Coupling method for O-RAN shared cell configuration

By controlling message combination on an extended antenna carrier basis, the method addresses network congestion and delays in O-RAN shared cells, enhancing operational efficiency and error resilience.

JP2024541642AActive Publication Date: 2024-11-08SOLID
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
JP2024532779
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2022-10-05
Publication Date
2024-11-08
Estimated Expiration
2042-10-05

AI Technical Summary

Technical Problem

The O-RAN shared cell configuration faces challenges with network congestion and complex connection structures due to message replication and merging processing, particularly in the uplink direction, where limited time resources and transmission delays complicate effective message combination.

Method used

A method for controlling message combination timing and operation on an extended antenna carrier (eAxC) basis, using triggering mechanisms to determine the optimal timing for combining messages, thereby optimizing resource utilization and reducing delays.

Benefits of technology

The proposed method effectively configures and operates shared cells under limited time resources, simplifying network control and minimizing errors in message merging operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024541642000001_ABST
    Figure 2024541642000001_ABST
Patent Text Reader

Abstract

The present invention discloses a method for operating a node device in an O-RAN (Open Radio Access Network), the method including the steps of receiving a message related to a user plane from at least one south-node device, and determining, based on the message, a timing of an operation to combine messages on an extended antenna carrier (eAxC) basis.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to wireless communication including a coupling method for a shared cell configuration of an O-RAN (Open Radio Access Network). [Background technology]

[0002] The O-RAN Alliance has released specifications that define the architecture for implementing next-generation RAN (Radio Access Network) infrastructure. "O-RAN" stands for Open RAN, and the O-RAN architecture uses "O-DU (O-RAN Distributed Unit)" and "O-RU (O-RAN Remote Unit)". Each O-DU implements Layer 2 and higher Layer 1 functions for the air interface used when communicating wirelessly with user equipment, and each O-RU implements lower Layer 1 functions for the air interface. Each O-DU and O-RU are communicatively connected via a fronthaul link.

[0003] The O-RAN Alliance has published specifications that define an open fronthaul interface for communication between the O-DU and O-RU via the fronthaul. For example, the O-RAN Fronthaul Working Group 4 provides the "Control, User and Synchronization Plane Specification" that specifies the functional split used between the functions implemented in the O-DU and O-RU.

[0004] Initial versions of the O-RAN specifications only specified a point-to-point configuration in which each O-DU pairs with one O-RU to serve one physical cell, and individual O-RAN fronthaul interfaces for each O-DU and O-RU pair, but recently O-RAN specifications have been developed that define further configurations that can be used to implement a "shared cell" in which one O-DU pairs with multiple O-RUs to serve one physical cell.

[0005] The recently published O-RAN specifications give examples of shared cells including a topology in which one O-DU communicates with multiple O-RUs via a fronthaul including a fronthaul multiplexer (FHM), a topology in which one O-DU communicates with multiple cascaded O-RUs, and a combination of these topologies.

[0006] In a shared cell, the O-RU cascaded with the FHM copies and transmits messages in the downlink direction, and combines and transmits messages in the uplink direction. As the number of O-RUs constituting the shared cell and the number of carriers supported by the O-RU increase due to this copying / combining process, and the connection structure of the FHM and O-RU becomes more complex, the network congestion of the O-RAN, which is a package-based network, increases significantly. This is particularly problematic in the uplink direction where message combining processing must be performed within limited time resources, causing serious physical constraints in implementing the fronthaul.

[0007] Therefore, there is a need for an efficient uplink message combining scheme for shared cells. Summary of the Invention [Problem to be solved by the invention]

[0008] The technical problem to be solved by the present invention is to provide a combination scheme for a shared cell configuration of O-RAN that can effectively use limited time resources.

[0009] The technical problems that the technical idea of ​​the present invention is intended to solve are not limited to the problems mentioned above, and other problems not mentioned will be clearly understood by those skilled in the art from the following description. [Means for solving the problem]

[0010] According to one aspect of the present invention, there is disclosed a method for operating a node device in an O-RAN (Open Radio Access Network), the method including the steps of receiving a message related to a user plane from at least one south-node device, and determining, based on the message, a timing of an operation to combine the messages on an extended antenna carrier (eAxC) basis.

[0011] According to an exemplary embodiment, the determining step includes the steps of: determining whether a final message for the eAxC unit is received from at least one port; and if it is determined that the final message has been received, generating a first combining trigger for the eAxC unit indicating a timing of an operation to combine the messages.

[0012] According to an exemplary embodiment, the determining step determines based on whether messages in the eAxC unit are continuously received from the at least one port.

[0013] According to an exemplary embodiment, the determining step includes the steps of determining whether a first message for the eAxC unit is received from at least one port, and if it is determined that the first message has been received, generating a second combining trigger in the eAxC unit indicating a timing of an operation to combine the messages.

[0014] According to an exemplary embodiment, the step of generating the second combined trigger includes delaying the timing at which the first message is received by a predetermined time to generate the second combined trigger.

[0015] According to an exemplary embodiment, the at least one south node device includes a plurality of south node devices, and the determining step uses a message received from a south node device among the plurality of south node devices, the south node device having the largest transmission delay for the node device.

[0016] According to an exemplary embodiment, among the messages, messages of the same eAxC unit are received consecutively.

[0017] According to an exemplary embodiment, the at least one south node device includes a plurality of south node devices, and messages received from each of the plurality of south node devices have the same receiving order based on the eAxC unit.

[0018] According to an exemplary embodiment, the method further includes combining the messages in units of the eAxCs according to the determined timing, and transmitting the combined messages to a north node device in a combination order.

[0019] According to another aspect of the technical idea of ​​the present invention, there is disclosed an O-RAN node device comprising at least one processor, wherein the at least one processor is configured to determine, based on a user plane related message received from at least one south node device, a timing of an operation of combining the messages on an eAxC basis.

[0020] According to an exemplary embodiment, the at least one processor is further configured to determine whether a final message for the eAxC unit is received from at least one port, and if it is determined that the final message is received, generate a first combining trigger indicative of a timing of an operation to combine the messages in the eAxC unit.

[0021] According to an exemplary embodiment, the at least one processor is further configured to determine whether a final message for the eAxC unit is received based on whether messages for the eAxC unit are consecutively received from the at least one port.

[0022] According to an exemplary embodiment, the at least one processor is further configured to determine whether a first message for the eAxC unit is received from at least one port, and if it is determined that the first message is received, generate a second combining trigger indicative of a timing of an operation to combine the messages in the eAxC unit.

[0023] According to an exemplary embodiment, the at least one processor is further configured to delay receipt of the first message by a predetermined amount to generate the second combined trigger.

[0024] According to an exemplary embodiment, the at least one south node device includes a plurality of south node devices, and the at least one processor is further configured to determine, in the eAxC unit, a timing of an operation of combining the messages using a message received from a south node device having a largest transmission delay for the node device among the plurality of south node devices.

[0025] According to an exemplary embodiment, among the messages, messages of the same eAxC unit are received consecutively.

[0026] According to an exemplary embodiment, the at least one south node device includes a plurality of south node devices, and messages received from each of the plurality of south node devices have the same receiving order based on the eAxC unit.

[0027] According to an exemplary embodiment, the at least one processor may be further configured to combine the messages on an eAxC basis according to the determined timing, and to control transmission of the combined message to a north node device according to a combination procedure. Effect of the Invention

[0028] According to an exemplary embodiment of the present invention, by controlling the combining timing and combining operation of messages related to the user plane on an extended antenna carrier (eAxC) basis, it is possible to effectively configure and operate a shared cell even with limited fronthaul time resources.

[0029] The effects of the present invention are not limited to those mentioned above, and other effects not mentioned will be clearly understood by those skilled in the art from the following description. [Brief description of the drawings]

[0030] [Figure 1] FIG. 1 is a conceptual diagram for explaining a shared cell configuration of O-RAN. [Diagram 2] 1 is a diagram illustrating a user plane message combination method in a node device constituting a shared cell according to an exemplary embodiment of the present invention. [Diagram 3] 1 is a diagram illustrating a frame format of a user-plane message applied to a combining method according to an exemplary embodiment of the present invention. [Figure 4] 1 is a diagram illustrating a node device supporting a bonding scheme and an operating method thereof according to an exemplary embodiment of the present invention; [Diagram 5] 1 is a diagram illustrating a node device supporting a bonding scheme and an operating method thereof according to an exemplary embodiment of the present invention; [Figure 6] 1 is a diagram illustrating a node device supporting a bonding scheme and an operating method thereof according to an exemplary embodiment of the present invention; [Figure 7] 1 is a diagram illustrating a node device supporting a bonding scheme and an operating method thereof according to an exemplary embodiment of the present invention; [Figure 8] 1 is a diagram illustrating a node device supporting a bonding scheme and an operating method thereof according to an exemplary embodiment of the present invention; [Figure 9] 1 is a diagram illustrating a node device supporting a bonding scheme and an operating method thereof according to an exemplary embodiment of the present invention; [Figure 10] 1 is a diagram illustrating a node device supporting a bonding scheme and an operating method thereof according to an exemplary embodiment of the present invention; [Figure 11] 1 is a diagram illustrating a node device supporting a bonding scheme and an operating method thereof according to an exemplary embodiment of the present invention; [Figure 12] 1 is a flowchart illustrating an operation method of a node device supporting a bonding scheme according to an exemplary embodiment of the present invention. [Figure 13] 1 is a flowchart illustrating an operation method of a node device supporting a bonding scheme according to an exemplary embodiment of the present invention. [Figure 14] 1 is a flowchart illustrating an operation method of a node device supporting a bonding scheme according to an exemplary embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0031] The terms used in the present invention are merely used to describe a particular embodiment and are not intended to limit the scope of other embodiments. A singular expression includes a plural expression unless the context clearly indicates otherwise. Terms used herein, including technical and scientific terms, have the same meaning as commonly understood by those skilled in the art. Terms used in the present invention that are defined in a general dictionary are interpreted in the same or similar meaning as they have in the context of the related art, and are not interpreted in an ideal or overly formal sense unless clearly defined in the present invention. In some cases, even terms defined in the present invention should not be interpreted to exclude embodiments of the present invention.

[0032] In the various embodiments of the present invention described below, a hardware approach will be mainly described as an example, however, the various embodiments of the present invention include techniques using both hardware and software, and therefore the various embodiments of the present invention do not exclude a software-based approach.

[0033] The various illustrative logic blocks / sections, modules, and circuits, processors described in connection with the present invention may be embodied or implemented by a general purpose processor, a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic device (PLD), discrete gate or transistor logic, discrete hardware components, or any combination thereof designed to perform the functions disclosed herein. A general purpose processor may be a microprocessor, but alternatively, the processor may be any commercially available processor, controller, microcontroller, or state machine. A processor may also be embodied in a combination of computing devices, such as a combination of a DSP and a microprocessor, multiple microprocessors, one or more microprocessors in conjunction with a DSP core, or any other configuration.

[0034] In the following description, terms for signals (e.g., message, information, preamble, signal, signaling, sequence, stream), terms for resources (e.g., symbol, slot, subframe, radio frame, subcarrier, resource element (RE), resource block (RB), bandwidth part (BWP), occasion), terms for operation states (e.g., step, operation, procedure), terms for data (e.g., package, user stream, information, bit, symbol, codeword), terms for channels, terms for control information (e.g., downlink control information (DCI), medium access control element (MACCE), radio resource control (RRC) signal), terms for network entities, terms for device components, etc. are exemplified for convenience of description. Therefore, the present invention is not limited to the terms described below, and other terms having equivalent technical meanings may be used.

[0035] In addition, in the present invention, expressions such as "more than" or "less than" may be used to determine whether a particular condition is satisfied or fulfilled, but this is merely a description to express one example and does not exclude descriptions such as "more than" or "less than." A condition described as "more than" may be replaced with "more than," a condition described as "less than," and a condition described as "more than and less than" may be replaced with "more than and less than."

[0036] In addition, the present invention will be described in various embodiments using terminology used in some communication standards (e.g., 3GPP (3rd Generation Partnership Project), xRAN (extensible radio access network), and O-RAN (open-radio access network), but this is merely an example for the purpose of explanation. The various embodiments of the present invention can be easily modified and applied to other communication systems.

[0037] Hereinafter, various embodiments according to the technical concept of the present invention will be described in detail.

[0038] FIG. 1 is a conceptual diagram for explaining a shared cell configuration of O-RAN.

[0039] First, a first shared cell configuration will be described with reference to (a) of FIG. 1. In the first shared cell configuration, an O-DU 10 is paired with a plurality of O-RUs 30 (e.g., O-RU#1 to O-RU#n), and the O-DU 10 and the O-RUs 30 communicate with each other via a fronthaul including an FHM 20. Here, the FHM 20 refers to a node device that is modeled as an O-RU to which a copy and combine function is added in addition to a Lower Layer Split (LLS) fronthaul support function like a general O-RU, but does not have a radio transmission / reception function. The first shared cell configuration is called an FHM mode.

[0040] In the downlink (e.g., the path from the north node to the south node), the O-DU 10 transmits a duplicate version of each control-plane and user-plane message to the FHM 20, which duplicates each control-plane and user-plane message and transmits each duplicate version to each of multiple O-RUs 20.

[0041] In the uplink (e.g., the path from the south node to the north node), each O-RU 30 transmits a user plane message to the FHM 20, which combines resource elements (REs) received from the O-RUs 30 and then transmits a single user plane message including the combined REs to the O-DU 10.

[0042] A second shared cell configuration will be described with reference to (b) of FIG. 1. In the second shared cell configuration, an O-DU 10 is paired with multiple O-RUs 30 (e.g., O-RU#1 to O-RU#n), where a cascade topology is applied to implement a fronthaul for intercommunication between the O-DU 10 and the O-RUs 30. The O-DU 10 directly communicates with the first O-RU (e.g., O-RU#1) in the cascade, and each O-RU directly communicates with the previous O-RU and the next O-RU in the cascade. The second shared cell configuration is referred to as a cascade mode.

[0043] In the downlink, the O-DU 10 transmits a duplicated version of each control plane and user plane message to the first O-RU (e.g., O-RU #1) of the cascaded O-RUs 30, and each O-RU in the cascade transmits a duplicated version to the next O-RU in the cascade using each message transmitted to it from the previous O-RU.

[0044] In the uplink, the last O-RU (e.g., O-RU#n) of the cascaded O-RUs 30 transmits a user plane message including an RE generated from the received RF signal to the previous O-RU, and each O-RU in the cascade combines the RE included in the user plane message received from the immediately succeeding O-RU with the RE generated from its own received RF signal and transmits it to the previous O-RU in a single user plane message.

[0045] 1(c), the third shared cell configuration is a hybrid of the first and second shared cell configurations, in which the O-DU 10 communicates with a plurality of O-RUs (O-RU#1 to O-RU#n) through a fronthaul including FHM#1 of the cascaded FHMs 20, and communicates with a plurality of O-RUs (O-RU#1 to O-RU#m) through a fronthaul including FHM#2 of the cascaded FHMs 20. The third shared cell configuration is called a cascaded FHM mode, and the intercommunications between the O-DU 10, the FHM 20, and the O-RU 30 in the downlink and uplink are substantially the same as those described above with reference to FIG. 1(a) and FIG. 1(b), and therefore detailed description thereof will be omitted.

[0046] As mentioned above, in the first to third shared cell configurations, message duplication and merging processing is required in the FHM and cascaded O-RU, which are nodes that configure the fronthaul. As a result, as the number of shared cell nodes increases, the connection structure between nodes becomes more complex, and as the number of carriers to be supported increases, network congestion increases significantly in the O-RAN, which is a package-based network, and operation control becomes more difficult, resulting in serious physical constraints on network implementation.

[0047] This is especially problematic in the uplink direction. In a typical combining method, the time at which the symbol-based messages to be combined arrive at the FHM and cascaded O-RU is not constant due to differences in transmission delays caused by the physical / logical locations of the nodes, and each node transmits messages related to various resource elements in an arbitrary order, making it difficult to control the combining timing and combining operation. Furthermore, since the allowable fronthaul delay is limited, each node cannot be given sufficient waiting time and processing time for the symbol-based messages to be combined, making it difficult to respond to error situations.

[0048] The technical idea of ​​the present invention is to solve the above-mentioned problems, and proposes a method of using an extended antenna-carrier (eAxC) as a message combination unit related to the user plane in a shared cell configuration, and controlling the timing and operation of message combination on an eAxC basis.

[0049] Fig. 2 is a diagram for explaining a user plane message combining method in a node device configuring a shared cell according to an exemplary embodiment of the present invention, and Fig. 3 is a diagram for explaining a frame format of a user plane message applied to the combining method according to an exemplary embodiment of the present invention. For convenience of explanation, Fig. 2 exemplarily illustrates an embodiment in which a shared cell configuration is implemented in FHM mode and the FHM 20 receives and combines user plane messages for one antenna port each from the O-RU.

[0050] Referring to FIG. 2, a shared cell configuration according to an exemplary embodiment of the present invention includes an FHM 20, an O-RU#1 30-1, and an O-RU#2 30-2.

[0051] First, O-RU#1 30-1 and O-RU#2 30-2 each include an interface section 31 and a Low-PHY section 33. Although not shown, O-RU#1 30-1 and O-RU#2 30-2 each further include at least one antenna port (and / or antenna) for transmitting and receiving radio signals to and from user equipment, and an RF section (or RF transceiver) for digital conversion processing of radio signals. Meanwhile, the terms "... section", "... device", etc. used below refer to a unit that processes at least one function or operation, and are embodied in hardware, software, or a combination of hardware and software. At least a part of the operation or action of any one section may be performed in another section, or any one section itself may be integrated into another section.

[0052] The Low-PHY section 33 generates IQ data based on a radio signal received via at least one antenna port (antenna) and digitally converted via the RF section.

[0053] Based on the generated IQ data, the Low-PHY section 33 generates a message for the user plane according to a fronthaul transport protocol. The transport protocol uses Ethernet and eCPRI, which are easily shared with the network, and the frame format 300 of the message has a structure as shown in FIG.

[0054] 3, the message frame format 300 includes an eCPRI header 310 and an eCPRI payload 330. The eCPRI header 310 includes a message source and destination identifier ecpriPcid, and in the O-RAN fronthaul specification, the message source and destination identifier ecpriPcid defines the eAxC (eAxC ID) 311. The eAxC 311 includes an O-DU port identifier (DU_Port_ID) 3111, a band sector identifier (BandSector_ID) 3113, a component carrier identifier (CC_ID) 3115, and an O-RU port identifier (RU_Port_ID) 3117.

[0055] The low-PHY section 33 is configured to group IQ data having the same eAxC among the IQ data for each antenna port to generate a message in eAxC units. The eAxC unit message is a single message, but is not limited thereto, and is fragmented to be composed of multiple messages.

[0056] The interface section 31 transmits the eAxC-based messages to the FHM 20 via the fronthaul link.

[0057] The interface section 31 continuously transmits messages having the same eAxC among the eAxC-based messages to the FHM 20 .

[0058] Also, the interface section 31 transmits the eAxC messages to the FHM 20 in a predetermined transmission order. Specifically, a transmission order is predetermined for each eAxC, and the interface section 31 transmits the eAxC messages in accordance with the transmission order.

[0059] For example, the interface section 31 transmits the eAxC-based messages for a specific antenna port to the FHM 20 in ascending order of eAxC ID numbers (eAxC ID-1, eAxC ID-2, ...) as shown in Fig. 2. However, without being limited thereto, the interface section 31 may transmit the eAxC-based messages for a specific antenna port to the FHM 20 in descending order of eAxC ID numbers or in a certain pattern order of eAxC ID numbers.

[0060] The transmission order is determined by O-DU 10 (see FIG. 1) and updated according to the network operation environment / condition, the service provider's request, etc. The transmission order is updated in real time, but is not limited thereto. Also, the transmission order is set and updated remotely, but is not limited thereto.

[0061] In this manner, O-RU#1 30-1 and O-RU# 30-2 each generate an eAxC unit message for at least one antenna port and transmit the eAxC unit messages for the antenna ports to FHM 20 in an equal eAxC unit-based transmission order.

[0062] The FHM 20 includes an interface section 21 , a coupling section 23 and a triggering section 25 .

[0063] First, the triggering section 25 determines the timing of an operation to combine messages in eAxC units (hereinafter, combining operation timing) based on messages received from at least one of the south nodes, i.e., O-RU#1 30-1 and O-RU#2 30-2. Here, the term "determine" as mentioned above includes various actions. For example, "determine" includes calculate, computing, processing, deriving, investigating, looking up (e.g., looking up in a table, database, or other data structure), checking, etc. Also, "determine" includes receive (e.g., receiving information), access (accessing data in a memory), etc. Also, "determine" includes resolve, select, choose, establish, etc.

[0064] In one embodiment, the triggering section 25 determines whether a final message is received for each eAxC unit among received messages, and determines the timing of the combining operation based on the determination result.

[0065] In another embodiment, the triggering section 25 determines whether a first message is received for each eAxC among the received messages, and determines the timing of the combining operation based on the determination result.

[0066] In yet another embodiment, the triggering section 25 determines the timing of the combining operation using the determination result of whether the last message or the first message has been received in the eAxC unit as described above, as well as waiting time related information calculated based on the frame structure applied to the message in the eAxC unit and the timing of the control plane message applied to the eAxC unit.

[0067] On the other hand, when performing the above-mentioned example, triggering section 25 can determine the timing of the combining operation without using either the message received from O-RU#1 30-1 or O-RU#2 30-2, but only using the message received from O-RU#2 30-2, which has a larger transmission delay for FHM 20, out of O-RU#1 30-1 and O-RU#2 30-2.

[0068] In FHM 20, since the concept of triggering the combining operation based on whether a message is received last / first is highly likely to arrive later than messages from other south nodes, triggering can be controlled based on a specific route in terms of preventing further delays by controlling the combining operation timing and simplifying the process, etc. Here, a specific south node is exemplified as a comparison target for the transmission delay value, but it is not limited thereto, and it goes without saying that a specific antenna port, etc. can be selected as a comparison target.

[0069] The triggering section 25 is described in further detail below with reference to Figures 4 to 11.

[0070] The combining section 23 combines messages of equal eAxC units according to the combining operation timing determined by the triggering section 25. For example, as shown in Fig. 2, messages related to each antenna port (e.g., port a of O-RU#1, port b of O-RU#2) can be combined in units of eAxC ID-1 and eAxC ID-2. The message combining in units of eAxC in the combining section 23 means combining IQ data samples of corresponding eAxC messages as specified in the O-RAN fronthaul specifications, and is a concept including compression processing after combining.

[0071] Meanwhile, the combining section 23 generates a message related to the user plane according to the fronthaul transmission protocol based on the IQ data generated by the combining operation. For convenience of explanation, it has been described that the message generation function is performed in the combining section 23, but the message generation function is embodied by a separate section.

[0072] The interface section 21 transmits the message generated by combining the messages on an eAxC basis to the north node (eg, the O-DU 10 (see FIG. 1)).

[0073] The interface section 21 may transmit the messages to the north node in the order of generation of the messages, i.e., the order in which the messages are generated as a result of execution of the combining operation. However, the present invention is not limited to this. In some embodiments, the interface section 21 may transmit the messages generated as a result of execution of the combining operation based on a specific parameter (e.g., Ta3_min, FHM, or the minimum value of the last time that a cascaded O-RU can transmit a user plane message to an O-DU or a north node based on the reception timing at the O-RU antenna) in consideration of the O-RU delay profile.

[0074] In this way, according to the combining scheme of the exemplary embodiment of the present invention, the combining operation can be triggered on an eAxC basis more quickly than the existing combining scheme in which the FHM or cascaded O-RU waits until all symbols to be combined are received before combining, thereby making it possible to more effectively utilize time resources under limited fronthaul delay.

[0075] In addition, the bonding operation triggering per eAxC and the bonding operation triggering specified in the existing O-RAN fronthaul specifications can be used in a mutually complementary manner to prevent errors caused by message loss (or dropping).

[0076] In addition, by simplifying the trigger procedure for the combining operation on an eAxC basis in consideration of the transmission delay, it is possible to prevent further delays based on the combining operation on an eAxC basis, which is performed more frequently than before.

[0077] 4 to 11 are diagrams for explaining a node device supporting a combining scheme according to an exemplary embodiment of the present invention and an operation method thereof. In explaining FIG. 4 to FIG. 11, the embodiment of the present invention shown in FIG. 2 will be referred to. Meanwhile, for convenience of explanation, the triggering section in FIG. 4 and FIG. 8 and the subsection in FIG. 6 and FIG. 10 are each shown as one configuration, but the section is configured in multiple units corresponding to the number of symbols.

[0078] FIG. 4 shows one embodiment of the triggering section of an FHM or cascaded O-RU in a shared cell configuration.

[0079] Referring to FIG. 4, the triggering section 43 includes a first combined trigger generator 431, logic 433, and first to j-th end flag generators 435-1 to 435-j.

[0080] The first to jth end flag generators 435-1 to 435-j each determine whether a final message is received for each eAxC unit for a corresponding antenna port among user plane messages transmitted from a plurality of south node devices, and can generate an end flag if it is determined that the final message has been received.

[0081] In one embodiment, the first through j-th end flag generators 435-1 through 435-j determine whether or not a final message has been received in a particular eAxC unit based on whether messages are continuously received in the eAxC unit.

[0082] The consecutive reception of the messages may be determined based on whether the messages received sequentially within a predetermined time have the same eAxC. For example, the same AxC may be determined by searching a predetermined parameter (e.g., filter index).

[0083] Alternatively, whether the messages are continuously received can be determined based on whether a message is received within a predetermined time after any one eAxC unit message is received using a W timer. This is to prevent delays due to waiting when the reception interval between messages is long, and if a message does not arrive within the predetermined time, it is determined that the already received eAxC unit message is the last message.

[0084] In another embodiment, the first through j-th end flag generators 435-1 through 435-j may determine whether or not the final message has been received in a particular eAxC unit based on predetermined information included in the message. The message transmitted from the south node may include a predetermined field (e.g., subseq-ID) indicating whether or not it is the final message in the eAxC unit, and the first through j-th end flag generators 435-1 through 435-j may determine whether or not the final message has been received based on the field.

[0085] The logic 433 performs a logical operation on the per-port end flags generated by the first through j-th end flag generators 435-1 through 435-j. For example, the logic 433 performs an AND operation.

[0086] The first combining trigger generator 431 generates a first combining trigger (hereinafter, referred to as an AR (arrival)-trigger) that indicates the combining operation timing based on the calculation result of the logic 433 .

[0087] The first combination trigger generator 431 determines whether an end flag is generated for the message stream of a particular eAxC unit at all ports based on the result of the AND operation of logic 433, and if an end flag is generated at all ports, the eAxC unit determines that the final message has arrived from all ports and generates an AR-trigger that triggers the combination operation of the messages of the eAxC unit.

[0088] Meanwhile, according to an embodiment, the triggering section 43 generates the AR-trigger using only a user plane message transmitted from a south node device having the longest transmission delay among a plurality of south node devices. Since a message from the south node device having the longest transmission delay is likely to arrive the latest, the AR-trigger can be generated based only on the message.

[0089] FIG. 5 is a diagram for explaining an operation of determining the timing of an operation of combining messages related to a user plane on an eAxC basis by the triggering section 43 of FIG.

[0090] FIG. 5(a) illustrates an operation of generating an AR-trigger based on an eAxC-based message for one antenna port.

[0091] 5(a), an end flag generator corresponding to antenna port a of south node #1 can generate an end flag for eAxC ID-1 because messages for eAxC ID-1 are continuously received and another message for eAxC ID-2 is received, and in the case of eAxC ID-2, an end flag for eAxC ID-2 can be generated because no subsequent message is received within the time specified by the W-timer. The first combined trigger generator 431 can generate AR-triggers for eAxC ID-1 and 2 at the generation timing of each end flag.

[0092] FIG. 5(b) illustrates an operation of generating an AR-trigger based on eAxC-based messages for two antenna ports.

[0093] 5(b), end flag generators corresponding to antenna port a of south node #1 and antenna port b of south node #2 can generate end flags for eAxC ID-1 and eAxC ID-2, respectively, as shown in FIG 5(a). Logic 433 can perform an AND operation on the generated end flags, and first combined trigger generator 431 can generate an AR-trigger for each of eAxC ID-1 and 2 at the timing when the end flags are generated at each port according to the AND operation result of logic 433.

[0094] FIG. 5(c) illustrates an operation of generating an AR-trigger for messages in eAxC units related to two antenna ports, taking into consideration only the message of south node #2, which has a larger transmission delay among the transmission delays of south nodes #1 and #2.

[0095] 5(c), only the end flag generator corresponding to antenna port b of south node #2, which has a relatively larger transmission delay, can generate end flags for eAxC ID-1 and eAxC ID-2 as in FIG 5(a). The first combined trigger generator 431 can generate AR-triggers for eAxC ID-1 and 2 at the timing of generating each end flag.

[0096] Figure 6 shows another embodiment of the triggering section of the FHM or cascaded O-RU in a shared cell configuration. The triggering section 63 in Figure 6 is a modified example of the triggering section 43 in Figure 4, and is an embodiment in which the AR-trigger and the TW (Timing Window)-trigger based on timing-related information are used in a mutually complementary manner to determine the timing of the message combining operation. In describing Figures 6 and 7, reference will be made to Figures 4 and 5, but overlapping descriptions will be omitted.

[0097] Referring to FIG. 6, the triggering section 63 includes a first subsection 63-1 for generating an AR-trigger, a second subsection 63-2 and a selector 641 for generating and selecting a TW-trigger, and logic 62 for selecting the AR-trigger and / or the TW-trigger.

[0098] The first subsection 63-1 generates an AR-trigger substantially equivalent to the triggering section 43 of Figure 4. The first subsection 63-1 outputs the generated AR-trigger to the logic 62.

[0099] The second subsection 63-2 includes a TWN-trigger generator 643 and a TWC-trigger generator 645.

[0100] The triggers generated by the TWN-trigger generator 643 and the TWC-trigger generator 645 are based on the contents specified in the O-RAN fronthaul standard specifications and can be calculated from the frame structure and control plane timing applied to the eAxC unit, respectively.

[0101] For example, the TWN-trigger generator 643 can determine a waiting time by applying an offset to a normal frame structure (e.g., determined by SCS (Sub-Carrier Spacing) and N_TA_Offset, etc.) applied to an eAxC unit of a PUSCH / PUCCH, and then generate a TWN-trigger that triggers a combining operation at the end of the waiting time.

[0102] For example, the TWC-trigger generator 645 may determine a waiting time from the eAxC unit of the PRACH and its control plane timing, and then generate a TWC-trigger to trigger a combining operation at the end of the waiting time.

[0103] The reference time of the TWN-trigger is the start point of the symbol including the CP (Cyclic Prefix), and the reference time of the TWC-trigger is the start point of the sequence duration excluding the PRACHCP, which can be calculated using the time offset and the CP length.

[0104] The TWN-trigger and the TWC-trigger can be calculated based on the respective reference times as (Ta3-Prime_max)-(T_Combine_Net)-(Txwindow), where Ta3_Prime_max means the maximum value of the last time that the FHM or cascaded O-RU can transmit a user plane message to the O-DU or the north node based on the reception timing at the O-RU antenna, T_Combine_net means the maximum processing delay of the FHM or cascaded O-RU between the start time of combining IQ samples in a received message and the start time of transmitting the message to the O-DU or the north node through the fronthaul interface, and Txwindow means the time that the FHM or cascaded O-RU must wait for an uplink user plane message transmitted from the south node ORU.

[0105] The TWN-trigger and TWC-trigger generated by the second subsection 63-2 can be used selectively or simultaneously since they apply different eAxC units.

[0106] The selector 641 selects at least one of the generated TWN trigger and TWC trigger and outputs it to the logic 62 .

[0107] The logic 62 performs a logical operation on the generated AR-trigger, TWN-trigger and TWC-trigger, for example, the logic 62 performs an OR operation.

[0108] The logic 62 can output at least one of an AR-trigger, a TWN-trigger, and a TWC-trigger, and the trigger output from the logic 62 triggers the combining operation of messages on an eAxC basis.

[0109] 7, the triggering section 63 can selectively use the AR-trigger generated for each of eAxC ID-1, 2, 8, the TWN-trigger calculated based on the reception waiting time, and the TWC-trigger generated for each of eAxC ID-8, when the end flag is generated at each port, to trigger the message combining operation on an eAxC basis.

[0110] In this manner, when controlling the message combining operation on an eAxC basis based on the final reception of a message stream for a particular eAxC basis, even if an error such as a message loss occurs, the combining operation can be further performed on an eAxC basis for the missing message by the TWN-trigger or TWC-trigger, thereby minimizing errors during message combining and effectively dealing with error situations.

[0111] FIG. 8 shows yet another embodiment of the triggering section of an FHM or cascaded O-RU in a shared cell configuration.

[0112] Referring to FIG. 8, the triggering section 83 includes a second combined trigger generator 831, logic 833, and first to j-th start flag generators 835-1 to 835-j.

[0113] The first to jth start flag generators 835-1 to 835-j each determine whether a first message is received for each eAxC unit for a message of a corresponding antenna port among user plane messages transmitted from a plurality of south node devices, and can generate a start flag if it is determined that the first message is received.

[0114] The logic 833 performs a logical operation on the per-port start flags generated by the first to j-th start flag generators 835-1 to 835-j. For example, the logic 833 performs an AND operation.

[0115] Based on the calculation result of the logic 833, the second combining trigger generator 831 generates a second combining trigger (hereinafter, referred to as an ST (start)-trigger) that indicates the combining operation timing.

[0116] The second combining trigger generator 831 determines whether a start flag is generated for the message stream of a particular eAxC unit at all ports based on the AND operation result of the logic 833, and if a start flag is generated at all ports, the eAxC unit determines that the first message has arrived and generates an ST-trigger that triggers the combining operation of the messages of the eAxC unit.

[0117] When start flags are generated at all ports, the second combined trigger generator 831 generates the ST-trigger at a point where the generation time of the last start flag is delayed by a predetermined time (e.g., eAxC message duration) using an S timer.

[0118] Meanwhile, according to an embodiment, the triggering section 83 generates the ST-trigger using only a user plane message transmitted from a south node device having the longest transmission delay among a plurality of south node devices. Since a message from a south node device having the longest transmission delay is likely to arrive the latest, the ST-trigger can be generated based only on the message.

[0119] FIG. 9 is a diagram for explaining an operation of determining the timing of an operation of combining messages related to a user plane on an eAxC basis by the triggering section 83 of FIG.

[0120] FIG. 9(a) illustrates an operation of generating an ST-trigger based on an eAxC-based message for one antenna port.

[0121] 9(a), a start flag generator corresponding to antenna port a of south node #1 can generate a start flag because a message related to eAxC ID-1 and a message related to eAxC ID-2 are received. A second combined trigger generator 831 can generate an ST-trigger for eAxC ID-1 and 2 at a time point delayed by a predetermined time (e.g., a time set by an S timer) based on the time point of generation of each start flag.

[0122] FIG. 9(b) illustrates an operation of generating an ST-trigger based on eAxC-based messages for two antenna ports.

[0123] 9(b), start flag generators corresponding to antenna port a of south node #1 and antenna port b of south node #2 can generate start flags for eAxC ID-1 and eAxC ID-2, respectively, as shown in FIG 9(a). Logic 833 can perform an AND operation on the generated start flags, and a second combined trigger generator 831 can delay the time when all start flags are generated at each port by a predetermined time according to the result of the AND operation of logic 833, and generate an ST-trigger for each of eAxC ID-1 and 2.

[0124] FIG. 9(c) illustrates an operation of generating an ST-trigger for messages in eAxC units related to two antenna ports, taking into consideration only the message from south node #2, which has a larger transmission delay among the transmission delays of south nodes #1 and #2.

[0125] 9(c), only the start flag generator corresponding to antenna port b of south node #2, which has a relatively larger transmission delay, can generate start flags for eAxC ID-1 and eAxC ID-2 as in FIG 9(a). The second combined trigger generator 831 delays the generation time of each of the generated start flags by a predetermined time and generates ST-triggers for eAxC ID-1 and 2.

[0126] Figure 10 shows another embodiment of the triggering section of the FHM or cascaded O-RU in a shared cell configuration. The triggering section 103 in Figure 10 is a modified example of the triggering section 83 in Figure 8, and is an embodiment in which the ST-trigger and the TW-trigger based on timing-related information are used in a mutually complementary manner to determine the timing of the message combining operation. In describing Figures 10 and 11, reference will be made to Figures 6 to 9, but overlapping descriptions will be omitted.

[0127] Referring to FIG. 10, the triggering section 103 includes a first subsection 103-1 for generating an AR-trigger, a second subsection 103-2 and a selector 1041 for generating and selecting a TW-trigger, and logic 102 for selecting between an ST-trigger and a TW-trigger.

[0128] The first subsection 103-1 generates an ST-trigger substantially equivalent to the triggering section 83 of Figure 8. The first subsection 103-1 outputs the generated ST-trigger to the logic 102.

[0129] The second subsection 103-2 includes a TWN-trigger generator 1043 and a TWC-trigger generator 1045, and generates a TWN-trigger and a TWC-trigger in a manner substantially similar to the second subsection 63-2 of Fig. 6. The selector 1041 selects at least one of the generated TWN-trigger and TWC-trigger and outputs it to the logic 102.

[0130] The logic 102 performs a logical operation on the generated ST-trigger, TWN-trigger, and TWC-trigger, for example, the logic 102 performs an OR operation.

[0131] The logic 102 can output at least one of an ST-trigger, a TWN-trigger, and a TWC-trigger, and the trigger output from the logic 102 triggers a message combining operation on an eAxC basis.

[0132] 11, the triggering section 103 can delay the timing when all start flags are generated at each port by a predetermined time, and selectively use the ST-trigger generated for each of eAxC ID-1, 2, and 8, the TWN-trigger calculated based on the reception waiting time, and the TWC-trigger to trigger the message combining operation on an eAxC basis.

[0133] In this manner, when controlling the message combining operation on an eAxC basis based on whether a message stream of a particular eAxC unit is initially received, even if an error such as a message loss occurs, the combining operation can be further performed on an eAxC basis for the missing message by the TWN-trigger or TWC-trigger, thereby minimizing errors during message combining and effectively dealing with error situations.

[0134] 12 to 14 are flow charts illustrating an operation method of a node device supporting a combining scheme according to an exemplary embodiment of the present invention. FIGs. 12 to 14 are flow charts illustrating a combining operation process performed in an FHM or cascaded O-RU in a shared cell configuration, and the following description focuses on an embodiment in which the process is performed in the FHM 20 of FIG. 2.

[0135] In step S1201, the FHM 20 receives a user plane message from at least one south node device, the message being for each antenna port of the south node device, the messages for each antenna port being consecutive in the same eAxC unit, and the eAxC unit messages received from each south node device have the same eAxC unit sequence order.

[0136] In step S1203, the FHM 20 determines the timing of the message combining operation on an eAxC basis based on the received messages.

[0137] The FHM 20 determines the timing of the combining operation based on the result of determining whether the message was received first or last, or the FHM 20 determines the timing of the combining operation using wait time related information calculated based on the frame structure applied to the eAxC unit message and the timing of the control plane message applied to the eAxC unit together with the result of determining whether the message was received first or last.

[0138] The process of determining the timing of the coupling operation of the FHM 20 will be described in further detail with reference to FIGS.

[0139] 13, first, in step S1301, the FHM 20 determines whether the last message in eAxC unit has been received.

[0140] In some embodiments, the FHM 20 determines whether a message stream for a particular eAxC unit has been finally received from all antenna ports. The FHM 20 determines this based on continuity of messages for the eAxC unit, information indicating the last message, etc.

[0141] In another embodiment, the FHM 20 uses only the message received from the south node device with the largest transmission delay value for the FHM 20 to determine whether the message stream for a particular eAxC unit has been finally received.

[0142] In step S1303, the FHM 20 generates an AT-trigger if it determines that the final message of the eAxC unit has been received.

[0143] In step S1305, the FHM 20 calculates a waiting time from the frame structure and control plane timing applied to the eAxC-based message, and in step S1307, generates a TW-trigger based on the calculation result.

[0144] In step S1309, the FHM 20 outputs the generated AT-trigger and / or TW-trigger.

[0145] Next, referring to FIG. 14, in step S1401, the FHM 20 determines whether a first message in eAxC unit has been received.

[0146] In some embodiments, the FHM 20 determines whether the message stream for a particular eAxC unit has been received from all antenna ports initially.

[0147] In another embodiment, the FHM 20 uses only the message received from the south node device with the largest transmission delay value for the FHM 20 to determine whether or not to receive the first message in the message stream for a particular eAxC unit.

[0148] In step S1403, the FHM 20 generates an ST-trigger if it determines that the first message of the eAxC unit has been received.

[0149] In step S1405, the FHM 20 calculates a waiting time from the frame structure and control plane timing applied to the eAxC-based message, and in step S1407, generates a TW-trigger based on the calculation result.

[0150] In step S1409, the FHM 20 outputs the generated ST-trigger and / or TW-trigger.

[0151] Referring again to FIG. 12, in step S1205, the FHM 20 combines messages of each port on an eAxC basis according to the determined timing.

[0152] In step S1207, the FHM 20 transmits the combined messages to the north node device in the combining order.

[0153] The methods described with reference to Figures 12-14 include one or more steps or actions for achieving the method described above. At least some of the steps and / or actions for achieving the method may be interchanged with one another or omitted without departing from the scope of the claims. In other words, unless a specific order of steps or actions is specified, the order and / or use of specific steps and / or actions may be modified without departing from the scope of the claims.

[0154] Additionally, the various operations of the methods described above may be performed by any suitable means capable of performing the corresponding functions, including, but not limited to, various hardware and / or software components and / or modules, such as an application specific integrated circuit (ASIC), or a processor. In general, where there are corresponding operations in the figures, such operations may also have corresponding relative means and functional components having the same numbers.

[0155] The above-described methods may be embodied in the form of program instructions executed by various computer means and recorded on a computer-readable medium. The computer-readable medium may include program instructions, data files, data structures, and the like, alone or in combination. The program instructions recorded on the computer-readable medium may be those specially designed and constructed for the present invention, or may be those known and available to those skilled in the art of computer software. Examples of computer-readable media include hardware devices specially configured to store and execute program instructions, such as ROM, RAM, and flash memory. Examples of program instructions include not only machine code, such as produced by a compiler, but also high-level language code that may be executed by a computer using an interpreter, etc. The above-described hardware devices may be configured to operate with at least one software module to perform the operations of the present invention, and vice versa.

[0156] Those skilled in the art will appreciate that various modifications and variations can be made to the present invention without departing from the essential characteristics of the technical concept of the present invention.

[0157] Therefore, the embodiments exemplified in the present invention are intended to explain but not to limit the technical idea of ​​the present invention, and the scope of the technical idea of ​​the present invention is not limited by these embodiments.

[0158] The scope of protection of the technical idea of ​​the present invention should be interpreted according to the following claims, and all technical ideas within the equivalent scope should be interpreted as being included in the technical imaginary scope of the present invention.

Claims

1. An operation method of a node device in an O-RAN (Open Radio Access Network), comprising: receiving a user-plane related message from at least one south-node device; determining a timing of an operation of combining the messages on an extended antenna-carrier (eAxC) basis based on the messages; A method comprising:

2. The determining step includes: determining whether a final message for the eAxC unit is received from at least one port; generating a first combining trigger indicative of a timing of an operation of combining the messages in units of the eAxC when it is determined that the final message has been received; 10. The method of claim 1, comprising:

3. The determining step includes:

3. The method of claim 2, wherein the determination is based on whether the eAxC unit messages are received consecutively from the at least one port.

4. The determining step includes: determining whether a first message for the eAxC unit is received from at least one port; generating a second combining trigger instructing timing of an operation of combining the messages in units of the eAxC when it is determined that the first message has been received; 10. The method of claim 1, comprising:

5. The step of generating the second combined trigger comprises:

5. The method of claim 4, wherein the second combined trigger is generated by delaying the timing at which the first message is received by a predetermined time.

6. the at least one south node device includes a plurality of south node devices; The method of claim 1 , wherein the determining step uses a message received from a south node device having the longest transmission delay for the node device among the plurality of south node devices.

7. The method of claim 1 , wherein the messages of the same eAxC unit are received consecutively.

8. the at least one south node device includes a plurality of south node devices; The method according to claim 7, wherein messages received from the plurality of south node devices are received in the same order based on the eAxC unit.

9. combining the messages in units of the eAxCs according to the determined timing; transmitting the combined messages to a north node device in combination order; 9. The method of any one of claims 1 to 8, comprising:

10. A node device of an O-RAN, at least one processor; The at least one processor: A node device configured to determine, based on user plane related messages received from at least one south node device, a timing of an operation to combine the messages on an eAxC basis.

11. The at least one processor: determining whether a final message for the eAxC unit is received from at least one port; The node device according to claim 10, further configured to generate a first combining trigger instructing timing of an operation of combining the messages in units of the eAxC when it is determined that the final message has been received.

12. The at least one processor: The node apparatus according to claim 11, further configured to determine whether a final message of the eAxC unit is received based on whether messages of the eAxC unit are received consecutively from the at least one port.

13. The at least one processor: determining whether a first message of the eAxC unit is received from at least one port; The node device according to claim 10, further configured to generate, when it is determined that the first message has been received, a second combining trigger instructing timing of an operation to combine the messages in units of the eAxC.

14. The at least one processor: The node apparatus according to claim 13, further configured to delay the timing at which the first message is received by a predetermined time, and then generate the second combined trigger.

15. the at least one south node device includes a plurality of south node devices; The at least one processor:

11. The node apparatus according to claim 10, further configured to determine, for each eAxC, a timing of an operation of combining the messages, using a message received from a south node apparatus having the longest transmission delay for the node apparatus among the plurality of south node apparatuses.

16. The node device according to claim 10, wherein messages of the same eAxC unit among the messages are received consecutively.

17. the at least one south node device includes a plurality of south node devices; The node device according to claim 16, wherein messages received from the plurality of south node devices are received in the same order based on the eAxC unit.

18. The at least one processor: combining the messages in units of the eAxCs according to the determined timing; 18. A node device according to any one of claims 10 to 17, further configured to control transmission of the combined message to a north node device according to a combining procedure.