Reactive compensation method for coal mine power supply system

By using reactive power and ideal compensation curves to strategically place and number reactive compensation equipment, the method optimizes coal mine power supply systems, reducing costs and improving efficiency.

JP2025532741AActive Publication Date: 2025-10-03HUANENG COAL TECH RES CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2024571080
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-09-13
Filing Date
2023-12-04
Publication Date
2025-10-03
Estimated Expiration
2043-12-04

Smart Images

  • Figure 2025532741000001_ABST
    Figure 2025532741000001_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of reactive compensation in electricity supply systems, and more particularly to a reactive compensation method for coal mine power supply systems. This reactive compensation method for coal mine power supply systems is used in coal mine power supply systems and includes the following steps: plotting a reactive power curve of a circuit to be optimized; plotting an ideal compensation curve according to the reactive power curve and active power; and formulating a compensation strategy according to the ideal compensation curve to achieve the optimization of reactive compensation for coal mine power supply systems.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Reactive compensation method based on distribution network load curve

    CN105071406A

  • Power demand response implementation cost and compensation standard evaluation method

    CN111324864A

  • Hybrid power reactive compensation method and system

    CN115207938A

  • Dynamic reactive compensation and harmonic suppression device for coal mine low-voltage power grid

    CN115986760A

  • Reactive power compensation device for mining area power supply system of mine

    CN203674720U