Control device, communication node, and method thereof

The control device and method address the challenge of resource reservation in sparse NTNs by tentatively reserving NTN paths and combining them with TN resources, ensuring efficient end-to-end communication.

JP2024167548APending Publication Date: 2024-12-04NEC CORP

Patent Information

Application Number
JP2023083698
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-22
Publication Date
2024-12-04

AI Technical Summary

Technical Problem

Existing resource reservation techniques struggle to reserve resources for an end-to-end path through non-terrestrial networks (NTNs) due to sparse and localized satellite constellations, leading to difficulties in ensuring availability of necessary communication resources.

Method used

A control device and method that facilitate resource reservation by sending a request for NTN and terrestrial network (TN) paths without waiting for immediate availability, establishing links, and coupling partial paths with previously reserved resources.

Benefits of technology

Enables efficient reservation of end-to-end resources by tentatively completing NTN reservations and combining them with TN resources, ensuring seamless communication paths.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024167548000001_ABST
    Figure 2024167548000001_ABST
Patent Text Reader

Abstract

To facilitating reservation of resources for a path from a first communication node to a second communication node that passes through a non-terrestrial network (NTN) and a terrestrial network (TN).SOLUTION: A control device (7) receives a request to reserve resources in an NTN (4) for a path (100) from a first node (1) to a second node (2) via a TN (3) and the TN (4). In response to the request, the control device (7) transmits a response indicating acceptance of the resource reservation without waiting for resources of a first partial path in the NTN (4) to be actually reserved for the path (100). After one or more links in the NTN (4) are established and the resources of the first partial path are reserved, the control device (7) performs control to couple the first partial path to a second partial path for which the resources have previously been reserved in the TN (3).SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to communication networks, and more particularly to resource reservation for paths through multiple networks, including non-terrestrial networks. [Background technology]

[0002] A non-terrestrial network (NTN) is a network or network segments that utilizes airborne and space-borne vehicles or platforms, each of which may have transparent or regenerative repeaters, relay nodes, or base stations. More specifically, NTNs may use communications satellites, High Altitude Platform Stations (HAPS), unmanned aerial vehicles, or manned aerial vehicles, or any combination of these. Communications satellites include Geostationary Earth Orbit (GEO) satellites or Non-Geostationary Orbit (NGSO) satellites, or both. GEO satellites orbit the Earth in a geostationary orbit 35,786 km above the equator. NGSO satellites include Low-Earth orbit (LEO) satellites and Medium-Earth Orbit (MEO) satellites. LEO satellites generally orbit closer to Earth, at altitudes between 500 km and 2,000 km. MEO satellites typically orbit at altitudes between 5,000 km and 20,000 km.

[0003] In this specification, the term terrestrial network (TN) is used to distinguish it from NTN. A TN is a network, or a segment of a network, located on the surface of the Earth. A TN can be a wired network or a wireless network, or a combination of both.

[0004] Patent Document 1 discloses a mobile communication system that uses a communication line or resource (e.g., frequency band) allocated by a Demand Assigned Multiple Access (DAMA) satellite communication system. Specifically, in Patent Document 1, a management station of the mobile communication system requests a control station of the DAMA satellite communication system to allocate one or more reserved lines or resources. A reservation request transmitted from a management node includes a description indicating a communication start time and an end time. In response to receiving the reservation request, the control station of the DAMA satellite communication system allocates one or more reserved lines or resources to the mobile communication system. The management station of the mobile communication system allocates resources in the allocated reserved satellite communication resource (e.g., frequency band) to a communication line for mobile communication. The management station transmits a line setting command to a radio base station and a mobile station in the mobile communication system. Based on the line setting command, the base station and the mobile station set up a line. Thereafter, when the communication start time arrives, the control station of the DAMA satellite communication system transmits a start notification to the management station of the mobile communication system instructing the start of communication of the reserved line. Based on the start notification, the management station instructs the base station to start communication, and the base station then transmits a communication start signal to the mobile station over a communication line via a communication satellite. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2011-130498 A Summary of the Invention [Problem to be solved by the invention]

[0006] Communication nodes in an NTN include mobile airborne and space vehicles as well as terrestrial or satellite gateways or hubs located on the Earth's surface. In addition, the constellations formed by communication nodes in an NTN (e.g., satellite constellations or HAPS constellations) may be sparse and localized. Due to this characteristic, an NTN may not always be able to provide the resources necessary for communication between two communication nodes in the NTN. This may lead to difficulties in reserving resources for an end-to-end path from a first communication node to a second communication node via the NTN and the TN. Specifically, common resource reservation techniques or protocols assume a network including multiple communication nodes with links established between each other. In other words, common resource reservation techniques or protocols aim to reserve network resources that are already available at the time the reservation is made. Thus, if an NTN is included in the end-to-end path for which resource reservation is attempted, the resource reservation for the end-to-end path may fail due to, for example, the unavailability of resources in the NTN at the time the reservation is attempted.

[0007] As described above, in Patent Document 1, the management station of the mobile communication system sends a reservation request indicating the communication start time and end time to the control station of the DAMA communication system, and receives allocation of resources (e.g., frequency band) from the DAMA communication system. Then, the management station of the mobile communication system uses the allocated resources for an access line (i.e., NTN access) between a base station and a mobile station in the mobile communication system during a period defined by the communication start time and end time. However, this technology disclosed in Patent Document 1 does not provide a solution to the problem that it is difficult to reserve resources for an end-to-end path from a first communication node to a second communication node via an NTN and a TN.

[0008] One of the objectives of the embodiments disclosed herein is to provide an apparatus, method, and program that facilitates reserving resources for an end-to-end path from a first communication node to a second communication node via an NTN and a TN. It should be noted that this objective is only one of the objectives of the embodiments disclosed herein. Other objectives or problems and novel features will become apparent from the description of this specification or the accompanying drawings. [Means for solving the problem]

[0009] In a first aspect, a control device is configured to receive a request for resource reservation in a NTN for a path from a first node to a second node through the TN and NTN from the first node, the second node, a communication node belonging to the path, a management node in the NTN, or another controller associated with the TN. In response to the request, the control device is configured to send a response indicating grant of resource reservation without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved. The control device is configured to establish one or more links in the non-terrestrial network and reserve resources of the first partial path. Furthermore, the control device is configured to control combining the first partial path in the non-terrestrial network with a second partial path in the terrestrial network whose resources have been previously reserved.

[0010] In a second aspect, a method performed by a controller includes the steps of: (a) receiving a request for resource reservation in an NTN for a path through the TN and NTN from the first node to a second node, from the first node, the second node, a communication node belonging to the path, a management node in the NTN, or another controller associated with the TN; (b) in response to the request, transmitting a response indicating grant of resource reservation without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; (c) establishing one or more links in the non-terrestrial network and reserving resources for the first partial path; and (d) controlling the combining of the first partial path in the non-terrestrial network with a second partial path in the terrestrial network, the resources of which have been previously reserved;

[0011] In a third aspect, a communication node is configured to send a request for resource reservation for a path from the communication node to another node or from the other node to the communication node via a TN and an NTN to any node belonging to the path, a first controller associated with the TN, or a second controller associated with the NTN. The communication node is configured to receive a response indicating acceptance of the resource reservation, which is returned without waiting for resources of a first partial path in the NTN for the path to actually be reserved. After receiving the response, the communication node is configured to receive a notification indicating that resource reservation of the first partial path or the path has actually been completed or that the first partial path or the path is available.

[0012] In a fourth aspect, a method performed by a communication node comprises the following steps: (a) sending a request for resource reservation for a path from the communication node to another node or from the other node to the communication node via a TN and an NTN to any node belonging to the path, a first controller associated with the TN, or a second controller associated with the NTN; (b) receiving a response indicating acceptance of the resource reservation, returned without waiting for resources of a first partial path within the NTN for the path to actually be reserved; and (c) after receiving the response, receiving a notification indicating that resource reservation for the first partial path or the path has actually been completed or that the first partial path or the path is available for use.

[0013] In a fifth aspect, the control device is configured to receive a request for resource reservation in the NTN for a path from a first node to a second node through the TN and the NTN from the first node, the second node, a communication node belonging to the path, a management node in the NTN, or another controller associated with the TN. In response to the request, the control device is configured to send a response indicating grant of resource reservation without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved. Furthermore, the control device is configured to send a notification to the first node, the second node, the communication node, the management node, the other controller, or any communication node in the non-terrestrial network, or any combination thereof, after resources of the first partial path are actually reserved. The notification indicates that resource reservation of the first partial path has actually been completed or that the first partial path is available.

[0014] In a sixth aspect, a method performed by a controller includes the steps of: (a) receiving a request for resource reservation in an NTN for a path through the TN and NTN from the first node to a second node, from the first node, the second node, a communication node belonging to the path, a management node in the NTN, or another controller associated with the TN; (b) in response to the request, transmitting a response indicating grant of resource reservation without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; and (c) after resources of the first partial path have actually been reserved, sending a notification to the first node, the second node, the communication node, the management node, the other controller, or any communication node in the non-terrestrial network, or any combination thereof, wherein the notification indicates that resource reservation for the first partial path has actually been completed or that the first partial path is available.

[0015] In a seventh aspect, a program comprises a set of instructions (software code) which, when loaded into a computer, causes the computer to carry out a method according to the second, fourth or sixth aspect above. Effect of the Invention

[0016] According to the above-described aspects, an apparatus, method, and program can be provided that facilitate reserving resources for an end-to-end path from a first communication node to a second communication node via an NTN and a TN. [Brief description of the drawings]

[0017] [Figure 1] FIG. 1 illustrates an example configuration of a communications network or system according to one or more embodiments. [Diagram 2] FIG. 1 illustrates an example configuration of a communications network or system according to one or more embodiments. [Diagram 3] FIG. 1 illustrates an example configuration of a communications network or system according to one or more embodiments. [Figure 4] 6 is a flow chart illustrating an example of the operation of a controller according to one or more embodiments. [Diagram 5] 6 is a flow chart illustrating an example of the operation of a controller according to one or more embodiments. [Figure 6] 1 is a flow chart illustrating an example of operation of a communication node according to one or more embodiments. [Figure 7]FIG. 1 illustrates an example of a resource reservation procedure according to one or more embodiments. [Figure 8] FIG. 1 illustrates an example of a resource reservation procedure according to one or more embodiments. [Figure 9] FIG. 1 illustrates an example of a resource reservation procedure according to one or more embodiments. [Figure 10] FIG. 1 is a sequence diagram illustrating an example of a resource reservation procedure according to one or more embodiments. [Figure 11] FIG. 1 is a sequence diagram illustrating an example of a resource reservation procedure according to one or more embodiments. [Figure 12] FIG. 1 is a sequence diagram illustrating an example of a resource reservation procedure according to one or more embodiments. [Figure 13] FIG. 2 is a block diagram illustrating an example configuration of a controller according to one or more embodiments. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0018] In the following, specific embodiments will be described in detail with reference to the drawings. In each drawing, the same or corresponding elements are denoted by the same reference numerals, and duplicated descriptions will be omitted as necessary for clarity of explanation.

[0019] The multiple embodiments described below can be implemented independently or in appropriate combination. These multiple embodiments have different novel features. Therefore, these multiple embodiments contribute to solving different objects or problems and provide different effects.

[0020] As used herein, depending on the context, "if" may be interpreted to mean "when," "at or around the time," "after," "upon," "in response to determining," "in accordance with a determination," or "in response to detecting." These expressions may be interpreted to have the same meaning, depending on the context.

[0021] First, the configuration and operation of a plurality of elements common to a plurality of embodiments will be described. FIG. 1 shows an example of the configuration of a communication network or system. In the example of FIG. 1, the communication network or system includes an end node 1, an end node 2, a terrestrial network (TN) 3, a non-terrestrial network (NTN) 4, a TN 5, and a controller 7. The communication network or system may include one or both of controllers 6 and 8. Each element (network function) shown in FIG. 1 can be implemented, for example, as a network element on dedicated hardware, as a software instance running on dedicated hardware, or as a virtualized function instantiated on an application platform.

[0022] End node 1 communicates with end node 2 via an end-to-end path 100 passing through TN3, NTN4, and TN5. Depending on a specific implementation or use case, end node 1 may be called a source node or an ingress node. Similarly, end node 2 may be called a destination node or an egress node. Note that in the example of FIG. 1, the end-to-end path 100 is a unidirectional path from end node 1 to end node 2, but this is only an example. The end-to-end path 100 may be a bidirectional path that allows bidirectional communication between end node 1 and end node 2. In other words, the end-to-end path 100 may be a combination of a unidirectional path from end node 1 to end node 2 and a unidirectional path in the opposite direction from end node 2 to end node 1. These two paths in the opposite direction may take different routes from each other.

[0023] TN3 includes a boundary node 31 and a boundary node 33. The boundary node 31 provides a link or interface to an end node 1. The boundary node 33 provides a link or interface to an NTN4 (boundary node 41). TN3 may or may not include one or more intermediate nodes 32. The boundary node 31 and the boundary node 33 are communicatively connected directly or via one or more intermediate nodes 32. Each of the links or interfaces connecting adjacent communication nodes within TN3 and between TN3 and NTN4 may be a wired link or a wireless link. The network topology of TN3 is not particularly limited. In one example, each of the communication nodes 31 to 33 in TN3 may be a switch, a router, or a label switching node. Additionally or alternatively, the communication nodes 31 to 33 in the TN3 may include cellular access nodes, i.e., base stations (e.g., Long-Term Evolution (LTE) base stations or 5G New Radio (NR) base stations) and wireless terminals (e.g., LTE or 5G NR User Equipments (UEs). The communication nodes 31 to 33 in the TN3 may include core network nodes of a cellular communication system (e.g., Serving Gateways (SGW), Packet Data Network Gateway (PGW), or User Plane Function (UPF)).

[0024] The controller 6 may be used to manage the nodes in the TN3. The controller 6 may control resource reservation in the TN3. Additionally or alternatively, resource reservation in the TN3 may be performed by exchanging control packets between the boundary node 31, the boundary node 33, and one or more intermediate nodes 32. In this case, the controller 6 may not be used. The resource reservation may be a route reservation of a path between the boundary node 31 and the boundary node 33. The route reservation may include a reservation of computing and memory resources of communication nodes on the path. Additionally or alternatively, the resource reservation may be a reservation of a Quality of Service (QoS) guaranteed path between the boundary node 31 and the boundary node 33. The guaranteed QoS may be, for example, bandwidth, bit rate, latency (or end-to-end delay), jitter, or packet loss rate, or any combination thereof. The controller 6 may include one or more computer systems.

[0025] NTN4 includes boundary node 41 and boundary node 43. Boundary node 41 provides a link or interface to TN3 (boundary node 33). Boundary node 43 provides a link or interface to TN5 (boundary node 51). NTN4 may or may not include one or more intermediate nodes 42. Boundary node 41 and boundary node 43 are communicatively connected directly or via one or more intermediate nodes 42. Each of the links or interfaces connecting adjacent communication nodes within NTN4, between NTN4 and TN3, and between NTN4 and TN5 may be a wired link or a wireless link.

[0026] Specifically, each communication node in the NTN4 may be an airborne vehicle or platform carrying a transparent or regenerative repeater, a relay node, or a base station, or a space-borne vehicle or platform. More specifically, the NTN4 may use a communication satellite, a HAPS, an unmanned aerial vehicle, or a manned aerial vehicle, or any combination thereof. The communication satellite may include a GEO satellite, a MEO satellite, or a LEO satellite, or any combination thereof. In addition, the NTN4 may include two or more nodes (e.g., NTN gateways) located on the ground or near the earth's surface, and these nodes may provide wired links or interfaces. The network topology of the NTN4 is not particularly limited.

[0027] The controller 7 is used to manage the nodes in the NTN 4. The controller 7 controls resource reservation in the NTN 4. Furthermore, the resource reservation in the NTN 4 may be performed by exchanging control packets between the boundary node 41, the boundary node 43, and one or more intermediate nodes 42. The resource reservation may be a route reservation of a path between the boundary node 41 and the boundary node 43. The route reservation may include a reservation of computing and memory resources of communication nodes on the path. Additionally or alternatively, the resource reservation may be a reservation of a QoS-guaranteed path between the boundary node 41 and the boundary node 43. The guaranteed QoS may be, for example, bandwidth, bit rate, latency (or end-to-end delay), jitter, or packet loss rate, or any combination thereof. The controller 7 may include one or more computer systems. In some implementations, the controller 7 may manage or obtain movement information or flight path information of airborne or spacecraft in the NTN 4 and predict a future constellation based on the information. Alternatively, the controller 7 may receive the future constellation from another controller or system. The controller 7 may then decide whether to accept or reject a resource reservation for a future time point based on the future constellation.

[0028] TN5 includes a boundary node 51 and a boundary node 53. The boundary node 51 provides a link or interface to the NTN4 (boundary node 43). The boundary node 53 provides a link or interface to the end node 2. TN5 may or may not include one or more intermediate nodes 52. The boundary node 51 and the boundary node 53 are communicatively connected directly or via one or more intermediate nodes 52. Each of the links or interfaces connecting adjacent communication nodes within TN5 and between TN5 and NTN4 may be a wired link or a wireless link. The network topology of TN5 is not particularly limited.

[0029] The controller 8 may be used to manage the nodes in the TN5. The controller 8 may be combined or integrated with the controller 6 for the TN3. The controller 8 may control resource reservation in the TN5. Additionally or alternatively, resource reservation in the TN5 may be performed by exchanging control packets between the boundary node 51, the boundary node 53, and one or more intermediate nodes 52. In this case, the controller 8 may not be used. The resource reservation may be a route reservation of a path between the boundary node 51 and the boundary node 53. The route reservation may include a reservation of computing and memory resources of communication nodes on the path. Additionally or alternatively, the resource reservation may be a reservation of a QoS-guaranteed path between the boundary node 51 and the boundary node 53. The guaranteed QoS may be, for example, bandwidth, bit rate, latency (or end-to-end delay), jitter, or packet loss rate, or any combination thereof. The controller 8 may include one or more computer systems.

[0030] In the configuration example of Fig. 1, the end node 1 may be a node belonging to TN3. In this case, the boundary node 31 may not exist or may simply be called a communication node or an intermediate node. Similarly, the end node 2 may be a node belonging to TN5. In this case, the boundary node 53 may not exist or may simply be called a communication node or an intermediate node.

[0031] FIG. 2 shows another example of the configuration of a communication network or system. Compared with FIG. 1, TN5 is omitted in FIG. 2. End node 1 communicates with end node 2 via an end-to-end path 100 via TN3 and NTN4. Border node 43 of NTN4 provides a link or interface to end node 2. The configuration, function, and operation of each element shown in FIG. 2 are similar to those described for the corresponding element with respect to FIG. 1. In the configuration example of FIG. 2, end node 1 may be a node belonging to TN3. In this case, border node 31 may not exist or may simply be called a communication node or an intermediate node. Similarly, end node 2 may be a node belonging to NTN4. In this case, border node 43 may not exist or may simply be called a communication node or an intermediate node.

[0032] FIG. 3 shows another example of the configuration of a communication network or system. Compared with FIG. 1, TN3 is omitted in FIG. 3. End node 1 communicates with end node 2 via an end-to-end path 100 via NTN4 and TN5. Border node 41 of NTN4 provides a link or interface to end node 1. The configuration, function, and operation of each element shown in FIG. 3 are similar to those described for the corresponding element with respect to FIG. 1. In the configuration example of FIG. 3, end node 1 may be a node belonging to NTN4. In this case, border node 41 may not exist or may simply be called a communication node or an intermediate node. Similarly, end node 2 may be a node belonging to TN5. In this case, border node 53 may not exist or may simply be called a communication node or an intermediate node.

[0033] As described above, in the communication network or system shown in FIG. 1 to FIG. 3, each communication node in the NTN 4 may be a mobile airborne and space vehicle or platform. In addition, a constellation (e.g., a satellite constellation or a HAPS constellation) formed by multiple communication nodes in the NTN 4 may be sparse and localized. Due to this characteristic, the NTN 4 may not always be able to provide a communication path between the boundary node 41 and the boundary node 43 in the NTN 4, or the resources required for the communication path. The following embodiment provides a resource reservation method or procedure for the end-to-end path 100 that takes into account this characteristic of the NTN 4. In other words, the following embodiment provides an improvement for facilitating reserving resources for the end-to-end path 100 from end node 1 to end node 2 via the NTN 4 and one or more TNs (e.g., TNs 3 and 5).

[0034] <First embodiment> A configuration example of the wireless communication system according to the present embodiment may be the same as any of the configuration examples described with reference to Figs. 1 to 3. Fig. 4 shows an example of the operation of the controller 7 associated with the NTN 4. In step 401, the controller 7 receives a request for resource reservation in the NTN 4 for the end-to-end path 100 passing through the TN (e.g., one or both of TN3 and TN5) and the NTN 4 from the end node 1 to the end node 2. Specifically, the controller 7 receives the request from the end node 1, the end node 2, any communication node (e.g., the boundary node 41 or 43) belonging to the end-to-end path 100, the management node in the NTN 4, or the controller 6 or 8 associated with the TN 3 or 5.

[0035] The request in step 401 may include a deadline requirement indicating by when the resources for the end-to-end path 100 need to be reserved. The deadline requirement may indicate a future time or period by which the end-to-end path 100 is required. The controller 7 may decide whether to grant the request based on the deadline requirement. If the resources for the partial path in the NTN 4 are ready by the time or period required in the deadline requirement, the controller 7 may grant the request. Otherwise, the controller 7 may reject the request.

[0036] The request of step 401 may include other requirements regarding the end-to-end path 100. For example, the request may indicate route information for the end-to-end path 100. The route information may explicitly indicate identifiers or addresses of one or more communication nodes included in the route of the end-to-end path 100. The request may also indicate QoS requirements (e.g., required throughput and / or latency) for the end-to-end path 100. The controller 7 may decide whether to grant the request based further on these other requirements.

[0037] In step 402, the controller 7 responds to the request of step 401 by sending a response indicating grant of the resource reservation without waiting for the resources of the first partial path in the NTN 4 for the end-to-end path 100 to actually be reserved. In the configuration example described with reference to Figures 1 to 3, the first partial path corresponds to the path from the boundary node 41 to the boundary node 43, either directly or via one or more intermediate nodes 42. The controller 7 may send the response of step 402 to the sender of the request of step 401.

[0038] The response of step 402 may indicate that the resource reservation in the NTN 4 for the end-to-end path 100 has been granted but is not yet complete. The response may cause a provisional completion of the resource reservation for the end-to-end path 100.

[0039] More specifically, in the configuration example shown in FIG. 1 and FIG. 2, the response of step 402 may cause the completion of the resource reservation of the second partial path in TN3 between end node 1 and NTN4. Specifically, the controller 6 associated with TN3 may complete the resource reservation in TN3 in response to receiving the response of step 402 from the controller 7. The controller 6 may then inform the end node 1 of the provisional completion of the resource reservation of the end-to-end path 100 directly or via another node (e.g., the boundary node 31). Alternatively, the boundary node 33 in TN3 may receive a response packet based on the response of step 402 from the NTN4 (e.g., the boundary node 41 or another management node) and forward the response packet toward the end node 1. The response packet may inform the end node 1 of the provisional completion of the resource reservation of the end-to-end path 100.

[0040] In the example configuration shown in FIG. 3, the controller 7 may send the response of step 402 to the end node 1 via the border node 41 or other management node in the NTN 4.

[0041] In the configuration example shown in FIG. 1 and FIG. 3, before or after step 402, or in parallel with step 402, the controller 7 may operate as follows to support resource reservation in the TN5 for the end-to-end path 100. The controller 7 may send a request for resource reservation of the second partial path in the TN5 to a node in the TN5 (e.g., the boundary node 51) or the controller 8 associated with the TN5, directly or via a node in the NTN4 (e.g., the boundary node 43 or another management node). The controller 7 may then receive a response indicating completion of the resource reservation in the TN5. On condition that the controller 7 receives the response indicating completion of the resource reservation in the TN5, the controller 7 may send the response of step 402, for example a response indicating tentative completion of the resource reservation of the first partial path in the NTN4.

[0042] Returning to FIG. 4, in step 403, the controller 7 establishes one or more links in the NTN 4 and actually reserves resources of the first partial path in the NTN 4. Step 403 may be initiated after step 402 or in parallel with step 402. The controller 7 may establish one or more links in the NTN 4 and reserve resources of the first partial path in the NTN 4 to meet the required deadline requirement of the end-to-end path 100. The controller 7 may ask one or more control nodes in the NTN 4 to establish one or more links in the NTN 4. The controller 7 may ask one or more control nodes in the NTN 4 to reserve resources in the established one or more links in the NTN 4.

[0043] In step 404, the controller 7 controls the combining of the first partial path in NTN 4 with one or two second partial paths whose resources have been previously reserved in one or both of TNs 3 and 5. In other words, the controller 7 completes the entire resource reservation of the end-to-end path 100 by combining the first partial path and the second partial path.

[0044] Specifically, the controller 7 may instruct one or more nodes (e.g., the boundary nodes 41 and 43, or one or more other management nodes) in the NTN 4 to perform a route switch to combine the first partial path with the second partial path. Additionally or alternatively, the controller 7 may instruct one or more communication nodes belonging to the end-to-end path 100, directly or via any node in the NTN 4, to perform a route switch to combine the first partial path with the second partial path. The one or more communication nodes belonging to the end-to-end path 100 may be the end node 1, the end node 2, the boundary node 43, or the boundary node 51, or any combination thereof. Additionally or alternatively, the controller 7 may instruct one or both of the controllers 6 and 8 associated with the TNs 3 and 5 to perform a route switch to combine the first partial path with the second partial path.

[0045] The controller 7 may send a notification indicating that the resource reservation for the first partial path is indeed completed or that the first partial path is available. This notification may be sent to the end node 1, the end node 2, the communication nodes belonging to the end-to-end path, the management node in the NTN 4, the controller 6, or the controller 8, or any combination of these, directly or via any node in the NTN 4. This notification may trigger a path switch in a node in the TN3, or in a node in the TN5, or both, to combine the second partial path with the first partial path.

[0046] According to the operation described with reference to FIG. 4, the controller 7 provisionally completes resource reservation in the NTN 4 for the end-to-end path 100 passing through one or both of TNs 3 and 5 and the NTN 4. Then, the controller 7 establishes one or more links in the NTN 4 and actually reserves resources for a first partial path in the NTN 4. Then, the controller 7 controls to combine the first partial path in the NTN 4 with one or two second partial paths whose resources have been previously reserved in one or both of TNs 3 and 5. Such an operation of the controller 7 contributes to facilitating the reservation of resources for the end-to-end path 100 from the end node 1 to the end node 2 passing through the NTN 4 and one or more TNs (e.g., TNs 3 and 5).

[0047] <Second embodiment> A configuration example of the wireless communication system according to the present embodiment may be the same as any of the configuration examples described with reference to Figs. 1 to 3. Fig. 5 shows another example of the operation of the controller 7 associated with the NTN 4. Step 501 is the same as step 401 in Fig. 4. That is, in step 501, the controller 7 receives a request for resource reservation in the NTN 4 for the end-to-end path 100 passing through the TN (e.g., one or both of TN3 and TN5) and the NTN 4 from the end node 1 to the end node 2. Specifically, the controller 7 receives the request from the end node 1, the end node 2, any communication node (e.g., the boundary node 41 or 43) belonging to the end-to-end path 100, the management node in the NTN 4, or the controller 6 or 8 associated with the TN 3 or 5.

[0048] The request in step 501 may include a deadline requirement indicating by when the resources of the end-to-end path 100 need to be reserved. The deadline requirement may indicate a future time or period by which the end-to-end path 100 is required. The controller 7 may decide whether to grant the request based on the deadline requirement. If the resources of the partial path in the NTN 4 are ready by the time or period required in the deadline requirement, the controller 7 may grant the request. Otherwise, the controller 7 may reject the request.

[0049] The request of step 501 may include other requirements regarding the end-to-end path 100. For example, the request may indicate route information for the end-to-end path 100. The route information may explicitly indicate identifiers or addresses of one or more communication nodes included in the route of the end-to-end path 100. The request may also indicate QoS requirements (e.g., required throughput and / or latency) for the end-to-end path 100. The controller 7 may decide whether to grant the request based further on these other requirements.

[0050] Step 502 is identical to step 401 of Fig. 4. That is, in step 502, in response to the request of step 501, the controller 7 sends a response indicating the grant of the resource reservation without waiting for the resources of the first partial path in the NTN 4 for the end-to-end path 100 to actually be reserved. In the configuration example described with reference to Figs. 1 to 3, the first partial path corresponds to the path from the boundary node 41 to the boundary node 43, either directly or via one or more intermediate nodes 42. The controller 7 may send the response of step 502 to the sender of the request of step 401.

[0051] The response of step 502 may indicate that the resource reservation in the NTN 4 for the end-to-end path 100 has been granted but is not yet complete. The response may cause a provisional completion of the resource reservation for the end-to-end path 100.

[0052] More specifically, in the configuration example shown in FIG. 1 and FIG. 2, the response of step 502 may cause the completion of the resource reservation of the second partial path in TN3 between end node 1 and NTN4. Specifically, the controller 6 associated with TN3 may complete the resource reservation in TN3 in response to receiving the response of step 502 from the controller 7. The controller 6 may then inform the end node 1 of the provisional completion of the resource reservation of the end-to-end path 100 directly or via another node (e.g., the boundary node 31). Alternatively, the boundary node 33 in TN3 may receive a response packet based on the response of step 502 from the NTN4 (e.g., the boundary node 41 or another management node) and forward the response packet toward the end node 1. The response packet may inform the end node 1 of the provisional completion of the resource reservation of the end-to-end path 100.

[0053] In the example configuration shown in FIG. 3, the controller 7 may send the response of step 502 to the end node 1 via the border node 41 or other management node in the NTN 4.

[0054] In the configuration example shown in FIG. 1 and FIG. 3, before or after step 502, or in parallel with step 502, the controller 7 may operate as follows to support resource reservation in the TN5 for the end-to-end path 100. The controller 7 may send a request for resource reservation of the second partial path in the TN5 to a node in the TN5 (e.g., the boundary node 51) or to the controller 8 associated with the TN5, directly or via a node in the NTN4 (e.g., the boundary node 43 or another management node). The controller 7 may then receive a response indicating completion of the resource reservation in the TN5. On condition that the controller 7 receives the response indicating completion of the resource reservation in the TN5, the controller 7 may send the response of step 502, for example a response indicating tentative completion of the resource reservation of the first partial path in the NTN4.

[0055] Returning to Fig. 5, in step 503, the controller 7 sends a notification indicating that the resource reservation of the first partial path is actually completed or that the first partial path is available after the resources of the first partial path are actually reserved in the NTN 4. This notification may be sent to the end node 1, the end node 2, the communication nodes belonging to the end-to-end path, the management node in the NTN 4, the controller 6, or the controller 8, or any combination of these, directly or via any node in the NTN 4. This notification may cause a path switch to combine the second partial path with the first partial path in a node in the TN3, or in a node in the TN5, or in both.

[0056] According to the operations described with reference to Figure 5, the controller 7 provisionally completes the resource reservation in the NTN 4 for the end-to-end path 100 via one or both of TNs 3 and 5 and the NTN 4. The controller 7 then transmits a notification indicating that the resource reservation in the NTN 4 has actually been completed. Such operations of the controller 7 contribute to facilitating the reservation of resources for the end-to-end path 100 from end node 1 to end node 2 via the NTN 4 and one or more TNs (e.g., TNs 3 and 5).

[0057] <Third embodiment> A configuration example of the wireless communication system according to the present embodiment may be the same as any of the configuration examples described with reference to Figs. 1 to 3. Fig. 6 shows an example of an operation performed by the end node 1 or 2. In step 601, the end node 1 or 2 transmits a request for resource reservation for an end-to-end path 100 from the end node 1 to the end node 2 via a TN (e.g., one or both of TN3 and TN5) and an NTN4. Specifically, the end node 1 or 2 transmits the request to any communication node (e.g., boundary node 31 or 53) belonging to the end-to-end path 100, the controller 6 or 8 associated with the TN3 or 5, or the controller 7 associated with the NTN4.

[0058] The request in step 601 may include a deadline requirement indicating by when the resources for the end-to-end path 100 need to be reserved. The deadline requirement may indicate a time or period in the future by which the end-to-end path 100 is required. This deadline requirement may be used by the controller 7 of the NTN 4 to decide whether to grant or reject the request for resource reservation for a partial path in the NTN 4. If the resources for the partial path in the NTN 4 are ready by the time or period requested in the deadline requirement, the controller 7 may grant the request. Otherwise, the controller 7 may reject the request.

[0059] The request of step 601 may include other requirements regarding the end-to-end path 100. For example, the request may indicate route information of the end-to-end path 100. The route information may explicitly indicate identifiers or addresses of one or more communication nodes included in the route of the end-to-end path 100. The request may indicate QoS requirements (e.g., required throughput and / or latency) for the end-to-end path 100. The controller 7 associated with the NTN 4 may decide whether to grant the reservation request for resources in the NTN 4 based further on these other requirements.

[0060] In step 602, the end node 1 or 2 receives a response indicating acceptance of the resource reservation, which is returned without waiting for the resources of the first partial path in the NTN 4 for the end-to-end path 100 to be actually reserved. The end node 1 or 2 may receive the response from any communication node (e.g., the border node 31 or 53) belonging to the end-to-end path 100, the controller 6 or 8 associated with the TN 3 or 5, or the controller 7 associated with the NTN 4.

[0061] The response of step 602 may indicate that the resource reservation in NTN4 for the end-to-end path 100 has been granted but is not yet complete. The response may indicate tentative completion of the resource reservation for the end-to-end path 100. In response to receiving the response of step 602, end node 1 or 2 may recognize that resources for a second partial path in a TN (e.g., one or both of TN3 and TN5) of the end-to-end path 100 have indeed been successfully reserved and prepared, but resources for a first partial path in NTN4 have only been tentatively reserved and not yet actually prepared.

[0062] In step 603, after receiving the response of step 602, the end node 1 or 2 receives a notification indicating that the resource reservation of the first partial path or end-to-end path 100 in the NTN 4 has actually been completed or that the first partial path or end-to-end path 100 is available. The end node 1 or 2 may receive the notification from any communication node (e.g., boundary node 31 or 53) belonging to the end-to-end path 100, the controller 6 or 8 associated with the TN 3 or 5, or the controller 7 associated with the NTN 4. In response to receiving the notification, the end node 1 or 2 may recognize that the resources of the first partial path in the NTN 4 have actually been successfully reserved and prepared. In other words, in response to receiving the notification, the end node 1 or 2 may recognize that the resources of the entire end-to-end path 100 including the first partial path have actually been successfully reserved and prepared.

[0063] 6, end node 1 or 2, or both, may recognize that resource reservation in NTN 4 for end-to-end path 100 is provisionally completed and thereafter recognize that resource reservation in NTN 4 is actually completed. Such operation of end node 1 or 2, or both, may contribute to facilitating reserving resources for end-to-end path 100 from end node 1 to end node 2 via NTN 4 and one or more TNs (e.g., TNs 3 and 5).

[0064] <Fourth embodiment> The configuration example of the wireless communication system according to the present embodiment may be the same as any of the configuration examples described with reference to Figures 1 to 3. The following mainly uses the configuration example of Figure 1 to provide an example of a resource reservation procedure for an end-to-end path 100 from end node 1 to end node 2 via TNs (e.g., one or both of TN3 and TN5) and NTN4. However, this procedure can also be applied to the case where the configuration examples shown in Figures 2 and 3 are adopted.

[0065] Figures 7 to 9 show three phases for resource reservation for the end-to-end path 100. Figure 7 shows the provisional completion phase of resource reservation for the end-to-end path 100. Figure 8 shows the phases of link establishment and resource reservation in the NTN 4 for the end-to-end path 100. Figure 9 shows the route switching phase for completing the end-to-end path 100.

[0066] In the tentative completion phase of resource reservation, resource reservation for one or more intra-TN partial paths (called second partial paths) included in the end-to-end path 100 is completed first without waiting for the completion of resource reservation for a partial path (called a first partial path) within the NTN 4. Referring to Figure 7, resource reservation for two second partial paths, i.e., partial paths 761 and 762, is completed first.

[0067] In some implementations, the end node 1 sends a request 721 for resource reservation for the end-to-end path 100 to the boundary node 31 of the TN 3. The request 721 may include a deadline requirement indicating by when the resources for the end-to-end path 100 need to be reserved. The deadline requirement may indicate a future time or period of time for which the end-to-end path 100 is needed. The request 721 may include other requirements for the end-to-end path 100. For example, the request 721 may indicate route information for the end-to-end path 100. The route information may explicitly indicate identifiers or addresses of one or more communication nodes included in the route of the end-to-end path 100. The request 721 may indicate QoS requirements (e.g., one or both of a required throughput and latency) for the end-to-end path 100.

[0068] The request 721 or a control packet based on the request 721 is forwarded from the boundary node 31 to the boundary node 33. The boundary node 33 sends a request 722 for resource reservation for the end-to-end path 100 to the management node 701 of the NTN 4. The request 722 may include the information items included in the request 721. The management node 701 sends a request 723 for resource reservation for the end-to-end path 100 to the controller 7. The request 723 may include the information items included in the request 722.

[0069] In response to receiving the request 723, the controller 7 determines whether to grant or reject the request 723. The controller 7 may grant the request 723 if it can fulfill one or more requirements set forth in the request 723. For example, the controller 7 may grant the request 723 if the resources of the first partial path in the NTN 4 can be prepared by the time or period required by the deadline requirement contained in the request 723. Otherwise, the controller 7 may reject the request 723.

[0070] If the request 723 is granted, the controller 7 sends a response 724 to the management node 701 indicating the grant of the resource reservation without waiting for the resources of the first partial path in the NTN 4 for the end-to-end path 100 to be actually reserved. The response 724 may indicate that the resource reservation in the NTN 4 for the end-to-end path 100 has been granted but is not yet complete. The response may cause a provisional completion of the resource reservation of the end-to-end path 100.

[0071] The management node 701 sends a response 725 to the boundary node 33 in response to receiving the response 724. The response 725 may include the information items included in the response 724. The response 725 or a control packet based on the response 725 is forwarded from the boundary node 33 to the boundary node 31. The boundary node 31 sends a response 726 of the resource reservation for the end-to-end path 100 to the end node 1. The response 726 may include the information items included in the response 724. In particular, the response 726 may indicate that the resource reservation in the NTN 4 for the end-to-end path 100 has been granted but is not yet completed. The response 726 may indicate the provisional completion of the resource reservation for the end-to-end path 100. In response to receiving response 726, end node 1 may recognize that resources for the second partial paths 761 and 762 of the end-to-end path 100 have actually been successfully reserved and prepared, but that resources for the first partial path in NTN 4 have only been tentatively reserved and not yet actually prepared.

[0072] Before or after sending the response 724, or in parallel with sending the response 724, the controller 7 operates as follows to support resource reservation of the partial path 762 in the TN5. The controller 7 sends a request 741 for resource reservation of the partial path 762 to the management node 702 of the NTN4. The management node 702 may be identical to the management node 701. The request 741 may include the information item included in the request 723. In response to receiving the request 741, the management node 702 sends a request 742 to the boundary node 51. The request 742 may include the information item included in the request 741. The request 742 or a control packet based on the request 742 is forwarded from the boundary node 51 to the boundary node 53. The boundary node 53 sends a request 743 to the end node 2. The request 743 may include the information item included in the request 742. The end node 2 sends a response 744 to the boundary node 53. Response 744 or a control packet based on response 744 is forwarded from boundary node 53 to boundary node 51. Boundary node 51 sends response 745 to management node 702. Management node 702 sends response 746 to controller 7. Based on receipt of response 746, controller 7 may recognize that resource reservation for partial path 762 in TN5 has been successfully completed. Transmission of response 724 by controller 7 may occur in response to receipt of response 746.

[0073] Next, with reference to Fig. 8, a phase of link establishment and resource reservation in the NTN 4 for the end-to-end path 100 will be described. In this phase, the controller 7 establishes one or more links in the NTN 4 and actually reserves resources of the first partial path 840 in the NTN 4. In some implementations, the controller 7 exchanges control signals or messages 820 with the boundary node 41, one or more intermediate nodes 42, and the boundary node 43 in the NTN 4. By exchanging the control signals or messages 820, the controller 7 may instruct the communication nodes 41 to 43 to establish one or more links and actually reserve resources of the first partial path 840. The exchange of control signals or messages for link establishment may also take place between the communication nodes 41 to 43.

[0074] 9, a route switching phase for completing the end-to-end path 100 will be described. In this phase, the controller 7 controls the first partial path 840 in the NTN 4 to be combined with the two second partial paths 761 and 762 whose resources have been previously reserved in the TNs 3 and 5, thereby completing the establishment or creation of the end-to-end path 100. In other words, the controller 7 completes the entire resource reservation of the end-to-end path 100 by combining the first partial path 840 and the second partial paths 761 and 762.

[0075] In some implementations, the controller 7 exchanges control signals or messages 920 with the boundary nodes 41 and 43 and the management nodes 701 and 703. Specifically, the controller 7 may instruct the boundary node 41 to receive packets related to the end-to-end path 100 from the boundary node 33 of the TN3. The controller 7 may instruct the boundary node 43 to transmit packets related to the end-to-end path 100 to the boundary node 51 of the TN5. The controller 7 may request the management node 701 to send an instruction 921 to the boundary node 33 of the TN3 to switch the forwarding destination of packets related to the end-to-end path 100 to the boundary node 41. The controller 7 may request the management node 702 to send an instruction 922 to the boundary node 51 of the TN5 to switch the forwarding source of packets related to the end-to-end path 100 to the boundary node 43.

[0076] The resource reservation method or procedure described with reference to Figures 7 to 9 can be modified in various ways. For example, a controller 6 associated with TN3 and a controller 8 associated with TN5 may be used. In this case, the controller 7 may exchange control messages with the controller 6 instead of the signaling with the management node 701 shown in Figures 7 and 9. Similarly, the controller 7 may exchange control messages with the controller 8 instead of the signaling with the management node 702 shown in Figures 7 and 9.

[0077] Figure 10 shows an example of signalling of the tentative completion phase of resource reservation for the end-to-end path 100 described with reference to Figure 7. Steps 1001 to 1004 correspond to the sending of requests 721, 722 and 723 in Figure 7. Step 1005 decides whether to grant the request of NTN4 for resource reservation for the end-to-end path 100. Steps 1006 to 1009 correspond to the sending of responses 724, 725 and 726 in Figure 7. In step 1010, TN3 completes the resource reservation of the partial path 761 within TN3.

[0078] Steps 1021 to 1024 correspond to sending requests 741, 742, and 743 in Figure 7. Steps 1025 to 1028 correspond to sending responses 744, 745, and 746 in Figure 7. In step 1029, TN5 completes resource reservation for partial path 762 in TN5. Steps 1021 to 1028 may be performed before step 1005 or before step 1006.

[0079] Fig. 11 shows an example of signalling of the link establishment and resource reservation phases in the NTN 4 for the end-to-end path 100 described with reference to Fig. 8. In steps 1101 to 1104, the controller 7 instructs the communication nodes 41 to 43 to establish one or more links and to actually reserve resources of the first partial path 840. In steps 1105 to 1107, an exchange of control signals or messages for link establishment may take place between the communication nodes 41 to 43. In steps 1108 to 1111, the controller 7 receives responses from the communication nodes 41 to 43. These responses may indicate the completion of the link establishment and the completion of the resource reservation.

[0080] 12 shows an example of signaling of the route switching phase for completing the end-to-end path 100 described with reference to FIG. 9. In step 1201, the controller 7 instructs the boundary node 41 to receive packets related to the end-to-end path 100 from the boundary node 33 of the TN3. In step 1202, the controller 7 requests the management node 701 to instruct the boundary node 33 to switch the forwarding destination of packets related to the end-to-end path 100 to the boundary node 41. In step 1203, the management node 701 instructs the boundary node 33 to switch the forwarding destination of packets related to the end-to-end path 100 to the boundary node 41.

[0081] In step 1204, the boundary node 33 may send a notification to the boundary node 31, either directly or via one or more intermediate nodes 32. In step 1205, the boundary node 31 may forward the received notification to the end node 1. The notification may indicate that the resource reservation for the first partial path 840 or the end-to-end path 100 in the NTN 4 is indeed completed or that the first partial path 840 or the end-to-end path 100 is available.

[0082] In step 1221, the controller 7 instructs the boundary node 43 to transmit packets related to the end-to-end path 100 to the boundary node 51 of TN5. In step 1222, the controller 7 requests the management node 702 to instruct the boundary node 51 to switch the forwarding source of packets related to the end-to-end path 100 to the boundary node 43. In step 1223, the management node 702 instructs the boundary node 51 to switch the forwarding source of packets related to the end-to-end path 100 to the boundary node 43.

[0083] In step 1224, the boundary node 51 may send a notification to the boundary node 53, either directly or via one or more intermediate nodes 52. In step 1225, the boundary node 53 may forward the received notification to the end node 2. The notification may indicate that the resource reservation of the first partial path 840 or the end-to-end path 100 in the NTN 4 is indeed completed or that the first partial path 840 or the end-to-end path 100 is available.

[0084] In step 1230, resource reservation for the entire end-to-end path 100 is actually completed. In step 1204, end node 1 communicates with end node 2 via an end-to-end path via border nodes 31 and 33 in TN3, border nodes 41 and 43 in NTN4, and border nodes 51 and 53 in TN5.

[0085] The procedure or method described in this embodiment may facilitate reserving resources for an end-to-end path from a first communication node to a second communication node via an NTN and a TN.

[0086] Next, a configuration example of the controller 7 according to the above-mentioned embodiments will be described below. The controllers 6 and 8 may also have a configuration similar to that of the controller 8 described below. FIG. 13 is a block diagram showing a configuration example of the controller 7. In the example of FIG. 13, the controller 7 is implemented as a computer system. The computer system includes one or more processors 1310, a memory 1320, and a mass storage 1330, which communicate with each other via a bus 1370. The one or more processors 1310 may include, for example, a Central Processing Unit (CPU) or a Graphics Processing Unit (GPU), or both. The computer system may include other devices such as one or more output devices 1340, one or more input devices 1350, and one or more peripherals 1360. The one or more peripherals 1360 may include a modem, a network adapter, or any combination thereof.

[0087] One or both of the memory 1320 and the mass storage 1330 may include a computer readable medium having stored thereon one or more sets of instructions that may be located partially or completely in memory within the one or more processors 1310. These instructions, when executed in the one or more processors 1310, cause the one or more processors 1310 to provide the functionality of the controller 7 described in the embodiments above.

[0088] As described with reference to FIG. 13, one or more processors included in the controller 7 according to the above-described embodiment may execute one or more programs including instructions for making a computer execute the algorithm described with reference to the drawings. The programs include instructions (or software codes) for making a computer execute one or more functions described in the embodiment when the programs are loaded into a computer. The programs may be stored in a non-transitory computer-readable medium or a tangible storage medium. By way of example and not limitation, computer-readable medium or tangible storage medium may include random-access memory (RAM), read-only memory (ROM), flash memory, solid-state drive (SSD) or other memory technology, CD-ROM, digital versatile disk (DVD), Blu-ray (registered trademark) disk or other optical disk storage, magnetic cassette, magnetic tape, magnetic disk storage or other magnetic storage device. The programs may be transmitted on a transitory computer-readable medium or communication medium. By way of example and not limitation, the transitory computer-readable medium or communication medium may include electrical, optical, acoustic, or other forms of propagated signals.

[0089] The above-described embodiment is merely an example of the application of the technical idea obtained by the inventor of the present invention. In other words, the technical idea is not limited to the above-described embodiment, and various modifications are possible.

[0090] For example, some or all of the above embodiments may be described as, but are not limited to, the following supplementary notes.

[0091] (Appendix 1) means for receiving a request for resource reservation in a non-terrestrial network for a path from a first node to a second node via a terrestrial network and a non-terrestrial network from the first node, the second node, a communication node belonging to the path, a management node in the non-terrestrial network, or another controller associated with the terrestrial network; means for transmitting a response in response to the request, indicating a grant of resource reservation, without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; means for establishing one or more links in the non-terrestrial network and reserving resources for the first partial path; means for controlling the combining of the first partial path in the non-terrestrial network with a second partial path in the terrestrial network, the resources of which have been previously reserved; A control device comprising: (Appendix 2) the response indicating to the first node, the second node, the communication node, the management node, or the other controller that resource reservation in the non-terrestrial network for the path has been granted but not yet completed. 2. The control device according to claim 1. (Appendix 3) the terrestrial network includes a first terrestrial network between the first node and the non-terrestrial network; the response causes completion of resource reservation for the second partial path in the first terrestrial network. 3. The control device according to claim 1 or 2. (Appendix 4) the terrestrial network includes a second terrestrial network between the non-terrestrial network and the second node; The control device further comprises means for transmitting a request for resource reservation in the second terrestrial network to a node in the second terrestrial network or a controller associated with the second terrestrial network, directly or via a node in the non-terrestrial network. 4. The control device according to claim 1, wherein the control device is a (Appendix 5) the means for controlling is adapted to instruct one or more nodes in the non-terrestrial network to perform a path switch to combine the first partial path with the second partial path. 5. The control device according to any one of claims 1 to 4. (Appendix 6) the controlling means is adapted to instruct the first node, the second node, the communication node, the management node, or the other controller, directly or via any node in the non-terrestrial network, to perform a path switch to combine the first partial path with the second partial path. 6. The control device according to any one of claims 1 to 5. (Appendix 7) the means for controlling is adapted to send a notification to the first node, the second node, the communication node, the management node or the other controller, directly or via any node in the non-terrestrial network, indicating that the resource reservation for the first partial path has indeed been completed or that the first partial path is available. 7. The control device according to any one of claims 1 to 6. (Appendix 8) The notification causes a node in the terrestrial network to switch paths to combine the second partial path in the terrestrial network and the first partial path in the non-terrestrial network. 8. The control device according to claim 7. (Appendix 9) the control means is adapted to complete resource reservation of the entire path by combining the first partial path and the second partial path; 9. The control device according to any one of claims 1 to 8. (Appendix 10) the request includes a deadline requirement indicating by when the resources for the path need to be reserved; The control device further includes means for determining whether to grant the request based on the deadline requirement. 10. The control device according to any one of claims 1 to 9. (Appendix 11) the reserving means is adapted to configure one or more links in the non-terrestrial network and reserve resources of the first partial path to meet the deadline requirement. 11. The control device according to claim 10. (Appendix 12) A communication node, means for transmitting a resource reservation request for a path from the communication node to another node or from the other node to the communication node, passing through a terrestrial network and a non-terrestrial network, to any node belonging to the path, a first controller associated with the terrestrial network, or a second controller associated with the non-terrestrial network; means for receiving a response indicating acceptance of the resource reservation, the response being returned without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; means for receiving, after receiving the response, a notification indicating that resource reservation for the first partial path or the path has actually been completed or that the first partial path or the path is available; A communication node comprising: (Appendix 13) the response indicating that resource reservation in the non-terrestrial network for the path has been granted but not yet completed. 13. The communication node of claim 12. (Appendix 14) the request includes a deadline requirement indicating by when the resources for the path need to be reserved. 14. The communication node according to claim 12 or 13. (Appendix 15) receiving a request for resource reservation in a non-terrestrial network for a path from a first node to a second node through the terrestrial network and the non-terrestrial network from the first node, the second node, a communication node belonging to the path, a management node in the non-terrestrial network, or another controller associated with the terrestrial network; in response to the request, transmitting a response indicating grant of resource reservation without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; establishing one or more links in the non-terrestrial network and reserving resources for the first partial path; and controlling a combination of the first partial path in the non-terrestrial network with a second partial path in the terrestrial network, the resources of which have been previously reserved; The method performed by the control device. (Appendix 16) A method performed by a communication node, comprising: sending a request for resource reservation for a path from the communication node to another node or from the other node to the communication node via a terrestrial network and a non-terrestrial network to any node belonging to the path, a first controller associated with the terrestrial network, or a second controller associated with the non-terrestrial network; receiving a response indicating acceptance of the resource reservation, returned without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; and receiving, after receiving the response, a notification indicating that resource reservation for the first partial path or the path has actually been completed or that the first partial path or the path is available; A method for providing the above. (Appendix 17) receiving a request for resource reservation in a non-terrestrial network for a path from a first node to a second node through the terrestrial network and the non-terrestrial network from the first node, the second node, a communication node belonging to the path, a management node in the non-terrestrial network, or another controller associated with the terrestrial network; in response to the request, transmitting a response indicating grant of resource reservation without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; establishing one or more links in the non-terrestrial network and reserving resources for the first partial path; and controlling a combination of the first partial path in the non-terrestrial network with a second partial path in the terrestrial network, the resources of which have been previously reserved; A program for causing a computer to carry out a method for a control device, comprising: (Appendix 18) A program for causing a computer to execute a method for a communication node, the method comprising: sending a request for resource reservation for a path from the communication node to another node or from the other node to the communication node via a terrestrial network and a non-terrestrial network to any node belonging to the path, a first controller associated with the terrestrial network, or a second controller associated with the non-terrestrial network; receiving a response indicating acceptance of the resource reservation, returned without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; and receiving, after receiving the response, a notification indicating that resource reservation for the first partial path or the path has actually been completed or that the first partial path or the path is available; A program that includes: (Appendix 19) means for receiving a request for resource reservation in a non-terrestrial network for a path from a first node to a second node via a terrestrial network and a non-terrestrial network from the first node, the second node, a communication node belonging to the path, a management node in the non-terrestrial network, or another controller associated with the terrestrial network; means for transmitting a response in response to the request, indicating a grant of resource reservation, without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; means for sending a notification to the first node, the second node, the communication node, the management node, the other controller, or any communication node in the non-terrestrial network, or any combination thereof, after the resources of the first partial path have actually been reserved; Equipped with the notification indicating that resource reservation for the first partial path has actually been completed or that the first partial path is available. Control device. (Appendix 20) The notification causes a node in the terrestrial network to switch paths to combine the second partial path in the terrestrial network and the first partial path in the non-terrestrial network. 20. The control device of claim 19. (Appendix 21) receiving a request for resource reservation in a non-terrestrial network for a path from a first node to a second node through the terrestrial network and the non-terrestrial network from the first node, the second node, a communication node belonging to the path, a management node in the non-terrestrial network, or another controller associated with the terrestrial network; in response to the request, transmitting a response indicating grant of resource reservation without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; and sending a notification to the first node, the second node, the communication node, the management node, the other controller, or any communication node in the non-terrestrial network, or any combination thereof, after the resources of the first partial path have actually been reserved; Equipped with the notification indicating that resource reservation for the first partial path has actually been completed or that the first partial path is available. A method performed by a control device. (Appendix 22) receiving a request for resource reservation in a non-terrestrial network for a path from a first node to a second node through the terrestrial network and the non-terrestrial network from the first node, the second node, a communication node belonging to the path, a management node in the non-terrestrial network, or another controller associated with the terrestrial network; in response to the request, transmitting a response indicating grant of resource reservation without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; and sending a notification to the first node, the second node, the communication node, the management node, the other controller, or any communication node in the non-terrestrial network, or any combination thereof, after the resources of the first partial path have actually been reserved; Equipped with the notification indicating that resource reservation for the first partial path has actually been completed or that the first partial path is available. A program for causing a computer to carry out a method for a control device. [Explanation of symbols]

[0092] 1 End node 2 End nodes 3. Terrestrial Network (TN) 4. Non-terrestrial Network (NTN) 5. Terrestrial Network (TN) 6 Controller 7 Controller 8 Controller 31 Border Nodes 32 intermediate nodes 33 Border Nodes 41 Border Nodes 42 intermediate nodes 43 Border Nodes 51 Border Nodes 52 intermediate nodes 53 Border Nodes 100 End-to-End Paths 701 Management Node 702 Management Node 761 Second partial path 762 Second partial path 840 First partial path

Claims

1. means for receiving a request for resource reservation in a non-terrestrial network for a path from a first node to a second node via a terrestrial network and a non-terrestrial network from the first node, the second node, a communication node belonging to the path, a management node in the non-terrestrial network, or another controller associated with the terrestrial network; means for transmitting a response in response to the request, indicating a grant of resource reservation, without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; means for establishing one or more links in the non-terrestrial network and reserving resources for the first partial path; means for controlling the combining of the first partial path in the non-terrestrial network with a second partial path in the terrestrial network, the resources of which have been previously reserved; A control device comprising:

2. the response indicating to the first node, the second node, the communication node, the management node, or the other controller that resource reservation in the non-terrestrial network for the path has been granted but not yet completed. The control device according to claim 1 .

3. the terrestrial network includes a first terrestrial network between the first node and the non-terrestrial network; the response causes completion of resource reservation for the second partial path in the first terrestrial network. The control device according to claim 1 or 2.

4. the terrestrial network includes a second terrestrial network between the non-terrestrial network and the second node; The control device further comprises means for transmitting a request for resource reservation in the second terrestrial network to a node in the second terrestrial network or a controller associated with the second terrestrial network, either directly or via a node in the non-terrestrial network. The control device according to claim 1 or 2.

5. the means for controlling is adapted to instruct one or more nodes in the non-terrestrial network to perform a path switch to combine the first partial path with the second partial path. The control device according to claim 1 or 2.

6. the controlling means is adapted to instruct the first node, the second node, the communication node, the management node, or the other controller, directly or via any node in the non-terrestrial network, to perform a path switch to combine the first partial path with the second partial path. The control device according to claim 1 or 2.

7. the means for controlling is adapted to send a notification to the first node, the second node, the communication node, the management node or the other controller, directly or via any node in the non-terrestrial network, indicating that the resource reservation for the first partial path has indeed been completed or that the first partial path is available. The control device according to claim 1 or 2.

8. the notification causes a node in the terrestrial network to switch paths to combine the second partial path in the terrestrial network with the first partial path in the non-terrestrial network; The control device according to claim 7.

9. the control means is adapted to complete resource reservation of the entire path by combining the first partial path and the second partial path; The control device according to claim 1 or 2.

10. the request includes a deadline requirement indicating by when the resources for the path need to be reserved; The control device further includes means for determining whether to grant the request based on the deadline requirement. The control device according to claim 1 or 2.

11. the reserving means is adapted to configure one or more links in the non-terrestrial network and reserve resources of the first partial path so as to satisfy the deadline requirement. The control device according to claim 10.

12. A communication node, means for transmitting a resource reservation request for a path from the communication node to another node or from the other node to the communication node, the path passing through a terrestrial network and a non-terrestrial network, to any node belonging to the path, a first controller associated with the terrestrial network, or a second controller associated with the non-terrestrial network; means for receiving a response indicating acceptance of the resource reservation, the response being returned without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; means for receiving, after receiving the response, a notification indicating that resource reservation for the first partial path or the path has actually been completed or that the first partial path or the path is available; A communication node comprising:

13. the response indicating that resource reservation in the non-terrestrial network for the path has been granted but not yet completed. The communication node according to claim 12.

14. the request includes a deadline requirement indicating by when the resources for the path need to be reserved. A communication node according to claim 12 or 13.

15. receiving a request for resource reservation in a non-terrestrial network for a path from a first node to a second node via a terrestrial network and a non-terrestrial network from the first node, the second node, a communication node belonging to the path, a management node in the non-terrestrial network, or another controller associated with the terrestrial network; in response to the request, transmitting a response indicating grant of resource reservation without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; establishing one or more links in the non-terrestrial network and reserving resources for the first partial path; and controlling a combination of the first partial path in the non-terrestrial network with a second partial path in the terrestrial network, the resources of which have been previously reserved; The method performed by the control device.

16. A method performed by a communication node, comprising: sending a request for resource reservation for a path from the communication node to another node or from the other node to the communication node, the path passing through a terrestrial network and a non-terrestrial network, to any node belonging to the path, a first controller associated with the terrestrial network, or a second controller associated with the non-terrestrial network; receiving a response indicating acceptance of the resource reservation, returned without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; and receiving, after receiving the response, a notification indicating that resource reservation for the first partial path or the path has actually been completed or that the first partial path or the path is available; A method for providing the above.

17. receiving a request for resource reservation in a non-terrestrial network for a path from a first node to a second node via a terrestrial network and a non-terrestrial network from the first node, the second node, a communication node belonging to the path, a management node in the non-terrestrial network, or another controller associated with the terrestrial network; in response to the request, transmitting a response indicating grant of resource reservation without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; establishing one or more links in the non-terrestrial network and reserving resources for the first partial path; and controlling a combination of the first partial path in the non-terrestrial network with a second partial path in the terrestrial network, the resources of which have been previously reserved; A program for causing a computer to carry out a method for a control device, comprising:

18. A program for causing a computer to execute a method for a communication node, the method comprising: sending a request for resource reservation for a path from the communication node to another node or from the other node to the communication node, the path passing through a terrestrial network and a non-terrestrial network, to any node belonging to the path, a first controller associated with the terrestrial network, or a second controller associated with the non-terrestrial network; receiving a response indicating acceptance of the resource reservation, returned without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; and receiving, after receiving the response, a notification indicating that resource reservation for the first partial path or the path has actually been completed or that the first partial path or the path is available; A program that includes:

19. means for receiving a request for resource reservation in a non-terrestrial network for a path from a first node to a second node via a terrestrial network and a non-terrestrial network from the first node, the second node, a communication node belonging to the path, a management node in the non-terrestrial network, or another controller associated with the terrestrial network; means for transmitting a response in response to the request, indicating a grant of resource reservation, without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; means for sending a notification to the first node, the second node, the communication node, the management node, the other controller, or any communication node in the non-terrestrial network, or any combination thereof, after the resources of the first partial path have actually been reserved; Equipped with the notification indicating that resource reservation for the first partial path has actually been completed or that the first partial path is available. Control device.

20. the notification causes a node in the terrestrial network to switch paths to combine the second partial path in the terrestrial network and the first partial path in the non-terrestrial network; 20. The control device of claim 19.

21. receiving a request for resource reservation in a non-terrestrial network for a path from a first node to a second node via a terrestrial network and a non-terrestrial network from the first node, the second node, a communication node belonging to the path, a management node in the non-terrestrial network, or another controller associated with the terrestrial network; in response to the request, transmitting a response indicating grant of resource reservation without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; and sending a notification to the first node, the second node, the communication node, the management node, the other controller, or any communication node in the non-terrestrial network, or any combination thereof, after the resources of the first partial path have actually been reserved; Equipped with the notification indicating that resource reservation for the first partial path has actually been completed or that the first partial path is available. A method performed by a control device.

22. receiving a request for resource reservation in a non-terrestrial network for a path from a first node to a second node via a terrestrial network and a non-terrestrial network from the first node, the second node, a communication node belonging to the path, a management node in the non-terrestrial network, or another controller associated with the terrestrial network; in response to the request, transmitting a response indicating grant of resource reservation without waiting for resources of a first partial path in the non-terrestrial network for the path to actually be reserved; and sending a notification to the first node, the second node, the communication node, the management node, the other controller, or any communication node in the non-terrestrial network, or any combination thereof, after the resources of the first partial path have actually been reserved; Equipped with the notification indicating that resource reservation for the first partial path has actually been completed or that the first partial path is available. A program for causing a computer to carry out a method for a control device.

Citation Information

Patent Citations

  • Mobile communication system, and line control station, mobile communication base station and mobile station used for the system

    JP2011130498A

Cited By

  • Lithium recovery method and lithium recovery device

    CN121737476A