Plant control system and plant control method

The cooperative operation of a controller and IO device with auxiliary control functions in the plant control system addresses impaired cooperation issues, ensuring stable plant operation and reducing downtime and costs through seamless transitions and efficient resource utilization.

JP2024168729AActive Publication Date: 2024-12-05YOKOGAWA ELECTRIC CORP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2023085633
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-24
Publication Date
2024-12-05
Estimated Expiration
2043-05-24

AI Technical Summary

Technical Problem

The separation of input/output and control functions in different devices within a plant control system can lead to impaired cooperation, causing instability in plant operations due to increased complexity, communication interruptions, and maintenance requirements, resulting in significant opportunity losses and operational challenges.

Method used

A plant control system with a controller and IO device that operate cooperatively, where the IO device includes an auxiliary control function to maintain plant operation by calculating output data using a previous output value when cooperation with the controller is impaired, allowing seamless transition back to primary control upon recovery.

Benefits of technology

Ensures stable plant operation with a high availability rate of 99.9999% by maintaining control during communication disruptions and maintenance, reducing operational downtime and costs, and enabling efficient use of cloud resources for high-load control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024168729000001_ABST
    Figure 2024168729000001_ABST
Patent Text Reader

Abstract

To realize stable plant operation by maintaining a control state even when cooperation between an input / output function and a control function is impaired.SOLUTION: A controller 10 includes a main control unit 11 that creates first output data for controlling an operation device 42 on the basis of reception data obtained from a measuring instrument 41. An IO device 20 includes: an auxiliary control unit 23 that creates second output data for controlling the operation device 42 on the basis of reception data obtained from the measuring instrument 41; an input / output unit 22 that relays communication between the main control unit 11 and auxiliary control unit 23, and the measuring instrument 41 and operation device 42; and a management unit 21 that controls the input / output unit 22 so as to transmit the second output data, created by the auxiliary control unit 23, to the operation device 42 when cooperation is impaired.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a plant control system and a plant control method. [Background technology]

[0002] Conventionally, in various plants using petroleum, petrochemical, chemical, gas, etc., plant control systems have been constructed to control various state quantities (e.g., pressure, temperature, flow rate, etc.) in industrial processes, and highly automated operations have been realized. An example of a plant control system is a distributed control system (DCS). A plant control system is provided with on-site devices (measuring instruments, operating instruments) called field devices. The plant control system acquires measurement results from various measuring instruments such as flow meters and thermometers, determines the operating amounts of operating devices such as valves and actuators according to the measurement results, and controls the operating devices according to the operating amounts.

[0003] In order to perform the above-mentioned control, the plant control system has an input / output function for exchanging data with field devices, and a control function for using the input data to perform control calculations and create output data. In the plant control system, the input / output function and the control function work in conjunction with each other to enable stable plant operation. The plant control system may be realized by a device in which the input / output function and the control function are integrated, or by a device in which the input / output function and the control function are separate, and it is possible to select and use either one depending on the purpose. Here, a device having an input / output function in a plant control device in which the input / output function and the control function are separate is called an IO (Input Output) device, and a device having a control function is called a controller.

[0004] In a plant control system, arranging the I / O functions and the control functions in different devices provides the following benefits. One is that it is easy to improve the control function's capacity by improving the performance of the controller through the use of IT (Internet Technology). Other benefits include the ability to install the controller in a safe environment such as an instrument room, the ability to scale up the controller and I / O devices, and improved maintainability due to the small-scale and highly distributed system achieved through node separation.

[0005] The following techniques have been proposed as methods for managing plant facilities. For example, there is a technique for calculating a first control value for a second device based on a measured process value of a first device and a set parameter, and comparing the second control value for the second device calculated by another device with the first control value to determine whether to set the first control value for the second device. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2019-61661 A Summary of the Invention [Problem to be solved by the invention]

[0007] However, when the input / output function and the control function are arranged in different devices in a plant control system, there is a risk that stable plant operation will not be possible if the cooperation between the input / output function and the control function is lost. The following are possible reasons for the loss of cooperation. For example, the greater the physical distance between the input / output function and the control function, the more complex the path becomes, and the higher the probability of the path being interrupted. In addition, the more IT technologies such as server PCs (Personal Computers) and cloud computing are utilized, the higher the risk of cooperation being lost due to failures in those devices. In addition, the frequency of maintenance increases for the hardware and software of advanced control functions, and it is possible that the operation of each device will be temporarily stopped for maintenance purposes, in which case cooperation will be interrupted.

[0008] If the cooperation between the input / output functions and the control functions is lost, the operation is stopped and the plant is put into a safe state. If the plant is temporarily stopped, a large opportunity loss occurs until the operation is restarted. Thus, in the past, it was difficult to realize stable plant operation when the input / output functions and the control functions in a plant control system were provided in different devices.

[0009] In addition, a technology that compares a calculated control value with a control value calculated by another device to determine whether to use the calculated control value for control can improve the reliability of the control value, but it is difficult to deal with cases where the cooperation between the input / output function and the control function is lost. Therefore, even if this technology is used, it is difficult to achieve stable plant operation.

[0010] One aspect of the present invention is to realize stable plant operation. [Means for solving the problem]

[0011] A plant control system according to one aspect includes a controller and an input / output device that operate in cooperation with each other. The controller includes a main control unit that creates first output data based on data received from a first device. The input / output device includes an auxiliary control unit that creates second output data based on the data received from the first device, an input / output unit that relays communications between the main control unit and the auxiliary control unit and between the first device and the second device, and a management unit that controls the input / output unit to transmit the second output data to the second device when the cooperation is lost. Effect of the Invention

[0012] According to the present invention, even if the cooperation between the input / output function and the control function is lost, the control state can be maintained and stable plant operation can be realized. [Brief description of the drawings]

[0013] [Figure 1] 1 is a block diagram of a plant control system according to an embodiment. [Diagram 2] FIG. 11 is a sequence diagram of an operation device control process when the controller is in a normal state. [Diagram 3] FIG. 11 is a sequence diagram of an operation device control process when the controller is in an abnormal state. [Figure 4] FIG. 11 is a sequence diagram of an operation device control process during maintenance of the controller. [Diagram 5] 11 is a sequence diagram of an operation device control process when the controller recovers from an abnormal state. FIG. [Figure 6] FIG. 2 is a diagram illustrating the hardware configuration of a computer. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] Hereinafter, an embodiment of a plant control system and a plant control method will be described with reference to the drawings. Note that the same elements are given the same reference numerals, and duplicated descriptions will be omitted as appropriate. In addition, each embodiment can be appropriately combined within a range that does not cause inconsistency.

[0015] (Overall composition) 1 is a block diagram of a plant control system according to an embodiment. The plant control system 1 acquires information representing a state of a plant as input data. The plant control system 1 then performs control calculations using the input data to generate output data. Thereafter, the plant control system 1 controls the plant using the generated output data.

[0016] The plant control system 1 according to this embodiment includes a controller 10 and an IO device 20. The controller 10 and the IO device 20 are connected via a network 30. The IO device 20 is connected to various field devices 40 including a measuring device 41 and an operating device 42. The measuring device 41 includes, for example, a pressure sensor, a temperature sensor, and a flow rate sensor. The operating device 42 includes a valve, an actuator, and the like. The measuring device 41 is an example of a "first device," and the operating device 42 is an example of a "second device."

[0017] The controller 10 is realized by, for example, a DCS. The controller 10 has a main control function of periodically receiving measurement results from a measuring instrument 41 of the field devices 40 as information representing the state of the plant from the IO device 20 as input data, and performing control calculations using the received input data to create output data. The controller 10 also transmits the output data to an operation device 42 via the IO device 20.

[0018] The controller 10 can use its main control function to build a control loop that integrates a plurality of IO devices 20. This enables the controller 10 to realize efficient control operation of the entire plant across a plurality of IO devices 20.

[0019] The controller 10 is separated from the IO device 20, which reduces the constraints on performance and physical placement. This allows the controller 10 to determine the control target range and placement location in consideration of processing capacity, responsiveness, and maintainability.

[0020] The IO device 20 is realized by, for example, a PLC (Programmable Logic Controller). The IO device 20 periodically acquires measurement results by the measuring instruments 41 among the field devices 40 from each measuring instrument 41. Then, the IO device 20 transmits the acquired measurement results as input data to the controller 10 via the network 30. Also, the IO device 20 receives output data from the controller 10 via the network 30. Then, the IO device 20 transmits the acquired output data to the operation device 42. The IO device 20 is an input / output device having the above input / output functions.

[0021] Furthermore, the IO device 20 has an auxiliary control function that calculates output data from input data and controls the operation device 42 in place of the controller 10 when cooperation with the controller 10 is lost due to a communication cutoff or the like. When cooperation with the controller 10 is restored, the IO device 20 returns control of the operation device 42 to the controller 10 and executes processing of the input / output function. Here, "cooperation" does not simply refer to a state in which the controller 10 and the IO device 20 are connected and capable of communication, but refers to a state in which the controller 10 and the IO device 20 can transmit and receive data and operate in cooperation with each other.

[0022] The IO devices 20 are physically connected to the operation devices 42 located at various locations in the plant, and therefore the physical locations are fixed, and therefore the IO devices 20 are distributed at various locations in the plant. The IO devices 20 are arranged in "units of control objects" taking into consideration the improvement of the plant's operating rate and costs. That is, the IO devices 20 are assigned units to which data is sent and received. In the following, the units of control objects are called "units." A unit in a plant is a group of mechanisms that perform processing as a single entity, and corresponds to a "storage tank," "piping," "reaction furnace," etc.

[0023] The IO device 20 can establish a control loop limited to the operation device 42 included in the unit assigned by the auxiliary control function. The IO device 20 can maintain control within the scope of the assigned unit by the auxiliary control function, and transition the assigned unit to a safe state by performing fallback if a danger is detected.

[0024] (Controller 10) As shown in FIG. 1, the controller 10 includes a main control unit 11 having a main control function.

[0025] The main control unit 11 receives input data from the input / output unit 22 of the IO device 20 via the network 30. Next, the main control unit 11 executes a control operation using a preregistered application, and creates output data including an output value for controlling the operation device 42 from the input data and an output value indicated by the output data previously output by the main control unit 11. Hereinafter, the output value indicated by the output data previously output by the main control unit 11 is referred to as the "previous output value of the main control unit 11". After that, the main control unit 11 transmits the created output data to the input / output unit 22 of the IO device 20 via the network 30. In addition, the main control unit 11 continuously transmits a status signal indicating its own status, such as a heartbeat, to the management unit 21 of the IO device 20.

[0026] In both cases where the controller 10 goes into an abnormal state, is stopped, repaired, and then resumes, and where the controller 10 is stopped for maintenance and then resumes, the main control unit 11 resumes the transmission of the status signal. After that, the main control unit 11 receives feedback of a previous output value indicated by the previous output data calculated by the auxiliary control function of the IO device 20 from the management unit 21 of the IO device 20. Hereinafter, the previous output value received from the management unit 21 will be referred to as the "feedback previous output value."

[0027] Furthermore, the main control unit 11 receives input data from the input / output unit 22 of the IO device 20 via the network 30. Then, the main control unit 11 executes a control calculation using the received input data and the fed-back previous output value to create output data. This enables the main control unit 11 to switch the control function for the control target from the auxiliary control unit 23 without bumps.

[0028] Here, the output data for controlling the operation device 42 created by the main control unit 11 is an example of the "first output data". That is, the main control unit 11 creates the first output data based on the received data obtained from the measuring device 41, which is the first device. More specifically, the main control unit 11 accepts the received data sent from the first device via the input / output unit 22 as an input, and outputs the first output data created based on each received data via the input / output unit 22 to the operation device 42, which is the second device. In addition, when the management unit 21 confirms that the link has been restored, the main control unit 11 calculates the next first output data based on the received data and the second output data output from the input / output unit 22 that has been fed back from the management unit 21. Here, the output data for controlling the operation device 42 created by the auxiliary control function of the IO device 20 is an example of the "second output data".

[0029] (IO device 20) As shown in FIG. 1, the IO device 20 has a management unit 21 that manages the operation of a main control function and an auxiliary control function, an input / output unit 22 having an input / output function, and an auxiliary control unit 23 having an auxiliary control function.

[0030] The management unit 21 receives a status signal from the main control unit 11 of the controller 10. The management unit 21 determines whether or not the controller 10 is in a normal state from the received status signal. For example, the management unit 21 analyzes the received signal to determine whether the controller 10 is in a normal state or an abnormal state. Alternatively, the management unit 21 may determine that an abnormality has occurred in the controller 10 when the management unit 21 no longer receives a status signal.

[0031] When management unit 21 determines that controller 10 is in a normal state, it instructs input / output unit 22 to output output data from main control unit 11 of controller 10 to operating device 42. In this case, management unit 21 stops transmission of output data created by auxiliary control unit 43 by input / output unit 22 to operating device 42. Furthermore, management unit 21 feeds back the output data created by controller 10 that input / output unit 22 outputs to operating device 42 to auxiliary control unit 23 as a previous output value. Every time input / output unit 22 outputs output data to operating device 42, management unit 21 repeats feeding back the output data to auxiliary control unit 23 as a previous output value.

[0032] On the other hand, when the management unit 21 determines that the controller 10 is in an abnormal state, the management unit 21 determines that the cooperation is lost and instructs the input / output unit 22 to output the output data from the auxiliary control unit 23 to the operation device 42. Furthermore, during maintenance of the controller 10, the management unit 21 receives a notification of the execution of maintenance from the main control unit 11 of the controller 10. Then, even when the management unit 21 receives a notification of the execution of maintenance, the management unit 21 determines that the cooperation is lost and instructs the input / output unit 22 to output the output data from the auxiliary control unit 23 to the operation device 42. In this way, in the case of an abnormal state or a planned stop such as maintenance, the management unit 21 determines that the cooperation with the controller 10 is lost. Then, when the cooperation with the controller 10 is lost, the management unit 21 instructs the input / output unit 22 to output the output data from the auxiliary control unit 23 to the operation device 42. Furthermore, in either case, the management unit 21 stops the transmission of the output data created by the main control unit 11 to the operation device 42 by the input / output unit 22. In the following, the case where the auxiliary control unit 23 determines that the controller 10 is in an abnormal state will be referred to as the "case of abnormal state", and the case where maintenance is performed on the controller 10 will be referred to as the "case of maintenance".

[0033] In either case where cooperation is lost, such as in the case of an abnormal state or during maintenance, when the controller 10 returns to normal after completion of repair or maintenance of the controller 10, the management unit 21 resumes receiving a status signal from the main control unit 11 of the controller 10. Then, when the management unit 21 resumes receiving the status signal and confirms that the controller 10 is in a normal state, it feeds back to the main control unit 11 the latest output data that the input / output unit 22 has output to the operation device 42 as a previous output value.

[0034] Thereafter, management unit 21 instructs input / output unit 22 to return to a state in which output data from main control unit 11 of controller 10 is output to operation device 42. In this case, management unit 21 stops transmission of output data created by auxiliary control unit 43 to operation device 42 by input / output unit 22. Furthermore, management unit 21 resumes feedback of the output data output by input / output unit 22 to operation device 42 to auxiliary control unit 23 as a previous output value.

[0035] In this way, when the linkage is lost, the management unit 21 controls the input / output unit 22 to transmit the second output data to the second device, which is the operation device 42. More specifically, when the management unit 21 confirms that the linkage is lost, it instructs the input / output unit 22 to output the second output data to the second device, and when it confirms that the linkage is restored, it feeds back to the main control unit 11 the second output data created based on each received data output from the input / output unit 22, and instructs the input / output unit 22 to output the first output data to the second device. Furthermore, when the linkage is maintained, the management unit 21 controls the input / output unit 22 to transmit the first output data created by the main control unit 11 to the second device. More specifically, when the management unit 21 confirms that the linkage is maintained, it instructs the input / output unit 22 to output the first output data to the second device, and also feeds back to the auxiliary control unit 23 the first output data output from the input / output unit 22. Furthermore, the management unit 21 exclusively controls the transmission of the first output data to the second device and the transmission of the second output data to the second device. Furthermore, when the main control unit 11 determines that the plant is in an abnormal state based on state information indicating the state of the plant acquired from the main control unit 11, or when the management unit 21 receives a notification of a planned shutdown from the main control unit 11, the management unit 21 determines that the cooperation has been lost.

[0036] Input / output unit 22 receives the measurement result from measuring device 41. Then, input / output unit 22 transmits the acquired measurement result as input data to main control unit 11 and auxiliary control unit 23. In this manner, input / output unit 22 relays communication between main control unit 11 and auxiliary control unit 23 and measuring device 41, which is a first device, and operating device 42, which is a second device.

[0037] When the controller 10 is in a normal state, the input / output unit 22 receives an instruction from the management unit 21 to output the output data from the main control unit 11 to the operation device 42. Also, when the controller 10 is in a normal state, the input / output unit 22 receives output data from both the main control unit 11 and the auxiliary control unit 23. In this case, the input / output unit 22 outputs the output data received from the main control unit 11 to the operation device 42 in accordance with the instruction from the management unit 21.

[0038] On the other hand, when cooperation with controller 10 is lost, such as in the case of an abnormal state or during maintenance, input / output unit 22 receives an instruction from management unit 21 to output output data from auxiliary control unit 23 to operation device 42. Then, input / output unit 22 receives the output data from auxiliary control unit 23. In this case, input / output unit 22 outputs the output data received from auxiliary control unit 23 to operation device 42 in accordance with the instruction from management unit 21.

[0039] Thereafter, when it is confirmed that the controller 10 has returned to a normal state, the input / output unit 22 receives an instruction from the management unit 21 to return to a state in which the output data from the main control unit 11 is output to the operation device 42. In this case, since the controller 10 has returned to a normal state, the input / output unit 22 receives output data from both the main control unit 11 and the auxiliary control unit 23. Then, in accordance with the instruction from the management unit 21, the input / output unit 22 outputs the output data received from the main control unit 11 to the operation device 42.

[0040] When controller 10 is in a normal state, auxiliary control unit 23 receives feedback of a previous output value indicated by the previous output data calculated by main control unit 11 of controller 10 from management unit 21. In addition, auxiliary control unit 23 acquires input data from input / output unit 22. Then, auxiliary control unit 23 executes a control calculation using the fed-back previous output value and input data to create output data. Thereafter, auxiliary control unit 23 outputs the created output data to input / output unit 22.

[0041] In the case of an abnormal state or maintenance, etc., when cooperation with the controller 10 is lost, the auxiliary control unit 23 stops receiving the feedback of the previous output value indicated by the output data output by the input / output unit 22 to the operation device 42. In this case as well, the auxiliary control unit 23 acquires the input data from the input / output unit 22. Then, in either case of an abnormal state or maintenance, etc., in the subsequent first generation of output data, the auxiliary control unit 23 executes a control calculation using the fed back previous output value and the acquired input data to create output data. Then, the auxiliary control unit 23 outputs the created output data to the input / output unit 22. In this way, the auxiliary control unit 23 executes a control calculation using the fed back previous output value to create output data, thereby enabling bumpless switching.

[0042] Thereafter, auxiliary control unit 23 executes a control calculation using its own previous output value and the acquired input data to create output data. Then, auxiliary control unit 23 outputs the created output data to input / output unit 22. Auxiliary control unit 23 repeats creating output data using its own previous output value and outputting it to input / output unit 22 until controller 10 recovers and returns to a normal state.

[0043] Thereafter, when it is confirmed that controller 10 has returned to a normal state, auxiliary control unit 23 resumes feedback from management unit 21 of the previous output value indicated by the previous output data calculated by main control unit 11 of controller 10. In addition, auxiliary control unit 23 acquires input data from input / output unit 22. Then, auxiliary control unit 23 executes a control calculation using the fed-back previous output value and the acquired input data to create output data. Thereafter, auxiliary control unit 23 outputs the created output data to input / output unit 22.

[0044] Here, the auxiliary control unit 23 can construct a control loop limited to a unit. For example, the auxiliary control unit 23 collectively controls sensors, valves, etc. provided in a storage tank, which is one unit, and receives measurement results related to them from the measuring device 41 to control the operation device 42 on a unit-by-unit basis. The auxiliary control unit 23 maintains control within the scope of the unit it is responsible for, and can transition the unit it is responsible for to a safe state by performing a fallback if it detects a danger. In the fallback, the auxiliary control unit 23 transitions the assigned unit to a safe state by holding the output value to maintain a constant output value or setting a safe value as the output value. For example, in the case of valve control, the auxiliary control unit 23 can set the output value to 0 as a safe value to completely close the valve.

[0045] In this way, auxiliary control unit 23 creates the second output data based on the measurement result, which is the received data obtained from measuring device 41, which is the first device. In addition, auxiliary control unit 23 accepts as input the received data sent from the first device via input / output unit 22, and outputs the second output data to the second device via input / output unit 22. If the linkage is lost, auxiliary control unit 23 calculates the next second output data based on the received data and the second output data output from input / output unit 22 until management unit 21 confirms that the linkage has been restored. In addition, if the linkage is maintained, auxiliary control unit 23 calculates the next second output data based on the received data and the first output data output from input / output unit 22 that has been fed back from management unit 21.

[0046] (Operation device control processing) (Normal state) Fig. 2 is a sequence diagram of the operation device control process when the controller is in a normal state. The arrows connecting the various parts indicate the transmission and reception of signals. Next, with reference to Fig. 2, the flow of the operation device control process when the controller 10 of the plant control system 1 according to this embodiment is in a normal state will be described.

[0047] The input / output unit 22 acquires measurement results from the measuring devices 41 arranged in the assigned units at high frequency by oversampling (step S101). Although it is described in Fig. 2 that the measurement results are acquired in step S101, in reality, the input / output unit 22 continues acquiring the measurement results by oversampling.

[0048] The input / output unit 22 confirms that the timing of a periodic event of the manipulation device control process has arrived (step S102).

[0049] Next, the input / output unit 22 transmits the measurement results, which are the most recently collected data, as input data to the main control unit 11 and auxiliary control unit 23 of the controller 10 (step S103).

[0050] The main control unit 11 receives input data from the input / output unit 22 of the IO device 20. Then, the main control unit 11 creates output data from the input data and its own previous output value (step S104).

[0051] Next, the main control unit 11 transmits the created output data to the input / output unit 22 of the IO device 20 (step S105).

[0052] Additionally, auxiliary control unit 23 receives input data from input / output unit 22. Then, auxiliary control unit 23 creates output data from the input data and the previous output value that has been fed back (step S106).

[0053] Next, auxiliary control unit 23 transmits the created output data to input / output unit 22 (step S107).

[0054] The management unit 21 determines from the status information received from the controller 10 that the controller 10 is in a normal state (step S108).

[0055] Then, the management unit 21 instructs the input / output unit 22 to output the output data received from the controller 10 to the operation device 42 (step S109).

[0056] Input / output unit 22 transmits the output data received from controller 10 to manipulation device 42 in accordance with the instruction from management unit 21 (step S110).

[0057] The management unit 21 acquires the output data output by the input / output unit 22 (step S111).

[0058] Thereafter, management unit 21 feeds back the acquired output data to auxiliary control unit 23 as a previous output value (step S112).

[0059] (When an abnormal condition occurs) Fig. 3 is a sequence diagram of the operation device control process when the controller 10 is in an abnormal state. Next, the flow of the operation device control process when the controller 10 in the plant control system 1 according to this embodiment is in an abnormal state will be described with reference to Fig. 3.

[0060] The input / output unit 22 executes an input data transmission process including acquiring a measurement result as a periodic event and transmitting the acquired measurement result as input data (step S201). This input data transmission process corresponds to steps S101 to S103 in Fig. 2. However, in this case, the controller 10 is in an abnormal state and the connection between the IO device 20 and the controller 10 is lost, so the input / output unit 22 does not transmit the input data to the controller 10.

[0061] The auxiliary control unit 23 receives input data from the input / output unit 22 of the IO device 20. Then, the auxiliary control unit 23 creates output data from the input data and the previous output value that has been fed back (step S202).

[0062] Next, auxiliary control unit 23 transmits the created output data to input / output unit 22 (step S203).

[0063] The management unit 21 determines from the status information received from the controller 10 that the controller 10 is in an abnormal state (step S204).

[0064] Then, management unit 21 instructs input / output unit 22 to output the output data received from auxiliary control unit 23 to operation device 42 (step S205).

[0065] Input / output unit 22 transmits the output data received from auxiliary control unit 23 to manipulation device 42 in accordance with the instruction from management unit 21 (step S206).

[0066] Thereafter, when the timing of the fixed cycle event arrives again, the input / output unit 22 executes the input data transmission process (step S207).

[0067] Auxiliary control unit 23 receives input data from input / output unit 22 of IO device 20. Then, auxiliary control unit 23 creates output data from the input data and its own previous output value (step S208).

[0068] Next, auxiliary control unit 23 transmits the created output data to input / output unit 22 (step S209).

[0069] Input / output unit 22 transmits the output data received from auxiliary control unit 23 to manipulation device 42 in accordance with the instruction from management unit 21 (step S210).

[0070] (During maintenance) Fig. 4 is a sequence diagram of the operation device control process during maintenance of the controller 10. Next, the flow of the operation device control process during maintenance of the controller 10 by the plant control system 1 according to this embodiment will be described with reference to Fig. 4.

[0071] The management unit 21 receives a maintenance notification from the controller 10 (step S301). After that, the controller 10 is stopped for maintenance, and the cooperation between the IO device 20 and the controller 10 is lost.

[0072] The input / output unit 22 executes an input data transmission process (step S302).

[0073] Auxiliary control unit 23 receives input data from input / output unit 22 of IO device 20. Then, auxiliary control unit 23 creates output data from the input data and the fed-back previous output value (step S303).

[0074] Next, auxiliary control unit 23 transmits the created output data to input / output unit 22 (step S304).

[0075] Management unit 21, having received the maintenance notification from controller 10, instructs input / output unit 22 to output the output data received from auxiliary control unit 23 to operation device 42 (step S305).

[0076] Input / output unit 22 transmits the output data received from auxiliary control unit 23 to manipulation device 42 in accordance with the instruction from management unit 21 (step S306).

[0077] Thereafter, when the timing of the fixed cycle event arrives again, the input / output unit 22 executes the input data transmission process (step S307).

[0078] Auxiliary control unit 23 receives input data from input / output unit 22 of IO device 20. Then, auxiliary control unit 23 creates output data from the input data and its own previous output value (step S308).

[0079] Next, auxiliary control unit 23 transmits the created output data to input / output unit 22 (step S309).

[0080] Input / output unit 22 transmits the output data received from auxiliary control unit 23 to manipulation device 42 in accordance with the instruction from management unit 21 (step S310).

[0081] (When recovering from an abnormal state) Fig. 5 is a sequence diagram of the operation device control process when the controller 10 of the plant control system 1 according to this embodiment returns to a normal state from an abnormal state. Next, with reference to Fig. 5, the flow of the operation device control process when the controller 10 returns to a normal state from an abnormal state will be described.

[0082] The management unit 401 receives status information from the restored controller 10 and confirms that the controller 10 has returned to a normal state (step S401).

[0083] Then, the management unit 401 feeds back the output data previously output by the input / output unit 22 to the main control unit 11 of the controller 10 as a previous output value (step S402).

[0084] The input / output unit 22 executes an input data transmission process (step S403).

[0085] The main control unit 11 receives the input data from the input / output unit 22 of the IO device 20. Then, the main control unit 11 creates output data from the input data and the previous output value that has been fed back (step S404).

[0086] Next, the main control unit 11 transmits the created output data to the input / output unit 22 of the IO device 20 (step S405).

[0087] Additionally, auxiliary control unit 23 receives input data from input / output unit 22. Then, auxiliary control unit 23 creates output data from the input data and its own previous output value (step S406).

[0088] Next, auxiliary control unit 23 transmits the created output data to input / output unit 22 (step S407).

[0089] Since the management unit 21 confirms that the controller 10 is in a normal state, it instructs the input / output unit 22 to output the output data received from the controller 10 to the operation device 42 (step S408).

[0090] Input / output unit 22 transmits the output data received from controller 10 to manipulation device 42 in accordance with the instruction from management unit 21 (step S409).

[0091] The management unit 21 acquires the output data output by the input / output unit 22 (step S410).

[0092] Thereafter, management unit 21 feeds back the acquired output data to auxiliary control unit 23 as a previous output value (step S411).

[0093] (effect) As described above, the plant control system 1 according to the embodiment is separated into the controller 10 having a control function and the IO device 20 having an input / output function. The IO device 20 has an auxiliary control function and manages the field devices 40 on a unit basis. When the controller 10 is in a normal state, the IO device 20 transmits output data calculated by the controller 10 to the field devices 40 to control them, and feeds back the output data to the auxiliary control function. When the cooperation between the controller 10 and the IO device 20 is lost, the IO device 20 calculates output data using the previous output value fed back by the auxiliary control function, and transmits the output data to the field devices 40 to control them. In this way, the IO device 20 continues to control the plant on a unit basis. Furthermore, when the controller 10 is restored, the controller 10 receives feedback of the previous output value created by the IO device 20, calculates output data from the previous output value fed back, and continues to control the plant.

[0094] As a result, the plant control system 1 can perform stable plant operation even if the cooperation between the input / output function and the control function is lost. Here, the main control function and the auxiliary control function can be operated with different logics. In addition, during normal times, the main control function can be executed by a general-purpose computer such as a server PC or a cloud with high cost performance. Then, during abnormal times, the minimum control required to protect the operation can be executed using the auxiliary control function. The auxiliary control function can use a computer with limited cost performance. In addition, the auxiliary control function may perform a fallback operation to safely stop the plant. In this way, by operating both control functions in conjunction with each other, it is possible to approach an availability rate of 99.99999% (seven nines), and it is possible to ensure stable operation of the plant.

[0095] Moreover, according to the plant control system 1 of this embodiment, plant control can be continued by the auxiliary control function even during maintenance, and it is possible to easily perform maintenance of the control function while performing stable plant operation. For example, in the case of a refinery plant, the controller 10 is open and exposed to security threats, and periodic updates are required to strengthen security. If the plant operation is stopped at the time of the update, it often takes about one week to start stable operation, depending on the size of the plant, and an opportunity loss of 100 million yen or more is expected. In contrast, in the plant control system 1 of this embodiment, the update can be performed without stopping the plant operation even when updating to strengthen security, so that the opportunity loss can be suppressed.

[0096] In addition, according to the plant control system 1 of this embodiment, it is possible to reduce the actual cost (TOTEX: Total Expenditure) of the control equipment. For example, in the case of an application with a large load fluctuation of the control function, the plant control system 1 of this embodiment can reduce the cost of the control system by performing high-load control on the cloud. When an application is operated on the cloud, it is charged by a subscription method according to the amount of use, so that the cost can be reduced. In this way, it is possible to reduce the TOTEX of the instrumentation equipment by performing high-load control by the main control function on the cloud and low-load control by the auxiliary control function on the IO node. For example, in beer production managed by batch control, the fermentation and storage processes are low-load controls and take up a large proportion of the time during the process. Therefore, by performing the fermentation and storage processes with the auxiliary control function, the operating time of the main control function operating on the cloud can be shortened, and the running cost can be reduced. Furthermore, even if a dedicated controller is prepared instead of the cloud, if multiple manufacturing processes are staggered so that the main control function is not executed simultaneously, then it is sufficient to prepare one controller 10 that operates the main control function, thereby reducing capital investment.

[0097] (Hardware) Next, an example of a hardware configuration for realizing the controller 10 and the IO device 20 will be described. Fig. 6 is a hardware configuration diagram of a computer. The controller 10 and the IO device 20 can be realized by, for example, a computer 90 shown in Fig. 6. As shown in Fig. 6, the computer 90 has a processor 91, a memory 92, a hard disk 93, and a communication device 94. The processor 91 is connected to the memory 92, the hard disk 93, and the communication device 94 via a bus.

[0098] The communication device 94 is a network interface card or the like, and is used for communication with other information processing devices. For example, in the case of the controller 10, the communication device 94 is used for communication with the IO device 20. In addition, in the case of the IO device 20, the communication device 94 is used for communication with the controller 10 and the field device 40.

[0099] The hard disk 93 is an auxiliary storage device. For example, in the case of the controller 10, the hard disk 93 stores various programs including a program for realizing the functions of the main control unit 11. In the case of the IO device 20, the hard disk 93 stores various programs including a program for realizing the functions of the management unit 21, the input / output unit 22, and the auxiliary control unit 23.

[0100] The processor 91 reads out various programs stored in the hard disk 93, expands them in the memory 92, and executes them. In this way, the processor 91 realizes the functions of the main control unit 11 if it is the controller 10. Also, if it is the IO device 20, the processor 91 realizes the functions of the management unit 21, the input / output unit 22, and the auxiliary control unit 23.

[0101] In this way, the computer 90 operates as an information processing device that executes various processing methods by reading and executing the program. The computer 90 can also realize the same functions as the above-mentioned embodiment by reading the program from a recording medium using a medium reading device and executing the read program. Note that the program here is not limited to being executed by the computer 90. For example, the present invention can be similarly applied to cases where another computer or server executes the program, or where these execute the program in cooperation with each other.

[0102] This program can be distributed via a network such as the Internet. This program can also be recorded on a computer-readable recording medium such as a hard disk, a flexible disk (FD), a CD-ROM, a magneto-optical disk (MO), or a digital versatile disk (DVD), and can be executed by being read out from the recording medium by a computer.

[0103] Some examples of combinations of the disclosed technical features are set out below.

[0104] (1) A plant control system having a controller and an input / output device that operate in cooperation with each other, The controller: a main control unit that creates first output data based on the received data obtained from the first device; The input / output device is an auxiliary control unit that creates second output data based on the received data obtained from the first device; an input / output unit that relays communication between the main control unit and the auxiliary control unit and the first device and the second device; a management unit that controls the input / output unit so as to transmit the second output data to the second device when the link is lost. A plant control system comprising: (2) The plant control system described in (1) is characterized in that, when the collaboration is maintained, the management unit controls the input / output unit to transmit the first output data created by the main control unit to the second device. (3) The plant control system according to claim 1 or 2, wherein the management unit exclusively controls the transmission of the first output data to the second device and the transmission of the second output data to the second device. (4) the main control unit receives as input the received data sent from the first device via the input / output unit, and outputs to the second device the first output data created based on each of the received data via the input / output unit; The auxiliary control unit receives as an input the received data sent from the first device via the input / output unit, and outputs to the second device the second output data created based on each of the received data via the input / output unit. The plant control system according to any one of (1) to (3) above. (5) If the above mentioned cooperation is impaired, the management unit instructs the input / output unit to output the second output data to the second device, and when the management unit confirms the restoration of the link, feeds back the second output data output from the input / output unit to the main control unit and instructs the input / output unit to output the first output data to the second device; The auxiliary control unit calculates the next second output data based on the received data and the second output data output from the input / output unit until the recovery of the cooperation is confirmed by the management unit, When the management unit confirms that the link has been restored, the main control unit calculates the next first output data based on the received data and the second output data output from the input / output unit and fed back from the management unit. The plant control system according to any one of (1) to (4) above. (6) If the said cooperation is maintained, the management unit instructs the input / output unit to output the first output data to the second device, and feeds back the first output data output from the input / output unit to the auxiliary control unit; the main control unit calculates the next first output data based on the received data and the first output data output from the input / output unit; The auxiliary control unit calculates the second output data for the next time based on the received data and the first output data output from the input / output unit that is fed back from the management unit. The plant control system according to any one of (1) to (5) above. (7) The plant control system according to any one of (1) to (6), characterized in that the management unit determines that the coordination has been impaired when the main control unit determines that an abnormal state is present based on status information representing the status of the plant obtained from the main control unit, or when the management unit receives a notification of a planned shutdown from the main control unit. (8) A plant control method using a controller and an input / output device that operate in cooperation with each other, comprising the steps of: The controller: creating first output data based on the received data obtained from the first device; The input / output device is creating second output data based on the received data obtained from the first device; If the link is maintained, acquiring the first output data from the controller and transmitting the first output data to the second device; If the link is lost, the second output data is transmitted to the second device. A plant control method comprising: [Explanation of symbols]

[0105] 1. Plant control system 10 Controller 11 Main control unit 20 IO devices 21 Management Department 22 Input / output section 23 Auxiliary control section 30 Network 40 Field Devices 41 Measuring instruments 42 Operating equipment

Claims

1. A plant control system having a controller and an input / output device that operate in cooperation with each other, The controller: a main control unit that creates first output data based on received data obtained from the first device; The input / output device is an auxiliary control unit that creates second output data based on the received data obtained from the first device; an input / output unit that relays communication between the main control unit and the auxiliary control unit and the first device and the second device; a management unit that controls the input / output unit so as to transmit the second output data to the second device when the link is lost. A plant control system comprising:

2. The plant control system according to claim 1, wherein the management unit controls the input / output unit to transmit the first output data created by the main control unit to the second device when the collaboration is maintained.

3. 3. The plant control system according to claim 2, wherein the management unit exclusively controls the transmission of the first output data to the second device and the transmission of the second output data to the second device.

4. the main control unit receives as input the received data transmitted from the first device via the input / output unit, and outputs to the second device the first output data created based on each of the received data via the input / output unit; The auxiliary control unit receives as an input the received data sent from the first device via the input / output unit, and outputs to the second device the second output data created based on each of the received data via the input / output unit.

2. The plant control system according to claim 1 .

5. If the above mentioned cooperation is impaired, the management unit instructs the input / output unit to output the second output data to the second device, and when the management unit confirms the restoration of the cooperation, feeds back the second output data output from the input / output unit to the main control unit and instructs the input / output unit to output the first output data to the second device; The auxiliary control unit calculates the next second output data based on the received data and the second output data output from the input / output unit until the recovery of the cooperation is confirmed by the management unit, When the management unit confirms that the link has been restored, the main control unit calculates the next first output data based on the received data and the second output data output from the input / output unit and fed back from the management unit.

2. The plant control system according to claim 1 .

6. If the said cooperation is maintained, the management unit instructs the input / output unit to output the first output data to the second device, and feeds back the first output data output from the input / output unit to the auxiliary control unit; the main control unit calculates the next first output data based on the received data and the first output data output from the input / output unit; The auxiliary control unit calculates the second output data for the next time based on the received data and the first output data output from the input / output unit that is fed back from the management unit.

2. The plant control system according to claim 1 .

7. 2. The plant control system according to claim 1, wherein the management unit determines that the coordination has been impaired when the main control unit determines that an abnormal state is present based on status information representing the plant status obtained from the main control unit, or when the management unit receives a notification of a planned shutdown from the main control unit.

8. A plant control method using a controller and an input / output device that operate in cooperation with each other, comprising the steps of: The controller: creating first output data based on the received data obtained from the first device; The input / output device is creating second output data based on the received data obtained from the first device; If the link is maintained, the first output data is acquired from the controller and transmitted to the second device; If the link is lost, the second output data is transmitted to the second device. A plant control method comprising:

Citation Information

Patent Citations

  • Switching method for dual controller and the dual controller

    JP1995244598A

  • Controller system

    JP1999184507A

  • Backup system

    JP2011186664A

  • Input / output control system

    JP2013149114A

  • Fail-safe system

    JP2021140370A