms implemented in this month) = In the second step, in the work-related information of Figure 10, focusing on the assessment standard registration date and time information and the work completion date and time information, the completed room number standard volume for the current month (December to which the current date and time, December 30, 2022, belongs) is identified.

[0173] Specifically, for example, similar to the quantity-based output display processing described above, processing is performed based on the appraisal criteria registration date and time information and work completion date and time information in FIG. 10, and the accounting ratio information of the appraisal criteria-related information in FIG.

[0174] In detail, by referring to the assessment criteria related information in Fig. 3, the calculation ratio information associated with the work name information indicating the target work identified in the first process is identified, the total value of the multiplication results of "1", indicating the number of rooms indicated by the room name information associated with the information indicating the date in December, which is the current month, as the assessment criteria registration date and time information and the work completion date and time information in Fig. 10, and a coefficient based on the above-mentioned identified calculation ratio information is calculated, and the calculated total value is divided by the total number of rooms where the work is performed (i.e., "total value of multiplication results ÷ total number of rooms where the work is performed"), and the calculation result is identified as the number of rooms performed standard output for the current month. Note that here, unlike the case of the quantity-based output display process, set quantity information is not used.

[0175] Fig. 14 is an explanatory diagram of the process. In Fig. 14, on the right side of an arithmetic expression such as "This month (December) =...", an arithmetic expression or explanation showing the basis of the numerical value is written in "()".

[0176] <Example> Here, for example, by referring to the assessment criteria related information in FIG. 3, the calculation ratio information associated with the "door and window frame" identified in the first process is identified as "50", indicating 50%.

[0177] Next, in Figure 10, the work completion date and time information for Room 401 is "2022 / 12 / 15", so the calculation of "1 (Room 401) x 50%" in "Current month (December) = 1 (1 (Room 401) x 50% + 1 (Room 404) x 50%) / 8" in Figure 14 is performed.

[0178] Note that "1 (Room 401)" indicates "1", which is the number of rooms in Room 401, and "50%" indicates the result of the calculation of "100% - 50% as the accounting ratio information associated with the "door and window frame"". In other words, it indicates the proportion of the amount of work corresponding to the intermediate stage or later within the entire work of the "door and window frame" (in other words, the proportion of the amount of work for the second process out of the first and second processes mentioned above).

[0179] Next, in FIG. 10, the work completion date and time information for Room 404 is also "2022 / 12 / 15", so the calculation of "1(Room 404) x 50%" in "1(Room 401) x 50%" in "Current month (December) = 1(1(Room 401) x 50% + 1(Room 404) x 50%) / 8" in FIG. 14 is performed. Note that the meaning of this calculation is the same as in the case of Room 401.

[0180] Then, these calculation results (multiplication results) are added up, and the result of "1 x 0.5 (50%) + 1 x 0.5 (50%)" is divided by "8", which is the total number of rooms in which the work identified in the first step will be performed, to determine the result of "0.13 (i.e., 13%)" as the standard output by number of rooms performed for the current month.

[0181] =Third step (Number of rooms completed in the previous month)= In the third step, the number of rooms performed standard output in the previous month (November) is identified by focusing on the assessment standard registration date and time information and the work completion date and time information in the work-related information in Fig. 10. Note that the specific processing content is the same as in the second step, so only the outline will be explained (the same applies to the fourth step described later).

[0182] By referring to the assessment criteria related information in Figure 3, the accounting ratio information associated with the work name information indicating the target work identified in the first process is identified, and the total value of the multiplication results of ``1'', which indicates the number of rooms indicated by the room name information associated with the assessment criteria registration date and time information and the work completion date and time information in Figure 10 indicating the date in November of the previous month, and a coefficient based on the identified accounting ratio information is calculated, and the calculated total value is divided by the total number of rooms where the work is performed, and the calculation result is identified as the standard output based on the number of rooms performed for the previous month.

[0183] <Example> Here, for example, by referring to the assessment criteria related information in FIG. 3, the calculation ratio information associated with the "door and window frame" identified in the first process is identified as "50", indicating 50%.

[0184] Next, in Figure 10, the appraisal standard registration date and time information for Room 401 is "2022 / 11 / 12", so the calculation of "1 (Room 401) x 50%" in "Previous month (November) = 1.5 (1 (Room 401) x 50% + 1 (Room 402) x 50% + 1 (Room 404) x 50%) / 8" in Figure 14 is performed.

[0185] Note that "1 (Room 401)" indicates "1", which is the number of rooms in Room 401, and "50%" indicates "50%" as the accounting ratio information associated with the "door and window frame". In other words, it indicates the proportion of the amount of work corresponding to the intermediate stage within the entire work of the "door and window frame" (in other words, the proportion of the amount of work for the first process out of the first and second processes mentioned above).

[0186] Next, in FIG. 10, the work completion date and time information for Room 402 and Room 404 is also "2022 / 11 / 12", so the calculations of "1 (Room 402) x 50%" and "1 (Room 404) x 50%" in FIG. 14 are performed. Note that the meaning of this calculation is the same as in the case of Room 401.

[0187] Then, these calculation results (multiplication results) are added up, and the result of "1 x 0.5 (50%) + 1 x 0.5 (50%) + 1 x 0.5 (50%)" (1.5) is divided by "8", which is the total number of rooms in which the work identified in the first step will be performed, to determine the result as "0.19 (i.e., 19%)", which is the standard output by number of rooms performed in the previous month.

[0188] = 4th step (Number of rooms completed in the month before last) = In a fourth step, the room number standard output for the month before last or before (before October) is identified by focusing on the assessment standard registration date and time information and the task completion date and time information in the task-related information in FIG.

[0189] By referring to the appraisal criteria-related information in Figure 3, the accounting ratio information associated with the work name information indicating the target work identified in the first process is identified, and the sum of the multiplication results of the set quantity information associated with the appraisal criteria registration date and time information and the work completion date and time information in Figure 10 indicating a date before October (including October), which is two months ago or earlier, and a coefficient based on the identified appraisal ratio information is calculated, and the calculated sum is divided by the total number of rooms where the work is performed, and the calculation result is identified as the standard output by number of rooms performed for the month before last or earlier.

[0190] <Example> Here, for example, by referring to the assessment criteria related information in FIG. 3, the calculation ratio information associated with the "door and window frame" identified in the first process is identified as "50", indicating 50%.

[0191] Next, in Figure 10, the appraisal standard registration date and time information and work completion date and time information for Room 301 are "2022 / 9 / 8" and "2022 / 10 / 12", so the calculation of "1 (Room 301) x 100%" in "Before last month (October) = 4 (1 (Room 301) x 100% + 1 (Room 302) x 100% + 1 (Room 303) x 100% + 1 (Room 304) x 100%) / 8" in Figure 14 is performed.

[0192] Note that "1 (Room 301)" indicates "1", which is the number of rooms in Room 301, and "100%" is the sum of "50%" as the accounting percentage information associated with the "door and window frame" (i.e., the percentage of the amount of work for the first step out of the first and second steps mentioned above) and "100% - 50% as the accounting percentage information associated with the "door and window frame" (i.e., the percentage of the amount of work for the second step out of the first and second steps mentioned above), which indicates that all of the work for the "door and window frame" has been completed.

[0193] Next, in FIG. 10, the same calculation as for room 301 is performed for rooms 302 to 304.

[0194] Then, these calculation results (multiplication results) are added up, and the result of "1 x 1 (100%) + 1 x 1 (100%) + 1 x 1 (100%) + 1 x 1 (100%)" (4) is divided by "8", which is the total number of rooms in which the work identified in the first step will be performed, and the result "0.5 (i.e., 50%)" is determined to be the standard volume of work performed by the number of rooms in the month before last or earlier.

[0195] =5th step (Overall display graph information)= In the fifth step, based on the processing results of the second to fourth steps, the overall display graph information 620 in Fig. 13 is generated. Note that the unexecuted display portion 624 is generated by calculating "0.18" (18%), which is the difference between "1 (i.e., 100%)" and the total of the standard output amounts for the number of rooms executed identified in the second to fourth steps ("0.13" (13%) + "0.19" (19%) + "0.5" (50%)), and based on the calculated difference.

[0196] ==Third Process== In the third process, the control unit 23 of the server device 2 displays a number-of-rooms database output display screen based on the information specified or generated in the second process. Specifically, although it is arbitrary, for example, the number-of-rooms-based output of the previous month specified in the third step of the second process, the number-of-rooms-based output of the current month specified in the second step of the second process, the total of each output specified in the second to fourth steps of the second process, and the overall display graph information 620 generated in the fifth step of the second process are displayed in the "previous month", "current month", "cumulative" and "total output" columns in the information display field 62 of FIG. 12. The number-of-rooms-based output display screen is displayed on the display 13 of the terminal device 1 by generating screen information for displaying the number-of-rooms-based output display screen. Here, for example, the number-of-rooms-based output display screen of FIG. 12 is displayed. This concludes the explanation of the number-of-rooms-based output display process.

[0197] (Processing - Output Processing) Next, the output processing of the amount of production will be described. The output processing of the amount of production is, for example, processing for outputting the detailed information related to the amount of production. Fig. 15 is an example of the display of the detailed information related to the amount of production.

[0198] ===Detailed Volume Information=== "Output-related detailed information" is information indicating details of output relating to a specific target task, and as shown in Figure 15, for example, includes task-specific information 71, setting summary information 72, period summary information 73, and period detailed information 74.

[0199] ==Work etc. specific information== The work etc. specific information 71 in Figure 15 is information that identifies the target work etc. for which information is displayed, and includes, for example, information indicating the cooperating company in charge of carrying out the target work ("Cooperating Company: Company A" in Figure 15) and information indicating the target work ("Work: Door and window frame" in Figure 15).

[0200] ==Settings Summary Information== The setting summary information 72 in Figure 15 is information that indicates an overview of the information that is set for the target work for which information is to be displayed, and includes, for example, information that indicates candidate assessment criteria information ("Assessment criteria name: Delivery completed" in Figure 15), information that indicates the accounting ratio information ("Accounting ratio (%): 50" in Figure 15), information that indicates the number of rooms in which the target work will be carried out ("Number of rooms / parts in construction scope: 8" in Figure 15), and information that indicates the total quantity planned to be carried out ("Construction scope quantity: 10" in Figure 15).

[0201] ==Period Overview== The period summary information 73 in Figure 15 is information that provides an overview of the period for which information is displayed, and includes, for example, information indicating the specified period for which information is displayed ("Aggregation period: 2022 / 12 / 1 to 2022 / 12 / 31" in Figure 15), information indicating the number of rooms in which assessment criteria information or work status information of Figure 2 or Figure 4 is stored within the specified period (i.e., for example, within the period from 2022 / 12 / 1 to 2022 / 12 / 31) ("Number of assessment criteria registered rooms / parts: 2" in Figure 15), information indicating the number of rooms in which "work completed" is stored as work status information of Figure 2 or Figure 4 within the specified period ("Number of work completed rooms / parts: 1" in Figure 15), and information indicating the number of rooms in which "remaining damaged" is stored as work status information of Figure 2 or Figure 4 within the specified period ("Number of rooms / parts left damaged: 1" in Figure 15).

[0202] ==Period Overview== The period detail information 74 in Figure 15 is information that displays details about the target work when a specified period is taken into consideration, and is table information in which, for example, the following columns are mutually associated, as shown in Figure 15: "Floor name", "Room / part", "Set quantity", "Period volume", "Cumulative volume", "Assessment criteria", "Assessment criteria registration date / time", "Work status", and "Work completion date / time".

[0203] The information in the "Floor Name" column is information indicating floor name information (e.g., "4F" in FIG. 15). The information in the "Room / Part" column is information indicating room name information (e.g., "401" in FIG. 15). The information in the "Set Quantity" column is information indicating "Set Quantity Information" (e.g., "2" in FIG. 15).

[0204] The information in the "Period Amount Completed" column indicates the amount of work performed within a specified period. Any information can be used as the information in the "Period Amount Completed" column, but for example, information based on the allocation ratio information in FIG. 3 is used. In detail, information indicating that neither the first nor the second process of the target work has been performed within the specified period (for example, "0" indicating 0%), information indicating that only the first or second process of the target work has been performed within the specified period and only one of them has been completed (that is, completed to an intermediate stage, or completed from an intermediate stage to the end) (for example, in the case of "door and window frame", "50" is stored as the allocation ratio information in FIG. 3, so both are "50" indicating 50%), and information indicating that both the first and second processes of the target work have been performed and completed within the specified period (for example, "100" indicating 100%) are used.

[0205] The information in the "cumulative volume" column indicates the cumulative amount of work that has been done up to now. Any information can be used as the information in the "cumulative volume" column, but for example, information based on the allocation ratio information in FIG. 3 is used. In detail, information indicating that neither the first nor second process of the target work has been done up to now (for example, "0" indicating 0%), information indicating that only the first process of the target work has been completed up to now (for example, in the case of "door and window frame", "50" is stored as the allocation ratio information in FIG. 3, so "50" indicating 50%), and information indicating that both the first and second processes of the target work have been completed up to now (for example, "100" indicating 100%) are used.

[0206] The information in the "Assessment Criteria" column is information that indicates the assessment criteria information (e.g., "Delivery completed" in Figure 15). The information in the "Assessment Criteria Registration Date and Time" column is information that indicates the assessment criteria registration date and time information (e.g., "2022 / 11 / 12 0900" in Figure 15). The information in the "Work Status" column is information that indicates work status information (e.g., "Work completed" in Figure 15). The information in the "Work Completion Date and Time" column is information that indicates work completion date and time information (e.g., "2022 / 12 / 15 1000" in Figure 15).

[0207] ===Processing=== The output process will be described by taking as an example a case where detailed information related to the progress of the work of "framework" which is the target work carried out by "Company A". That is, for example, after the following premise processing is carried out, the first to fifth processings are carried out.

[0208] == Prerequisites == In the premise process, when a user (for example, an employee of a prime contractor, etc.) inputs "Company A" and "door and window frame" as information indicating a cooperating company and target work for which the progress-related detailed information is to be displayed via his / her own terminal device 1, the terminal device 1 transmits the input "Company A" and "door and window frame" to the server device 2. Meanwhile, the server device 2 receives the "Company A" and "door and window frame" and starts the progress output process. In addition, here, for example, a case where the specified period is "2022 / 12 / 1 to 2022 / 12 / 31" corresponding to the current month will be described as an example, but the specified period may be configured to use any period specified by the user, or may be configured to use a predetermined period (for example, the current month, etc.).

[0209] ==First Process== In the first process, the control unit 23 of the server device 2 acquires "Company A" and "door and window frame" received when the output process is started (i.e., "prerequisite process"), and generates work etc. specific information 71 of Figure 15 based on the acquired "Company A" and "door and window frame".

[0210] ==Second Process== In the second process, the control unit 23 of the server device 2 identifies the candidate appraisal criteria information and accounting ratio information associated with the ``door and window frame'' received when the output process is started based on the appraisal criteria-related information of Figure 3, and also identifies the number of rooms in which the ``door and window frame'' will be performed and the total planned performance quantity related to the ``door and window frame'' based on the work-related information of Figure 10, and generates setting summary information 72 based on the identification results.

[0211] ==Third Process== In the third process, the control unit 23 of the server device 2 generates "aggregation period: 2022 / 12 / 1 to 2022 / 12 / 31" in the period summary information 73 of FIG. 15 based on "2022 / 12 / 1 to 2022 / 12 / 31", which is the predetermined period (period of the current month).

[0212] In addition, in the work management information of Figures 2 and 10, the appraisal standard registration date and time information and work completion date and time information associated with the "door and window frame" are referenced to identify the number of rooms in which dates and times included in "2022 / 12 / 1-2022 / 12 / 31" are stored, and based on the identification results, "Number of appraisal standard registered rooms / parts: 2" in the period summary information 73 of Figure 15 is generated.

[0213] In addition, in the work management information of Figures 2 and 10, by referring to the work status information and work completion date and time information associated with the "door and window frame," the number of rooms in which "work completed" is stored as the work status information and the number of rooms in which "remaining to be done" is stored as the work status information are identified for rooms in which a date and time included in "2022 / 12 / 1-2022 / 12 / 31" is stored as the work completion date and time information, and based on the identification results, "Number of rooms / parts where work has been completed: 1" and "Number of rooms / parts where work has been left to be done: 1" are generated in the period overview information 73 of Figure 15.

[0214] ==Fourth Process== In the fourth process, the control unit 23 of the server device 2 identifies information related to the "door and window frame" in the work-related information of Figs. 2 and 10, and generates information for each field of the period detail information 74 based on the identification results.

[0215] In addition, with regard to the information in the "Periodic Volume" column in detail, in the work-related information of Figures 2 and 10, if neither the assessment standard registration date and time information nor the work completion date and time information indicates a date and time within the specified period (i.e., within the period from "2022 / 12 / 1 to 2022 / 12 / 31"), "0" is specified, if only one of the aforementioned date and time information indicates a date and time within the specified period, "50" is specified, and if both of the aforementioned date and time information indicate a date and time within the specified period, "100" is specified. Then, based on this determination result, the information in the "Periodic Volume" column is generated.

[0216] In addition, in detail, for the information in the "cumulative volume" column, if "not registered" is stored as the assessment standard information in Fig. 2, "0" is specified, if "delivery completed" is stored as the assessment standard information in Fig. 2 and "not started" or "work started" (i.e., information other than "work completed" and "not left for damage") is stored as the work status information, "50" is specified, and if "work completed" and "not left for damage" are stored as the work status information in Fig. 2, "100" is specified. Then, based on this specification result, information in the "cumulative volume" column is generated.

[0217] As for the information in the other columns, the respective information in FIG. 15 is generated by carrying out the processes corresponding to the above definitions.

[0218] == Fifth Process == In the fifth process, the control unit 23 of the server device 2 transmits the detailed performance-related information of Fig. 15 generated in the first to fourth processes to the terminal device 1 and outputs it by displaying it on the display 13. The data format of the detailed performance-related information is arbitrary, and for example, a format corresponding to so-called CSV data separated by commas may be adopted, or another format may be adopted. This concludes the explanation of the performance output process.

[0219] (Effects of this embodiment) According to this embodiment, the volume of work completed for the target work is managed based on progress status information, and the progress status information includes intermediate progress information indicating the progress up to the intermediate stage before the target work is completed. Therefore, for example, the volume of work completed can be managed taking into account the progress up to the intermediate stage before the target work is completed, thereby enabling more precise management of the volume of work completed for the target work.

[0220] [III] Modifications to the embodiment Although the embodiments of the present invention have been described above, the specific configurations and means of the present invention can be modified and improved as desired within the scope of the technical ideas of each invention described in the claims.

[0221] (Detailed information on volume) In the above embodiment, the case has been described in which the information in the "cumulative volume" field of the period detailed information 74 in the volume-related detailed information of Fig. 15 indicates the cumulative volume of work performed up to the present, but this is not limiting. For example, the processing contents described in the embodiment may be modified as appropriate so that the information in the "cumulative volume" field indicates the cumulative volume of work performed up to the last day of a specified period.

[0222] (About assessment criteria information) In the above embodiment, the assessment criteria information is input and stored via the progress registration screen of Fig. 6, but the present invention is not limited to this. Fig. 16 shows an example of another progress registration screen. The "other progress registration screen" is a screen for inputting and storing assessment criteria information, and is, for example, a screen displayed on the display 13 of the terminal device 1.

[0223] For example, the user may tap an input field corresponding to each room (such as a rectangular field labeled "Delivery Completed" below "401" in FIG. 16) via the touchpad 12, so that "Delivery Completed" is input to the server device 2. By using this other progress registration screen, it becomes possible to input assessment criteria information for multiple rooms at once on one screen and transmit it to the server device 2.

[0224] (Regarding warnings regarding walking distance) In addition, in the above embodiment, the acquisition means may be configured to acquire, in addition to the progress status information, labor information indicating the labor involved in the target work, and the management means may be configured to identify the labor-per-unit of the target work based on the progress status information and labor information acquired by the acquisition means, and to output an alert regarding the identified labor-per-unit based on predetermined criteria, as the management process.

[0225] FIG. 17 is a diagram illustrating an example of input history information, FIG. 18 is an example of a progress registration screen, FIG. 19 is an example of a first progress display screen, and FIG. 20 is an example of a second progress display screen.

[0226] The input history information in Fig. 17 is the input history information in Fig. 4 to which labor information (on the right side of Fig. 17) has been added. "Labor information" is information indicating so-called labor, and is measured in man-days. "Unit rate" is information that quantifies information related to the effort or efficiency of work, and in this embodiment, a case will be described in which the calculation result of "quantity of work performed" ÷ "labor force performing that quantity of work" is used as the unit rate.

[0227] The progress registration screen of FIG. 18 is obtained by adding an artificial input field 46 for inputting artificial information to the progress registration screen of FIG.

[0228] The "first unit-rate display screen" in Figure 19 is a screen that displays information about the unit-rate for each room for a specific target task; in the example of Figure 19, for example, it is shown that the unit-rate for Room 401 is "AA locations / man-day" ("AA" is a convenient notation, and in reality it will show different numerical values), and it also shows that the unit-rates for Rooms 404 and 304 are highlighted and an alarm is displayed.

[0229] The "second rate display screen" in Figure 20 is a screen that displays the change over time in the rate of a specific room for a specific target task, and in the example of Figure 20, for example, a warning image G1 is displayed to warn that the rate has fallen below the lower limit of a preset standard range.

[0230] The specific processing is basically the same as that explained in the embodiment, but the specific processing relating to the yield will be mainly explained.

[0231] In the information storage process described in the embodiment, when the user inputs "3" in the artificial input field 46 of FIG. 18 in addition to each piece of information of "number" = "1" in FIG. 7 via the touch pad 12 and performs a predetermined operation, the terminal device 1 transmits each piece of input information to the server device 2. Meanwhile, the control unit 23 of the server device 2 receives and acquires the information transmitted from the terminal device 1, and stores "artificial information" = "3" in FIG. 17, etc., based on the acquired information. Also, after this, when the user inputs "2" in the artificial input field 46 of FIG. 18 in addition to each piece of information of "number" = "2" in FIG. 7 and performs a predetermined operation, the "artificial information" = "2" in FIG. 17, etc. are stored.

[0232] ===Processing for displaying the first step display screen=== Next, a process for displaying the first work rate display screen (FIG. 19) will be described. Here, a case where information on the work rate of the current month (that is, for example, December 2022) is displayed will be described.

[0233] ==First Process== In this process, first, in the first process, the user inputs "door and window frame" to the server device 2 via the terminal device 1 as information indicating the target work (quantity setting target work) for which the labor rate is to be displayed. Meanwhile, the control unit 23 of the server device 2 performs a process similar to the "second step (quantity standard work output for the current month)" of the "second process" in the "quantity-based work output display process" in the embodiment, thereby identifying the quantity standard work output for the current month in each room. For example, for room 401, as shown in FIG. 2, the work completion date and time information indicates the date and time of the current month, and the set quantity information is "2", so the calculation of "2 x 0.5 (i.e., 50%)" is performed, and the result of this calculation, "1", is identified as the quantity standard work output for the current month. Note that the meaning of "0.5 (i.e., 50%)" here has been explained in the embodiment, so the explanation here is omitted. In addition, the same process is performed for other rooms in which the work of "door and window frame" is set (similar to the second and third processes).

[0234] ==Second Process== Next, in the second process, the control unit 23 of the server device 2 refers to the labor information in the input history information of Fig. 17 and identifies the labor for the current month in each room related to the work of "door and window frame" (if there are multiple rooms, the total is used). Here, for example, the labor information for room 401, whose input date and time information is the date and time of the current month, is "3", so "3" is identified.

[0235] ==Third Process== Next, in the third process, the control unit 23 of the server device 2 performs a calculation for each room for the work of "door and window frames" corresponding to "quantity of work performed" divided by "manpower required to perform said quantity of work" based on the above-mentioned specified standard output of work performed and manpower, and specifies the calculation result as the labor rate for each room. Here, for example, for room 401, "0.33", which is the calculation result of "1 divided by 3", is specified as the labor rate.

[0236] ==Fourth Process== Next, in the fourth process, the control unit 23 of the server device 2 identifies, among the labor rates for each room identified above, those that deviate from a preset standard range (i.e., labor rates that exceed the upper limit of the standard range and labor rates that fall below the lower limit of the standard range).

[0237] == Fifth Process == Next, in the fifth process, the control unit 23 of the server device 2 generates screen information for displaying a first rate display screen on which the rate of each room specified in the third process is displayed and which highlights and warns of rate deviations from the standard range specified in the fourth process, and transmits the generated screen information to the terminal device 1, thereby displaying the first rate display screen of Fig. 19 on the display 13. Note that in Fig. 19, the rate of rooms 404 and 304 deviate from the standard range, and the information corresponding to these is highlighted and a warning is issued. This concludes the explanation of the process for displaying the first rate display screen.

[0238] ===Processing for displaying the second step display screen=== Next, a process for displaying the second rate display screen (FIG. 20) will be described. Here, a case where information on the rate for room 401 is displayed will be described.

[0239] ==First Process== In this process, first, in the first process, the user inputs "401" as room name information indicating the room for which the labor rate is to be displayed, and "door and window frame" as information indicating the target work (quantity setting target work) for which the labor rate is to be displayed, to the server device 2 via the terminal device 1. Meanwhile, the control unit 23 of the server device 2 performs a process similar to the first process in the "process for displaying the first labor rate display screen" to identify the standard output of the implemented quantity for each month (i.e., October, November, December, etc.) of room 401 indicated by "401".

[0240] ==Second Process== Next, in the second process, the control unit 23 of the server device 2 performs processes similar to the second and third processes of the "process for displaying the first labor-hour display screen" to identify the labor-hours for each month (i.e., October, November, December, etc.) of room 401.

[0241] ==Third Process== Next, in the third process, the control unit 23 of the server device 2 identifies, among the unit rates for each month identified above, those that deviate from the preset standard range (i.e., unit rates that exceed the upper limit of the standard range and unit rates that fall below the lower limit of the standard range).

[0242] ==Fourth Process== Next, in the fourth process, the control unit 23 of the server device 2 generates screen information for displaying a second rate display screen on which the rate for each month specified in the second process is displayed and a warning image G1 for highlighting and warning of a rate that deviates from the standard range specified in the third process is displayed, and transmits the information to the terminal device 1, thereby displaying the second rate display screen of Fig. 20 on the display 13. Note that in Fig. 20, information is displayed as a line graph connecting the rate for each month with a straight line, and a warning image G1 is displayed around the rate for each month that falls below the lower limit and deviates from the standard range to highlight the rate. This concludes the explanation of the process for displaying the second rate display screen.

[0243] (combination) Furthermore, the techniques described in the above embodiments and the techniques described in the modifications may be combined in any manner. [Explanation of symbols]

[0244] 1 Terminal equipment 2. Server equipment 11 Communications Department 12 Touchpad 13. Display 14 Recording section 15 Control section 21 Communications Department 22 Recording Section 23 Control Unit 31 Work name display field 32 Unit information input field 33. Input field for candidate information on assessment criteria 34 Input field for recording ratio information 41 Floor name information input field 42 Room name information input field 43 Work name information input field 44 Work status information input field 45 Assessment criteria information input field 51 Partner company selection section 52 Information display column 61 Partner company selection field 62 Information display field 71 Specific information such as work etc. 72 Configuration Summary Information 73 Period Overview Information 74 Period Details 100 Management Systems 221 Work management information DB 222 Assessment criteria related information DB 223 Input History Information DB 520 Overall display graph information 521 Display part from two months ago 522 Previous month display part 523 Current month display part 524 Unimplemented display part 620 Overall display graph information 621 Display part from two months ago 622 Previous month display part 623 Current month display part 624 Unimplemented display part G1 Warning Image

Claims

1. A management system for managing the volume of work to be performed, An acquisition means for acquiring progress status information indicating the progress of the target work; a management means for performing management processing related to management of the amount of work of the target work based on the progress status information acquired by the acquisition means, The progress status information includes intermediate progress information indicating progress up to an intermediate stage before the target work is completed. Management system.

2. The intermediate progress information indicates information indicating a criterion regarding the progress of the target work at the intermediate stage and information indicating a degree of progress of the target work at the intermediate stage. The management system according to claim 1 .

3. The target work is performed at a plurality of work locations in a building; the acquiring means acquires information indicating a progress of the target work at each of the plurality of work locations as the progress status information; The management means performs the management process on a per-workplace basis. The management system according to claim 1 .

4. The target work is performed by a predetermined work organization, The acquisition means acquires information indicating a progress of the target work performed by the work responsible organization as the progress status information; The management means performs the management process on a work organization basis. The management system according to claim 1 .

5. The target work includes at least a quantity setting target work, the planned execution quantity information of which indicates a planned execution quantity related to the target work, is stored in the management system, The management means performs, as the management process, a process of identifying an implementation quantity standard output, which is the output of the quantity setting target work based on the implementation quantity of the quantity setting target work, based on the progress state information acquired by the acquisition means and the planned implementation quantity information stored in the management system. The management system according to claim 1 .

6. The target work is scheduled to be performed in one or more rooms among a plurality of rooms in a building; the acquisition means acquires information indicating a progress of the target work in each of the one or more rooms as the progress status information; The management means performs a process of identifying a room number based throughput, which is a throughput of the target work based on the number of rooms in which the target work is performed, as the management process. The management system according to claim 1 .

7. The management means performs at least a process of outputting the amount of work completed for the target work during a predetermined period as the management process. The management system according to claim 1 .

8. The acquisition means acquires, in addition to the progress state information, effort information indicating effort related to the target work, The management means performs, as the management process, a process of identifying a unit rate of the target work based on the progress status information and the labor information acquired by the acquisition means, and outputting a warning regarding the identified unit rate based on a predetermined criterion. The management system according to claim 1 .

9. A management program for managing the output of a target task, Computer, An acquisition means for acquiring progress status information indicating the progress of the target work; a management means for performing management processing related to management of the amount of work of the target work based on the progress status information acquired by the acquisition means, The progress status information includes intermediate progress information indicating progress up to an intermediate stage before the target work is completed. Management program.